disaster recovery plan - rensselaer polytechnic institute continuity-disaster... ·...

19

Click here to load reader

Upload: vanngoc

Post on 16-Feb-2019

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

1

RPI Employee’s Federal Credit Union Business Continuity/Disaster Recovery Plan

January 23, 2012

Page

Purpose and Objectives 2 Disaster Recovery Organizational Structure 3

Disaster Recovery Emergency Response Team 4

Disaster Recovery Subteams and Membership

1 – Recovery Team 5 2 – Damage Assessment Team 7 3 – Restoration Team 9 4 – Public Relations Team 11 5 – Logistics Team 13

Appendices:

Appendix A: Disaster Categories 15 Appendix B - Record of Disaster Recovery Occurrence 18 Appendix C - Product Service Providers and Contacts 19

Page 2: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

2

PURPOSE AND OBJECTIVES

Plan Purpose: The objective of the RPIEFCU’s Business Continuity/Disaster Recovery Plan is to minimize financial loss and ensure a timely resumption of operation in the event of a disaster. A disaster is any event resulting in damage to equipment, damage to the physical location, and/or injury to personnel, to the extent of which it is serious enough to require action for recovery, and is outside the authority of those initially aware of such an event. This plan addresses a course of action that will be taken in the event the organization experiences a disaster as described above. The Business Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include a review of the plan by the board of directors and a simulated disaster. Plan Objectives:

1. PROTECTION OF PERSONNEL: The first objective of the Business Continuity/Disaster Recovery Plan will be to provide for the protection of personnel during and after a disaster situation.

2. PROTECTION OF ASSETS AND RECORDS: The second objective will

be the protection of assets, records, documents and vital statistical data, and the preservation and safekeeping of our property.

3. CONTINUITY OF MANAGEMENT: In a disaster, executives, or vital staff

members could be killed or incapacitated. This plan will provide for the continuity of management and personnel requirements. It will also define the lines of authority and responsibility during and after a disaster.

4. MINIMIZE LOSSES AND RECOVERY TIME: In some disasters, a

“business as usual” environment will not always be lost; thus, another objective will be to recover the critical business functions at an alternate location within 24 hours.

5. RESUMPTION OF NORMAL OPERATIONS: Our reputation and the

client’s confidence in the stability of the organization are important resources, and a lengthy interruption in service could erode or destroy the confidence and reputation. The final objective of the Business Continuity/Disaster Recovery Plan will be to resume operational status of the critical business functions within 24 hours and to maintain operational capabilities status at the alternate locations until normal support and operational capabilities can be re-established in a permanent environment.

Page 3: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

3

Page 4: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

4

DISASTER RECOVERY EMERGENCY RESPONSE TEAM The emergency response team will meet at the following location to determine whether or not to declare a disaster, assess the damage, and implement whatever activities are necessary: Folsom Library lobby 518-276-8310 Alternate location Hilton Garden Inn lobby 235 Hoosick Street Troy, New York 12180 518-272-1700 TEAM MEMBERS: Team Member 1 - Joanne Esposito, Team Leader Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368 Team Member 2 - Warren Wallin Work Phone 486-7443 Home Phone 346-6973 Cell Phone 518-859-1142 Team Member 3 - Paul J. Galbraith Work Phone 276-4333 Home Phone 692-7635 Cell Phone 518-857-0318

Page 5: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

5

SUBTEAM MEMBERS

Recovery Subteam

Team Member 1 - Jacqueline Farmer, Team Leader Work Phone 276-8041 Home Phone 274-6372 Cell Phone 518-331-8040 Team Member 2 - Terrance Burns Work Phone 276-6106 Home Phone 664-5152 Cell Phone 518-378-0913 Team Member 3 - Bill Mielke, Secretary, Logistics Rep Work Phone 276-6881 Home Phone 456-9876 Cell Phone 518-728-9249

Recovery Team Responsibilities

The responsibilities’ of the Recovery Team during a disaster situation are to:

Authorize Business Continuity – Disaster Recovery plan activation

Ensure the safety of all employees

Authorize the initiation of alternate site notification procedures

Notify all affected employees

Authorize and evaluate the extent of the damage

Develop the recovery directive according to the type of situation

Provide overall direction to all employees

Notify regulatory agencies as required

Implement effective security measures

Document all activities during the recovery effort

Page 6: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

6

Coordinate all purchasing activities

Coordinate the distribution of equipment, furniture and supplies

Coordinate activities with insurance adjusters

Coordinate activities with contractors

Maintain communication with the Disaster Recovery Emergency Response Team Leader

Joanne Esposito Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368

Page 7: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

7

SUBTEAM MEMBERS (Continued)

Damage Assessment Subteam

Team Member 1 - Mary Alice O’Brien, Team Leader

Work Phone 276-6106 Home Phone 237-0370 Cell Phone 518-577-3807 Team Member 2 - Phylis Federici Work Phone 276-8817 Home Phone 237-3141 Cell Phone 518-221-4008 Team Member 3 – Eleanor Burns Work Phone 276-6108 Home Phone 279-9076 Cell Phone 518-892-5471

Damage Assessment Responsibilities

This team will perform a damage assessment and salvage activities at the damaged facility:

Determine the extent of personal injury to personnel at the damaged facility

If there is a personal injury, notify emergency services immediately

Determine the extent of the damage to facilities, electronic equipment, furniture, vital records, forms, supplies and documentation

Assess the need to implement security procedures to insure proper access controls to all work areas and that salvageable items are safeguarded

Take appropriate steps to minimize further loses to personnel and facilities

Page 8: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

8

Report the extent of personal injury and physical damage to Recovery Team Leader

Jacqueline Farmer Work Phone 276-8041 Home Phone 274-6372 Cell Phone 518-331-8040

Determine, based on the extent of the damage, the need to declare a disaster

Prepare written documentation detailing the finding to support the need to declare a disaster

Coordinate the move, storage or on-site protection of salvageable items

Coordinate all vendor activities at the damaged facility

Assist and support team leaders to relocate critical functions at the appropriate alternate location

Document all activities

Maintain communication with the Disaster Recovery Emergency Response Team Leader

Joanne Esposito Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368

Page 9: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

9

SUBTEAM MEMBERS (Continued)

Restoration Subteam

Team Member 1 - Terrance Burns, Team Leader Work Phone 276-6106 Home Phone 664-5152 Cell Phone 518-378-0913 Team Member 2 - Earl DeVito Work Phone Home Phone 783-5476 Cell Phone 518-265-5885 Team Member 3 – Theresa Testo Phone 518-755-5542

Restoration Responsibilities

After the extent of the damage is determined by damage assessment personnel, the Restoration Sub Team will assess what resources are necessary to secure the exposed assets of the corporation, including personnel

Notify internal and external security personnel and inform them of the actions to be taken to secure the corporation’s assets

Obtain telecommunications equipment to allow communication between the security personnel and the recovery team

Contact security personnel to meet at the damaged facility and the temporary facility to protect the assets of the corporation

Request to acquire new security equipment for installation at the appropriate location to properly monitor the corporation’s assets

Appoint additional personnel to the location where business functions will be conducted and instruct them to implement all daily security procedures as documented in the security policy manual

Coordinate the installation of newly acquired devices at the alternate location where business functions are being conducted.

Document all activities

Page 10: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

10

Maintain communication with the Disaster Recovery Emergency Response Team Leader

Joanne Esposito Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368

Page 11: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

11

SUBTEAM MEMBERS (Continued) Public Relations Subteam

Team Member 1 - Sandra Redemann-Butcher, Team Leader Work Phone 276-8978 Home Phone 374-0943 Cell Phone 518-928-3077 Team Member 2 - Theresa Testo Phone 518-755-5542 Team Member 3 - Joanne Esposito Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368

Public Relations Responsibilities

This team is responsible for notifying Rensselaer Polytechnic Institute administration, the press, and other news media. It is imperative that the message is clear that Credit Union members’ monies are safe (insured), that the Business Continuity/Disaster Recovery Plan is being implemented

Formulate a press release to be issued to the press.

Control all responses to the press. Authorize only those responses that will emphasize positive reinforcement of the corporation’s position and its ability to protect client’s assets.

Whenever dealing with the media follow the basic rules as listed below:

Have one company spokesperson; be careful of reporters a. Say as little as possible b. If you speak to the media; tell the truth c. Do not say anything “Off the record” d. Never say “No comment” e. Emphasize the positive, communicate the corporation message f. Provide accurate information and correct inaccuracies.

Initiate a press release to all members, business will operate as usual and to inform them of where member’s services are being performed and how to contact the Credit Union.

Page 12: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

12

Be prepared to hold periodic press conferences to inform members of the status of recovery efforts.

Document all activities

Maintain communication with the Disaster Recovery Emergency Response Team Leader

Joanne Esposito Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368

Page 13: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

13

SUBTEAM MEMBERS (Continued) Logistics Subteam

Team Member 1 - Bill Mielke, Team Leader Work Phone 276-6881 Home Phone 456-9876 Cell Phone 728-9249 Team Member 2 - Warren Wallin Work Phone 486-7443 Home Phone 346-6973 Cell Phone 518-859-1142 Team Member 3 - Joanne Esposito Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368

Logistics Responsibilities

The Logistics Team is responsible for procurement of supplies and replacement of assets, insurance claim filing, employee payroll, and an account of recovery efforts as well as maintaining daily financial matters.

Implement administrative and clerical support capabilities, including coordination of communication methods to subteam members.

The Logistics Team Leader is the secretary to the Recovery Team and is responsible to document each and every action and decision made by the Recovery Team Members and all decisions being made by other Team Leaders in an events log. Include date, time, subject, follow-up actions, and personnel responsible to follow through.

Maintain personnel work schedules, locations, out of pocket expenses, transportation arrangements, etc.

Coordinate all transportation requirements for the Recovery Team, including travel advances, travel arrangements, hotel accommodations, itineraries and work schedules.

Instruct all Team Leaders to complete and deliver their general supplies request form to prepare to order necessary items.

Page 14: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

14

After the Recovery Team has determined what equipment, furniture, supplies, forms, etc. are needed to recover its critical functions, order replacement items from the appropriate vendors.

Coordinate the distribution of newly acquired items to the appropriate areas.

Document all activities.

Maintain communication with the Disaster Recovery Emergency Response Team Leader

Joanne Esposito Work Phone 276-6591 Home Phone 235-8172 Cell Phone 518-727-5368

Reviewed and Approved 1/23/2012

Page 15: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

15

APPENDIX A – RPIEFCU DISASTER CATEGORIES The Business Continuity/Disaster Recovery Plan addresses the following risks:

1. FIRE: The probability of a fire is an ongoing concern for any financial institution. Since the Credit Union is in an office building administered by Rensselaer Polytechnic Institute (currently located in West Hall on the Rensselaer Campus), a fire could occur outside the Credit Union office and still affect the Credit Union.

The Credit Union has smoke detectors, fire extinguishers, and sprinklers in the Credit Union Office. The building (referred to as West Hall) also has similar equipment, as well as fire alarms. The Troy Fire Department is less than a mile from the Credit Union Office. Fire hydrants are located adjacent to West Hall. A fire alarm box is located on the third floor of West Hall, across from the Credit Union entrance. Vital records are stored in fire resistant containers located in the Credit Union office. Cash and checks are stored in the safe. If a fire occurs during work hours, staff safety comes first. If time permits, the Manager will lock the safe. Employees will lock fire resistant containers. Windows will be shut and each employee will shut down their equipment. The office will be secured when vacated by the employees. If the Credit Union office became inoperable from a fire, the Credit Union will start relocation procedures. The Credit Union estimates it will take 12 to 48 hours before the Credit Union is relocated at another location. FIRE DRILL Rensselaer Polytechnic Institute conducts fire drills semi-annually. The RPIEFCU, as occupants of Rensselaer owned and administered buildings, must participate in the drills and follow Rensselaer regulations regarding vacating the building. At the time of said fire drills:

1. Each employee will shut down their equipment, including computers and printers.

2. The Office Manager/designee will close and lock the safe. 3. Each employee will secure their area and leave the office promptly.

Securing an area includes locking all file cabinets, shutting all windows and doors.

4. All employees will assemble in the parking lot of the Credit Union for a head count by the Office Manager/designee.

Page 16: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

16

5. The Office Manager/designee will secure the main entrance to the Credit Union upon departure.

2. ELECTRICAL FAILURE: Electric failure must be reported by the Office Manager to the Physical Facilities office of Rensselaer, ext. 6238, immediately. A request for emergency power generation until restoration of power should be made to Physical Facilities to ensure the continued operation of the Credit Union during business hours.

If it is determined that the electrical failure is beyond the control of RPI (such as brownouts, blackouts, weather) the Credit Union office should be promptly secured and closed until further notice. The Office Manager is to contact the Disaster Recovery Emergency Response and Public Relations Team Leaders. Proper signs should be posted at the Credit Union entrance by the Office Manager.

3. EARTHQUAKE: The Credit Union, which is located in the Hudson Valley

of New York, is near a fault line. A serious earthquake has not occurred in over 200 years. Depending upon the damage, the initial relocation will be either at the Folsom Library lobby or the Hilton Garden Inn, 235 Hoosick Street, Troy, New York 12180.

4. FLOOD: An external flood is a very remote probability with the geographic

location of Rensselaer Polytechnic Institute. There is a higher probability that the Credit Union office will flood due to broken water pipes or broken steam lines. All CPU units are located 30” above the floor. However, in the event of internal flooding, floor drains are located within 150 ft. of the Credit Union office.

5. HIGHWAY CLOSURES – STORM DAMAGE: The probability of a snow or

ice storm closing highways in Rensselaer County is low. If the County closes all highways, the Credit Union will be closed. In the event that a snow or ice storm closes major routes to Troy, the Credit Union will be closed until routes are passable.

6. WAR – ATOMIC BOMB, TERRORIST ATTACK: The Credit Union has no

plans to recover operations in case of an atomic attack. Such an attack would be totally devastating to this State. In a conventional war and a terrorist attack, and except for road closures, the Credit Union will be operational, unless military/government officials deem it is unsafe.

7. LOSS OF HEAT: If the Credit Union office temporarily loses heat, electric

heating units may be purchased or rented from a number of local vendors. However, in the event of a long-term heat loss, the Credit Union will set up temporary quarters at the Folsom Library lobby or the Hilton Garden Inn, 235 Hoosick Street, Troy, New York 12180.. Signs will be posted at the

Page 17: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

17

Credit Union Office and emails will be sent to direct members to the temporary location.

8. LOSS OF WATER: The Credit Union will function without water.

Employees will be given bathroom breaks. Normal operations are expected to return within 24 to 48 hours.

9. TELEPHONE LINES DEAD: If the telephone lines are inoperable, the

Credit Union will continue to service member accounts with the in-house computer systems and will coordinate phone services with DOTCIO

10. COMPUTER FAILURE: The RPIEFCU has an extended maintenance

agreement with AMI covering both hardware and software. The software service is called The Ultimate CURE (Credit Union Disaster Recovery Enhancement). This service transits a daily backup of the RPIEFCU member’s information via the internet to AMI’s secure servers located in Racine, WI. The back up system is completely automated and runs nightly. There is an email sent daily verifying that the system was backed up and that it has verified its integrity. Should it be necessary, the AMI system can be run over a dial up phone line or high speed internet connection until a suitable location can be found. AMI’s toll free number is 1-800-558-3709. AMI has a 24-hour, 365-day maintenance agreement with RPIEFCU. The email address is: [email protected]. AMI can print checks from the on-line station.

Page 18: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

18

APPENDIX B – RPIEFCU

Record of Disaster Recovery Occurrence

Date: Disaster Category: Description: Actions Taken: _____________________________________ Signature: _____________________________________ Date:

Page 19: Disaster Recovery Plan - Rensselaer Polytechnic Institute Continuity-Disaster... · Continuity/Disaster Recovery Plan will be tested at a minimum, annually. This test will include

19

APPENDIX C - RPIEFCU

List of Product/Service providers

1. AMI (800-558-3709)

2. Rensselaer Polytechnic Institute Physical Facilities Office (ext. 6238)

3. Citizens Bank, 1818 Fifth Avenue, Troy (518-272-36110)

4. Rensselaer’s DOTCIO Help Desk (ext. 7777)

a. Help desk to notify service provider, if necessary

5. Rensselaer Polytechnic Institute’s Vice President of Administration (ext. 6601)

6. Members United Bridge Corporate Federal Credit Union (518-292-3800 or 800-253-0053-ext. 3833) 7. National Credit Union Administration (518-862-7400 Albany Office)

8. CUNA Mutual Insurance Company (800-621-6323)

9. New York State Credit Union League (518-437-8100 or 800-342-9835)