directorate general of new ... - energy-indonesia.com · • ministry regulation of minister of...

12
Energy and Mineral Resources for Peolple’s Prosperity DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION MINISTRY OF ENERGY AND MINERAL RESOURCES by : Tisnaldi Director of Geothermal Presented at : The APEC Conference on Clean, Renewable and Sustainable Use of Energy” Bali, October 1 st 2013

Upload: doankiet

Post on 24-May-2019

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION

MINISTRY OF ENERGY AND MINERAL RESOURCES

by :

Tisnaldi

Director of Geothermal

Presented at :

“The APEC Conference on Clean, Renewable and Sustainable Use of Energy”

Bali, October 1st 2013

Page 2: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

Republic of Indonesia

Republik Indonesia

Flag National emblem

Motto: "Bhinneka Tunggal Ika" (Old Javanese)

"Unity in Diversity"

National ideology: Pancasila

Anthem: Indonesia Raya

Capital

and largest city

Jakarta

6°10.5′S 106°49.7′E

Official languages Indonesian

Area

- Land 1,904,569 km2 (15th)

735,358 sq mi

- Water (%) 4.85

Population

- 2011 census 237,424,363 (4th)

- Density 124.66/km2 (84th)

322.87/sq mi

GDP (nominal)

- Total $946.391 billion (16th)

- Per capita $3,816(105th)

INDONESIAN ARCHIPELAGO

Source : Wikipedia (2013)

Page 3: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity Energy and Mineral Resources for Peolple’s Prosperity

2011

Oil20 %

Gas30 %

Coal 33 %

NRE17 %

NEP : Gov. Reg. NO. 5/2006

Note:

NRE = New and Renewable Energy

NEP = National Energy Policy

Oil49,7 %

Gas 20,1 %

Coal 24,5 %

NRE5,7 %

2025

CURRENT ENERGY CONDITION

BACKGROUND

Page 4: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

Source : Geological Survey, MEMR(2011)

Installed

Ready to develop

Preliminary survey

Early preliminary survey

Note:

Detailed survey

1 Sumatera 90 12,778 122

2 Java 71 9,717 1,134

3 Bali & Nusa Tenggara 28 1,805 5

4 Kalimantan 12 145

5 Sulawesi 65 3,044 80

6 Maluku 30 1,071

7 Papua 3 75

1,34128,635

Installed

Capacity

(MW)

Potential (MW)

Total 299

No. Island Number of Location

PLTP SIBAYAK: 12 MW

PLTP ULUBELU: 110MW

PLTP LAHENDONG: 80 MW

PLTP ULUMBU: 5 MW

PLTP DIENG: 60 MW PLTP DARAJAT: 270 MW

PLTP KAMOJANG: 200 MW

PLTP WAYANG WINDU: 227 MW PLTP GUNUNG SALAK: 377 MW

GEOTHERMAL POTENTIAL

Page 5: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

5

ACEH 2 WKP

Jaboi: 70 MW

Seulawah Agam: 130 MW

NORTH SUMATERA 5 WKP

Sibayak – Sinabung: 130 MW

Sibual – Buali: 750 MW

Sipaholon Ria-ria: 75 MW

Sorik Marapi: 200 MW

Simbolon Samosir : 155 MW

JAMBI 1 WKP

Sungai Penuh: 70 MW

SOUTH SUMATERA 2 WKP

Lumut Balai: 250 MW

Rantau Dedap: 106 MW

BANTEN 2 WKP

Kaldera Danau Banten: 115 MW

G. Endut: 80 MW

WEST SUMATERA 4 WKP

Bukit Kili: 83 MW

Gn Talang: 35 MW

Liki Pinangawan: 400 MW

Bonjol: 200 MW

LAMPUNG 4 WKP

Gn.Rajabasa: 91 MW

Suoh Sekincau: 230 MW

Waypanas – Ulubelu: 556 MW

Way Ratai :105 MW

WEST JAVA 10 WKP

Ciater - Tgkban Perahu: 60 MW

Cibeureum–Parabakti: 485 MW

Cibuni: 140 MW

Cisolok Cisukarame: 45 MW

Gn. Tampomas: 50 MW

Gn. Tgkuban Perahu: 100 MW

Kamojang-Darajat: 1465 MW

Karaha Cakrabuana: 725 MW

Pangalengan: 1106 MW

G. Ciremai: 150 MW

CENTRAL JAVA 5 WKP

Baturaden: 175 MW

Dataran Tinggi Dieng: 780 MW

Guci: 79 MW

Gn. Ungaran: 100 MW

Umbul Telomoyo : 72 MW EAST JAVA 3 WKP

Blawan – Ijen: 270 MW

Gn. Iyang Argopuro: 295 MW

Telaga Ngebel: 120 MW

BALI 1 WKP

Tabanan: 276 MW

WEST NUSA

TENGGARA 2 WKP

Hu'u Daha: 65 MW

Sembalun : 100 MW

EAST NUSA TENGGARA 5 WKP

Atadei: 40 MW

Sokoria: 30 MW

Ulumbu: 199 MW

Mataloko: 63 MW

Oka Ile Ange : 40 MW

MALUKU 1 WKP

Tulehu: 100 MW

NORTH MALUKU 2 WKP

Jailolo: 75 MW

Songa Wayaua: 140 MW

NORTH SULAWESI 2 WKP

Kotamobagu: 410 MW

Lahendong-Tompaso: 358 MW

GORONTALO 1 WKP

Suwawa: 110 MW

CENTRAL SULAWESI 2 WKP

Marana: 35 MW

Bora Pulu : 152 MW

Total : 58 GWA

BENGKULU 2 WKP

Tmbg Sawah-Hululais: 873 MW

Kepahiyang : 180 MW

CENTRAL JAVA & EAST JAVA 1 WKP

Gunung Lawu : 195 MW

SOUTH SUMATERA & LAMPUNG 1 WKP

Danau Ranau: 210 MW

DISTRIBUTION OF GEOTHERMAL WORKING AREAS

Lisence – Issued : 38 GWAs

Tender on Progress : 2 GWAs

Tender Preparation : 13 GWAs

Tender – Failed : 5 GWAs

Page 6: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

GEOTHERMAL BUSINESS STAGES

Page 7: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi

Kementerian Energi dan Sumber Daya Mineral

• Law No. 27/2003 On Geothermal.

• Government Regulation No. 59/2007 on Geothermal Bussiness Activities.

• Presidential Regulation No. 04/2010 on Assignment to PT. PLN (Persero) to Accelerate The Development of Power Plant from Renewable Energy, Coal and Gas

• Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

2). MR No. 02/2009 on Guidelines for Geothermal Preliminary Survey Assignment (as amendment of MR. 05/2007)

3). MR No. 11/2009 on Guidelines for Implementation of Geothermal Business , jo. MR No. 18/2012

4). MR No. 21/2013 on Revision of MR No. 15/2010 on The List of Power Plant Acceleration Projects Using Renewable Energy, Coal, and Gas and Related

Transmission

LEGAL FRAMEWORK

Page 8: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

1. Improving and harmonizing regulations in Geothermal Business;

2. Developing a comprehensive pricing structure;

3. Provide fiscal incentives for geothermal development;

4. MoU between Ministry of Energy and Mineral Resorces and Ministry of Forest;

5. Acceleration program in electricity generation; geothermal power is

expected to contributed 4,965 MW;

GEOTHERMAL POLICIES

Page 9: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi

Kementerian Energi dan Sumber Daya Mineral

GEOTHERMAL

DEVELOPMENT

INSTAL

LED

CAPACI

TY

(MW)

DEVELOPMENT (MW)

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

ADDED CAPACITY

(MW) 1226 115 5 58 135 715 1765 425 507 935 247 130 175 40 160

TOTAL

INSTALLED CAPACITY

(MW) 1226 1341 1346 1404 1539 2254 4019 4444 4951 5886 6133 6263 6438 6478 6638

Page 10: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

Access to Potential Geothermal Resources for Investors:

• Preliminary Survey Assignment;

• Participate in the geothermal business through GWAs tendering mechanism.

Investment Opportunities:

3 new GWAs with total potential of 545 MW are going to be tendered in the near future:

Umbul Telomoyo : 120 MW

Danau Ranau : 210 MW

Gunung Lawu : 195 MW

Afterwards Government will tender another 10 GWAs

Currently 13 Preliminary Survey Assignment are carried out by Private Parties

7

INVESTMENT OPPORTUNITIES

Page 11: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity

Indonesia holds tremendous geothermal power potential;

Installed capacity of geothermal power plant is only1,341 MW;

Optimum utilization will significantly reduce dependence on fossil fuel and improve

national energy security;

Restructuring Geothermal Business to allow private participation in geothermal

development;

Whilst some supporting policies are in place, acceleration of geothermal

development in Indonesia needs international support in terms of finance,

technology, human resources as well as technical assistance.

7

CONCLUSION

Page 12: DIRECTORATE GENERAL OF NEW ... - energy-indonesia.com · • Ministry Regulation of Minister of Energy And Mineral Resources 1). MR No. 11/2008 on the Procedure for GWA Determination

Energy and Mineral Resources for Peolple’s Prosperity www.ebtke.esdm.go.id www.esdm.go.id