Drilling Engineering Association - Forth Quarter
Coil Tubing Directional Drilling
Steve Carey INTEQ Product Line ManagerHouston, November 20th 2008
![Page 2: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/2.jpg)
Content
• Why Coil Tubing Directional Drilling?
• Re-entry
• Grass roots
• Questions
![Page 3: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/3.jpg)
Closed loop / Automated Drilling SystemsCoilTrak®
TruTrak®
Slim AutoTrak® RSS
![Page 4: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/4.jpg)
What is Coiled Tubing Drilling?
• CT & Motor to drill, sidetrack, or deepen a wellEfficiencies & economies compared with jt’d pipe
• Types of CTDNon-directional i.e. ~90% Canada shallow <$
Directional Advanced BHA controlling well path
Re-entry CTD accesses uneconomic reservesw/o tbg retrieval
![Page 5: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/5.jpg)
Why consider Coil Tubing Directional Drilling?
• Reservoir access • Production • Recovery factor• Life of Field• Existing infrastructure • Unit lifting costs • Hostile environments• Environmental impact
![Page 6: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/6.jpg)
Typical reentry CTD sidetrack
3 3/16“ liner2 7/8“ liner
4 1/2“ productiontubing
7“ liner
Top of 3 3/16“ in4 1/2” tailpipe
liner crossover
CTD “bighole“ completion
CTD Sidetrack
throughtubingwhipstock
4 1/8“ or 3 3/4” openhole
liner cement
Parent - 4 ½” production tubing- 7” liner
Pre rig• Set 4 ½” x 7” whipstock• Squeeze cement to abandon perfs
CTD• Mill window• Drill - 3 3/4” or 4 1/8” bicenter
- 45° DLS common- Xanthan drilling fluid
• Run 3 3/16” x 2 7/8” liner & cmt• Log CNL & Perforate
optional “slimhole“sidetrack fromexisting “bighole”sidetrack
2 3/8“ liner
whipstock set in 3 3/16“ liner
2.3/8” slimhole optionincreases candidates
![Page 7: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/7.jpg)
Electronic Disconnect & Circulation (EDC)
![Page 8: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/8.jpg)
Electro-Hydraulic Orienter (HOT)
Spiral Piston
Oil Chamber #1
Oil Chamber #2
Stroke length corresponds to 400° rotation
of spiral thread
![Page 9: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/9.jpg)
Oversized, quality?
Most tortuous
Least tortuous, longest reach
![Page 10: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/10.jpg)
A case for Rib Steering
![Page 11: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/11.jpg)
X-treme motor section
Near bit Inclination 12.2ft (3.73m) behind bit
Control Electronics
Bit RPM measurementHydraulic Power Unit
Steering Pads 1.3ft (0.4m) behind bit
3” CoilTrak RSM
• 4 Drilling Modes
- “ribs off”
- “steer” (direction steer force)
- “inclination hold” (target inclination + steer force)
- “backreaming” (steer mode with SF = 0%)
![Page 12: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/12.jpg)
RSM extends lateral and saves 6 days/$ - Alaska Well Data • North Slope• August 2008• 3 ¾” Re-entry• Sandstone
Objectives•Extended lateral •Decrease tortuosity and drag•Meet AFE $/time•Increase production
Results – Answers While Drilling•AFE –6 days •Additional sidetrack drilled•Minimize tortuosity + extend lateral•Improved weight-to-bit transfer•Improved bore-hole quality •Increased production
INTEQ Solution• 3” RSM and CoilTrak• 3 ¾” Hughes Christensen Bit (HCM 304Z)
7 inch
True
Ver
tical
Depth
(ft)
P1-24L 1-01
TD 14,017ft MD
TD 14,750ft MDP1-24L 1
0
500
1000
1500
2000
2500
3000
North (ft)
9500
9000
8500
8000
80007500
70006500
6000
East (ft)
C 2008 Copyright Baker Hughes Inc. All righ
![Page 13: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/13.jpg)
A case for Reservoir navigation
Shaley sand with poor markers. What if dip or faulting different than expected? Porpoise = lost pay and in some cases OH sdtk.
![Page 14: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/14.jpg)
Multiple Propagation Resistivity
• Frequencies 400kHz & 2MHz Pilot fleet
![Page 15: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/15.jpg)
TruTrak CTDD - DJ Basin
![Page 16: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/16.jpg)
TruTrak Automated Directional Drilling
• Unmatched X-trememotor power
+• Reliable VertiTrak hardware
+• Superior AutoTraksteering concept
Steering Head
X-tremePower Section
Control Sub
Pulser Sub
MWD System
Adapter Sub
![Page 17: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/17.jpg)
A Slide Only Experience
Commands:– Maintain Verticality – Kick-Off and Build to 30O
– Hold Inclination– Drop back to Vertical– Maintain Verticality
Downlink System
![Page 18: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/18.jpg)
TruTrak on Coil Tubing
Tool size 9-1/2“ 8“ 6-3/4“ 4-3/4“
Max. Inclination 30° 30° 30° 90°
Max Build up rate 2° / 100 ft 2° / 100 ft 3° / 100 ft 5° / 100 ft
Possible to run on coil no no Under certain
conditions yes
Commercial yes yes yes Pilot phase
![Page 19: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/19.jpg)
a) b) c)
TruTrak: New Well Profiles
![Page 20: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/20.jpg)
4.3/4 TruTrak on CT
Results• 21 wells ~ 118,000ft (14 with 3.1/2” CT)
• Exceptional HS&E
– fewer crew; less handling; automation
• Ave. 3 - 4 days drilling /well (8,000ft)
• 500 fph instantaneous / 200 fph average ROP
• Precise directional control “painting the line”
• Excellent bore-hole quality
• HD404z optimized bit / hydraulics
• Case histories awaiting approval
• Continue CTD with TruTrak 2nd rig
• Further optimize CTDD operation
![Page 21: Directional Drilling with Coil tubing - Drilling Engineering Association](https://reader030.vdocuments.site/reader030/viewer/2022021009/6203af26da24ad121e4c4343/html5/thumbnails/21.jpg)
TruTrak advantages
• Precise well placement via automated control– High-quality, vertical section– Smooth build/drops with minimal doglegs– Efficient tangent drilling in auto-inclination hold mode
• Improved bore-hole quality– Minimal doglegs– Reduced tortuosity
• Lower torque and drag– In-gauge hole– No spiraling– Time saving
• Improve gross ROP vs. conventional motors– No correction runs– Simple casing run and reduced wear