digital 123077 r210802 tinjauan optimalisasi bibliografi

2
 82 DAFTAR PUSTAKA [1] Asiyanto, Construction Project Cost Management  (Jakarta:Pradnya Paramita,2003) [2] Afrizal Nursin (1999) Perencanaan, Penjadwalan, dan Pengendalian Proyek Konstruksi. (Politeknik Negeri Jakarta Depok 1999) [3] A. Elias (1999), Construction planning and scheduling CCE 5035,class Notes September 1999. [4] Beecher, J(1995) Integrated Resource Planning Fundamental.  AWWA  Journal  v87(6) [5] Brian J Dreger, Project Management: Effective Schedulling (New York:Van Wastrand,1992). [6] Daniel W. Halpin and Ronald W Woodhead, Construction Management (1998) John Wiley and sons, Inc. [7] Donald S Barrie, Boy C Paulson Jr, “  Manajemen Konstruksi Profesional ”, (Jakarta: Erlangga, 1990). [8] Edi Nugroho,  Dasar-dasar manajemen proyek konstruksi (Depok, FTUI 2001) [9] Greenberg V. and Harshbarger S. (1993). “  Least cost selection of energy conserva tion measures for regulated gas utilities”.  Energy Economic . July 93 [10] Harris, Robert B., Precedence And Arrow Networking Techniques For Construction (New York :John Wiley & Sons, 1978) [11] Holsapple, C.W. (Ed), Handbook of Knowledge Management, Springer- Verlag, Heidelberg, 2002 [12] Humpreys, KK,  Jelen’s Cost and Optimization Engineering  (Singapore :Mc-Graw-Hill). [13] Imam Soeharto,  Manajemen Proyek-dari konseptual sampai operasional , (Jakarta:Erlangga, 1995) [14] Kunal Sinha, Ogilvy & Mather India (2004). “Knowledge, Entertainment,  Networking”. Journal of Knowledge Management Practice, May 2004 Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008

Upload: bogi-rama

Post on 04-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

 

  82

DAFTAR PUSTAKA

[1]  Asiyanto, Construction Project Cost Management   (Jakarta:Pradnya

Paramita,2003)

[2]  Afrizal Nursin (1999) Perencanaan, Penjadwalan, dan Pengendalian

Proyek Konstruksi. (Politeknik Negeri Jakarta Depok 1999)

[3]  A. Elias (1999), Construction planning and scheduling  CCE 5035,class

Notes September 1999.

[4]  Beecher, J(1995) Integrated Resource Planning Fundamental.  AWWA

 Journal v87(6)

[5]  Brian J Dreger, Project Management: Effective Schedulling  (New

York:Van Wastrand,1992).

[6]  Daniel W. Halpin and Ronald W Woodhead, Construction Management

(1998) John Wiley and sons, Inc.

[7]  Donald S Barrie, Boy C Paulson Jr, “ Manajemen Konstruksi Profesional”,

(Jakarta: Erlangga, 1990).

[8]  Edi Nugroho,  Dasar-dasar manajemen proyek konstruksi  (Depok, FTUI

2001)

[9]  Greenberg V. and Harshbarger S. (1993). “ Least cost selection of energy

conservation measures for regulated gas utilities”. Energy Economic. July

93

[10]  Harris, Robert B., Precedence And Arrow Networking Techniques For

Construction (New York :John Wiley & Sons, 1978)

[11]  Holsapple, C.W. (Ed), Handbook of Knowledge Management, Springer-

Verlag, Heidelberg, 2002

[12]  Humpreys, KK,  Jelen’s Cost and Optimization Engineering  (Singapore

:Mc-Graw-Hill).

[13]  Imam Soeharto,  Manajemen Proyek-dari konseptual sampai operasional,

(Jakarta:Erlangga, 1995)

[14]  Kunal Sinha, Ogilvy & Mather India (2004). “Knowledge, Entertainment,

 Networking”. Journal of Knowledge Management Practice, May 2004

Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008

 

  83

[15]  Kyunghwan Kim and Jesus M de la Garza (2005), “Evaluation of the

Resource-Constrained Critical Path Method Algorithms”  ASCE Journal

May 2005.

[16]  Leroy J Isidore and W. Edward Back (2001). “Probabilistic Optimal Cost

Scheduling” ASCE Journal Vol 127, No.6 November/Desember 2001.

[17]  Makarand Hastak, Daniel W Halpin and Jorge Vanegas (1996). “New

Paradigm for Project Cost Control Strategy and Planning. Journal of

Construction Engineering and Management . September 1996

[18]  Roberta Russell and Bernard W. Taylor, III (2006). operation

management-5th

 edition. Project management. John Willey and Son inc.

[19]  Shtub, A., Globerson, S., Band, J.f., Project Management: Enrg, Tech, and

 Imple.(New Jersey: Prentice Hall, 1994)

[20]  Simon Fane and Stuart White (2007),” Levelised cost, a general formula

 for calculation of unit cost in integrated resource planning”

[21]  Stepehen Grey , Practical Risk Asessment for Project Management  

(Chichester: John Willey and Sons Ltd, 1995)

[22]  Suhail, S., and Neale, R (1994).” CPM/LOB: New methodology to

integrate CPM and line of balance.” J. Constr. Eng. Manage., 1994

[23]  Terry Sugijanti (1999), “Penjadualan Proyek dengan PERT-CPM”  Jurnal

Teknik Sipil “Sipil Soepra”1999, Volume 1. No.2

[24] Yin R. K., Case Study Research, Design and Method (Sage Publication,. 

1994)

[25]  Yusuf Latief, Perencanaan dan Penjadualan Proyek Konstruksi(Depok

FTUI, 2001).

Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008