different scenarios for the implementation of the new test method 42. grb5.-7. september 2005...
DESCRIPTION
Scenario I ECE-R stays as it is and the new test method has to be added. Vehicles have to be tested according two methods: For type approval according ECE-R For data collection according the new methods Christian Theis, Referat S 34TRANSCRIPT
![Page 1: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/1.jpg)
Different Scenarios forthe Implementation of the
New Test Method
42. GRB 5.-7. September 2005
Informal document No. GRB-42-10
(42nd GRB, 5 – 7 September 2005
agenda item 1.2.1.)
![Page 2: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/2.jpg)
Content
1. Scenario I (Proposed by WP. 29)
2. Scenario II
3. Scenario III
4. Alternative Solutions
5. Conclusions
Christian Theis, Referat S 34
![Page 3: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/3.jpg)
Scenario I
• ECE-R 51.02 stays as it is and the new test method has to be added.
• Vehicles have to be tested according two methods:
• For type approval according ECE-R 51.02
• For data collection according the new methods
Christian Theis, Referat S 34
![Page 4: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/4.jpg)
Scenario I
Advantages:
• The new method is inserted into the regulation (“frozen”)
• Experience with the new method
• Increase of vehicle data base
• Adoption of the new method can be done very quick
Christian Theis, Referat S 34
![Page 5: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/5.jpg)
Scenario I
Disadvantages:
• Increase of the time delay
• Increase of costs for type approval
• No benefit for the environment
• How can the new data base be used for finding “limit values”? (“worst case testing ↔ different vehicles for ECE-R 51.02 and new test method”)
Christian Theis, Referat S 34
![Page 6: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/6.jpg)
Scenario ITime schedule:
Christian Theis, Referat S 34
Action Date
Adoption of the new method at 42. GRBincl. a period of 24 month (data-collection)
09/2005
Adoption of GRB proposal at WP.29 03/2006
Date of entry into force 01/2007
Collection of data until 01/2009
Analysis of data (contracting parties) 07/2009
Proposals for limit values (contracting parties) 44. GRB 09/2009
Recommendations for limit values 45.GRB 02/2010
Starting point for a cost benefit analysis 04/2010
Results of the cost benefit study 07/2011
Discussion of the results and limit values (GRB) 02/2012
Proposal for WP.29 06/2012
Date of entry into force 03/2013
Transitional provisions? 24 month?
![Page 7: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/7.jpg)
Scenario II
• New Series of Amendment ECE-R 51.03
• Content of ECE 51.03• New test method
• New limit values (all vehicle categories)
• Test procedure for “Off cycle emission provisions”
Christian Theis, Referat S 34
![Page 8: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/8.jpg)
Scenario II
Advantages:
• Benefit for the environment
• Costs for testing are minimized
Christian Theis, Referat S 34
![Page 9: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/9.jpg)
Scenario II
Disadvantages:
• Test procedure for “off cycle emissions” is not available
• Data base for HDV needs more measurement results
• “Informal Group” needs more time
Christian Theis, Referat S 34
![Page 10: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/10.jpg)
Scenario II
Time schedule:
Christian Theis, Referat S 34
Action DateInformal document prepared during 42. GRB, depending on the discussion during this meeting
09/2005
Adoption of the new method incl. limit values at 43. GRB
02/2006
Discussion of GRB proposal at WP.29 06/2006
Starting point for discussion inside EU 04/2006
3 years discussion inside EU (incl. cost benefit analysis)Proposal for WP.29; Adoption in WP.29
06/2009
Date of entry into force 03/2010
![Page 11: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/11.jpg)
Scenario III
• ECE-R 51.02 stays as it is and the new test method with limit values for M1, N1, M2≤ 3500 kg and N2 ≤ 3500 kg have to be inserted
• Vehicles of the above mentioned categories have to be tested according two methods and have to fulfil both limit values
• Vehicles of other categories have to be tested according ECE-R 51.02
Christian Theis, Referat S 34
![Page 12: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/12.jpg)
Scenario III
Advantages:
• Benefit for the environment
• The new method is inserted into the regulation (“frozen”)
• Experience with the new method for HDV
• Increase of vehicle data base for HDV
• Adoption of the new method can be done very quick
• ECE-R 51.02 becomes “place holder” for “off-cycles”
• Proposals for limit values (M1, N1,..) are available
Christian Theis, Referat S 34
![Page 13: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/13.jpg)
Scenario III
Disadvantages:
• Additional Amendment for HDV is necessary
• Costs for type approval
Christian Theis, Referat S 34
![Page 14: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/14.jpg)
Scenario III
Time schedule:
Christian Theis, Referat S 34
Action Date
Informal document prepared during 42. GRB, depending on the discussion during this meeting
09/2005
Adoption of the new method incl. limit values at 43. GRB
02/2006
Discussion of GRB proposal at WP.29 06/2006
Starting point for discussion inside EU 04/2006
In the case where scenario III can be adopted at CATP on European level a voting during the 140. WP.29 meeting can be possible
11/2006
Date of entry into force 08/2007
![Page 15: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/15.jpg)
Alternative solutions
• More stringent limit values in ECE-R 51.02
• Change of tyre selection in ECE-R 51.02
• Modifications of the scenarios
• …
Christian Theis, Referat S 34
![Page 16: Different Scenarios for the Implementation of the New Test Method 42. GRB5.-7. September 2005 Informal document No. GRB-42-10 (42nd GRB, 5 7 September](https://reader036.vdocuments.site/reader036/viewer/2022082510/5a4d1b877f8b9ab0599bd11e/html5/thumbnails/16.jpg)
Conclusions
…..
Christian Theis, Referat S 34