dewatering discharge point.pdf
TRANSCRIPT
-
8/19/2019 Dewatering Discharge Point.pdf
1/1
.\LOgOs\Lusail City Logo.jpg
DISCHARGE LAYOUT
Notes:
Location :
Originator Company (CP) :
Originator Authorized Signatory
Reviewed / Checked by
Consultant :
LREDC Project Manager :
Ref: LREDC-LOG-RC/D-2015-
Date of commencement ( from / / 20 to / / 20 )
Copy to
: All Contractor
LREDC Project Manager LREDC Security Command Center
LREDC Safety
Final Approved by :
Signature Date
ROAD CLOSURE / ROAD DIVERSIONTitle :
Area LREDC Logistics Representative :
LREDC Senior Logistics & Security Manager
Signature/Date
Name :
Mobile No :
Email :
PM/CM Project Manager
Notes:
SignatureLogistics Follow up Date received Confirmation Date
Verified by Safety Manager (HSSELQ) Signature
Note
*
*
*
COD LREDC
LREDC will not be held responsible for any cost implications on site due
to above approved actions or further changes.
Originator developer/contractor is responsible for protection against any
damages or property loss to infrastructure/service lines above/below grade
Must vacate/clear authorized area within 15 days of notice by LREDC.
(For Developer Only)
Area PM/CM Safety Supervisor Signature
Name :
Name :
Name :
PROPOSED ACCESS ENTRANCE & EXIT
DEWATERING HOSES ROUTE
Road Closed
Heavy Vehicles
SAID MAHMOUD - PROJECT MANAGER
5557 4174
HASSANESCO TRADING & CO.
SEEF LUSAIL - DOHA, QATAR
27 / 07 / 2015 TO 31 / 07 2016
GATE 2
G
A
C
D
F
I
T O T H E A P P R O V E D
D I S C H A R G E L O C A T I O N