Development projectOSAKA STATION CITY
Shinya MORITAWest Japan Railway Company
Construction Department
Intercity and regional
service area
Urban Network area
Sanyo Shinkansen
• Operating area– Western part of Honshu and Northern tip of Kyushu
– About 1/3 of total population and GDP in Japan
• Railway operations– Sanyo Shinkansen
– Urban Network(Kyoto-Osaka-Kobe metropolitan area)
– Intercity and regional services
Hakata
(Fukuoka)
Shin-Osaka
TokyoKokura
HiroshimaOkayama
KyotoNagoya
Shin-Kobe
Sanyo Shinkansen Tokaido Shinkansen
(JR-Central)(JR-West)
Shinagawa
Osaka Station North District
Yodo river
Osaka
Station
About 24 ha
• Outline of West Japan Railway Company
- Operating Area、Osaka Station North District
• History of Osaka Station
• Outline of Development Project of Osaka Station
1. Construction of Plazas and Pathways
2. Improvement of Station Equipment
3. Construction of New Station Building
4. Extension of "Acty Osaka"
• Present Situation of Construction
Outline of Presentation
① Construction of plazas and pathways
③ Construction of new station building
② Improvement of station equipment
④ Extension of "Acty Osaka"
Discovery. Impression. OSAKA Grand Station
Concept
・ Congestion around ticket gates, stairs and corridors due to the increase of passengers
・ Passenger increase is expected because of the development of surrounding areas
(e.g. North Yard)
・ Responding to concerns for universal designs
・ Responding to requests for a station with multi functions
Issues
Outline of Development Project of Osaka Station
4th (1979~)
Dome
Extension Newly-built
1. Construction of plazas and pathways
(Acty Osaka)
Extention
DomeJapanese style plaza
Roof farm
Roof Plaza
For North
District of
Osaka Station
For South
District of
Osaka Station
Sun plaza
South Gate Plaza
North Gate Plaza
Bridge
Under groundGround floor concourse
2F2F
Central gate
Platform 4Platform 5
Platform 6 Before Improvement
Platform 3
Platform 2
Platform 1
Loop line platform
Sakurabashi gate
Pathway on mezzanine floor
Midousuji gate
Pathway on mezzanine floor
2. Improvement of station equipment
North/south
pathwayAfter Improvement
Platform 1
Loop line platform
Platform 2
Platform 3
Platform 4Platform 5
Transfer
pathway
Construction station on bridge
Widening of ticket gates
and pathway areas
Congestion around
ticket gates
Congestion on passenger
transfer pathways
Congestion on
platforms and stairs
Construction of wide 1st floor concourse
Installing many escalators
3. Construction of new station building
<Scale>
Floor space: approx 210,000m2
3 basement floors
28 stories
Height: 150mTop floor restaurant
Department storeSpecially stores
Cinema complex
Office (14F~27F)
Fitness club etc
North Gate Plaza
Existing building
(“Acty Osaka”)
<Scale: Extension areas>
Floor space: approx 35,000m2
2 basement floors
16 stories
Height: 71m
Department store
South Gate Plaza
Sun plaza
4. Extension of "Acty Osaka"
Present Situation of Construction
South Gate
Building
North Gate PlazaRoof plaza
Grand Opening on May 4, 2011