development of surrogate reservoir models (srm) for fast

50
1 Development of Surrogate Reservoir Models (SRM) For Fast Track Analysis of Complex Reservoirs Shahab D. Mohaghegh, WVU & ISI Modavi, A., Hafez, H. Haajizadeh, M., Kenawy, M., and Guruswamy, S., Abu Dhabi Company for Onshore Oil Operations - ADCO SPE 99667 SPE Intelligent Energy Conference, Amsterdam, The Netherlands, April 2006

Upload: others

Post on 03-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Development of Surrogate Reservoir Models (SRM) For Fast

1

Development of Surrogate Reservoir Models (SRM) For Fast Track Analysis of Complex Reservoirs

Shahab D. Mohaghegh, WVU & ISIModavi, A., Hafez, H. Haajizadeh, M., Kenawy, M., and Guruswamy, S.,

Abu Dhabi Company for Onshore Oil Operations - ADCO

SPE 99667

SPE Intelligent Energy Conference, Amsterdam, The Netherlands, April 2006

Page 2: Development of Surrogate Reservoir Models (SRM) For Fast

2

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

The Bottle-Neck

Real-Time, High Frequency Data Stream

Full Field Models for Reservoir Simulation & Modeling. One of

the major tools for integrated Reservoir Management

Time Scale:

Seconds, Minutes, Hours

Time Scale:

Days, Months, ….

Page 3: Development of Surrogate Reservoir Models (SRM) For Fast

3

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

ObjectiveDeveloping the next generation of intelligent applications as enabling technologies in response to the needs of smart fields.Development of a Surrogate Reservoir Model (SRM) based on a Full Field Model (FFM) for a giant oil field in the Middle East.

Page 4: Development of Surrogate Reservoir Models (SRM) For Fast

4

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

FFM CharacteristicsFull Field Model Characteristics:

Underlying Complex Geological Model.ECLIPSETM

165 Horizontal Wells.Approximately 1,000,000 grid blocks.Single Run = 10 Hours on 12 CPUs.Water Injection for Pressure Maintenance.

Page 5: Development of Surrogate Reservoir Models (SRM) For Fast

5

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

SRM CharacteristicsAccurate replication of Full Field Model Results (for every well in the field):

Instantaneous Water CutCumulative Oil ProductionCumulative Water Production

Ability to run in real-time.Remove the bottleneck.

Page 6: Development of Surrogate Reservoir Models (SRM) For Fast

6

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Surrogate Reservoir ModelsA subset of a more general set of models called Surrogate Intelligent Models

Real-Time OptimizationReal-Time Decision MakingAnalysis of Uncertainty

An absolute essential tool for smart fields (i-fields)

Page 7: Development of Surrogate Reservoir Models (SRM) For Fast

7

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

SRM an Engineering ToolAre Surrogate Reservoir Models the same as “Response Surface” techniques?NO.Unlike purely statistical techniques, SRMs are designed to be engineering tools.

Page 8: Development of Surrogate Reservoir Models (SRM) For Fast

8

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

SRM an Engineering ToolDepending on the project objectives, SRMs are developed to preserve and respond to the physics of the problem.Honoring the physics is an important validation step in the development process of SRMs.

Page 9: Development of Surrogate Reservoir Models (SRM) For Fast

9

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Surrogate Reservoir ModelsProject Objectives:

To create an accurate surrogate model that can mimic the Full Field Model.Use the surrogate model to perform Monte Carlo Simulation to quantify the uncertainties associated with the FFM.

Page 10: Development of Surrogate Reservoir Models (SRM) For Fast

10

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Surrogate Reservoir ModelsProject Objectives:

It can provide a foundation for:Analysis of Uncertainty (Monte Carlo Simulation)Real Time OptimizationReal Time Decision MakingAutomatic History Matching

Page 11: Development of Surrogate Reservoir Models (SRM) For Fast

11

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Surrogate Reservoir Models

Methodology:Identify the specific objective of the Surrogate Model. Identify the necessary information needed to accomplish the objective (understand the physics).Resolve the major issue related to the “curse of dimensionality”Develop and validate the Surrogate Model

Page 12: Development of Surrogate Reservoir Models (SRM) For Fast

12

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Methodology

Identify the specific objective of the Surrogate Model.

Analysis of uncertainty.Develop a bean-up schedule for the wells in the asset.Optimize the oil production from the asset (minimize left behind oil).

Page 13: Development of Surrogate Reservoir Models (SRM) For Fast

13

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Very Complex Geology

Page 14: Development of Surrogate Reservoir Models (SRM) For Fast

14

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Very Complex Geology

Page 15: Development of Surrogate Reservoir Models (SRM) For Fast

15

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Very Complex Geology

Reservoirs represented in the FFM.

Page 16: Development of Surrogate Reservoir Models (SRM) For Fast

16

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of DimensionalitySource of dimensionality:

STATIC: Representation of reservoir properties associated with each well.DYNAMIC: Simulation runs to demonstrate well productivity.

Page 17: Development of Surrogate Reservoir Models (SRM) For Fast

17

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of Dimensionality, Static

Representing reservoir properties for horizontal wells.

Page 18: Development of Surrogate Reservoir Models (SRM) For Fast

18

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of Dimensionality, StaticPotential list of parameters that can be collected on a “per-well” basis.

IMPORTANT NOTE: Specific objective of the surrogate model must be identified in advance.

Latitude Longitude

Deviation Azimuth

Horizontal Well Length Productivity Index

Distance to Free Water Level Water Cut @ Reference Point

Flowing BHP @ Reference Point Oil Prod. Rate @ Reference Point

Cum. Oil Prod. @ Reference Point Cum. Water Prod. @ Reference Point

Distance to Nearest Producer Distance to Nearest Injector

Distance to Major Fault Distance to Minor Fault

Parameters Used on a per well basis

Page 19: Development of Surrogate Reservoir Models (SRM) For Fast

19

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of Dimensionality, Static

Potential list of parameters that can be collected on a “per-grid block” basis.

IMPORTANT NOTE: Specific objective of the surrogate model must be identified in advance.

Mid Depth Thickness

Relative Rock Ttype Porosity

Initial Water Saturations Stylolite Intensity

Horizontal Permeabil ity Vertical Permeabil ity

Sw @ Reference Point So @ Reference Point

Capil lary Pressure/Saturation Function Pressure @ Reference Point

Parameters Used on a per segment basis

Page 20: Development of Surrogate Reservoir Models (SRM) For Fast

20

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of Dimensionality, StaticTotal number of parameters that need representation during the modeling process:

18 parameters x 40 grid block/well = 720

12 parameter per well

Total of 732 parameter per well

Building a model with 732 parameters per well is not realistic, THE CURSE OF DIMENSIONALITY

Dimensionality Reduction becomes a vital task.

Page 21: Development of Surrogate Reservoir Models (SRM) For Fast

21

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of Dimensionality, Dynamic

Well productivity is identified through following simulation runs:

All wells producing at 1500, 2500, 3500, & 4500 bpd (nominal rates)

No cap on field productivityCap the field productivity

Page 22: Development of Surrogate Reservoir Models (SRM) For Fast

22

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of Dimensionality, Dynamic

Well productivity through following simulation runs:

Step up the rates for all wellsNo cap on field productivityCap the field productivity

Page 23: Development of Surrogate Reservoir Models (SRM) For Fast

23

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of Dimensionality

In order to address the “Curse of Dimensionality” one must understand the behavior and contribution of each of the parameters to the process being modeled.Not a simple and straight forward task. !!!

Page 24: Development of Surrogate Reservoir Models (SRM) For Fast

24

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Curse of DimensionalityTo address this issue, we use ISI’s Fuzzy Pattern Recognition technology.

Page 25: Development of Surrogate Reservoir Models (SRM) For Fast

25

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Parameter: Pressure @ Reference

Key Performance Indicator

Page 26: Development of Surrogate Reservoir Models (SRM) For Fast

26

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Key Performance Indicator

Page 27: Development of Surrogate Reservoir Models (SRM) For Fast

27

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Key Performance IndicatorsPotential Benefits:

This analysis would confirm or dispute hypotheses and findings, purely based on the collected data:

GeologyPetrophysicsDynamic Data

Page 28: Development of Surrogate Reservoir Models (SRM) For Fast

28

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Key Performance Indicators

Page 29: Development of Surrogate Reservoir Models (SRM) For Fast

29

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Please Note: The lower the bar, the higher the influence.

Key Performance Indicators

Page 30: Development of Surrogate Reservoir Models (SRM) For Fast

30

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Candidate Selection

Page 31: Development of Surrogate Reservoir Models (SRM) For Fast

31

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Surrogate ModelingMethodology:

Divided the data into three partitions.Training dataset – 40%Calibration dataset– 20 %Verification dataset – 40%

Train, and validate the model.Run the model for the ranked candidate wells to decide on the most efficient production strategy.

Page 32: Development of Surrogate Reservoir Models (SRM) For Fast

32

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Surrogate Modeling

Page 33: Development of Surrogate Reservoir Models (SRM) For Fast

33

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Surrogate Modeling

Page 34: Development of Surrogate Reservoir Models (SRM) For Fast

34

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Optimal Production Strategy

Well Ranked No. 1

IMPORTANT NOTE: This is NOT a Response Surface – SRM was run hundreds of times to generate these figures.

Page 35: Development of Surrogate Reservoir Models (SRM) For Fast

35

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Optimal Production Strategy

Well Ranked No. 100

IMPORTANT NOTE: This is NOT a Response Surface – SRM was run hundreds of times to generate these figures.

Page 36: Development of Surrogate Reservoir Models (SRM) For Fast

36

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Analysis of Uncertainty

Objective:To address and analyze the uncertainties associated with the Full Field Model using Monte Carlo simulation method.

Page 37: Development of Surrogate Reservoir Models (SRM) For Fast

37

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Analysis of Uncertainty

Motivation:The Full Field Model is a reservoir simulator that is based on a geologic model. The geologic model is developed based on a set of measurements (logs, core analysis, seismic, …) and corresponding geological and geophysical interpretations.

Page 38: Development of Surrogate Reservoir Models (SRM) For Fast

38

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Analysis of Uncertainty

Motivation:Therefore, like any other reservoir simulation and modeling effort, it includes certain obvious uncertainties.One of the outcomes of this project has been the identification of a small set of reservoir parameters that essentially control the production behavior in the horizontal wells in this field (KPIs).

Page 39: Development of Surrogate Reservoir Models (SRM) For Fast

39

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Following are the steps involved:1. Identify a set of key performance indicators

that are most vulnerable to uncertainty.2. Define probability distribution function for

each of the performance indicators.a. Uniform distributionb. Normal (Gaussian) distributionc. Triangular distributiond. Discrete distribution

Analysis of Uncertainty

Page 40: Development of Surrogate Reservoir Models (SRM) For Fast

40

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Following are steps involved:3. Run the neural network model hundreds or

thousands of times using the defined probability distribution functions for the identified reservoir parameters. Performing this analysis using the actual Full Field Model is impractical.

4. Produce a probability distribution function for cumulative oil production and the water cut at different time and liquid rate cap.

Analysis of Uncertainty

Page 41: Development of Surrogate Reservoir Models (SRM) For Fast

41

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Following are steps involved:5. Such results bounds to be much more

reliable and therefore, more acceptable to the management or skeptics of the reservoir modeling studies.

Analysis of Uncertainty

Page 42: Development of Surrogate Reservoir Models (SRM) For Fast

42

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Analysis of Uncertainty

Page 43: Development of Surrogate Reservoir Models (SRM) For Fast

43

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Analysis of Uncertainty

Page 44: Development of Surrogate Reservoir Models (SRM) For Fast

44

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Average Sw @ Reference point in Top Layer II

Value in the model = 8%Lets use a minimum of 4% and a maximum of 15% with a triangular distribution

4 8 15

Analysis of Uncertainty

Page 45: Development of Surrogate Reservoir Models (SRM) For Fast

45

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Average Capillary Pressure @ Reference point in Top Layer III

Value in the model = 79 psiLets use a minimum of 60 psi and a maximum of 100 psi with a triangular distribution

60 80 100

Analysis of Uncertainty

Page 46: Development of Surrogate Reservoir Models (SRM) For Fast

46

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Analysis of Uncertainty

PDF for HB001 Cumulative Oil and Cumulative Water production at the rate of 3,000 blpd cap after 20 years.

Page 47: Development of Surrogate Reservoir Models (SRM) For Fast

47

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

Such analysis can be performed for all wells at any rate and any number of years.There is a higher probability of acceptance of the ideas for rate increase by the management, if we show that:

We are aware of the uncertainties associated with our analysis.Uncertainties are being accounted for in our decision making process.

Analysis of Uncertainty

Page 48: Development of Surrogate Reservoir Models (SRM) For Fast

48

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

CONCLUSIONSA successful surrogate reservoir model was developed for a giant oil field in the Middle East.The surrogate model was able to accurately mimic the behavior of the actual full field flow model.

Page 49: Development of Surrogate Reservoir Models (SRM) For Fast

49

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

CONCLUSIONSThe surrogate reservoir model would provide results in real time.The surrogate model was used successfully to analyze uncertainties associated with the full field flow model.This approach and methodology is an important and essential step toward

Page 50: Development of Surrogate Reservoir Models (SRM) For Fast

50

SPE 99667

Shahab D. Mohaghegh, Ph.D. (WVU & ISI)

CONCLUSIONSDevelopment of successful surrogate reservoir model is an important and essential step toward development of next generation of reservoir management tools that would address the needs of smart fields.