destia engineering ltd

26
2020 Destia Engineering Ltd.

Upload: others

Post on 16-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

2020

Destia Engineering Ltd.

2

1

3

4

Destia EngineeringLtd.

Fleet

Core Competences

References

Fennovoima Hanhikivi FH1 Nuclear Power Plant (Finland)

Content

8.4.2020

© Destia3 v

Destia Engineering Ltd.

© Destia4

§ Ahlström Capital§ Finland-based multi-national private equity

company, $1 billion investment portfolio

§ Destia Plc.§ Largest infrastructure design & construct

company in Finland§ Operational for nearly two centuries§ Revenue 2018 = 550 milj. €

Company Background

8.4.2020

https://www.ahlstromcapital.com/https://www.destia.fi/en/home.htmlhttps://www.destia.fi/en/services/foundation-and-field-engineering.html

DESTIA PLC.

DESTIAENGINEERING

LTD.

© Destia5

Destia Engineering Ltd.

§ Founded in 1993, part of Earth and Rock Construction Division

§ Earth and Rock Construction Division:

§ Employees: approx. 250

§ Revenue: 100 milj. €/year

§ Operating in Finland, Sweden, Norway and the Baltic States

8.4.2020

© Destia6 v

Fleet

© Destia7

Fleet

§ 30 pcs of drilling rigs ranging from 1 ton to 100 tons

§ Sheet piling vibrators (free-hanging and rigs with telescopic

leaders)

§ Piling rigs for driven piles

§ Jet-grouting machinery

§ Grouting equipment

§ Shotcreting equipment

§ Auxiliary equipment (cranes, excavators etc.)

8.4.2020

SÖDRA HAMN, LULEÅ (SWEDEN)

© Destia8 v

Core Competences

© Destia9

Core Competences - Piling§ RD-piling (drilled piles)

§ Diameter 90 – 1400mm

§ Driven piles

§ Steel piles

§ Diameter 90 – 1400mm

§ Precast concrete piles

§ Pile Load Testing (PDA, static)

§ Bored piles

§ CFA-piles

§ DTH-reinforced concrete piles

§ Steel core piles

§ Restricted access piles8.4.2020

HANHIKIVI FH1 NUCLEAR POWER PLANT (FINLAND)

© Destia10

§ RD-pile wall

§ Sheet pile wall

§ Various combi-walls

§ Berliner walls

§ Soldier pile wall

§ Anchoring

§ Jetgrouting

§ Bedrock grouting

Core Competences –Retaining Walls

8.4.2020

APARTMENT COMPLEX VAAPUKKAPIHA, HELSINKI (FINLAND)

© Destia11

§ Onshore & Offshore

§ Foundation types:

§ Gravity foundation

§ Piled foundation

§ Anchored foundation

§ Design & build, full scope in foundation works

Core Competences –Wind Turbine Foundations

8.4.2020

ÅLIDEN WIND PARK, TREHÖRNINGSJÖ (SWEDEN)

© Destia12 v

References

© Destia13

§ Nuclear power plant retaining walls

§ RD700-pile wall, 775 piles

§ Bedrock grouting through piles, 450 holes

§ Grouting through pile grouting channel 650 piles

§ Jet grouting on 150 piles

§ Blasting tube casing drilling, 200 pipes

FH1 Hanhikivi NuclearPower Plant- OutletChannel 2018-2019

8.4.2020

Hanhikivi FH1 Nuclear Power Plant (Fennovoima)

© Destia14

§ 175 pcs RD1220-drilled foundation piles

§ Pile length over 14m

§ Drilled 1,5 meters into the bedrock

§ Rock strength > 150 MPa

§ Location tolerance < 20mm

§ First major RD1220mm project in Scandinavia

TRIPLA ProjectHelsinki, 2016

8.4.2020

© Destia15

Letke ProjectLahti, Finland 2018-2019

§ Total 150km of prefabricated concrete piles

§ 1000mm driven steel piles, up to 60m in total length

§ 800mm drilled piles, up to 40m in total pile length

8.4.2020

© Destia16

§ 100 piles drilled into bedrock

§ Diameter 400-800mm

§ Pile lengths up to 31m

Norvik Hamn,Nynäshamn, 2019

8.4.2020

© Destia17

§ Approx. 500 pcs drilled piles forRD-pile wall

§ Installed as a retaining RD-pilewall

§ Installed through tough glacial till

§ Retaining wall strand anchorsinstalled into the bedrock

§ All steel works, for examplebeams

§ Jetgrouting to seal the bedrockcontact of the retaining wall

Pori Coal Terminal,RD-pile Wall, 2019

8.4.2020

© Destia18

§ Bridge foundation piles (total 80 pcs)

§ Pile sizes:

§ RD500

§ RD600

§ Piles installed into the bedrock from a

jack-up barge

§ Pile lengths up to 35m

Vårdö Bridge,Åland 2017

8.4.2020

© Destia19

Piteå HamnSweden, 2017-2018

§ 100 pcs of RD500 & RD400 – piles

§ Pile lengths up to 31m

§ Piles drilled from a barge

§ Drilling in temperatures down to -20 degrees

Celsius

8.4.2020

© Destia20

§ 200 pcs of 600mm CFA-piles

§ Up to 23 m in length

§ PDA-measuring using own equipment

§ 220 pcs of 300mm precast concrete-driven

piles

Pori Power PlantFinland, 2018

8.4.2020

© Destia21 8.4.2020

© Destia22 8.4.2020

§ 800mm & 1200mm DTH-drilled bridge

foundation piles

§ Installed from a jack-up barge

§ Drilled up to 6m in > 200MPa bedrock

Kardonbanan ProjectNorrköping, 2019

© Destia23

§ 19 wind turbine foundations

§ Reinforcing, concreting and anchoring

works

§ In total 230pcs 25-strand rock

anchors

BrattmyrlidenWind Farm, 2019-2020

8.4.2020

© Destia24

§ 30 pcs RD1200-drilled piles

§ Piles lengths up to 40 meters

§ Piles drilled from a temporary

bridge

§ Nominated as the Finnish

Infrastructure Project of the

Year, 2018

Vekarasalmi BridgeFinland, 2018

8.4.2020

© Destia25

§ CEO

§ Arto Niemeläinen

§ +358400168213

§ [email protected]

§ Tenders

§ Matias Niemeläinen

§ +358405892446

§ [email protected]

§ Sweden / Norway

§ Risto Harling

§ +4745969270

§ [email protected]

Contact personnel

8.4.2020

RAILWAY BRIDGE PILING, ABISKO (SWEDEN, 2019)

© Destia26

http://www.destiaengineering.fi/en/