URBAN DESIGN PANEL REVIEW 526 - 548 WEST KING EDWARD AVENUE DECEMBER 2015 17
6' ht. metal security gate/fence
UP
DN
UP
DN
UP
DN
UP
DN
UP
DN
DN
DN
UP
UP
UP
UP
UP
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
BG. 68.74m(226.0')
B.G. 68.56M(224.93')
B.G. 68.45M(224.57')
B.G. 68.32M(224.15')
B.G. 68.55M(224.90')
B.G. 69.26M(227.23')
B.G. 70.42M(231.04')
B.G. 70.68.M(231.89')
B.G. 70.88.M(232.55')
B.G. 71.13.M(233.37')
B.G. 71.46 M(234.45')
B.G. 71.61 M(234.94')
BG. 70.67m(231.86')
BG. 70.61m(231.66')
BG. 70.66m(231.82')
BG. 70.93m(232.71')
FUTURE WIDENING LINEBG. 70.59m(231.59')
BG. 71.53m(234.68')
BG. 71.21m(233.63')
BG. 70.78m(232.22')
W E S T K I N G E D W A R D A V E N U E
L A N E
L A
N E
flush band
+ 230.00'
6' ht. metal fence at PL
3' ht. evergreen hedge
large shrubs
multistem tree
exit path
6' ht. security gate
42" ht. guardrail
address pier
3' ht. evergreen hedge at face of wall
shrub planting, typical
waterfall to generate white noise
Breezeway
Courtyard
entry sign/address wallfeature tree
address pier c/ w lighting
metal gate
raised planter
42" ht. metal guardrail
existing lamp standard
New Street Tree: Contact Eileen Curran, Streets Engineering [604.871.6131] to confirm tree planting locations, and Amit Gandha, Park Board, [604.257.8587] for tree species selection and planting requirements.
Broom Finished C.I.P. Concrete Sidewalk to COV Engineering Standard
expansion joint at Property Line
2.4m/8' section of 18" deep root barrier to COV Standard
Class B Bike Parking 6 space metal bike rack
accessible entry/ramp
fastigiate tree
DN 8R
DN
6R
DN
6R
DN
6R
DN
6R
DN
4R
DN
4R
DN
4R
DN 4R
DN 4RDN 4RDN 4RDN 4RDN 4R
DN 5R
DN 4R
DN 4R
lawn boulevard
2'
patiopatiopatiopatio
6' ht. privacy screen, typical
DN
3R
patio patio patio
bridge
seatwall with wood benchtop
metal planter
water channel
patio
patio
patio
6' ht. privacy screen
fastigiate treelightwell to below 3' ht. garden wall
metal gate
6' ht. privacy screen
garden wall/pier
metal gatesmall shade tree
3' ht. evergreen hedgegathering nook
water channel source/wiers
3' ht. evergreen hedge
24" sq. concrete paving slabs - colour to match architectural material palette
stone bridge over water channel
6' ht. privacy screen, typical
+ 230.00'
+ 230.00'
+ 232.00' + 232.00'+ 232.00'
+ 232.00'
+ 232.00'
+ 231.50'
concrete pavers
air intake
ram
p t
o u
nd
erg
rou
nd
pa
rkin
g
5'
Laneway Lofts
patiopatio
+ 230.00'
9'-5
"
10'
7.5'
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 231.00'
DN 1R
gas meter
+ 224.50'
3' ht. evergreen hedge
+ 230.00'
DN 8R
air intake
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
Revisions:
no.: date: item:
Ground Floor Landscape Plan
15020
JES
JES
2015.04.13
1/8" = 1'-0"
L1.1
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5
t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
North
-
526 - 548 WEST KING EDWARD AVENUE Vancouver BC
2015.05.04 Issued for Rezoning
- 2015.08.28 Issued for Coordination
D E S I G N P R O P O S A L GROUND FLOOR PLAN
4’-1”
22’-2”72’-2”20’-0”2’-10” 19’-6” 5’-0”
27’-6
”27
’-6”
5’-0
”5’
-0”
15’-6
”34
’-0”
31’-6
”
10’-0” 4’-2”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
GROU
ND F
LOOR
COU
RTYA
RD
24’-1
”
LAND
SCAP
E ST
RIP
EXISTING PROPERTY LINE
4’-1”
3’-0”20’-2”74’-2”21’-10” 54’-2” 4’-2”
31’-0
”31
’-0”
5’-0
”12
’-0”
5’-0
”5’
-0”
24’-0
”36
’-0”
10’-0” 83’-2” 23’-7” 57’-2” 4’-2”
10’-0”5’-0”
5’-0”31’-0”
36’-0”5’-0”
LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
27’-8”28’-8”5’-0”20’-6”
31’-6”36’-0
”
5’-0”22’-5”
83’-2”
6’-0”3’-0”
LobbyAmenity Space
1/16” = 1’0”
A1a538 sf
B1a766 sf
A2a647 sf
A2a646 sf
A6a580 sf
A7a427 sf
A7a433 sf
A5a527 sf
A3a734 sf
A5a526 sf
A5a539 sf
A1a558 sf
A1a557 sf
A1a531 sf
URBAN DESIGN PANEL REVIEW 526 - 548 WEST KING EDWARD AVENUE DECEMBER 2015 18
6' ht. metal security gate/fence
UP
DN
UP
DN
UP
DN
UP
DN
UP
DN
DN
DN
UP
UP
UP
UP
UP
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
BG. 68.74m(226.0')
B.G. 68.56M(224.93')
B.G. 68.45M(224.57')
B.G. 68.32M(224.15')
B.G. 68.55M(224.90')
B.G. 69.26M(227.23')
B.G. 70.42M(231.04')
B.G. 70.68.M(231.89')
B.G. 70.88.M(232.55')
B.G. 71.13.M(233.37')
B.G. 71.46 M(234.45')
B.G. 71.61 M(234.94')
BG. 70.67m(231.86')
BG. 70.61m(231.66')
BG. 70.66m(231.82')
BG. 70.93m(232.71')
FUTURE WIDENING LINEBG. 70.59m(231.59')
BG. 71.53m(234.68')
BG. 71.21m(233.63')
BG. 70.78m(232.22')
W E S T K I N G E D W A R D A V E N U E
L A N E
L A
N E
flush band
+ 230.00'
6' ht. metal fence at PL
3' ht. evergreen hedge
large shrubs
multistem tree
exit path
6' ht. security gate
42" ht. guardrail
address pier
3' ht. evergreen hedge at face of wall
shrub planting, typical
waterfall to generate white noise
Breezeway
Courtyard
entry sign/address wallfeature tree
address pier c/ w lighting
metal gate
raised planter
42" ht. metal guardrail
existing lamp standard
New Street Tree: Contact Eileen Curran, Streets Engineering [604.871.6131] to confirm tree planting locations, and Amit Gandha, Park Board, [604.257.8587] for tree species selection and planting requirements.
Broom Finished C.I.P. Concrete Sidewalk to COV Engineering Standard
expansion joint at Property Line
2.4m/8' section of 18" deep root barrier to COV Standard
Class B Bike Parking 6 space metal bike rack
accessible entry/ramp
fastigiate tree
DN 8R
DN
6R
DN
6R
DN
6R
DN
6R
DN
4R
DN
4R
DN
4R
DN 4R
DN 4RDN 4RDN 4RDN 4RDN 4R
DN 5R
DN 4R
DN 4R
lawn boulevard
2'
patiopatiopatiopatio
6' ht. privacy screen, typical
DN
3R
patio patio patio
bridge
seatwall with wood benchtop
metal planter
water channel
patio
patio
patio
6' ht. privacy screen
fastigiate treelightwell to below 3' ht. garden wall
metal gate
6' ht. privacy screen
garden wall/pier
metal gatesmall shade tree
3' ht. evergreen hedgegathering nook
water channel source/wiers
3' ht. evergreen hedge
24" sq. concrete paving slabs - colour to match architectural material palette
stone bridge over water channel
6' ht. privacy screen, typical
+ 230.00'
+ 230.00'
+ 232.00' + 232.00'+ 232.00'
+ 232.00'
+ 232.00'
+ 231.50'
concrete pavers
air intake
ram
p t
o u
nd
erg
rou
nd
pa
rkin
g
5'
Laneway Lofts
patiopatio
+ 230.00'
9'-5
"
10'
7.5'
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 231.00'
DN 1R
gas meter
+ 224.50'
3' ht. evergreen hedge
+ 230.00'
DN 8R
air intake
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
Revisions:
no.: date: item:
Ground Floor Landscape Plan
15020
JES
JES
2015.04.13
1/8" = 1'-0"
L1.1
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5
t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
North
-
526 - 548 WEST KING EDWARD AVENUE Vancouver BC
2015.05.04 Issued for Rezoning
- 2015.08.28 Issued for Coordination
D E S I G N P R O P O S A L SECOND FLOOR PLAN
4’-1”
22’-2”72’-2”20’-0”2’-10” 19’-6” 5’-0”
27’-6
”27
’-6”
5’-0
”5’
-0”
15’-6
”34
’-0”
31’-6
”
10’-0” 4’-2”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
GROU
ND F
LOOR
COU
RTYA
RD
24’-1
”
LAND
SCAP
E ST
RIP
EXISTING PROPERTY LINE
4’-1”
3’-0”20’-2”74’-2”21’-10” 54’-2” 4’-2”
31’-0
”31
’-0”
5’-0
”12
’-0”
5’-0
”5’
-0”
24’-0
”36
’-0”
10’-0” 83’-2” 23’-7” 57’-2” 4’-2”
10’-0”5’-0”
5’-0”31’-0”
36’-0”5’-0”
LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
27’-8”28’-8”5’-0”20’-6”
31’-6”36’-0
”
5’-0”22’-5”
83’-2”
6’-0”3’-0”
1/16” = 1’0”
A1b637 sf
B1b927 sf
E21384 sf
E21319 sf
E11319 sf
E11319 sf
A2b712 sf
A2b722 sf
A1b628 sf
A1b628 sf
A1b629 sf
A4653 sf
A1b655 sf
C11203 sf
B2977 sf
A5b 566 sf
A5b 562 sf
A5b 575 sf
A7b 467 sf
A7b 463 sf
A5b 603 sf
URBAN DESIGN PANEL REVIEW 526 - 548 WEST KING EDWARD AVENUE DECEMBER 2015 19
6' ht. metal security gate/fence
UP
DN
UP
DN
UP
DN
UP
DN
UP
DN
DN
DN
UP
UP
UP
UP
UP
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
BG. 68.74m(226.0')
B.G. 68.56M(224.93')
B.G. 68.45M(224.57')
B.G. 68.32M(224.15')
B.G. 68.55M(224.90')
B.G. 69.26M(227.23')
B.G. 70.42M(231.04')
B.G. 70.68.M(231.89')
B.G. 70.88.M(232.55')
B.G. 71.13.M(233.37')
B.G. 71.46 M(234.45')
B.G. 71.61 M(234.94')
BG. 70.67m(231.86')
BG. 70.61m(231.66')
BG. 70.66m(231.82')
BG. 70.93m(232.71')
FUTURE WIDENING LINEBG. 70.59m(231.59')
BG. 71.53m(234.68')
BG. 71.21m(233.63')
BG. 70.78m(232.22')
W E S T K I N G E D W A R D A V E N U E
L A N E
L A
N E
flush band
+ 230.00'
6' ht. metal fence at PL
3' ht. evergreen hedge
large shrubs
multistem tree
exit path
6' ht. security gate
42" ht. guardrail
address pier
3' ht. evergreen hedge at face of wall
shrub planting, typical
waterfall to generate white noise
Breezeway
Courtyard
entry sign/address wallfeature tree
address pier c/ w lighting
metal gate
raised planter
42" ht. metal guardrail
existing lamp standard
New Street Tree: Contact Eileen Curran, Streets Engineering [604.871.6131] to confirm tree planting locations, and Amit Gandha, Park Board, [604.257.8587] for tree species selection and planting requirements.
Broom Finished C.I.P. Concrete Sidewalk to COV Engineering Standard
expansion joint at Property Line
2.4m/8' section of 18" deep root barrier to COV Standard
Class B Bike Parking 6 space metal bike rack
accessible entry/ramp
fastigiate tree
DN 8R
DN
6R
DN
6R
DN
6R
DN
6R
DN
4R
DN
4R
DN
4R
DN 4R
DN 4RDN 4RDN 4RDN 4RDN 4R
DN 5R
DN 4R
DN 4R
lawn boulevard
2'
patiopatiopatiopatio
6' ht. privacy screen, typical
DN
3R
patio patio patio
bridge
seatwall with wood benchtop
metal planter
water channel
patio
patio
patio
6' ht. privacy screen
fastigiate treelightwell to below 3' ht. garden wall
metal gate
6' ht. privacy screen
garden wall/pier
metal gatesmall shade tree
3' ht. evergreen hedgegathering nook
water channel source/wiers
3' ht. evergreen hedge
24" sq. concrete paving slabs - colour to match architectural material palette
stone bridge over water channel
6' ht. privacy screen, typical
+ 230.00'
+ 230.00'
+ 232.00' + 232.00'+ 232.00'
+ 232.00'
+ 232.00'
+ 231.50'
concrete pavers
air intake
ram
p t
o u
nd
erg
rou
nd
pa
rkin
g
5'
Laneway Lofts
patiopatio
+ 230.00'
9'-5
"
10'
7.5'
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 231.00'
DN 1R
gas meter
+ 224.50'
3' ht. evergreen hedge
+ 230.00'
DN 8R
air intake
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
Revisions:
no.: date: item:
Ground Floor Landscape Plan
15020
JES
JES
2015.04.13
1/8" = 1'-0"
L1.1
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5
t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
North
-
526 - 548 WEST KING EDWARD AVENUE Vancouver BC
2015.05.04 Issued for Rezoning
- 2015.08.28 Issued for Coordination
D E S I G N P R O P O S A L THIRD FLOOR PLAN1/16” = 1’0”
4’-1”
3’-0”20’-2”74’-2” 54’-2” 4’-2”
31’-0
”31
’-0”
5’-0
”12
’-0”
5’-0
”5’
-0”
24’-0
”36
’-0”
10’-0” 4’-2”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
4’-1”
31’-0
”31
’-0”
5’-0
”12
’-0”
5’-0
”5’
-0”
24’-0
”36
’-0”
10’-0” 4’-2”
10’-0”
57’-2”
8’-3
”
83’-2”
5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
57’-2”
8’-3
”
83’-2”
A1b637 sf
A1b628 sf
A1b628 sf
A1b594 sf A1b
653 sf
A1b629 sf C1
1203 sf
C2a1018 sf
B3927 sfA2b
713 sfA2b712 sf
B1b922 sf
URBAN DESIGN PANEL REVIEW 526 - 548 WEST KING EDWARD AVENUE DECEMBER 2015 20
6' ht. metal security gate/fence
UP
DN
UP
DN
UP
DN
UP
DN
UP
DN
DN
DN
UP
UP
UP
UP
UP
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
BG. 68.74m(226.0')
B.G. 68.56M(224.93')
B.G. 68.45M(224.57')
B.G. 68.32M(224.15')
B.G. 68.55M(224.90')
B.G. 69.26M(227.23')
B.G. 70.42M(231.04')
B.G. 70.68.M(231.89')
B.G. 70.88.M(232.55')
B.G. 71.13.M(233.37')
B.G. 71.46 M(234.45')
B.G. 71.61 M(234.94')
BG. 70.67m(231.86')
BG. 70.61m(231.66')
BG. 70.66m(231.82')
BG. 70.93m(232.71')
FUTURE WIDENING LINEBG. 70.59m(231.59')
BG. 71.53m(234.68')
BG. 71.21m(233.63')
BG. 70.78m(232.22')
W E S T K I N G E D W A R D A V E N U E
L A N E
L A
N E
flush band
+ 230.00'
6' ht. metal fence at PL
3' ht. evergreen hedge
large shrubs
multistem tree
exit path
6' ht. security gate
42" ht. guardrail
address pier
3' ht. evergreen hedge at face of wall
shrub planting, typical
waterfall to generate white noise
Breezeway
Courtyard
entry sign/address wallfeature tree
address pier c/ w lighting
metal gate
raised planter
42" ht. metal guardrail
existing lamp standard
New Street Tree: Contact Eileen Curran, Streets Engineering [604.871.6131] to confirm tree planting locations, and Amit Gandha, Park Board, [604.257.8587] for tree species selection and planting requirements.
Broom Finished C.I.P. Concrete Sidewalk to COV Engineering Standard
expansion joint at Property Line
2.4m/8' section of 18" deep root barrier to COV Standard
Class B Bike Parking 6 space metal bike rack
accessible entry/ramp
fastigiate tree
DN 8R
DN
6R
DN
6R
DN
6R
DN
6R
DN
4R
DN
4R
DN
4R
DN 4R
DN 4RDN 4RDN 4RDN 4RDN 4R
DN 5R
DN 4R
DN 4R
lawn boulevard
2'
patiopatiopatiopatio
6' ht. privacy screen, typical
DN
3R
patio patio patio
bridge
seatwall with wood benchtop
metal planter
water channel
patio
patio
patio
6' ht. privacy screen
fastigiate treelightwell to below 3' ht. garden wall
metal gate
6' ht. privacy screen
garden wall/pier
metal gatesmall shade tree
3' ht. evergreen hedgegathering nook
water channel source/wiers
3' ht. evergreen hedge
24" sq. concrete paving slabs - colour to match architectural material palette
stone bridge over water channel
6' ht. privacy screen, typical
+ 230.00'
+ 230.00'
+ 232.00' + 232.00'+ 232.00'
+ 232.00'
+ 232.00'
+ 231.50'
concrete pavers
air intake
ram
p t
o u
nd
erg
rou
nd
pa
rkin
g
5'
Laneway Lofts
patiopatio
+ 230.00'
9'-5
"
10'
7.5'
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 231.00'
DN 1R
gas meter
+ 224.50'
3' ht. evergreen hedge
+ 230.00'
DN 8R
air intake
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
Revisions:
no.: date: item:
Ground Floor Landscape Plan
15020
JES
JES
2015.04.13
1/8" = 1'-0"
L1.1
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5
t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
North
-
526 - 548 WEST KING EDWARD AVENUE Vancouver BC
2015.05.04 Issued for Rezoning
- 2015.08.28 Issued for Coordination
D E S I G N P R O P O S A L FOURTH FLOOR PLAN
4’-1”
3’-0”20’-2”74’-2” 54’-2” 4’-2”
31’-0
”31
’-0”
5’-0
”12
’-0”
5’-0
”5’
-0”
24’-0
”36
’-0”
10’-0” 4’-2”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
4’-1”
31’-0
”31
’-0”
5’-0
”12
’-0”
5’-0
”5’
-0”
24’-0
”36
’-0”
10’-0” 4’-2”
10’-0”
57’-2”
8’-3
”
83’-2”
5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
57’-2”
8’-3
”
83’-2”
B4954 sf
B4948 sf A1b
594 sfA4
653 sfA1b630 sf C1
1203 sf
C2b1057 sf
B3925 sfA2b
713 sfA2b690 sf
B1b918 sf
1/16” = 1’0”
URBAN DESIGN PANEL REVIEW 526 - 548 WEST KING EDWARD AVENUE DECEMBER 2015 21
6' ht. metal security gate/fence
UP
DN
UP
DN
UP
DN
UP
DN
UP
DN
DN
DN
UP
UP
UP
UP
UP
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
BG. 68.74m(226.0')
B.G. 68.56M(224.93')
B.G. 68.45M(224.57')
B.G. 68.32M(224.15')
B.G. 68.55M(224.90')
B.G. 69.26M(227.23')
B.G. 70.42M(231.04')
B.G. 70.68.M(231.89')
B.G. 70.88.M(232.55')
B.G. 71.13.M(233.37')
B.G. 71.46 M(234.45')
B.G. 71.61 M(234.94')
BG. 70.67m(231.86')
BG. 70.61m(231.66')
BG. 70.66m(231.82')
BG. 70.93m(232.71')
FUTURE WIDENING LINEBG. 70.59m(231.59')
BG. 71.53m(234.68')
BG. 71.21m(233.63')
BG. 70.78m(232.22')
W E S T K I N G E D W A R D A V E N U E
L A N E
L A
N E
flush band
+ 230.00'
6' ht. metal fence at PL
3' ht. evergreen hedge
large shrubs
multistem tree
exit path
6' ht. security gate
42" ht. guardrail
address pier
3' ht. evergreen hedge at face of wall
shrub planting, typical
waterfall to generate white noise
Breezeway
Courtyard
entry sign/address wallfeature tree
address pier c/ w lighting
metal gate
raised planter
42" ht. metal guardrail
existing lamp standard
New Street Tree: Contact Eileen Curran, Streets Engineering [604.871.6131] to confirm tree planting locations, and Amit Gandha, Park Board, [604.257.8587] for tree species selection and planting requirements.
Broom Finished C.I.P. Concrete Sidewalk to COV Engineering Standard
expansion joint at Property Line
2.4m/8' section of 18" deep root barrier to COV Standard
Class B Bike Parking 6 space metal bike rack
accessible entry/ramp
fastigiate tree
DN 8R
DN
6R
DN
6R
DN
6R
DN
6R
DN
4R
DN
4R
DN
4R
DN 4R
DN 4RDN 4RDN 4RDN 4RDN 4R
DN 5R
DN 4R
DN 4R
lawn boulevard
2'
patiopatiopatiopatio
6' ht. privacy screen, typical
DN
3R
patio patio patio
bridge
seatwall with wood benchtop
metal planter
water channel
patio
patio
patio
6' ht. privacy screen
fastigiate treelightwell to below 3' ht. garden wall
metal gate
6' ht. privacy screen
garden wall/pier
metal gatesmall shade tree
3' ht. evergreen hedgegathering nook
water channel source/wiers
3' ht. evergreen hedge
24" sq. concrete paving slabs - colour to match architectural material palette
stone bridge over water channel
6' ht. privacy screen, typical
+ 230.00'
+ 230.00'
+ 232.00' + 232.00'+ 232.00'
+ 232.00'
+ 232.00'
+ 231.50'
concrete pavers
air intake
ram
p t
o u
nd
erg
rou
nd
pa
rkin
g
5'
Laneway Lofts
patiopatio
+ 230.00'
9'-5
"
10'
7.5'
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 231.00'
DN 1R
gas meter
+ 224.50'
3' ht. evergreen hedge
+ 230.00'
DN 8R
air intake
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
Revisions:
no.: date: item:
Ground Floor Landscape Plan
15020
JES
JES
2015.04.13
1/8" = 1'-0"
L1.1
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5
t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
North
-
526 - 548 WEST KING EDWARD AVENUE Vancouver BC
2015.05.04 Issued for Rezoning
- 2015.08.28 Issued for Coordination
D E S I G N P R O P O S A L FIFTH FLOOR PLAN1/16” = 1’0”
4’-1”
27’-6
”20
’-91/
2”27
’-6”
8’-6
”5’
-0”
10’-0” 43’-0” 4’-2”121’-2”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
4’-1”
14’-6
”6’
-0”
6’-0
”60
’-0”
10’-0” 45’-0” 12’-0”121’-0”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
12’-0”
77’-0
”12
’-0”
URBAN DESIGN PANEL REVIEW 526 - 548 WEST KING EDWARD AVENUE DECEMBER 2015 22
6' ht. metal security gate/fence
UP
DN
UP
DN
UP
DN
UP
DN
UP
DN
DN
DN
UP
UP
UP
UP
UP
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
BG. 68.74m(226.0')
B.G. 68.56M(224.93')
B.G. 68.45M(224.57')
B.G. 68.32M(224.15')
B.G. 68.55M(224.90')
B.G. 69.26M(227.23')
B.G. 70.42M(231.04')
B.G. 70.68.M(231.89')
B.G. 70.88.M(232.55')
B.G. 71.13.M(233.37')
B.G. 71.46 M(234.45')
B.G. 71.61 M(234.94')
BG. 70.67m(231.86')
BG. 70.61m(231.66')
BG. 70.66m(231.82')
BG. 70.93m(232.71')
FUTURE WIDENING LINEBG. 70.59m(231.59')
BG. 71.53m(234.68')
BG. 71.21m(233.63')
BG. 70.78m(232.22')
W E S T K I N G E D W A R D A V E N U E
L A N E
L A
N E
flush band
+ 230.00'
6' ht. metal fence at PL
3' ht. evergreen hedge
large shrubs
multistem tree
exit path
6' ht. security gate
42" ht. guardrail
address pier
3' ht. evergreen hedge at face of wall
shrub planting, typical
waterfall to generate white noise
Breezeway
Courtyard
entry sign/address wallfeature tree
address pier c/ w lighting
metal gate
raised planter
42" ht. metal guardrail
existing lamp standard
New Street Tree: Contact Eileen Curran, Streets Engineering [604.871.6131] to confirm tree planting locations, and Amit Gandha, Park Board, [604.257.8587] for tree species selection and planting requirements.
Broom Finished C.I.P. Concrete Sidewalk to COV Engineering Standard
expansion joint at Property Line
2.4m/8' section of 18" deep root barrier to COV Standard
Class B Bike Parking 6 space metal bike rack
accessible entry/ramp
fastigiate tree
DN 8R
DN
6R
DN
6R
DN
6R
DN
6R
DN
4R
DN
4R
DN
4R
DN 4R
DN 4RDN 4RDN 4RDN 4RDN 4R
DN 5R
DN 4R
DN 4R
lawn boulevard
2'
patiopatiopatiopatio
6' ht. privacy screen, typical
DN
3R
patio patio patio
bridge
seatwall with wood benchtop
metal planter
water channel
patio
patio
patio
6' ht. privacy screen
fastigiate treelightwell to below 3' ht. garden wall
metal gate
6' ht. privacy screen
garden wall/pier
metal gatesmall shade tree
3' ht. evergreen hedgegathering nook
water channel source/wiers
3' ht. evergreen hedge
24" sq. concrete paving slabs - colour to match architectural material palette
stone bridge over water channel
6' ht. privacy screen, typical
+ 230.00'
+ 230.00'
+ 232.00' + 232.00'+ 232.00'
+ 232.00'
+ 232.00'
+ 231.50'
concrete pavers
air intake
ram
p t
o u
nd
erg
rou
nd
pa
rkin
g
5'
Laneway Lofts
patiopatio
+ 230.00'
9'-5
"
10'
7.5'
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 231.00'
DN 1R
gas meter
+ 224.50'
3' ht. evergreen hedge
+ 230.00'
DN 8R
air intake
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
Revisions:
no.: date: item:
Ground Floor Landscape Plan
15020
JES
JES
2015.04.13
1/8" = 1'-0"
L1.1
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5
t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
North
-
526 - 548 WEST KING EDWARD AVENUE Vancouver BC
2015.05.04 Issued for Rezoning
- 2015.08.28 Issued for Coordination
D E S I G N P R O P O S A L SIXTH FLOOR PLAN
4’-1”
27’-6
”20
’-91/
2”27
’-6”
8’-6
”5’
-0”
10’-0” 43’-0” 4’-2”121’-2”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
4’-1”
14’-6
”6’
-0”
6’-0
”60
’-0”
10’-0” 45’-0” 12’-0”121’-0”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
12’-0”
77’-0
”12
’-0”
1/16” = 1’0”
C31359 sf
C31323 sf
B51225 sf
D2160 sf
C31359 sf
B51225 sf
B51225 sf
B51225 sf
C31359 sf
URBAN DESIGN PANEL REVIEW 526 - 548 WEST KING EDWARD AVENUE DECEMBER 2015 23
6' ht. metal security gate/fence
UP
DN
UP
DN
UP
DN
UP
DN
UP
DN
DN
DN
UP
UP
UP
UP
UP
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
BG. 68.74m(226.0')
B.G. 68.56M(224.93')
B.G. 68.45M(224.57')
B.G. 68.32M(224.15')
B.G. 68.55M(224.90')
B.G. 69.26M(227.23')
B.G. 70.42M(231.04')
B.G. 70.68.M(231.89')
B.G. 70.88.M(232.55')
B.G. 71.13.M(233.37')
B.G. 71.46 M(234.45')
B.G. 71.61 M(234.94')
BG. 70.67m(231.86')
BG. 70.61m(231.66')
BG. 70.66m(231.82')
BG. 70.93m(232.71')
FUTURE WIDENING LINEBG. 70.59m(231.59')
BG. 71.53m(234.68')
BG. 71.21m(233.63')
BG. 70.78m(232.22')
W E S T K I N G E D W A R D A V E N U E
L A N E
L A
N E
flush band
+ 230.00'
6' ht. metal fence at PL
3' ht. evergreen hedge
large shrubs
multistem tree
exit path
6' ht. security gate
42" ht. guardrail
address pier
3' ht. evergreen hedge at face of wall
shrub planting, typical
waterfall to generate white noise
Breezeway
Courtyard
entry sign/address wallfeature tree
address pier c/ w lighting
metal gate
raised planter
42" ht. metal guardrail
existing lamp standard
New Street Tree: Contact Eileen Curran, Streets Engineering [604.871.6131] to confirm tree planting locations, and Amit Gandha, Park Board, [604.257.8587] for tree species selection and planting requirements.
Broom Finished C.I.P. Concrete Sidewalk to COV Engineering Standard
expansion joint at Property Line
2.4m/8' section of 18" deep root barrier to COV Standard
Class B Bike Parking 6 space metal bike rack
accessible entry/ramp
fastigiate tree
DN 8R
DN
6R
DN
6R
DN
6R
DN
6R
DN
4R
DN
4R
DN
4R
DN 4R
DN 4RDN 4RDN 4RDN 4RDN 4R
DN 5R
DN 4R
DN 4R
lawn boulevard
2'
patiopatiopatiopatio
6' ht. privacy screen, typical
DN
3R
patio patio patio
bridge
seatwall with wood benchtop
metal planter
water channel
patio
patio
patio
6' ht. privacy screen
fastigiate treelightwell to below 3' ht. garden wall
metal gate
6' ht. privacy screen
garden wall/pier
metal gatesmall shade tree
3' ht. evergreen hedgegathering nook
water channel source/wiers
3' ht. evergreen hedge
24" sq. concrete paving slabs - colour to match architectural material palette
stone bridge over water channel
6' ht. privacy screen, typical
+ 230.00'
+ 230.00'
+ 232.00' + 232.00'+ 232.00'
+ 232.00'
+ 232.00'
+ 231.50'
concrete pavers
air intake
ram
p t
o u
nd
erg
rou
nd
pa
rkin
g
5'
Laneway Lofts
patiopatio
+ 230.00'
9'-5
"
10'
7.5'
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 232.00'
patio
+ 231.00'
DN 1R
gas meter
+ 224.50'
3' ht. evergreen hedge
+ 230.00'
DN 8R
air intake
Project:
Drawn by:
Checked by:
Date:
Scale:
Drawing Title:
Project No.:
Sheet No.:
Revisions:
no.: date: item:
Ground Floor Landscape Plan
15020
JES
JES
2015.04.13
1/8" = 1'-0"
L1.1
Durante Kreuk Ltd.102 - 1637 West 5th Avenue Vancouver BC V6J 1N5
t: 604 684 4611f: 604 684 0577www.dkl.bc.ca
North
-
526 - 548 WEST KING EDWARD AVENUE Vancouver BC
2015.05.04 Issued for Rezoning
- 2015.08.28 Issued for Coordination
4’-1”
3’-0”20’-2”74’-2” 54’-2” 4’-2”
12’-0
”
10’-0” 4’-2”
10’-0”5’-0”LINE OF 1.5 METER S.R.W.
EXISTING PROPERTY LINE
EXISTING PROPERTY LINE
D E S I G N P R O P O S A L ROOF PLAN1/16” = 1’0”