  • 7/29/2019 Design of Electrical Works for Projects

    1/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 1

  • 7/29/2019 Design of Electrical Works for Projects

    2/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 2

    Introduction

    This course covers three main areas of the Electrical Contracting Process:

    1. Basics of Electrical Works Design.2. Shop drawing and Site Works.3. Tendering of Electrical Projects.The Course requires pre-knowledge of [AutoCAD].

    A project naturally progresses from design to the actual building going through the

    following stages:

    As the previous chart suggests, the electrical design is the first step of any electrical project, this

    step has two major concerns besides the basic knowledge of electrical engineering which are

    basic knowledge ofElectrical Safety and Economical Design.

    Where the design aspect of this course covers areas like: Interior Lighting design, Socket

    distribution, panel Boards design, cables selection, etc.

    To

    Contractors

    Consultant

    Approval

    Tender selection

    (Contractor)

    Project as an idea

    Planning Civil & Architecture Design Electro-Mechanical Works Design

    Electrical Works Plumping works Design HVAC works Design

    B.O.Q Preparation Tendering & Analysis

    Shop DrawingImplementation Process

    So on

  • 7/29/2019 Design of Electrical Works for Projects

    3/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 3

    The second phase of the course addresses electrical site works supported with figures and videos

    that introduces the student to real world experience of Sites Electrical Works and how to prepare

    shop drawings for a given project.

    Then the third phase, introduces the student to the basics of tendering and preparing a project bill

    of quantity (B.O.Q).

    At the end of this course, the student will have a head start extensive knowledge of how the

    electrical contracting process works and will able to use this knowledge whenever facing an

    electrical project.

    With all respect

    Eng .Mohammed Tharwat

  • 7/29/2019 Design of Electrical Works for Projects

    4/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 4

    Part One

    Interior Lightning Design

  • 7/29/2019 Design of Electrical Works for Projects

    5/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 5

    I nteri or lighting Design

    While the most important aspect of this area of design is determining the

    desirable lux according to Egyptian, international codes and standards to match

    your project needs, whether your project is a bank, school or even a hospitalthere are some basic rules to go by while determining the lux value of a given

    area.

    Lumen (lm):The unit of luminous flux is a measure for the quantity of luminous energy emitted per second by a lightsource.

    Luminous I ntensity (I ):Light flux irradiated through a tri dimensional angle (solid angle) directed by the magnitude of the referredangle.

    L= (Q/w) Lm/Seta radians

    I L luminance (Lm/M2):The quantity of incidental light falling onto a given surface per unit area of the suface taking into

    consideration that, it is uniformly illuminated.

    E=Q/A Lux

    To have a better understanding of the role of lux in lighting designs consider the

    following example:

    A lamp connected to a power source, the lamp will emit many lighting lines as

    shown in the figure:

    The lighting lines that illuminates 1 m2 is a simple definition of Lux

    Lux = lumen/m2

    Lighting lines

    Lumen

  • 7/29/2019 Design of Electrical Works for Projects

    6/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 6

    So if we say that an office needs 300 lux to be illuminated.

    This simply means each 1 m2 requires 300 lumen.

    The required lux depends on the application or usage of this area.

    Some Lighting Parameters:

    Colour Render ing I ndex (CRI ):A measure of the degree to which the appearance of a surface colour under a given light sourceCompares to the same surface under a CIE reference source. The index has a maximum value of 100.

    Colour Temperature (K):All materials emit light when heated (e.g. metal glows red through to white as the temperatureIncrease). The temperature to which a full radiator (or black body) would be heated to achieve theSame chromaticity (colour quality) of the light source being considered, defines the correlated colour

    temperature of the lamp, quoted in degrees Kelvin.

    Luminance (L):

    L=I/A (Cd/m2)

    Luminous Ef fi cacy (lm/W):

    The ratio of light emitted, to the power consumed by a lamp.

  • 7/29/2019 Design of Electrical Works for Projects

    7/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 7

    The following tables show required lux for many appli cations:

  • 7/29/2019 Design of Electrical Works for Projects

    8/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 8

  • 7/29/2019 Design of Electrical Works for Projects

    9/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 9

  • 7/29/2019 Design of Electrical Works for Projects

    10/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 10

    Types of lamps:

    Normal

    Incident

    Lamp

    Tungsten

    Halogen

    Lamp

    Low

    Pressure

    Mercury

    Lamp

    High

    Pressure

    Mercury

    Lamp

    Metal

    Halide

    Lamp

    Low

    Pressure

    Sodium

    Lamps

    High

    Pressure

    Sodium

    Lamps

    Theory Of

    Operation

    Black Body

    Radiation

    Black Body

    Radiation

    Quantum

    Theory

    Quantum

    Theory

    Quantum

    Theory

    Quantum

    Theory

    Quantum

    Theory

    Color

    Rendering100% 100% 50-95% 15-50% 65-90% 0 25-85%

    Luminous

    Efficacy8-17 13-25 60-95 40-60 70-95 125-200 40-90

    Lif e Time 1000-2000 hr 2000-4000 hr 8000 hr 5000-24000 hr

    3000-12000

    hr 5000-20000 hr 6000-24000 hr

    DimmingCan be

    Dimmed

    Can be

    Dimmed

    Can`t be

    Dimmed

    Can be

    Dimmed

    Can be

    Dimmed

    Can`t be

    Dimmed

    Can be

    Dimmed

    Application Indoor Indoor Indoor Outdoor Outdoor Outdoor Outdoor

    In order to reach a satisfactory lux value for a given area, It`s required to use number of

    lighting fixtures.

    While the number of lighting fixture is dependent on a set of parameters which can be illustrated

    in the following equation:

    N =

    Where:

    N number of lighting fixtures. Q lumen for lighting unit.E required lux. n number of lamps per unit.

    A. Area of room. utilization factor.F clearance factor. K. Maintenance Factor [0.8].

  • 7/29/2019 Design of Electrical Works for Projects

    11/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 11

    A)Area of room (A):A = L.W

    B)Clearance factor (F ):It is the factor that affect of num. lighting fixture according to

    room clean degree.

    For an open lighting fixture in a computer lap room and under a clean room condition,

    clearance factor is 1.27

    C)Number of l amps (n):

    L

    W

    n = 4

    n = 2

    4 x 18

    2 x 36

    n = 1

    n = 1

    100

    60

    Spot light:

  • 7/29/2019 Design of Electrical Works for Projects

    12/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 12

    D)Uti li zation factor ():For a certain lux value to be reached in a given room (area) there are some

    parameters that affect the quantity of lumen per lamp, those parameters are

    better illustrated as follow:

    1. Room index:

    Where:

    KrRoom indexL.Room length

    wRoom widthHmdistance between the

    lighting fixture & working

    plan.

    S/Hm Parameter means the ratio between Mounting Height & distance between

    lighting fixtures which give us the ratio between Emin & Emax

    For Example:

    S/H = 1.75 which mean ratio of [Emin / Emax= 75%]

    S/Hm Ratio is a given value in lighting fixture data sheet.

    Hm2Hm1

    Hf

    Hw

    Hm1 = Ht Hw , Hm2 = Ht - (Hw + Hf)

  • 7/29/2019 Design of Electrical Works for Projects

    13/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 13

    2.Reflection factors: ( )Depending on wall, ceiling, ground colors and materials, Reflection factor can be

    determined by using the following tables:

    Uti li zation factorcan be one from the following tables by using both ofRoom indexand

    Reflection factors.

    Now that we have reached this point, we know all the required parameters to get the desired

    number of lighting fixtures in a specified room.

  • 7/29/2019 Design of Electrical Works for Projects

    14/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 14

  • 7/29/2019 Design of Electrical Works for Projects

    15/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 15

  • 7/29/2019 Design of Electrical Works for Projects

    16/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 16

  • 7/29/2019 Design of Electrical Works for Projects

    17/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 17

  • 7/29/2019 Design of Electrical Works for Projects

    18/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 18

  • 7/29/2019 Design of Electrical Works for Projects

    19/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 19

  • 7/29/2019 Design of Electrical Works for Projects

    20/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 20

  • 7/29/2019 Design of Electrical Works for Projects

    21/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 21

    Lumen per lighting lamp:

    Can be determined by the following table according to lamp type:

  • 7/29/2019 Design of Electrical Works for Projects

    22/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 22

    Design lighting for the following project:

    L = 15 m

    W = 8 m

    H = 4 m

    Work plan = 85 cm

    The above data is for a Conference room, with a white colored ceiling, its required that you

    determine the number of lighting fixtures that achieves the desired Lux.

    Solution

    A = L.w = 15 x 8 = 120 m2

    From tables: conference room has an E = 500 lux

    The owner choose fixture (E). so, lamps = 2 x 36 watt , n = 2

    From application: for a clean room, F = 1.33 (clearance factor = 1.33)

    From lumen table: Q = 3250 lumen

    From wall and ceiling color: Hm = Ht(Hs + Hw) lighting fixture will be on false ceiling (Hw = 0.7 m)

    Hm = 4(0.85 + 0.7) = 2.45 m Hm = 2.45 m

    Kr= Kr= 2.12

    From tables:

    (Uf= 0.52)

    N =

    N = 23.6 units 24 units

    L

    W

  • 7/29/2019 Design of Electrical Works for Projects

    23/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 23

    Arrangement of lighting fixture

    From the previous example the required number of lighting fixtures is 24 unit, now

    the question is how they can be arranged?

    (4x6) or (3x8) or (12x2) or .etc

    So we will arrange those as (4x6) units

    As shown in the fig. below, The distance between each lighting fixture and the

    other is double the distances between the lighting fixture and the wall to avoid a

    blind spots.

    12X = 10 x = m

    8y = 8 y = 1 m

    10 mX 2X 2X 2X 2X 2X 2X 2X X

    8 m

    y

    y

    2 y

    2 y

    2 y

  • 7/29/2019 Design of Electrical Works for Projects

    24/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 24

    Control of lighting circuits

    Lighting circuits can be controlled by lighting switches.

    L ighti ng switches can be classif ied into:

    One way, one gang.

    One way, two gang.

    One way, three gang.

    Two ways, one gang.

    Two ways, two gang.

    Two ways, three gang.

    The difference between one way & two way switches is that the one way switch controls the

    circuit from one location. However, two way switches controls the circuit from two locations.

    Two way switches used in bed rooms, corridors.etc.

    One way switch:

    Two way switch:

  • 7/29/2019 Design of Electrical Works for Projects

    25/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 25

    Part Two

    Basics of Street lighting Design

  • 7/29/2019 Design of Electrical Works for Projects

    26/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 26

    Street Lighting Design

    Lighting is a vital rule to describe the importance of major

    and minor roads, which constitute the lifelines of

    communication in the motorized world today.

    Good street lighting is aiming to:

    Reduce traffic accidents Combat crime Respect the environment

    For good street lighting design there are some parameters

    must be taken:

    Area Classification.

    Road way Classification. Street Width. Poles height.

    A) Area Classif ications:

    Commercial Intermediate Residential

  • 7/29/2019 Design of Electrical Works for Projects

    27/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 27

    B/Roadway Classif ications:

    Freeway Expressway Arterial Collector Local Alleys

    Poles height and street width affect li ghting arrangement

    Street Lighting Arrangement:

    1/Single sided:

    This type of arrangement, in which all luminaries are

    located on one side of the road, is used only when the width

    of the road is equal to, or less than the mounting height of

    the luminaries.

    W

  • 7/29/2019 Design of Electrical Works for Projects

    28/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 28

    2/Staggered:

    This type of arrangement in which the luminaries are

    located on both sides of the road in a staggered, or zigzag,

    arrangement is used mainly when the width of the road is

    between 1 to 1.5 times the mounting height of the

    luminaries.

    W=1~1.5 H

    3/Opposite:

    This type of arrangement, with the luminaries located on

    both sides of the road opposite to one another, is used

    mainly when the width of the

    road is greater than 1.5 times

    the mounting height of the

    luminaries.

    W>1.5H

  • 7/29/2019 Design of Electrical Works for Projects

    29/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 29

    4- Span wire

    This type of arrangement, with the luminaries suspended along

    the axis of the road, is normally used for narrow roads that have

    buildings on both sides.

    I f Road is curved:

    Single Sided:

    If the radius is Small & The length is 300 m.

    Opposite:

    If the radius is Large & The length > 300 m.

  • 7/29/2019 Design of Electrical Works for Projects

    30/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 30

  • 7/29/2019 Design of Electrical Works for Projects

    31/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 31

    Types of lamps used in Street lighting

    1- H igh pressure sodium lamps (H ighway Streets):

    It is suitable for such kinds of lighting even in cloudy weather.

    2- Low pressure sodium lamps (Tunnels):

    This type of lamp is used in tunnels and closed public places. They also have

    relatively long life.

    3- Metal halide lamps.

    4- Mercury lamps (I nternal Streets):

    It gives a bright white light thus it could be used in illumination of open places

    such as large stadiums since this type of lamps have strong glass.

    Methods of switching of lamps

    There are various methods, some of which are:

    - Photo cell.

    - Control switch.

    - Timer.

  • 7/29/2019 Design of Electrical Works for Projects

    32/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 32

    Street Lighting System

    The distr ibution lighting network consists of:

    - Lighting distribution box

    - Poles

    - Lighting luminaries

    - Cables

    Design of the street l ighti ng scheme:

    Where:

    F: is lamp flux in lumens.

    C.F: is the clearing factor, taken about 0.6.

    M.F: is the maintenance factor, taken about 0.7.

    S: is the space between the poles in meter.

    W: is the street width in meter.

    E: is the illumination level of street in lux.

  • 7/29/2019 Design of Electrical Works for Projects

    33/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 33

    Part Three

    Electrical Sockets & Power Calculations

  • 7/29/2019 Design of Electrical Works for Projects

    34/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 34

    Electri c sockets

    Types of Electri cal Sockets:

    Single & Duplex Socketsare used for low current applications, as in TVs, DVDs, computers, laptops,mobile chargers, cassettes, videos, and home instruments.etc.

    Power socketsare used for heavy loads as Boilerssmall motor pumpswater heatersetc

    Fuse Switch Disconnect Switch

    Applications Used for [A/C-W.HETC] as a isolatorswitch & protective switch against overcurrent by using to rapture fuse

    Used for [FCU-AHU-Pumps-Elevators-

    ..ETC] as isolator switch only.

    Poles Number Double Poles Only Single, Double & Three PolesCurrent Rating 26A-32A 16A20A32A40A60A80A100A125A150A200A250A -320A-400A-

    800A

    All previous socket types are available with high IP for protection against water and dust in wet

    and open or landscape areas.

    Sockets distribution:

    Socket distribution for a given room is dependent on the following factors:

    1- Room application2- Room furniture3- Each 3 meters put a single or duplex socket (in case of no furniture DWG)4- For kitchens, there must be at least one power socket.

    HD

    Single Socket

    Hand Drier

    Fuse Switch or

    Disconnect Switch

    Duplex Socket

    Power Socket

  • 7/29/2019 Design of Electrical Works for Projects

    35/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 35

    Power calcul ations

    A) For lighting:

    - Incident lamps or spotsP = 20 200 watts.

    - For florescent lamps2 x 36 watt

    4 x 18 watt

    2 x 55 watt

    - For chandeliersP= 400500 watt

    B) For sockets:

    - Single socket........................200 VA- Duplex socket ......................400VA- Power socket.2000-2500VA- Hand driver1500VA-

    Fuse switches

    A.C W.H

    1 HP....... ......1000 VA

    1.5HP... 1500 VA

    1500 VA

    Up to 2000 VA

    2.25 HP.2250 VA

    3 HP .3000 VA

    4 HP..4000 VA

    5 HP..5000 VA

  • 7/29/2019 Design of Electrical Works for Projects

    36/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 36

    Power Factor:

    It`s a percentage of used active power.

    Where:

    P ==== Active Power

    S==== Apparent Power

    For all cables and C.Bs calculations, power must be in (VA)

    For lighting, power must be in VA but its data is given by watt so:

    For fluorescent lamps PF = 0.45 = 0.6

    For halogen or spots PF = 1

    For current calculations:

    Single phase loads

    I (Amp) = 4.5 Skva

    Three phase loads

    I (Amp) = 1.5 Skva

  • 7/29/2019 Design of Electrical Works for Projects

    37/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 37

  • 7/29/2019 Design of Electrical Works for Projects

    38/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 38

    Electrical Loads Estimation

    According to Egyptian Company for Distribution maximum demand load (VA) is calculated by

    knowing the area and building application as following:

    A) For buildings less than 15 floors:The following table gives required KVA for each 100 m2:

    Application Type Residential Building Commercial Building

    Low Density 1.5-2 6-12

    Medium Density 2.5-4 6-12

    High Density 6-10 6-12

    B) For buildings more than 15 floors:The following table gives required KVA for each 100 m2:

    Residential Building Commercial Building

    8-10 12

    Height of building is calculated by 1.5 of street width.

  • 7/29/2019 Design of Electrical Works for Projects

    39/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 39

    Electric li nes calculations

    After Distributing lighting fixtures and sockets, it must be fed from a main panel board.

    Each group of lighting fixtures or group of sockets has one line to the main panel board.

    For lighting lines:

    For socket lines:

    For power socket lines:

    For hand drier:

    For air conditioners:

    Each unit takes a separate line:

    16 AmpEach line 1500 VA 2.5 mmNo more

    Than

    With wire

    Size

    With

    MCB

    20 AmpEachline 2000 VA

    3 mm

    No more

    Than

    With wire

    Size

    With

    MCB

    25 AmpEach line 2000 VA 4 mmNo more

    Than

    With wire

    Size

    With

    MCB

    25 AmpWith

    MCB

    Each unit

    takes a

    separate line

    1500 VA 4 mmNo more

    Than

    With wire

    Size

    25 Amp1, 2.25, 3 HP 4 mm

    32 Amp4 - 5 HP 6 mm

  • 7/29/2019 Design of Electrical Works for Projects

    40/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 40

    Load schedules

    Project Name: MCB:

    Panel Name: cable: size:

    Breaking cap.:

    Circuit

    NumberType

    Cable

    sizeMCCB

    Three phaseNotes

    R Y B

    R1 Lighting 2.5 mm2

    16A 800

    Y1 Lighting 2.5 mm2

    16A 600

    B1 Lighting 2.5 mm2

    16A 990

    R2 Socket 3 mm2

    20A 1600

    Y2 Socket 3 mm2

    20A 1800

    B2 A.C 4 mm

    2

    25A 1500R3 Spare 16A

    Y3 Spare 20A

    B3 Spare 32A

    Total connected load 2400 2400 2490

    Load balancing:

    Given that the network is featuring a star connection.

    Its important to achieve I1 I2 I3 to reach an IN of nearly equal zero.

    R

    Y

    B

    N

    I1

    IN

    I2

    I3

    R

    BY

  • 7/29/2019 Design of Electrical Works for Projects

    41/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 41

    Balance Check:

    For any panel board, there is a balance check for three phase loads due to reducing nuteral

    current & unbalanced stresses on circuit breakers.

    Unbalance ratio can be calculated by:

    Unbalance Ratio (%) mustnt exceed a value of5% of total three phase load.

    For above panel bard unbalance ration will be:

    Unbalance Ratio (%) = 3.62% so the above its balanced panel board.

    Diversity factor:

    It`s the percentage of expected on line loads connected at the same time.

    - For lighting .. ....0.7 1- For all sockets............................... 0.6 0.9- For Air conditioners .. 1- For heaters and hand drier . 1

    Circuit breaker capacity calculations:

    After conducting load and diversity factor calculations, now we consider C.B capacitycalculations which are as follows:

    IC.B = =

  • 7/29/2019 Design of Electrical Works for Projects

    42/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 42

    Circuit breaker standard:

    1016202532405060637580100125160200250320400

    50063080010001250160020002500320040005000-6300 Amp.

    MCB MCCB VACUUM ELCB

    AbbreviationMiniature

    Circuit

    Breaker

    Molded Case

    Circuit

    Breaker

    Vacuum

    Circuit

    Breaker

    Earth Leakage

    Circuit

    Breaker

    Nominal Current 10125 A 321600 A 16005000 A 10100A

    Short Circuit Current 630 KA 1080 KA Up to 150 KA 630 KA

    Num.Poles SPDPTP- FP TP - FP FP DP

    Adjustment FixedFixed -

    AdjustableFixed Fixed

    For pervious load, there will be a panel board to feed these circuits, Single line

    diagrammed for panel board required to represent panel specifications and component as

    following:

    16A20A32A16A20A32A

    X3X2X1X1X1X1

    LightingSocketA.CSpareSpareSpare

    40A

    [4x10]+10 mm CU/PVC

    380V,50HZ,Isc

  • 7/29/2019 Design of Electrical Works for Projects

    43/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 43

    Motors Panel Boards

    Circuit Breakers of each motor should be greater than starting current of the motor.

    Starting Current of motors can be determined by Code-letter method according to the following

    table:

    Code LetterKVA/HP at

    startingCode Letter

    KVA/HP at

    starting

    A 1.6 L 9.495

    B 3.29 M 10.595

    C 3.72 N 11.845

    D 4.25 P 13.25

    E 5.3 R 14.995F 5.95 S 16.995

    G 6.1 T 18.995

    H 6.7 U 21.195

    J 7.55 V 22.4

    K 8.495

    As an example:

    A 3 phase, 380V, 50HZ, 5KVA motor with code letter J, Required calculating Ist?

    From above table:

    Code letter J mean KVA) st = KVA) motor * 7.55

    = 5 * 7.55 = 37.75 KVA

    So:

    Ist= 1.5 * 37.75 = 56.625 Amp,

    So the circuit breaker rating will be = 60A

  • 7/29/2019 Design of Electrical Works for Projects

    44/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 44

    Distribution Board for group of motors:

    For distribution board, feed group of motors, the sub circuit breakers ratings should be larger

    than starting current of each motor.

    To determine the rating of main circuit breaker:

    IM.C.B= Ist-largest+ D.F ( IRating-except largest )

    Where:

    D.F is a diversity factor & can be calculated from following table:

    No. Motors Type of drive Demand Factor1:5 Individual Drive 1

    6:10 Individual Drive 0.75

    11:15 Individual Drive 0.716:20 Individual Drive 0.65

    21:30 Individual Drive 0.6

    Less than 5 Group Drive 1

    5:10 Group Drive 0.85

    More than 10 Group Drive 0.7

  • 7/29/2019 Design of Electrical Works for Projects

    45/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 45

    Part Four

    Cables Selection

  • 7/29/2019 Design of Electrical Works for Projects

    46/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 46

    Cable selection

    Power cables are used to feed circuits with the required power.

    So, cables selection must be according to transfer a full power to certain load, that mean the

    cables must transfer the full current with no or limited voltage drop to ensure full power transfer.

    Cables can be classif ied as following below:

    Operating & Meggered Voltages 600/1000 450/750

    Conductor Type Copper Aluminum

    Insulation Material PVC XLPE

    Number of cores Single Multi core

    ArmoredArmored

    [STASWA]

    Non-

    Armored

    Neutral Size Reduced NeutralNon-

    Reduced

    Neutral

    To select a cable for a certain load like below:

    ELECTRICA

    L LOAD

    AC Source

    380 V, 50HZ

  • 7/29/2019 Design of Electrical Works for Projects

    47/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 47

    The above mentioned cable should transfer full power from

    source to load, so it must stand full load current with limited

    voltage drop.

    To ensure carrying full load current [Derating Factors] must be

    taken in consideration.

    Derating factor :

    Derating factors are the factors that affect cables life time

    and their standing current and its dependant on cable laying

    methods.

    From Cables catalogue we can obtain the Derating factors

    ratings

  • 7/29/2019 Design of Electrical Works for Projects

    48/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 48

    Df= D1 x D2 x D3 x D4 x D5 x D6x..Dy

    Icable = Voltage Drop:

    A long distance cable and its internal impedance may

    cause a voltage drop more than the allowed percentage.

    Voltage Drop Percentage mustnt more than 5%.Voltage drop calculations:

    VD% =

    Where:

    VD% Voltage Drop Percentage Voltage Drop for a certain cable[Obtained from cables catalogues]

    Circuit Breaker Current Cables Length

  • 7/29/2019 Design of Electrical Works for Projects

    49/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 49

    Part Five

    Emergency Loads

    Generators & UPS

  • 7/29/2019 Design of Electrical Works for Projects

    50/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 50

    Generators and UPS

    In some projects, power continuity is required for many different reasons

    like:

    (1)Data loss as in banks(2)Emergency as in hospitals(3)Production quantity as in factoriesetcSo the important loads must be fed by a stand by source.

    In case of power interruptions, another source will feed these loads

    There are two devices that ensure power continu ity:

    (A) Generators(B) UPS

    Difference between Generators and UPS:

    Generatorsare used as a standby power source with a delay time

    between current interruption and continuity.

    On the other hand, UPS are used as a power source without any

    time delay between current interruption and current continuity.

  • 7/29/2019 Design of Electrical Works for Projects

    51/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 51

    Theory of operation:

    G

    UPS

    1

    3

    2

    L5

    Main power source is on:

    S1 is on S2 is on S3 is off

    Power interruption:

    S1 is off S2 is on S3 is on

    For load (5): Power continuity is needed without time delay so a UPS is

    used to feed the load till the Generator starts up.

    UPS is connected before load.

  • 7/29/2019 Design of Electrical Works for Projects

    52/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 52

    A controller of three switches called (ATS)

    ATS panels:

    Its a panel that consists of three switches one is connected to the mainsource, the second one is connected to the Generator and the third one is

    connected to the load through a controller Microcontroller, PLCEtc

    Generator selection:

    Generators are selected according to emergency loads power rating (KVA).

    UPS selection:

    A UPS is selected according to emergency load power rating (KVA) and dischargingtime of back up batteries.

    Co-ordination between Generator starting up time and backup battery discharging time is

    crucial as to assure the continuity of power.

    The UPS discharging time must be selected to cover the delay time between current

    interruption and continuity.

    ATSG

    Load

    Main source

  • 7/29/2019 Design of Electrical Works for Projects

    53/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 53

    Part Six

    Short Circuit Current

  • 7/29/2019 Design of Electrical Works for Projects

    54/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 54

    Short cir cui t current

    In case of short circuit, there is a large current value passing through protective devices.

    If these protective devices fail to stand the current value, damage occurs in circuit

    components which might cause fire or complete damage of the electrical system.

    The power systems must be designed to stand short circuit currents for a short period of

    time before the trip process takes place.

    While the types of trips performed by a circuit breaker are:

    Thermal trip: Responsible for protection against over load currents.

    Magnetic trip: Responsible for protection against short circuit currents.

    Ikis the maximum current capacity that a device stands before damaging.

    Short circuit current calculations:

    It = ISC + IL

    At short circuit (IL = Zero):

    IS.C =

    Vphphase voltage

    Zttotal circuit impedance

    Thermal trip

    Mag. trip

    ISC IK

    ZCab

    ZLoad

    ZCab

    ZLoad

    It

    Isc

    IL

  • 7/29/2019 Design of Electrical Works for Projects

    55/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 55

    For the following circuit:

    A)For part a:IS.C =

    =

    B)For part b:

    IS.C =

    =

    a

    b

  • 7/29/2019 Design of Electrical Works for Projects

    56/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 56

    Impedances Calculations:

    1/Ring Main Units:

    Power Rating Reactance Value

    250 KVA0.633 m

    500 KVA0.316 m

    1000 KVA0.158 m

    2/Transformers:

    Power Rating Reactance Value

    25 KVA 256 m50 KVA 128 m

    100 KVA 64 m160 KVA 40 m200 KVA 32 m250 KVA 25.6 m

    315 KVA 20.3 m400 KVA 16 m

  • 7/29/2019 Design of Electrical Works for Projects

    57/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 57

    500 KVA 12.8 m630 KVA 10.16 m

    800 KVA 9 m1000 KVA 8 m1600 KVA 7.35 m

    3/Circuit breaker:

    XC.B = 0.15 m4/Bus Way:

    Xb.w= 0.15L mCables:

    XCable = 0.08L mResistances are negligible.

    Shor t cir cuit current can be calculated by another method

    Up and Down Stream Tables

  • 7/29/2019 Design of Electrical Works for Projects

    58/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 58

  • 7/29/2019 Design of Electrical Works for Projects

    59/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 59

  • 7/29/2019 Design of Electrical Works for Projects

    60/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 60

    Part Seven

    Earthing Systems

  • 7/29/2019 Design of Electrical Works for Projects

    61/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 61

    Earthing systems

    There are two types of ear thing systems:

    (1) Function earthing(2) Protection earthing

    (1)Function earthing:

    This is the earthing of neutral points.

    A neutral point is connected to the earth point to get the potential of the neutral point to be zero.

    (2) Protection earthing:

    This is the earthing of the electrical equipment body for human protection.

    Earthing system design:

    The following shape shows electrical equipment having a current leakage problem while a human is

    touching the equipment body.

    The above circuit can be represented by:

    Rh.. Human Resistance.

    Re.. Earthing Resistance.

    The sole purpose of any earthing system is to protect humans from (I1)

    So for I1

  • 7/29/2019 Design of Electrical Works for Projects

    62/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 62

    Earthing Systems Resistance Calculation:

    Re =

    Where:

    Re . Electrode Resistance

    Soil ResistivityL..Earth Electrode Length

    Soil resistivity depends on soil type as show in table (1)

    Rv = Where:

    Rv Total earth resistance

    ReEarth resistance for each electrode

    L..Electrode length

    SDistance between electrodes

    N.Number of electrodes

    ..Utilization factor which calculated by tables (2), (3), (4).

    L

    L

    SS

  • 7/29/2019 Design of Electrical Works for Projects

    63/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 63

  • 7/29/2019 Design of Electrical Works for Projects

    64/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Eng.M.Tharwat 64

  • 7/29/2019 Design of Electrical Works for Projects

    65/65

    [ELECTRICAL WORKS FOR PROJECTS] 2013/2014

    Also there is the resistance of wire thats connected between electrodes (Rh)

    Rh =

    Where:

    .soil resistivityL.wire length

    .utilization factor.

    Total Earth Resistance

    Rt = .