design drawings vendor drawings

8
NOTICE: THE DATA IN THIS DOCUMENT INCORPORATES PROPRIETARY RIGHTS OF UC SYNERGETIC, LLC. ANY PARTY ACCEPTING THIS DOCUMENT DOES SO IN CONFIDENCE AND AGREES THAT IT SHALL NOT BE DUPLICATED IN WHOLE OR PART, NOR DISCLOSED TO OTHERS WITHOUT THE CONSENT OF UC SYNERGETIC, LLC. CONTRACTOR SHALL VERIFY ALL CONDITIONS ON JOB SITE & NOTIFY PROJECT MANAGER OF ANY VARIATIONS FROM DIMENSIONS SHOWN ON THESE DRAWINGS BEFORE PROCEEDING WITH ANY CONSTRUCTION. UC SYNERGETIC, LLC. 123 North White Street Fort Mill, SC 29715 VA License No. 0407004417 0 SAE ISSUE FOR CONSTRUCTION 08-19-2015 SHEET NO. SHEET TITLE REV. ISSUE DATE ISSUED FOR COMMENTS CS01.01 COVER SHEET 0 08/19/2015 CONSTRUCTION COMPLETED BM01.01 BILL OF MATERIAL 0 08/19/2015 CONSTRUCTION COMPLETED CB01.01 CORE BORING PLAN 0 08/19/2015 CONSTRUCTION COMPLETED CB01.02 CORE BORING LOGS 0 08/19/2015 CONSTRUCTION COMPLETED FD01.01 DIRECT EMBEDMENT FOUNDATION DETAILS AND SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED FD01.02 DRILLED PIER FOUNDATION DETAILS AND SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED FP01.01 DRILLED PIER, DIRECT EMBED STEEL POLE STAKING 0 08/19/2015 CONSTRUCTION COMPLETED PR01.01 STEEL POLE RAKING DETAIL AND SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED PP01.01 PLAN AND PROFILE, STA. 174+33.90' TO 196+00' 0 08/19/2015 CONSTRUCTION COMPLETED PP02.01 PLAN AND PROFILE, STA. 196+00' TO 223+00' 0 08/19/2015 CONSTRUCTION COMPLETED PP03.01 PLAN AND PROFILE, STA. 223+00' TO 247+00' 0 08/19/2015 CONSTRUCTION COMPLETED PP04.01 PLAN AND PROFILE, STA. 247+00' TO 271+22.14' 0 08/19/2015 CONSTRUCTION COMPLETED SD01.01 ASSEMBLY DRAWINGS 0 08/19/2015 CONSTRUCTION COMPLETED SD02.01 ASSEMBLY DRAWINGS 0 08/19/2015 CONSTRUCTION COMPLETED SD03.01 ASSEMBLY DRAWINGS 0 08/19/2015 CONSTRUCTION COMPLETED SD04.01 STEEL POLE ASSEMBLY SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED SD05.01 BOLT SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED SF06.01 +($9< '($' (1' )5$0,1* 0 08/19/2015 CONSTRUCTION COMPLETED SF09.01 TP69A & VRAP69A FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED SF09.02 TP69A & VRAP69A WITH TAPS FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED SF09.03 TP69A CLAMP TOP FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED SF10.01 GLIDE SLOPE OHGW DEAD END FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED SF10.02 GLIDE SLOPE OHGW SUSPENSION FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED SF10.03 GLIDE SLOPE UNDERBUILD FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED SF13.01 '($' (1' )5$0,1* 0 08/19/2015 CONSTRUCTION COMPLETED SF14.01 TRANSITION DEAD END FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED SF17.01 DISTRIBUTION UNDERGROUND STRUCTURE FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED ST06.01 HEAVY DEAD END STR. #90, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST06.02 HEAVY DEAD END STR. #96, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST09.01 TP69A & VRAP69A BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST09.02 TP69A & VRAP69A WITH TAPS, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST10.01 GLIDE SLOPE BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST10.02 GLIDE SLOPE UNDERBUILD DEAD END, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST10.03 GLIDE SLOPE UNDERBUILD SUSPENSION, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST10.04 GLIDE SLOPE HEAVY ANGLE DEAD END, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST13.01 +($9< '($' (1' %,' '5$:,1* 0 08/19/2015 CONSTRUCTION COMPLETED ST14.01 TRANSITION DEAD END STR. #110, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST14.02 TRANSITION DEAD END STR. #80, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED ST17.01 DISTRIBUTION UNDERGROUND STRUCTURE, BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED SHEET NO. SHEET TITLE REV. ISSUE DATE ISSUED FOR COMMENTS TP-13376-9-ABC ANCHOR BOLT DETAIL, STR. #80 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-31-ABC ANCHOR BOLT DETAIL, STR. #86 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-32-ABC ANCHOR BOLT DETAIL, STR. #106 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-33-ABC ANCHOR BOLT DETAIL, STR. #90 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-34-ABC ANCHOR BOLT DETAIL, STR. #96 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-36-ABC ANCHOR BOLT DETAIL, STR. #110 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-1-PA MANUFACTURER DRAWING DETAIL, STR. #72 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-5-PA MANUFACTURER DRAWING DETAIL, STR. #74 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-6-PA MANUFACTURER DRAWING DETAIL, STR. #75 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-7-PA MANUFACTURER DRAWING DETAIL, STR. #77 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-8-PA MANUFACTURER DRAWING DETAIL, STR. #76 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-9-PA MANUFACTURER DRAWING DETAIL, STR. #80 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-10-PA MANUFACTURER DRAWING DETAIL, STR. #81 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-11-PA MANUFACTURER DRAWING DETAIL, STR. #84 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-12-PA MANUFACTURER DRAWING DETAIL, STR. #85 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-13-PA MANUFACTURER DRAWING DETAIL, STR. #87 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-14-PA MANUFACTURER DRAWING DETAIL, STR. #88 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-15-PA MANUFACTURER DRAWING DETAIL, STR. #89 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-16-PA MANUFACTURER DRAWING DETAIL, STR'S. #91, #93 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-17-PA MANUFACTURER DRAWING DETAIL, STR. #92 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-19-PA MANUFACTURER DRAWING DETAIL, STR'S. #94, #95 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-21-PA MANUFACTURER DRAWING DETAIL, STR. #97 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-22-PA MANUFACTURER DRAWING DETAIL, STR'S. #98, #99, #101, #103, #105 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-24-PA MANUFACTURER DRAWING DETAIL, STR. #100 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-27-PA MANUFACTURER DRAWING DETAIL, STR'S. #104, #108 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-30-PA MANUFACTURER DRAWING DETAIL, STR. #82 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-31-PA MANUFACTURER DRAWING DETAIL, STR. #86 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-32-PA MANUFACTURER DRAWING DETAIL, STR. #106 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-33-PA MANUFACTURER DRAWING DETAIL, STR. #90 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-34-PA MANUFACTURER DRAWING DETAIL, STR. #96 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-35-PA MANUFACTURER DRAWING DETAIL, STR. #109 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-36-PA MANUFACTURER DRAWING DETAIL, STR. #110 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-37-PA MANUFACTURER DRAWING DETAIL, STR. #102 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-38-PA MANUFACTURER DRAWING DETAIL, STR. #107 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-CA1 DAVIT ARM DETAIL, 8' 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-1-DA1 DAVIT ARM DETAIL, 6', SHEET 1 OF 2 0 08/19/2015 CONSTRUCTION COMPLETED TP-13376-1-DA2 DAVIT ARM DETAIL, 6', SHEET 2 OF 2 0 08/19/2015 CONSTRUCTION COMPLETED DESIGN DRAWINGS VENDOR DRAWINGS

Upload: others

Post on 24-Dec-2021

94 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: DESIGN DRAWINGS VENDOR DRAWINGS

NOTICE:

THE DATA IN THIS DOCUMENT INCORPORATES

PROPRIETARY RIGHTS OF UC SYNERGETIC, LLC.

ANY PARTY ACCEPTING THIS DOCUMENT DOES

SO IN CONFIDENCE AND AGREES THAT IT SHALL

NOT BE DUPLICATED IN WHOLE OR PART, NOR

DISCLOSED TO OTHERS WITHOUT THE CONSENT

OF UC SYNERGETIC, LLC.

CONTRACTOR SHALL VERIFY ALL CONDITIONS ON

JOB SITE & NOTIFY PROJECT MANAGER OF ANY

VARIATIONS FROM DIMENSIONS SHOWN ON THESE

DRAWINGS BEFORE PROCEEDING WITH ANY

CONSTRUCTION.

UC SYNERGETIC, LLC.

123 North White Street

Fort Mill, SC 29715

VA License No. 0407004417

®

0 SAE ISSUE FOR CONSTRUCTION08-19-2015

SHEET NO. SHEET TITLE REV. ISSUE DATE ISSUED FOR COMMENTS

CS01.01 COVER SHEET 0 08/19/2015 CONSTRUCTION COMPLETED

BM01.01 BILL OF MATERIAL 0 08/19/2015 CONSTRUCTION COMPLETED

CB01.01 CORE BORING PLAN 0 08/19/2015 CONSTRUCTION COMPLETED

CB01.02 CORE BORING LOGS 0 08/19/2015 CONSTRUCTION COMPLETED

FD01.01 DIRECT EMBEDMENT FOUNDATION DETAILS AND SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED

FD01.02 DRILLED PIER FOUNDATION DETAILS AND SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED

FP01.01DRILLED PIER, DIRECT EMBED STEEL POLE STAKING

0 08/19/2015 CONSTRUCTION COMPLETED

PR01.01 STEEL POLE RAKING DETAIL AND SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED

PP01.01PLAN AND PROFILE, STA. 174+33.90' TO 196+00'

0 08/19/2015 CONSTRUCTION COMPLETED

PP02.01PLAN AND PROFILE, STA. 196+00' TO 223+00'

0 08/19/2015 CONSTRUCTION COMPLETED

PP03.01PLAN AND PROFILE, STA. 223+00' TO 247+00'

0 08/19/2015 CONSTRUCTION COMPLETED

PP04.01PLAN AND PROFILE, STA. 247+00' TO 271+22.14'

0 08/19/2015 CONSTRUCTION COMPLETED

SD01.01 ASSEMBLY DRAWINGS 0 08/19/2015 CONSTRUCTION COMPLETED

SD02.01 ASSEMBLY DRAWINGS 0 08/19/2015 CONSTRUCTION COMPLETED

SD03.01 ASSEMBLY DRAWINGS 0 08/19/2015 CONSTRUCTION COMPLETED

SD04.01 STEEL POLE ASSEMBLY SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED

SD05.01 BOLT SCHEDULE 0 08/19/2015 CONSTRUCTION COMPLETED

SF06.01 75° - 105° HEAVY DEAD END FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF09.01 TP69A & VRAP69A FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF09.02 TP69A & VRAP69A WITH TAPS FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF09.03 TP69A CLAMP TOP FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF10.01 GLIDE SLOPE OHGW DEAD END FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF10.02 GLIDE SLOPE OHGW SUSPENSION FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF10.03 GLIDE SLOPE UNDERBUILD FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF13.01 25° - 60° DEAD END FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF14.01 TRANSITION DEAD END FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

SF17.01 DISTRIBUTION UNDERGROUND STRUCTURE FRAMING 0 08/19/2015 CONSTRUCTION COMPLETED

ST06.01HEAVY DEAD END STR. #90, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST06.02HEAVY DEAD END STR. #96, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST09.01 TP69A & VRAP69A BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED

ST09.02TP69A & VRAP69A WITH TAPS, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST10.01 GLIDE SLOPE BID DRAWING 0 08/19/2015 CONSTRUCTION COMPLETED

ST10.02GLIDE SLOPE UNDERBUILD DEAD END, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST10.03GLIDE SLOPE UNDERBUILD SUSPENSION, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST10.04GLIDE SLOPE HEAVY ANGLE DEAD END, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST13.0130° - 60° HEAVY DEAD END, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST14.01TRANSITION DEAD END STR. #110, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST14.02TRANSITION DEAD END STR. #80, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

ST17.01DISTRIBUTION UNDERGROUND STRUCTURE, BID DRAWING

0 08/19/2015 CONSTRUCTION COMPLETED

SHEET NO. SHEET TITLE REV. ISSUE DATE ISSUED FOR COMMENTS

TP-13376-9-ABCANCHOR BOLT DETAIL, STR. #80

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-31-ABCANCHOR BOLT DETAIL, STR. #86

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-32-ABCANCHOR BOLT DETAIL, STR. #106

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-33-ABCANCHOR BOLT DETAIL, STR. #90

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-34-ABCANCHOR BOLT DETAIL, STR. #96

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-36-ABCANCHOR BOLT DETAIL, STR. #110

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-1-PAMANUFACTURER DRAWING DETAIL, STR. #72

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-5-PAMANUFACTURER DRAWING DETAIL, STR. #74

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-6-PAMANUFACTURER DRAWING DETAIL, STR. #75

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-7-PAMANUFACTURER DRAWING DETAIL, STR. #77

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-8-PAMANUFACTURER DRAWING DETAIL, STR. #76

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-9-PAMANUFACTURER DRAWING DETAIL, STR. #80

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-10-PAMANUFACTURER DRAWING DETAIL, STR. #81

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-11-PAMANUFACTURER DRAWING DETAIL, STR. #84

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-12-PAMANUFACTURER DRAWING DETAIL, STR. #85

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-13-PAMANUFACTURER DRAWING DETAIL, STR. #87

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-14-PAMANUFACTURER DRAWING DETAIL, STR. #88

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-15-PAMANUFACTURER DRAWING DETAIL, STR. #89

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-16-PAMANUFACTURER DRAWING DETAIL, STR'S. #91, #93

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-17-PAMANUFACTURER DRAWING DETAIL, STR. #92

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-19-PAMANUFACTURER DRAWING DETAIL, STR'S. #94, #95

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-21-PAMANUFACTURER DRAWING DETAIL, STR. #97

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-22-PAMANUFACTURER DRAWING DETAIL, STR'S. #98, #99, #101, #103, #105

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-24-PAMANUFACTURER DRAWING DETAIL, STR. #100

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-27-PAMANUFACTURER DRAWING DETAIL, STR'S. #104, #108

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-30-PAMANUFACTURER DRAWING DETAIL, STR. #82

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-31-PAMANUFACTURER DRAWING DETAIL, STR. #86

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-32-PAMANUFACTURER DRAWING DETAIL, STR. #106

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-33-PAMANUFACTURER DRAWING DETAIL, STR. #90

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-34-PAMANUFACTURER DRAWING DETAIL, STR. #96

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-35-PAMANUFACTURER DRAWING DETAIL, STR. #109

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-36-PAMANUFACTURER DRAWING DETAIL, STR. #110

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-37-PAMANUFACTURER DRAWING DETAIL, STR. #102

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-38-PAMANUFACTURER DRAWING DETAIL, STR. #107

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-CA1DAVIT ARM DETAIL, 8'

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-1-DA1DAVIT ARM DETAIL, 6', SHEET 1 OF 2

0 08/19/2015 CONSTRUCTION COMPLETED

TP-13376-1-DA2DAVIT ARM DETAIL, 6', SHEET 2 OF 2

0 08/19/2015 CONSTRUCTION COMPLETED

DESIGN DRAWINGS VENDOR DRAWINGS

Page 2: DESIGN DRAWINGS VENDOR DRAWINGS

NOTICE:THE DATA IN THIS DOCUMENT INCORPORATESPROPRIETARY RIGHTS OF UC SYNERGETIC, LLC.ANY PARTY ACCEPTING THIS DOCUMENT DOESSO IN CONFIDENCE AND AGREES THAT IT SHALLNOT BE DUPLICATED IN WHOLE OR PART, NORDISCLOSED TO OTHERS WITHOUT THE CONSENTOF UC SYNERGETIC, LLC.

CONTRACTOR SHALL VERIFY ALL CONDITIONS ONJOB SITE & NOTIFY PROJECT MANAGER OF ANYVARIATIONS FROM DIMENSIONS SHOWN ON THESEDRAWINGS BEFORE PROCEEDING WITH ANYCONSTRUCTION.

UC SYNERGETIC, LLC.123 North White Street

Fort Mill, SC 29715VA License No. 0407004417

®

0 SAE ISSUE FOR CONSTRUCTION08-19-2015

BILL OF MATERIALS

ITEM DESCRIPTION QTY. UOM MANUFACTURER CATALOG No.

1 SHACKLE, ANCHOR, 58" PIN 112 EA. CHANCE 5801

2 INSULATOR, PIN 156 EA. VICTOR 9R

3 INSULATOR, PIN, STRAIGHT 117 EA. JOSLYN J207Z

4 CROSSARM, FIBERGLASS, 10' (BANDABLE) 5 EA. SHAKESPEARE XDB120G12482DE

5 INSULATOR, SUSPENSION, POLYMER, 25kV 98 EA. OHIO BRASS 4010250215

6 CLAMP, STRAIN, 556.5 93 EA. ANDERSON ADEZ-116-N

7 NUT, OVAL EYE, 58" 30 EA. JOSLYN J1092

8 BOLT, 58" WITH NUTS 162 EA. HUGHES BROTHERS BOLT SCHEDULE

10 LOCKNUT, 58" 177 EA. HUGHES BROTHERS MF60

11 WASHER, 2" ROUND, 58" 260 EA. HUGHES BROTHERS RW2-60

12 INSULATOR, PIN, SHORT SHANK 39 EA. JOSLYN J224Z

13 SLEEVE, JUMPER, 556.5 ACSR, "OSPREY" 39 EA. BURNDY YCS-37R-R

14 TIES, WIRE (SET), ACSR, "OSPREY" 141 EA. PLP UTF-1212

15 CLAMP, GROUND, 12" FLAT BAR TO 5

16" DIA. COPPERWELD 120 EA. ANDERSON/FARGO GC-141A-02-1/2

16 WIRE, GROUND, 7#10, COPPERWELD, 516" DIA. 726 FT. ALCOA CCS071040

17 TIES, WIRE (SET), ACSR, "PENGUIN" 23 EA. PLP SPL-1358-P

18 BRACKET, RIGID CLEVIS, SPOOL 23 EA. JOSLYN J1399

19 INSULATOR, SPOOL, WHITE 23 EA. JOSLYN J151

20 CONNECTOR, PARALLEL GROVE 73 EA. ANDERSON LC-811-A-XB

21 CLAMP, STRAIN, #4 TO 4/0 ACSR 24 EA. ANDERSON ADEZ-57-N

22 WIRE, #4 COPPER, BARE, SD 150 FT. - -

23 WIRE, RISER, COVERED, #2 COPPER 230 FT. - -

24 ARRESTER, 10kV WITH CROSSARM BRACKET 15 EA. OHIO BRASS 217609-7314

25 CUTOUT, TYPE C, 100 AMP, 15kV 15 EA. CHANCE C710-112PB

26 FUSE, 80 AMP, ELF 15 EA. COOPER FAK23W80

27 CLAMP, HOT LINE 23 EA. MACLEAN C1520

28 CLAMP, HOT LINE STIRRUP, 556.5 23 EA. MACLEAN HLS-795-LD-E

29 CROSSARM, FIBERGLASS, 10', HEAVY TANGENT (BANDABLE) 39 EA. SHAKESPEARE HTZ120N12402BND

30 TERMINATOR, COLD SHRINK, #2 TO 4/0 15 EA. 3M 7652-S-4

31 PLUG, TERMINAL ADAPTER 15 EA. ANDERSON/FARGO PT-24-2.5

32 POSITIONER, CABLE 15 EA. CHANCE CCS-820

33 GROUND, TANK 8 EA. ANDERSON/FARGO GTCS-34A

34 ARRESTER, ZHP,10 kV WITH CROSSARM BRACKET 8 EA. OHIO BRASS 217609-7354

35 FUSE, LIMITER, FAULT TAMER 8 EA. S&C 98072-BD

37 LINK, CHAIN 19 EA. ANDERSON/FARGO LK-30

38 SUPPORT, SHIELD WIRE WITH NUT AND LOCKNUT 33 EA. HUGHES BROTHERS 2855.6-XX BCL

ITEM DESCRIPTION QTY. UOM MANUFACTURER CATALOG No.

39 ASSEMBLY, SINGLE SUSPENSION, OPGW WITH ARMOR ROD 33 EA. ALCOA/FUJIKURA SUME 450/475

40 CLEVIS EYE 33 EA. MACLEAN SCE-56-1625-BC

41 CLAMP, BONDING FOR OPGW 40 EA. ALCOA/FUJIKURA OBCA2A21

42 DEAD END, BOLTED FOR OPGW 14 EA. ALCOA/FUJIKURA ODEC 460/469G08

43 SHACKLE, ANCHOR 134 EA. ANDERSON/FARGO AS-25-BNK

44 LINK PLATE, DEAD END, 15" 14 EA. ALCOA/FUJIKURA OPDELP15

45 Y-CLEVIS - EYE, 90° 63 EA. ANDERSON/FARGO YCS-16-90

46 INSULATOR, HORIZONTAL POST, 69kV 63 EA. OHIO BRASS 522006-1002

47 CLAMP, SUSPENSION, 795 DRAKE 63 EA. ANDERSON/FARGO HAS-182-N

48 ROD, ARMOR, 795KCMIL, 26/7 ACSR 69 EA. PLP AR-0141

49 BOLT, 34" WITH NUTS 191 EA. HUGHES BROTHERS BOLT SCHEDULE

50 LOCKNUT, 34" 191 EA. HUGHES BROTHERS MF70

51 WASHER, 2" ROUND, 34" 376 EA. HUGHES BROTHERS RW2-70

52 INSULATOR, STRAIN, 69kV 106 EA. OHIO BRASS 515006-1201

53 CLAMP, STRAIN, 795KCMIL, 26/7 ACSR 106 EA. ANDERSON/FARGO SD-112-S

54 SLEEVE, JUMPER SUPPORT, COMPRESSION, 795 ACSR 56 EA. ALCOA JC12

55 INSULATOR, HORIZONTAL POST, 69kV 30 EA. OHIO BRASS 522006-1102

56 CLAMP, SUSPENSION, TRUNNION, 795 DRAKE 24 EA. ANDERSON/FARGO TSC-150

57 CLAMP, GROUND ROD, BRONZE 38 EA. JOSLYN J8492

58 COUPLING, GROUND ROD, BRONZE, 58" 38 EA. JOSLYN J9182

59 STUD, DRIVING, GROUND ROD, STEEL, 58" 38 EA. JOSLYN J9186

60 ROD, GROUND, 58" X 10', COPPERBOND 38 EA. JOSLYN J9160

61 TEE, CLAMP, BOLTED, CABLE TO CABLE, 556.5 3 EA. HUBBELL ATCC1111

64 CLAMP, SUSPENSION, TRUNNION, 795 DRAKE 6 EA. ANDERSON/FARGO TSC-200

65 WIRE, GUY, 12" X 19 STRAND, HS STEEL 110 FT. - -

66 ANCHOR, DOUBLE HELIX, (8 & 10"), 36" 2 EA. CHANCE 012642AE

67 EXTENSION, ANCHOR, 42" 2 EA. CHANCE 12655

68 ADAPTER, THIMBLE - EYE, ANCHOR ROD 2 EA. CHANCE C102-0023

69 GUARD, GUY 2 EA. PLP PG-5718-P

70 GRIP, GUY, 12" X 19 STRAND, HS STEEL 4 EA. PLP BG-2115

71 CLEVIS, THIMBLE EYE, HEAVY, 40K 2 EA. MACLEAN FSA-100-6

72 TEE, DEAD END, HEAVY, 1 18" MOUNTING HOLES 3 EA. HUGHES BROTHERS A2132-E

WIRE, 795 KCMIL, 26/7 STRAND, ACSR, "DRAKE" 31,470 FT. SOUTHWIRE -

WIRE, 556.5 KCMIL, 18/1 STRAND, ACSR, "OSPREY" 24,400 FT. SOUTHWIRE -

WIRE, 4/0 KCMIL, 6/1 STRAND, ACSR, "PENGUIN" 8,400 FT. SOUTHWIRE -

WIRE, OPTICAL GROUND, AFL CC-57/465 24 FIBERS 10,650 FT. AFL -

WIRE, 38" HS STEEL 110 FT. SOUTHWIRE -(XX) SEE BOLT SCHEDULE FOR LENGTHS.

(XX)

Page 3: DESIGN DRAWINGS VENDOR DRAWINGS

AIRSIDE 69kVSUBSTATION

P. I . = 21+03.03#102

∠ = 0°34'11"

P . I . = 21+23.71#103

∠ = 0°14'02"

CAI

N ST

REET

SOUTH BOSTON HIGHWAYUS ROUTE 58

B-14STR #110

B-13STR #106

B-12ASTR #96

B-11ASTR #90

B-10STR #86

B-9STR #80

UC SYNERGETIC, LLC.123 North White Street

Fort Mill, SC 29715VA License No. 0407004417

®

ISSUED-FOR-CONSTRUCTION

0 SAE 08-19-2015 ISSUE FOR CONSTRUCTION

Page 4: DESIGN DRAWINGS VENDOR DRAWINGS

UC SYNERGETIC, LLC.

123 North White Street

Fort Mill, SC 29715

VA License No. 0407004417

®

ISSUED-FOR-CONSTRUCTION

0 SAE 08-19-2015 ISSUE FOR CONSTRUCTION

Page 5: DESIGN DRAWINGS VENDOR DRAWINGS

SCALE:

DIRECT EMBEDMENT ELEVATIONN.T.S.

GROUND LINE

COMPACTEDBACKFILL

TRANSMISSION

LINE

BACK AHEAD

SCALE:

TYPICAL STAKING PLANN.T.S.

DIRECT EMBEDMENT FOUNDATION NOTES:1. AUGER HOLES USING A CASING OR DRILLING SLURRY IF NEEDED. SET

POLE PLUMB OR RAKE AS REQUIRED AND BACKFILL WITH DOT #57 STONE.THOROUGHLY COMPACT IN 6" TO 12" LAYERS USE PNEUMATIC TAMPS FORDRY HOLES OR LONG STEMMED VIBRATOR FOR WET HOLES. POLESHOULD BE SET IMMEDIATELY AFTER HOLE IS AUGERED.

2. FOUNDATION SHALL BE FOUNDED ON SOLID UNDISTURBED SOIL. BOTTOMSHALL BE EXCAVATED TO A LEVEL PLANE AND CLEARED OF LOOSEMATERIAL. EXCAVATE AN ADDITIONAL 1 FOOT AND BACKFILL WITHTAMPED STONE AS REQUIRED TO FORM A SOLID BASE.

3. CONSULT WITH DESIGN ENGINEER IF SOLID ROCK OR VERY SOFT SOIL ISENCOUNTERED.

4. FOUNDATION DESIGN ASSUMES CASING, IF USED, WILL NOT BE LEFT INPLACE. EQUIPMENT, PROCEDURES AND PROPORTIONS OF BACKFILLMATERIALS SHALL INSURE BACKFILL WILL NOT BE ADVERSELY DISTURBEDUPON CASING REMOVAL.

5. SUPER MUD OR ATTAPULGITE CLAY DRILLING FLUID, IF USED, SHALL BEFULLY DISPLACED BY BACKFILL AND SHALL NOT BE DETRIMENTAL TOBACKFILL OR SURROUNDING SOIL.

6. REFERENCE PLAN AND PROFILE DRAWINGS FOR STRUCTURE LOCATIONS,POLE OFFSETS AND EMBEDMENT DEPTH.

7. THE FOUNDATION CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALLU.G. LOCATOR SERVICES PRIOR TO EXCAVATION.

8. REFERENCE PROJECT 16247 DRAWING FD01.02 FOR DRILLED PIERFOUNDATION DETAILS.

9. WOOD POLES MAY BE BACKFILLED AND TAMPED WITH NATIVE SOIL.

INSTRUCTIONS FOR STAKING FOUNDATIONS:1. STAKE THE PI POINT ON THE TRANSMISSION LINE CENTERLINE AND ESTABLISH THE

BISECTOR OF THE CENTERLINE ANGLE. STAKE FORE AND AFT REFERENCE HUBS 30'OUT AND PERPENDICULAR TO THE BISECTOR AND 30' OUT FROM THE FOUNDATIONSALONG THE BISECTOR. SEE DRAWING 16247-FP01.01-0 FOR ADDITIONAL DATA.

2. REFERENCE HUBS SHOULD BE SMALL WOODEN STAKES WITH A TACK. EACH STAKEOR REFERENCE HUB SHOULD ALSO HAVE A WIRE PICKET WITH FLAGGING.

REPRESENTS CENTER OF FOUNDATIONS

REPRESENTS STAKES

NOTICE:THE DATA IN THIS DOCUMENT INCORPORATESPROPRIETARY RIGHTS OF UC SYNERGETIC, LLC.ANY PARTY ACCEPTING THIS DOCUMENT DOESSO IN CONFIDENCE AND AGREES THAT IT SHALLNOT BE DUPLICATED IN WHOLE OR PART, NORDISCLOSED TO OTHERS WITHOUT THE CONSENTOF UC SYNERGETIC, LLC.

CONTRACTOR SHALL VERIFY ALL CONDITIONS ONJOB SITE & NOTIFY PROJECT MANAGER OF ANYVARIATIONS FROM DIMENSIONS SHOWN ON THESEDRAWINGS BEFORE PROCEEDING WITH ANYCONSTRUCTION.

UC SYNERGETIC, LLC.123 North White Street

Fort Mill, SC 29715VA License No. 0407004417

®

0 SAE ISSUE FOR CONSTRUCTION08-19-2015

DIRECT EMBEDMENT FOUNDATION DETAILS AND SCHEDULESTRUCTURE

NO.STRUCTURE

TYPESTR. HT.

(FT.)

GALVANIZEDWEIGHT

(LBS)

BASEDIAMETER(INCHES)

FOUNDATIONTYPE

MIN. HOLEDIAMETER

(FT)

EMBEDMENTDEPTH

(FT)

HOLEDEPTH

(FT)BACKFILLMATERIAL

MANUFACTURERDRAWING NUMBER

Page 6: DESIGN DRAWINGS VENDOR DRAWINGS

DEP

TH (A

T C

PIE

R) "

B"

SEE

DES

IGN

TAB

LE

"X" P

RIM

AR

Y T

IES

SEE

DES

IGN

TAB

LE&

NO

TE 1

3

3" C

LR.

MIN

.

REV

EAL

"R"

SEE

NO

TE 3

7

CLEAR COVER(3" MIN.)

SEE NOTE 12 SHAFT DIA. "A"SEE DESIGN TABLE

LEN

GTH

"E"

SEE

DES

IGN

TAB

LE"C" DIA.

SEE DESIGNTABLE

PR

OJ.

"D"

SEE

DES

IGN

TABL

E(F

RO

M M

FG.)

L

CL

DETAIL "A"

AA "W" BARSSEE DESIGN TABLE

LATERAL TIESSEE DESIGN TABLE

HEAVY HEX NUT(TOP & BOTTOM) BYSTR. MANUFACTURER

ANCHOR BOLTTEMPLATE BYSTR. MANUFACTURERSEE VENDOR DWGS.

"W" BARS EQ. SPACEDIN A CIRCULAR CAGESEE DESIGN TABLE& NOTE 6

SECTION A

3"±

1/2"

BASE PLATE TACK WELDING OF NUTSTO THE ANCHOR BOLT ISNOT PERMITTED.

SLOPE FORDRAINAGE

SEE DETAIL "A"2 PLACES

GRADESEE NOTE 35

T.O.C.

T.O.C.

LAP LENGTH "L"SEE NOTE 13.

ANCHOR BOLT DETAIL

SEE ANCHORBOLT DETAIL

SEE DESIGN TABLE

SEE NOTE 36

CL P.I. ANGLEBISECTOR (P.A.B.)

NOTE:P.A.B. IS BISECTOR OF INTERIOR ANGLERESULTING FROM A CHANGE IN DIRECTIONOF TRANSMISSION LINE CENTERLINE.POSITIVE (+) LINE ANGLE θ SHOWN. SEEDRAWING FP01.01-0 FOR ADDITIONALSTRUCTURE STAKING DETAILS.

"F" BOLT CIRCLESEE DESIGN TABLE

No. OF ANCHORBOLTS VARIES.SEE DESIGN TABLE.

V-NOTCH POSITIONINDICATORREFERENCE STAKE

TYP. 4 PLACES

ORIENTATION PLANSTRUCTURE No.

(SEE TABLE)

θ/2

"G"

"G"

(-)

(+)

2" C

LR.

"Y" I

NTE

RM

ED

IATE

TIE

SS

EE N

OTE

14

& D

ESIG

N T

ABLE

DO

NO

T IN

STAL

L M

OR

E T

HA

N T

HE

SPEC

IFIE

DQ

UA

NTI

TY O

F IN

TER

ME

DIA

TE T

IES

ADDITIONAL TIE TO BE BUNDLEDWITH THE TOP PRIMARY TIESEE NOTE 14

ANCHOR BOLT(21

4" DIA.)

VERTICAL #11, (138" DIA.)

VERTICAL #10, (114" DIA.)

2/0 CU CABLE

SEFCORGU1-5809

(OR EQUAL)

SEFCORGU1-4909

(OR EQUAL)

STRUCTURE INFORMATION FOUNDATION INFORMATIONSHAFT REINFORCING ANCHOR BOLTS DESIGN LOADS

VERTICAL BARS "W" LATERAL TIES "X" AND "Y"REINF.

WEIGHT(LB.)STR.

NO.STR.TYPE

STR.WEIGHT

(LB.)

STR.HEIGHT

(FT.)

LINE ANGLE"Ø"

(DMS)

SOILBORING

NO.

NO. OFFDNS.REQ'D

SHAFTDIA. "A"

(FT.)

DEPTH"B"

(FT.-IN.)

REQ'DLENGTH(FT.-IN.)

REVEAL"R"

(FT.-IN.)

T.O.C.ELEV.(FT.)

CONCRETEREQ'D

(CU.YD.)QTY. SIZE

SPAC.(IN.)

LENGTH(FT.-IN.)

"X"QTY.

"X"SIZE

"X"SPAC.(IN.)

"Y"QTY.

"Y"SIZE

"Y"SPAC.(IN.)

"L" LAP(IN.)

TOTALQTY.

LENGTH(FT.-IN.)

CAGEDWG.NO.

QTY.DIA."C"

(IN.)

PROJ."D"

(IN.)

LENGTH"E"

(FT.-IN.)

CIR. DIA."F"

(IN.)

ANGLE"G"

(DMS)

UPLIFT(KIPS)

COMPR.(KIPS)

SHEAR(KIPS)

BEND.MOM.

(FT-KIP)

TOR.MOM.

(FT-KIP)

80 ENGINEERED DE 16,517 75' 01 º 35 ' 40 " RT B-9 1 7'-0" 21'-0" 22'-0" 1'-0" 546.41 31.1 27 #10 834" 21'-6" 12 #5 9" 13 #5 12" 33 26 22'-11" 3,119 13376-9-ABC 20 21

4" 12" 9'-6" 6014" 0 º 0 ' 0 " N/A 34.59 122.23 5,120.03 50

86 ENGINEERED DE 18,323 80' 27 º 42' 43 " LT B-10 1 7'-0" 18'-0" 19'-0" 1'-0" 550.11 26.9 26 #10 9 116" 18'-6" 19 #5 6" 9 #5 12" 33 29 22'-11" 2,762 13376-31-ABC 20 21

4" 12" 10'-6" 5934" 0 º 0 ' 0 " N/A 37.22 122.24 5,732.75 50

90 ENGINEERED DE 24,143 85' 84 º 13' 00 " RT B-11A 1 7'-6" 20'-0" 21'-0" 1'-0" 531.85 34.1 28 #11 9" 20'-6" 13 #6 9" 11 #6 12" 40 25 25'-0" 3,986 13376-33-ABC 24 214" 12" 11'-0" 65" 0 º 0 ' 0 " N/A 45.70 156.69 7,817.58 30

96 ENGINEERED DE 24,404 85' 75 º 45 ' 15 " LT B-12A 1 7'-6" 25'-0" 26'-0" 1'-0" 532.40 42.1 32 #11 778" 25'-6" 39 #6 8" - - - 40 39 24'-10" 5,789 13376-34-ABC 28 21

4" 12" 9'-3" 6614" 0 º 0 ' 0 " N/A 46.67 156.72 8,121.80 45

106 ENGINEERED DE 16,518 75' 55 º 07 ' 51 " RT B-13 1 7'-0" 15'-0" 16'-0" 1'-0" 526.69 22.6 24 #11 934" 15'-6" 25 #6 8" - - - 40 25 23'-6" 2,857 13376-32-ABC 20 21

4" 12" 9'-6" 6014" 0 º 0 ' 0 " N/A 34.59 122.23 5,120.03 50

110 ENGINEERED DE 13,289 75' 56 º 00 ' 13 " RT B-14 1 7'-0" 14'-0" 15'-0" 1'-0" 538.24 21.2 22 #10 101116" 14'-6" 12 #5 8" 7 #5 12" 33 20 22'-10 1,849 13376-36-ABC 16 21

4" 12" 9'-0" 5834" 0 º 0 ' 0 " N/A 23.88 91.88 3,953.46 25

TOTAL = 178.0 TOTAL = 20,362

AHEAD STRUCTURE

BACK STRUCTURE

θ/2

SEE DESIGN TABLEFOR ANGLE VALUE

NOTES:1. THE FOUNDATIONS SHOWN HEREON WERE DESIGNED USING RECOMMENDATIONS PROVIDED IN TWO

FROEHLING & ROBERTSON, INC. REPORTS FOR PROJECT 62P0217 AND PROJECT 62S0322, DATEDAUGUST 2012 AND OCTOBER 2014, RESPECTIVELY. IF FOUNDATION EXCAVATION MATERIAL DIFFERSFROM THESE REPORTS THE STRUCTURAL ENGINEER SHALL BE CONSULTED FOR DESIGNCOMPLIANCE.

2. THE FOUNDATIONS SHOWN HEREON WERE DESIGNED USING LOADS PROVIDED IN TRANSAMERICANPOWER PRODUCTS, INC. CALCULATIONS, JOB No. 15-0058, DATED JUNE 19, 2015.

3. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI AT 28 DAYS. CONCRETESHALL MEET THE FOLLOWING REQUIREMENTS:

• TYPE I/II LOW ALKALI PORTLAND CEMENT• SLUMP = 4"-8" (DRY HOLES); 7"-10" (TREMIE)• WATER/CEMENT RATIO < 0.45• AIR ENTRAINMENT = 4% ± 2%• MAXIMUM AGGREGATE SIZE = 1"

4. REINFORCING BARS AND TIES SHALL BE OF GRADE 60 STEEL PER ASTM-A615 WITH DEFORMATIONSAND DETAILED IN ACCORDANCE WITH ACI-315, "MANUAL OF STANDARD PRACTICE FOR DETAILINGREINFORCED CONCRETE STRUCTURES".

5. REINFORCING BAR SIZES ARE NOTED IN INCH-POUND BAR SIZE DESIGNATION.

6. VERTICAL BAR LENGTH IS BASED ON THE TOTAL PIER LENGTH REQUIRED AS SHOWN IN THE TABLE.AS REQUIRED, CLASS B SPLICE LAP LENGTHS SHALL BE AS SHOWN IN THE DESIGN TABLE AND SHALLNOT BE LOCATED WITHIN THE EMBEDMENT AREA OF THE ANCHOR BOLTS. FOR SPLICES LOCATED INTHE LOWER ONE-THIRD OF THE PIER, IT SHALL BE PERMISSIBLE TO USE A CLASS A SPLICE LAPLENGTH USING THE SPECIFIED MINIMUM COMPRESSIVE STRENGTH OF CONCRETE. MECHANICALAND WELDED SPLICES ARE PERMITTED IN THE LOWER ONE-THIRD OF THE PIER AS LONG AS THESPLICE STRENGTH MEETS OR EXCEEDS 125% OF THE SPECIFIED YIELD STRENGTH OF THE STEELREINFORCING BARS.

7. ALL CONSTRUCTION INSTALLATION WORK SHALL MEET THE REQUIREMENTS OF ACI 336-1,"STANDARD SPECIFICATION FOR THE CONSTRUCTION OF DRILLED PIERS", LATEST EDITION, PROJECTSPECIFICATIONS, AND THIS DRAWING AS WELL AS RELATED DRAWINGS. IN GENERAL, CONCRETEINSTALLATION AND MATERIAL TOLERANCES SHOULD BE IN ACCORDANCE WITH ACI 117 UNLESSENGINEER APPROVES OTHERWISE.

8. SHAFT SHALL BE FOUNDED ON SOLID, UNDISTURBED SOIL. THE SHAFT BOTTOM SHALL BEEXCAVATED TO A LEVEL PLANE AND CLEARED OF LOOSE MATERIAL. FOR WET HOLES, AFTER TWOHOURS OF SETTLEMENT TIME, THE SEDIMENT IN THE BOTTOM SHALL BE LESS THAN 3". IF GREATERTHAN 3", CLEAN THE HOLE AND ALLOW CUTTINGS TO SETTLE TWO ADDITIONAL HOURS ANDREMEASURE. IF NECESSARY, REPEAT THE CLEANING AND SETTLEMENT PROCESS UNTIL THICKNESSOF BOTTOM SEDIMENT IS LESS THAN 3".

9. THE CENTER OF EACH PIER EXCAVATION SHALL NOT VARY FROM ITS DESIGNATED CENTER BY MORETHAN 1/4" FOR MULTI-LEG FRAMED STRUCTURE OR 2" FOR MONOPOLE STRUCTURES.

10. THE PIER SHAFT SHALL BE INSTALLED PLUMB TO WITHIN 2% OF THE TOTAL DEPTH.

11. NO BLASTING IS ALLOWED WITHOUT PRIOR ENGINEERING APPROVAL.

12. ALL REINFORCING STEEL SHALL HAVE A MINIMUM 3" CLEAR COVER OF CONCRETE, EXCEPT ASNOTED.

13. TIES FOR DRILLED SHAFT FOUNDATIONS SHALL BE CLOSED TIES WITH CLASS B LAP SPLICES WITHTHE MINIMUM LAP SPLICE LENGTHS INDICATED IN THE TABLE SHOWN ON THIS DRAWING. TIE TOTALLENGTH INCLUDES LAP. THE LAP LENGTH SHALL BE LOCATED ALTERNATELY 180° APART, ALONG THELENGTH OF THE REBAR CAGE.

14. AS REQUIRED, INSTALL ADDITIONAL INTERMEDIATE "Y" TIES AROUND THE ANCHOR BOLT CAGEBETWEEN PRIMARY "X" TIES, WITH "Y" QUANTITY AS SHOWN IN TABLE, TYPICAL EACH PIER. ANADDITIONAL TIE, NOT AN INTERMEDIATE TIE, SHOULD BE BUNDLED WITH THE TOP PRIMARY TIEUNLESS TIES ARE BUNDLED SETS.

15. CONCRETE POURS SHALL BE SCHEDULED TO ALLOW CONCRETING OF THE ENTIRE PIER WITHOUTINTERRUPTION DUE TO BREAK PERIODS OR END OF WORKDAY. COLD JOINTS SHALL BE AVOIDEDUNLESS ABSOLUTELY NECESSARY. ANY COLD JOINTS MUST HAVE PRIOR APPROVAL OF THEPROJECT MANAGER.

16. FOR DRY HOLE CONDITIONS, WHEN THE CENTERLINE OF THE SHAFT IS SUFFICIENTLY OPEN ANDCLEAR, CONCRETE MAY BE PLACED BY THE FREE FALL METHOD PROVIDED THAT IT DOES NOT HITTHE SIDES OF THE SHAFT, RODS, SPACERS, OR ANY REINFORCEMENT. IF CONDITIONS DO NOTALLOW THE TOTALLY UNOBSTRUCTED PLACEMENT AS DESCRIBED ABOVE, THE USE OF ANELEPHANT TRUNK OR TREMIE PIPE SHALL BE REQUIRED. IF WATER OR SLURRY IS PRESENT IN THESHAFT THE USE OF "WET HOLE" PLACEMENT PROCEDURES UTILIZING A TREMIE PIPE MUST BEFOLLOWED.

17. THE HOLE SHALL BE CONTINUOUSLY MONITORED DURING CONCRETE PLACEMENT TO DETERMINE IFANY CAVING OCCURS. ALL CONCRETING SHALL STOP IF ANY CAVING OCCURS AND ALL LOOSEEARTH, CONTAMINATED CONCRETE, AND OTHER MATERIALS SHALL BE REMOVED FROM THE HOLEBEFORE CONCRETING IS TO RESUME.

18. IF A CASING IS USED FOR INSTALLATION, IT SHALL REMAIN IN PLACE. PRIOR WRITTEN APPROVAL BYENGINEER IS REQUIRED IF CONTRACTOR DESIRES TO REMOVE THE CASING. FOR A CASING TO BE

REMOVED, EQUIPMENT PROCEDURES AND PROPORTIONS OF CONCRETE MATERIALS SHALL INSURETHAT THE CONCRETE WILL NOT BE ADVERSELY DISTURBED UPON CASING REMOVAL.

19. DRILLING FLUID, IF USED, SHALL BE FULLY DISPLACED BY CONCRETE AND SHALL NOT BEDETRIMENTAL TO CONCRETE OR THE SURROUNDING SOIL. CONTAMINATED CONCRETE SHALL BEREMOVED FROM THE TOP OF THE FOUNDATION AND REPLACED WITH FRESH CONCRETE. FOR SOILSRANGING FROM CLAY TO COARSE SANDS, THE VISCOSITY OF MUD SLURRY SHALL BE 26 TO 40SECONDS (MARSH FUNNEL) (35-60 SECONDS-POLYMER SLURRY), AND THE FLUID DENSITY AT ONEFOOT FROM THE HOLE BOTTOM JUST BEFORE CONCRETE PLACEMENT SHALL NOT EXCEED 85 PCFFOR MUD OR 64 PCF FOR POLYMER SLURRY.

20. ANCHOR BOLTS FOR FOUNDATIONS SHALL BE PROVIDED BY THE STEEL STRUCTURE VENDOR.

21. INSTALL AND ORIENT ANCHOR BOLTS IN ACCORDANCE WITH ANCHOR BOLT DETAIL DRAWINGS ANDTEMPLATES SUPPLIED BY THE STEEL STRUCTURE VENDOR. THE ANCHOR BOLT CAGE SHALL BEPLACED AND CENTERED IN THE VERTICAL REINFORCING BAR CAGE.

22. ANCHOR BOLTS SHALL BE INSTALLED PLUMB, AND SHALL BE PLACED AND ADEQUATELY SUPPORTEDPRIOR TO PLACING CONCRETE.

23. CONCRETE TEST CYLINDERS SHALL BE MOLDED AND LABORATORY CURED IN ACCORDANCE WITHASTM C31 AND TESTED IN ACCORDANCE WITH ASTM C39. THREE (3) CYLINDERS SHALL BE TAKENFROM EACH TRUCK LOAD OF CONCRETE WITH ONE TESTED AT 7 DAYS, ONE TESTED AS 28 DAYSAND ONE HELD AS A SPARE.

24. CONCRETE SHALL BE PLACED AGAINST UNDISTURBED SOIL UNLESS OTHERWISE APPROVED BYTHE ENGINEER. LOW SLUMP (3"-6") CONCRETE SHALL BE CONSOLIDATED BY IMMERSION TYPEVIBRATION (AT LEAST 800 RPM). THE ANCHOR BOLT SECTION OF HIGH SLUMP (6"-10") CONCRETEPOURS SHALL BE RODDED IN LIFTS DURING PLACEMENT USING A TAMPING ROD OR OTHER SUITABLETOOL (8 TO 10 VERTICAL INSERTIONS).

25. ALL EXPOSED SURFACES SHALL HAVE A BROOM FINISH AND ALL EDGES SHALL HAVE A 1" CHAMFER.

26. "AS PLACED" CONCRETE QUANTITIES MAY VARY FROM THE CALCULATED VALUES DUE TOVARIATIONS IN CONSTRUCTION TECHNIQUES AND SITE SPECIFIC SOIL CONDITIONS.

27. REINFORCING BAR CAGES AND MATS SHALL BE ASSEMBLED ACCURATELY AND SECURELY WITHINTHE TOLERANCES SPECIFIED IN ACI 318. A MINIMUM OF 50 PERCENT OF THE JOINTS SHALL BE TIED.

28. WELDING OF REINFORCEMENT IS NOT PERMITTED WITHOUT PRIOR ENGINEERING APPROVAL AND ASMAY BE SPECIFIED HEREIN.

29. REINFORCING BAR CAGES AND MATS SHALL BE ACCURATELY PLACED AND ADEQUATELYSUPPORTED PRIOR TO PLACING CONCRETE. CAGES SHALL BE SECURED AGAINST DISPLACEMENTWITHIN THE TOLERANCES PERMITTED BY ACI 318 BY USING BAR SUPPORTS AND SPACERS. BARSUPPORTS AND SPACERS MAY BE PRECAST MORTAR BLOCKS, OR FABRICATED FROM STEEL ORPLASTIC. WOOD SPACERS AND SUPPORTS ARE NOT PERMITTED. VERTICAL REINFORCING BAR CAGESHALL BE CENTERED IN THE EXCAVATED HOLE.

30. ANCHOR BOLT CAGE SHALL BE ELECTRICALLY BONDED TO THE REBAR CAGE IN TWO (2) LOCATIONSAS PER ANCHOR BOLT CAGE BOND DETAIL.

31. UPON COMPLETION OF THE FOUNDATION, THE NUTS ON EACH BOLT SHALL BE TIGHTENEDTOGETHER TO PREVENT HAND REMOVAL. TACK WELDING OF ANCHOR BOLTS IS NOT PERMITTED.

32. CONTACT ENGINEERING IF AUGURED SHAFT DEPTH CANNOT BE ACHIEVED. ENGINEERING SHALLDETERMINE IF ROCK AT PRIOR TO DESIRED SHAFT DEPTH SHALL BE SUITABLE FOR ADJUSTEDFOUNDATION DESIGN.

33. FOR ADDITIONAL AND DETAILED REQUIREMENTS, REFER TO THE CONSTRUCTION SPECIFICATION.HOWEVER, THE PROVISIONS OF THIS DRAWING SHALL TAKE PRECEDENCE OVER OTHERDOCUMENTS.

34. SEE STRUCTURE STAKING LIST FOR FOUNDATION LOCATION COORDINATES.

35. FOR ABRUPT DOWN SLOPES ADJACENT TO DRILLED PIER FOUNDATIONS, THE CLEAR DISTANCEFROM TOP OF SLOPE TO PIER FACE SHALL NOT BE LESS THAN 1.0 DIAMETER FOR COHESIVEMATERIAL WHERE THE SLOPE IS 45 DEGREES (1/1) OR GREATER FROM HORIZONTAL REFERENCE,AND THE CLEAR DISTANCE SHALL NOT BE LESS THAN 2.0 DIAMETERS FOR GRANULAR MATERIALWHERE THE SLOPE IS 35 DEGREES (1/1.5) OR GREATER FROM HORIZONTAL REFERENCE. ABRUPT

SLOPES SHALL BE STABILIZED AND PROTECTED FROM EROSION.

36. T.O.C. ELEVATIONS ARE DETERMINED USING PI CENTERLINE VALUES PLUS ONE FOOT. FORMULTIPLE POLE FOUNDATIONS, THE T.O.C. ELEVATIONS FOR ALL PIERS SHOULD BE EQUAL TO ONEVALUE. ELEVATIONS SHOWN IN TABLE REFLECT A TOPOGRAPHIC SURVEY BY DEWBERRY, INC.

37. REVEAL VALUES ARE BASED ON SITE BEING APPROXIMATELY LEVELED, BY CUT AND FILL ASREQUIRED, TO SURVEYED CENTERLINE ELEVATION. GROUND ELEVATIONS ARE DETERMINED USINGDERIVED TOPOGRAPHY. ACTUAL FIELD CONDITIONS MAY VARY.

UC SYNERGETIC, LLC.123 North White Street

Fort Mill, SC 29715VA License No. 0407004417

®

ISSUED-FOR-CONSTRUCTION

0 SAE 08-19-2015 ISSUE FOR CONSTRUCTION

Page 7: DESIGN DRAWINGS VENDOR DRAWINGS

STR. 78

STR. 80

STR. 86

AHEAD

BACK

STR. 90

STR. 96

AHEAD

BA

CK

AH

EAD

BACKINDEX

MK. INDEXMK.

INDEXMK.

INDEXMK.

INDEXMK.

AHEAD

BACK

AHEA

D

BACK

76°08'39"

76°08'39"

27°42'43" LT.

52°07'22"

52°07'22"

75°45'15" LT

.

47°53'30"

47°53'30"

62°26'05"

62°26'05"

55°0

7'51"

RT.

61°5

9'54

"

61°59'54"

56°00'13" RT.

00°48'35" LT.

01°24'09" LT.

02°50'57" LT.

N 3,374,009.295E 11,241,061.029

N 3,374,059.992E 11,240,789.154

N 3,374,172.853E 11,240,646.117

EXISTINGSTR. 70

N 3,374,338.215E 11,239,605.612

N 3,374,378.107E 11,239,800.572

EXISTING STR. 83

N 3,374,267.070E 11,240,349.358

STR. 81

STR. 82

STR. 84

STR. 85

20°24'35" LT.

23°00'19" RT.

06°09'42" RT.

20°40'03" RT.

STR. 8705°40'22" LT.

N 3,373,987.608E 11,241,349.700

STR. 8802°37'53" RT.

OFFSET 3.0' LT.

N 3,373,961.792E 11,241,545.233

STR. 89

N 3,373,932.872E 11,241,741.357

STR. 91

N 3,373,629.346E 11,241,738.151

STR. 92

N 3,373,298.514E 11,241,722.111

STR. 93

N 3,372,970.420E 11,241,728.477

STR. 94

N 3,372,711.751E 11,241,739.833

STR. 95

N 3,372,457.892E 11,241,749.568

N 3,372,155.876E 11,241,772.116

N 3,372,101.389E 11,242,038.707

STR. 97

N 3,372,102.541E 11,242,217.354

STR. 98

N 3,372,098.352E 11,242,448.190

STR. 99

N 3,372,095.412E 11,242,742.663

STR. 100N 3,372,094.431

E 11,242,891.629

STR. 101

N 3,372,092.964E 11,243,111.686

STR. 102

N 3,372,089.908E 11,243,359.749

N 3,372,085.558E 11,243,588.813

N 3,372,084.245E 11,243,814.091

00°14'01" LT.STR. 103 STR. 105

N 3,372,082.910E 11,244,041.445

STR. 106

N 3,371,906.522E 11,244,161.681

STR. 107

N 3,371,724.323E 11,244,286.129

STR. 108

N 3,371,525.078E 11,244,422.220

STR. 110

01°35'40" RT.N 3,374,375.565E 11,239,365.531

EXISTINGSTR. 79.5

STR. 7901°10'19" RT.

N 3,374,403.837E 11,239,141.285

03°58'09" LT.N 3,374,430.872E 11,238,887.122

N 3,374,470.675E 11,238,662.516

STR. 7601°14'04" LT.

N 3,374,476.735E 11,238,443.028

STR. 7502°41'04" RT.

N 3,374,488.901E 11,238,195.681

N 3,374,489.462E 11,237,943.960

STR. 73

N 3,374,552.602E 11,237,715.092

00°04'07" LT.

N 3,374,624.353E 11,237,456.216

STR. 7200°51'26" LT.

EXISTING STR. 71

STR. 104

178.65' 230.87' 294.49' 148.97' 220.06' 248.08' 229.11' 225.28'227.36'

213.47'

220.64'

241.29'

272.10'

254.05'302.86'

258.92'

328.

16'

331.

22'

303.

54'

198.25'

197.23'289.48'

276.56'

182.20'

311.36'

287.89'

272.02'199.00'242.97'

103.30'122.72'255.60'

228.11'219.57'247.65'251.72'

237.42'

268.64'

287.88'

306.31'

N 3,371,561.183E 11,244,403.614

RISER STR. 109

00°07'32" LT.

84°13'00" RT.

STR. 7708°28'05" RT.

STR. 7415°17'44" RT.

OFFSET 3.0' LT.

OFFSET 6.0' LT.

OFFSET 5.0' RT.

10°10'22" LT.OFFSET 3.0' RT.

00°24'53" RT.OFFSET 0.5' LT.

00°47'11" LT.OFFSET 1.0' LT.

00°34'10" RT.OFFSET 0.5' RT.

OFFSET 2.0' RT. OFFSET 1.0' RT.

OFFSET 5.0' LT.

201.04'

01°35'40" RT89°12'10"

89°12'10"

INDEXMK.

STR. 80

TRANSMISSIONLINE ANGLE

(VARIES)

BACK AHEAD NOTE:1. FOR DRILLED PIER FOUNDATION DETAILS SEE DRAWING 16247.FD01.01.2. FOR STRUCTURE LOCATIONS, SEE PLAN & PROFILE DRAWINGS

16247.PP01.01 THROUGH 16247.PP04.04.

REFERENCE:16247.FD01.01 DRILLED PIER FOUNDATION DETAILS

UC SYNERGETIC, LLC.123 North White Street

Fort Mill, SC 29715VA License No. 0407004417

®

0 SAE ISSUE FOR CONSTRUCTION08-19-2015

GENERAL INSTRUCTIONS FOR STAKING FOUNDATIONS1. STAKE THE PI POINT ON THE TRANSMISSION LINE CENTERLINE AND ESTABLISH THE

BISECTOR OF THE CENTERLINE ANGLE. STAKE FORE AND AFT REFERENCE HUBS OUTFROM THE FOUNDATION, ALONG THE BISECTOR.

2. REFERENCE HUBS SHOULD BE WOODEN WITH A TACK. EACH REFERENCE HUB SHOULDALSO HAVE A LABELED GUARD STAKE WITH FLAGGING.

3. STRUCTURES 88,89,91,95,97,98,99,102,104,105 AND 109 ARE OFFSET FROM THECENTERLINE.

REPRESENTS DRILLED PIER/DIRECT EMBED FOUNDATIONS

REPRESENTS REFERENCE HUB

NOT TO SCALE

TYPICAL STAKING PLAN

Page 8: DESIGN DRAWINGS VENDOR DRAWINGS

0°180°

90°

STRUCTURE #74

BISECTOR

270°

RAKE 2.0"@ 305°

TO STR. #75

TO STR. #73

0°180°

90°

STRUCTURE #81

BISECTOR

270°TO STR. #82

TO STR. #80

RAKE 7.0"@ 359°

0°180°

90°

STRUCTURE #82

BISECTOR

270°TO STR. #83

TO STR. #81

RAKE 6.25"@ 183.5°

0°180°

90°

STRUCTURE #84

BISECTOR

270°TO STR. #85

TO STR. #83

RAKE 7.5"@ 180°

0°180°

90°

STRUCTURE #85

BISECTOR

270°TO STR. #86

TO STR. #84

RAKE 8.25"@ 180°

0°180°

90°

STRUCTURE #87

BISECTOR

270°TO STR. #88

TO STR. #86

RAKE 5.75"@ 0°

0°180°

90°

STRUCTURE #88

BISECTOR

270°TO STR. #89

TO STR. #87

RAKE 2.25"@ 166°

180°

90°

TO STR. #90

TO STR. #88

STRUCTURE #89

270°

0° BISECTOR

RAKE 2.0"@ 182°

180°

90°

TO STR. #92

TO STR. #90

STRUCTURE #91

270°

0° BISECTOR

RAKE 4.0"@ 181°

0°180°

90°

STRUCTURE #92

BISECTOR

270°TO STR. #93

TO STR. #91

RAKE 5.75"@ 0°

0°180°

90°

STRUCTURE #93

BISECTOR

270°TO STR. #94

TO STR. #92

RAKE 3.75"@ 359°

180°

90°

TO STR. #90

TO STR. #88

STRUCTURE #95

270°

0° BISECTOR

RAKE 4.5"@ 0°

0°180°

90°

STRUCTURE #97

BISECTOR

270°TO STR. #98

TO STR. #96

RAKE 7.0"@ 6°

0°180°

90°

STRUCTURE #98

BISECTOR

270°TO STR. #99

TO STR. #97

RAKE 1.5"@ 181°

180°

90°

TO STR. #101

TO STR. #99

270°

0° BISECTOR

RAKE 2.5"@ 294°

90°

TO STR. #103

TO STR. #101

STRUCTURE #102

270°

0° BISECTOR

RAKE 5.75"@ 230°

0°180°

90°

STRUCTURE #103

BISECTOR

270°TO STR. #104

TO STR. #102

RAKE 1.5"@ 182.5°

0°180°

90°

STRUCTURE #107

BISECTOR

270°TO STR. #104

TO STR. #106

RAKE 1.25"@ 237°

STRUCTURE #100

180°

NOTICE:THE DATA IN THIS DOCUMENT INCORPORATESPROPRIETARY RIGHTS OF UC SYNERGETIC, LLC.ANY PARTY ACCEPTING THIS DOCUMENT DOESSO IN CONFIDENCE AND AGREES THAT IT SHALLNOT BE DUPLICATED IN WHOLE OR PART, NORDISCLOSED TO OTHERS WITHOUT THE CONSENTOF UC SYNERGETIC, LLC.

CONTRACTOR SHALL VERIFY ALL CONDITIONS ONJOB SITE & NOTIFY PROJECT MANAGER OF ANYVARIATIONS FROM DIMENSIONS SHOWN ON THESEDRAWINGS BEFORE PROCEEDING WITH ANYCONSTRUCTION.

UC SYNERGETIC, LLC.123 North White Street

Fort Mill, SC 29715VA License No. 0407004417

®

0 SAE ISSUE FOR CONSTRUCTION08-19-2015

POLE RAKING DETAILSAND SCHEDULE

STRUCTURENO.

RAKEDIST.(IN.)

DIRECTION(DEG.)