design construction group the governor nelson a ... 02 c.pdf · leeds, ny 12451 august 3, 2018 ......

12
Updated 05/24/2018 Printed 08/03/2018 Page 1 of 1 Project No. 45615-C DESIGN & CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER EMPIRE STATE PLAZA ALBANY, NY 12242 ADDENDUM NO. 2 TO PROJECT NO. 45615 CONSTRUCTION WORK PROVIDE LEAD REMEDIATION LEEDS READINESS CENTER 2515 ROUTE 23 LEEDS, NY 12451 August 3, 2018 NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual. Acknowledge receipt of this Addendum in the space provided on the Bid Form. SPECIFICATIONS GROUP 1. Page 028303 – 5, Article 1.04, Add the Following Paragraph: “T. Put Back Work: Replacement of moveable objects into the work area.” 2. Page 028303 – 5, Article 1.04, Add the Following Paragraph: “U. Finish Work: Installation of finishes, including but not limited to application of paint or encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and epoxy floor systems.” DRAWINGS 1. Drawing Nos. H-104 and H-105: a. NOTES, Change Note 2 to Read: “2. PROVIDE CLEANING OF INTERIOR OF ALL DUCTWORK IN ACCORDANCE WITH SECTION 230130. ASSUME A TOTAL OF 550 L.F. OF 12-IN (OR SMALLER) DUCTS AND 400 L.F. OF GREATER THAN 12-IN DUCTS (RECTANGULAR AND/OR ROUND) FOR ESTIMATING PURPOSES.” 2. Revised Drawings: a. Drawing Nos. G-2, G-4, G-5, G-6, H-001, H-002, H-003, H-004, H-101, H-102 and H-103 noted “ADDENDUM #2 08/02/2018” accompany this Addendum and supersede the same numbered originally issued drawings. END OF ADDENDUM Erik T. Deyoe, P.E. Director, Division of Design Design & Construction

Upload: others

Post on 27-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

Updated 05/24/2018

Printed 08/03/2018 Page 1 of 1 Project No. 45615-C

DESIGN & CONSTRUCTION GROUP

THE GOVERNOR NELSON A. ROCKEFELLER

EMPIRE STATE PLAZA

ALBANY, NY 12242

ADDENDUM NO. 2 TO PROJECT NO. 45615

CONSTRUCTION WORK

PROVIDE LEAD REMEDIATION

LEEDS READINESS CENTER

2515 ROUTE 23

LEEDS, NY 12451

August 3, 2018

NOTE:This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.

Acknowledge receipt of this Addendum in the space provided on the Bid Form.

SPECIFICATIONS GROUP

1. Page 028303 – 5, Article 1.04, Add the Following Paragraph:

“T. Put Back Work: Replacement of moveable objects into the work area.”

2. Page 028303 – 5, Article 1.04, Add the Following Paragraph:

“U. Finish Work: Installation of finishes, including but not limited to application of paint or

encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and epoxy floor systems.”

DRAWINGS

1. Drawing Nos. H-104 and H-105:

a. NOTES, Change Note 2 to Read:

“2. PROVIDE CLEANING OF INTERIOR OF ALL DUCTWORK IN ACCORDANCE WITH

SECTION 230130. ASSUME A TOTAL OF 550 L.F. OF 12-IN (OR SMALLER) DUCTS AND

400 L.F. OF GREATER THAN 12-IN DUCTS (RECTANGULAR AND/OR ROUND) FOR

ESTIMATING PURPOSES.”

2. Revised Drawings:

a. Drawing Nos. G-2, G-4, G-5, G-6, H-001, H-002, H-003, H-004, H-101, H-102 and H-103 noted

“ADDENDUM #2 08/02/2018” accompany this Addendum and supersede the same numbered

originally issued drawings.

END OF ADDENDUM

Erik T. Deyoe, P.E.

Director, Division of Design

Design & Construction

Page 2: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

a.

a.

i.

Page 3: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

TRUENORTH

010' 0 10'

SECOND FLOOR PHASING PLANSCALE 1" = 10'

PHASE 1APHASE 1B

EXIT 2

EXIT 3

EXIT 1

Page 4: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

TRUENORTH

010' 0 10'

FIRST FLOOR PHASING PLANSCALE 1" = 10'

PHASE 2A

PHASE 2D

PHASE 2E

PHASE 2C

PHASE 2F

PHASE 1B

EXIT 1

EXIT 2

EXIT 3

EXIT 4

EXIT 7

EXIT 6

EXIT 5

EXIT 8

PHASE 2B

Page 5: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

TRUENORTH

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

010' 0 10'

BASEMENT PHASING PLANSCALE 1" = 10'

PHASE 3A

EXIT 1

Page 6: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

Page 7: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

Page 8: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

Page 9: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

Page 10: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

TRUENORTH

010' 0 10'

SECOND FLOOR PLANSCALE 1" = 10'

Page 11: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

TRUENORTH

010' 0 10'

FIRST FLOOR PLANSCALE 1" = 10'

Page 12: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 02 C.pdf · LEEDS, NY 12451 August 3, 2018 ... encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and

TRUENORTH

DESIGN & CONSTRUCTION

2018 © O'BRIEN & GERE, INC.

O'BRIEN & GERE ENGINEERS, INC

010' 0 10'

BASEMENT PLANSCALE 1" = 10'