Page 2: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

HS&E Performance of any Construction Industry is measured against the completion of project without any major incident. Construction industry is considered as one of the most dangerous trade due to mixture of multiple activities. Thousands of people lost their lives or suffered from disabilities annually, which contribute drastic impact on financial and social health. Adopting high standards of HSE and keeping extra measures against the precarious activities during the enormous construction works, resulted in achieving more than 200 Injury Free Days and 1 Million Man-hours without LTI.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

     

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

g|àÄxá ctzx 6 Management Remarks 2

HSE Statistics 3

Triumphs & Mileposts 4 & 5

Campaigns 6

Global Instances 7 & 8

Team Building Activities 9

Project Progress 10

Ongoing Challenges 11

Table Of Content

 MUNIR AHMED KHAN Sr. Construction Manager 

Health Safety & Environment is a first priority and Core value of any organization which upholds National / International Contour in construction Business.

HSE performance can never be achieved in any industry until and unless we do not train & educate our employees, holding them accountable / responsible on HSE performance & appreciation on best HSE performance.

We have implemented high standard of HSE on UZ750 Project in order to Establish Safe Work Practices, Enforce Safety Rules and Regulation, Training & Education of the employees to avoid hazards, allocating & implementing Safety Accountabilities & Responsibilities, Setting HSE Performance Objectives and appreciating the best HSE Performances. More than 200 Injury Free Days and 1 Million Man-hour without LTI are our pride of performances so far.

 SALAH HASSAN MOUSA ALSHAYBATSite Manager 

IIF - Incident & Injury Free HSE - Health Safety & Environment

TBT - Tool Box Talk

TI - Task Instruction

HTV - Heavy Traffic Vehicles

WWF - World Wild Fund

LTI - Lost Time Injury

TRIR - Total Recordable Incident Rate

PTD - Project to Date ZADCO- Zakum Development Company Co. Ltd. PED - Petrofac Emirates & Daewoo

Shipbuilding and Marine Engineering Co. Ltd.

  Abriviations

  VÄÉáx XÇvÉâÇàxÜá SUPPORTED BY: - IJAZ AHMED

Site HSE Lead, North Island FAHAD MEHMOOD Site HSE Lead, Central Island MUHAMMAD SHAOIB AZEEM Site HSE Lead, South Island FAHEEM AHMED Site Construction Lead, North Island RASHID IQBAL Site Construction Lead, South Island JAVAID IQBAL Site Construction Lead, Central Island

COMPILED BY: - FAROOQ LIAQAT HSE Manager, UZ-750 Project

EDITIED BY: - KAAB RAZA QAZI Training & Incident Coordinator (C. I.)

REVIEWED BY: - SYED ABDUL MOEED UAE Business Construction Head SALAH HASSAN MOUSA ALSHAYBAT Site Manager, UZ-750 Project MUNIR AHMED KHAN Sr. Construction Manager, UZ-750 Project

Page 3: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

31 ‐ 3550%

36 ‐ 4025%

41 ‐ 4512%

51 ‐ 5513%

No. of incidents Per Age

31 ‐ 35

36 ‐ 40

41 ‐ 45

51 ‐ 55

FRONT L INE  SUPERV I SOR

P I P E   F I T T ER   /  FABR I CATOR

DR IV ER OPERATOR

12

1

4

NO.  OF  INCIDENT  PER  CRAFT

0 0.05 0.1 0.15

YEAR 2015

YEAR 2016

SET TARGET FOR PROJECT TRIR

SET TARGET FOR DESCON TRIR

0

0

0.125

0.05

Total Recordable Injury Rates (TRIR)

So far on the project, we do not have any recordable injury. 

Year 2015 Year 2016

17285

14092

TRAINING MAN‐HOURS (YEAR WISE)

0

200000

400000

600000

800000

1000000

1200000

1400000

PTD Man‐Hours PTD LTI FreeMan‐Hours

1301140 1301140

PROJECT  MAN ‐HOURS

Page 4: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Incident  Injury Free  (IIF)  is a day when an  individual works without causing any injury to himself, his co‐worker and reports any recordable incident. 

DESCON has achieved more than 200 IIF days on each island which shows the entire commitment of its employees towards daily routine activities 

Page 5: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

Lifting  and  Rigging  are  dangerous  activities  if  not  focused  properly.  Due  to  their potential to cause harms, damages and injuries, these are considered as Back Bone of construction industry. 

Observing  the  HSE  Statistics  on  lifting  and  rigging  incidents  in  previous  projects, DESCON  conducted  Lifting  and  Rigging Workshops  on  all  islands.  These Workshops contained Lessons Learned Incidents, discussion on translated Petrofac Procedure and Practical Session on Safe Lifting and Rigging, conducted and supervised by Lifting and Riffing Superintendents. 

Robust message  from Practical HSE demonstrations  stay  longer  in worker’s mind and heart. Island Safety Days on Man machine Interface, Dropped Objects & Heat Stress Awareness were organized at different  islands where play‐actors, from the core of their heart, put remarkable efforts to make Island Safety Days successful and appreciated by DESCON, PED & ZEDCO Senior Management. 

Page 6: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

HSE posters competition was one of the best initiative at site  in order  to simulate the creativity and  ideas among the workers. More than 30 posters were received from all islands.  The  top  3  posters  were  awarded  as  Best  HSE Poster by the Senior Management. 

Hands are the most useable tools in any industry. Most of the injuries in the construction industry are related to hand and fingers. Due to wide use of hand tools at site, DESCON decided to launch HAND AND FINGER SAFETY CAMPAIGN at all  islands, which was  comprised of Hand and Finger Safety Awareness, Posters & Flyers, Development of Hand  and  Finger  Safety  Commitment  Board  and  focusing  site inspection to use proper type of gloves for each activity 

Dropped objects have a major input of  multiple  injuries  /  fatalities  in construction  industries  where  the work  at  height  is  involved.  80%  of activities at site are related to work at  height,  where  dropped  objects and  personal  falls  are  potential hazards, if not mitigated properly. 

Dropped Objects & Work at Height Campaign was commenced at Site. 

Dropped Objects and WAH practical awareness to the workforce, Provision of lanyards with the tools, Provision of wooden boxes at height, Provision of Gin Wheels / Pulleys fitted with rope & certified bags for  lifting of material, establishment of dropped object  intervention and hazard hunt team were included in this campaign.

Page 7: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

Earth Hour is an international event organized by the World Wide Fund  (WWF)  which  focuses  on  the  importance  of  energy conservation and celebrated  in encouraging people  to  turn off their unnecessary lights when not in use. 

This year on 29th March, 2016, DESCON celebrated Earth Hour event  at  Central  Island,  comprised  of  circulation  and dissemination of HSE Posture and Flyer on  importance of Earth Hours. 

5th  June  2016  was  celebrated  as  a WORLD  ENVIROEMENT  DAY  and ILLEGAL WILD LIFE TRADE is a Theme of this year which was communicated and circulated to the workforce through HSE Flyers. 

In addition, every 1st week of the Month a  Site  Wide  Massive  Housekeeping  is carried  out  at  Site  including  all  the Management & Non‐Management  staff at Site in order to refresh the importance of WORLD ENVIRONMENT DAY. 

Page 8: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The main  goals  of  the World  Health  Day  2016  (07‐04‐2016)  campaign were  to  increase  awareness  about  the rise in diabetes, its staggering burden and consequences. 

Similarly, Dietetic Awareness Campaigns were  launched at North & Central Islands with the collaboration of PED Medical  &  HSE  Staff  which  included  the  circulation  & destination of HSE  flyers on Diabetes Awareness  to  the workforce and random sampling of blood sugar check in the morning &  after  lunch  at  site with  dedicated male nurses, ambulances and HSE staffs 

In UAE, summer starts in late May and lasts till September in UAE. The weather is hot in UAE with temperatures reaching 45 °C (113 °F). The humidity is very high averaging over 90%. 

PREVENTIVE MEASURES Descon Launched Heat Stress Awareness Campaigns at site which included the following control measures. 1. Heat Stress Awareness / Trainings OF all the employees. 2.  Fatigue Assessment / surveys of critical crafts at Site. 3. Provision of proper welfare facilities e.g. rest shelters, water stations, ablution blocks 

& fans etc. 4. Celebration of Island Safety Days on Heat Stress Awareness at all islands. 5. Water Parade during Task Instruction and in regular interval during the course of 

activity by the supervisors.  6. Display of Heat Stress related Posters at site. 7. TBTs on the Heat Stress Awareness & Control Measures. 8. Visibility of Line / senior management at site all the time at site 

Page 9: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Appreciations / Team Building Parties plays significant role in energizing & altering the behavior / attitude of the workforce at site in owning the HSE. Descon celebrates Monthly SHES Communication Activity which includes celebrations of HSE milestones at different islands,  Lunch  &  Diner  with  Workers,  Senior  Management  walkthroughs  focusing  on  behavior  and  positive intervention with the workforce etc. 

Page 10: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GRE Fabrication

4%

E&I4%

Mechanical92%

PROJECT  CONTRIBUTION MAN‐HOUR WISE

GRE

Fabrication

E&I

Mechan

ical

100%

100%

100%

52.44%

0.30%

12.04%

WORK PROGRESS

Done Total

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

PROJECT TOTAL PROGRESS

Total, 100%

Done, 12.34%

Page 11: Descon HSE News Letter - UZ750 Project, January - June 2016

 

 

 

 

 

 

 

 

 

 

 

Heat Stress Season 2016. SIMOPS Work & PTW Formalities Availability of barge for mobilization of resources. Adverse weather conditions. Welder’s Competency for golden joints. Limited Storage area. Purging constraints for welding. U/G cable pulling for Electrical & Instrumentation. High curie RT source movement to the island. High thickness and cladded metal welding. High Humid atmosphere. Carrying on the jobs at a high-node with regards to HSE & QA/QC and all other aspects