Page 1: Desalination Plant Test Hole

GWI 2007Minneapolis, Minnesota

Desalination Plant Test Hole

Presented by: Travis Russell

Russell Drilling Co., Inc.

Page 2: Desalination Plant Test Hole

s

Study for

City of Corpus Christi,

Padre Island Desalination Plant

Test Hole Program.

Page 3: Desalination Plant Test Hole

Scope of Project:

Drill three or more test holes to

determine sands for production for

desalination, alternately for study for

horizontal ASR wells.

Page 4: Desalination Plant Test Hole

Test Holes Were to Drilled at

Three Separate Locations:

• Sea Pines

• Mustang Island Fire Station

• Padre Island Pump Station

Page 5: Desalination Plant Test Hole
Page 6: Desalination Plant Test Hole
Page 7: Desalination Plant Test Hole

Depth of each test hole 850’.

One to be completed as

brackish water supply well with

pump.

Page 8: Desalination Plant Test Hole

Contract had strict guidelines

for operating hours.

7:00 A.M. – 5:00 P.M.

Contractor was allowed to work on

Saturday.

(For a while anyway.)

Page 9: Desalination Plant Test Hole

This presentation is intended

to provoke thought and

design issues.

Page 10: Desalination Plant Test Hole

Test holes were

drilled, collecting three samples

every five feet.

Page 11: Desalination Plant Test Hole

Contractor was required to drill with

degradable synthetic organic drilling

compound. (Guar based mud).

The intent of this was to prevent mud

intrusion into the formation. The fines

deposited in the formation would

eventually be pumped from the formation

after completion of a supply well, and

would plug an RO system.

Page 12: Desalination Plant Test Hole

Guar based mud tended to blind

off mud cleaner screens, and

would thin out overnight if left

in the hole, and the hole was

sloughing off, requiring daily

ream out and/or wash out.

Page 13: Desalination Plant Test Hole

Hole conditions required the

use of bentonite, and the

engineer was concerned that a

gel based mud would

contaminate cuttings.

Page 14: Desalination Plant Test Hole

The Sea Pines site had sands at

510’-570’ and 675’-742’. The

hole was plugged and the rig

was moved to the Mustang

Island Fire Station site.

Page 15: Desalination Plant Test Hole
Page 16: Desalination Plant Test Hole

The Mustang Island Fire Station

test hole showed sands from

520’-575’ and 660’-740’.

Conductor pipe had been set to 80’

and pressure cemented. The test

well was plugged and the rig moved

to Padre Island Pump Station site.

Page 17: Desalination Plant Test Hole
Page 18: Desalination Plant Test Hole

Drilling was stopped at 765’.

Sands were encountered at

500’-536’, 568’-584’, and 658’-

704’. We were under contract

to complete a 6” PVC supply

well at one of the sites, and the

Padre Island Pump Station sit

was chosen.

Page 19: Desalination Plant Test Hole
Page 20: Desalination Plant Test Hole

The well was upgraded to 12”

PVC Certa-Lok, with casing

pressure cemented to 520’..

Stainless steel rod base screens

were installed from 500’-

534’, 568’-582’, and 658’-704’.

The well was developed and a

chemical analysis obtained.

Page 21: Desalination Plant Test Hole

*

"

.

K

>

tCtn70•no30

DEPTH

FEET

520

525

530

535

540

545

565

570

570

575

600

605

660

665

670

675

685

690

695

700

705

710

715

720

GAUGE

0.0331 0 0 0 0 0 0 0 0 0 0 0 0

0.0234 0 0 0 0 0 0 0 0 0 0 0 0

0.0165 1 0 1 0 0 1 1 0 1 0 0 0

0.0117 10 9 8 10 7 6 7 8 7 7 6 4

0.0098 20 19 20 19 19 16 18 13 17 18 15 10

0.0083 33 34 33 35 36 27 30 29 31 32 30 25

0.0070 49 50 52 54 56 40 42 45 47 49 47 41

0.0059 66 68 70 74 76 56 58 60 65 69 65 60

0.0029 99 100 99 100 100 97 98 99 99 100 99 98

PAN 100 100 100 100 100 100 100 100 100 100 100 100

Page 22: Desalination Plant Test Hole

The sieve analysis’ on each test

hole were very similar, an

average grain size of .0059 on

the 70 percentile.

Page 23: Desalination Plant Test Hole

To insure no sand production, a

20/40 gravel pack was used with

a .015 slot screen. Chemical

analysis showed the water to

have 18,000 ppm chlorides.

Page 24: Desalination Plant Test Hole

Conclusion: They want to

develop an ASR well field with

lateral lines extending 2500’+

in four directions.

Page 25: Desalination Plant Test Hole

The sands are too fine for

natural development, and must

be gravel packed. The screens

will be 500’-570’, and 660’-

740’ deep.

Page 26: Desalination Plant Test Hole

Would you use a

Muni-Pak Screen?

Page 27: Desalination Plant Test Hole

Would you gravel

pack?

Page 28: Desalination Plant Test Hole

How well do you

think you could

develop it?

Page 29: Desalination Plant Test Hole
Page 30: Desalination Plant Test Hole
Page 31: Desalination Plant Test Hole