department of the army permit · 2016. 1. 6. · department of the army permit permittee: national...

18
DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG) Issuing Office: U.S. Army Engineer District, Jacksonville NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer. You are authorized to perform work in accordance with the terms and conditions specified below. Project Description: For each annual event, the applicant proposes to construct and subsequently remove floating docks, awnings, dock ramps, and pilings for the Miami International Boat Show for the years 2016 through 2020 show dates. The following structures are proposed to be placed in waters of the U.S. for the duration of the show on an annual basis: (1) install 326 10-ft. by 40 ft. (130,400 sq. ft. total) temporary floating docks; (2) install 277 10-ft. by 40 ft. (110, 800 sq. ft. total) temporary floating docks with tents; (3) install 111 10-ft. by 20-ft. (22, 200 sq. ft. total) temporary floating docks with tents; (4) install 50 5-ft. by 20-ft. (5, 000 sq. ft . total) floating finger piers; (5) install 546 dock piles; (6) install 497 mooring piles; (7) install a maximum of 830 temporary slips for vessels with 12" to 5' 11 " draft ranges; (8) install 1 O helical anchors with marker buoys to mark the ingress/egress channel; (9) install 9 helical anchors and buoys to mark shallow areas with dense seagrass. Authorized activities are depicted on the attached drawings date-stamped by the Corps of Engineers on 17 November 2015 Project Location: The project would affect waters of the United States associated with Biscayne Bay. The project site is the Miami Marine Stadium located at 3501 Rickenbacker Causeway, in Section 17, Township 54 South, Range 42 East, Miami, Miami-Dade County, Florida 33149 (Folio# 01-4217-000-0110).

Upload: others

Post on 29-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

DEPARTMENT OF THE ARMY PERMIT

Permittee National Marine Manufactures Association co Nelson Wold

Permit No SAJ-2014-01034 (SP-AG)

Issuing Office US Army Engineer District Jacksonville

NOTE The term you and its derivatives as used in this permit means the permittee or any future transferee The term this office refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer

You are authorized to perform work in accordance with the terms and conditions specified below

Project Description For each annual event the applicant proposes to construct and subsequently remove floating docks awnings dock ramps and pilings for the Miami International Boat Show for the years 2016 through 2020 show dates The following structures are proposed to be placed in waters of the US for the duration of the show on an annual basis

(1) install 326 10-ft by 40 ft (130400 sq ft total) temporary floating docks (2) install 277 10-ft by 40 ft (110 800 sq ft total) temporary floating docks with tents (3) install 111 10-ft by 20-ft (22 200 sq ft total) temporary floating docks with tents (4) install 50 5-ft by 20-ft (5 000 sq ft total) floating finger piers (5) install 546 dock piles (6) install 497 mooring piles (7) install a maximum of 830 temporary slips for vessels with 12 to 511 draft ranges (8) install 1 Ohelical anchors with marker buoys to mark the ingressegress channel (9) install 9 helical anchors and buoys to mark shallow areas with dense seagrass

Authorized activities are depicted on the attached drawings date-stamped by the Corps of Engineers on 17 November 2015

Project Location The project would affect waters of the United States associated with Biscayne Bay The project site is the Miami Marine Stadium located at 3501 Rickenbacker Causeway in Section 17 Township 54 South Range 42 East Miami Miami-Dade County Florida 33149 (Folio 01-4217-000-0110)

PERMIT NUMBER SAJ-2014-01034 (SP-tG)

PERMITTEE NMMA- Miami Jnlemalional Boal Show PAGE 2 of9

Directions to site From US-1 heading North turn right onto FL-913Rickenbacker Causeway End at 3501 Rickenbacker Causeway

Approximate Central Coordinates Latitudemiddot 25742673deg Longitude -80169407deg

Permit Conditions

General Conditions

1 The time limit for completing the work authorized ends on DEC 2 8 2020 If you find that you need more time to complete the authorized activity submit your request for a time extension to this office for consideration at least one month before the above date is reached

2 You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit You are not relieved of this requirement if you abandon the permitted activity although you may make a good faith transfer to a third party in compliance with General Condition 4 below Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer you must obtain a modification of this permit from this office which may require restoration of the area

3 If you discover any previously unknown historic or archeolog1cal remains while accomplishing the activity authorized by this permit you must immediately notify this office of what you have found We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places

4 If you sell the property associated with this permit you must obtain the signature and the mailing address of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization

5 If a conditioned water quality certification has been issued for your project you must comply with the conditions specified in the certification as special conditions to this permit For your convenience a copy of the certification 1s attached if it contains such conditions

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 3 of9

6 You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit

Special Conditions

The following specials conditions will be included in the permit

1 REPORTING ADDRESS The Permittee shall submit all reports notifications documentation and correspondence required by the general and special conditions of this permit to the following address

a For standard mail US Army Corps of Engineers Regulatory Division Special Projects and Enforcement Branch 9900 SW 107th Ave Suite 203 Miami FL 33176-2785

b For electronic mail CESAJ-ComplyDocsusacearmymil (not to exceed 10 MB)

The Permittee shall reference this permit number SAJ-2014-01034(SP-AG) on all submittals

2 COMMENCEMENT NOTIFICATION Within 10 days from the date of initiating the work authorized by this permit The Permittee shall provide a written notification of the date of commencement of authorized work to the Corps

3 SELF-CERTIFICATION Within 60 days of completion of the work authorized by this permit the Permittee shall complete the attached Self-Certification Statement of Compliance form and submit it to the Corps In the event that the completed work deviates in any manner from the authorized work the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the Self-Certification Statement of Compliance form The description of any deviations on the Self-Certification Statement of Compliance form does not constitute approval of any deviations by the Corps

4 POSTING OF PERMIT The Permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE4 of9

5 AGENCY CHANGESAPPROVALS Should any other agency require andor approve changes to the work authorized or obligated by this permit the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes It is the Permittees responsibility to request a modification of this permit from the Miami Permits Section The Corps reserves the right to fully evaluate amend and approve or deny the request for modification of this permit

6 MANATEE CONDITIONS

a)The Permittee shall comply with the Standard Manatee Conditions for In-Water Work - 2011 (attachment A)

b) Manatee Educational Signs The Permittee shall comply with A Guide to Manatee Educational Signs revised June 2009 (Attachment B)

c) Manatee observers At least one person shall be designated as a manatee observer when in-water work is being performed That person shall have experience in manatee observation and be equipped with polarized sunglasses to aid in observation The manatee observer must be on site during all in-water construction activities and will advise personnel to cease operation upon sighting a manatee within 50 feet of any inshywater construction activity Movement of a work barge other associated vessels or any in-water work shall not be performed after sunset or before sunrise when the possibility of spotting manatees is negligible Additionally as an extra precaution the permittee has agree to place additional manatee observers on the water taxis that will be used during the event for the FEC slip location d) In addition to parts a-c above the applicant shall also follow protection measures a-j outlined in the 17 December FWS concurrence letter (attachment C)

7 SEA TURTLE AND SMALL TOOTH SAWFISH CONDITIONS The Permittee agrees to abide by the enclosed standard construction conditions designed to protect the Smalltooth sawfish and sea turtles (National Marine Fisheries 2006)(attachment D)

8 TURBIDITY BARRIERS Prior to the initiation of any of the work authorized by this permit the Permittee shall install floating turbidity barriers with weighted skirts that extend to within one foot of the bottom around all work areas that are in or adjacent to surface waters The turbidity barriers shall remain in place and be maintained until the authorized work has been completed and all erodible materials have been stabilized

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 5 of9

9 ASSURANCE OF NAVIGATION AND MAINTENANCE The Permittee understands and agrees that if future operations by the United States require the removal relocation or other alteration of the structures or work herein authorized or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters the Permittee will be required upon due notice from the Corps of Engineers to remove relocate or alter the structural work or obstructions caused thereby without expense to the United States No claim shall be made against the United States on account of any such removal or alteration

a No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP

b If during the ground disturbing activities and construction work within the permit area there are archaeologicalcultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include but not be limited to pottery modified shell flora fauna human remains ceramics stone tools or metal implements dugout canoes evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement) the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours) The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions

c Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and if deemed necessary by the SHPO THPO(s) or Corps in accordance with 36 CFR 800 or 33 CFR 325 Appendix C (5) Based on the circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction and from the Corps

d In the unlikely event that unmarked human remains are identified on non-federal lands they will be treated in accordance with Section 87205 Florida Statutes All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner Corps and State Archeologist within the same business day (8-hours) The Corps shall then notify the appropriate SHPO and THPO(s) Based on the

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE6of9

circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume without written authorization from the State Archeologist and from the Corps

11 WATER QUALITY CERTIFICATION The permittee shall comply with the specific conditions included in the Florida Department of Environmental Protection Environmental Resource Permit Number 13-0306513-006 (attachment E)

12 ENDANGERED SPECIES The permittee is required to comply with all the conservation measures outlined in the FWS Event Plan for Environmental Protection (Attachment F)

13 MONITORING SURVEYS The permittee is required to conduct one annual project-wide survey in 2016 2017 2018 and 2019 that adheres to the Recommendations for Sampling Johnsons Seagrass at a Project Site (attachment G) This survey should be conducted between June 1 to September 30 The annual project-wide surveys should quantitatively compare seagrass cover over time The survey shall also include quantification of corals

14 MONITORING SURVEYS The permittee shall also conduct pre-and post-show seagrass surveys for the years of 2016-2020 and record any physical disturbance and the spatial extent and location of any pile installation impacts and propeller dredging scarring caused by vessels installing pilings or boats on display at the boat show The post show survey shall be conducted within a maximum of 30 days after the event has concluded

15 MONITORING SURVEYS The permittee shall submit all seagrass survey reports to NMFS at nmfssermonitoringreportshcnoaagov

16 AVOIDANCE AND MINIMIZATION Environmental controls and best management practices must be implemented to prevent any materials related to construction activities from entering the surrounding water Any material removed as well as material applied to accomplish the project must be contained so as to prevent fugitive particulates andor discharge to surface waters Best management practices to minimize seagrass impacts and water quality degradation should be incorporated into the project design during dock construction and pile installation These best management practices shall include pile driving (as opposed to pile jetting) to install all piles The permittee has agreed to implement the following specific best management practices

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 7 of9

a Mooring larger vessels further away from the seagrass areas in deeper water b Scheduling the movement in and out of the slips for deep draft vessels during high tide c Use of only encapsulated floating docks that do not have any exposed Styrofoam floats d Pile driving barges shall operate in deep water during pile installation e If necessary smaller push boats will be used to maneuver large vessels into slips in order to avoid prop wash f Diver assisted pile driving to avoid direct impacts to benthic resources to the maximum extent practicable g At the entry way of each floating dock will be signage that will include a manatee fact sheet sign and other information on the area h The boats attending the show will be given a packet specifying the routes to and from the show the location of areas to avoid and in addition will have a manatee placard (as required by DEP) affixed at the helm i The applicant will mark all shallow dense seagrass area with visual marker buoys j The access platforms of the dense seagrass areas near shore will be ramped and will be the last to be installed to minimize shading time k At no point shall there be less than one (1) foot between the deepest draft of any vessel and the top of any submerged aquatic resources

17 SETUPBREAKDOWN TIMEFRAME The setup and break down of all structures related to the show shall occur during a maximum timeframe of 90 days Upon completion of break-down and clean-up the applicant shall provide written verification of this removal along with photographic evidence to the Corps

18 MITIGATION If any direct impacts( prop dredging scaring spudding impacts etc) associated with any activities related to the event set-up andor break-down are identified in the prepost show surveys the permittee is required to submit an appropriate mitigation plan to address those impacts within 30 days of the discovery of the impacts Information obtained from the project wide survey conducted during the summer as required in the previous condition 13 and spatial extent of the direct impact observed in the post show survey will be used to quantify the functional loss and determine the amount of mitigation necessary to offset that functional loss The Corps must review and approve the final mitigation which must comply with the 12 components of the Federal Mitigation Rule The applicant can also explore the use of mitigation bank credits to off-set the impacts if those are available

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 2: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-tG)

PERMITTEE NMMA- Miami Jnlemalional Boal Show PAGE 2 of9

Directions to site From US-1 heading North turn right onto FL-913Rickenbacker Causeway End at 3501 Rickenbacker Causeway

Approximate Central Coordinates Latitudemiddot 25742673deg Longitude -80169407deg

Permit Conditions

General Conditions

1 The time limit for completing the work authorized ends on DEC 2 8 2020 If you find that you need more time to complete the authorized activity submit your request for a time extension to this office for consideration at least one month before the above date is reached

2 You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit You are not relieved of this requirement if you abandon the permitted activity although you may make a good faith transfer to a third party in compliance with General Condition 4 below Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer you must obtain a modification of this permit from this office which may require restoration of the area

3 If you discover any previously unknown historic or archeolog1cal remains while accomplishing the activity authorized by this permit you must immediately notify this office of what you have found We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places

4 If you sell the property associated with this permit you must obtain the signature and the mailing address of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization

5 If a conditioned water quality certification has been issued for your project you must comply with the conditions specified in the certification as special conditions to this permit For your convenience a copy of the certification 1s attached if it contains such conditions

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 3 of9

6 You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit

Special Conditions

The following specials conditions will be included in the permit

1 REPORTING ADDRESS The Permittee shall submit all reports notifications documentation and correspondence required by the general and special conditions of this permit to the following address

a For standard mail US Army Corps of Engineers Regulatory Division Special Projects and Enforcement Branch 9900 SW 107th Ave Suite 203 Miami FL 33176-2785

b For electronic mail CESAJ-ComplyDocsusacearmymil (not to exceed 10 MB)

The Permittee shall reference this permit number SAJ-2014-01034(SP-AG) on all submittals

2 COMMENCEMENT NOTIFICATION Within 10 days from the date of initiating the work authorized by this permit The Permittee shall provide a written notification of the date of commencement of authorized work to the Corps

3 SELF-CERTIFICATION Within 60 days of completion of the work authorized by this permit the Permittee shall complete the attached Self-Certification Statement of Compliance form and submit it to the Corps In the event that the completed work deviates in any manner from the authorized work the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the Self-Certification Statement of Compliance form The description of any deviations on the Self-Certification Statement of Compliance form does not constitute approval of any deviations by the Corps

4 POSTING OF PERMIT The Permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE4 of9

5 AGENCY CHANGESAPPROVALS Should any other agency require andor approve changes to the work authorized or obligated by this permit the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes It is the Permittees responsibility to request a modification of this permit from the Miami Permits Section The Corps reserves the right to fully evaluate amend and approve or deny the request for modification of this permit

6 MANATEE CONDITIONS

a)The Permittee shall comply with the Standard Manatee Conditions for In-Water Work - 2011 (attachment A)

b) Manatee Educational Signs The Permittee shall comply with A Guide to Manatee Educational Signs revised June 2009 (Attachment B)

c) Manatee observers At least one person shall be designated as a manatee observer when in-water work is being performed That person shall have experience in manatee observation and be equipped with polarized sunglasses to aid in observation The manatee observer must be on site during all in-water construction activities and will advise personnel to cease operation upon sighting a manatee within 50 feet of any inshywater construction activity Movement of a work barge other associated vessels or any in-water work shall not be performed after sunset or before sunrise when the possibility of spotting manatees is negligible Additionally as an extra precaution the permittee has agree to place additional manatee observers on the water taxis that will be used during the event for the FEC slip location d) In addition to parts a-c above the applicant shall also follow protection measures a-j outlined in the 17 December FWS concurrence letter (attachment C)

7 SEA TURTLE AND SMALL TOOTH SAWFISH CONDITIONS The Permittee agrees to abide by the enclosed standard construction conditions designed to protect the Smalltooth sawfish and sea turtles (National Marine Fisheries 2006)(attachment D)

8 TURBIDITY BARRIERS Prior to the initiation of any of the work authorized by this permit the Permittee shall install floating turbidity barriers with weighted skirts that extend to within one foot of the bottom around all work areas that are in or adjacent to surface waters The turbidity barriers shall remain in place and be maintained until the authorized work has been completed and all erodible materials have been stabilized

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 5 of9

9 ASSURANCE OF NAVIGATION AND MAINTENANCE The Permittee understands and agrees that if future operations by the United States require the removal relocation or other alteration of the structures or work herein authorized or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters the Permittee will be required upon due notice from the Corps of Engineers to remove relocate or alter the structural work or obstructions caused thereby without expense to the United States No claim shall be made against the United States on account of any such removal or alteration

a No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP

b If during the ground disturbing activities and construction work within the permit area there are archaeologicalcultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include but not be limited to pottery modified shell flora fauna human remains ceramics stone tools or metal implements dugout canoes evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement) the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours) The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions

c Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and if deemed necessary by the SHPO THPO(s) or Corps in accordance with 36 CFR 800 or 33 CFR 325 Appendix C (5) Based on the circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction and from the Corps

d In the unlikely event that unmarked human remains are identified on non-federal lands they will be treated in accordance with Section 87205 Florida Statutes All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner Corps and State Archeologist within the same business day (8-hours) The Corps shall then notify the appropriate SHPO and THPO(s) Based on the

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE6of9

circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume without written authorization from the State Archeologist and from the Corps

11 WATER QUALITY CERTIFICATION The permittee shall comply with the specific conditions included in the Florida Department of Environmental Protection Environmental Resource Permit Number 13-0306513-006 (attachment E)

12 ENDANGERED SPECIES The permittee is required to comply with all the conservation measures outlined in the FWS Event Plan for Environmental Protection (Attachment F)

13 MONITORING SURVEYS The permittee is required to conduct one annual project-wide survey in 2016 2017 2018 and 2019 that adheres to the Recommendations for Sampling Johnsons Seagrass at a Project Site (attachment G) This survey should be conducted between June 1 to September 30 The annual project-wide surveys should quantitatively compare seagrass cover over time The survey shall also include quantification of corals

14 MONITORING SURVEYS The permittee shall also conduct pre-and post-show seagrass surveys for the years of 2016-2020 and record any physical disturbance and the spatial extent and location of any pile installation impacts and propeller dredging scarring caused by vessels installing pilings or boats on display at the boat show The post show survey shall be conducted within a maximum of 30 days after the event has concluded

15 MONITORING SURVEYS The permittee shall submit all seagrass survey reports to NMFS at nmfssermonitoringreportshcnoaagov

16 AVOIDANCE AND MINIMIZATION Environmental controls and best management practices must be implemented to prevent any materials related to construction activities from entering the surrounding water Any material removed as well as material applied to accomplish the project must be contained so as to prevent fugitive particulates andor discharge to surface waters Best management practices to minimize seagrass impacts and water quality degradation should be incorporated into the project design during dock construction and pile installation These best management practices shall include pile driving (as opposed to pile jetting) to install all piles The permittee has agreed to implement the following specific best management practices

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 7 of9

a Mooring larger vessels further away from the seagrass areas in deeper water b Scheduling the movement in and out of the slips for deep draft vessels during high tide c Use of only encapsulated floating docks that do not have any exposed Styrofoam floats d Pile driving barges shall operate in deep water during pile installation e If necessary smaller push boats will be used to maneuver large vessels into slips in order to avoid prop wash f Diver assisted pile driving to avoid direct impacts to benthic resources to the maximum extent practicable g At the entry way of each floating dock will be signage that will include a manatee fact sheet sign and other information on the area h The boats attending the show will be given a packet specifying the routes to and from the show the location of areas to avoid and in addition will have a manatee placard (as required by DEP) affixed at the helm i The applicant will mark all shallow dense seagrass area with visual marker buoys j The access platforms of the dense seagrass areas near shore will be ramped and will be the last to be installed to minimize shading time k At no point shall there be less than one (1) foot between the deepest draft of any vessel and the top of any submerged aquatic resources

17 SETUPBREAKDOWN TIMEFRAME The setup and break down of all structures related to the show shall occur during a maximum timeframe of 90 days Upon completion of break-down and clean-up the applicant shall provide written verification of this removal along with photographic evidence to the Corps

18 MITIGATION If any direct impacts( prop dredging scaring spudding impacts etc) associated with any activities related to the event set-up andor break-down are identified in the prepost show surveys the permittee is required to submit an appropriate mitigation plan to address those impacts within 30 days of the discovery of the impacts Information obtained from the project wide survey conducted during the summer as required in the previous condition 13 and spatial extent of the direct impact observed in the post show survey will be used to quantify the functional loss and determine the amount of mitigation necessary to offset that functional loss The Corps must review and approve the final mitigation which must comply with the 12 components of the Federal Mitigation Rule The applicant can also explore the use of mitigation bank credits to off-set the impacts if those are available

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 3: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 3 of9

6 You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit

Special Conditions

The following specials conditions will be included in the permit

1 REPORTING ADDRESS The Permittee shall submit all reports notifications documentation and correspondence required by the general and special conditions of this permit to the following address

a For standard mail US Army Corps of Engineers Regulatory Division Special Projects and Enforcement Branch 9900 SW 107th Ave Suite 203 Miami FL 33176-2785

b For electronic mail CESAJ-ComplyDocsusacearmymil (not to exceed 10 MB)

The Permittee shall reference this permit number SAJ-2014-01034(SP-AG) on all submittals

2 COMMENCEMENT NOTIFICATION Within 10 days from the date of initiating the work authorized by this permit The Permittee shall provide a written notification of the date of commencement of authorized work to the Corps

3 SELF-CERTIFICATION Within 60 days of completion of the work authorized by this permit the Permittee shall complete the attached Self-Certification Statement of Compliance form and submit it to the Corps In the event that the completed work deviates in any manner from the authorized work the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the Self-Certification Statement of Compliance form The description of any deviations on the Self-Certification Statement of Compliance form does not constitute approval of any deviations by the Corps

4 POSTING OF PERMIT The Permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE4 of9

5 AGENCY CHANGESAPPROVALS Should any other agency require andor approve changes to the work authorized or obligated by this permit the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes It is the Permittees responsibility to request a modification of this permit from the Miami Permits Section The Corps reserves the right to fully evaluate amend and approve or deny the request for modification of this permit

6 MANATEE CONDITIONS

a)The Permittee shall comply with the Standard Manatee Conditions for In-Water Work - 2011 (attachment A)

b) Manatee Educational Signs The Permittee shall comply with A Guide to Manatee Educational Signs revised June 2009 (Attachment B)

c) Manatee observers At least one person shall be designated as a manatee observer when in-water work is being performed That person shall have experience in manatee observation and be equipped with polarized sunglasses to aid in observation The manatee observer must be on site during all in-water construction activities and will advise personnel to cease operation upon sighting a manatee within 50 feet of any inshywater construction activity Movement of a work barge other associated vessels or any in-water work shall not be performed after sunset or before sunrise when the possibility of spotting manatees is negligible Additionally as an extra precaution the permittee has agree to place additional manatee observers on the water taxis that will be used during the event for the FEC slip location d) In addition to parts a-c above the applicant shall also follow protection measures a-j outlined in the 17 December FWS concurrence letter (attachment C)

7 SEA TURTLE AND SMALL TOOTH SAWFISH CONDITIONS The Permittee agrees to abide by the enclosed standard construction conditions designed to protect the Smalltooth sawfish and sea turtles (National Marine Fisheries 2006)(attachment D)

8 TURBIDITY BARRIERS Prior to the initiation of any of the work authorized by this permit the Permittee shall install floating turbidity barriers with weighted skirts that extend to within one foot of the bottom around all work areas that are in or adjacent to surface waters The turbidity barriers shall remain in place and be maintained until the authorized work has been completed and all erodible materials have been stabilized

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 5 of9

9 ASSURANCE OF NAVIGATION AND MAINTENANCE The Permittee understands and agrees that if future operations by the United States require the removal relocation or other alteration of the structures or work herein authorized or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters the Permittee will be required upon due notice from the Corps of Engineers to remove relocate or alter the structural work or obstructions caused thereby without expense to the United States No claim shall be made against the United States on account of any such removal or alteration

a No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP

b If during the ground disturbing activities and construction work within the permit area there are archaeologicalcultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include but not be limited to pottery modified shell flora fauna human remains ceramics stone tools or metal implements dugout canoes evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement) the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours) The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions

c Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and if deemed necessary by the SHPO THPO(s) or Corps in accordance with 36 CFR 800 or 33 CFR 325 Appendix C (5) Based on the circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction and from the Corps

d In the unlikely event that unmarked human remains are identified on non-federal lands they will be treated in accordance with Section 87205 Florida Statutes All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner Corps and State Archeologist within the same business day (8-hours) The Corps shall then notify the appropriate SHPO and THPO(s) Based on the

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE6of9

circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume without written authorization from the State Archeologist and from the Corps

11 WATER QUALITY CERTIFICATION The permittee shall comply with the specific conditions included in the Florida Department of Environmental Protection Environmental Resource Permit Number 13-0306513-006 (attachment E)

12 ENDANGERED SPECIES The permittee is required to comply with all the conservation measures outlined in the FWS Event Plan for Environmental Protection (Attachment F)

13 MONITORING SURVEYS The permittee is required to conduct one annual project-wide survey in 2016 2017 2018 and 2019 that adheres to the Recommendations for Sampling Johnsons Seagrass at a Project Site (attachment G) This survey should be conducted between June 1 to September 30 The annual project-wide surveys should quantitatively compare seagrass cover over time The survey shall also include quantification of corals

14 MONITORING SURVEYS The permittee shall also conduct pre-and post-show seagrass surveys for the years of 2016-2020 and record any physical disturbance and the spatial extent and location of any pile installation impacts and propeller dredging scarring caused by vessels installing pilings or boats on display at the boat show The post show survey shall be conducted within a maximum of 30 days after the event has concluded

15 MONITORING SURVEYS The permittee shall submit all seagrass survey reports to NMFS at nmfssermonitoringreportshcnoaagov

16 AVOIDANCE AND MINIMIZATION Environmental controls and best management practices must be implemented to prevent any materials related to construction activities from entering the surrounding water Any material removed as well as material applied to accomplish the project must be contained so as to prevent fugitive particulates andor discharge to surface waters Best management practices to minimize seagrass impacts and water quality degradation should be incorporated into the project design during dock construction and pile installation These best management practices shall include pile driving (as opposed to pile jetting) to install all piles The permittee has agreed to implement the following specific best management practices

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 7 of9

a Mooring larger vessels further away from the seagrass areas in deeper water b Scheduling the movement in and out of the slips for deep draft vessels during high tide c Use of only encapsulated floating docks that do not have any exposed Styrofoam floats d Pile driving barges shall operate in deep water during pile installation e If necessary smaller push boats will be used to maneuver large vessels into slips in order to avoid prop wash f Diver assisted pile driving to avoid direct impacts to benthic resources to the maximum extent practicable g At the entry way of each floating dock will be signage that will include a manatee fact sheet sign and other information on the area h The boats attending the show will be given a packet specifying the routes to and from the show the location of areas to avoid and in addition will have a manatee placard (as required by DEP) affixed at the helm i The applicant will mark all shallow dense seagrass area with visual marker buoys j The access platforms of the dense seagrass areas near shore will be ramped and will be the last to be installed to minimize shading time k At no point shall there be less than one (1) foot between the deepest draft of any vessel and the top of any submerged aquatic resources

17 SETUPBREAKDOWN TIMEFRAME The setup and break down of all structures related to the show shall occur during a maximum timeframe of 90 days Upon completion of break-down and clean-up the applicant shall provide written verification of this removal along with photographic evidence to the Corps

18 MITIGATION If any direct impacts( prop dredging scaring spudding impacts etc) associated with any activities related to the event set-up andor break-down are identified in the prepost show surveys the permittee is required to submit an appropriate mitigation plan to address those impacts within 30 days of the discovery of the impacts Information obtained from the project wide survey conducted during the summer as required in the previous condition 13 and spatial extent of the direct impact observed in the post show survey will be used to quantify the functional loss and determine the amount of mitigation necessary to offset that functional loss The Corps must review and approve the final mitigation which must comply with the 12 components of the Federal Mitigation Rule The applicant can also explore the use of mitigation bank credits to off-set the impacts if those are available

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 4: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE4 of9

5 AGENCY CHANGESAPPROVALS Should any other agency require andor approve changes to the work authorized or obligated by this permit the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes It is the Permittees responsibility to request a modification of this permit from the Miami Permits Section The Corps reserves the right to fully evaluate amend and approve or deny the request for modification of this permit

6 MANATEE CONDITIONS

a)The Permittee shall comply with the Standard Manatee Conditions for In-Water Work - 2011 (attachment A)

b) Manatee Educational Signs The Permittee shall comply with A Guide to Manatee Educational Signs revised June 2009 (Attachment B)

c) Manatee observers At least one person shall be designated as a manatee observer when in-water work is being performed That person shall have experience in manatee observation and be equipped with polarized sunglasses to aid in observation The manatee observer must be on site during all in-water construction activities and will advise personnel to cease operation upon sighting a manatee within 50 feet of any inshywater construction activity Movement of a work barge other associated vessels or any in-water work shall not be performed after sunset or before sunrise when the possibility of spotting manatees is negligible Additionally as an extra precaution the permittee has agree to place additional manatee observers on the water taxis that will be used during the event for the FEC slip location d) In addition to parts a-c above the applicant shall also follow protection measures a-j outlined in the 17 December FWS concurrence letter (attachment C)

7 SEA TURTLE AND SMALL TOOTH SAWFISH CONDITIONS The Permittee agrees to abide by the enclosed standard construction conditions designed to protect the Smalltooth sawfish and sea turtles (National Marine Fisheries 2006)(attachment D)

8 TURBIDITY BARRIERS Prior to the initiation of any of the work authorized by this permit the Permittee shall install floating turbidity barriers with weighted skirts that extend to within one foot of the bottom around all work areas that are in or adjacent to surface waters The turbidity barriers shall remain in place and be maintained until the authorized work has been completed and all erodible materials have been stabilized

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 5 of9

9 ASSURANCE OF NAVIGATION AND MAINTENANCE The Permittee understands and agrees that if future operations by the United States require the removal relocation or other alteration of the structures or work herein authorized or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters the Permittee will be required upon due notice from the Corps of Engineers to remove relocate or alter the structural work or obstructions caused thereby without expense to the United States No claim shall be made against the United States on account of any such removal or alteration

a No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP

b If during the ground disturbing activities and construction work within the permit area there are archaeologicalcultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include but not be limited to pottery modified shell flora fauna human remains ceramics stone tools or metal implements dugout canoes evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement) the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours) The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions

c Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and if deemed necessary by the SHPO THPO(s) or Corps in accordance with 36 CFR 800 or 33 CFR 325 Appendix C (5) Based on the circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction and from the Corps

d In the unlikely event that unmarked human remains are identified on non-federal lands they will be treated in accordance with Section 87205 Florida Statutes All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner Corps and State Archeologist within the same business day (8-hours) The Corps shall then notify the appropriate SHPO and THPO(s) Based on the

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE6of9

circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume without written authorization from the State Archeologist and from the Corps

11 WATER QUALITY CERTIFICATION The permittee shall comply with the specific conditions included in the Florida Department of Environmental Protection Environmental Resource Permit Number 13-0306513-006 (attachment E)

12 ENDANGERED SPECIES The permittee is required to comply with all the conservation measures outlined in the FWS Event Plan for Environmental Protection (Attachment F)

13 MONITORING SURVEYS The permittee is required to conduct one annual project-wide survey in 2016 2017 2018 and 2019 that adheres to the Recommendations for Sampling Johnsons Seagrass at a Project Site (attachment G) This survey should be conducted between June 1 to September 30 The annual project-wide surveys should quantitatively compare seagrass cover over time The survey shall also include quantification of corals

14 MONITORING SURVEYS The permittee shall also conduct pre-and post-show seagrass surveys for the years of 2016-2020 and record any physical disturbance and the spatial extent and location of any pile installation impacts and propeller dredging scarring caused by vessels installing pilings or boats on display at the boat show The post show survey shall be conducted within a maximum of 30 days after the event has concluded

15 MONITORING SURVEYS The permittee shall submit all seagrass survey reports to NMFS at nmfssermonitoringreportshcnoaagov

16 AVOIDANCE AND MINIMIZATION Environmental controls and best management practices must be implemented to prevent any materials related to construction activities from entering the surrounding water Any material removed as well as material applied to accomplish the project must be contained so as to prevent fugitive particulates andor discharge to surface waters Best management practices to minimize seagrass impacts and water quality degradation should be incorporated into the project design during dock construction and pile installation These best management practices shall include pile driving (as opposed to pile jetting) to install all piles The permittee has agreed to implement the following specific best management practices

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 7 of9

a Mooring larger vessels further away from the seagrass areas in deeper water b Scheduling the movement in and out of the slips for deep draft vessels during high tide c Use of only encapsulated floating docks that do not have any exposed Styrofoam floats d Pile driving barges shall operate in deep water during pile installation e If necessary smaller push boats will be used to maneuver large vessels into slips in order to avoid prop wash f Diver assisted pile driving to avoid direct impacts to benthic resources to the maximum extent practicable g At the entry way of each floating dock will be signage that will include a manatee fact sheet sign and other information on the area h The boats attending the show will be given a packet specifying the routes to and from the show the location of areas to avoid and in addition will have a manatee placard (as required by DEP) affixed at the helm i The applicant will mark all shallow dense seagrass area with visual marker buoys j The access platforms of the dense seagrass areas near shore will be ramped and will be the last to be installed to minimize shading time k At no point shall there be less than one (1) foot between the deepest draft of any vessel and the top of any submerged aquatic resources

17 SETUPBREAKDOWN TIMEFRAME The setup and break down of all structures related to the show shall occur during a maximum timeframe of 90 days Upon completion of break-down and clean-up the applicant shall provide written verification of this removal along with photographic evidence to the Corps

18 MITIGATION If any direct impacts( prop dredging scaring spudding impacts etc) associated with any activities related to the event set-up andor break-down are identified in the prepost show surveys the permittee is required to submit an appropriate mitigation plan to address those impacts within 30 days of the discovery of the impacts Information obtained from the project wide survey conducted during the summer as required in the previous condition 13 and spatial extent of the direct impact observed in the post show survey will be used to quantify the functional loss and determine the amount of mitigation necessary to offset that functional loss The Corps must review and approve the final mitigation which must comply with the 12 components of the Federal Mitigation Rule The applicant can also explore the use of mitigation bank credits to off-set the impacts if those are available

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 5: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 5 of9

9 ASSURANCE OF NAVIGATION AND MAINTENANCE The Permittee understands and agrees that if future operations by the United States require the removal relocation or other alteration of the structures or work herein authorized or if in the opinion of the Secretary of the Army or his authorized representative said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters the Permittee will be required upon due notice from the Corps of Engineers to remove relocate or alter the structural work or obstructions caused thereby without expense to the United States No claim shall be made against the United States on account of any such removal or alteration

a No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP

b If during the ground disturbing activities and construction work within the permit area there are archaeologicalcultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include but not be limited to pottery modified shell flora fauna human remains ceramics stone tools or metal implements dugout canoes evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement) the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours) The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions

c Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and if deemed necessary by the SHPO THPO(s) or Corps in accordance with 36 CFR 800 or 33 CFR 325 Appendix C (5) Based on the circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction and from the Corps

d In the unlikely event that unmarked human remains are identified on non-federal lands they will be treated in accordance with Section 87205 Florida Statutes All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner Corps and State Archeologist within the same business day (8-hours) The Corps shall then notify the appropriate SHPO and THPO(s) Based on the

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE6of9

circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume without written authorization from the State Archeologist and from the Corps

11 WATER QUALITY CERTIFICATION The permittee shall comply with the specific conditions included in the Florida Department of Environmental Protection Environmental Resource Permit Number 13-0306513-006 (attachment E)

12 ENDANGERED SPECIES The permittee is required to comply with all the conservation measures outlined in the FWS Event Plan for Environmental Protection (Attachment F)

13 MONITORING SURVEYS The permittee is required to conduct one annual project-wide survey in 2016 2017 2018 and 2019 that adheres to the Recommendations for Sampling Johnsons Seagrass at a Project Site (attachment G) This survey should be conducted between June 1 to September 30 The annual project-wide surveys should quantitatively compare seagrass cover over time The survey shall also include quantification of corals

14 MONITORING SURVEYS The permittee shall also conduct pre-and post-show seagrass surveys for the years of 2016-2020 and record any physical disturbance and the spatial extent and location of any pile installation impacts and propeller dredging scarring caused by vessels installing pilings or boats on display at the boat show The post show survey shall be conducted within a maximum of 30 days after the event has concluded

15 MONITORING SURVEYS The permittee shall submit all seagrass survey reports to NMFS at nmfssermonitoringreportshcnoaagov

16 AVOIDANCE AND MINIMIZATION Environmental controls and best management practices must be implemented to prevent any materials related to construction activities from entering the surrounding water Any material removed as well as material applied to accomplish the project must be contained so as to prevent fugitive particulates andor discharge to surface waters Best management practices to minimize seagrass impacts and water quality degradation should be incorporated into the project design during dock construction and pile installation These best management practices shall include pile driving (as opposed to pile jetting) to install all piles The permittee has agreed to implement the following specific best management practices

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 7 of9

a Mooring larger vessels further away from the seagrass areas in deeper water b Scheduling the movement in and out of the slips for deep draft vessels during high tide c Use of only encapsulated floating docks that do not have any exposed Styrofoam floats d Pile driving barges shall operate in deep water during pile installation e If necessary smaller push boats will be used to maneuver large vessels into slips in order to avoid prop wash f Diver assisted pile driving to avoid direct impacts to benthic resources to the maximum extent practicable g At the entry way of each floating dock will be signage that will include a manatee fact sheet sign and other information on the area h The boats attending the show will be given a packet specifying the routes to and from the show the location of areas to avoid and in addition will have a manatee placard (as required by DEP) affixed at the helm i The applicant will mark all shallow dense seagrass area with visual marker buoys j The access platforms of the dense seagrass areas near shore will be ramped and will be the last to be installed to minimize shading time k At no point shall there be less than one (1) foot between the deepest draft of any vessel and the top of any submerged aquatic resources

17 SETUPBREAKDOWN TIMEFRAME The setup and break down of all structures related to the show shall occur during a maximum timeframe of 90 days Upon completion of break-down and clean-up the applicant shall provide written verification of this removal along with photographic evidence to the Corps

18 MITIGATION If any direct impacts( prop dredging scaring spudding impacts etc) associated with any activities related to the event set-up andor break-down are identified in the prepost show surveys the permittee is required to submit an appropriate mitigation plan to address those impacts within 30 days of the discovery of the impacts Information obtained from the project wide survey conducted during the summer as required in the previous condition 13 and spatial extent of the direct impact observed in the post show survey will be used to quantify the functional loss and determine the amount of mitigation necessary to offset that functional loss The Corps must review and approve the final mitigation which must comply with the 12 components of the Federal Mitigation Rule The applicant can also explore the use of mitigation bank credits to off-set the impacts if those are available

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 6: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE6of9

circumstances of the discovery equity to all parties and considerations of the public interest the Corps may modify suspend or revoke the permit in accordance with 33 CFR Part 3257 Such activity shall not resume without written authorization from the State Archeologist and from the Corps

11 WATER QUALITY CERTIFICATION The permittee shall comply with the specific conditions included in the Florida Department of Environmental Protection Environmental Resource Permit Number 13-0306513-006 (attachment E)

12 ENDANGERED SPECIES The permittee is required to comply with all the conservation measures outlined in the FWS Event Plan for Environmental Protection (Attachment F)

13 MONITORING SURVEYS The permittee is required to conduct one annual project-wide survey in 2016 2017 2018 and 2019 that adheres to the Recommendations for Sampling Johnsons Seagrass at a Project Site (attachment G) This survey should be conducted between June 1 to September 30 The annual project-wide surveys should quantitatively compare seagrass cover over time The survey shall also include quantification of corals

14 MONITORING SURVEYS The permittee shall also conduct pre-and post-show seagrass surveys for the years of 2016-2020 and record any physical disturbance and the spatial extent and location of any pile installation impacts and propeller dredging scarring caused by vessels installing pilings or boats on display at the boat show The post show survey shall be conducted within a maximum of 30 days after the event has concluded

15 MONITORING SURVEYS The permittee shall submit all seagrass survey reports to NMFS at nmfssermonitoringreportshcnoaagov

16 AVOIDANCE AND MINIMIZATION Environmental controls and best management practices must be implemented to prevent any materials related to construction activities from entering the surrounding water Any material removed as well as material applied to accomplish the project must be contained so as to prevent fugitive particulates andor discharge to surface waters Best management practices to minimize seagrass impacts and water quality degradation should be incorporated into the project design during dock construction and pile installation These best management practices shall include pile driving (as opposed to pile jetting) to install all piles The permittee has agreed to implement the following specific best management practices

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 7 of9

a Mooring larger vessels further away from the seagrass areas in deeper water b Scheduling the movement in and out of the slips for deep draft vessels during high tide c Use of only encapsulated floating docks that do not have any exposed Styrofoam floats d Pile driving barges shall operate in deep water during pile installation e If necessary smaller push boats will be used to maneuver large vessels into slips in order to avoid prop wash f Diver assisted pile driving to avoid direct impacts to benthic resources to the maximum extent practicable g At the entry way of each floating dock will be signage that will include a manatee fact sheet sign and other information on the area h The boats attending the show will be given a packet specifying the routes to and from the show the location of areas to avoid and in addition will have a manatee placard (as required by DEP) affixed at the helm i The applicant will mark all shallow dense seagrass area with visual marker buoys j The access platforms of the dense seagrass areas near shore will be ramped and will be the last to be installed to minimize shading time k At no point shall there be less than one (1) foot between the deepest draft of any vessel and the top of any submerged aquatic resources

17 SETUPBREAKDOWN TIMEFRAME The setup and break down of all structures related to the show shall occur during a maximum timeframe of 90 days Upon completion of break-down and clean-up the applicant shall provide written verification of this removal along with photographic evidence to the Corps

18 MITIGATION If any direct impacts( prop dredging scaring spudding impacts etc) associated with any activities related to the event set-up andor break-down are identified in the prepost show surveys the permittee is required to submit an appropriate mitigation plan to address those impacts within 30 days of the discovery of the impacts Information obtained from the project wide survey conducted during the summer as required in the previous condition 13 and spatial extent of the direct impact observed in the post show survey will be used to quantify the functional loss and determine the amount of mitigation necessary to offset that functional loss The Corps must review and approve the final mitigation which must comply with the 12 components of the Federal Mitigation Rule The applicant can also explore the use of mitigation bank credits to off-set the impacts if those are available

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 7: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 7 of9

a Mooring larger vessels further away from the seagrass areas in deeper water b Scheduling the movement in and out of the slips for deep draft vessels during high tide c Use of only encapsulated floating docks that do not have any exposed Styrofoam floats d Pile driving barges shall operate in deep water during pile installation e If necessary smaller push boats will be used to maneuver large vessels into slips in order to avoid prop wash f Diver assisted pile driving to avoid direct impacts to benthic resources to the maximum extent practicable g At the entry way of each floating dock will be signage that will include a manatee fact sheet sign and other information on the area h The boats attending the show will be given a packet specifying the routes to and from the show the location of areas to avoid and in addition will have a manatee placard (as required by DEP) affixed at the helm i The applicant will mark all shallow dense seagrass area with visual marker buoys j The access platforms of the dense seagrass areas near shore will be ramped and will be the last to be installed to minimize shading time k At no point shall there be less than one (1) foot between the deepest draft of any vessel and the top of any submerged aquatic resources

17 SETUPBREAKDOWN TIMEFRAME The setup and break down of all structures related to the show shall occur during a maximum timeframe of 90 days Upon completion of break-down and clean-up the applicant shall provide written verification of this removal along with photographic evidence to the Corps

18 MITIGATION If any direct impacts( prop dredging scaring spudding impacts etc) associated with any activities related to the event set-up andor break-down are identified in the prepost show surveys the permittee is required to submit an appropriate mitigation plan to address those impacts within 30 days of the discovery of the impacts Information obtained from the project wide survey conducted during the summer as required in the previous condition 13 and spatial extent of the direct impact observed in the post show survey will be used to quantify the functional loss and determine the amount of mitigation necessary to offset that functional loss The Corps must review and approve the final mitigation which must comply with the 12 components of the Federal Mitigation Rule The applicant can also explore the use of mitigation bank credits to off-set the impacts if those are available

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 8: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 8 of9

19 MARINE PATROL The permittee shall employ a marine patrol officer to provide oversight and to ensure that all vessels associated with the event are traveling along the approved transportation routes identified on page 8 of the approved plans and are avoiding all environmentally sensitive areas

Further Information

1 Congressional Authorities You have been authorized to undertake the activity described above pursuant to

(X ) Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403)

(X) Section 404 of the Clean Water Act (33 USC 1344)

( ) Section 103 of the Marine Protection Research and Sanctuaries Act of 1972 (33 USC 1413)

2 Limits of this authorization

a This permit does not obviate the need to obtain other Federal State or local authorizations required by law

b This permit does not grant any property rights or exclusive privileges

c This permit does not authorize any injury to the property or rights of others

d This permit does not authorize interference with any existing or proposed Federal projects

3 Limits of Federal Liability In issuing this permit the Federal Government does not assume any liability for the following

a Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes

b Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest

c Damages to persons property or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 9: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 9 of9

d Design or construction deficiencies associated with the permitted work

e Damage claims associated with any future modification suspension or revocation of this permit

4 Reliance on Applicants Data The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided

5 Reevaluation of Permit Decision This office may reevaluate its decision on this permit at any time the circumstances warrant Circumstances that could require a reevaluation include but are not limited to the following

a You fail to comply with the terms and conditions of this permit

b The information provided by you in support of your permit application proves to have been false incomplete or inaccurate (see 4 above)

c Significant new information surfaces which this office did not consider in reaching the original public interest decision

Such a reevaluation may result in a determination that it is appropriate to use the suspension modification and revocation procedures contained in 33 CFR 325 7 or enforcement procedures such as those contained in 33 CFR 3264 and 3265 The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate You will be required to pay for any corrective measures ordered by this office and if you fail to comply with such directive this office may in certain situations (such as those specified in 33 CFR 209170) accomplish the corrective measures by contract or otherwise and bill you for the cost

6 Extensions General Condition 1 establishes a time limit for the completion of the activity authorized by this permit Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision the Corps will normally give favorable consideration to a request for an extension of this time limit Your signature below as permittee indicates that you accept and agree to comply with the terms and conditions of this permit

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 10: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMff NUMBER SAJ-2014-01034 (SP-AG)

PER1ITIEE lMMA- Miami International Boal Show PAGL 10 of9

(PERMITIEE)

(PERMITTEE NAME-PRINTED) This permit becomes effective when the Federal official designated to act for the Secretary of the Army has signed below

I

L ( middotflI 1 f J

I L ) y~ ~ ( gtamp- f l t L t ( f

(DISTRICT ENGINEER) (DATE) Jason A Kirk PE Colonel US Army District Commander When the structures or work authorized by this permit are still in existence at the time the property is transferred the terms and conditions of this permit will continue to be binding on the new owner(s) of the property To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions have the transferee sign and date below

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY STATE AND ZIP CODE)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 11: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

PERMIT NUMBER SAJ-2014-01034 (SP-AG)

PERMITTEE NMMA- Miami International Boat Show PAGE 11 of9

Attachments to Department of the Army Permit NumberSAJ-2014-01034 (SP-AG)

A STANDARD MANATEE CONSTRUCTION CONDITIONS

8 MANATEE EDUCATIONAL SIGNS SPECIFICATIONS

CUS FWS CONCURRANCE LETTER WITH PROTECTION MEASURES (December 17 2015)

D SEATURTLE and SAWFISH CONSTRUCTION CONDITONS PROJECT

E WATER QUALITY CERTIFICATION Specific Conditions of the water quality permitcertification in accordance with General Condition number 5 on page 2 of this DA permit (12 pages issued on December 12 2015)

F FWS EVENT PLAN FOR ENVIRONMETAL PROTECTION

G NMF- HCD BMPS FOR SEAGRASS SURVEYSSAMPLEING PROTOCAL

H SELF CERTIFICATION STATEMENT OF COMPLIANCE FORM

I PRELIMINARY JURISDICTIONAL FORM December 23 2015

J DRAWINGS 12 Pages date stamped by the Corps of Engineers on 17 November 2015

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 12: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

2011 203 2016 02bull lt 2019 2025 ~ u _ ~-deg 2020 202G i ltI)laquo) gi i 2C2J lFfn 0 Qj~ tNflW 1015bull J) z ~~~r-tSiQIbull __ _ $4~-io~_ - 0101 lt ~~~~g

AeroOMctWTh 20bull011C OAlAlnJCAaLAOOODUM5 mMAflAGR Amiddotamp~ l- IL 5 E r ~~~~~ W-LTbull2-~~ I - __ - - - ~ uu

ROl05t0 WOI~ iS TfWOAAtY -- 5AU IK rnr

IN lWf lOt NO t40t nwlt 2 WtG ~ N MITTOF Dlsan 5TOIW OR Ttol 1-1TOF A -JAAICANE OQCI( 5Tl1UCTJ~ 51111 RtlOCATCV TO 5fE ~ c

0 0

U W000 Pllt5 TO Ill 50tJTHElN lINC ANO COMfLY W11H A 5 TM d25 7tgt AND II( lRfl5URt TlCAT(D NC CA (11_GREENHEAU EOEIW 5PEOFICATltON5 TT bull W- 550)(1) OR fTW-0055(Jf( I ANgt AWPA-MP 4 lLt5 TO HAJr A MI OIA Of 14 7

INbullMJM PENfTRATIO Obull ALL ~ TO ll~ A5 OI LOWSmiddot zO NTO lleDROCK G MIN i=

~ NTO lIElDING MATtRJAL 17 MN J)

INIMJM SMC llfARING 15 TON W000 US ~~ ~~ UNG AnA01MtNT A5 PER DlT1L I)deg ra 5 o~ Ooco (J0 ct

degt0A1lG 000lt 5TRUC1llttbull IU ~

G ooos ARE waoeo bullAAMr bull IU AUM~U bull000 OtltX flOTATIOlt fNCAlgtUV1fO ro ~ 4 TTAClMENT 15 av GALW~bullzrD 5TtCJ rtNGI ATE gtETAJ-500- PIGE 4 r- ~ ~ AMP5 AND DfCJIG

AMPSANO OEOltC)ltUAgt ARE JU APA AATrosnwcn~ I EXT fX05IJlt fLW000 CCJltG IS COMERCW GltADC SOUTlttltH MgtI lTAC fgtIT 11AADWARt ST~ srm 13IGJ ANO I ORdeg [)lllfD GAlVMztD 3071 A5 ~OUT A5

bullbullbullbullbull

G

O

~

I

~f

M

IM

r

F

AA

ADA

0

11 ENVIRDltEllTAL g -A wNATCE WATCH 511AU 6E I EllecT lOR AU 1ASE50fTMl5 ~tCT AU NO~gtMAUCEA5C Ir NltYMANAt 15 SPOTTtD I

W1 TnlN 50 OF Tl1E NOIU AIUA A LOG OF All MNTS SHALi eE llOT ON SITf i 6 TlRfIOfTYCURfAl~S SliAU et Klrr ON~ AND DEPLOYED~ Af((Vl5f6lpound fWti~ occu~ IN fHf fVrnl THERf 15 TUReOnY I

CUltTAJNS 5HAU RfMAJN i VGC UNllL lgtACltGROUND ltetS MATCH bull CAT NO POINT DURING THIS fl(OJlCT 5HAJI ANY DEllRl5 8E ALLOWW TO 8E flACtll INTO TIOAl WATUS D NAVIGATION TO ANO FROM THC SHOW SHAil et N MARf0 01ANbullEl5 MAPS 5HALL llC GIVfN TO VE55~L5 FOR 5EA TRAL5 ~ I

INDICATING MANATft 5Pff0 ZONCS AND ARlA5 TO AVOID SUCH A5 SCAGM55 ~TOAAf10N AREAS NIO 5tlOAL$ t A MARJltJD ENTRANCE CttANtL GOING INTO 1 HC SHOW AfllA 5HALL IE CONSTRUCTED A5 SHOWN ON PAGE 2 F IN Tl1E EVENT ANY MANAft5 OR OTHrR WllDUFE 5t10UU) lNTtR THC CON5TRUCION ARIA All ~SHALLc~ UNTIL THC

WlLCUf ltAVE5 THE NORI( AAeA THCSC CVCN15 5U et gtOCUMENTlO AND ~CNTeD TO NVllltOifNTAL le~IT AGENOE5 G 6E5T MARINE CON5TlllJCTION lllACTlcr5 5HAU llE USED AT AU TIMfS ~CWOING TlUt NOT UMbullTED TO GOOD tOUS=tING

ULLSJlll Rf5P05E iltJTS SHAUOW OlltAM VC5S05 rDll SlfW MANfUVfRllltG TO lIUVtNT TU-51DltTY MORlt11gt$ ENVllONMENTAL ~ 0 TAJLGATE MErTING5

~~ ltraquo 5EAGAA55 lROTECTlON N ~~sect~ 3i bull EIVJltONMaTAL OM VM TO CHfC~ Ill-NG ocAnoH 70 lRpoundVENT UN~~OV degAGt TO~ t~ bull TUlltlllOOY C0laquo~5 0 llE U5ftgt TO~ ANO degTOR lJ~l)ITYOIJRlNG ~11WCTION rivsc 0 ~iie p~bull 5Q6 mo lUOY UNt 511AJ I( lIACtO IN Sf51TM 5EAGltA55 AApoundA AIDIG 10lt111 ro lR1 NltYVE55ideg twvtIG ~ l ~ c LtGtO~ J 5 ti~~lt _~~AjLbull llAAG5 TO tt 30 WIDE ev IC l()OjG WTH A LOADfO ~ ~ - 0 ~~ 32 TOTAl bull 0Xo40 OClQ(5DfltAI or 24middot IIlUllllD I=(1lObullOO llJ lt ~~~I 8lbull flJG OOAT5 TO at 32 r11ll RGtA55 W1 II A DRAlT Of

24middot ANO 37 rlllERGlASI WITH A 0AArT OI 3CT 2n TOT- I oxbullO OOCltS z 8~

bull 11UNG 5HAU amp DRIVEN WlTH A OiiOf hAM1ER Wlll1 A CJ1iDllWlTH Ttl(f5 C I OIXgtO 5f) ~ - ~ QJ5HltONED BONNT AND A VllAATORY AAMMER bull Vl6RATOllI HAMMER 511AU HA 6100fGAADAllll I 1 1 102000ClS ID enVEGETAfllE TYPE Cltl AltD 5 11All HAVC A 00U6ll UNCR WlTH TENT (22200SrgtAS 51CONDA~ PROTECTION ON THE 110IE5 TO JRtVfNT Ntr JYPE OF 5fIL 50 5bull0 r1NGCR fIER5 ~

bull UCH 6ARGt 5t1ALL tiAvr A MANATfE sroTTER ON WATCH (5000 ~ IK ~ 5~ DOCK lllJNG Ill

OURJNG ALL BARGE ACTIVITIES ~ ~ I-- ~ 7 MOOltnJC lIL1NG en lt - gtshy

-bulll llOAf ill~ Tflt) 8

SHOW 0ATC5 FOR I 0 1M flRMITI

20IG 2022

NOV 1 7 015 ~~~~deg- ~

bull

JOB LOCATION

i~

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 13: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

J08 NoCOASTAL SYSTEMS INTERNATIONAL INC 2k130M01

o bull 44 South Dixlt l11ltjhway

ColtbullI Gables flonltY 331 G 1CI 30~middotmiddot3bull 30511-IS14

_ wwwCCa~Lt~~tcomgtr fATlOfllOODAffi l7007

Co-~tal fn111ronmlt0tal

II y s T E M s CMI el~ bullbulld Mgtno~emont O(TbullbullATIOllfAt

ll11E 4-3-2015

STRUC1JAAL ENGINEER

PAG(TEMPORARY IN EXISTING CONDITIONS or s 2WATER EXHIBITION

DOCK AND MARINE CONSTRUCTION CORltMIAMI BOATSHOW 752 NC 79TH STREET

2016 MIAMI FL 33138 305-751-9911

f 305-75 1-4825

r G

~

~ ~ r-i

~ lt - ~

~ ~ r-shyCJ ~ ~ Ci)

~ Cj) -

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 14: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

J OF 8 CAT 4-3-20152KIJDMOI WATER EXHIBITION

MIAMI El0AT5HOW 2016

STRUCTURAi EHCINEER

DOCK AND MARINE CONSTIWCTION CORPt752 N~ 79TH 5TRfU

MIAMI FL 33136 305-751-991 I

f 305-75 l-IB25

~~ I ~I ijl

~~ ~ B iI

0 ~

z 0 lt shy-J

C) cnshy

0 0 0 -a enc Oen11gt ~~ --lt ~

COASTAL SlSttMS INTERNATIONAL INC PNF

DOCK LAYOUT J08 Ho TEMPORARY IN

975-0

t I ~

I ~

~ ~ s

~6i~ a~~

21

h middot~~ ~ijl

() I) Ul

q

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 15: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

IU~ oJ ~ z~ ~ glt

~ O~ltCgt-~ e= ~E~alt()

Zlaquogt~~D orlaquogtv-

TYPICAL TEMPORARY FLOATING DOCK SYSTEM ALUMINUM FRAME WOOD DECK WITH ENCAPSULATED FLOTATION shy2X8 UTILITY ACCESS

BOARD ON STAINLESS -UTILITY CHANNEL STEEL HINGES DOCK NOTES ~ z g~~~~

~ lt( ot 1UEu10 _ IU f- ZcO DOCK SHOWN IS TYPICAL DESIGN FOR 20 Cl ~ ~~51laquogt~ DOCK 40 DOCK IS SAME DESIGN WITH 2 - 20 14 OQ ILu u DOCKS COMBINED 0 0

o D 6 NCAPSUtgtTtO POLCat ltCTATION

~ z6 s - F ~

(f)~ Q ii5

~ ~~ 2XG DECKING ATTACHED 8-011 -=-GOG I TG ALUMINUM CHANNEL oGS o 0

IL a CO (jTO ALUMINUM FRAME _ 8X225(A5J ALUMINUM DOCK 2 UJ WITH 2 I 2 STAINLESS FRAME CHANNEL UJ I- 2

I- lt lt( E~SJlATEO ~YatflOTATIONSHEET METAL SCREWS s ~

EACH INTERSECTION

shy

el ~ ~

i57 ~ SIDE VIEW ~DIAMETER GALVANIZED2XG DECKING

HINGE PINBOLT i I20-0

i ~ INCH THICKDESIGN MIN p ~ GALVANIZED STEEL FREEBOARD I 8 og

tNCAlWtAlCD rOLYctU flOTAfl~ fNCAlSUlAl[O -OLYCW1DTAOON HINGE PLATE z 0 ci 2 (DEAD LOAD ONLY) Sil~ j)4i ~ r G I lt ~ E 1 N ~laquoiHS --lgt

~ttJ bullrqfl ~ ~I ti c~~ I 8 ALUMINUM STRUCTURAL CHANNEL ~ ~~~~~ ~~TYPICAL GALVANIZED STEEL HINGE PLATE ~

_J i up~~~ ~ ATTACHED TO DOCK WITH 4 ~DIAMETER 0 Z 5~~ __C2XG DECKING c 1 lt( ~ OUcTHRU BOLTS CONNECTED TOGETHER 0 U)g~ 0 t~ I= ltgt~t u ~~

10-9 WITH DIAMETER GALVANIZED PINBOLT I c ~ Ul~inla ~F et ~ oO ii iiJ( 5EE PLATE DETAIL THIS PAGE I u~ 5

middoto pound 0 Q----- - ~ ()8 ALUMINUM

iENC1SIJIA11D JOtY CCl1 llOTAnONTRUSS SECTION UTILITY CHANNEL US ARMY I TUBING WITH ~) I l

IN51DE DIAMETER END VIEW __ IICORPS OF ENGINE ~ ~I

HINGE PIN AND PLATE DETAIL ltI ~8 0()~JV 17 2015

l M 1gtT()~

COl Zigt1~- odeg 1~6oil -tezPRC

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 16: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

fXISTING ASPHALT PARKING LOT ~ ~~~

bl

~ Gl~ EXISTING GRASS AfltpoundA

2 J-0

PLrWOOO RAMP

UPLAND PILING TO SUPPORT ANCHOR WALKWAY

REINFORCE HINGE A5SEM5LY AS

DOCK SUPPORT lIUN

lt( ~tu QfjltQ

~ u~laquogt=zltllm ~ a Q~oi_ -~-middot--lt=~

20-()

7

~

t

til

40-oshy

--shy40-0

--~

~ jJ

~ ~

NeCESSARY TO S~PPORJ DOClt CANTILEVER

[J VIHW NGVD) EL + 1 b

bull -MLW (NGVD) fl -04

(f)

a 6 11J (f)

z g~U~~ lt( ~~~8QNo2laquogtu8~ Ii

0 DOCK SECTION WITH FLOTATION - --~ a

REMOVED AS NECESSARY TO ALLOW FOR DOCK TO BECOME -middot FLUSH WITH BERM AREA Of DENSE SEAGRASSES

TO BE AVOIDED

30-4y ~

z zO ~

PROPOSED DOCK SUPPORT PILING see PILING HOOP DETAIL FOR ATTACHMElT TO TOP OF PILING (NGVO) EL +6

TfMPORARY DOCK 5Y5TEM JYlICAL 1tradelOAARY PLOArlNG 000 SEE PAGE 4 FOl1-0ETAIL5

~~middot-- middot u l MHW (NGVO) fL + I 6 10-0 10-0

lt-MLW (NGVD) EL -04

-OIVER TO INSPECT 60TTOM AND LOCATe PILING FACEMENT TO AN ARtA VOID OF

fXISTING BfRM eLEVATION -~ 111GVD) SEAGRA55ES AND SeA LIFE

h -ltshy

u

-~ iampus lQ J)~I lti oiri Oo

CONIL~ ~11J 11J I shyI- lti ~ ~ ~

12 SChEDULE 00 PIPE TEMPORARY STA(NLESS SPEED RAIL SYSTEM lPOST SPACO AT 4 MAX g~

bObl TG AlUMINUM I ~ I lt CHAlNEL 6X225(A5) I ALUMINUM COCK

~ECHANNEL IOETAIL A ~ middotTURBIDITY CURTAIN IN PLACE AS NECESSARY f T1RU 80LT

ci ~ T

~~ ~ ~ ~ lC

ZQ

~ ~~ ~8 3lT~-c-agr ~~ u Uc lt(a B~J a gtIi

I r ( -~ 0 middot8 a rr middot r - J lt ~ li~~amp _ti

-l - 112 SCHEDULE 00 IS)i~L350 ~ l ~ INCM STEEL PLATE THRiJ~ STEEL HOOP WELOED F== ~~~i~ BOLTED TO 8 ALUMINUM 1 lt TO PLATE

lt ~ ~g tr 8E CHANNEL WITH ~ INCH u

THRU 60LT5 ~ ~ gt 6 ALUMINUM a

O()Cl(CHANNEL ti) EUSARMY ~DETAIL B ti) 111CORPS OF ENGINEERS ~

lt ~- )1

_ lt ti) 0 gtlt 0 u uNOV 17 2015 lt

MiAM gir11 111(l ~

shy

COE 2oLy-o)~~7Ae~Pit)J

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 17: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

1bull1 - - - ~__ - shy

q + TOP OF PILING (NGVD) EL +8 IOX20 TENTN CANOPY

TYPICAL STEEL lt QUICK CONNECT

PILING HOOP (5EE MHW (NGVDJ EL +I G+Cmiddot7bull DETAIL B PAGE 5)t oshy

+-MLW (NGVD) EL -04

TYICAL I OX20 FLOAT TYPICAL TEMPORARY I 2 DIAMETER SECTION FOR ADDITIONAL GREENHEART PILING

DETAl5 5EE PAGE 3

l

EXISTING BERM

BERM (NGVD) t t ~ - middotbull +--EL - I 2 lYP --t

GREENHEART DOC- AND - v MOORING PILING TO BE - I

DRIVEN 24 INTO FIRM - shy MATERIAL OR G INTO ROCK I

-~ -~

~-- -~middot

FLOATING DOCK SECTION WITH CANOPY

~TOW

u ~ I 0 I 0 3f _ i4 60Q1

LOATING TURBIDllY CURTPLACE WHERE NECE55ARY

BALLAST

~ lt)

_

_ MUDLINE

-gtmiddot

~ I

J I ~

~ ~ ~ ~ ~ ~ ~ ~ g laquoz ~ ~ ()

E ~

~ J

~ ~ u

ll z

I ~

~~ ~ ~tamp~ at ~~gp ~~ ~ ~ eg ~ t~i~ A~~~7~~ ~6 I 1ui~~ a~ Sill u5

s ~ 0

TYPICAL TEMPORARY I OX20 CANOPY ON VENDOR DOClS NOT TO EXCEED

PERMITIED AMOUNT LISTED ON PAGE 2 -

US ARMY CORPS OF ENGtNEER

NOV 1 7 2015

11

~ 1-i _

AIN IN

~ ~

If)z Qti UJ

If)

zzO ~secto2 x o~ 0 degtu~ tu--

--~

uJ~ zcl lt( amp1 iu ~sr-bull11)a~osectiJO( z tiltflCui

gt( ~= lt( ~~~~ ~ ~_gllo our- 0 0

~ c If)

~ UI 0shyIO 0

CJ

~ ~

shy

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()

Page 18: DEPARTMENT OF THE ARMY PERMIT · 2016. 1. 6. · DEPARTMENT OF THE ARMY PERMIT Permittee: National Marine Manufacture's Association, c/o Nelson Wold Permit No: SAJ-2014-01034 (SP-AG)

WATER TAXI LOCATIONS BUOY LOCATIONS

J 25deg445374N 80deg103487-W MWJ ~Ff rbull ~Tnav

DINNER KEY MARINA 2 25deg44548 I N 00deg I 03G39W lROroSEO LIGt1TID MARJpoundR SEA ISLE MARINA 3 25deg445492N 00deg I03377W llUOY LABlLEO ~Dlf 5PffD

EPIC I MIAMI RIVER 4 25deg445G54N 00deg103470W COE ioty-0103 4 ~ - ~ eoaT 5ttOW CHANNabullamp (oll~lltl 1ElAYFRONT PARK (INTERCONTI NENTAL HOTEU- NORTH COMMERCIAL DOCK 5 25deg445G40N 00deg1030WW ~o (

MIAMI BEACH MARINA G 25deg4454GGN 8(J I03 I 20W VICEROY HOTEL 7 25deg44497GN 8(JI022G7W AAA ARENA BASIN (fEC SUP) 8 25deg444834N 00deg I 02434W

9 25deg444299N 8CJ I Ol 538W PROPOSf-0 HWX ANC110R 5~M

WATER TAXIS TO RANGE FROM 45-75 AND HAVE A DRAFT RANGE Of 2-4 5 I 0 25deg444 I G7N 00deg IO I G88W 5-1 25deg445402N 8(J I o middot3390W

SHOW MOVE IN SET UP S-2 25deg445433N 80 I 0 3244W f I 5 -3 25deg445307N 80 I03005W I

PRE SHOW ENVIRONMENTAL SURVEY SECOND WEEK OF DEC 5-4 25deg445 I 12N 8(J I02795W STAGING AND LAYOUT DEC 2 1 ST TO JAN 5TH S-5 25deg444920N 8(J I02592W I er a PRDPOSeD

TNFORARY C1ANNElDRIVE PERIMETER PILING DEC 2 2ND-30TH 5-G 25deg4447 I 4N 80 I023G4W eNrAA~C ixrr e1~ ~v SPLASH FLOATS AND BEGIN POSITIONING AND PILE DRIVING JAN 2ND S-7 25deg444553N 80 I02295W ~-~ -REMOVAL Of DOCKS COMPLETE 18 DAYS FROM SHOWS END S-8 25deg444380N W102000W PILING REMOVAL COMPLETE MARCH 20TH S-9 25deg4442 19N 80 I0 I827W -

OOUY ANCHOR DETAIL

l ~~~ ~ rshy Qt~lt(~Ju

2v~ll=~middot11)-ltIgt~

J D ~i~~ lU ljltTgttez Z ) liz lt( lt( ~i~~i bull ~Cl_glaquol) ie 0 inE bull

uvr-- IIamp 1shyz 0 lU D

z z 0 ~ - i= I

(I)~as ~E lt~ on Oo

IO Cl0 Cllt2 lU ~ ~~ ~

US ARMY CORPS OF ENGINEERS

inv 1 J nu

I~ I

I7 ~ ~

o~ Zo UI ~8

~ gtlt f~g~ ~~ ~~IO~~ l

~ grcJ ~ ~ i ~ i~~ ~

_ 0 8 i~ lt( ~ ti~ic c z 6113150 F S)JOmiddotu H lt( ~lti~ iS amp~ z v o~ sv ii~ 0

~ - lt( () lt( 0 ()