  • 8/11/2019 Deoiling Performance Improvements

    1/13

    Tekna Produced Water Management 2008, Stavanger

    Improving DeoilingImproving DeoilingHydrocyclone SystemHydrocyclone System

    PerformancePerformance

    Malcolm Corsie, Cyclotech ASMalcolm Corsie, Cyclotech AS

  • 8/11/2019 Deoiling Performance Improvements

    2/13

  • 8/11/2019 Deoiling Performance Improvements

    3/13

    Deoiling Liner RetroDeoiling Liner Retro--FitsFits

    Normally, No hot work required;Normally, No hot work required; Minimum vessel downtimeMinimum vessel downtime a vessela vessel

    retroretro--fit normally takes one 12 hour shift;fit normally takes one 12 hour shift;

    Only light rigging / lifting gear required;Only light rigging / lifting gear required; No pipework modifications normallyNo pipework modifications normally

    necessary;necessary;

    Tekna Produced Water Management 2008, Stavanger

  • 8/11/2019 Deoiling Performance Improvements

    4/13

    RetroRetro--Fit ProcessFit Process

    Isolate vessel, open and clean;Isolate vessel, open and clean; Remove existing liners and reject plate;Remove existing liners and reject plate;

    Remove existing support plate;Remove existing support plate;

    Further clean vessel if necessary;Further clean vessel if necessary; Install new support plate;Install new support plate;

    Install new liners;Install new liners;

    Install New Reject plate;Install New Reject plate;

    Close vessel and reClose vessel and re--connect pipework.connect pipework.

    Tekna Produced Water Management 2008, Stavanger

  • 8/11/2019 Deoiling Performance Improvements

    5/13

    RetroRetro--Fit ProcessFit Process

    Tekna Produced Water Management 2008, Stavanger

    Remove Old SupportRemove Old Support

    PlatesPlates

    Open vessel & RemoveOpen vessel & Remove

    Old LinersOld Liners

  • 8/11/2019 Deoiling Performance Improvements

    6/13

    RetroRetro--Fit Process (Cont)Fit Process (Cont)

    Tekna Produced Water Management 2008, Stavanger

    Install New LinersInstall New Liners

    Install New SupportInstall New Support

    PlatePlate

  • 8/11/2019 Deoiling Performance Improvements

    7/13

    RetroRetro--Fit Process (Cont)Fit Process (Cont)

    Tekna Produced Water Management 2008, Stavanger

    Done!Done!

    Install New Reject PlateInstall New Reject Plate

  • 8/11/2019 Deoiling Performance Improvements

    8/13

  • 8/11/2019 Deoiling Performance Improvements

    9/13

    High Turndown ApproachHigh Turndown Approach

    Test separator applications often requireTest separator applications often requireflexibility to deal with constantly varyingflexibility to deal with constantly varying

    amounts of produced water;amounts of produced water;

    Traditionally this has required changeTraditionally this has required change--outoutofof livelive liners with blanks and vice versa;liners with blanks and vice versa;

    Fluctuating water rates make it difficult toFluctuating water rates make it difficult to

    maintain optimum hydrocyclonemaintain optimum hydrocyclone

    performanceperformance

    Tekna Produced Water Management 2008, Stavanger

  • 8/11/2019 Deoiling Performance Improvements

    10/13

    High Turndown ApproachHigh Turndown Approach

    Use of a HTD (High Turndown) VesselUse of a HTD (High Turndown) Vesselcan:can:

    Significantly improve system turndown (up toSignificantly improve system turndown (up to

    20:1 for a two chamber vessel and up to 50:120:1 for a two chamber vessel and up to 50:1

    for a three chamber vessel);for a three chamber vessel);

    Ensure optimum environmental performanceEnsure optimum environmental performance

    over a range of flowrate variations;over a range of flowrate variations;

    Reduce the need for vessel entryReduce the need for vessel entry thusthusmaximising vessel upmaximising vessel up--time.time.

    Tekna Produced Water Management 2008, Stavanger

  • 8/11/2019 Deoiling Performance Improvements

    11/13

    High Turndown VesselHigh Turndown Vessel

    Uses two or three chambers to maximiseUses two or three chambers to maximiseturndown;turndown;

    Chambers are isolated using externalChambers are isolated using external

    valves;valves; These valves can either be manual orThese valves can either be manual or

    automated;automated;

    Reduces requirement for vessel entryReduces requirement for vessel entry

    Tekna Produced Water Management 2008, Stavanger

  • 8/11/2019 Deoiling Performance Improvements

    12/13

  • 8/11/2019 Deoiling Performance Improvements

    13/13

    Tekna Produced Water Management 2008, Stavanger

    Thank You For Your Time AndThank You For Your Time And