denver public schools strategic sourcing department 1617 s...

24
17-BS-Intrusion Addendum # 4 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 17-BS-Intrusion as follows: Please see attached revised pricing form and spreadsheet with sight and device lists related to this project. Thank you. If your proposal has been submitted and you wish to amend it, please modify your proposal on company letterhead. The amended proposal must be received prior to or included at the time and date set for the proposal opening. Each modification submitted to the District's Purchasing Office located at 1617 S. Acoma St. Denver, CO 80223. It must have Vendor’s name and return address and the applicable RFP number and title of the RFP clearly marked on the face of the envelope. If more than one modification is submitted, the modification bearing the latest date of receipt by the District's Strategic Sourcing Office will be considered the valid modification. Denver Public Schools Strategic Sourcing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 17-BS-Intrusion ADDENDUM NUMBER FOUR January 30, 2018

Upload: vuminh

Post on 27-May-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

17-BS-Intrusion Addendum # 4

THIS ADDENDUM MUST BE ACKNOWLEDGED.

THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 17-BS-Intrusion as follows: Please see attached revised pricing form and spreadsheet with sight and device lists related to this project. Thank you. If your proposal has been submitted and you wish to amend it, please modify your proposal on company letterhead. The amended proposal must be received prior to or included at the time and date set for the proposal opening. Each modification submitted to the District's Purchasing Office located at 1617 S. Acoma St. Denver, CO 80223. It must have Vendor’s name and return address and the applicable RFP number and title of the RFP clearly marked on the face of the envelope. If more than one modification is submitted, the modification bearing the latest date of receipt by the District's Strategic Sourcing Office will be considered the valid modification.

Denver Public Schools Strategic Sourcing Department

1617 S. Acoma St. Denver, Colorado 80223

INVITATION TO BID 17-BS-Intrusion

ADDENDUM NUMBER FOUR January 30, 2018

Design

Cabling

Devices

Commissioning

Closeout

Management

School /Site Name Design Cabling

Abe Lincolln HS PC Labs -$ -$

Abe Lincoln-HS -$ -$

Academy of Urban Learning -$ -$

Asbury ES -$ -$

Ashley ES -$ -$

Baker Warhouse -$ -$

Barnum ES -$ -$

Barrett ES -$ -$

Beach Court ES -$ -$

Bill Roberts ES / MS -$ -$

Bradley ES -$ -$

Brown ES -$ -$

Bruce Randolph MS / HS -$ -$

Bryant Webster ES -$ -$

CEC Early College -$ -$

Cheltenham ES -$ -$

Cole HS / ES -$ -$

Colfax ES -$ -$

Colfax ES TEMP 1 -$ -$

College View ES -$ -$

Collegiate PREP Academy -$ -$

Collegiate PREP Academy Room 133 -$ -$

Columbian ES -$ -$

Columbine ES -$ -$

Cory ES -$ -$

Cowell ES -$ -$

DC 21 at Wyman -$ -$

DCIS Baker MS / HS -$ -$

DCIS Fairmont ES -$ -$

DCIS Ford ES -$ -$

DCIS Ford ES TEMP 1 -$ -$

This should include all QA/QC, Punch Walks, O&M's, Record Drawings, Testing Documentation, Warranty Letter and Customer Acceptance.

This should include all OAC Meetings, Project Management, and Administrative Costs.

This should include Shop drawings with device locations identified for existing & new, cable pathway to show locations where wire mold, wall and floor penetrations are necessary.

Include implementation plan for manpower, duration, management, QA/QC, etc.

This should include all costs for the installation of cabling and supporting pathways required to connect the devices to the system.

This should include all costs for the physical installation of all Panels, Motion Detectors, Dooor Contacts, Keypads, etc...

This should include all programming , configuration and testing of all devices connected to the panel. This should also include any customer/staff training.

DCIS Ford ES TEMP 2 -$ -$

Dennis BLDG 1 Student Union -$ -$

Dennis BLDG 2 DSST GVR HS -$ -$

Dennis BLDG 3 DSST GVR MS -$ -$

Dennis BLDG 5 Strive GVR -$ -$

Dennis BLDG 6 Vista Academy HS / MS -$ -$

Dennison Montesorri ES -$ -$

Denver Green Cottage ES / MS -$ -$

Denver Green ES / MS -$ -$

Denver Language School East ES -$ -$

Denver Montessori / Denver online MS / HS -$ -$

Denver School of the Arts HS / MS -$ -$

Dora Moore ES MS -$ -$

Doull ES -$ -$

DSST Henry/Bear Valley ES/MS -$ -$

Eagleton ES -$ -$

Eagleton ES TEMP 1 -$ -$

East Computer Room 126 HS -$ -$

East HS -$ -$

East ROTC HS -$ -$

Edison ES -$ -$

Ellis ES -$ -$

Ellis ES TEMP 1 -$ -$

Escalante Biggs ECE / K -$ -$

Fairview ES -$ -$

Florida Pitt Waller ES -$ -$

Force ES -$ -$

Garden Place ES -$ -$

Gilpin -$ -$

Girls Athletic Leadership MS / HS -$ -$

Godsman ES -$ -$

Godsman ES TEMP 1 -$ -$

Goldrick ES TEMP 1 -$ -$

Grant Beacon MS -$ -$

Grant Ranch ES / MS -$ -$

Green Valley Ranch ES TEMP 1 -$ -$

Green Valley Ranch ES -$ -$

Greenlee Computer Room ES -$ -$

Greenlee ES -$ -$

Greenwood ES -$ -$

Greenwood ES TEMP 1 -$ -$

Greenwood ES TEMP 2 -$ -$

Gust ES -$ -$

Hallett ES -$ -$

Hamilton MS -$ -$

Harrington ES -$ -$

High Tech Early College HS -$ -$

Hill MS -$ -$

Hilltop Trans Bus Terminal 2800 W 7th Ave -$ -$

Hilltop Trans Main Office 2909 W 7th Ave -$ -$

Hilltop Trans Training Offices 2909 W 7th Ave -$ -$

Hilltop Trans Training RED 2929 7th Ave -$ -$

Hilltop Warehouse Refridgeration 2800 W 7th Ave -$ -$

Holm ES -$ -$

Howell ES -$ -$

John Amesse ES -$ -$

John F Kennedy Computer Room HS -$ -$

John F Kennedy Gym HS -$ -$

John F Kennedy HS -$ -$

John F Kennedy ROTC HS -$ -$

Johnson ES -$ -$

Kaiser ES -$ -$

Kepner Campus ES / MS -$ -$

Knapp ES -$ -$

Kunsmiller ES / MS / HS -$ -$

Lake Campus MS -$ -$

Lena Archuleta ES -$ -$

Lena Archuleta ES TEMP 2 -$ -$

Lincoln ES -$ -$

Lowry ES -$ -$

Manual / Mcauliffe MS / HS -$ -$

Marie Sandoval ES -$ -$

Marrama ES -$ -$

Marrama ES TEMP 1 -$ -$

Martin Luther King MS / HS -$ -$

Maxwell ES -$ -$

Maxwell ES TEMP 1 -$ -$

Mcauliffe MS -$ -$

Mcglone ES -$ -$

Mckinley Thatcher ES -$ -$

Mcmeen ES -$ -$

Mcmeen ES TEMP 1 -$ -$

Merrill Room 116, 117 MS -$ -$

Montbello Campus Auditorium MS / HS -$ -$

Montbello Campus MS / HS -$ -$

Montclair ES -$ -$

Montclair ES TEMP 1 -$ -$

Montclair ES TEMP 2 -$ -$

Morey DSISD MS / HS -$ -$

Morey DSISD MS / HS TEMP 1 -$ -$

Morey DSISD MS / HS TEMP 2 -$ -$

MSLA / Kipp Denver Collegiate ES / HS -$ -$

Munroe ES -$ -$

Newlon ES -$ -$

North HS -$ -$

North HS Room 204 -$ -$

North HS Room 206 -$ -$

North HS Room 242 -$ -$

North HS Room 244 -$ -$

North HS Room 2ND Floor LMC N -$ -$

North HS Room A201 -$ -$

North HS Room B121 North -$ -$

North HS Room B122 -$ -$

North HS Room B301 -$ -$

North HS Store -$ -$

Oakland ES -$ -$

Odyssey ES / MS -$ -$

Palmer ES -$ -$

Park Hill ES -$ -$

Place Bridge Academy ES / MS -$ -$

Place Bridge Academy ES / MS TEMP 1 -$ -$

Polaris ES -$ -$

PREP Academy Basement -$ -$

PREP Academy HS / MS -$ -$

Rosedale ES -$ -$

Sabin Computer Room 122 ES -$ -$

Samuels ES -$ -$

Samuels ES TEMP 1 -$ -$

Samuels ES TEMP 2 -$ -$

Samuels ES TEMP 3 -$ -$

Schenck ES -$ -$

Schenek ES TEMP 1 -$ -$

Schmitt ES -$ -$

Schmitt ES TEMP 1 -$ -$

Service Building TEMP 1 -$ -$

Service Building TEMP 2 -$ -$

Skinner MS -$ -$

Skinner MS DOTS Data Center -$ -$

Slavens ES -$ -$

Smith ES -$ -$

South Computer Room 155 / 156 HS -$ -$

South HS -$ -$

Southmoor ES -$ -$

Southmoor ES TEMP 1 -$ -$

Southmoor ES TEMP 2 -$ -$

Steck ES -$ -$

Stedman ES -$ -$

Steele ES -$ -$

Stephen Knight ECE -$ -$

Strive Sunnyside MS -$ -$

Strive Westwood / Smart HS / MS -$ -$

Swigert / Denver Discovery ES / MS -$ -$

Teller ES -$ -$

Thomas Jefferson HS -$ -$

Traylor ES -$ -$

Traylor ES TEMP 1 -$ -$

Trevista ES -$ -$

University Park ES -$ -$

University PREP at Arapahoe -$ -$

University PREP Steele ES -$ -$

Valverde ES -$ -$

West Campus MS / HS -$ -$

West Campus ROTC MS / HS -$ -$

Westerly Creek ES -$ -$

Whittier ES -$ -$

Wyatt Academy ES / MS -$ -$

Yuma Street Warehouse Area 1 -$ -$

Yuma Street Warehouse Area 2 -$ -$

HIGHLIGHTED FACILITIES CURRENTLY HAVE THE BOSCH INTRUSION SYSTEM MAY ONLY NEED BADGE READER/PROGRAMMING. KEY PAD MAY NEED TO BE MOVED AS WELL.

Unit PricesDescription MFG Part Number

Unit Price 1 - PANEL WITH TRANSFORMER, B8103

ENCLOSURE, LOCK AND KEY Bosch B8512G-C

Unit Price 2 - 8 INPUT MODULE FOR SDI2 BUS Bosch B208

Unit Price 3 - CONETTIX IP ETHERNET INTERFACE Bosch B425

Unit Price 4 - UNIVERSAL ENCLOSURE Bosch B8103

Unit Price 5 - LOCK AND KEY SET Bosch D101

Unit Price 6 - ALPHANUMERIC KEYPAD Bosch B920

Unit Price 7 - ALPHANUMERIC KEYPAD WITH 4 POINTS Bosch B921C

Unit Price 7 - OVERHEAD DOOR CONTACT Bosch ISN-CMET-4418

Unit Price 8 - STEEL DOOR CONTACT UTC 1076

Unit Price 9 - COMMERCIAL SURFACE METAL CONTACT Bosch ISN-CMET-200AR

Unit Price 10 - COMMERCIAL SURFACE WIDE GAP CONTACT Bosch ISN-CSM20-WGW

Unit Price 11 - NEMA 1 ENCLOSURE 12 X 12 X 6 Honeywell A12N126

Unit Price 12 - BOSCH MOTION DETECTOR 50 x 50 Bosch ISC-CDL1-W15G

Unit Price 13 - BOSCH MOTION DETECTOR 200 x 15 Bosch DS778

Unit Price 14 - BOSCH MOTION DETECTOR CEILING 360 Bosch DS9360

Unit Price 15 - BOSCH MOTION DETECTOR 60 x 60 Bosch ISC-PDL1-W18G

Unit Price 16 - COST PER 10' OF WIRE

Unit Price 17 - COST FOR EQUIPMENT &

INSTALLATION OF DOOR CONTACTS

Unit Price 18 - COST FOR EQUIPMENT &

INSTALLATION OF FIELD SENSORS

Pricing Form

Devices Commissioning Closeout Management

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

This should include all QA/QC, Punch Walks, O&M's, Record Drawings, Testing Documentation, Warranty Letter and Customer Acceptance.

This should include all OAC Meetings, Project Management, and Administrative Costs.

This should include Shop drawings with device locations identified for existing & new, cable pathway to show locations where wire mold, wall and floor penetrations are necessary.

Include implementation plan for manpower, duration, management, QA/QC, etc.

This should include all costs for the installation of cabling and supporting pathways required to connect the devices to the system.

This should include all costs for the physical installation of all Panels, Motion Detectors, Dooor Contacts, Keypads, etc...

This should include all programming , configuration and testing of all devices connected to the panel. This should also include any customer/staff training.

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

-$ -$ -$ -$

HIGHLIGHTED FACILITIES CURRENTLY HAVE THE BOSCH INTRUSION SYSTEM MAY ONLY NEED BADGE READER/PROGRAMMING. KEY PAD MAY NEED TO BE MOVED AS WELL.

Price

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

$

Total

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

This should include all QA/QC, Punch Walks, O&M's, Record Drawings, Testing Documentation, Warranty Letter and Customer Acceptance.

This should include all OAC Meetings, Project Management, and Administrative Costs.

This should include Shop drawings with device locations identified for existing & new, cable pathway to show locations where wire mold, wall and floor penetrations are necessary.

Include implementation plan for manpower, duration, management, QA/QC, etc.

This should include all costs for the installation of cabling and supporting pathways required to connect the devices to the system.

This should include all costs for the physical installation of all Panels, Motion Detectors, Dooor Contacts, Keypads, etc...

This should include all programming , configuration and testing of all devices connected to the panel. This should also include any customer/staff training.

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

-$

School Name B8512G-C Points Areas B920 B921C

Abe Lincolln HS PC Labs 0 5 0 1

Abe Lincoln-HS 1 26 2 2

Academy of Urban Learning 1 14 2

Asbury ES 1 13 2

Ashley ES 1 16 2

Baker Warhouse 0 3 1

Barnum ES 1 24 2

Barrett ES 1 18 2

Beach Court ES 1 18 2

Bill Roberts ES / MS 1 34 2

Bradley ES 1 18 2

Brown ES 1 23 2

Bruce Randolph MS / HS 1 24 4

Bryant Webster ES 1 17 2

CEC Early College 1 24 2

Centennial ES 1 17 2

Cheltenham ES 1 22 2

Cole HS / ES 1 36 2

Colfax ES 1 16 2

Colfax ES TEMP 1 1 12 1

College View ES 1 17 2

Collegiate PREP Academy 1 33 2 3

Collegiate PREP Academy Room 133 0 2 0 1

Columbian ES 1 20 2

Columbine ES 1 17 2

Cory ES 1 20 2

Cowell ES 1 15 2

DC 21 at Wyman 1 15 2

DCIS Baker MS / HS 1 18 2 2

DCIS Fairmont ES 1 27 2

DCIS Ford ES 1 24 1

DCIS Ford ES TEMP 1 1 2 1

DCIS Ford ES TEMP 2 1 2 1

Dennis BLDG 1 Student Union 1 24 2

Dennis BLDG 2 DSST GVR HS 1 13 1

Dennis BLDG 3 DSST GVR MS 1 12 1

Dennis BLDG 4 SOAR ES 1 12 1

Dennis BLDG 5 Strive GVR 1 24 3

Dennis BLDG 6 Vista Academy HS / MS 1 25 2

Dennison Montesorri ES 1 17 2

Denver Green Cottage ES / MS 1 25 4

Denver Green ES / MS 1 17 2

Denver Language School East ES 1 12 2

Denver Montessori / Denver online MS / HS 1 23 4

Denver School of the Arts HS / MS 1 35 4

Dora Moore ES MS 1 26 2

Doull ES 1 12 2

DSST Henry/Bear Valley ES/MS 1 17 2

Eagleton ES 1 16 4

Eagleton ES TEMP 1 1 2 1

East Computer Room 126 HS 0 2 0 1

East Computer Room 160 HS 0 3 0 1

East HS 1 27 4 2

East ROTC HS 0 4 0 1

Edison ES 1 17 2

Ellis ES 1 19 2

Ellis ES TEMP 1 1 2 1

Escalante Biggs ECE / K 1 37 4

Fairview ES 1 20 2

Florida Pitt Waller ES 1 43 2

Force ES 1 18 2

Garden Place ES 1 19 2

Gilpin 1 20 2

Girls Athletic Leadership MS / HS 1 23 4

Godsman ES 1 21 2

Godsman ES TEMP 1 1 2 1

Goldrick ES 1 18 2

Goldrick ES TEMP 1 1 2 1

Grant Beacon MS 1 16 2

Grant Ranch ES / MS 1 40 2

Green Valley Ranch ES TEMP 1 1 2 1

Green Valley Ranch ES 1 22 4

Greenlee Computer Room ES 0 2 0 1

Greenlee ES 1 23 2 2

Greenwood ES 1 27 2

Greenwood ES TEMP 1 1 2 1

Greenwood ES TEMP 2 1 2 1

Gust ES 1 25 2

Hallett ES 1 19 2

Hamilton MS 1 13 1

Harrington ES 1 33 2

High Tech Early College HS 1 17 3

Hill MS 1 31 2

Hilltop Service Bldg.2800 W 7th Ave 1 7 1

Hilltop Trans Bus Terminal 2800 W 7th Ave 1 18 3

Hilltop Trans Main Office 2909 W 7th Ave 1 17 3

Hilltop Trans Training Offices 2909 W 7th Ave 1 13 4

Hilltop Trans Training RED 2929 7th Ave 1 3 1

Hilltop Warehouse Refridgeration 2800 W 7th Ave 1 2 1

Holm ES 1 33 2

Howell ES 1 35 2

John Amesse ES 1 11 2

John F Kennedy Computer Room HS 0 1 0 1

John F Kennedy Gym HS 0 4 0 1

John F Kennedy HS 1 35 5 2

John F Kennedy ROTC HS 0 6 0 1

John F Kennedy Tech Lab HS 0 3 0 1

Johnson ES 1 25 2

Kaiser ES 1 18 2

Kepner Campus ES / MS 1 24 2

Knapp ES 1 29 2

Kunsmiller ES / MS / HS 1 37 6

Lake Campus MS 1 26 2

Lena Archuleta ES 1 32 2

Lena Archuleta ES TEMP 1 1 13 1

Lena Archuleta ES TEMP 2 1 13 1

Lincoln ES 1 12 1

Lowry ES 1 25 4

Manual / Mcauliffe MS / HS 1 27 2

Marie Sandoval ES 1 26 2

Marrama ES 1 16 2

Marrama ES TEMP 1 1 2 1

Marrama ES TEMP 2 1 2 1

Martin Luther King MS / HS 1 21 2

Maxwell ES 1 16 2

Maxwell ES TEMP 1 1 2 1

Mcauliffe MS 1 16 2

Mcglone ES 1 23 2

Mckinley Thatcher ES 1 19 2

Mcmeen ES 1 17 2

Mcmeen ES TEMP 1 1 2 1

Merrill Room 116, 117 MS 0 3 0 1

Merrill MS 1 25 2 4

Montbello Campus Auditorium MS / HS 0 4 0 1

Montbello Campus MS / HS 1 50 2 4

Montclair ES 1 25 2

Montclair ES TEMP 1 1 2 1

Montclair ES TEMP 2 1 2 1

Morey DSISD MS / HS 1 18 3 2

Morey DSISD MS / HS TEMP 1 0 2 0 1

Morey DSISD MS / HS TEMP 2 0 1 0 1

MSLA / Kipp Denver Collegiate ES / HS 1 31 2

Munroe ES 1 14 2

NE Terminal Bus lot 1 11 1

Newlon ES 1 27 3

North HS 1 28 8 4 0

North HS Room 204 0 0 0 0

North HS Room 206 0 2 0 1

North HS Room 242 0 0 0 0

North HS Room 244 0 0 0 0

North HS Room 2ND Floor LMC N 0 3 0 1

North HS Room A201 0 1 0 1

North HS Room B1 Welcome 0 3 0 1

North HS Room B121 North 0 2 0 1

North HS Room B122 0 0 0 0

North HS Room B301 0 1 0 1

North HS Store 0 1 0 1

Oakland ES 1 13 1

Odyssey ES / MS 1 19 2

Omar D Blair ES / MS 1 31 3

Palmer ES 1 21 2

Park Hill ES 1 22 2

Place Bridge Academy ES / MS 1 25 2

Place Bridge Academy ES / MS TEMP 1 1 6 4

Polaris ES 1 24 2

PREP Academy Basement 0 12 0 1

PREP Academy HS / MS 1 18 2 2

Rosedale ES 1 11 1

Sabin Computer Room 122 ES 0 1 0 1

Sabin ES 1 15 2 2

Samuels ES 1 38 1

Samuels ES TEMP 1 1 2 1

Samuels ES TEMP 2 1 2 1

Samuels ES TEMP 3 1 2 2

Schenck ES 1 29 2

Schenek ES TEMP 1 1 12 1

Schmitt ES 1 26 2

Schmitt ES TEMP 1 1 2 1

Service Building 1 12 5

Service Building TEMP 1 1 1 1

Service Building TEMP 2 1 1 1

Skinner MS 1 28 2

Skinner MS DOTS Data Center 1 1 4

Slavens ES 1 23 2

Smith ES 1 18 2

South Computer Room 155 / 156 HS 0 2 0 4

South HS 1 30 2 2

Southmoor ES 1 21 2

Southmoor ES TEMP 1 1 2 1

Southmoor ES TEMP 2 1 2 1

Steck ES 1 17 2

Stedman ES 1 23 2

Steele ES 1 11 1

Stephen Knight ECE 1 16 2

Strive Sunnyside MS 1 21 2

Strive Westwood / Smart HS / MS 1 23 4

Swigert / Denver Discovery ES / MS 1 33 3

Teller ES 1 21 2

Thomas Jefferson HS 1 51 2

Traylor ES 1 2 1

Traylor ES TEMP 1 1 18 2

Trevista ES 1 16 2

University Park ES 1 17 2

University PREP at Arapahoe 1 15 2

University PREP Steele ES 1 17 2

Valverde ES 1 16 2

West Campus MS / HS 1 34 2

West Campus ROTC MS / HS 1 5 1

Westerly Creek ES 1 48 4

Whittier ES 1 17 1

Wyatt Academy ES / MS 1 20 2

Yuma Street Warehouse Area 1 1 10 2 1

Yuma Street Warehouse Area 2 0 8 1

TOTAL QTY. 173 352 28

B208 D126 B520-C B8103 B10 D9002-5

1 1

3 1 1 1

1 1

1 1

1 1

0 1

2 1

2 1

2 1

4 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

4 1

1 1

1 1

2 1

4 1

0 1

2 1

2 1

2 1

1 1

1 1

2 1

3 1

2 1

0 1

0 1

2 1

1 1

1 1

1 1

2 1

3 1

2 1

3 1

2 1

1 1

2 1

4 1

3 1

1 1

2 1

1 1

0 1

0 1

0 1

3 1

0 1

2 1

2 1

0 1

4 1

2 1

5 1

2 1

2 1

2 1

2 1

2 1

0 1

2 1

0 1

1 1

4 1

0 1

2 1

0 1

2 1

3 1

0 1

0 1

3 1

2 1

1 1

4 1

2 1

3 1

0 1

2 1

2 1

1 1

0 1

0 1

4 1

4 1

1 1

0 1

0 1

4 1

1 1

0 1

3 1

2 1

2 1

3 1

4 2 1 1

3 1

3 1 1 1

1 1

1 1

1 1

3 1

3 1

3 1

1 1

0 1

0 1

2 1

1 1

0 1

1 1

2 1

1 1

2 1

0 1

0 1

3 1

0 1

9 2 1 1 1

3 1

0 1

0 1

2 1

0 1

0 1

3 1

1 1

1 1

3 1

3 1

0 1

0 1

0 1

0 1

0 1

0 1

0 1

0 1

0 1

0

0 1

1 1

2 1

3 1

2 1

2 1

3 1

0 1

2 1

1 1

2 1

1 1

0 1

1 1

4 1

0 1

0 1

0 1

3 1

1 1

3 1

0 1

1 1

0 1

0 1

3 1

0 1

2 1

2 1

0 1

3 1

2 1

0 1

0 1

1 1

2 1

1 1

1 1

2 1

2 1

4 1

2 1

6 1

0 1

2 1

1 1

2 1

1 1

2 1

1 1

4 1

0 1

5 2 1 1

2 1

2 1

2 1

0 1

324 205 3 1 2 5