Page 1: DENSO HARYANA PVT.LTD. - · PDF fileDENSO HARYANA PVT.LTD. Plot No 3 Sector 3, IMT Manesar, Gurugram, Haryana ... Radiation sensor Ambient sensor STEP BY STEP DEVELOPMENT. CASE STUDIES

CASE STUDIESROOFTOP

DENSO HARYANA PVT.LTD.Gurugram, Haryana

CASE STUDY

Page 2: DENSO HARYANA PVT.LTD. - · PDF fileDENSO HARYANA PVT.LTD. Plot No 3 Sector 3, IMT Manesar, Gurugram, Haryana ... Radiation sensor Ambient sensor STEP BY STEP DEVELOPMENT. CASE STUDIES

DENSO HARYANA PVT.LTD.Plot No 3 Sector 3, IMT Manesar, Gurugram, Haryana

RSite Co-ordinates 28.364021 N, 76.929845 E RProject 75 kW Rooftop Solar PV PlantRModule Type Polycrystalline - 310 WpRNumber of Modules 242 nos.RInverter Solar Grid Connected Inverter (2 nos.)RAnnual Energy Yield 0.106 million unit (approx)

PROJECT OVERVIEW

ABOUT THE COMPANY

Denso Corporation is a global automotive components manufacturer and a Fortune 500 company. About 25% of the company is owned by Toyota Motor and Denso ranks as the second largest auto parts supplier in the world. As of 2016, Denso Corporation consisted of about 189 subsidiaries (63 in Japan, 34 in the Americas, 34 in Europe and 58 in Asia/Oceania) with a total of 151,775 employees.

Page 3: DENSO HARYANA PVT.LTD. - · PDF fileDENSO HARYANA PVT.LTD. Plot No 3 Sector 3, IMT Manesar, Gurugram, Haryana ... Radiation sensor Ambient sensor STEP BY STEP DEVELOPMENT. CASE STUDIES

CASE STUDIESROOFTOPCHALLENGES & SOLUTION

• For the Module Mounting Structure (MMS) for Denso, they wanted a very strict regime to be maintained concerning safety issues, quality control and housekeeping

• In order to fix the MMS Denso wanted only ‘HILTI-make drill bits’ with the involvement of HILTI personnel for the drilling. The Vikram Solar rooftop engineering team was deployed to work in tandem with the HILTI personnels and the project was completed successfully

Denso Haryana Pvt.Ltd., Gurugram, Haryana

Page 4: DENSO HARYANA PVT.LTD. - · PDF fileDENSO HARYANA PVT.LTD. Plot No 3 Sector 3, IMT Manesar, Gurugram, Haryana ... Radiation sensor Ambient sensor STEP BY STEP DEVELOPMENT. CASE STUDIES

03 04 05

Module mounting

01 02

Marking by template HILTI anchoring bolt

Radiation sensor Ambient sensor

STEP BY STEP DEVELOPMENT

Page 5: DENSO HARYANA PVT.LTD. - · PDF fileDENSO HARYANA PVT.LTD. Plot No 3 Sector 3, IMT Manesar, Gurugram, Haryana ... Radiation sensor Ambient sensor STEP BY STEP DEVELOPMENT. CASE STUDIES

CASE STUDIESROOFTOP

ACDB

06 07

Earthing pit ACDB to LT panel laying & termination

0908

Inverter

ENVIRONMENTAL BENEFITS

FINANCIAL BENEFITS

The solar PV system is expected to reduce CO2 emissions to the tune of 93.1 metric tonnes annually

The cost savings per unit from the system is about K2 Average life cycle of a solar PV system is 25 years and the payback period for this system is 5 years and 6 months

Denso Haryana Pvt.Ltd., Gurugram, Haryana