denis boucher - db conseil – project management …dbconseil.ca/testing/documents/list of...
TRANSCRIPT
Denis Boucher
EExxppeerriieennccee SSuummmmaarryy
For the last seventeen years, Mr. Boucher has worked in the manufacturing and logistics environment,
especially in production planning and control, inventory management, as well as in process improvement
and integration of information systems. Over the last 12 years, most of his achievements were concentrated
in the integration of SAP ERP and APO.
MMaajjoorr AAcchhiieevveemmeennttss
Vicwest Income Fund (Steel Building Construction Products) Integration of SAP ECC 6.0 Best Practice Fabricated Metal (Project Duration: actual)
21 production sites, 400 users
Project Manager
Plan, Direct, Manage, Monitor and Control Project Work
Direct more than 50 resources
Communicate to more than 100 stakeholders
Manage issues, risks and scope
Put in place mitigation and contingency plans
Control quality & run lesson learned sessions
Teach methodology and introduce standards
Develop Center of Excellence (COE)
Director of PMO (Project Management Office) and CCB (Change Control Board)
Cut-over detailed planning
Go-Live support plan
L3 Communication (Modernization Service Provider for Military Aircraft) Integration of SAP R/3 4.7 extension Aerospace & Defense (Project Duration: 12 months)
1 production site, 400 users
Project Manager
Plan, Direct, Manage, Monitor and Control Project Work
Direct more than 40 resources (6000 days/ person)
Manage issues, risks and scope
Put in place mitigation and contingency plans
Quality control
Teach methodology and introduce standards
Member of PMO (Project Management Office) and CCB (Change Control Board)
Cut-over detailed planning (more than 100 resources)
Go-Live support plan
Standard Product (Lighting Product Manufacturer & Distributor)
Integration of SAP R/3 5.0 and APO 4.1 (Project Duration: 7 months)
1 production sites, 5 distribution centers
Team Leader and Functional Consultant – DP & SNP Module
2
Denis Boucher
Functional analysis of forecasting, distribution planning and purchasing
Configuration / unit and scenario tests / data conversion
Documentation of procedures and processes
Training of Super Users
Manage issues, risks and scope
Go lives and post go lives support
This project was a success
Pharmascience (Pharmaceutical Manufacturer)
Planning and scoping of SAP APO (Project Duration: 2 months)
Project Manager/ Expert
Functional analysis of production planning, scheduling and control processes
Cost / benefits analysis of the SAP APO PPDS implementation
Workshops to determine opportunities and benefits
Evaluation of resource needs; human, logistic and finance
Definition of technical & functional scope
Lead a team of more than 4 resources
Manage issues, risks and scope
Project scope planning
Implementation plan preparation
Camoplast Thermoplastic Group (OEM Automotive Plastic Component Manufacturer) Planning and scoping of SAP R/3 (Project Duration: 2 months)
2 production sites
Project Manager
Functional and business processes’ scope definition
Cost / benefits analysis of the SAP R/3 implementation
Project planning and control
Lead a team of more than 8 resources
Manage issues, risks and scope
Project scope planning
Project plan preparation
Camoplast Track Vehicule (Manufacturer of multi-terrain track vehicules) Advanced integration of SAP R/3 4.7 (Project Duration: 6 months)
1 production site
Functional Consultant/ Expert – PP Module
Functional analysis of production planning, scheduling and control processes
Configuration / unit and scenario tests / data conversion
Documentation of procedures and processes
Report / enhancement specification
Conversion and cut-over plan preparation
Manage issues
Go live and post go live support
Project plan preparation.
3
Denis Boucher
Domtar (Paper Manufacturer) Global integration of SAP R/3 4.6C and APO 3.1 (Project Duration: 20 months)
9 production sites (North America), 11 distribution centers
Team Leader and Functional Consultant – PP-PPDS Module
Functional analysis of production planning, scheduling and control processes
Configuration / unit and scenario tests / data conversion
Documentation of procedures and processes
Project planning and control (deadlines and budget)
Lead more than 16 resources from all over the world and different consulting firms
Manage issues, risks and scope
Go lives and post go lives support
This project was a success
Dutailier (Furniture Manufacturer) Integration of logistic modules of SAP R/3 4.6C (Project Duration: 9 months)
5 production sites (North America), 70 users
Project Manager and Functional Consultant – PP module
Functional analysis of production planning and control processes
Configuration / unit and integration tests / data conversion
Documentation of procedures and processes
Training of ‘Super-users’
Project planning and control (deadlines and budget)
Lead more than 20 resources
Manage issues, risks and scope
Go live and post go live support
Following an involvement of more than 2 000 days / person, this project was a success
Dutailier (Furniture Manufacturer) Planning and scoping of SAP R/3 (Project Duration: 3 months)
5 production sites (North America), 2 distribution centers
Functional Consultant and Project Manager Assistant– PP Module
Functional analysis of production planning and control processes
Cost / benefits analysis of the SAP R/3 implementation
Fit-gap analysis of functionality
Determination of human, logistic and financial resources needs
Project scope planning
Project plan preparation
Following the final presentation, the project was accepted
Les Entreprises Barrette – US Fence (Vinyl Fence Manufacturer & Distributor)
Integration of PP module of SAP R/3 4.6C (Project Duration: 5 months)
1 production sites, 55 users
Team Leader and Functional Consultant – PP Module
Functional analysis of production planning and control processes
Identify configuration improvement
4
Denis Boucher
Configuration / unit and integration tests / data conversion
Report / enhancement specification
Development of implementation & cut-over plan
Go live and post go live support
This project was a success
Trudeau Corp. (Houseware Products Distributor)
Integration of PP module of SAP R/3 4.6C (Project Duration: 3 months)
2 distribution sites, 70 users
Functional Consultant – PP Module
Functional analysis of procurement planning and forecasting
Project scope planning and definition of blueprint
Configuration / unit and integration tests / data conversion
Documentation of procedures and processes
Report specification
Preparation of implementation plan
Imperial Tobacco (Tobacco Products Manufacturer) Upgrade of SAP R/3 4.6B (Project Duration: 6 months)
2 production sites, 5 distributions sites, 800 users
Functional Consultant – PP Module
Functional analysis of production planning and control processes
Improvement of processes / issue resolution
Configuration and implementation of new functionality
Planning and execution of unit and integrated tests with the users
Training of users
Go live and post go live support
Automate integration tests with CATT of SAP
This project was a success
Waterville T.G. (OEM Automotive Sealing System Manufacturer)
Upgrade of SAP R/3 4.6B Automotive 2.0 (Project Duration: 5 months)
4 production sites, 2 distribution sites, 240 users
Functional Consultant – PP Module
Issues resolution, bugs correction
Configuration and implementation of new functionality
Planning and execution of unit tests
Post go live support
This project was a success
Pratt and Whitney Canada (Aircraft Engine Manufacturer)
Procurement processes optimization with the help of SAP R/3 4.6B (Project Duration: 3 months)
Team Leader and Functional Consultant - PP and MM Module
Functional analysis of procurement processes
Configuration, transactions and reports analysis
Preparation of a training plan
Identification of improvement in the MRP process
5
Denis Boucher
Training material development
More than 20 buyers have been trained
Pharmascience (Pharmaceutical Manufacturer)
Preparation to global integration of SAP R/3 4.6C (Project Duration: 2 months)
Functional Consultant – PP-PI Module
Functional analysis of forecasting and master data processes
Fit-gap analysis of functionality
Determination of human and logistic resources needs
Determination of reengineering steps required
Project scope planning
Mapping of future forecasting business process
Sabex, now Sandoz (Pharmaceutical Manufacturer)
Global integration of SAP R/3 3.1H (Project Duration: 10
months)
1 production site, 4 distribution sites, 120 users
Team Leader and Functional Consultant – PP-PI Module
Functional analysis of production planning and control processes
Configuration / unit and integration tests / data conversion
Documentation of procedures and processes
Report specification
Training of ‘Super-users’
Creation and test of authorization profiles
Go live and post go live support
This project was a success
Isofab (Insulation Distributor and Manufacturer)
Planning and procurement processes optimization with the help of SAP R/3 3.1H (Project Duration: 1 month)
2 production sites, 2 distribution sites
Team Leader and Functional Consultant – PP Module
Functional analysis of production planning and procurement processes (SandOP, MPS, MRP)
Improvement of processes / issue resolution
Configuration and unit tests of PP module
Implementation of improved processes
Training of users
Go live and post go live support
Waterville T.G. (OEM Automotive Sealing System Manufacturer)
Integration of PP module of SAP R/3 3.1H (Project Duration: 3 months)
4 production sites, 1 distribution site, 240 users
Team Leader and Functional Consultant – PP Module
Functional analysis of production planning and control processes
Identify configuration improvement
Configuration / unit and integration tests / data conversion
Report specification
6
Denis Boucher
Preparation of implementation plan
This project was a success
Pratt and Whitney Canada (Aircraft Engine Manufacturer)
Production control process optimization with the help of SAP R/3 3.1H (Project Duration: 2 months)
Functional Consultant – PP module
Functional analysis of production control process
Management of issue resolution sessions
Preparation of implementation plan
Viability analysis of solutions
Determination of ABAP needs to automate non-valued activities
Following the implementation of solutions, a labor reduction of 12 persons have been realized
Draxis Health (Pharmaceutical Manufacturer)
Information system plan (Project Duration: 2 months)
Functional Consultant
Functional analysis of production planning and control processes, inventory management and quality
control
Preparation of opportunities report including project plan, budget and deadline
Elaboration of detailed criteria list for a software ERP selection
Cost/ benefit analysis
Broan-Nutone (Ventilation Products Manufacturer)
Global integration of MRPII Mac-Pac software on AS/400 (Project Duration: 5 months)
1 production site de production, 40 users
Functional Consultant - Production and Stock Modules
Functional analysis of production planning and control processes and inventory management
Configuration / unit and integration tests / data conversion
Documentation of procedures and processes
Creation and test of authorization profiles
Training of users
Go live and post go live support
This project was a success
Powers-Crane (Plumbing Equipments Distributor)
Global integration of MRPII Man-Man software (Project Duration: 2 months)
Business Analyst – Purchasing and Planning (MRP) Modules
Execution of unit and integration tests / data conversion
Report specification
Implementation of key performance measurements (KPIs)
Training of users
This project was a success
Crane Canada (Plumbing Equipments Distributor)
Global integration of MRPII Mac-Pac software on AS/400 (Project Duration: 3 months)
Business Analyst – Purchasing and planning (MRP) Modules
7
Denis Boucher
Functional analysis of planning (MRP), procurement and inventory management
Execution of unit and integration tests / data conversion
Report specification
Implementation of key performance measurements (KPIs)
Training of users
Following the implementation, stock level was reduced by 50% and service level was increased by 40%
OOtthheerr AAcchhiieevveemmeennttss
Quality Assurance - Curtiss Wright, Otera Capital, Pillar5, Westfalia Surge
SAP or other ERP software support: punctual interventions to improve business processes – VKI Technologies,
Astral Home Entertainment, Powers Process Control, Waterville T.G., Sabex, Produit Confort Internationnal,
Camoplast, Pharmascience, Kontron, Ultima
SAP or other ERP software upgrade - Prevost Car, Baronet, Isofab
Pre-sale for the information system APO & R/3 from SAP – Danone, Distribution Toiture Mauricienne
Integrated system (ERP/ MRPII) software selection – Paco Corp., Draxis Health
Improvement opportunities assessment – Paco Corp., Technologies Chromas
Manufacturing and distribution processes reengineering and layout design – G.E.C. Alsthom, Paco Corp., Crain-
Drummond, Crane Canada
Supply chain management improvement – La Brasserie Labatt
Set-up time reduction project (SMED) – Crain-Drummond, Garant, Wyeth, SCA
Implementation of Just-in-Time (JIT) – Crane Canada, Powers-Crane
Implementation of Kanban inventory system - Paco Corp., Wyeth
Implementation of good manufacturing practices (5S, lean manufacturing) – Paco Corp., SCA
Implementation of manufacturing cells – Crain-Drummond, Paco Corp., Wyeth
Business process simulation – Alcan, Montupet, Wyeth
PPrriioorr PPoossiittiioonnss
Consultant – Manufacturing process improvement (Lean)
Trainer (OMERICS courses) – APICS
Part time teacher (Simulation and Introduction to Industrial Engineering courses) – École Polytechnique
Business analyst – inventory management, production planning and control, purchasing
Buyer/ planner
Inventory analyst