Page 1: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

DEMONSTRATION OF IN-SITU SEWAGE DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON TREATMENT TECHNOLOGIES ON

RIVER GANGA RIVER GANGA (Proposal under NGRBA)(Proposal under NGRBA)

CENTRAL POLLUTION CONTROL BOARD

IST

IST

IST

IST

Sewage Drain

Sewage Drain

Sewage Drain

Sewage Drain

River

River

Page 2: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

DEMONSTRATION OF IN-SITU SEWAGE TREATMENT DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES THROUGH BIOREMEDIATION TECHNOLOGIES THROUGH BIOREMEDIATION

PROCESSPROCESS

1. Budha Nala, Ludhiana (Punjab)

2. Morigate Nala, Allahabad (UP)

3. City Drain, Farukhabad (UP)

4. Bakarganj Nala, Patna (Bihar)

5. Uttarakhand (Muni ki Reti, Haridwar)

6. West Bengal (Tolly’s/ Taldanga, Kolkata)

7. Jharkhand (Sahebganj/ Rajmahal)

Page 3: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

GENESIS OF PROJECTGENESIS OF PROJECT

Gap in Sewage treatment

Generation : 38,255 MLD

Treatment : 11,787 MLD

Sewage Treatment Plants;

(Ex-situ) * Costing

* O & M

* Performance

Target : 2020 Action Plan

Page 4: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

PROJECT PROPOSAL - CHRONOLOGY

• Expression of Interest : April, 2010

• Response : 7 Firms

• Technical Review in CPCB : June, 2010

• CPCB’s proposal to MoEF : August, 2010

• Meeting in MoEF and suggestion to demonstrate IST on Ganga

: August, 2010

• Forwarded 7 proposals on Ganga to MoEF

: September/ October, 2010

• Comments of NRCD to revise the Proposals

: November, 2010

Contd….

Page 5: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

PROJECT PROPOSAL - CHRONOLOGY

• Committee to examine the proposals

: December, 2010

• Examination, Conditions, recommendation of proposals

: February, 2011

• Research Advisory Committee - Recommended

: 28th February, 2011

• Admn. Approval and ES of MoEF : 6/11 April, 2011

• Suggested to seek Performance BG, TPA, Patent & MoA

: May/ June, 2011

• CPCB confirmation on MoA, BG : July, 2011

• Review by Secretary : 02 August, 2011

• Funds Transfer : Awaited

Page 6: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

IN-SITU SEWAGE TREATMENTIN-SITU SEWAGE TREATMENT(IST)(IST)

In-situ Sewage Treatment refers to treatment of

sewage in the running battery of flow without

displacing; and by employing microbial consortia

in aerobic and facultative environment to degrade

sewage into CO2 and H2O and remove odour.

Page 7: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

IST- TECHNOLOGIES

Principle:

Microbial consortia act on sewage to degrade into simpler forms under aerobic/anaerobic/ facultative environment-Extracellular Enzymes/Nutrients-added.

Technologies: Free release-Tablets/ Blocks/ Spraying Blocks on Bottom- porous blocks embedded

with microbes Horizontal media/microbe loaded filters-

Green Bridge Self-Cleansing (Bio-Mimicry)

Page 8: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

SELECTED DRAINS FOR DEMO

Drains Flow (MLD)

Characterization Disposal

Budha Nala(Punjab)

600 BOD: 60-200 mg/lCOD: 350-650mg/lSS: 200-400 mg/l FC: 108- 109 MPN/100ml

Sutlej

Morigate Nala (UP)

40 BOD: 96- 138 mg/lCOD: 280- 348 mg/lSS: 188- 239 mg/lpH: 7.43DO: 0.7 mg/l

Ganga

Bakarganj Nala(Bihar)

21 BOD: 110 mg/lCOD: 240 mg/lSS: 326 mg/lFC: 72400 MPN/100ml

Ganga

Farrukhabad (UP)

16 BOD: 105 mg/lCOD: 161 mg/lTSS: 74 mg/lFC: 1.5 X106 MPN/100ml

Ganga

Page 9: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

CLAIMED PERFORMANCES

Drains Technology Project Cost

Expected Results

Budha Nala (Ludhiana)

Green Bridge- microbial and plants

Rs. 15.28 Cr BOD: <30 mg/lCOD: < 150 mg/lTSS: < 80 mg/lFC: 90% reduction

Morigate Nala (Allahabad)

Inoculation –slow release of microbial consortia (Tablets/Blocks)

Rs. 1.38 Crore BOD: < 30 mg/lCOD: < 250 mg/lTSS: < 100 mg/l

Bakarganj Nala (Patna)

Microbes embedded in porous blocks (Eco-Bio-Blocks)

Rs. 2.24 Crore BOD: 50 mg/lCOD: 100 mg/lSS: 130 mg/lDO:: 0.5 mg/lFC: 55% reduction

City Drain (Farrukhabad)

Physical/Biological-Bio-Mimickry (Self purification capacity of river)

Rs. 0.94 Crore BOD: <30 mg/lCOD: < 100mg/lTSS: < 100 mg/lFC: <1000 MPN

Page 10: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

PROJECT IMPLEMENTATION

i. CPCB awarded work order to 4 firms based on AA and ES of MoEF

ii. MoA drafted for seeking concurrence of MoEF

iii. CPCB as the Nodal Agency to implement the project

iv. ‘Monitoring Committee’ at State level through State Pollution Control Board (SPCB)

v. Provision of ‘Third Party Inspection’ through IITs/ Universities

vi. Project Implementing Agencies(PIAs);• M/s Green Infrastructure, Pune (Budha Nala, Ludhiana) • M/s Amrit Clean water technologies, Gurgaon (Morigate,

Allahabad)• M/s US Environ, New Delhi (Bakarganj, Patna)• M/s Clover Organic, Dehradun (Farrukhabad, UP)

Page 11: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

ROLE OF CPCB

Monitoring Performance at 4 locations

R & D components- Investigations

Evolving Guidelines/ Protocols.

Trainings and Mass Awareness

Page 12: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

ROLE OF SPCBSROLE OF SPCBS UP, Bihar and Punjab to constitute ‘Monitoring Committee’

represented by Municipality, Water Supply & Sewerage Board, Jal Nigam, State Urban Authority, Irrigation Department, NGOs, etc.

Guide Project Implementing Agency (PIA) at local level-including site visits

Coordinate with PIA and concerned agencies for required clearances, if any;

Undertake laboratory analyses for performance evaluation of technology(Random-basis).

Page 13: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

R & D COMPONENTSR & D COMPONENTS(CPCB)(CPCB)

i. Standardization of the design parameters of In-situ sewage treatment technology in terms of working methodology, microbial dosing, and working optimum ranges of pH, temperature, time, hydraulics, etc.

ii. Assessing efficacy and effectiveness of each treatment process with regard to removal of pollutants and elimination of pathogens.

iii. Developing treatment packages with microbial dosing Vs MLD of sewage to be treated and taking care of microbial population control.

Page 14: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

R & D COMPONENTSR & D COMPONENTS(CPCB)(CPCB)

iv. Listing of microbes used in consortia to rule-out

‘secrets’ and having no doubts on harmful microbes.

v. Study the formulation of intermediary compounds for

assessing complete degradation.

vi. Studying inhibitory/ antagonistic parameters effecting

in-situ treatment.

vii. Evolving Protocol and guidelines for implementation in

other parts of the country.

Page 15: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

SAMPLING AND ANALYSIS SAMPLING AND ANALYSIS SCHEDULESCHEDULE

S. No.

Parameters to be monitored

Sampling frequency for

per Centre

Months per

Centre

Total Samples

Total samples at 4

Centre

1 Flow, Temperature, pH, Oil and Grease, BOD, COD,

NO3, NH3-N, PO4-P

Weekly Fort-nightly monthly

336

1266

482424

12 24 96

2 Heavy Metals and Pesticides

Fort-nightly Monthly

39

69

2436

12 15 60

3 Bacteriology (FC, E.coli, Streptococcus, Salmonella, Shigella, Vibrio, Pseudomonas)

Weekly Fort-nightly Monthly

336

1266

482424

12 24 96

Page 16: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

MEMORANDUM OF AGREEMENT(DRAFT CONDITIONS)

i. Bank Guarantee against amount released.

ii. Bank Guarantee for Performance claimed.

iii. No charges for Royalty or Patent.

iv. No GMOs.

v. No major alteration/modification of the drain.

vi. Provisions for Third Party Inspection/ Monitoring.

vii. Fortnightly Progress Reports (monthly/ quarterly basis).

Page 17: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

RELEASE OF FUNDS RELEASE OF FUNDS

Release of funds in 4 equal installments (to PIAs). [However, felt need for 75 % fund at-

once]

Bank Guarantees (against installments/ Performance) will be obtained from PIAs

Release of funds on receipt of UCs, Physical progress and Monitoring Reports

Page 18: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

PRESENT STATUSPRESENT STATUS

MoEF Accorded – Administrative Approval

and Expenditure Sanction on 6th and 11th

April, 2011 to 4 Projects.

CPCB has proposed for transfer of funds for

further releasing to PIA subject to the receipt

of two BGs and signing of MoA (total cost

Rs. 19.84 Crore-first installment: 4.96 Crore).

Page 19: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

LOCATION- 1 LOCATION- 1

In-situ Treatment of Sewage through

Bioremediation at Budha Nala, Ludhiana, Punjab

Page 20: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

BUDHA NALA, LUDHIANABUDHA NALA, LUDHIANA

Budha Nala originates at Kumbkalam and runs parallel to River Sutlej and joins at Gorsian Kadar Baksh.

Perennial freshwater source and gets polluted in Ludhiana.

water used for irrigation near Ferozpur.

Carries treated/untreated industrial wastewater of Ludhiana city.

Page 21: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

Buddha Nala, Ludhiana, Punjab Geographical Location Buddha Nala, Ludhiana, Punjab Geographical Location

Page 22: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

PHYSICAL FEATURES PHYSICAL FEATURES

Length : 36 km. (Kumbkalan to Ludiana 13 km

& Ludhiana to Sutlej

River confluence

point 23 km)

Width of the Drain : 12-24 meter Average water depth : 0.6-1.8 meter Average Flow : 600 MLD

(Monitored by CPCB)

Page 23: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

PROJECT OBJECTIVES PROJECT OBJECTIVES

Demonstration of ‘In-situ Sewage Treatment’ in Budha Nala

Treatment of wastewater by application of microbial consortia augmented with aquatic plants

Standardization of the technology for replication after assessment of performance

Page 24: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

TECHNOLOGY : GREEN-BRIDGE TECHNOLOGY : GREEN-BRIDGE

Green-bridge and three to four hydro-cell construction for flow control and effective treatment of sewage.

Green –Bridge acts as a reservoir of microbes

Microbial storage at the green bridges and mingling by bottom of the hydro-cells.

Microbes feed on the pollutants and treat the water

Aquatic plants grown on Green-bridges & along drain-bank absorb nutrients to treat waste water.

Page 25: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

Green Bridges for Buddha Nala RestorationGreen Bridges for Buddha Nala Restoration

Page 26: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

WORKING PRINCIPLEWORKING PRINCIPLE Placement of Bar screen before green bridge to trap

garbage and other floating materials

Waste water to pass through green bridges placed in a Zig-zag manner.

The green bridges made of boulder provided with microbial doses and aquatic plants grown over it.

Microbial doses released from the Green Bridge and also from bottom of hydro-cells

Regular monitoring of water quality

Regular cleaning of Green bridges and maintenance of aquatic plants.

Page 27: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

CLAIMED RESULTSCLAIMED RESULTS

Parameters

Existing Quality

Reduction

After Treatment

BOD 85 to 165 mg/l 55- 70% 25 to 50 mg/l

COD 387 to 526 mg/l 55- 70% 115 to 150 mg/l

TSS 201 to 398 mg/l 55- 80% 40 to 80 mg/l

Cr+ 0.46 mg/l 55- 60% 0.18 mg/l

Pb+ 0.21 mg/l 55-60% 0.08 mg/l

Ni+ 0.47 mg/l 55-60% 0.18 mg/l

Zn+ 2.40 mg/l 55-60% 0.96 mg/l

Page 28: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

DEMONSTRATED CASE STUDIES DEMONSTRATED CASE STUDIES

Ahar River for Eco-restoration, Pune

Udaisagar lake for Eco-restoration - Udaipur

Page 29: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

COST OF THE PROJECTCOST OF THE PROJECT

Rs. 15.28 Crore Rs. 15.28 Crore (including one year O&M cost)(including one year O&M cost)

Page 30: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

LOCATION-2LOCATION-2

Morigate Nala, AllahabadMorigate Nala, Allahabad

Page 31: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

MORIGATE NALA, ALLAHABADMORIGATE NALA, ALLAHABAD

Morigate Nala carries 40 MLD sewage from Allahabad city to River Ganga

Two drains coming from Katra and Rambagh, meets at Parade Ground and outfalls into River Ganga through Morigate

As per High Court Order, the Nala has been blocked, but spill over still reaching River Ganga.

Page 32: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

TECHNOLOGY: BIO-AUGMENTATIONTECHNOLOGY: BIO-AUGMENTATION

‘EmTech’ patented product used in tablet and liquid

form to release microbial consortia

Degrade organic matters, oil & grease, reduces sludge

and remove odour

Page 33: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

WORKING PRINCIPLEWORKING PRINCIPLE

Physical cleaning at dosing points to maintain flow

Bar screen to be installed before dosing points

Sprayer and slow release tablets to be applied at upstream of drain

Installation of spraying devices for microbial dosing at selected sites of microbes at selected sites

Operation of Fixed mist sprayer for consistent mix of microbes with wastewater

Page 34: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

CLAIMED RESULTSCLAIMED RESULTS

Parameters

Existing Quality After Treatment

BOD 96 to 138 mg/l < 30 mg/l

COD 280 to 348 mg/l < 250mg/l

SS 188 to 239 mg/l < 100 mg/l

Page 35: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

COST OF THE PROJECTCOST OF THE PROJECT

Rs. 1.38 Crore (including one year O&M cost)

Page 36: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

LOCATION-3Bakarganj Nala,Patna

Page 37: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

BAKARGANJ NALA, PATNABAKARGANJ NALA, PATNA

Length : 2.5 km Width : 2 – 5 meters Depth : 2-3 ft. Flow : 21 MLD Joins River Ganga

Page 38: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

TECHNOLOGY: ECO-BIO-BLOCK TECHNOLOGY: ECO-BIO-BLOCK

EBB contains “fermented soya bean bacillus”

Made of porous volcanic rock, cement, beneficial bacteria and nutrients that released regularly in water

EBB structure designed according to hydrodynamics and placed

Number of EBB requested is based on pollution load

Page 39: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

DIFFERENT STRUCTURES OF EBB BLOCKSDIFFERENT STRUCTURES OF EBB BLOCKS

INTERLOCKING OF ECO-BIO BLOCKSINTERLOCKING OF ECO-BIO BLOCKS

Page 40: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

Construction and Placement of EBB in River

Page 41: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

WORKING PRINCIPLEWORKING PRINCIPLE

Pre-analysis of water quality for Block Placement

Installation of Bar screen to check floating materials

Installation of EBB reactor and bottom lining

De-silting of the drain at regular intervals

EBB bacteria degrade organic matters into carbon dioxide and water and helps in rapid oxidization (anaerobically) converting ammonia into nitrite and nitrate, nitrates are naturally absorbed by plants and microbes and release nitrogen gas

EBB bacteria in contact of water, propagate and multiply every half an hour to cleanse water

Page 42: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

DEMONSTRATED EBB CASE DEMONSTRATED EBB CASE STUDIESSTUDIES

Mayur Vihar Phase-I Drain, Delhi

Alandur, Chennai

Page 43: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

CLAIMED RESULTS (EBB)CLAIMED RESULTS (EBB)

Parameters Existing water quality

After Treatment

pH 7.26 6.5 to 8

DO 0.5 mg/l 0.5 mg/l

BOD 110 mg/l 50 mg/l

COD 240 mg/l 110 mg/l

TSS 326 mg/l 130 mg/l

Fecal Coliform

- 5-55% reduction

Page 44: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

COST OF THE PROJECTCOST OF THE PROJECT

Rs. 2.24 Crores Rs. 2.24 Crores (including one year O&M cost)(including one year O&M cost)

Page 45: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

LOCATION- 4LOCATION- 4(City Drain, Farrukhabad)(City Drain, Farrukhabad)

Page 46: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

CITY DRAIN/HATHIKHANA DRAIN, CITY DRAIN/HATHIKHANA DRAIN, FARRUKHABADFARRUKHABAD

The City Drain of Farrukhabad(UP) carries 16 MLD untreated sewage into Ganga River

Page 47: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

Physical Features of the DrainPhysical Features of the DrainHathikhana DrainHathikhana Drain

PARTICULARS/ PARAMETERS VALUE

Approximate Length of the drain (From Nekpur to river Ganga)

10 Km

Drain Width 18.50 feet

Drain Depth 5.00 feet

Sludge accumulation 2.50 feet

Perennial Flow 16 MLD

BOD 105 mg/l

COD 161 mg/l

TSS 94 mg/l

TDS 973 mg/l

Total Coliform 3,07,18,800 MPN/l

Faecal Coliform 1,51,00,000 MPN/l

Page 48: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

TECHNOLOGY: BIO-MIMICRYTECHNOLOGY: BIO-MIMICRY

Bio-mimicking designed the stretch of a drain/river enhancing self cleansing process supported by application of natural materials and NatureVel-WW products for water purification

Strategies made for adsorption, degradation, aeration, filtration and sedimentation through biofilter made of boulders, charcoal and mud balls.

NatureVel-WW, the patented product is applied/ sprayed for treatment of water pollutants

Page 49: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

WORKING PRINCIPLEWORKING PRINCIPLE The stretch of the drain is mended as Rapids and Pool with

boulder and charcoal

The Rapids helps in adsorption, aeration and filtration of sewage and the Pool helps in sedimentation

Wood charcoal dipped in NatureVel-WW is packed in fishnet bag

Mud ball of clay and rice bran mixed with microbes are tied with charcoal balls for slow release of doses

River banks are treated and inoculated with spray of Naturavel-WW

Page 50: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

Pool

Rapids

SELF-CLEANSING MECHANISM OF RIVERSELF-CLEANSING MECHANISM OF RIVER

AERATION

ABSORPTION & DEGRADATION

SEDIMENTATION

FILTRATION

Rapids Rapids

PoolPool

Page 51: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

CLAIMED RESULTSCLAIMED RESULTS

Parameters Current Values

Projected after 6 Months

BOD 105 mg/l <30 mg/l

COD 161 mg/l <100 mg/l

TSS 94 mg/l <100 mg/l

Total Coliform 3,07,18,800 MPN/100ml

< 1,000 MPN

Faecal Coliform 1,51,00,000 MPN/100ml

< 1,000 MPN

Page 52: DEMONSTRATION OF IN-SITU SEWAGE TREATMENT TECHNOLOGIES ON RIVER GANGA  (Proposal under NGRBA)

COST OF THE PROJECTCOST OF THE PROJECT

Rs. 0.94 Crore Rs. 0.94 Crore (including one year O&M cost)(including one year O&M cost)