Mano a Mano is building a demonstration and training center in Bolivia.

TRANSCRIPT

Page 1: Demonstration and Training Center Update_Mid-Feb 2013

Demonstration and Training Center Update

Mock-up of Project

Page 2: Demonstration and Training Center Update_Mid-Feb 2013

New Work on the Project, Feb 2013Phase 4

Construction of greenhouse to raise crops in a protected environment

For an overview of the demonstration and training center project click the following link: http://manoamano.org/blog/demonstration-and-training-center-in-el-abra/

Page 3: Demonstration and Training Center Update_Mid-Feb 2013

Step 1: measuring and digging holes

Page 4: Demonstration and Training Center Update_Mid-Feb 2013

Step 2: Planting treated posts

Page 5: Demonstration and Training Center Update_Mid-Feb 2013

Measuring and cutting wooden beams

Step 3: Building the Greenhouse structure

Page 6: Demonstration and Training Center Update_Mid-Feb 2013

Fitting and nailing the roof

Page 7: Demonstration and Training Center Update_Mid-Feb 2013

Step 4: Completing the interior structure

Page 8: Demonstration and Training Center Update_Mid-Feb 2013

Cutting and fitting beams and posts

Page 9: Demonstration and Training Center Update_Mid-Feb 2013

Measuring and cutting the Agrofilm

Step 5: Placing and fastening the Agrofilm

Page 10: Demonstration and Training Center Update_Mid-Feb 2013

Cutting protective strips from left-over plastic from ponds and recycling them for use in attaching the covering of the

green house

Page 11: Demonstration and Training Center Update_Mid-Feb 2013

Extending and fastening the Agrofilm to the roof and sides

Page 12: Demonstration and Training Center Update_Mid-Feb 2013

Cutting, extending and fastening the Agrofilm to the front panel

Page 13: Demonstration and Training Center Update_Mid-Feb 2013

Constructing the door

Step 6: Constructing and placing the door

Page 14: Demonstration and Training Center Update_Mid-Feb 2013

Installing hinges for the door

Page 15: Demonstration and Training Center Update_Mid-Feb 2013

Placing the door

Page 16: Demonstration and Training Center Update_Mid-Feb 2013

Step 7: Fastening the base of the green house

Page 17: Demonstration and Training Center Update_Mid-Feb 2013

Completed Green House

Page 18: Demonstration and Training Center Update_Mid-Feb 2013

Phase 5: Planting

• After fertilizing, plowing, raking, breaking up sod and leveling, more organic material was spread on the land in order to proceed with the plantings and transplants of various crops.

• In addition, holes were dug for the shade and fruit trees that will continue to form segments of planting.

Page 19: Demonstration and Training Center Update_Mid-Feb 2013

Spreading manure

Page 20: Demonstration and Training Center Update_Mid-Feb 2013

Digging holes for rows of trees among sections of plantings

Page 21: Demonstration and Training Center Update_Mid-Feb 2013

Planting onions

Page 22: Demonstration and Training Center Update_Mid-Feb 2013

Planting lima beans

Page 23: Demonstration and Training Center Update_Mid-Feb 2013

Planting a mixture of corn, peas and squash

Page 24: Demonstration and Training Center Update_Mid-Feb 2013

Seeds used

Page 25: Demonstration and Training Center Update_Mid-Feb 2013

Planting carrots

Page 26: Demonstration and Training Center Update_Mid-Feb 2013

First completed planting bed

Page 27: Demonstration and Training Center Update_Mid-Feb 2013

Other Activities

Page 28: Demonstration and Training Center Update_Mid-Feb 2013

Final Finishing of Ponds

• Beause of rain, the ponds began to accumulate water before they were completely finished.

• To finish them, a human chain was formed in which all cooperated to extract water.

• Then the rain damage to the wall was repaired and a protective plastic was installed to protect the lining.

• Next the impermeable liner was installed.• The pond was then filled to mold the plastic.• Finally, a channel was constructed to secure the liner.

Page 29: Demonstration and Training Center Update_Mid-Feb 2013

Human chain to extract rain water from the pond

Page 30: Demonstration and Training Center Update_Mid-Feb 2013

Repairing the walls and placing the protective plastic

Page 31: Demonstration and Training Center Update_Mid-Feb 2013

Installation of the impermeable liner

Page 32: Demonstration and Training Center Update_Mid-Feb 2013

Filling the pond to mold the plastic

Page 33: Demonstration and Training Center Update_Mid-Feb 2013

Building the canal to secure the liner

Page 34: Demonstration and Training Center Update_Mid-Feb 2013

Completed Pond

Page 35: Demonstration and Training Center Update_Mid-Feb 2013

Unloading material

The construction of the perimeter wall continues

Page 36: Demonstration and Training Center Update_Mid-Feb 2013

Placing support beams

Page 37: Demonstration and Training Center Update_Mid-Feb 2013

Installing the siding

Page 38: Demonstration and Training Center Update_Mid-Feb 2013

Plants in the shaded area

• After marking and preparing beds, various vegetables were planted including:– Cilantro– Radishes– Cabbage– Lettuce– Spinach

Page 39: Demonstration and Training Center Update_Mid-Feb 2013

Watering lettuce in the semi-shaded area

Page 40: Demonstration and Training Center Update_Mid-Feb 2013

Beds in the semi-shaded area 12 days after planting

Page 41: Demonstration and Training Center Update_Mid-Feb 2013

Now the Agro-Ecological Training Center (CEA, by its initials in Spanish) has more to show visitors!