demand side working group
DESCRIPTION
Demand Side Working Group. Chair Slides July 20, 2012. Antitrust Admonition. - PowerPoint PPT PresentationTRANSCRIPT
Demand Side Working GroupChair SlidesJuly 20, 2012
Antitrust Admonition
Demand Side Working Group 07-20-122
ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws.
Disclaimer All presentations and materials submitted by Market Participants or any other Entity to ERCOT staff for this meeting are received and posted with the acknowledgement that the information will be considered public in accordance with the ERCOT Websites Content Management Operating Procedure.
CONFIDENTIAL Not for distribution or reproduction.
Evacuation Route
Demand Side Working Group 07-20-123
Agenda
Demand Side Working Group 07-20-124
1. Antitrust Admonition T Carter 9:30 a.m.
2. Agenda Review T Carter 9:35 a.m.
3. 2012 DSWG Goals Review T Carter 9:40 a.m.
4. Load Provided Capacity Update M Smith 10:00 a.m.
5. ALR Update P Wattles 10:30 a.m.
6. METF Update P Wattles 11:00 a.m.
7. ERS Update M Patterson 11:15 a.m.
8. Resource Performance Information
T Carter 11:45 a.m.
Lunch Noon
9. MIS Reports E Rothschild 1:00 p.m.
10. Long Term Study Update G Thurnher 1:45 p.m.
11. Temperature Sensitive Load Update
M Smith 2:00 p.m.
12. Action Items and Next Meeting T Carter 2:55 p.m.
Adjourn T Carter 3:00 p.m.
Demand Side Working Group 07-20-125
DSWG Goals for 2012
# Goal Description Deliverable Scheduled Completion
Market Champion Contributors Status
1 Load Resource Alternatives to RMR NPRR detailing how LRs can participate as an RMR alternate Sep-12 Mark Smith Tim C, Jay Z, Sarah G, John V, Melissa T,
Ino G, Eric G, Floyd TDraft
Whitepaper
2 Modify EILS Rules to Increase Available Capacity
NPRR and Technical Requirements document change to accommodate PUCT EILS Rule change
Jun-12 Ed Echols Tim C, Mark S, Betty M, Joel O
3 Load Participation in SCEDSupport Load participation of Load Resources in the design of the Look Ahead SCED project
Dec-12 John VarnellTim C, Jay Z, Mark S, Floyd T, Eric R, Parviz
A, Joel O, Ed E, Manny M, Laura R, Melissa T
Future Phase of Look Ahead
SCED
4Develop proposals for DR Products with different ramp periods and temperature sensitive loads
Functional requirements development Dec-12 Mark SmithTim C, Mark S, Eric R, Joel O, John T, Ed E,
Laura R, Jay Z, Nelson N, Justin L, Ed R, Cyrus R, Melissa T
Sub Group Review
5 Improve access to ERCOT market data to assist in DR business decisions NPRR for changes to MIS Reports May-12 Eric Rothschild Mark S, Floyd T, Parviz A Survey sent
6 Aggregations of Small Customers as Load Resources
Functional requirements and possible proof of concept test for aggregations of small customers to qualify as Load Resources
Sep-12 Ed Echols Jay Z, Eric R, Parviz A, John T, Justin L, Laura R, Manny M, Ed R, Cyrus R, Rob C
7 Adjust DR Capacity for T&D Losses Potential NPRR to bring DR impacts up to a wholesale level Oct-12 Tim Carter Ed E, Melisssa T
8 Update Load Participation in ERCOT Markets document Revised and Updated Document Sep-12 Tim Carter Eric R, Joel O
9 Explore Settlement Improvements for Price Sensitive Loads
Develop NPRR for five minute settlement option for Loads Sep-12 Mark Smith
Floyd Trefny Eric R, Parviz A, Ed E, Nelson N, John V Draft Whitepaper
10 Review DR components of CDR and SARA Suggest improvements if necessary Sep-12 Cyrus R Jay Z, Manny M
11 4CP / Price Response Study Write NPRR requiring a public version of this report to be posted Jun-12 Jay Z Eric R, Ed E, John S, Floyd T
NPRR being re-examined; Survey sent
12 Expand Sources of Frequency Data for UFR Events
Formulate recommendation to ERCOT for use of additional TDSP data Dec-12 John Varnell Ed E
Resource Performance Information
Demand Side Working Group 07-20-126
o ERS Protocols allow for penalties in the event of QSE-level portfolio failureo QSEs need protection from poorly performing ERS Loads or ERS Generators rotating through different QSEso Simple solution: results of ERID process provides results ofo Each ESIIDo Each historical contract period
o Suggest nine codes:
o Initially discussed in April DSWGo ERCOT to review privacy/administration concerns
Future Meetingso Demand Side Working Group
o 8/24/12 9:30 a.m. to 3:30 p.m. ERCOT Met 206B
Demand Side Working Group 07-20-127
Chair Contact Information
Tim Carter713-646-5476
Demand Side Working Group 07-20-128