deer lake oil & gas i deer lake oil & gas e · top log interval bottom log interval...

26
5,4 NOR Elev GROUND LEVEL Permanent Datum: Elev 2000-120-01-01 API Serial No. Field: Location: Well: Company: NEWFOUNDLAND EXPLORATORY DEER LAKE OIL & GAS ET AL WESTERN ADV DEER LAKE OIL & GAS INC. LOCATION ROB TAYLOR KELLI SASCO DARTMOUTH 19 6:30 3-AUG-2000 22:00 2-AUG-2000 22 degC 22 @ 22 @ 0.452 NO SAMPLE NO SAMPLE @ @ 15 degC @ 0.539 ohm.m MEASURED 35 s 1044 kg/m3 POT. SULFATE 96.000 mm 218 m 218 m @ 114.300 mm 218 m 868 m 872 m 1 3-AUG-2000 Witnessed By Recorded By Location Unit Number Time Logger On Bottom Time Circulation Stopped Maximum Recorded Temperatures RMF @ MRT RM @ MRT RMC Source RMF RMC @ Measured Temperature RMF @ Measured Temperature RM @ Measured Temperature Source Of Sample PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date DRILL FLOOR Drilling Measured From: 2.5 DRILL FLOOR Log Measured From: PROVINCE: NEWFOUNDLAND PROVINCE: EXPLORATORY FIELD: WELL: DEER LAKE OIL & GAS IN COMPANY: DEER LAKE OIL & GAS ET WESTERN ADVENTURE NO 873.5 m NORTHING: 5,456,519 EASTING: 482,797 DUAL LATER

Upload: others

Post on 10-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

5,4N

OR

Elev

GR

OU

ND

LEV

EL

Perm

anent Datum

:

Ele v

2000-120-01-01A

PI S

erial No.

Field:

Location:

Well:

Company:

NEWFOUNDLAND

EXPLORATORY

DEER LAKE OIL & GAS ET AL WESTERN ADV

DEER LAKE OIL & GAS INC.

LOCATION

RO

B T

AY

LOR

KE

LLI SA

SC

OD

AR

TM

OU

TH

196:30

3-AU

G-2000

22:002-A

UG

-200022 degC

22 @

22 @

0.452N

O S

AM

PLE

NO

SA

MP

LE@ @

15 degC@

0.539 ohm.m

ME

AS

UR

ED

35 s1044 kg/m

3P

OT

. SU

LFA

TE

96.000 mm

218 m218 m

@114.300 m

m218 m868 m

872 m1 3-A

UG

-2000

Witnessed B

yR

ecorded By

LocationU

nit Num

berT

ime

Logger On B

ottomT

ime

Circulation S

topped M

aximum

Recorded T

emperatures

RM

F @

MR

TR

M @

MR

TR

MC

Source R

MF

RM

C @

Measured T

emperature

RM

F @

Measured T

emperature

RM

@ M

easured Tem

peratureS

ource Of S

ample

PH

Fluid Loss

Viscosity

Density

MUD Type F

luid In Hole

Bit S

izeC

asing Schlum

bergerC

asing Driller S

ize @ D

epthT

op Log IntervalB

ottom Log Interval

Schlum

berger Depth

Depth D

rillerR

un Num

berLogging D

ate

DR

ILL FLO

OR

Drilling M

easured From

:

2.5 D

RILL F

LOO

RLog M

easured From

:

PROVINCE:

NE

WF

OU

ND

LA

ND

PR

OV

INC

E: E

XP

LO

RA

TO

RY

FIE

LD

:

WE

LL

:

DE

ER

LA

KE

OIL

& G

AS

INC

OM

PA

NY

:DE

ER

LA

KE

OIL

& G

AS

ET

WE

ST

ER

N A

DV

EN

TU

RE

NO

873.5 m

NO

RT

HIN

G: 5,456,519

EA

ST

ING

: 482,797

DU

AL

LA

TE

R

Page 2: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

482,797E

AS

TIN

G:

456,519R

TH

ING

:

v.:90 m

v.:

3RD DESCENT: COMPENSATED NEUTRON, LITHO DENSITY, GR2ND DESCENT: BHC SONIC, GR1ST DESCENT: DUAL LATEROLOG, GR

REMARKS: RUN NUMBER 1 REMARKS: RUN NUMBER 2OS5: OS5:

LITHO DENSITYOS4: OS4:COMPENSATED NEUTRONOS3: OS3:BHC SONICOS2: OS2:DUAL LATEROLOGOS1: OS1:

OTHER SERVICES1 OTHER SERVICES2

ALL INTERPRETATIONS ARE OPINIONS BASED ON INFERENCES FROM ELECTRICAL OR OTHER MEASUREMENTS AND WE CANNOT, AND DO NOT GUARANTEE THE ACCURACY OR CORRECTNESS OF ANY INTERPRETATIONS, AND WE SHALL NOT, EXCEPT IN THE CASE OF GROSS OR WILLFUL NEGLIGENCE ON OUR PART, BE LIABLE OR RESPONSIBLE FOR ANY LOSS, COSTS, DAMAGES OR EXPENSES INCURRED OR SUSTAINED BY ANYONE RESULTING FROM ANY INTERPRETATION MADE BY ANY OF OUR OFFICERS, AGENTS OR EMPLOYEES. THESE INTERPRETATIONS ARE ALSO SUBJECT TO CLAUSE 4 OF OUR GENERAL TERMS AND CONDITIONS AS SET OUT IN OUR CURRENT PRICE SCHEDULE.

Run 1

Run 2

Run 3

Run 4

@@

@ @ @ @

@@

@ @ @ @

Witnessed B

yR

ecorded By

LocationU

nit Num

berT

ime

Logger On B

ottomT

ime

Circulation S

topped M

aximum

Recorded T

emperatures

RM

F @

MR

TR

M @

MR

TR

MC

Source R

MF

RM

C @

Measured T

emperature

RM

F @

Measured T

emperature

RM

@ M

easured Tem

peratureS

ource Of S

ample

PH

Fluid Loss

Viscosity

Density

MUD Type F

luid In Hole

Bit S

izeC

asing Schlum

bergerC

asing Driller S

ize @ D

epthT

op Log IntervalB

ottom Log Interval

Schlum

berger Depth

Depth D

rillerR

un Num

berLogging D

ate

@@

@ @ @ @ 90 mG

.L.

92.5 mK

.B.

92.5 mD

.F.

above Perm

. Datum

m

NC

.

T A

LO

. 1

RO

LO

G

Final Print

Page 3: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

RUN 1 RUN 2

CREW 19: OTTO MARSHALL, MIKE DIGGDON

RIG:: LONGYEAR SUPER 50

SCALES AND INTERVALS AS PER CLIENT REQUEST

CEMENT VOLUME BASED ON 66.7MM PRODUCTION CASING

STOP STOPSTART STARTLOGGED INTERVAL LOGGED INTERVALFLUID LEVEL: FLUID LEVEL:

9C0-413PROGRAM VERSION: PROGRAM VERSION:6418543SERVICE ORDER #: SERVICE ORDER #:

RUN 1 RUN 2EQUIPMENT DESCRIPTION

DOWNHOLE EQUIPMENT

11.70MDLT-A MDLH-AMDLI-AAH-189MDLH-BMDLC-AMDLS A

14.14DTA-A ECH-KEDTA-A

14.39AH-216

14.94AH-201 AH-201

17.29STGC-B STGH-B 8007STGC0-ASTGC1-B

18.20LEH-ST LEH-ST

42.59BSP BRT-S

14.94TelStatus

16.30CTEM 16.77Gamma Ray

24.42SP SPARC

SURFACE EQUIPMENTLCM-AAWITM (DTS)-A

DOWNHOLE EQUIPMENT

11.70MDLT-A MDLH-AMDLI-AAH-189MDLH-BMDLC-AMDLS A

14.14DTA-A ECH-KEDTA-A

14.39AH-216

14.94AH-201 AH-201

17.29STGC-B STGH-B 8007STGC0-ASTGC1-B

18.20LEH-ST LEH-ST

42.59BSP BRT-S

14.94TelStatus

16.30CTEM 16.77Gamma Ray

24.42SP SPARC

SURFACE EQUIPMENTLCM-AAWITM (DTS)-A

Page 4: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

ALL LENGTHS IN METERSMEASUREMENTS RELATIVE TO TOOL ZERO

MAXIMUM STRING DIAMETER 86 MM

0.14BNS-CCS

MDLS-AMDLE

TOOL ZERO0.00Tension ACCZ

HV DF

4.56LLD LLS

ALL LENGTHS IN METERSMEASUREMENTS RELATIVE TO TOOL ZERO

MAXIMUM STRING DIAMETER 86 MM

0.14BNS-CCS

MDLS-AMDLE

TOOL ZERO0.00Tension ACCZ

HV DF

4.56LLD LLS

Page 5: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

Input DLIS FilesDEFAULT MDLT .004 FN:3 PRODUCER 03-Aug-2000 06:17 874.3 M 69.8 M

OP System Version: 9C0-413MCM

Page 6: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

500

450

400

Page 7: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

650

600

550

Page 8: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

850

800

750

700

Page 9: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

OP System Version: 9C0-413MCM

MDLT-A OP9-KP2 DTA-A OP9-KP2STGC-B OP9-KP2 BSP OP9-KP2

Input DLIS FilesDEFAULT MDLT .004 FN:3 PRODUCER 03-Aug-2000 06:17 874.3 M 69.8 M

Input DLIS FilesDEFAULT MDLT .004 FN:3 PRODUCER 03-Aug-2000 06:17 874.3 M 69.8 M

OP System Version: 9C0-413MCM

MDLT-A OP9-KP2 DTA-A OP9-KP2STGC-B OP9-KP2 BSP OP9-KP2

Format: DLT_DST_1 Vertical Scale: 1:600 Graphics File Created: 03-Aug-2000 07:28

Parameters

DLIS Name Description ValueBS Bit Size 96.000 MMDO Depth Offset 0.0 MDORL Depth Offset Repeat Analysis 0.0 MDPRF DEEP REFERENCE POWER 550 NWKFAC K FACTOR SONDLLOO LATEROLOG LOOP OFFPLRM POWER LOOP REFERENCE MODE DEEPPP Playback Processing NORMALSPNV SP Next Value -25 MVSPRF SHALLOW REFERENCE POWER 550 NW

Bit Size (BS)(MM)75 275

Gamma Ray (GR_STGC)(GAPI)0 150

Laterolog Deep Resistivity (LLD)(OHMM)0.2 2000

Laterolog Shallow Resistivity (LLS)(OHMM)0.2 2000

SP (SP)(MV)-80 20

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

Bit Size (BS)(MM)75 275

Gamma Ray (GR_STGC)(GAPI)0 150

Laterolog Deep Resistivity (LLD)(OHMM)0.2 2000

Laterolog Shallow Resistivity (LLS)(OHMM)0.2 2000

SP (SP)(MV)-80 20

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

MAIN PASS

<--TD-->

Page 10: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

( )

75

100

125

MAIN PASS

Page 11: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

200

175

150

GAMMA RAY LOGGED TO SURFACE

Page 12: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

250

225

<--CD-->

Page 13: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

325

300

275

Page 14: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

400

375

350

Page 15: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

450

425

Page 16: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

525

500

475

Page 17: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

600

575

550

Page 18: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

650

625

Page 19: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

725

700

675

Page 20: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

800

775

750

Page 21: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

850

825

FR-->

FR-->

FR SP-->

Page 22: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

OP System Version: 9C0-413MCM

MDLT-A OP9-KP2 DTA-A OP9-KP2STGC-B OP9-KP2 BSP OP9-KP2

Input DLIS FilesDEFAULT MDLT .003 FN:2 PRODUCER 03-Aug-2000 06:05 874.8 M 784.9 M

Input DLIS FilesDEFAULT MDLT .004 FN:3 PRODUCER 03-Aug-2000 06:17 874.3 M 69.8 M

OP System Version: 9C0-413MCM

MDLT-A OP9-KP2 DTA-A OP9-KP2STGC-B OP9-KP2 BSP OP9-KP2

Format: DLT_DST Vertical Scale: 1:240 Graphics File Created: 03-Aug-2000 07:28

Parameters

DLIS Name Description ValueBS Bit Size 96.000 MMDO Depth Offset 0.0 MDORL Depth Offset Repeat Analysis 0.0 MDPRF DEEP REFERENCE POWER 550 NWKFAC K FACTOR SONDLLOO LATEROLOG LOOP OFFPLRM POWER LOOP REFERENCE MODE DEEPPP Playback Processing NORMALSPNV SP Next Value -25 MVSPRF SHALLOW REFERENCE POWER 550 NW

BS_REP Curve (BS_REP)(MM)75 275

GR_STGC_REP Curve (GR_STGC_REP)(GAPI)0 150

LLD_REP Curve (LLD_REP)(OHMM)0.2 2000

LLS_REP Curve (LLS_REP)(OHMM)0.2 2000

SP_REP Curve (SP_REP)(MV)-80 20

TENS_REP Curve (TENS_REP)

(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

Bit Size (BS)(MM)75 275

Gamma Ray (GR_STGC)(GAPI)0 150

Laterolog Deep Resistivity (LLD)(OHMM)0.2 2000

Laterolog Shallow Resistivity (LLS)(OHMM)0.2 2000

SP (SP)(MV)-80 20

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

MAIN PASS<--TD-->

Page 23: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

SLIM Telemetry Gamma-ray Cartridge - B / Equipment Identification

Primary Equipment:STGC Gamma-ray & Accelerometer Cartridge STGC - BSTGC Telemetry Cartridge STGC - A

Auxiliary Equipment:SLIM Electronics Cartridge Housing STGH - B 8007

MEDIUM DUAL LATEROLOG - A / Equipment Identification

Primary Equipment:

Auxiliary Equipment:Medium Dual Laterolog Electrode MDLE - Medium Dual Laterolog Sonde MDLS - AMedium Dual Laterolog Housing B MDLH - BMedium Dual Laterolog Cartridge MDLC - AAdapter Head 189 AH - 189Medium Dual Laterolog Housing A MDLH - AMedium Dual Laterolog Digital Interface MDLI - ALaterolog Control Module LCM - AA

Gamma Ray (Calibrated) 155.1 N/A 155.1 N/A N/A 15.00 GAPIGamma Ray (Jig - Bkg) 149.1 N/A 149.1 N/A N/A 13.55 GAPI

Before: 1-AUG-2000 14:44 SLIM Telemetry Gamma-ray Cartridge - B Wellsite Calibration - Detector Calibration

MEASURED LLS 31.62 N/A 0 N/A N/A 0.9000 OHMMMEASURED LLD 31.62 N/A 0 N/A N/A 0.9000 OHMM

Before: Calibration not done MEDIUM DUAL LATEROLOG - A Wellsite Calibration - DLT ELECTRONICS CALIBRATION Laterolog Measurement

Measurement MasterNominal Before After Change Limit Units

y

Before: 1-AUG-2000 14:44

Phase

Before

Gamma Ray Background GAPI

(Minimum) 0

(Nominal) 30.00

(Maximum) 120.0

Value

47.68

Phase

Before

Gamma Ray (Jig - Bkg) GAPI

(Minimum) 135.5

(Nominal) 149.1

(Maximum) 162.6

Value

149.1

Phase

Before

Gamma Ray (Calibrated) GAPI

(Minimum) 140.1

(Nominal) 155.1

(Maximum) 170.1

Value

155.1

Detector Calibration

SLIM Telemetry Gamma-ray Cartridge - B Wellsite Calibration

DUAL LATEROLOG

COMPANY:

WELL:

FIELD:

PROVINCE:

DEER LAKE OIL & GAS INC. BOTTOM LOG INTERVAL 868 m

SCHLUMBERGER DEPTH

DEPTH DRILLER 872 m

KELLY BUSHING 92.5 m

DRILL FLOOR 92.5 m

GROUND LEVEL 90 m

DEER LAKE OIL & GAS ET AL WESTERN ADVENTURE NO. 1

NEWFOUNDLAND

EXPLORATORY

873.5 m

Page 24: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

Input DLIS FilesDEFAULT MDLT .003 FN:2 PRODUCER 03-Aug-2000 06:05 874.8 M 784.9 M

OP System Version: 9C0-413MCM

MDLT-A OP9-KP2 DTA-A OP9-KP2STGC-B OP9-KP2 BSP OP9-KP2

Format: DLT_DST_REP Vertical Scale: 1:240 Graphics File Created: 03-Aug-2000 07:28

Calibration and Check Summary

Parameters

DLIS Name Description ValueBS Bit Size 96.000 MMDO Depth Offset 0.0 MDORL Depth Offset Repeat Analysis 0.0 MDPRF DEEP REFERENCE POWER 550 NWKFAC K FACTOR SONDLLOO LATEROLOG LOOP OFFPLRM POWER LOOP REFERENCE MODE DEEPPP Playback Processing NORMALSPNV SP Next Value -25 MVSPRF SHALLOW REFERENCE POWER 550 NW

BS_REP Curve (BS_REP)(MM)75 275

GR_STGC_REP Curve (GR_STGC_REP)(GAPI)0 150

LLD_REP Curve (LLD_REP)(OHMM)0.2 2000

LLS_REP Curve (LLS_REP)(OHMM)0.2 2000

SP_REP Curve (SP_REP)(MV)-80 20

TENS_REP Curve (TENS_REP)

(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

REPEAT ANALYSIS

Page 25: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

MCM

MDLT-A OP9-KP2 DTA-A OP9-KP2STGC-B OP9-KP2 BSP OP9-KP2

Bit Size (BS)(MM)75 275

Gamma Ray (GR_STGC)(GAPI)0 150

Laterolog Deep Resistivity (LLD)(OHMM)0.2 2000

Laterolog Shallow Resistivity (LLS)(OHMM)0.2 2000

SP (SP)(MV)-80 20

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

100

150

MAIN PASS

GAMMA RAY LOGGED TO SURFACE

Page 26: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date ... CEMENT VOLUME BASED ON 66.7MM PRODUCTION

350

300

250

200

<--CD-->