2009 Capt. Kelvin L. Davis BGSU Fire Instructor Class Burn Date 7/8/2009 Maumee Training Facility 700 Mingo Drive, Maumee, OH 43537 Acquired Structure Site Plan

Upload: kelvindavis

Post on 19-Jul-2015

122 views

Category:

Documents


0 download

TRANSCRIPT

2009

Capt. Kelvin L. Davis

BGSU Fire Instructor Class

Burn Date 7/8/2009

Maumee Training Facility 700 Mingo Drive, Maumee, OH 43537

Acquired Structure Site Plan

Title: Acquired Structure Site Plan

Section: Exterior Photos

Purpose: General InformationLesson: Hydraulic

VentilationPage: 1 of 9

Prepared By: Kelvin L. Davis Date: 5/21/09

A B

C D

Notes:

Exterior Dimensions - 34.6’ X 36.6’

Title: Acquired Structure Site Plan

Section: 1st Floor Interior

Purpose: General InformationLesson: Hydraulic

VentilationPage: 2 of 9

Prepared By: Kelvin L. Davis Date: 5/21/09

up

up

Notes:

Rooms - 10’ X 14’Windows - 3’6”Entry Doors – 42”Room Doors – 42” / 36”

A

BC

D34.6’

36.6’

Title: Acquired Structure Site Plan

Section: Interior Photos

Purpose: General InformationLesson: Hydraulic

VentilationPage: 3 of 9

Prepared By: Kelvin L. Davis Date: 5/21/09

up

Title: Acquired Structure Site Plan

Section: First Floor Roof

Purpose: General InformationLesson: Hydraulic

VentilationPage: 4 of 9

Prepared By: Kelvin L. Davis Date: 5/21/09

* A

BC

D

Notes:

Handrail around all of roof structure, landing and down stairs

up

up

Title: Acquired Structure Site Plan

Section: Second Floor Interior

Purpose: General InformationLesson: Hydraulic

VentilationPage: 5 of 9

Prepared By: Kelvin L. Davis Date: 5/21/09

* A

BC

D

Notes:

Handrail around all of roof structure, landing and down stairs

Inside Room 10’ X 14’

Outside dimensions of second floor 12’6” X 16’6”

Title: Acquired Structure Site Plan

Section: Photos of Exposures

Purpose: Exposure InformationLesson: Hydraulic

VentilationPage: 6 of 9

Prepared By: Kelvin L. Davis Date: 5/21/09

Notes:

E-1 House on “B” side is xxx from “AD” corner of structure

E-2 Structure is xxx from “AB” corner of Structure

E-3 Fence line from A side is 102’ from BC corner of structure

*

E-3

E-1E-2

Fire Flow DeterminationCalculation – (Building Length X Building Width) / 3 = GPM needed per floor.

(36.6’ X 34.6’) / 3 = GPM

1266.36 / 3 = GPM

422 GPM for the First Floor

(12.5’ X 16.5’) / 3 = GPM for second Floor

206.25 / 3 = 68.5 GPM for Second Floor

490.5 = GPM for Structure

50% Reserve GPM = 245.25

Total Required Flow (including reserve) = 735.75 GPM

AVAILABLE WATER SOURCES

Many hydrants are available around and near the structure with 5” Storz Fittings. Refer to Page 9 for specific locations indicated on map. Photo is Typical of all hydrants. Pressure for hydrants is 60psi and 1000gpm.

Two fire engines with pump capacity of flowing a total of 1000 gpm being supplied with 5” LDH each will be used to supply water. Each engine will be on a separate hydrant to prevent loss of water due to unforeseen reasons.

Title: Acquired Structure Site Plan

Section: 1st Floor Interior

Purpose: Fire Flow & Water RequirementsLesson: Hydraulic

VentilationPage: 7 of 9

Prepared By: Kelvin L. Davis Date: 6/11/09

Title: Acquired Structure Site Plan

Section: 1st Floor Interior

Purpose: Location of Fire Set & Interior PersonnelLesson: Hydraulic

VentilationPage: 8 of 9

Prepared By: Kelvin L. Davis Date: 6/11/09

up

up

Notes:

Ventilation to be conducted out of window on “B” side of structure

Red Line indicates “Backup Charged Line”, Orange indicates “RIT Charged Line”

Evacuation to meet by Command Post in designated area

This is based on wind direction from the DC side of building. This will be adjusted if wind shifts.

A

B

C

D

• Safety Officer• Instructor• Backup Crew w/Hose• RIT w/Hose Evacuation Route

E 2

E 1

E 3

CommandPost

Evacuation Area

Ingress of all Equipment

Egress of all Equipment

EMSStaging

Rehab & Personnel

Staging Area

Yellow IndicatesTaped Perimeter

Additional Equipment Staging Area

PressArea

Red Dots indicate

Hydrant Locations

Black Dots indicate lamp

posts

E1,E2 &E3Are exposures as indicated on

page 6

All Handlines are 1 ¾”

Supply Lines are 5" LDH

Title: Acquired Structure Site Plan

Section: Exterior Layout

Purpose: Location of Exterior Equipment & AreasLesson: Hydraulic

VentilationPage: 9 of 9

Prepared By: Kelvin L. Davis Date: 6/20/09