Date: 08.09.2008
To,
The Director,
Ministry of Environment & Forests,
‘PARYAVARAN BHAVAN’
CGO Complex, Lodhi Road,
New Delhi 110 033
Sub: Application for environmental clearance for our proposed expansion plant of
Epoxidized Soya bean oil (Epoxy plasticizer) at our existing plant located at Plot. No.
57/D/A, 1st phase, Industrial estate, GIDC Vapi 396 195. Di: Valsad. Gujarat.
Respected Sir,
With reference to the above subject, we would like to state that, at present, we are engaged
in the manufacturing of Epoxidized Soya bean oil (Epoxy plasticizer) with capacity of
54 TPM at our unit located at Plot. No. 57/D/A, 1st phase, Industrial estate, GIDC Vapi
396 195. Di: Valsad. Gujarat.
Now we wish to expand our production capacity of Epoxidized Soya bean oil (Epoxy
plasticizer) at our existing plant located in notified industrial area, GIDC Vapi, Di: Valsad,
State: Gujarat.
We are submitting herewith the following details
1. Form No.1 along with Details. (Page No. 01 to 38).
2. Draft Terms of Reference (TOR): (Page No. 39).
3. Project Feasibility Report: (Page No. 40 to 50).
We request you to kindly consider our case in B2 category & issue us Environmental
Clearance for our proposed plant.
Please do the needful & oblige.
Thanking You,
Yours Faithfully
FOR MAWELL ORGANICS PVT. LIMITED
DIRECTOR
APPENDIX I
FORM 1
(I) Basic Information
Name of the Project: M/s. Makwell Organics Pvt. Ltd.
Location / site alternatives under consideration:Plot No. 57/D/A, 1st
Phase,
GIDC Vapi,
Dist. Valsad, State: Gujarat,
India.
Phone: +91-260- 2423495
Fax: +91-260- 2423496
Email: [email protected]
Size of the Project: * organic chemicals
Existing: 54 TPM
Proposed: 946 TPM
TOTAL : 1000 TPM
Expected cost of the project: Total : Rs. 237 Lacs
Existing : Rs. 97 Lacs
Proposed : Rs. 140 Lacs
Contact Information: Mr. Hiren Thakkar (Director)
Mobile No. : +91-98922 27171
Screening Category: Category B, 5(f), as the unit is
Located in notified area.
• Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining
lease area and production capacity for mineral production, area for mineral exploration, length for
linear transport infrastructure, generation capacity for power generation etc.,}
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical
changes in the locality (topography, land use, changes in water bodies, etc.)
Sr.
No.
Information/Checklist confirmation Yes/No? Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
1.1 Permanent or temporary change in land
use, land cover or topography including
increase in intensity of land use (with respect to local
land use plan)
No The plant is located in Notified
Industrial zone of GIDC Vapi.
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil
testing? No
1.5 Construction works? No Existing buildings shall be utilized for
the Proposed plant. No new civil
construction is required. Suitable
modification in MS structure shall be
carried out. Layout Plan is Attached as
Annexure 1
1.6 Demolition works? No Suitable modification in MS structure
shall be carried out.
1.7
Temporary sites used for construction workers or
housing of construction workers? No
Not required as local laborers shall be
employed.
1.8 Above ground buildings, structures or Earthworks
including linear structures, cut and fill or excavations Yes
As per GIDC approved Plan in existing
shed, Attached as Annexure 1
1.9
Underground works including mining or tunneling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing Yes
As per List of Product attached as
Annexure 2.
1.14 Facilities for storage of goods or materials? Yes As per Table attached as Annexure 3
1.15
Facilities for treatment or disposal of solid waste or
liquid effluents?
Yes Effluent treatment plant shall be
modified for the proposed quantity of
industrial effluent. The treated effluent
shall be sent to CETP for further
treatment and disposal. And
solid/hazardous waste shall be disposed
into approved TSDF site of M/s.
VWEMCL, GIDC Vapi.
1.16 Facilities for long term housing of operational No Local people will be employed as
workers? workers.
1.17 New road, rail or sea traffic during construction or
operation?
No Developed Industrial Area with
infrastructure facilities.
1.18 New road, rail, air waterborne or other airports etc? No Developed Industrial Area with
infrastructure facilities.
1.19 Closure or diversion of existing transport routes or
infrastructure leading to changes in traffic
movements?
No Developed Industrial Area with
infrastructure facilities.
1.20 New or diverted transmission lines or pipelines? No Developed Industrial Area with
infrastructure facilities.
1.21
Impoundment, damming, converting, realignment or
other changes to the hydrology of watercourses or
aquifers?
No Developed Industrial Area with
infrastructure facilities.
1.22 Stream crossings? No Developed Industrial Area with
infrastructure facilities.
1.23
Abstraction or transfers or the water form ground or
surface waters? Yes
No ground water shall be used. The
water shall be supplied by GIDC.
1.24
Changes in water bodies or the land surface affecting
drainage or run-off?
No No ground water shall be used. The
water shall be supplied by GIDC.
Separate rain water drains have been
provided. Treated effluent is sent to
CETP through underground pipeline.
1.25
Transport of personnel or materials for construction,
operation or decommissioning?
No Not applicable.
1.26 Long-term dismantling or decommissioning or
restoration works?
No Not applicable. No dismantling or
decommissioning is required for the
project.
1.27 Ongoing activity during decommissioning which could
have an impact on the environment?
No Not applicable.
1.28
Influx of people to an area in either temporarily or
permanently?
No Existing 25 numbers of locally
employed will be utilized.
1.29 Introduction of alien species? No
1.30 Loss of native species of genetic diversity? No
1.31 Any other actions? No
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or
energy, especially any resources which are non-renewable or in short supply):
Sr.
No
Information/checklist confirmation Yes/
No?
Details there of (with approximate
quantities/rates, wherever possible)
with source of information data
2.1 Land especially undeveloped or agriculture land (ha) No Site located in notified Industrial area of
GIDC Vapi.
2.2 Water (expected source & competing users) unit: KLD Yes Notified area authority will supply total
water 13.262 KL/day. Notified area takes
its water from the weir storage
constructed on the river Damanganga.
2.3 Minerals (MT) No
2.4
Construction material -stone, aggregates, sand / soil
(expected source MT)
Yes Existing buildings shall be utilized for
proposed plant. Necessary modification in
MS structure shall be carried out.
2.5 Forests and timber (source - MT) No No forest resource or timber will be used
in the project.
2.6
Energy including electricity and fuels )source,
competing users) Unit: fuel (MT), energy (MW)
Yes Power requirement : Existing : 60 HP+
Proposed : 40 HP= TOTAL : 100 HP power
is required for Proposed Expansion plant)
Coal : 50 TPM
HSD : 15 KG/HR
2.7 Any other natural resources (use appropriates
standard units)
No
3. Use, storage, transport, handling or production of substances or materials, which could be harmful to
human health or the environment or raise concerns about actual or perceived risks to human health.
Sr. No. Information / Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates wherever possible)
with source of information data
3.1 Use of substances or materials, which are hazardous
(as per MSIHC rules) to human health or the
environment (flora, fauna, and water supplies)
Yes
List hazardous raw material is attached at
Annexure 3.
3.2 Changes in occurrence of disease or affect disease
vectors (e.g. insect or water borne diseases)
No Not applicable.
3.3 Affect the welfare of people e.g. by changing living
conditions?
No The site is in notified industrial area of
GIDC Vapi, thus there will not be change
in living condition of the people in the
nearby vicinity. The expansion will
generate employment opportunity for
local people.
3.4
Vulnerable groups of people who could be affected
by the project e.g. hospital patients, children, the
elderly etc.,
No The site is in notified industrial area of
GIDC Vapi, The nearest town is 3.0 km
having population of about 1.25 lacs
people.
3.5 Any other causes No
4. Production of solid wastes during construction or operation or decommissioning MT/month)
Sr. No. Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable.
4.2
Municipal waste (domestic and or commercial
wastes) No Not applicable.
4.3
Hazardous wastes (as per Hazardous Waste
Management Rules)
Yes The list of hazardous waste is attached as
Annexure 4. The company has a
membership of approved TSDF facility of
M/s VWEMCL, GIDC Vapi for disposal of
their waste.
4.4 Other industrial process wastes Yes The list of other hazardous waste
generated is attached as Annexure 4. The
company has a membership of approved
TSDF facility of M/s VWEMCL, GIDC Vapi,
for disposal of their waste.
4.5 Surplus product Yes There will be no surplus products
4.6
Sewage sludge or other sludge from effluent
treatment
Yes Attached Annexure as 4
4.7 Construction or demolition wastes No No new construction or demolition
required. Existing buildings shall be
utilized for proposed plant. Necessary
modification in MS structure shall be
carried out.
4.8 Redundant machinery or equipment
No
Small reactors shall be partly utilized and
remaining unusable reactors shall be sold
to scrap dealers after thorough cleaning.
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sr. No. Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
5.1 Emissions from combustion of fossil fuels From
stationary or mobile sources
Yes Emission from steam boiler, Thermopak
& D G set from coal & HSD firing in the
form of PM, RSPM, SOx, NOx, but they
will be well within GPCB norms. Attached
as Annexure 5. Suitable chimney height
shall be provided.
5.2 Emissions from production processes No There is no process gas emission.
5.3 Emissions from materials handling including storage or
transport
Yes All mitigation measures as proposed in
the Risk assessment report shall be
appropriately taken. There is no used of
solvent
5.4 Emissions from construction activities including plant
and equipment
No No construction is required.
5.5
Dust or odours from handling of materials including
construction materials, sewage and waste
No No construction is required.
All the waste shall be stored in designated
place and shall be transported to TSDF
site in approved closed vehicles owned by
the TSDF authority.
5.6 Emissions from incineration of waste No Not applicable.
5.7 Emissions from burning of waste in open air (e.g. slash
materials, construction debris)
No No open burning of waste is permitted.
5.8 Emissions from any other sources No
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Sr. No. Information/Checklist confirmation Yes/
No?
Details there of (with approximate
Quantities /rates, wherever possible)
With source of source of information
data
6.1
From operation of equipment e.g. engines, ventilation
plant, crushers
Yes Expected Noise monitoring results are
shown in table attached as Annexure 6.
All precautionary measures like acoustic
enclosure, anti vibrating pad/foundation
for equipments etc shall be taken.
6.2 From industrial or similar processes Yes Expected Noise monitoring results are
shown in table attached as Annexure 6.
All precautionary measures like acoustic
enclosure, anti vibrating pad/foundation
for equipments etc shall be taken.
6.3 From construction or demolition No
No new construction or demolition
required. Existing buildings shall be
utilized for proposed plant. Small reactors
shall be replaced by bigger size reactors
and necessary modification in MS
structure shall be carried out.
6.4 From blasting or piling No
6.5 From construction or operational traffic No
6.6 From lighting or cooling systems No
6.7 From any other sources No
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,
surface waters, groundwater, coastal waters or the sea:
Sr. No Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
7.1
From handling, storage, use or spillage of hazardous
materials
No Hazardous material shall be stored in
designated storage area with bund walls
for tanks. Other material will be stored in
bags/drums on pallets with concrete
flooring and no spillage is likely to occur.
All liquid raw materials shall be
transported through pumps and closed
pipelines and no manual handling shall be
involved.
7.2
From discharge of sewage or other effluents to water
or the land (expected mode and place of discharge)
No Treated effluent shall be discharged into
under ground drainage line to CETP, Vapi
for further treatment and disposal to
estuary of River Damanganga, finally
meeting Arabian sea.
7.3
By deposition of pollutants emitted to air into the
land or into water
No The factory is located in notified
industrial area of GIDC, Vapi. The
emissions shall conform the GPCB / CPCB
norms. The effluent shall be treated and
shall be sent to CETP for further
treatment through under ground
drainage line and finally the treated
effluent shall be discharged into tidal
zone of river Damanganga meeting
Arabian sea.
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollution in the
environment from these sources?
No
Full- fledged Environmental Management
System (EMS) will be installed. I.e. ETP,
Air Pollution Control systems, Solid
Hazardous Waste Handling and
Management as per norms, etc which will
eliminates the possibility of building up of
pollution.
8. Risks of accident during construction or operation of the Project, which could affect human health or the
environment:
Sr. No Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
8.1 From explosions, spillages, fires etc from storage,
handling, use or production of hazardous substances
Yes Summary of The risk assessment reports
is attached. Mitigations measures shall be
taken as per the report. Annexure 7.
8.2 From any other causes No
8.3 Could the project be affected by natural disasters
causing environmental damage (e.g. floods,
earthquakes, landslides, cloudburst etc)?
No There is no history of flood in GIDC Vapi.
The buildings are designed considering
seismic zone III which is not earthquake
prone area.
The land is plain terrain – no scope of
landslide.
This area is having moderate rainfall and
there is no history of cloudburst.
9. Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned activities in
the locality
Sr.
No.
Information/Checklist confirmation Yes/
No?
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
9.1 Lead to development of supporting. laities, ancillary
development or development stimulated by the
project which could have impact on the environment
e.g.:
* Supporting infrastructure (roads, power supply,
waste or waste water treatment, etc.)
• housing development
• extractive industries
• supply industries
• other
No Site is located in Notified Industrial area
of GIDC Vapi.
This industrial zone is having existing road
infrastructure, power supply, CETP, and
Common TSDF which are to be utilized.
Local people will be employed.
9.2
Lead to after-use of the site, which could have an
impact on the environment
No The treated effluent shall be sent to CETP
for further treatment and final disposal to
tidal zone of river Damanganga. The
hazardous waste shall be disposed to
common TSDF site of VWEMCL.
9.3 Set a precedent for later developments No
9.4 Have cumulative effects due to proximity to Other
existing or planned projects with similar effects
No The proposed ETP shall be designed in
such a way that the treated effluent
conforms to the statutory requirements.
The treated effluent shall be discharged
to CETP for further treatment and
disposal. The load of 17.234 kl/day of the
project will be taken by the ETP.
There is no process gas emission.
The common TSDF site of VWEMCL, Vapi
is also adequate to take the additional
load of the project.
The CETP capacity is suitably expanded by
the CETP authority.
The common TSDF site of VWEMCL is also
adequate to take the additional load of
the project.
(III) Environmental Sensitivity
Sr. No Information/Checklist confirmation Name /
Identity
Aerial distance (within 25 km). Proposed
Project Location Boundary.
1 Areas protected under international conventions
national or local legislation for their ecological,
landscape, cultural or other related value
Nil Site is located in Notified Industrial Area
of GIDC Vapi.
2 Areas which are important or sensitive for Ecological
reasons - Wetlands, watercourses or other water
bodies, coastal zone, biospheres, mountains, forests
Nil - do -
3 Areas used by protected, important or sensitive
species of flora or fauna for breeding, nesting,
foraging, resting, over wintering, migration
Nil - do -
4 Inland, coastal, marine or underground waters Yes Arabian Sea – 12.0 km
Damanganga River – 3.5 km
5 State, National boundaries Yes Maharashtra State Boundary – 15 km
Dadra & Nagar Haveli (UT) – 10 km
6 Routes or facilities used by the public for to recreation
or other tourist, pilgrim areas.
Nil
7 Defense installations Nil Daman Coast Guard Station is 12 km
away.
8 Densely populated or built-up area Yes Vapi GIDC and Vapi Town – 1.25 Lakhs
population at 1.0 km
9 Areas occupied by sensitive man-made land
community facilities)
Nil The site is located in notified industrial
area of GIDC Vapi.
10 Areas containing important, high quality or scarce
resources (ground water resources, surface
resources, forestry, agriculture, fisheries, tourism,
tourism, minerals)
Yes
The project shall not use any ground
water.
The nearest surface resource is river
Damanganga where the treated effluent
conforming GPCB standard, from CETP is
discharged.
The project being in notified industrial
area does not affect agricultural land.
Daman Port is 12 km which is having
fisheries and tourism activities.
11 Areas already subjected to pollution or
environmental damage. (those where existing legal
environmental standards are exceeded)
Nil Site is located in Notified Industrial Area
of GIDC Vapi.
12
Areas susceptible to natural hazard which could
cause the project to present environmental problems
(earthquakes, subsidence, landslides, erosion,
flooding or extreme or adverse climatic conditions)
Nil
The area falls under seismic zone III
which is non earthquake prone area.
The area is plain terrain with sandy loam
soil.
There is no heavy rain in the area and it is
away from coastal area. So erosion of
land is very little.
The area has no history of flooding in
GIDC Vapi area.
The climate of area is moderate. There is
no history of cloud burst.
LIST OF ANNEXURE
SR. NO.
ANNEXURE NO.
PARTICULARS PAGE NO.
1 - Application Form 1 to 11
2 Annexure: 1 Site plan, key plan, lay out plan with area table 12
3 Annexure: 2 List of Product with monthly Capacity, Mass balance, flow diagram & brief process
13 to 17
4 Annexure: 3 List of Raw Materials with Monthly Quantity & Details of safe storage & handling of Hazardous chemicals
18, 19
5 Annexure: 4 Details of hazardous waste generation, storage & disposal with TSDF membership certificate
20, 21
6 Annexure: 5 Details of flue gas & proposed pollution control equipment 22
7 Annexure: 6 Noise Level Monitoring 23
8 Annexure: 7 Executive Summary (Risk Assessment summary) 24 to 32
9 Annexure: 8 Water consumption & effluent generation & Water balance diagram
33,34
10 Annexure: 9 Characteristics of Untreated Effluent & treated effluent & membership certificate of CETP, Vapi
35,36
11 Annexure: 10 Details of Proposed Effluent Treatment Plant with flow diagram
37,38
12 Annexure: 11 Terms of Reference For Proposed Organic Chemical Plant 39
13 Annexure: 12 Project Feasibility Report 40 to 50
ANNEXURE: 2
LIST OF PRODUCTS AT EXISTING & PROPOSED SCENERIO WITH
MONTHLY CAPACITY
Sr. No. Product Existing Proposed Total After Expansion
1 Epoxy Plasticizer, TPM 54 946 1000
ANNEXURE:3
LIST OF RAW MATERIALS CONSUMPTION PER TONNE & PER MONTH OF PRODUCT
Sr. No. Raw Materials Quantity in MT Per tone per month
1.0 Soya bean oil 0.935 935.0 2.0 Hydrogen peroxide 0.299 299.0 3.0 Formic Acid 0.042 42.0 4.0 Caustic lye (100%) 0.014 14.0
ANNEXURE:3
DETAILS OF SAFE STORAGE & HANDLING OF HAZARDOUS CHEMICAL
No. Name of Finish Products
Quantity stored (MT) Place of Storage Standard operating
Pressure & temperature
Possible Type of Hazards
Control Measures Provided
Max. Actual
1 Soya Bean Oil 200.0 100.0 Storage tank Liquid at room temperature
Eye: Irritant, Animal tests
indicate lowest rating for corneal
injury
Move affected person to fresh air. In case of respiratory system or mucous membranes, or if you feel unwell or in case of prolonged
exposure, get medical attention
2 Hydrogen peroxide 100.0 50.0 HDPE carboys Liquid, Ambient temperature
Corrosive & irritant to
respiratory tract
Self contained breathing apparatus , protective clothing to prevent contact with
eye & skin 3 Formic acid 50.0 20.0 HDPE carboys Liquid, Ambient
temperature Corrosive &
Irritant Use water spray
4 Caustic lye 5.0 1.0 HDPE carboys liquid , Ambient Temperature
Corrosive & Irritant
Use water spray
ANNEXURE:2 A
MANUFACTURING PROCESS IN BRIEF
In a jacketed vessel fitted with stirrer, add Soya bean oil, heat it up to 45 0C. Then add slowly hydrogen peroxide & formic acid. Exothermic reaction takes place above 40 0C. Then start cooling through jacket. The total reaction time is 24 hrs. After that, keep for a layer separation. Bottom layer is taken into collection tank of ETP for treatment. Upper layer is neutralized with caustic lye. Then given wash of hot water. Further keep for a layer separation. Bottom layer mainly water is taken into collection tank of ETP for treatment. Steam is given to the upper layer for moisture removal. After removal of steam; mass is directly packed in a drum as a finished product.
ANNEXURE:8
WATER CONSUMPTION & EFFLUENT GENERATION IN M3/DAY AT EXISTING & AFTER PROPOSED EXPANSION
Sr. No.
Particulars Water Consumption Effluent Generation
Existing After expansion
Existing After expansion
1 Domestic 1.0 3.0 0.5 3.0 2 Processing 0 2.647 0 11.619 3 Boiler 0 3.0 0 1.5 4 Cooling 0 0.5 0 0.5 5 Product Washing 6.0 3.115 4.5 3.115 6 Floor/container
washing 0 0.5 0 0.5
7 Gardening 0.0 0.5 0 0 8 Total 7.0 13.262 5.0 20.234 Total Industrial 6.0 9.762 4.5 17.234
Note:
• At present, the unit is using steam from their sister concern unit. Now the unit proposes to install their own new steam boiler & cooling tower. Boiler condensate is recycled. Boiler blow down comes out as effluent.
• Presently the unit is not using any process water. Now unit proposes to use water for making solution of caustic lye.
• By process changing, the unit has reduced the wash water consumption.
ANNEXURE: 9
CHARACTERISTICS OF EFFLUENT
• Characteristics of Untreated Effluent:
No Effluent
parameters Domestic Process +
washing Boiler
+ cooling
Equip + floor +
cont. wash
Combined Effluent
1 pH 6.8 2.8 8.1 5.5 3.2 2 Color 80 50 60 100 75 3 TDS 800 3000 2400 2100 2850 4 S/S 255 564 121 456 306 5 Oil/grease 12.5 11.2 13.6 14.8 9.78 6 BOD - 2051 10 150 1860 7 COD - 4783 124 603 4528 8 Ammonical
nitrogen 25 ND 8 ND 17
9 Phenolic compound
ND ND ND ND ND
Chloride 120 1800 560 510 1250 Sulphate 180 125 240 180 180
10 Hydraulic load, lit/day
3000 14734 2000 500 20234
• Expected Characteristic of Treated Effluent:
No. Parameter Expected Results 1. pH 7.0 2. Colour 60 unit 3. S/S 56 mg/l 4 BOD 20-30 mgl 4. COD 200-250 mg/l 5 Ammonical nitrogen 10 mgl
• Mode of Disposal of Treated Effluent:
GIDC Vapi Effluent Drainage Line for further treatment in the CETP, for ultimate disposal into tidal zone of river Damanganga.
ANNEXURE: 10
DETAILS OF MODIFIED EFFLUENT TREATMENT PLANT
Average hydraulic load ,m3/day : 17.234 Design hydraulic load, m3/day : 20 Average BOD, mgl : 1860 Average COD, mgl : 4528 Design BOD load, kg/day : 37.2 Design COD load, kg/day : 90.56 COD after primary treatment, mgl : 2030 BOD after primary treatment, mgl : 832 Design BOD load on aeration tank, kg/day : (832-30)/1000 x 20 = 16.04
No Name of the unit Dimensions in meters
Capacity in m3
MOC Detention time in hrs Adequacy Reqd Prov.
1 Oil/grease trap 1x1.2x1.2 1 RCC 10 mts 1.2 hrs Adequate 2 Collection Tank 2 x 2.5 x 3.5 17.5 RCC 24 hrs 21 Adequate 3 Neutralization
Tank 1.0 dia x 1.25 1 RCC 1 hr 1.2 Adequate
4 Flash mixer/flocculator
channel
0.8 dia x 1.25 0.6 RCC 15 mt 0.72 hrs
Adequate
5 Primary Lamella Clarifier
1.25 x 1.25 x 2.5
3 MS/ epoxy
2 hr 3.6 Adequate
7 Lime slurry preparation tank
0.5 HDPE Adequate
8 FeSO4 tank 0.2 HDPE Adequate 9 PE tank 0.5 HDPE Adequate 10 Sludge Drying
Bed 5x5x1.2 25 Brick Adequate
11 Aeration tank 4 x3.5 (2.5 + 0.5)
35 RCC 40 hr 42 Adequate
12 Diffused Aeration system
lot HDPE Adequate
13 Air Blower 80cfm 3 HP CI Adequate 15 Secondary
Lamella 1.25x1.25x2.5 3 RCC 3 hr 3.6 Adequate
16 Holding tank 2 m3 HDPE Adequate 17 Filter pump 1.0 m3/hr CI Adequate 18 Sand filter 0.6 dia x 1.2 3.5 MS 3.2
m3/m2/hr 4.2
m3/m2/hr
Adequate
19 Act. Carbon filter 0.6 dia x 1.2 3.5 MS 3.2 m3/m2/hr
4.2 m3/m2
/hr
Adequate
ANNEXURE:5
DETAILS OF AIR POLLUTION & ITS CONTROL MEASURES Sr. No.
Item Boiler Thermopak D G set
1. Capacity 1000 kg/hr 4 lac k cal 125 KVA
2. Fuel Used Coal Coal HSD
3. Quantity 25 tones/M 25 tones/M 15 kgs/hr
4. APC Provided Multi cyclone
separator
Multi Cyclone Separator
Exhaust
5. Height of Chimney Common chimney 30 meters 5 meter
6. Dia of Chimney 800 mm 400 mm
7. Expected Emission PM : < 150 mg/Nm3
SOx: < 100 ppm
NOx: < 50 ppm
DETAILS OF MULTI CYCLONE SEPARATOR FOR COAL FIRED BOILER &
THERMOPAK
SR. NO.
PARTICULARS BOILER THERMOPAK
1 Capacity 1000 kgs/hr 4 lacs k cal 2 Fuel Used Coal coal 3 Fuel Consumption 1 MT/day 1 MT/day 4 Calorific Value 4200 kcal/kg 4200 k cal/kg 5 Inlet to dust collector 250 oC 245 0C 6 Stack Temperature 160 oC 135 oC 7 Diameter of chimney 800 mm 8 Flue gas Value 10500 m3/hr 9 I D Fan 10900 cfm 10 Efficiency 65 % 11 Stack height 30 meters 12 APC Multi Cyclone
Separator Multi Cyclone
Separator 13 Overall dimensions 1.2m x 1.2 m x 2.0 m 1.2m x 1.2 m x 2.0 m 14 No. of clones 9 9 15 Size of clone 125 mm 125 mm
ANNEXURE:4 DETAILS OF HAZARDOUS WASTE GENERATION, STORAGE & DISPOSAL
AFTER PROPOSED EXPANSION No Type of
waste Category Quantity Storage
area in m2 Disposal
1 ETP waste 34.3 2 MT /year 5 TSDF, Vapi 2 Spent oil 5.1 24 kg/Year 2 Sold to Registered
recyclers 3 Discarded
containers 33.3 2500
Nos/year 10 Used for packing of
finished product or Sold to authorized
recycler Note:
• Memebrship of TSDF of Vapi Waste and Effluent Management Co Ltd obtained for disposal of waste.
• Designated storage area provided as per the category of the waste with leachate collection and disposal to ETP.
ANNEXURE:6
EXPECTED NOISE LEVEL
Sr. NO.
Source Location Noise Level dB(A) Measures taken
Day Time
Night time
1 Pumps Near ETP 68.0 67.2 Regular maintenance
2 D.G Set Inside D.G set room 68.2 62.4 Acoustic enclosure
3 Boiler, Blower In boiler house 73.8 75.3 Separate room & regular
maintenance 4 Vehicles &
other Out side factory
premises 60.2 58.2 -
5 Process machineries
Inside production plant
70.3 69.2 Regular maintenance
Note:
• Earplugs provided to the D.G set operators. Regular maintenance of blowers, pumps are carried out. Closed room & acoustic enclosure for D.G set is provided.