data monitoring powerview settings guide (pv pro)

26
DATA MONITORING PowerView Settings Guide (PV PRO) Apple App Store Google Play Store

Upload: others

Post on 13-Apr-2022

39 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DATA MONITORING PowerView Settings Guide (PV PRO)

DATA MONITORING

PowerView Settings Guide

(PV PRO)

Apple App Store Google Play Store

Page 2: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 2

October 8, 2021

Table of Contents Introduction ..................................................................................................................................... 4

Reaching the Settings ................................................................................................................ 4

Settings in PowerView (PV Pro & www.mysol-ark.com) ............................................................. 6

Battery Settings ......................................................................................................................... 6

Battery Mode ........................................................................................................................... 6

Battery Capacity ...................................................................................................................... 7

Max A Charge ......................................................................................................................... 7

Max A Discharge ..................................................................................................................... 7

Battery Empty V (41-63V) ...................................................................................................... 7

Batt Resistance ........................................................................................................................ 7

Batt Charging Efficiency ......................................................................................................... 8

Batt Shutdown V/% ................................................................................................................. 8

Batt Low V/% .......................................................................................................................... 8

Batt Restart .............................................................................................................................. 8

Activate Battery ....................................................................................................................... 8

Float V ..................................................................................................................................... 9

Grid Charge ............................................................................................................................. 9

Gen Charge .............................................................................................................................. 9

Grid Signal / Gen Signal ........................................................................................................ 10

Equalization Days .................................................................................................................. 10

Equalization Hours ................................................................................................................ 10

Absorption V ......................................................................................................................... 10

Equalization V ....................................................................................................................... 10

TEMPCO ............................................................................................................................... 10

System Work Mode ................................................................................................................. 11

Work Mode ............................................................................................................................ 11

Most Common Combination ................................................................................................. 11

Max Sell Power ..................................................................................................................... 12

Energy Patterns ...................................................................................................................... 12

Time of Use ........................................................................................................................... 12

Application Case 1................................................................................................................. 15

Page 3: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 3

October 8, 2021

Application Case 2................................................................................................................. 16

Application Case 3................................................................................................................. 16

Grid Setting .............................................................................................................................. 18

Grid Mode.............................................................................................................................. 18

Power Factor (+/- 0.9 – 1.0) .................................................................................................. 18

Grid Reconnect Time ............................................................................................................. 18

Grid Frequency ...................................................................................................................... 18

Grid Type ............................................................................................................................... 18

Grid Vol High ........................................................................................................................ 19

Grid Vol Low......................................................................................................................... 19

Grid Hz High ......................................................................................................................... 19

Grid Hz Low .......................................................................................................................... 19

Zero Export Power................................................................................................................. 19

Gen Connect to Grid Input .................................................................................................... 19

L/HVRT (Low/high voltage ride-through settings) ............................................................... 19

L/HFRT (Low high-frequency ride-through settings) ........................................................... 19

Smart Load .............................................................................................................................. 20

Mode ...................................................................................................................................... 20

Basic Setting ............................................................................................................................. 22

Time ....................................................................................................................................... 22

Factory Reset ......................................................................................................................... 22

ARC Setup ............................................................................................................................. 22

Time Sync .............................................................................................................................. 22

Beep ....................................................................................................................................... 22

AM/PM .................................................................................................................................. 22

Auto-Dim ............................................................................................................................... 22

Advanced Setting ..................................................................................................................... 23

Gen Peak-Shaving ................................................................................................................. 23

Grid Peak-Shaving ................................................................................................................. 23

Parallel ................................................................................................................................... 24

Auto Detect Home Limit Sensors .......................................................................................... 25

Lock the Inverter ................................................................................................................... 26

Page 4: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 4

October 8, 2021

Introduction Each Sol-Ark includes a DB9 Port dongle to connect the inverter to the internet via Wi-Fi or

Ethernet.

The dongle uses the PowerView (PV Pro) platform to remotely monitor the inverter's data from

anywhere on Earth that has a stable internet connection.

PowerView is FREE for homeowners and installers. Installers need to contact us at www.sol-

ark.com/support to configure an installer account. You can download the app using the QR codes

found on the title page. You can find PowerView online through a PC / laptop using

www.mysol-ark.com

Reaching the Settings Under "My Plants" →"Plant List" → Select your plant

Once the plant is selected, click on equipment, and then the three green dots (ellipsis) will drop a

menu to access the parameter settings.

Page 5: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 5

October 8, 2021

It is essentially the same process if you wish to use a smartphone, as shown below:

Page 6: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 6

October 8, 2021

Settings in PowerView (PV Pro & www.mysol-ark.com)

Battery Settings

Battery Mode A. Lithium Batt: For batteries with a BMS that allows intercommunication

B. Batt V: Displays information in voltages on the home screen. Changes set points

such as TOU, shut down, restart, and low batt to work off voltage values.

C. Batt %: Displays information in percentages on the home screen. Changes all set

points such as TOU, shut down, restart, and low batt to work off percentage values.

D. No Battery: If you do not have batteries, you will need to check this box, or the system

will beep at you forever.

Page 7: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 7

October 8, 2021

Battery Capacity

This value is the Amp-hour rating for your attached battery bank. Calculate this value using the

spec sheet of the battery, depending on how many strings of batts you have in parallel. You

could also work backward from the KWh they have on the specs.

Max A Charge

Value places global limits on battery charging. TOU, grid sell, grid, or gen Charge settings (and

other charge settings) will not supersede this amount.

This value also sets PV → Battery charge rate. We suggest 20-30% of battery

capacity for lead-acid up to our inverter maximum of 185A.

Max A Discharge

Value places global limits on the battery discharging. TOU, grid sell, grid, or gen discharge

settings (and other discharge settings) will not supersede this amount.

The battery bank will discharge 120% of this value for 10 seconds before the inverter

shuts down to prevent battery damage in off-grid mode. Please do not exceed 185 A.

Battery Empty V (41-63V)

Crucial setting. More critical for lithium than it is for lead-acid. The value defines the floor (0%

State of Charge) for the algorithm that calculates the SOC. This value does not account for

temperature or resistance.

We do this because if you hit the equivalent of an attached BMS, this will disconnect from the

system outright. If for any reason, the battery spec sheet does not specify this value and you have

to guestimate, 46V-48V is typically a reasonable range for any lead-acid battery.

Please reach out to your battery manufacturer for this information.

We recommend airing on the higher voltages side because it is better to shut down the inverter

than the BMS. After all, the inverter will restart independently, though it is not a full power

down; instead, you will lose AC output.

Batt Resistance The resistance value we are assuming for the battery bank is in milliohms (mΩ). We use this

value to adjust all the other set points for the battery based on the resistance in real-time. If you

are in voltage mode and your set point at a particular voltage, the sol-ark will adjust that set point

in real-time based on the number of amps pulled out of the battery using Ohm's law.

Page 8: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 8

October 8, 2021

Lithium technology tends to have a lower resistance than lead-acid batteries, and more batts in

parallel lower the resistance value. This value includes the total resistance of the battery network

+ cables + any switches or additional elements. Usually, cable resistance is typically negligible

unless you use small wires.

Batt Charging Efficiency

It is a value used for the algorithm to calculate SOC. Most batteries have a 98% to 99% charging

efficiency; however, wet cells and Nickel-Iron chemistries are a notable exception with 80% or

less. This value is the one-way efficiency (not round-trip).

Batt Shutdown V/% If batts reach this value while discharging, the system will shut down. The battery will not restart

until you hit the restart voltage/percentage (Batt Restart value).

The system will not let you set this value higher than Batt Low V.

The gap between shutdown and restart should be reasonable because constant cycling

from On to Off quickly could hurt the batteries.

Batt Low V/% It is the value between shutdown and restart. If you reach this value while discharging, the

battery icon on the home screen will turn yellow to warn that your batteries are reaching a low

SOC.

The system will not let you set this value lower than Batt Shutdown or higher than Batt Restart.

It also serves as a set point for your peak shaving interactions. When enabled, Peak Shaving will

work down to this value. Nevertheless, TOU will only work until the batts reach the programmed

value (V/%) under TOU settings, not until hitting this value.

Batt Restart If the battery discharges to the Batt Shutdown value, the Sol-Ark will not restart until the battery

starts recharging and it reaches the Batt Restart value.

The system will not let you set this value lower than Batt Low V.

Activate Battery Enabling keeps the BMS awake and enables Dark Start capabilities.

Everyone should keep this ON. There is NO downside to having it ON.

Page 9: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 9

October 8, 2021

Float V This value comes from the customer's battery spec sheet. This value signifies whenever the

battery charging has reached its absorption value, and it drops down to float and hangs out at this

voltage.

Grid Charge Ensure your selection by pressing the "Ok" button.

Grid Start V or %: The value which batts must reach to start whole-home generators

connected through an automatic transfer switch. This value triggers a relay to start a generator

automatically when connected to a two-wire start appropriately.

Grid Start A: This value specifies how many amps you can pull specifically from the Grid

breaker into the batteries. If you have a generator connected to the grid input, you will also be

dealing with "Grid Charge." You can limit this value for different power sources.

Customers will typically hold the grid charge value to a number smaller than the solar charge

value, as it is easier on the batteries. The batts also prefer to charge from solar.

This amperage is battery amperage (DC), not AC.

Math: 40A to the battery is approximately 2000W from the Grid at AC voltage

(2000W / 240Vac = 8.33 A @ 240 Vac). To charge batts at 5000W, you need to

set your Grid Start A = 100A because 100A_dc*48V = 4,800W. This would draw

approximately 4000W/240Vac= 16A from the Generator/Grid.

Gen Charge Ensure your selection by pressing the "Ok" button.

Gen Start V or %: Value batts need to reach before automatically starting a generator

connected to the GEN breaker to charge the battery bank.

Gen Start A: This is how many amps you can pull specifically from the Generator (GEN

breaker only) to charge the batts. To ensure you do not overload a small Generator, you will

want to adjust the GEN charge value.

Important Note: If no PV production and no TOU, but Grid/Gen Charge is

enabled, the batteries will be charged to "full" using the Grid or a Generator

(if available) until the battery bank accepts only 5% of its rated capacity in

Amperes. This value correlates to roughly 90-93% full for most batteries

and is the generator's default "OFF" signal. If producing PV, the system will

use PV to charge the batteries to 100% full instead.

EX

.

Page 10: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 10

October 8, 2021

Grid Signal / Gen Signal Enables the start signal to the generator if you have one connected. This value will turn GEN

start on and off.

Everyone should keep this ON. There is no downside to having it ON.

Equalization Days Value (Days) in between the equalization cycles to balance all the cells.

Equalization Hours Value duration (in hours) for the equalization cycle. If set to 0, equalization will not happen.

Absorption V When the battery has recharged the absorption voltage setpoint, the Sol-Ark uses constant-

voltage regulation to maintain battery voltage at the absorption setpoint to prevent heating and

excessive battery gassing. The battery is allowed to come to a whole state of charge at the

absorption voltage setpoint.

Absorption lasts until batteries charge at 1% of the programmed Ah size. In the Bulk Charge

stage, the battery is not at 100% SOC, and battery voltage has not yet reached the Absorption

voltage setpoint. The controller will deliver 100% of available solar power to recharge the

battery.

Equalization V The voltage at which the battery will hang out during the equalization cycle. Usually, lead-acid

batteries have a higher equalization V value than the absorption value, with Wet cell batteries

holding the highest equalization value (generally higher than 60V).

Since lithium batteries have a BMS performing their equalization, they do not need our

equalization cycle. If absorption and equalization values are the same, and Equalization Hours or

Days are not 0, bulk charging will be based on programmed time and not amps accepted to

ensure that the batteries are all the way full.

TEMPCO The temperature coefficient is how much Sol-Ark adjusts the voltages for charging based on

temperature. The units are mV/degrees C/Cell. Each cell in a lead-acid battery is about 2 V, and

if TEMPCO is five (5) mV/degrees C/Cell with 24 total cells, you get 5mV*24 cells per every

degree C. So every 8 degrees C is a 1 V difference.

Please note: If you see high voltage readings from your batteries, it could be that the

temperature of the batteries is significantly low. Generally, the suggested values for

lead-acid are -5 and -0 for lithium.

Page 11: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 11

October 8, 2021

System Work Mode

Work Mode Choose the power priorities of the Sol-Ark with the equivalent of the "Limiter" tab of the "Grid

Setup" menu on the Sol-Ark screen.

A. Grid Selling: If you are in this mode only, you will cover the Load's

breaker and sell all the extra PV production to the grid while keeping your batteries

full.

B. Limited Power to Load: You will only produce as much power as the

Load breaker consumes while keeping your batteries full. If you need to select Grid

Selling as well, you need to enable Solar sell.

C. Limited Power to Home: Meter zero mode. If using the CTs

correctly, this will only produce as much power as the house is consuming. If you

need to select Grid Selling as well, you need to enable Solar sell.

Most Common Combination Limited to Home + Solar Sell + Time of Use at the same time – in PowerView, you can only

select one of the above, and if you need to choose grid Selling as well, you need to enable Solar

Sell.

In this mode, we sell as much as we can during the day (after zeroing the meter) and charge batts

to 100% using PV. At night, this mode will switch over to Limited to Home to discharge the

battery using TOU to zero the meter based on the programmed TOU values as opposed to

entirely selling back from the batteries to the grid (like you would do if you were in TOU + Grid

Sell only).

Page 12: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 12

October 8, 2021

Max Sell Power A value that places a global limit on the sell-back through the Grid breaker. Since it is a global

limit, it affects the TOU sell back, the DC sell back from the solar panels, etc.

You will also need to adjust this value to comply with what the utility initially agreed to with a

previously established net metering agreement.

You would adjust this value if a customer were using a smaller breaker (i.e., if the

120% rule applies, and the customer is using a 40 A breaker, you will need to reduce

this value to 7,600W, which is the derated amount of power you can do for a 40A

breaker).

Energy Patterns On the LCD screen, you can toggle this on the Sell Control tab.

A. Batt First: If you are in this mode, you are going to preferentially use the excess PV

production to charge the batteries first, and only once the batteries are full, the system

will cover the loads and then sell excess PV power to the grid.

B. Load First: If you are in this mode, you will preferentially use the excess PV

production to cover the loads first and minimize your grid usage, and only once the loads

are covered can we charge the batteries and then sell excess PV power to the grid.

Time of Use Cycle your batteries to cover loads while the Grid is ON. You can select days you want to

control the behavior of the batteries during the weekdays and/or weekends.

EX

.

Page 13: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 13

October 8, 2021

• TOU always allows DC PV production.

• Time of Use changes the power priority to PV → Batts → Grid → Gen.

• Without TOU, power priority is PV → Grid → Gen (manual) → Batts,

or PV → Grid → Batts → Gen (two-wire start).

A. Sell: If you check a "Sell" box, you will sell the specified power from the batteries

towards the grid breaker. The MSP will likely use up the battery power, but it will sell

any extra to the grid.

B. Charge: This setting will allow charging from an external source to get the batteries up

to the programmed set point. It applies to Grid Charging and GEN Charging.

You must specify the amperage (DC) used for charging through either the Grid Charge or

the Gen Charge settings.

You must check the "Charge" boxes during time slots you wish to charge the battery

bank through an external AC source through TOU.

Suppose Grid Charge / Gen Charge ENABLED, but the time of use is DISABLED. In

that case, you will charge the batteries to full with the AC power source (using PV first if

available) and keep it full all the time (this is a popular option for customers doing battery

backup only and probably have lead-acid batteries).

Important Note: If you enable "Charge" boxes but do not enable either "Grid

Charge" or "Gen Charge," the system will not charge from an AC source.

Imagine this Charge setting and the Grid Charge / Gen Charge settings in the

Battery Setting menu are in series; these actions will happen if both are not on.

Page 14: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 14

October 8, 2021

C. Time Slots: Each chronological time slot consists of a starting time. Read from T1-T2,

T2-T3, etc. You may change these values to suit your desired usage.

D. Power#: The maximum power the Sol-Ark draws from the batteries to power loads

after PV cannot meet these loads. (Before Grid).

E. Battery V/%# (Only valid when the grid is up): Battery end-goal for the time slot.

The maximum allowable discharge level (lowest SOC allowed at a particular time slot).

i. It also limits charging your batteries from the Grid or the Generator if "Charge"

time slots and "Gen Charge" or "Grid Charge" are enabled.

ii. If I were to enable a "Charge" time slot, the system will use an external AC power

source (Grid or Gen, depending on which of the two is enabled) to get to this set

This will only prevent the batteries from being discharged below this setpoint

using the external AC power source.

If Grid Charge AND Gen Charge are BOTH enabled, Grid has priority.

The system will do both TOU and peak shaving between 100% and this value

(E. above).

Between E. and the low battery value, it will only use peak-shaving and stop

doing TOU.

It will not do either if batts fall below the low battery value.

Off-Grid systems do not need TOU—it discharges batts automatically. You

can use TOU to charge the batts using a generator up to the set % or voltage.

Otherwise (TOU off), it will charge to 95% full.

Page 15: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 15

October 8, 2021

Application Case 1

Limited to Home + Solar Sell + Batt First + Time of Use + no Charge or Sell boxes checked:

Sol-Ark will discharge batts during the night + early morning down to 50%. It will produce as

much PV as possible to charge the battery first, then cover the loads on the load breaker in the

morning. If you need more power than the PV can produce to cover the loads, the Sol-Ark pulls

power from the grid.

Conversely, if you produce more power than charging batteries plus covering the loads requires,

you will sell any extra to the grid. Batteries will not charge from either Grid or Gen because none

of the "Charge" time slots are enabled.

Page 16: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 16

October 8, 2021

Application Case 2

Limited to Load + NO Solar Sell + Batt First + Time Of Use + No “Charge” boxes selected.

The system will produce as much PV as the load breaker requires. If the grid is available, TOU

will ensure to discharge the batteries to the Battery V% setpoint.

The batteries will charge from PV ONLY. Batteries will not charge from either Grid or Gen

because none of the "Charge" time slots are enabled.

Application Case 3

Also enable

If Charging with Power Supply on Grid Breaker:

If Charging with Power Supply on Gen Breaker:

Page 17: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 17

October 8, 2021

Limited to Home + Solar Sell + Batt First + Time of Use + ALL Charge boxes checked (usually

with a generator)

During each selected time slot, the system will use the selected AC source from "Battery Setting"

to charge the batteries up to the setpoint "Battery V#" but not above it.

Enabling the "Charge" box in a time slot only prevents the batteries from being discharged below

the setpoint if using the grid.

If a Generator is the AC power source, it will be called during the selected time slots if— and

when— the batteries reach the Gen Start V/% programmed in the Gen Charge setting (or Grid

Charge if connected to the Grid breaker).

If the generator is running and the next time slot that does not have the "Charge" box checked

begins, the generator will turn off. Otherwise, the generator will only turn off once batteries

reach the "Battery V/%#" setpoint.

If producing PV power while charging with the generator, both power sources will charge the

batteries during checked "Charge" time slots until the batteries reach the time slot set point. PV

will continue charging to full after this.

Usually, lithium battery customers program the battery % setpoint at 20-40% for all time slots

because this chemistry has better Depth of Discharge abilities than lead-acid batteries. For the

health of the batteries and to increase their lifespans, they need a full charge daily.

Lead-Acid battery customers typically see 50% for all time slots (because batts do not like to

discharge below this value, and you will have enough capacity for when the grid goes out) and

100% at 1 PM for when you have good solar to recharge the batts.

AC Coupled PV Case

If the system has the latest versions of firmware, the AC couple panels on the GEN port can be

treated like DC couple panels and charge the batteries up to the "OFF V/%" value of the AC

coupled PV without the "Charge" time slots being enabled (even though the panels are on the AC

side).

Page 18: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 18

October 8, 2021

Grid Setting

Grid Mode A. UL1741 & IEEE1547: Standard connection to the grid and enables the sell-

compliant functionality. We have proven that we do not stay connected to the grid

when the grid goes out.

B. UL1741SA: Supplemental Addendum to the original UL1741. One of the

supplemental addendums is Frequency-Watt control/frequency curtailment.

i. Any UL1741SA inverter can be AC coupled to another and controlled via

its frequency.

ii. Therefore, any inverter AC-coupled with Sol-Ark needs to have

UL1741SA to control the AC-coupled inverter with frequency shifting.

iii. It also enables wider Freq, Voltage, and Power Factor.

C. General Standard: This gives us complete control over what we do to change all our

"protect parameters." Selecting UL1741SA or regular UL1741 will preset all the

connection requirements for the grid. Connecting generators may require changing

protect parameters or unusual installation locations—such as small islands.

Must set to General Standard if connecting Generator to AC Grid input breaker.

Power Factor (+/- 0.9 – 1.0) This value is the ratio between the real power (working power) and apparent power. Setting PF =

1 means all power does work.

Grid Reconnect Time The standard grid-reconnect time is 300s. If the system disconnected from the grid, the system

would not reconnect to the grid for this value of time. Time allows the utility provider to stabilize

their end before the inverter introduces more power.

When connecting a generator to the Grid breaker, you may avoid burning fuel for 300s

by changing this value to something faster. Ensure you do not go any lower than 30 sec

to warm up the generator before providing power. You could temporarily go lower than

30 sec for testing purposes only, but it needs to be set to a value equal or higher to 30

sec when the installer leaves.

Grid Frequency Choose the inverter's output frequency (50 or 60Hz depending on the install's location).

Grid Type Required inverter Power Cycle each time the input/output voltage is changed.

A. 120/240V Split Phase: Most common setup (North America).

Page 19: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 19

October 8, 2021

B. 220 Single Phase: Only some parts of South America, England, etc. If setting it to

220V, the neutral goes into the other leg of our inverter to produce 220V because we

have two inverters inside, and each one can only make 120V at most.

C. 120/208V 3-Phase: 1 system for 208 will do only two of the 3 phases. 2 systems

will do all 3 phases, but it is unbalanced (4.8kW, 6.2kW, 4.8KW). Need 3, 6, or 9

systems in parallel for balanced 3-phase.

Grid Vol High The highest value the system will allow on the grid before it disconnects.

Grid Vol Low The lowest value the system will allow on the grid before it disconnects.

Grid Hz High If you have a generator, you will need to adjust this value to 65Hz to make the inverter more

willing to stay connected to generators as the generator frequency may fluctuate significantly.

Grid Hz Low If you have a generator, you will need to adjust this value to 55.

Zero Export Power A target value for usage from the grid that you will be looking for from the CT sensors. This

value is not 0 because if you aim for 0 and the system is not fast enough to catch a large load,

you could end up pushing back some power.

Most people using this mode have no allowable sell-back, and some utility companies would not

like you to sell back. Therefore, we do not target 0 but instead 20 by default. If the loads at the

local unit cannot keep up for any reason and a small amount of power makes it back to the grid,

you can adjust the target value slightly higher.

Gen Connect to Grid Input You must select this if using a generator on the Grid input, either full-time such as off-grid, or

sometimes (whole-home generator with an automatic transfer switch). See Diagram 3.

L/HVRT (Low/high voltage ride-through settings) Usually enabled for islands, these require adjustments to particular values (see page 34 of

owner's manual).

L/HFRT (Low high-frequency ride-through settings) Usually enabled for islands, these require adjustments to particular values (see page 34 of

owner's manual).

Sometimes, rural areas or places with the last transformer on the line where these parameters

can fluctuate require enabling this setting. Enabling this will help to keep the Sol-Ark from

disconnecting all the time because you can dial in exactly when they will disconnect or not.

Page 20: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 20

October 8, 2021

Smart Load The Smart Load tab will control the GEN breaker's actions.

Mode A. Generator Input: Default mode. GEN breaker will be a generator input.

B. Smart Load Output: Use the Gen input as a Smart Load output.

This setting turns the GEN breaker into a programable output for automatic load shutting

for one or two circuits.

You can always press and hold the light bulb icon on the unit's home screen to force

the Smart Load on, and it will stay on for 4 hours. It will then reverse to its regularly

scheduled programming.

i. Solar Power: PV production wattage. The breaker will not receive

power if you do not produce at least this amount of PV (i.e., if you set the

value to 500, PV production will need to be at least 500W or higher to

power the loads connected to this breaker). The most common use for this

feature is for water heaters, small AC units, or non-critical luxuries. The

feature reduces the minimum size of batteries required when you are off-

grid. To ignore the PV production requirements, you can set this wattage

to 0; therefore, the Smart Load feature will work at night.

ii. Off V/%: Sol-Ark will turn the smart Load OFF when the batteries reach

this value (should be lower than the ON setpoint).

iii. ON V/%: It will turn the smart Load ON when the batteries reach this

value (should be higher than the OFF setpoint). This feature will reserve

the bottom half of your batteries to power your mission-critical loads and

the top half for your Smart Loads.

iv. On-Grid Always On: Enable to turn on Smart Load always when the

grid is present, regardless of SOC or PV wattage.

C. For AC Coupled Input: Select this option if you are AC-coupling a system. You

will produce as much AC-coupled PV as possible and sell any excess straight to the grid

when the grid is up.

i. Off V/% (90% recommended): The AC-coupled panels will turn OFF

when the batteries reach this value. We recommended not to go higher

than 95%, as there needs to be a buffer for the AC-coupled PV when off-

grid.

ii. ON V/% (60-80% recommended): The AC coupled panels will turn

ON when the batteries reach this value. We generally want to turn the AC-

coupled panels on when the battery is low.

iii. MI export to Grid Cutoff: Leave this setting OFF.

Page 21: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 21

October 8, 2021

iv. AC_Coupled_Frz_High: Upper limit for the frequency curtailment

(FrequencyWatt). We can only adjust 0.5 Hz per second as far as our

output to control the AC-coupled panels.

Important Note: If AC-coupling is on the load side, you will not see the

power production, whereas the GEN breaker has a sensor that allows us to

measure AC-Coupled panel production accurately.

Additionally, the GEN port has a relay since it typically connects to a

generator that would allow for a physical disconnect to the GEN breaker.

Therefore, if you were AC coupled with a unit that does not comply with

UL1741SA, connecting it to the GEN port would be required because the

Load port cannot do frequency curtailment.

If baseline is 60 Hz and the inverter needs to reach 62Hz, that is 2 seconds that the

AC-coupled panels will potentially be producing power which needs to go

somewhere. This is why we recommended that the OFF V/% is not 100% when

you are off-grid with AC coupled panels.

Page 22: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 22

October 8, 2021

Basic Setting Time

Please ensure this is correct, as the TOU bases its settings on this value (ensure

time zome is correct). Sometimes, if the data that the customer reports from the

unit does not match what we see on PowerView, the time set up could be

incorrect.

Factory Reset We do not recommend a remote factory reset. Preferably, have someone do this

locally as this will reset all the unit settings. The password for this is 9999.

ARC Setup To enable or disable ARC fault capabilities.

Time Sync Time sync enables the Wi-Fi dongle to sync time with the internet.

Beep You can turn the beep off temporarily by disabling this option.

AM/PM You can set the time as AM/PM format or military time if this is disabled.

Auto-Dim The customer will have a slider to adjust the brightness of the LCD screen, but PowerView does

not have this capability. If auto dim is not enabled, it will void the warranty of the LCD.

Page 23: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 23

October 8, 2021

Advanced Setting

Gen Peak-Shaving This feature is on the GEN port for a generator. If enabled, the sol-ark syncs up to the

generator to keep the inverter active and uses the CT sensors to see how much power

the generator is putting out.

This setting maintains the generator power from going above a threshold value to

protect it from overloading. The system will reduce the charge rate down to 0. If the

generator power is still going above the specified threshold, the system will discharge

the battery to avoid overloading the generator.

Grid Peak-Shaving Grid PS is a similar feature to Gen PS but on the grid side. Typical customers who use this

feature have demand pricing that bases their monthly electricity bill on the highest 15 minutes of

use. The system will place a ceiling threshold on grid quantity pulled (kW) with Grid PS

enabled.

The Sol-Ark will provide power through different sources do everything it can to keep the grid

usage at or below the threshold (discharging the batteries, using PV power if available, etc.).

This setting also requires the CTs to be on the grid side, and that limited power to home mode is

enabled.

This setting requires CT placement on the generator side. You will NOT be able to do

both Gen peak-shaving AND Grid peak-shaving (which also requires enabling limited

to home mode) simultaneously.

You can only use ONE set of two CTs (either on the Grid side or the Gen side).

Since we are just a load to the generator, without this enabled, the generator will

charge the batteries (limiting the amperage to the GEN Charge setpoint) and pass the

rest of the power through to the load panel.

Page 24: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 24

October 8, 2021

Parallel If you have parallel units, you will need to enable "Parallel" on each unit for correct

programming.

Sol-Ark Support rarely changes this setting remotely, as someone needs to program the units in

person. They also need to ensure the physical connections among each Sol-Ark.

Friendly reminder to users: Check the MCU and Comms are the same between

parallel units for proper functioning.

A. If "Grid Type" is 120/240V Split Phase i. Only ONE unit can be the master with Modbus SN = 1.

ii. Connect ALL the sensors and battery comm to the master unit.

iii. Program any other units as "Slave" with Modbus SN 2, 3, 4 … 9.

iv. All Modbus SN addresses need to go in the same order that you connected the

systems in parallel.

B. If “Grid Type” is 120/208V 3 Phase

i. Systems = 1 @ 208V

a. Enabling "parallel" when only installing one system is not required.

Inv_L2 = Grid_L1 + Inv_L1 = Grid_L2

b. Power to Grid: 4.5kW x 2 Legs

ii. Systems = 2 @ 208V

a. Master / Phase A /Modbus SN=1: Inv_L2 = Grid_L2 + Inv_L1 = Grid_L1

b. Master / Phase B /Modbus SN=2: Inv_L2 = Grid_L3 + Inv_L1 = Grid_L2

c. 9KWx2 Power to Grid: 4.2kW + 4.8kW & 4.8kW + 4.2kW

• Gen or Grid Peak-Shaving will force Time of Use to be ON and will require user

interaction with TOU settings to activate their desired setpoints.

• If you do NOT wish to use the battery, but want to use peak-shaving, program all

the TOU setpoints to 100% or equivalent voltage if set to voltage mode.

Page 25: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 25

October 8, 2021

iii. Systems = 3 @ 208V

a. Master / Phase A /Modbus SN=1: Inv_L2 = Grid_L2 + Inv_L1 = Grid_L1

b. Master / Phase B /Modbus SN =2: Inv_L2 = Grid_L3 + Inv_L1 = Grid_L2

c. Master / Phase C/Modbus SN =3: Inv_L2 = Grid_L1 + Inv_L1 = Grid_L3

d. 9 kW x 3 Power to Grid: 4.5kW + 4.5kW & 4.5kW + 4.5kW & 4.5kW +

4.5kW

iv. Systems = 6 @ 208V

a. Master / Phase A /Modbus SN =1

b. Slave / Phase A /Modbus SN =2

c. Master / Phase B /Modbus SN =3

d. Slave / Phase B /Modbus SN =4

e. Master / Phase C /Modbus SN =5

f. Slave / Phase C /Modbus SN =6

v. Systems = 9 @ 208V:

a. Master / Phase A /Modbus SN =1

b. Slave / Phase A /Modbus SN =2

c. Slave / Phase A /Modbus SN =3

d. Master / Phase B /Modbus SN =4

e. Slave / Phase B /Modbus SN =5

f. Slave / Phase B /Modbus SN =6

g. Master / Phase C /Modbus SN =7

h. Slave / Phase C /Modbus SN =8

i. Slave / Phase C /Modbus SN =9

Warning: Programming the Modbus SN in a different order than you connected

the systems will break the programming!

Auto Detect Home Limit Sensors This function will automatically detect the polarity for the sensors; however, it cannot fix the

phase alignment. Check the box, or turn the feature on through PowerView and press "Ok" or

"Confirm."

The auto-Detect feature will not fix a physical connection problem, such as if L1 connects to

sensor input two or if you connect the CTs to the Student inverter.

For example, if an HM value is negative and the other is positive, this function will correct the

data. If the sensors are facing the wrong direction or the polarity is wrong, Auto-Detect will fix

the data automatically.

After turning this on, the system may show values that might not make sense, but after one

minute or so, it will turn off this function once it finished correcting the sensor issues.

Page 26: DATA MONITORING PowerView Settings Guide (PV PRO)

Page | 26

October 8, 2021

Lock the Inverter If enabled, this will require a password for users to change settings locally at the unit. The

password for this is always 7777.

This function will only work if the system is connected to the Grid and has batteries. Otherwise, it will not

work.

Enabling this feature WITHOUT batteries will require a factory reset to regain control of the

Sol-Ark settings.

Any AC coupled panels or other AC power source on the property that sells to the Grid needs to be

OFF before using this function because the additional AC power source might cause confusion.

If you ONLY connect a generator to the Grid breaker, do NOT use this function because it will sell

back to the generator.

If you are off-grid + connected to a generator + do not have batteries + trying to use Gen peak-

shaking, you will have to verify manually that the CTs are connected correctly.