DAQ Hardware status - overview R. Stokstad • DOM Main Board – Schedule (Minor) – Design (Przybylski) – Firmware (Stezelberger) – Testing (Goldschmidt) • DOR Board (Sulanke) • Master Clock Unit (Nygren, Sulanke) ---------------------- • Time Calibration, Cable measurements (Stokstad, Sulanke, Hardtke) Individual presentations for the above to be in Mons proceedings

Upload: moshe

Post on 04-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

DAQ Hardware status - overview R. Stokstad. DOM Main Board Schedule (Minor) Design (Przybylski) Firmware (Stezelberger) Testing (Goldschmidt) DOR Board (Sulanke) Master Clock Unit (Nygren, Sulanke) ---------------------- Time Calibration, Cable measurements - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: DAQ Hardware status - overview R. Stokstad

DAQ Hardware status - overviewR. Stokstad

• DOM Main Board– Schedule (Minor)– Design (Przybylski)– Firmware (Stezelberger)– Testing (Goldschmidt)

• DOR Board (Sulanke)• Master Clock Unit (Nygren, Sulanke)

– ----------------------

• Time Calibration, Cable measurements(Stokstad, Sulanke, Hardtke)

Individual presentations for the above to be in Mons proceedings

Page 2: DAQ Hardware status - overview R. Stokstad

Rev 2 board

Page 3: DAQ Hardware status - overview R. Stokstad

Icecube DOM MB Status and Development

• April – Oct '03– Rev 2 test and development (22 boards)

• Oct – Nov ’03 – Rev 3 fabrication and test (16 boards)

• Nov ’03 – Mar ’04– Rev 4 fabrication and test (60 boards)

• March – June ’04 – Rev 5 for deployment (420 boards)

Schedule

Page 4: DAQ Hardware status - overview R. Stokstad

• October – November ‘03• First 4 cards due Oct 22, 12 more to follow 5 days

after approval– Changes from Rev 2 address memory performance at

temperature and signal quality issues– Testing at LBNL will include manual tests and STF

testing– Temp cycling of bare and loaded boards

• +65, -40degC 10 cycles

• First 4 cards to UW, later to LBNL• 8 cards to UW, 8 cards to LBNL

Rev 3 status

Page 5: DAQ Hardware status - overview R. Stokstad

• November – March ‘04– Design modifications as indicated by Rev 3

tests and internal review– Final parts selection for reliability– 60 cards to be fabricated– “Qualification test” at UW

• Longer term temperature tests• String operation tests• Some boards used for development at LBNL

Rev 4 plans

Page 6: DAQ Hardware status - overview R. Stokstad

Rev 5 plans• Initial production review November ‘03

– Based on Rev 3 and Rev 4 tests– Earlier than usual to allow long-lead parts purchasing

• Production readiness review - January ‘04– Based on initial Rev 4 tests– Qualification testing– Vendor qualifications– Fabrication process approval

Page 7: DAQ Hardware status - overview R. Stokstad

Rev 5 Production (March – June ’04)• Full production and Q/A procedures in place• All parts as selected for reliability• ATWD production run including qualification

tests• Any differences between Rev 4 and Rev 5

require formal Engineering Change Procedure and re-qualification testing

• Fabrication begins March ‘04• Testing begins April ’04• Delivery April - June ‘04

Page 8: DAQ Hardware status - overview R. Stokstad

• EPXA4 Baseline (The larger FPGA)• Hi-Reliability Part Substitutions

– Primary Oscillator; Corning (Hi-Rel 2560A-0009)

– High-Rel DC-DC Converter; Power-One brand

• Low impedance Power Distrib.to SDRAM• 2 x 12 Channel ADCs vs. 1 x 8 Channel

for monitoring • Q/A Tests Added to Plan; Coupons on PCB• Noise Related Layout Changes• Fabrication procedure changes

Some Changes made in Rev 3

Page 9: DAQ Hardware status - overview R. Stokstad

•On-Board Flasher Performance Tuning- UV LED gives < 10ns FWHM pulse- Blue LED gives ~13 ns FWHM pulse

•x0.25 x 2 x 8 gain for ATWD PMT inputs•Extend Input Clipping Range [+2.4..-3.0]•Stronger ATWD Drivers•Optimize ATWD Driver Output Impedance to minimize ringing•fADC channel gain adjustment for 12 bits

Tuning for Physics Performance

Page 10: DAQ Hardware status - overview R. Stokstad

DOMMB Block Diagram

Page 11: DAQ Hardware status - overview R. Stokstad

Firmware• CPLD (lowest level programmable logic device)

Almost finished. Smallr changes needed for Rev 3 and to make the design more robust.

• FPGA – STF 99% Done for testing– ConfigBoot Preliminary Version minimal boot– IceBoot Preliminary Version normal boot– DOMAPP ~50% Done for data taking

For software development purposes the SFT FPGA can be used for the ConfigBoot and the IceBoot FPGAs

Page 12: DAQ Hardware status - overview R. Stokstad

DOR card• Firmware Status• Production Status, Rev. 0• Planned Production, Rev. 1

Data Buffer

SRAM2 x 256Kx16

Cable Interface #1

Cable Interface #2

Cable Interface #3

Cable Interface #4

PCI-Core

FLASH1M x 8

AlteraPLD

EPM7064

Config JTAG

Altera FPGA

EP20K200E

JTAG

PCIBus

DOM 1..4

JTAG

Clock

96 V

DOM 5..8

Reload

Page 13: DAQ Hardware status - overview R. Stokstad

DOR, DOM Readout card 13

ICECUBE Meeting, Mons October 2003

FPGA FLASH SRAM

96VDOM Power

Clock & Time String port

JTAG

PLD

Comm. ADC

Comm. DACQuad Cable Con.

Comm. Rec.

Power Switch

Page 14: DAQ Hardware status - overview R. Stokstad

DOR Rev. 0, Main Firmware Status• PCI Bus control including DMA (..120 MB/s) &

Interrupts• Parallel control of 2 wire pairs / 4 DOMs• 1MBit/s serial data rate, (50KB/s per DOM)• DOM_a/b polling• Automatic cable length adaptation• Software initiated but firmware controlled time

calibration• Three running firmware versions:

– DOR_TEST, after production test– vDOM, includes two virtual DOMs for Linux driver test– DOR, final version, under development

Page 15: DAQ Hardware status - overview R. Stokstad

Production Status• Rev. 0, 10 DORs running at : UW 2x,

Bartol 1x, LBNL 7x• 20 more in production now, ready in Dec.

2003• 4 stay at DESY, 16 go to ?

Planned Production, Rev. 1• Redesign ready in January• first test in Feb., production of 60 if o.k.• 60 ready in April 2004• 60 DORs -> sufficient to control 480 DOMs

Page 16: DAQ Hardware status - overview R. Stokstad
Page 17: DAQ Hardware status - overview R. Stokstad
Page 18: DAQ Hardware status - overview R. Stokstad
Page 19: DAQ Hardware status - overview R. Stokstad

DOMMB Test Plan• Select well functioning DOM MBs (including

delay board) suitable for integration into DOMs to be deployed in IceCube/IceTop.

• For boards which are not well functioning, provide information to aid understanding, debugging and fixing.

• Provide some DOMMB characterization: optimum running parameters, etc.

• Be able to handle an expected “steady state” flow of 55 boards/week.

Page 20: DAQ Hardware status - overview R. Stokstad

Initial Tests• Visual inspection, Power to board• Load “released” firmware and software in

dedicated setup (1 board at a time)• Get “boot prompt” and tests that cannot be done in

DOR-based setup (if any)

• Multiple heating and cooling cycles (+65C to -40 C) to catch infant mortality cases.

• Boards powered and some testing during burn-in • Power cycles during burn-in • Full operational test at the end to identify bad boards.

Burn-in

Page 21: DAQ Hardware status - overview R. Stokstad

Testing Setup

• STF (Simple Test Framework) based: STFServer (DOMMB) and STFApp (Test-Control PC)

•All tests defined with Pass/Fail and Input and Output Parameters

•All Info saved to database (db)

•A db query program to see waveforms, output parameters, histograms, etc.

Page 22: DAQ Hardware status - overview R. Stokstad

Example of STF test atwd_pulser_spe test

Parameter Type Valueatwd_sampling_speed_dac input 850atwd_ramp_top_dac input 2097atwd_ramp_bias_dac input 3000atwd_analog_ref_dac input 2048atwd_pedestal_dac input 1925atwd_ch0_clamp input 0atwd_chip_a_or_b input 0atwd_channel input 1pulser_amplitude_uvolt input 50000pedestal_subtraction input truen_pedestal_waveforms input 50loop_count input 1000triggerable_spe_dac output 496atwd_baseline_waveform output plotatwd_waveform_width output 4atwd_waveform_amplitude output 65atwd_expected_amplitude output 50atwd_waveform_pulser_speoutput plotpassed output truetestRunnable output trueboardID output 3c62a6c4

Average of 1000 waveforms in 1 sec.

Page 23: DAQ Hardware status - overview R. Stokstad

Master Clock Unit: Function

• Create and distribute stable 20 MHz source to all DOM Hubs in IceCube DAQ.– DOR cards mirror MCU time, calibrate DOMs

• Link “IceCube Time” to GPS time .• Provide robust real-time time verification.

– Motivation: detect any error condition in less than 1 sec

Page 24: DAQ Hardware status - overview R. Stokstad

Some System Requirements• The DOM Hub will be capable of stand-

alone operation, (use the DSB 20 MHz clock)– This facilitates many testing activities

• The IceCube MCU will be capable of full operation in the absence of GPS input– Could happen that GPS signal interrupted

• IceCube MCU operation shall not require that all DOM Hubs are operational. – Independence of strings during

commissioning.

Page 25: DAQ Hardware status - overview R. Stokstad

Accuracy and Precision•GPS satellites are synchronized to the US Naval Observatory.•The USNO atomic clocks maintain time to < 2x10-15 day-1.

•GPS stability degraded to ~4x10-8 second-1 by triangulation errors.•DOM local clocks stable to < 1 x 10-10 second-1.

GPS much less stable than DOM local clocks (seconds scale)

•However, GPS will display better long-term stability (hours scale)

Master Clock unit must employ a source with better short-term stability than GPS, yet must still match long-term GPS time.

Use commercial atomic clock “linked” to GPS over long-term

Page 26: DAQ Hardware status - overview R. Stokstad

Master Clock Unit (MCU) Status

• Draft Requirements Document exists• Specific Implementation proposals have

been made by Sulanke and Przybylski.• Plan is that Sulanke will design and

fabricate this subsystem at DESY.