AM Disasters- Consequences of failure of AM -

Daniel Ortiz

Page 3: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

What is HidroItuango?

Hydroelectric Power Generation Plant

Dam Height: 225m (740 ft)

Vol: 20 million m3 of water (700 million cu ft)

Capacity: 2.4 GW (about 17% of Colombia’s installed capacity)

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Colombia: HidroItuango

Page 4: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

Project Objectives:

Estimated operation start: Dec. 2018

Contract began in 2010

Construction began in Sept. 2011

Initial Estimated Cost: Close to USD 4 billion

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Colombia: HidroItuango

Page 5: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

Dam

Main Diversion Tunnels (MDT)

AuxilaryDiversion

Tunnel (ADT)

Powerhouse

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Colombia: HidroItuango

Project Objectives:

Estimated operation start: Dec. 2018

Contract began in 2010

Construction began in Sept. 2011

Initial Estimated Cost: Close to USD 4 billion

Page 6: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

Photos: SKAVA CONSULTING , Informe de estudio de causa raiz fisica”, Proyecto hidroelectrico ituangohttps://www.epm.com.co/site/estudio-causa-raiz-hidroituango

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Colombia: HidroItuango

Current Situation:

NEW Estimated operation start: uncertain

NEW Estimated Cost: more than USD 5.5 billion + loss of profit

Page 7: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

What about failure in Decision Making

(1) Revista Semana. Hidroituango una cadena de decisiones cuestionables. https://sostenibilidad.semana.com/impacto/articulo/hidroituango-una-cadena-de-decisiones-cuestionables/43121

(2) Portafolio. Hidroituango http://blogs.portafolio.co/pensamiento-emprendedor/2018/06/01/hidroituango-proyectos-sostenibles/

(3) El Espectador. Responsabilidades y dudas que deja la crisis de hidroituango.https://www.elespectador.com/noticias/investigacion/responsabilidades-y-dudas-que-deja-la-crisis-de-hidroituango-articulo-789448

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Colombia: HidroItuango

Page 8: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

https://www.eltiempo.com/colombia/medellin/lo-que-revelan-las-nuevas-fotos-de-la-casa-de-maquinas-de-hidroituango-334196

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Colombia: HidroItuango

Sediment and rubble

Axis

20

Axis

17

Page 9: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

“What happened to the diversion tunnels in Hidroituango?” El Espectador (3)

Was there cost savings? Was there rushing due to the delays and the need to make the most of the summer to advance the project?

El Espectador (3)

“[…] hydroelectric Power Plants experts have questioned the procedures performed in these works, meanwhile other experts argue that because of the rush to deliver works, the risk was not measured

and a plan B was never considered [...]”

“Delays have been a constant in the construction of Hidroituango. On December 28th, 2015, at which point the project had delays of 20 months […]” Revista Semana (1)

Why did Hidroituango not wait to have operational spillways to

start the filling process? Portafolio (2)

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Page 10: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

“Cause and effect are not closely related in time and space” Peter Senge

Fiftth Discipline

6th Asset Leadership Week - 2019

AM Disasters – Consequences of failure of AM

Final thoughts:

Are we working in Asset Management from the early stages of asset life cycle?

Page 11: Daniel Ortiz Disasters ALW 2019 - Asset Leadership Network · Microsoft PowerPoint - Daniel Ortiz Disasters ALW 2019.pptx Author: Nicholas Created Date: 9/25/2019 8:35:53 AM

Thank youDaniel Ortiz