daily report
DESCRIPTION
yyTRANSCRIPT
Daily Thread Report
Daily Thread Production Report
Client :Machine No:Date:Shift:
Production DetailsQuality controlRoutine TestDiaDay ShiftNight ShiftTotal ThreadsLength GaugeGo GaugeNo Go Gauge16 mm20 mm25 mm28 mm32 mm36 mm40 mmTotal
Operator Name:Machine operating Hours: Breakage details:
Remarks:
Prepared By:Approved By:(Shift Supervisor)(In-charge)
Monthly Thread ReportThreading Report Monthly
Client:Location:Machine No:Month :DateDia 16mmDia 20mmDia 25mmDia 28 mmDia 32 mmTotal 0000000000Total work done in the month
Sheet3