daily report

4
Daily Thread Production Report Client : Machine No: Date: Shift: Production Details Quality control Dia Day Shift Night Shift Total Threads Length Gauge Go Gauge No Go Gauge 16 mm 20 mm 25 mm 28 mm 32 mm 36 mm 40 mm Total !erator Name" #a$hine o!erating %ours" &rea'age details" (emar's" )re!ared &y" *!!ro+ed &y" ,Shift Su!er+isor- ,.n/$harge- (outine Test

Upload: ashish-sawant

Post on 04-Nov-2015

219 views

Category:

Documents


0 download

DESCRIPTION

yy

TRANSCRIPT

Daily Thread Report

Daily Thread Production Report

Client :Machine No:Date:Shift:

Production DetailsQuality controlRoutine TestDiaDay ShiftNight ShiftTotal ThreadsLength GaugeGo GaugeNo Go Gauge16 mm20 mm25 mm28 mm32 mm36 mm40 mmTotal

Operator Name:Machine operating Hours: Breakage details:

Remarks:

Prepared By:Approved By:(Shift Supervisor)(In-charge)

Monthly Thread ReportThreading Report Monthly

Client:Location:Machine No:Month :DateDia 16mmDia 20mmDia 25mmDia 28 mmDia 32 mmTotal 0000000000Total work done in the month

Sheet3