PARAMETRIX Form 01-CN-65/Rev. 10/17 PCJWSA DAILY OBSERVATION REPORT Job No.: 276-3300-004 Phase: 1403 Task: 308 Report No. 011 Project: PCJWSA-WWTP Upgrade Owner: PCJWSA, 34005 Cape Kiwanda Dr., Tillamook, OR. Page 1 of 3 Contractor: McClure & Sons, Inc. Date: 12/11/17 Contractor’s Rep./Title: Rob Bechloff, Project Manager Day: Monday Weather A.M.: 39 °F P.M. 54 °F Site Conditions: (Good) (Fair) (Poor) Clear/ sunny Location and Type of Work: Jack Robinson and Sons (JRS) Number and Classification of Contractors, Men, and Equipment (include condition of equipment): MSI-# worker 3 US West Elec 1 Equipment Justin Quimby Sean Rowley Chris Bate Excavator SK140SR Choose an item. James Hosely Kevin Orton Mini-back hoe 305CR Choose an item. Tyler Gaughan Forklift TH844C Choose an item. Work in Progress (include report of operations, materials received and condition, work start/stop time, and any unusual conditions): TPUD was onsite to transfer transformer and wires from existing power pole to new pole. Power was off to the site from 1015 to 1515. While TPUD was onsite US West Electric installed 3-4in conduits through the transformer vault. These conduits will be tied into later in the project to transfer power to other areas of the site. Deliveries; supplies, equipment: 2 semi-truck deliveries with steel plates, concrete scaffolding, air compressor, small shed, and crates of concrete forming equipment. Testing: NA Any Cause for Dispute, Change Orders, or Delays, and Reasons: NA Visitors: NA Notes: Unloaded conex of equipment Cleaning out and arranging construction trailer. Installing office equipment. Ingmar Saul Signature

Upload: phungduong

Post on 24-Apr-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

PARAMETRIX Form 01-CN-65/Rev. 10/17

PCJWSA DAILY OBSERVATION REPORT

Job No.: 276-3300-004 Phase: 1403 Task: 308

Report No.

011

2

Project: PCJWSA-WWTP Upgrade

Owner: PCJWSA, 34005 Cape Kiwanda Dr., Tillamook, OR. Page 1 of 3

Contractor: McClure & Sons, Inc. Date: 12/11/17

Contractor’s Rep./Title: Rob Bechloff, Project Manager Day: Monday

Weather A.M.: 39 °F P.M. 54 °F Site Conditions:

(Good) (Fair) (Poor) Clear/ sunny

Location and Type of Work: Jack Robinson and Sons (JRS)

Number and Classification of Contractors, Men, and Equipment (include condition of equipment):

MSI-# worker 3 US West Elec 1 Equipment

Justin Quimby ☒ Sean Rowley ☐ Chris Bate ☒ Excavator SK140SR ☒ Choose an item. ☐

James Hosely ☒ Kevin Orton ☐ ☐ Mini-back hoe 305CR ☒ Choose an item. ☐

Tyler Gaughan ☒ ☐ Forklift TH844C ☒ Choose an item. ☐

Work in Progress (include report of operations, materials received and condition, work start/stop time, and any unusual conditions):

TPUD was onsite to transfer transformer and wires from existing power pole to new pole. Power was off to the site from 1015 to 1515.

While TPUD was onsite US West Electric installed 3-4in conduits through the transformer vault. These conduits will be tied into later in the project to transfer power to other areas of the site.

Deliveries; supplies, equipment:

2 semi-truck deliveries with steel plates, concrete scaffolding, air compressor, small shed, and crates of concrete forming equipment.

Testing:

NA

Any Cause for Dispute, Change Orders, or Delays, and Reasons:

NA

Visitors:

NA

Notes:

Unloaded conex of equipment

Cleaning out and arranging construction trailer. Installing office equipment.

Ingmar Saul

Signature

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

TPUD is transferring the transformer and power wires from the existing power pole to the new pole.

Installed 3-4in electrical conduits through the transformer vault to be tied into later in the project.

More deliveries of equipment to the site.

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

Unloading the conex that arrived yesterday.

PCJWSA DAILY OBSERVATION REPORT

Job No.: 276-3300-004 Phase: 1403 Task: 308

Report No.

015

2

Project: PCJWSA-WWTP Upgrade

Owner: PCJWSA, 34005 Cape Kiwanda Dr., Pacific City, OR. Page 1 of 2

Contractor: McClure & Sons, Inc. Date: 12/18/17

Contractor’s Rep./Title: Rob Bechloff, Project Manager Day: Monday

Weather A.M.: 50 °F P.M. 51 °F Site Conditions:

(Good) (Fair) (Poor) Raining (2in)

Location and Type of Work: PCJWSA, Pacific City, Construction.

Number and Classification of Contractors, Men, and Equipment (include condition of equipment):

MSI-# worker 5 US West Elec 1 Equipment

Justin Quimby ☒ Sean Rowley ☐ Chris Bate ☒ Excavator SK140SR ☒ Choose an item. ☐

James Hosely ☒ Kevin Orton ☐ ☐ Forklift TH844C ☒ Choose an item. ☐

Tyler Gaughan ☒ Rob Bechloff ☒ ☐ Choose an item. ☐ Choose an item. ☐

Shane Hollingworth ☒ Choose an item. ☐

Work in Progress (include report of operations, materials received and condition, work start/stop time, and any unusual conditions):

Continuing to work on 8in headworks piping bypass. Completed assembling all the piping and securing to the headworks screen tanks. The 8in bypass will be connected on Wednesday and the old piping removed.

Began working on the dewater plan and settling tank layout. Performing repairs on the settling tank.

US West Elec. Running conduit and wires from temporary power pole to construction trailer for temporary power. TPUD will be contacted to inspect work and hook up power.

Deliveries; supplies, equipment:

Deliver of settling tank for dewatering system.

Testing:

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

NA

Any Cause for Dispute, Change Orders, or Delays, and Reasons:

NA

Visitors:

Ron Bechloff (MSI) onsite for our weekly progress meeting. Ron left after the meeting.

Notes:

Weekly progress meeting

Ingmar Saul

Signature

Completed the 8in headworks piping in preparation for bypass tie in.

Delivery of sediment tank for site dewatering plan. Performing tank repairs.

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

Ran conduit and wires to construction trailer for temporary power.

PCJWSA DAILY OBSERVATION REPORT

Job No.: 276-3300-004 Phase: 1403 Task: 308

Report No.

016

2

Project: PCJWSA-WWTP Upgrade

Owner: PCJWSA, 34005 Cape Kiwanda Dr., Pacific City, OR. Page 1 of 3

Contractor: McClure & Sons, Inc. Date: 12/19/17

Contractor’s Rep./Title: Rob Bechloff, Project Manager Day: Tuesday

Weather A.M.: 50 °F P.M. 43 °F Site Conditions:

(Good) (Fair) (Poor)

Rain (5in), strong winds,

Location and Type of Work: PCJWSA, Pacific City, Construction.

Number and Classification of Contractors, Men, and Equipment (include condition of equipment):

MSI-# worker 5 US West Elec 1 Equipment

Justin Quimby ☒ Sean Rowley ☐ Chris Bate ☒ Forklift TH844C ☒ Choose an item. ☐

James Hosely ☒ Kevin Orton ☒ ☐ Skidsteer 287 ☒ Choose an item. ☐

Tyler Gaughan ☒ Rob Bechloff ☐ ☐ Mini-backhoe 305CR ☒ Choose an item. ☐

Shane Hollingworth ☒ Choose an item. ☐

Work in Progress (include report of operations, materials received and condition, work start/stop time, and any unusual conditions):

Began working on the dewater plan. Installed 9 of 14 dewatering well points. Excavated down between 5 to 6ft, installed non-woven geotextile fabric, then the 12in diameter slotted pipe (7ft 3in long), and then placed 1 ½ in minus drain rock around the pipe, folded over the fabric, and then covered the well with sand to the surface. These well were place approximately 7ft beyond the SBR foot print and around all four sides.

MSI and PCJWSA workers discussed the procedures for tomorrows 8in headworks piping bypass. Tony will not be onsite during the transfer.

Chris completed wiring the construction trailer from the meter box to the trailer fuse box.

Deliveries; supplies, equipment:

Kevin delivered the supplies for the dewatering system.

Two dump truck loads of 1 ½in minus drain rock for the dewatering wells.

Testing:

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

NA

Any Cause for Dispute, Change Orders, or Delays, and Reasons:

NA

Visitors:

Kevin Orton (MSI) onsite.

Notes:

Michael Kennedy from DEQ was onsite this afternoon to conduct a 1200C erosion control inspection. Michael said that the silt fence that we have installed is not the correct fencing and is not a best management practice (BMP). When I asked him why the fencing was incorrect he said that the since the wooden stakes were not part of the silt fence, even though the stakes were zip tied to the fabric and steel mesh. Michael also said that we do not need the silt fence that surrounds the site on the north and east sides of the site as well as the silt fence dams in the north ditch. He did say that we will need to place silt fence on the north side of the site across the street to prevent sediment from reaching the standing water in the wooded area. He also mentioned that a construction gravel entrance needs to be in place (for the north construction entrance and for the south headworks access). Michael said that we needed to add another line of silt protections on the south side of the property, south of the headworks, with wattles and place coconut fabric down on the disturbed ground at the headworks each night and weekend to keep the ground stable during rain events. MSI has not been keeping erosion control inspection records, during rain events, and starting today will be their first entry. Michael said if they can make the changes that he has talked about by Friday and send him pictures of the changes we will not fine us for being out of compliance with the permit. Justin Quimby will be the onsite erosion control inspector for MSI and be responsible for erosion control.

Ingmar Saul

Signature

Installing the dewatering well.

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

Backfilling the dewatering well.

US West Electric received the “Green” approval for service, electrical installation inspection sticker for the temporary power.

The construction trailer arrived for the resident project representative (RPR).

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

PCJWSA DAILY OBSERVATION REPORT

Job No.: 276-3300-004 Phase: 1403 Task: 308

Report No.

017

2

Project: PCJWSA-WWTP Upgrade

Owner: PCJWSA, 34005 Cape Kiwanda Dr., Pacific City, OR. Page 1 of 3

Contractor: McClure & Sons, Inc. Date: 12/20/17

Contractor’s Rep./Title: Rob Bechloff, Project Manager Day: Wednesday

Weather A.M.: 40, overcast °F P.M. 49, sunny °F Site Conditions:

(Good) (Fair) (Poor)

Location and Type of Work: PCJWSA, Pacific City, Construction.

Number and Classification of Contractors, Men, and Equipment (include condition of equipment):

MSI-# worker 4 US West Elec 0 Equipment

Justin Quimby ☒ Sean Rowley ☐ Chris Bate ☐ Forklift TH844C ☒ Choose an item. ☐

James Hosely ☒ Kevin Orton ☐ ☐ Skidsteer 287 ☒ Choose an item. ☐

Tyler Gaughan ☒ Rob Bechloff ☐ ☐ Mini-backhoe 305CR ☒ Choose an item. ☐

Shane Hollingworth ☒ Excavator SK140SR ☒

Work in Progress (include report of operations, materials received and condition, work start/stop time, and any unusual conditions):

Completed 8in headworks piping bypass. No issues during bypass connected. Removed shoring and backfilled excavation. System back up and running with no issues.

Installed gravel construction entrance at the north side entrance.

Deliveries; supplies, equipment:

Four (4) dump truck loads of 2in rock was delivered for the gravel construction entrance.

Testing:

NA

Any Cause for Dispute, Change Orders, or Delays, and Reasons:

NA

Visitors:

NA

Notes:

TPUD stopped by the site to confirm that the temporary power meter has passed inspection and that it is ready for hooked up. TPUD will connect the temporary power by the end of the week.

Cleaned and setup RPR trailer. Now waiting for power hookup.

Ingmar Saul

Signature

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

Completed 8in headworks piping bypass. Added extra support to hold the pipe inplace.

Backfilled bypass piping excavation and completed current work at the headworks.

Installing gravel construction entrance at the north entrance.

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

Completed gravel construction entrance.

PCJWSA DAILY OBSERVATION REPORT

Job No.: 276-3300-004 Phase: 1403 Task: 308

Report No.

018

2

Project: PCJWSA-WWTP Upgrade

Owner: PCJWSA, 34005 Cape Kiwanda Dr., Pacific City, OR. Page 1 of 3

Contractor: McClure & Sons, Inc. Date: 12/21/17

Contractor’s Rep./Title: Rob Bechloff, Project Manager Day: Thursday

Weather A.M.: 30, clear °F P.M. 45, sunny °F Site Conditions:

(Good) (Fair) (Poor)

Location and Type of Work: PCJWSA, Pacific City, Construction.

Number and Classification of Contractors, Men, and Equipment (include condition of equipment):

MSI-# worker 4 US West Elec 1 Equipment

Justin Quimby ☒ Sean Rowley ☐ Chris Bate ☒ Forklift TH844C ☒ Choose an item. ☐

James Hosely ☒ Kevin Orton ☒ ☐ Skidsteer 287 ☒ Choose an item. ☐

Tyler Gaughan ☐ Rob Bechloff ☐ ☐ Mini-backhoe 305CR ☒ Choose an item. ☐

Shane Hollingworth ☒ Excavator SK140SR ☒

Work in Progress (include report of operations, materials received and condition, work start/stop time, and any unusual conditions):

TPUD was onsite to connect temporary power to meter box.

Chris connected power to the RPR trailer. Now both construction trailers have power.

Installed gravel construction entrance on south side, for use during headworks construction. Replaced the silt fencing on the south side, per DEQ’s direction, and added hay waddles in front of the silt fence.

Installed two more dewatering well points around the SBR foundation foot print, for a total of 11 out of 14.

Deliveries; supplies, equipment:

Two (2) dump truck loads of 2in rock was delivered for the gravel construction access road to headworks.

Testing:

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

NA

Any Cause for Dispute, Change Orders, or Delays, and Reasons:

NA

Visitors:

Kevin Orton; he delivered the additional erosion control items (new silt fence, and hay waddles) and then left mid-morning.

Notes:

Ingmar Saul

Signature

TPUD connecting temporary power to meter box.

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

Installed gravel construction entrance for use during headworks construction.

Replaced silt fencing and added straw waddles.

Installing dewatering well points around the SBR foundation foot print.

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

PCJWSA DAILY OBSERVATION REPORT

Job No.: 276-3300-004 Phase: 1403 Task: 308

Report No.

019

2

Project: PCJWSA-WWTP Upgrade

Owner: PCJWSA, 34005 Cape Kiwanda Dr., Pacific City, OR. Page 1 of 2

Contractor: McClure & Sons, Inc. Date: 12/22/17

Contractor’s Rep./Title: Rob Bechloff, Project Manager Day: Friday

Weather A.M.: 38, overcast °F P.M. 46, drizzle °F Site Conditions:

(Good) (Fair) (Poor) 0.04in of rain.

Location and Type of Work: PCJWSA, Pacific City, Construction.

Number and Classification of Contractors, Men, and Equipment (include condition of equipment):

MSI-# worker 4 US West Elec 1 Equipment

Justin Quimby ☒ Sean Rowley ☐ Chris Bate ☒ Forklift TH844C ☒ Choose an item. ☐

James Hosely ☒ Kevin Orton ☒ ☐ Skidsteer 287 ☒ Choose an item. ☐

Tyler Gaughan ☐ Rob Bechloff ☐ ☐ Mini-backhoe 305CR ☒ Choose an item. ☐

Shane Hollingworth ☒ Excavator SK140SR ☐

Work in Progress (include report of operations, materials received and condition, work start/stop time, and any unusual conditions):

Installed a 4in electrical conduit underneath the roadway to provide electrical power to the dewatering pumps.

Performed cleaning and maintenance on the equipment.

Repaired the rusty areas on the dewatering settling tank

Deliveries; supplies, equipment:

Kevin delivered 14 submersible pumps for the dewatering plan.

Testing:

NA

Any Cause for Dispute, Change Orders, or Delays, and Reasons:

NA

Visitors:

Kevin Orton onsite, left mid-morning.

Notes:

Ingmar Saul

Signature

PARAMETRIX DAILY OBSERVATION REPORT (cont.) Form 01-CN-65/Rev. 10/17

Installing a 4in electrical conduit under the roadway to provide power to the dewatering pumps.

Completed backfilling the conduit trench and restoring the road.