    DAG Traffic Primer

    May 24, 2012

    CASEY ARBORWAY PROJECT

  • 7/31/2019 DAG Traffic Primer Meeting

    2/69

    1. Previous Traffic Analysis Summary

    2. Updates Post Planning Phase

    3. Signal Coordination

    4. Parking Supply

    5. Transit Service and Accommodations

    6. DAG #3: Mobility, Monday, June 18, 2012

    Todays Agenda

  • 7/31/2019 DAG Traffic Primer Meeting

    3/69

    Key Assumptions in Traffic AnalysisTraffic Calming

    Level of Service (LOS) & Queue Results

    Right Turn TreatmentsTraffic Operations

    Pedestrian Crossings

    Transit Accommodations

    Emergency Response Times

    Alternative Routes

  • 7/31/2019 DAG Traffic Primer Meeting

    4/69

  • 7/31/2019 DAG Traffic Primer Meeting

    5/69

    How to calm traffic with wide median DAG #3

    Rights on Red Allowed Design allows but

    requires further

    discussion on DAG #3

    Level of Service (LOS) Presentation today

    LOS with 2-lanes in each direction DAG #3

    Location of Pedestrian and bike paths DAG #3

    Path Analysis for all modes Experience

    of Corridor

    Presentation today

  • 7/31/2019 DAG Traffic Primer Meeting

    6/69

    North/south and east/west traffic flows Clarify

    Alternative Regional Routes - Walk Hill? Clarify Design or

    Construction Phase?

    Parking loss of off-street impacts on

    design

    Presentation today

    Emergency Response during Construction DAG #4

    24 hour review of traffic volumes (peak and

    non-peak)

    Presentation today

  • 7/31/2019 DAG Traffic Primer Meeting

    7/69

    Previous Traffic Analysis

    Summary

    A Look Back

  • 7/31/2019 DAG Traffic Primer Meeting

    8/69

  • 7/31/2019 DAG Traffic Primer Meeting

    9/69

    Key Assumptions inTraffic Analysis

  • 7/31/2019 DAG Traffic Primer Meeting

    10/69

    Top 5 Areas of Concern Today

  • 7/31/2019 DAG Traffic Primer Meeting

    11/69

  • 7/31/2019 DAG Traffic Primer Meeting

    12/69

  • 7/31/2019 DAG Traffic Primer Meeting

    13/69

    :

    Casey Overpass (Regional): + 5%

    Surface Roads (Regional & Local): + 12%

    + 13%

    + 10%

  • 7/31/2019 DAG Traffic Primer Meeting

    14/69

    Overall volumes

    Travel times

    Air Quality

  • 7/31/2019 DAG Traffic Primer Meeting

    15/69

    Traffic Calming

  • 7/31/2019 DAG Traffic Primer Meeting

    16/69

  • 7/31/2019 DAG Traffic Primer Meeting

    17/69

    Level of Service &Queue Analysis Results

  • 7/31/2019 DAG Traffic Primer Meeting

    18/69

  • 7/31/2019 DAG Traffic Primer Meeting

    19/69

  • 7/31/2019 DAG Traffic Primer Meeting

    20/69

  • 7/31/2019 DAG Traffic Primer Meeting

    21/69

    Regional AnalysisCentral Transportation Planning

    Staff Analysis

  • 7/31/2019 DAG Traffic Primer Meeting

    22/69

    CTPS Regional Traffic Model

    Model runs for At-Grade and Bridge

    Alternatives

    Initial results show no significant changes to:

    Traffic Volumes

    Vehicle Miles Traveled (VMT)

    Vehicle Hours Traveled (VHT)

    Air Quality/Emissions

  • 7/31/2019 DAG Traffic Primer Meeting

    23/69

  • 7/31/2019 DAG Traffic Primer Meeting

    24/69

    Traffic Operations Improved for both

    alternatives over existing conditions (see

    Technical Memoranda)

    Acceptable traffic operations provided forboth alternatives

    Queues managed within available

    storage area

    Operations comparable for at-grade and

    bridge alternatives

  • 7/31/2019 DAG Traffic Primer Meeting

    25/69

    Travel Time Comparison

    Travel times for existing based oncurrent volumes and presented forcomparison only

    Travel times for alternatives basedon 2035 volumes and analysis

    Travel times are for peak hours

  • 7/31/2019 DAG Traffic Primer Meeting

    26/69

    Peak Hour Travel Time Results

    Both alternatives improve overall travel times within

    the project limits

    Overall travel times for the alternatives are

    comparable

    At-grade improves travel time for many moves,

    particularly north-south

    At-grade increases travel time for affected left-turns

    and east-west regional traffic (30-90 seconds)

    Regional delays offset local travel time increases

  • 7/31/2019 DAG Traffic Primer Meeting

    27/69

    Future Operations with Modified

    Lane Configurations

    1. Pros and Cons of different lane

    configurations

    2. Queues and signalization

    3. Right sizing roadway 2016 versus 2035

  • 7/31/2019 DAG Traffic Primer Meeting

    28/69

    Right-Turn Treatments

  • 7/31/2019 DAG Traffic Primer Meeting

    29/69

    Traffic Operations

  • 7/31/2019 DAG Traffic Primer Meeting

    30/69

    Future Traffic Conditions: Summary

  • 7/31/2019 DAG Traffic Primer Meeting

    31/69

    East West

    Regional Travel

    Regional travel times relatively unchanged for

    overall trip Any in-bound delays at grade on New Washington

    are offset by existing delays at Murray Circle

    In fact, the new design of New Washington maymeter the travel times, providing more

    systematic processing of traffic

  • 7/31/2019 DAG Traffic Primer Meeting

    32/69

    Bar chart of traffic by time of day

    Discussion

  • 7/31/2019 DAG Traffic Primer Meeting

    33/69

    Pedestrian Crossings

  • 7/31/2019 DAG Traffic Primer Meeting

    34/69

    Pedestrian Crossings

  • 7/31/2019 DAG Traffic Primer Meeting

    35/69

    Transit Accommodations

  • 7/31/2019 DAG Traffic Primer Meeting

    36/69

    Transit Signalization

  • 7/31/2019 DAG Traffic Primer Meeting

    37/69

    School Bus Coordination

  • 7/31/2019 DAG Traffic Primer Meeting

    38/69

    Compiling data on busvolumes by peak hour,

    including deadhead buses

    Coordination on bus priorities

  • 7/31/2019 DAG Traffic Primer Meeting

    39/69

    Emergency ResponseTime

  • 7/31/2019 DAG Traffic Primer Meeting

    40/69

  • 7/31/2019 DAG Traffic Primer Meeting

    41/69

    Alternative Routes

  • 7/31/2019 DAG Traffic Primer Meeting

    42/69

  • 7/31/2019 DAG Traffic Primer Meeting

    43/69

    Local Diversions (cut-through)

  • 7/31/2019 DAG Traffic Primer Meeting

    44/69

  • 7/31/2019 DAG Traffic Primer Meeting

    45/69

    Casey Project Web Site Documentshttp://www.massdot.state.ma.us/caseyoverpass/

  • 7/31/2019 DAG Traffic Primer Meeting

    46/69

    Traffic

    Documents

  • 7/31/2019 DAG Traffic Primer Meeting

    47/69

    Meetings

    Notices

    Presentations Graphics

    Minutes

  • 7/31/2019 DAG Traffic Primer Meeting

    48/69

  • 7/31/2019 DAG Traffic Primer Meeting

    49/69

    Updates Post Planning Phase

  • 7/31/2019 DAG Traffic Primer Meeting

    50/69

    Conducted by CDM Smith

    Dec. 11Jan 12

  • 7/31/2019 DAG Traffic Primer Meeting

    51/69

    Summary:

    , the traffic analysis provided for the Casey overpass

    Project has been performed in a professional manner

    consistent with standard traffic engineering practices and

    the guidelines of the MassDOT 2006 Project Development

    and Design Guidebook.

    traffic operations will be more efficient in the future year

    with either alternative than the existing conditions or no

    build conditions.

  • 7/31/2019 DAG Traffic Primer Meeting

    52/69

    Report on Evaluation of Two DesignOptions for Casey Overpass

  • 7/31/2019 DAG Traffic Primer Meeting

    53/69

    Traffic count data for Cemetery Road

    Bus left-turn volumes

    Minor graphic clarifications

    Adjusted volumes at Orchardhill Road

  • 7/31/2019 DAG Traffic Primer Meeting

    54/69

    Ongoing/Future Traffic

    Analysis Summary

    A Look Ahead

  • 7/31/2019 DAG Traffic Primer Meeting

    55/69

    Signal Coordination

  • 7/31/2019 DAG Traffic Primer Meeting

    56/69

    :

    Casey Arborway (E-W)

    Washington Street (N-S)

    Hyde Park Avenue (N-S)

  • 7/31/2019 DAG Traffic Primer Meeting

    57/69

    Parking Supply

    On and Off-Street

  • 7/31/2019 DAG Traffic Primer Meeting

    58/69

    Existing Parking Supply

  • 7/31/2019 DAG Traffic Primer Meeting

    59/69

    Proposed Parking Supply

  • 7/31/2019 DAG Traffic Primer Meeting

    60/69

    Parking changes

    were reflected in

    the future traffic

    volumes

    (i.e. -LAZparking lot)

  • 7/31/2019 DAG Traffic Primer Meeting

    61/69

    Next Steps:

    DAG #3: Mobility Topics

  • 7/31/2019 DAG Traffic Primer Meeting

    62/69

    :

    Off-Peak Design Options

    Build Year LOS, queues, delays

    Turn Treatments

    Signal Details

    Bus Operations

    Cut-Thru Traffic

  • 7/31/2019 DAG Traffic Primer Meeting

    63/69

  • 7/31/2019 DAG Traffic Primer Meeting

    64/69

    End of Presentation

    Extra Slides

  • 7/31/2019 DAG Traffic Primer Meeting

    65/69

    Conceptual AlternativesTRAFFIC

  • 7/31/2019 DAG Traffic Primer Meeting

    66/69

    Traffic Simulations

    Bridge Alternative

    At-Grade Alternative

  • 7/31/2019 DAG Traffic Primer Meeting

    67/69

    How can traffic operations be similar?

    North-south traffic volumes unchanged betweenalternatives

    At-grade offers additional improvements to critical north-

    south link on South Street Removal of Bridge only adds east-west through traffic to

    surface streets (additional thru lanes provided at-grade)

    All turning movements happen at grade regardless

  • 7/31/2019 DAG Traffic Primer Meeting

    68/69

    At-Grade Conceptual Alternative

    DESIGNER GENERALS WARNING: THE DESIGN SHOWNHERE IS PRELIMINARY AND CONCEPTUAL, DESPITE THE

    HARD LINE FINISHED STYLE RESULTING FROM THESOFTWARE PROGRAMS USED

  • 7/31/2019 DAG Traffic Primer Meeting

    69/69

    Bridge Conceptual Alternative

    DESIGNER GENERALS WARNING: THE DESIGN SHOWN