Connecting Offshore Windfarm Clusters by HVDC Light®

Günter Stark, Windstärke 09 “Kurs Offshore“, Bremerhaven 16/17 Juni 2009

Page 2: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 2

Overview

Why HVDC ?

HVDC Classic, HVDC Light®

BorWin 1

Project Overview

Platform

Sea Cable

Land Cable

Outlook

Page 3: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 3

Development of the Electrical Grid

After first steps with DC:Standardisation with three-phaseAC current

Power transmission over longdistances at high voltage levels750kV/400kV in order to reduce losses

Production and consumptionof electrical energy in the samegeographical area.

Page 4: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 4

Characteristics of AC Cable Connections

Advantages

Known technology

Economical for short distances

Disadvantages

Reactive power compensation necessary

Max. economical distance around 100km

Longer distances need compensation on half way

Max. power around 250 MW (today)

Instability and resonancesbetween wind farm and grid possible

Page 5: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 5

What is HVDC?

DC Current

AC Current

HVDC Converter

HVDC Converter AC Current

HVDC Technology has been developed 50 Years ago.

Page 6: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 6

HVDC TechnologiesHVDC Classic and HVDC Light

600 MW,200 x 120 x 22 m

HVDC Classic (300 – 6.400 MW)Thyristor-Technology

Typical design: Valve building, filter and switchgear

Mass impregnated cables

Limited reactive power supply

HVDC Light® (50 – 1.100 MW)IGBT-Technology

Typical Design: Building withall components except transformers

VPE-Cable

Full reactive power supply

Voltage Source Converter

Black start capability550 MW,

120 x 50 x 11 m

Page 7: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 7

HVDC Classic 3000 MW Longquan Converter Station, Panorama View

Page 8: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 8

Overview

Why HVDC ?

HVDC Classic, HVDC Light®

BorWin 1

Project Overview

Platform

Sea Cable

Land Cable

Outlook

Page 9: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 11

Offshore wind power connectorsHVDC Light grid connection

Page 10: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 15

Example: Grid connection of the offshore wind farms cluster “SylWin” in the German North Sea

Transmission distance:

Sea cable: 160 km

Land cable: 50 km

Offshore wind farms

Sandbank 24

Nördlicher Grund

DanTysk

Butendiek

Nordpassage

Page 11: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 16

Scenario 1 with 10 x 200 MW AC grid connection

Platform

AC Cable

Page 12: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 17

Scenario 2 with 5 x 400 MW HVDC grid connection

PlatformDC Cable

Page 13: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 18

Scenario 3 with 2 x 1000 MW HVDC grid connection

PlatformDC CableAC Cable

Page 14: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 19

The first project to connect offshore wind BorWin 1

Customer: E.ON, Germany

Customer‘s need:connection of a 400 MW offshore wind farm to the German transmission grid125 km coast distancewithin two years (in operation end of 2009)

ABB response400 MW HVDC Light®system, ±150 kV125 km sea cable, 75 km land cableTurnkey delivery including platform

Page 15: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 20

BorWin 1 Single Line Diagram

DC

Cap

acito

r

AC B

reak

er +

pr

eins

ert.

Res

isto

r

DC

Cho

pper

Page 16: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 21

BorWin 1 Platform layout

Topside weight approx 3.300 t(incl. 800 t ABB equipment)Size approx 52 x 35 x 22 m Jacket 1.500 t (Height 62 m, sea level to topside approx 20 m) Topside and jacket verified, witnessed and approved by Germanische Lloyd according to the German rules & regulationsPermits for the platform has to be obtained from BSH before start of installation & operation

Page 17: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 22

BorWin 1 Platform and Jacket

Page 18: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 23

BorWin 1Plattform Montage

Plattformdeck:3800 to. ABB Equipment ca. 850 to.Maße: 50x30x25m

Montage in Vlisssingen NL

Page 19: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 25

BorWin 1HVDC Light® IGBT Module Stack und Transformator

Plattformdeck:3800 to. ABB Equipment ca. 850 to.Maße: 50x30x25m

Montage in Vlisssingen NL

Page 20: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 26

BorWin 1HVDC Light Station, Diele

Cooling Units

ReactorsValves

Chopper

AC Filter Yard

DC FilterYard

Power Transformer

Page 21: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 27

BorWin 1HVDC Light® Cables

121 km sea cable (1200 mm2 Cu)

8,4 km Wadden Sea, Norderney und Ems (1600 mm2 Cu)

73,6 km land cable (2300 mm2 AL)

Triple extruded VPE

- Conductor shield- HVDC Polymer Isolator- Isolator shield

Lead shield

Armour steel protection

Outer layer: Polypropylen

Page 22: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 28

BorWin 1Installation des Landkabels im Sommer 2008

Page 23: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 29

Temperature distribution in the Ground (Example)

Max. losses of 60 W/m result in max.55 W/m2 at Surface above the cable (Solar Radiation in Winter approx: 200 W/m2)

Temperature at Cable Jacket in Summer Conditions: 42 °C(Dray out of the earth will occur earliest at 50 °C )

4139373533312927252321191715

Temperature in °C

-1 -0,8 -0,6 -0,4 -0,2 0 0,2 0,4 0,6 0,8 1 1,2

0

-0,2

-0,4

-0,6

-0,8

-1,0

-1,2

-1,4

Depth in m

Distance in m

40

35

30

25

20

Temperature in °C

0 0,40,2 0,6 0,8 1

Distance in m

Temperature profilecorrespondingto the red line

Page 24: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 30

Magnetic Field

No electrical field outside the cable

Very low magnetic field

Exactly similar to natural magnetic field

Less that 1/10 of Earth‘s magnetic field

2 m above the cable (≈ 1 m above Ground)

Cable Distance in m

Mag

netic

Fie

ld in

Mic

rote

sla

DC CableEarth Magnetic FieldLimit for Public Areas

Page 25: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 31

Conclusion

HVDC will be an important contribution for the challenges in the expansion of the grid in Germany -today and in the future.

Offshore wind farm connection

Additional transmission capability of the existing 400-kV-Grid

Many innovations during the last 15 years with ongoing development

No substitute for the existing development of the AC grid.

Page 26: D23_ABB_Stark Winfarm and HVDC Light

© ABB AG Juni, 2009 GST | Folie 32