cv mahmoud abdalla hassan-updated

6
Mahmoud Abdalla Hassan CONSTRUCUTION SUPERINTENDED 21 Years’ Experience with multinational companies 12 Abdel Hameed Hassan Elsharkawy 5 Year Gulf Experience (Qatar) St. – Ezbet Elsharakwa, Email Address : [email protected] Elmatareia Amam meadeit Eldelta Cairo, Egypt. Work (Qatar):+97470486127 Home (Egypt): +20 100 651 84 14 Objective Seeking a challenging career opportunity in the field of Construction INDUSTRY to enhance my interpersonal, professional and technical skills, in a well established multinational company. Education Technical Architectural institute (Site Section) - Cairo Member Observance Association Date of Graduation: 1989 ADDITIONAL TRAINING ATTENDED: 1- First Aid (Hamad Hospital), 2- Orchestra (QDVC training center), 3- Basic Fire Fighting (Enertec), 4- Scaffolder Inspector(Enertec), 5- Iosh Managing Safely (D.I.S.S.). 6- Confined Space entry. (QDVC training centre). 7- He holds a Gulf driving license. 8- Leica Digicat 650 I Al Rafidain Co (Rafco) Career related experience Companies served in this duration (Reverse chronological order) : Employer : QDVC (Qatari Diar & Vinci Construction JV) (May2011 to Present) Project : Sheraton Park Project (SPP-2) Position : Superintendent Maintain the vertical shotcrete 11 meter depth from car park level. Mahmoud Abdalla CV Page 1 of 6

Upload: mahmoud-hegazy

Post on 11-Jan-2017

103 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: CV Mahmoud Abdalla Hassan-updated

Mahmoud Abdalla Hassan CONSTRUCUTION SUPERINTENDED 21 Years’ Experience with multinational companies 12 Abdel Hameed Hassan Elsharkawy5 Year Gulf Experience (Qatar) St. – Ezbet Elsharakwa, Email Address : [email protected] Elmatareia Amam meadeit Eldelta

Cairo, Egypt. Work (Qatar):+97470486127 Home (Egypt): +20 100 651 84 14

Objective Seeking a challenging career opportunity in the field of Construction INDUSTRY to enhance my interpersonal, professional and technical skills, in a well established multinational company.

Education

Technical Architectural institute (Site Section) - CairoMember Observance Association Date of Graduation: 1989

ADDITIONAL TRAINING ATTENDED:

1- First Aid (Hamad Hospital), 2- Orchestra (QDVC training center),3- Basic Fire Fighting (Enertec),4- Scaffolder Inspector(Enertec),5- Iosh Managing Safely (D.I.S.S.).6- Confined Space entry. (QDVC training centre).7- He holds a Gulf driving license.8- Leica Digicat 650 I Al Rafidain Co (Rafco)

Career related experienceCompanies served in this duration (Reverse chronological order):

Employer : QDVC (Qatari Diar & Vinci Construction JV) (May2011 to Present)

Project : Sheraton Park Project (SPP-2)Position : Superintendent

Maintain the vertical shotcrete 11 meter depth from car park level. Organize the equipments distribution among supervision team and distribute the target to

them. Anchoring for almost vertical slope protection and shotcret with wire mesh and dowels. Geotextile and water proofing installation along the vertical surface and for substation. Supervise all type of excavation work and dewatering.

Employer : Vinci Construction Grand Projects (French Co.) (From 15 October 2009 till May 2011)

Mahmoud Abdalla CV Page 1 of 4

Page 2: CV Mahmoud Abdalla Hassan-updated

Project : Greater Cairo Metro Line – 3Position : Superintendent

Manage the site installation include preparing the site, distribute the Equipment then earth works Excavation, Backfilling and Compaction in different Layers.

Manage construction works including (Formwork System, metal scaffolding system, foreface concrete, masonry works, and plastering).

Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows). Survey works including the usages of the Survey instruments. Prepare and install precast.

Employer : Vinci Construction Grand Projects (French Co.) (From 15 May 2008 Until 18 November 2008 )

Project : ALGERIA METROPosition : Superintendent

Manage the site installation include preparing the site, distribute the Equipment then earth works Excavation, Backfilling and Compaction in different Layers.

Manage construction works including (Formwork System, metal scaffolding system, foreface concrete, masonry works, and plastering).

Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows). Survey works including the usages of the Survey instruments. Prepare and install precast.

Employer : Vinci Construction Grand Projects & Bilfinger Berger & Orascom CI JV.

(From 16 August 2006 to May 2008 ) Project : New Nagaa Hammadi Barrage & Hydropower Plant. 160 million

Euros.

Position : Site Supervisor

Manage finishing & cosmetics works (repair works, painting, raised floor, door, windows) Special works for expansion Joints for bridge. Metal work handrail, fence, windows and door…….. Inspection and handing over for many items…….

Employer : Saline Nigeria Ltd. (Italian Co.) (From 28 April 2005 to 15 June 2006) Project : Bridges and City Development Project (Nigeria)Position : Site Supervisor

Manage of site installation of Camp, Bridge and deflation network. Special works for expansion Joints for bridge. Manage the site installation include preparing the site, distributing the Equipment then

earthworks Excavation, Backfilling and Compaction in different Layers. Manage construction works including (Formworks System, metal scaffolding system, foreface

concrete, masonry works, and plastering). Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows. Survey works including the usages of the Survey instruments.

Employer : Vinci Construction Grand Projects, Bilfinger Berger & Orascom CI JV.

(From 09 July 2002 to 20 MARCH 2005)

Mahmoud Abdalla CV Page 2 of 4

Page 3: CV Mahmoud Abdalla Hassan-updated

Project : New Nagaa Hammadi Barrage & Hydropower Plant. 160 million Euros.

Position : Site Supervisor

Manage of Site Camp Construction. Concrete for bridge and handrail Precast yard Section. Head regulator works & renovation. Special works for expansion Joints for bridge. Manage the site installation include preparing the site, distributing the Equipment then

earthworks Excavation, Backfilling and Compaction in different Layers. Manage construction works including (Formwork System, metal scaffolding system, foreface

concrete, masonry works, and plastering). Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows). Survey works including the usages of the Survey instruments.

Employer : Orascom CI & C.C.I.C co.(From 15 October 2001 till 01 July 2002)

Project : Golden Pyramids Project Position : Site Supervisor

Manage the site installation include preparing the site, distribute the Equipment then earth works Excavation, Backfilling and Compaction in different Layers

Manage construction works including (Formwork System, metal scaffolding system, foreface concrete, masonry works, and plastering)

Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows.

Employer : Campenon Bernard S.G.E. (From 10 OCTOBER 2000 to 15 OCTOBER 2001) Project : ElazharRoad Tunnel Project Position : Site Supervisor

Manage the site installation include preparing the site, distribute the Equipment then earth works Excavation, Backfilling and Compaction in different Layers.

Manage construction works including (Formwork System, metal scaffolding system, foreface concrete, masonry works, and plastering).

Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows). Survey works including the usages of the Survey instruments. Prepare and install precast.

Employer : Campenon Bernard S.G.E. (From 21 February 1995 till 09 OCTOBER 2000)

Project : Cairo Metro Project Line 2Position : Site Supervisor

Ramsis Station : From 20/02/1995 to 15/01/1997 Tahrir Station : From 15/01/1997 to 10/01/1998 Opera Station : From 10/01/1998 to 06/06/1999 Giza Station : From 06/06/1999 to 09/09/2000

Manage the site installation include preparing the site, distribute the Equipment then earth works Excavation, Backfilling and Compaction in different Layers

Manage construction works including (Formwork System, metal scaffolding system, foreface concrete, masonry works, and plastering)

Mahmoud Abdalla CV Page 3 of 4

Page 4: CV Mahmoud Abdalla Hassan-updated

Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows. Survey works including the usages of the Survey instruments.

Employer : KAJIMA Corporation (Japan Co.) (From 01 FEBRUARY 1993 till 16 February 1995)

Project : The project of building high institute of nursing at El-Kasr El Ainy

Position : Site Supervisor

Supervisor of plumbing works. Pipe works (supply water lines, drainage lines). Machines installations. Pumps erections. Erection for elevated tank (per fabricated type). Installation works (Hot water lines covered by glass wood and P.V.C Jacket). Supervisor of air conditioners works. Pipes works (refrigerant pipe). Install machine (split type package air conditioners and fan). Installation works (covered by glass wood and P.V.C Jacket for refrigerant pipe) . Coordination for site works. Arrangement for materials and equipment. Coordination for workers. Survey works including the usages of the Survey instruments.

Employer : SPECO El Nile (Reinforced Concrete).(From 11 January 1992 till 20 April 1993)

Project : The project of building 1300 building at Elsalam, CityPosition : Site Supervisor

Manage the site installation include preparing the site, distribute the Equipment then earth works Excavation, Backfilling and Compaction in different Layers

Manage construction works including (Formwork System, metal scaffolding system, foreface concrete, masonry works, and plastering)

Manage finishing and cosmetics works (repair works, painting, raised floor, door, and windows. Survey works including the usages of the Survey instruments.

Computer and Language skills

MS word & MS excel. Language skills: Good command of English and Arabic / Fair knowledge of French.

Personal data Date of birth : 16/07/1969 Military status : Exempted Marital status : Married Place of birth : Cairo (Egypt)

Strength : Strong determination positive attitude and flexibility.

Hobbies : Sports, listening music and Internet and interact with new people.

Mahmoud Abdalla Hassan

Mahmoud Abdalla CV Page 4 of 4