current trial of pavement management system in japan
DESCRIPTION
Presentation slides of Dr. AOKI (PASCO corporation) at International seminar on Technical assistance to Vietnamese pavement management.TRANSCRIPT
© PASCO CORPORATION 1953-2010- 1 -
International Seminar on Implementation of Technical Assistance for Road Asset Management in Vietnam
Current Trial of Asset Management in Japan – Japanese Experience
May 31, 2010
Kazuya AOKI, Ph.D.
PASCO Corporation
© PASCO CORPORATION 1953-2010
Contents
1. Current situation of asset management in Japan
2. Deterioration process of road pavement3. Challenges of Pavement asset management
• Evaluation of deterioration performance with inspection data
4. Role of Pavement Management System• Pavement database• Issues of Pave. DB install• Web-Based PMS• GIS-Based PMS
- 2 -
© PASCO CORPORATION 1953-2010
• Institution (government subsidies)
Current situation of asset management in Japan
1) Current state of asset management practice in Japan (background)– Developing of deterioration forecasting model, LCC evaluation model and optimal repair
model and accumulation of inspection data made it possible to compute the budget planning and repair strategy to minimize LCC by preventive repair and set the service level.
– Starting of making asset management plan for pavement, bridge, tunnel and water utilities.
- 3 -
• Deterioration forecasting model• LCC analysis model (optimal repair model)
R&D
• Consciousness of importance of maintenance and critical feeling• Accumulation of maintenance database(inspection data)
Asset manager
Environment
Practical realization of asset management(LCC analysis, long-term maintenance planning … )
AM plan to aim the life extension, cost reduction by preventive repair
© PASCO CORPORATION 1953-2010
0
5
10
15
20
25
30
35
0 5 10 15 20 25 30
Elapsed time (year)
Rut
ting
Vol
ume
(mm
)
Deterioration process of road pavement
• Uncertainty of deterioration process of pavement– Deterioration of pavement is generated according to various factors
– It is impossible to forecast the deterioration process correctly
- 4 -
Inspection data on expressway in Japan
© PASCO CORPORATION 1953-2010Elapsed Time (year)
Ra
ting
0 10 20 30 40 50
76
54
32
1
Challenges of Pavement asset management
• It is difficult to specify the deterioration mechanism from observational data.
Fig. differences in deterioration speed from route on expressway
- 5 -
© PASCO CORPORATION 1953-2010
Challenges of Pavement asset management
• It is difficult to specify the deterioration mechanism from observational data.
Elapsed Year
Ra
nki
ng
0 20 40 60 80
76
54
32
1 Fig. Comparison of the deterioration curve of same characteristic route. ( pavement type, traffic, and structure)
- 6 -
© PASCO CORPORATION 1953-2010
Evaluation of deterioration performance with inspection data
• Main uncertainty of infrastructure asset management– Deterioration performance
• Deterioration forecasting model– Impossible to forecast deterioration process– But, possible to evaluate the past deterioration performance using archived inspection data.
– Possible to make uncertainty (risk) small by decision-making using past deterioration performance evaluation.
• Not forecasting, but evaluation• Important to accumulate inspection data which recorded actual
deterioration performance. • Possible to model an actual deterioration phenomenon by
evaluating deterioration performance using inspection data• Statistical deterioration forecasting model can reproduce the
performance of actual local road- 7 -
© PASCO CORPORATION 1953-2010
Role of Pavement Management System
- 8 -
Plan
DoSee
Display of inventory data
Summary and indicationsInput of dairy patrol info
Input of repair info
Detailed investigation of repair sections
Daily patrol, repair workChecking of results of
repair works
Annual Level
Do
See Scheduled inspection
Import inspection data to DB
Plan Selection of repair sections, prioritization, budget allocation…
Making list of repair sections
Middle Term Level
Data management
Strategic management
Plan Asset management planning (budget, repair criteria, repair method, service level, inspection interval…)
Do
Check Monitoring of maintenance work, work achievement
Action Planning revision, updating of deterioration forecasting model
Budget simulation
Estimation of deterioration forecasting model
Summary and indication(GIS-based)
Pavement DB
LCC analysis
Performance evaluation
© PASCO CORPORATION 1953-2010
Role of Pavement Management System• Data management (main functions)
– Management and practical use of huge information which are generated on daily maintenance work
• Maintenance and updating of pavement data• Updating of scheduled inspection data• Accumulation of repair information• Reference of pavement inventory data
• Strategic management (optional functions)– Asset management planning, performance evaluation and
updating of planning based on pavement archived database– Application is not necessarily needed (less frequently used)– Asset management technologies are developed in the future
- 9 -
© PASCO CORPORATION 1953-2010
Role of Pavement Management System
• Main role of PMS is accumulating of knowledge data – Archived inspection data
• Time series evaluation of deterioration performance
– Archived repair data (including test construction data)
• Evaluation of effect of improvement
– Issue about section length• Adjustment with minimum unit of construction for
supporting the annual level (100m in Japan)
• Data coupling of construction data and inspection data is difficult.
© PASCO CORPORATION 1953-2010
Pavement databaseInspection
•Inspection time
•Pavement type
•Inspection method
•Cracking rate (%)
•Rutting (average and maximum) (mm)
•Smoothness (mm)
•MCI
Repair history
•Repair time•Repair method•Pavement type•Material type•Repair Cost
Road information
•Road name
•Administration office
•Road type
•Lane No.
•Section length
•Distance mark
•Width
•Attached structure
•Traffic volume
•Cracking rate (%)•Rutting (average and maximum) (mm)•Smoothness (mm)•MCI
1..*
1..*
1..*
1
20m~100m
Current conditions
Deterioration Performance
•Deterioration forecasting model•Hazard rate•Benchmarking index
© PASCO CORPORATION 1953-2010
• Accumulation of time series archived data– In order to evaluate the deterioration performance, it is necessary to
accumulate the time series data that corresponds to pavement life length(10 or 20 years)
• Fixing of evaluation unit– Same position is measured as past measured position. (Pavement is
consecutive facilities)– It depends on the accuracy of measurement equipment (distance meter, GPS)– In Japan, the accuracy of location information is kept by GIS-based map and
photo image data with measuring.– When inspection, information (landmark) to judge the position of each section
is recorded.
Issues of Pave. DB install
- 12 -
Inspection
RepairInspectio
nRepair
Time series
Data at the same position is always recorded.
Spacial accuracy
© PASCO CORPORATION 1953-2010
Issues of Pave. DB install• Setting of evaluation length
– Acquired data (inspection and repair data) for the daily maintenance work is secondarily used in asset management.
– Micro data is used for the macro analysis.– A minimum length of the evaluation is adjusted to the judgment of
the repair (find of damage) and the repair section.– In Japan, unit length is basically 100m, but nowadays, in order to
evaluate partial damage, the detailed data of 20m or 50m evaluation is acquired. ( it depends on capability of measurement equipment)
- 13 -
100m : Cracking rate = 10%
20m : Cracking rate = 50%
© PASCO CORPORATION 1953-2010
Issues of Pave. DB install• Data update
– if the data update is not executed, database becomes obsolete and the reliability of data decreases.
– Because the data update is complex work, it is a point that it improves the efficiency of the update work.
– Inspection data (batch data input)• Idea : When the inspection data is made, the inspection data is
put together on the format of DB beforehand. →DB design that automatically can be updated.
– Repair data ( input in each case)• Idea : making of easy interface to input repair data for all users
and the situation and the place of construction are recorded by photograph data etc.
– Web-Based application• Efficiency improvement of data input work
- 14 -
© PASCO CORPORATION 1953-2010
Web-Based PMS
• Database is managed collectively in a central office• The system function is limited by each user
– AM manager : Strategic management– Field worker : data input and browse
• The maintenance of system and data is easy.• Depends on network infrastructure
- 15 -
LAN
Server
Repair data
Patrol data
input
Inspection data
Install (auto)
Strategic management functions
Data management functions
© PASCO CORPORATION 1953-2010
GIS-Based PMS
• Basic window
(a) Legend and layer manage
(b) Map and attribute display
(c) function tool bar
- 16 -
© PASCO CORPORATION 1953-2010
GIS-Based PMS
100m
20m
Integrated evaluation of 20m data
Detailed damage data
• Inspection data– Time series data
• Current state of pavement– 100m, 20m
• Repair archived data• Road inventory and environmental
data– Traffic data, etc.
• Deterioration hazard rate• Structural survey result • Repair candidate section info.
- 17 -
© PASCO CORPORATION 1953-2010
GIS-Based PMS
• Display of comparative assessment (each route) result of deterioration risk
- 18 -
© PASCO CORPORATION 1953-2010
GIS-Based PMS
• Computing the repair criteria and repair cost– repair criteria for each route– Monte Carlo simulation model
• Influence analysis given to service level of pavement– Under budget constraint
Monte Carlo simulation conditions
Simulation results
Budget constraintOutput and map view
Repair cost Repair length
Average service level Service level
Simulation condition settingOutput sample
- 19 -
© PASCO CORPORATION 1953-2010 - 20 -