current status of dc distribution system by kepco · testing infrastructure for dc distribution...
TRANSCRIPT
![Page 1: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/1.jpg)
0
Current status of DC distribution system by KEPCO
Jintae Cho
Senior Researcher
KEPCO Research Institute
May 24, 2019
![Page 2: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/2.jpg)
1
Contents
Introduction of KEPRI 1
Background 2
Research activities of KEPCO 3
Future plan 4
Conclusion 5
![Page 3: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/3.jpg)
2
Introduction of KEPRI
![Page 4: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/4.jpg)
3
R&D Vision
Strategy
Structure
![Page 5: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/5.jpg)
4
![Page 6: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/6.jpg)
5
Demand increase of DC and high quality power
Growth of renewable energy
• By 2020, 50% of total will be digital loads(EPRI)
• Increasing high density DC loads (IDC)
• Energy efficiency improvement needs
- Dependence of Energy on Overseas (98%)
• AC/DC conversion energy lost is 10 ~ 25%
• Increase of DC output power distributed generation (PV, Fuel cell, Battery, etc.)
- By 2030, provide 20% of total primary energy supply with NRE
• DC market will grow to $241 billion in 2025(Navigant Research Report)
Background
![Page 7: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/7.jpg)
6
IDC (Internet Data Center), DC home
Global trend
• ABB 380V DC Date Center • LBNL DC home
• Fraunhofer Power Electronics • India Solar DC home
![Page 8: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/8.jpg)
7
Others
• NTT Hikari project • Benz DC automation
• DC Greenhouse • Siemens DC grid for offshore vessel
![Page 9: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/9.jpg)
8
Domestic Trend
![Page 10: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/10.jpg)
9
Benefit
• Transmission capacity
• Transmission distance
• Construction expenses
• Power supply reliability
• Power quality for customer
• Easy connected with DG
• Controllability
Advantage
[source : Delft University of Technology]
![Page 11: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/11.jpg)
10
Grounding
Structure
Pro
tectio
n
DC
netw
ork an
alysis
Voltage Converter
LVDC distribution System
Research Activities
![Page 12: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/12.jpg)
11
Economic Analysis
Method (NPV ; Net Present Value) • Total cost comparison with MVAC and LVDC
• Total cost = Investment + Loss + Fault + Maintenance + Outage
• System modeling and Loss analysis using Matlab/Simulink
• Case : MVAC distribution lines for small village and communication system
![Page 13: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/13.jpg)
12
MVAC system LVDC system
![Page 14: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/14.jpg)
13
Structure & Voltage
Mono-Pole vs Bi-Pole
Line voltage 1,500V(±750V) and Customer 380V
• Cost of Mono-pole is lower than Bi-pole
• Bi-pole, possible to supply power when one pole fault
• High cost, but high reliability for Electric Utility
• Mono-pole for small importance customers
• Standards
- Domestic : under DC 750V , IEC : under DC 1,500V
• Transmission capacity, distance and loss : line voltage 1,500V(±750V)
• Efficiency and global trend : customer voltage 380V
![Page 15: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/15.jpg)
14
Grounding
IT grounding system • Serious electrical corrosion by DC current
• Maximum 120Vdc touch voltage by IEC 60364
• Grounding makes high touch voltage despite of low earth resistance
![Page 16: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/16.jpg)
15
Protection
Protection system • Over-current protection by circuit breaker
• Over-voltage protection by surge arresters
• CB with Insulation Monitoring Device for ground fault
• Galvanic isolation between different grounding systems
![Page 17: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/17.jpg)
16
Converter
Rectifier • Bi-directional 150kW 3-Level NPC AC/DC converter
• Input : AC 380V, Output : DC ±750V
• Unbalanced voltage compensation and short-circuit protection
Io2 Current Limit
Io1 Current Limit
Io2 Current
[10A/div]
Io1 Current
[10A/div]
Vo1 Voltage
[200V/div]
Vo2 Voltage
[200V/div]
Software
Voltage Balancing
Hardware
Voltage Balancing
Io1, Io2
Current Limit
10s/div
![Page 18: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/18.jpg)
17
DC/DC Converter • Bi-directional high efficient 10kW DC/DC converter
• Input : DC ±750V, Output : DC ±380V
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
110.00%
0.5kW 1kW 2kW 3kW 4kW 5kW
![Page 19: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/19.jpg)
18
Voltage Control
Voltage control of LVDC distribution system • Considering loss, line voltage and feasible supply distance
• Cooperation between AC/DC and DERs
• Real time power flow analysis and voltage control
1 2 3 4 5 6 7 8
0.9
0.95
1
1.05
Fig: Simulation results of Bus voltage control
Number of Bus
Voltage am
plitude
Without control
ac/dc control
G8 injection
G8+G7 injection
![Page 20: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/20.jpg)
19
• Application of distributed control using P-gate
• Hybrid control using communication and Droop
Voltage control of LVDC distribution system
![Page 21: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/21.jpg)
20
• ±750/±380 and mono-pole/bi-pole selection
• Monitoring of voltage and current
• Control of each component by serial comm.
Demonstration
Test-lab
![Page 22: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/22.jpg)
21
Pilot system • Demonstration for actual field application using LVDC system
• 1.5km overhead lines, rectifier, converters, loads, and monitoring system
![Page 23: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/23.jpg)
22
[Overall condition] [System status]
[Status of AC/DC converter] [Status of load container]
LVDC distribution line monitoring system
![Page 24: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/24.jpg)
23
LVDC distribution system application(Gwangju)
![Page 25: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/25.jpg)
24
LVDC distribution system application(Gwangju)
![Page 26: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/26.jpg)
25
LVDC distribution system application(Gwangju)
• Operation from October, 2016
• Verification of power quality
• IMD 3-level alarm & block algorithm
![Page 27: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/27.jpg)
26
DC Island
![Page 28: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/28.jpg)
27
Design
Optimal DER capacity • NPV with installation and operating costs for 20 years by HOMER(NREL)
• Parameter : Solar radiation, Wind velocity, Load of the area and Investment
cost
[Economic analysis result]
[Solar radiation, Wind velocity]
[Seasonal load]
![Page 29: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/29.jpg)
28
• Existing AC system
- 3 Diesel Gens. , 2 D/L
• New DC distribution network
- DERs : ESS, PV, WT
- Gen. : Variable Speed Gen.
- Load : DC Streetlight,
Appliance, Vehicle
• Operation method
- DC isolated mode
- AC isolated mode
- DC-AC connected mode
DC network configuration
![Page 30: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/30.jpg)
29
Construction
Components of DC system • LVDC distribution line, PV, WT, ESS and variable-speed Diesel Generator
• DC loads : AC/DC hybrid home, DC home, DC street light and DC V2G
±750Vdc
±190Vdc
750Vdc
750Vdc
±750Vdc
±190Vdc
![Page 31: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/31.jpg)
30
DC EMS (Energy Management System)
![Page 32: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/32.jpg)
31
DC EMS (Energy Management System)
![Page 33: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/33.jpg)
32
Solid state Tr.(EPRI)
![Page 34: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/34.jpg)
33
1s/div
Iac [20A/div]
Vdc_Stack[1] Vdc_Stack[2] Vdc_Stack[3] Vdc_Stack[4] Vdc_Stack[5]
[500V/div]
13.2kV Solid State Transformer • Input 13.2kV, output ±750, 150kW, Max. efficiency 96%
• H-bridge AC/DC rectifier + NPC type DAB converter
![Page 35: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/35.jpg)
34
500kW AC/DC converter & DC smart switchgear
• 3-level NPC modular type, Input 380V, output ±750, Max. efficiency 98%
• Parallel operating algorithm for optimizing efficiency
• Switchgear consists of converter, ESS, PV and IED for DC customer with connected
and isolated modes
전력[kW]100 200 500400300
효율 최적효율 운전 방식
일괄제어 운전 방식
Parallel control
Serial control
Eff.
Power[kW]
![Page 36: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/36.jpg)
35
High speed circuit breaker • Development of semiconductor and hybrid breaker for LVDC distribution system
• Operation with high speed and coordinative protection algorithm
![Page 37: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/37.jpg)
36
Infrastructure
Testing infrastructure for DC distribution
• 6km testing distribution line can change to radial, closed-loop and mesh network
• DC distribution management system test with DER and DC load simulators
• Power converter performance evaluation system with real time simulator
![Page 38: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/38.jpg)
37
![Page 39: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/39.jpg)
38
Future Plan
Source : Direct Current BV
KEPCO ↔ HYUNDAI ELECTRIC
[ Global Research Center of HYUNDAI HAEVY INDUSTRIES]
![Page 40: Current status of DC distribution system by KEPCO · Testing infrastructure for DC distribution •6km testing distribution line can change to radial, closed-loop and mesh network](https://reader034.vdocuments.site/reader034/viewer/2022042108/5e87d4af0b523b5d466caae4/html5/thumbnails/40.jpg)
39
Conclusion
Source : Tony Seba, Clean Disruption
Power Electronics