Cube Grade Control System GCX II – Open Pit
![Page 2: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/2.jpg)
Overview
The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit Mines. • Easy to use, repeatable framework • Logical step-by-step process flow • External controls for self-customisation • Choice of estimation methods • Auditable • Statistical and visualisation tools • Full documentation
![Page 3: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/3.jpg)
GCX II Process Flow – Open Pit
Reconciliation
Dig Block Evaluation
Slice and Display of Block model and Relevant Data for Dig Block Delineation
Creation / Adjustment of Dig Block Outlines
Evaluation / Adjustment of Dig Block Outlines
Stamping and Reporting of Dig Blocks
Plotting of Dig plans / Markup Plans
Model Depletion and EOM Reporting
Campaign Modelling
Definition of Campaign Modelling Area
Domain Wireframing for Campaign Area
Model Stamping and Composite Extraction
Composite Validation
Grade Estimation
Update Master Block model
![Page 4: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/4.jpg)
Easy to Use
• Menu system within familiar Surpac environment • Logical step-by-step process flow • Local site terminology incorporated as appropriate
![Page 5: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/5.jpg)
External Controls Attributes associated with material types and cut-offs are handled externally via customisable parameter sheets in csv format. • Flexibility to modify material categories if related attributes such as grade cut-offs are
changed • Up to 8 elements and 40 material types
![Page 6: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/6.jpg)
Definition of Campaign Modelling Area
Campaign modelling areas can be defined using a polygon (typical of a e.g. blast hole environment) or a 3D solid (grade control RC).
![Page 7: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/7.jpg)
Domain Wireframing for Campaign Area A variety of visualisation tools are available to aid in domain delineation.
![Page 8: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/8.jpg)
Model Flagging and Composite Extraction Automated stamping of zone codes, density and composite extraction speeds the modelling process as well as maintaining an audit trail for future reference.
![Page 9: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/9.jpg)
Composite Validation Extreme grades at either end of the sample population can be examined numerically as well as spatially, Distribution allows multiple percentile or grade threshold bins to be examined.
![Page 10: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/10.jpg)
• Uses the Cube Estimation Management System – ECX – Easy to use, repeatable and auditable – Multi-element and multi-domain environments – Allows dynamic estimation into folded domains – External parameters saved and loaded from Excel – Wide range of useful outputs e.g. Kriging Neighbourhood Analysis,
Grade Estimation
![Page 11: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/11.jpg)
Update Master Block model
The master grade control model can be easily updated via a single step. The master block model acts as a single repository for all of the applicable grade control information for a pit/deposit.
![Page 12: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/12.jpg)
Open Cut: Slice and Display of Block model for Dig Block Delineation
A variety of layers can be loaded either automatically or manually to aid in the formation of dig block outlines.
![Page 13: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/13.jpg)
Create / Evaluate / Adjust of Dig Block Outlines Dig blocks once outlined can be manipulated many times allowing the user to test various design permutations, as well allowing overriding of the material type via a subjective adjustment if required.
![Page 14: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/14.jpg)
Stamping and Reporting of Dig Blocks Reports are generated in a number of formats with optional content for uploading to material tracking systems.
![Page 15: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/15.jpg)
Plotting of Dig plans / Markup Plans
AutoPlot is used as the primary plotting tool, with all data including styles files and entities being built in the background, this allows the user to point and shoot to create a dig plan.
![Page 16: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/16.jpg)
Handy tools A number of auxiliary and statistical tools are available under the Extras menu.
![Page 17: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/17.jpg)
GCX for Underground
The Cube Grade Control system (GCX II) is also available for UG mines, with both 2D and 3D estimation routines available
![Page 18: Cube Grade Control System GCX II – Open Pit · Overview The Cube Grade Control system (GCX II) is an integrated, Surpac based grade estimation and reporting system for Open Pit](https://reader033.vdocuments.site/reader033/viewer/2022041622/5e3fde90f6c5ce5f9b18c6c5/html5/thumbnails/18.jpg)
About Cube
Cube Consulting provides specialist consulting services and software systems to the global mining industry. We are a quality team of geologists and mining engineers with a wide range of skills and experience, applicable from advanced exploration projects through to operational mines across multiple commodities. Established in 2000 in Perth, Western Australia, Cube Consulting has grown to become a world class Mining Services Company, working with our customers to add value to their projects through considered and practical advice. • Geological Services based on extensive operational and field based experience. • Mine Engineering Consulting Services supporting sound commercial decisions. • Technology solutions focused on Mine Grade Control and Reconciliation. Our goal is to ensure our customers succeed through practical and professional advice.