csr (1)

61
WETLAND PROJECT Service Learning of Faculty of Science University of Colombo 1

Upload: chathuranga-silva

Post on 16-Aug-2015

16 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: CSR (1)

WETLAND PROJECTService Learning of Faculty of Science

University of Colombo

1

Page 2: CSR (1)

2

Page 3: CSR (1)

What is a Wetland ??

➢ A Wetland is a land area that is saturated with water , either permanently or seasonally , such that it takes on the characteristics of a distinct ecosystem

➢ Depth is generally not more than six meters

3

Page 4: CSR (1)

Why Are Wetlands Important ?

4

Page 5: CSR (1)

Nature Park Vs Urban Park

5

Page 6: CSR (1)

• Secure the wetland and improve it for its expected benefits.

• Secure the life and ecosystem of the wetland.

• Create an educational environment in the wetland.

• Success as a nature trail. (wetland park)

6

Page 7: CSR (1)

• Build the proposed bridges as an entrance to the wetland.

• Clean and develop the dam

• Complete the nature trail at least up to the watch tower.

• Build the watch tower

• Implement benches and other resting places.

• Implement information boards.

• Arrange activities for children and adults.

• Clean the canal and other water resources.

• Replace plants to improve the value of the wetland.

• Educate the near residencies about the value of the wetland.

• Ensure the safety of the implemented facilities.

7

Page 8: CSR (1)

8

Page 9: CSR (1)

Methodology

Phase 1

● Discussions about the project

outline and project activities.

9

Page 10: CSR (1)

Methodology

Identified Threats:● Attitude of the residents.● Invasive fauna and flora.

o Pond Apple. o Thilapia.o Knife fish.

● Unauthorized constructions on the wetland premises.

10

Page 11: CSR (1)

● Initial cost for the project was calculated.

● Required labour and equipment:

● Pontoon / Boat ● 4 to 5 labourers to clear the path

and operate the Pontoon/across the canal.

● Two Knives and two sickles ● Boots 8 pairs

Methodology

11

Page 12: CSR (1)

Geographical Map of the Kolonnawa Marsh

12

Page 13: CSR (1)

● Identification of the wetland entrance.

○ Three possible entrance were identified.

○ At each entrance following key factors were collected and analyzed.

■ Ease of access.

■ Lower disturbance.

■ Car park facilities.

■ Wetland environment of the selected area.

Phase 2

13

Page 14: CSR (1)

Entry point –Option 01

Phase 2

● First option: from the border of the Madinnagoda temple.

● The biodiversity of the associated area was observed and noted down.

● Temple

14

Page 15: CSR (1)

Entry point –Option 02

Phase 2

● Second option: was to use the area near new Madinnagoda road (near the Harward dam area)

● Due to illegal residents and with the constraint of our limited 6 months time frame and political background.

15

Page 16: CSR (1)

Phase 2

Entry point –Option 03

● Third option was to use Gamage watte (near the new gothatuwa road) area.

● It is a highly populated area and relatively less polluted than the option 01 and 02.

● Then the environmental factors of the area were analyzed.

16

Page 17: CSR (1)

Phase 3

● Drawing up the design specifications.

● Time frame: 6 monthsActivities :● Board walk● Watch tower● Tarzan rope / High ropes● Step path● Information boards● Design benches● Design study area● Design bridge● Design an Entrance

● Finally the project proposal was presented.

17

Page 18: CSR (1)

Phase 4

Coordinate and Manage wetland study park Creation.

● Pre-treat the dry and wet weather stormwater flows.

● Remove unwanted pond apple trees and replace other wetland plants.

● Restoration of the canal.

● Do all the development WITHOUT any harm to the ecosystem.

● SLLR&DC provided 6 labourers to carry out the work.

18

Page 19: CSR (1)

Results

19

Page 20: CSR (1)

Entrance

20

Page 21: CSR (1)

Entrance :

OptionsMadinnagoda

TempleMadinnagoda

RoadGamage Watta

EasyAccess

Disturbance

Car Parking

WetlandDiversity

21

Page 22: CSR (1)

Bridges

Problem:● Continue the paths across the canals● An eco-friendly solution needed.

22

Page 23: CSR (1)

The Solution

● A bridge made up with logs.

23

Page 24: CSR (1)

Access path

● Need a path to the wetland study area

Options● Step path● Boardwalk

24

Page 25: CSR (1)

Access path

● Step path using logs

● Minimum disturbance

25

Page 26: CSR (1)

Research area

● A Place to facilitate Researches

● Also act as resting places

26

Page 27: CSR (1)

● Need a way to observe Different Diverse areas

● With minimum disturbance to the wetland

Walk path

27

Page 28: CSR (1)

Sketches

28

Page 29: CSR (1)

Reduce Soil ErosionCover the wetland from outside

Planting Bamboo and Kaduru Trees

29

Page 30: CSR (1)

Before After

30

Page 31: CSR (1)

Information Boards

● Functions of the Wetland

● Importance in preserving Wetlands

● Biodiversity within the Wetland

31

Page 32: CSR (1)

Horizontal Board

32

Page 33: CSR (1)

Sinhala

English

ImagesClear Background&Interesting Design

Vertical Board

33

Page 34: CSR (1)

● Optimal height for birdwatching● Can observe the wetland

Watchtower

34

Page 35: CSR (1)

Research on Pond Apple

● Find out where the pond apple trees

have invaded

● What would be the replaceable trees

● How it could be done

35

Page 36: CSR (1)

● Map the entire area and identify the important locations

● Identify most suitable locations for future developments

● Submit a report to the authorities on future phases of the project

Overall Research on Wetland

36

Page 37: CSR (1)

Labour Handling & Budget Control

37

Page 38: CSR (1)

● Most difficult part of the project

● A Supervisor, an Architect and an

Assistant Engineer to Supervise

appointed for the site

● 8 labors worked

● 6 days per week

Labour Handling

38

Page 39: CSR (1)

39

Description Unit Qty Rate Amount

1 Cleaning the canal bank and surroundings Days 37 1190 44,030.00

2 Planting small plants at canal bank (Kumbuk, Bamboo, Ariconut)

Days 30 1190 35700.00

3 Supply and transporting Plants Nos 20 1000 20000.00

4 Cleaning the walking path Days 32 1190 38,080.00

5 Rubble packing in marshy areas of the foot path m3 5 2000 10000.00

6 Supply and fixing of vertical timber posts for waiting areas I,II,III

Nos 35 3150 110250.00

7 Labour for fixing the timber posts Days 21 1190 24990.00

8 Constructing timber bridge m 6 2250 13500.00

9 Watering the plants Days 21 1190 24,990.00

10 Transporting labours and materials from tractor Days 104 900 93,600.00

Total 415,140.00

Page 40: CSR (1)

Budget of the Project

40

Page 41: CSR (1)

Problems Faced

41

Page 42: CSR (1)

Problems Faced

❖No clear specification about the project at the beginning.

❖Requirements changed rapidly throughout the time.

42

Page 43: CSR (1)

Problems Faced

❖Couldn’t mark the key project areas in the initial visits due to GPS problems.

❖ Lack of information about the wetland ➢ No proper research done previously.➢ SLLRDC only had maps taken from google.

43

Page 44: CSR (1)

Problems Faced

❖ Agreed project scope turned out to be infeasible.➢ No soil research done previously.➢ Limited time.

❖ Identification of the actual project area was too time consuming.

44

Page 45: CSR (1)

Problems Faced

❖Difficulties faced when exploring the project area.

High plant density

45

Page 46: CSR (1)

Problems Faced❖Difficulties faced when exploring the project

area.

Small canals Muddy surface

46

Page 47: CSR (1)

Problems Faced

❖ Safety issues.

➢ Crocodile and snakes

➢ Sinking in mud

➢ Unsafe pontoon

and boat rides

47

Page 48: CSR (1)

Problems Faced

❖ Labour issues.

➢ Idling due to lack ofsupervision provided

➢ Low productivity

➢ Being absent

➢ No motivation due to heavy work load

48

Page 49: CSR (1)

Problems Faced

❖Delay of material consignments and labour.

49

Page 50: CSR (1)

Problems Faced

❖ Implementing structures with minimum damage to the wetland

50

Page 51: CSR (1)

Problems Faced

❖ Falling behind the schedule due to flood issues.

51

Page 52: CSR (1)

CONCLUSION

Our Project● Kolonnawa Wetland Park project : DEVELOPMENT, DESIGN and

IMPLEMENTATION of the first ever wetland park in Sri Lanka

Main Aspects Of The Project ● Restoration of the kolonnawa marsh to a tidal wetland,● Enhance the Economic value of Kolonnawa Area● Provide a facility to the environmentalists and students to

conduct their researches etc...

Mainly We Needed To

“restore the Kolonnawa Mash so it becomes a destination for people to enjoy. ”

52

Page 53: CSR (1)

THE JOURNEY

To Start Off with “The Idea Was To Build A BUTTERFLY GARDEN”

But At The End Idea Of “ WETLAND PARK “ Won the most Votes

The Whole Project Was Divided Into 2 Phases.Phase 1 : Develop the necessary facilities to conduct the RESEARCH

Phase 2 : Research , Design Specifications And the Implementation.

53

Page 54: CSR (1)

PHASE 1 (OUR ACHIEVEMENTS)

Targets And Objectives Of Phase 1

1) Bridge on the canal bank:

2) Access path to the inner wetland:

3) Inner wetland research area and study area:

4) Wetland Walk:

5) Planting Bamboo and Kaduru Trees:

6) Information Boards:

7) Phase 2:

54

Page 55: CSR (1)

WHAT WE GAINED IN THIS JOURNEY

SKILL WE GAINED

1) We Improved Our Leadership Skills.

● We had take lead on the field so the employees also get motivated.

● We made them feel important, ● we gain their willingness to work for us. ● We asked for their advice. ● We collected facts and data before planning

55

Page 56: CSR (1)

2) We Improved Our Communicational Skills.

● Communication was Important to us

● We always asked questions.

● That way the employees are focused on the objective.

● We listened to others point of view and understood them.

● We communicated with different levels people in different ways

56

Page 57: CSR (1)

3) We Improved Our Listening Skills.

● we always listened to what others had to stay.

● We always gave them the chance and even if we did not agree

● By listening we always managed to see many other different views

57

Page 58: CSR (1)

4) We Improved Our Teamwork.

● Teamwork is what kept us going

● We got to know each other.

● We created bonds and backed each other up

● We worked together to get through problems.

58

Page 59: CSR (1)

Our Presentation Skills

● We created advertising boards

● we improved our graphics skills

● we improved our graphical presentational skills

● and we improved our english presentational skills

59

Page 60: CSR (1)

60

Page 61: CSR (1)

61