7/28/2019 CSP TOWER BrightSourceEnergy
1/19
11
November 15-17, 2010
4th Concentrated SolarThermal Summit
-
7/28/2019 CSP TOWER BrightSourceEnergy
2/19
22
BrightSource Energy A CSP Success Story
BSEs Pilot Plant Has Been Directly Producing 5400C High Pressure Steam
from Concentrated Sunlight for Over Two Years
-
7/28/2019 CSP TOWER BrightSourceEnergy
3/19
3
October Groundbreaking for Ivanpah Solar Electric Generating System
-
7/28/2019 CSP TOWER BrightSourceEnergy
4/19
4
BSE: Four Years of Innovation and Achievement
October, 2006:
Technical and executive team with unmatched solar experience
Innovative solar thermal power tower technology cost effective on paper
Initial VC financing of US$31.5 million from enthusiastic, well-informed investors
MOU with Pacific Gas & Electric for 500 MW
No sites, no permits, no transmission approvals
October, 2010:
Backlog of 2.6 GW of signed, approved Power Purchase Agreements withPG&E and Southern California Edison
Pilot plant operational for two years with its performance certified by multiple IEs
Over US$300 million of corporate equity from world-class investors
Solar-2-Steam plant under construction for Enhanced Oil Recovery operations
Bechtel Power broken ground at Ivanpah, the worlds largest solar power project(392MW) - fully permitted with transmission access approved
Term sheet signed by US Government to provide US$1.4 billion Ivanpah debt
NRG Energy signed LOI to provide US$300 million of Ivanpah project equity
Alstom power invested US$50 million and became strategic partner
-
7/28/2019 CSP TOWER BrightSourceEnergy
5/19
5
BrightSources Formula for Success
Success
FinancialStrength
TechnicalCredibility
ProblemAnticipationand Solving
GreatTechnology
SolidBusiness
Plan
Talented,Proven Team
-
7/28/2019 CSP TOWER BrightSourceEnergy
6/19
6
BSEs High Temp, High Pressure CSP Technology
Heat ExchangerH C
Molten Salt Storage System
-
7/28/2019 CSP TOWER BrightSourceEnergy
7/197
Solar Field Layout for 125MW BSE Plant Low Impact Design does not require site grading and uses dry cooling, not water
Central power island reduces piping
Three-Stage Installation Pylon, Heliostat, Wiring/Cabling. Sequence of installation circular, back to front.
Numerous SF Installation teams work in parallel to reduce construction time
Flat mirrors slightly curved into four focal lengths during heliostat assembly
250m450m
750m1000m
-
7/28/2019 CSP TOWER BrightSourceEnergy
8/198
BSEs Solid Business Plan
Leverage decades of solar power generation experience
Integrate conventional generation equipment with directproduction of steam from sunlight
Prove technology at BSEs solar energy development center tosatisfaction of independent engineers, customers, investors,and the US Dept. of Energy
Set the environmental bar high with features such as low impactdesign and dry cooling
Assemble world-leading team of engineers, developers, projectfinancing specialists, and senior management
Adopt goal of making CSP competitive with CCGT during peakperiods
Address both power and industrial steam markets
Build solid backlog in US, then address international markets
-
7/28/2019 CSP TOWER BrightSourceEnergy
9/19
99
BrightSources Talented Proven Team
The BrightSource Team Built 354MW SEGS Plants in 80s and 90s - Still Running Today
-
7/28/2019 CSP TOWER BrightSourceEnergy
10/19
10
BSEs Financial Strength Over US$300 Equity
Series A, October, 2006: >US$15 million Initial investors includedVantage Point Venture Partners, DFJ, DBL Investors, and Chevron
Series B, March, 2007: >US$30 Million - Morgan Stanley becomessecond largest investor
Series C, May, 2008: >US$100 Million - Google joins the group
Series D, May, 2010: >US$150 Million Alstom Power and California
State Teachers Retirement System - largest investors in the round
-
7/28/2019 CSP TOWER BrightSourceEnergy
11/19
11
Credibility thru Successful Project Progression
Solar EnergyDevelopment
Center(OperationalOctober2008)
Solar Thermal
Chevron EORDemo Plant
(ConstructionBegan May, 2009)
Ivanpah SolarPower Complex
(Construction BeganOctober, 2010)
-
7/28/2019 CSP TOWER BrightSourceEnergy
12/19
12
BSEs Solar Energy Development Center
Key Demonstration Accomplishments
Worlds highest temperature and pressure solarthermal steam production known to be achieved
Independent verification by RW Beck
Over two years of successful operation
Laboratory for software optimization and testing ofdesign, materials, and suppliers
Key Design Parameters
6MWth production capacity
60 meter receiver tower
1,640 heliostats
12,000 meters of reflecting area
Operational since October, 2008
-
7/28/2019 CSP TOWER BrightSourceEnergy
13/19
13
Chevrons Coalinga Solar-2-Steam EOR Plant
Scheduled for Operation in 3Q 2011
Existing Enhanced OilRecovery Operations
-
7/28/2019 CSP TOWER BrightSourceEnergy
14/19
1414
BSEs Ivanpah Solar Energy Generating Station
Ivanpah Milestones
392 MW PG&E and SCE PowerPurchase Agreements executed andapproved by CPUC
$1.375 billion US DOE LoanGuarantee CCL received
NRG Corporation will provide $300M
of project equity for all three plants
Bechtel Selected as EPC contractor& equity investor in all three plants
Purchase orders issued for turbines,boilers, mirrors, etc.
Groundbreaking Ceremony onOctober 27, 2010
Transmission upgraded by 2Q 2012
Plant CODs scheduled for 4Q 2012,1Q 2013, and 3Q 2011
Ivanpah Site Layout
Ivanpah 1 126MW
Ivanpah 2 133MW
Ivanpah 3 133MW
-
7/28/2019 CSP TOWER BrightSourceEnergy
15/19
15
Successfully Bringing Technology to Market Establishing market credibility: Signed MOU for 500MW before Series A financing closed
Site selection: Analyzed DNI and transmission and identified over 4GW of good sites within
six months of beginning operations Raising project debt for second-generation technology: Submitted preliminary request for
100% loan guarantee to US Department of Energy in December, 2006
Key elements of successful project development in US:
Transmission: Transmission access requests submitted 1Q 2007
Permitting is critical and takes time: Utilized low-impact design with minimal site disturbance and dry cooling,submitted permit and site right-of-way requests in July, 2007
Need creditworthy customer commitments: Signed 900MW of Power Purchase Agreements with Pacific Gas& Electric in February, 2008
Must demonstrate technology: Dedicated pilot plant in June, 2008, fully operational inOctober, 2008, extensively vetted by customers, investors, and the US DOE.
Capital intensive business requires financial depth and patient investors: Multiple roundsof funding from world-class investors based on solid achievement
Big backlog required to fuel growth: Increased total backlog of signed and approved PPAsin the US to 2.6GW by mid-2009worlds largest CSP backlog
World-class EPC contractor for Ivanpah: Select Bechtel Power
Strategic investor/operator for Ivanpah: Signed LOI with NRB Energy
International growth fueled with partnerships: Signed strategic partnership agreement withAlstom Power for selected countries.
-
7/28/2019 CSP TOWER BrightSourceEnergy
16/19
16
The BrightSource Formula Equals Success
Largest PPA backlog of any CSP company in the world.
Only two CSP plants are currently under construction in the USboth by BrightSource: Ivanpah Solar Power Complex will be worlds largest. President Obama cited
BrightSource and its Ivanpah project as examples of renewable energysuccess in his October 2 radio address.
Chevrons Coalinga plant will be the worlds first plant to use direct sunlight toproduce steam for use in Enhanced Oil Recovery operations.
The US Government signed term sheet to provide 100% ofIvanpahs project debt US$1.4 billion.
NRG Energy, one of USs largest power generators signed LOI to
invest US$300 million to be Ivanpahs majority owner and operator. Alstom Power, one of the worlds largest manufacturers of power
generation equipment, and a major EPC contractor, has investedUS$55 million in BSE and is partnering in selected countries.
-
7/28/2019 CSP TOWER BrightSourceEnergy
17/19
17
Alstom is the world leader in clean integrated solutions
Alstom Clean PowerStrategy
Emissions CO2(Gt/y)
2005 Ref 20301000 ppm
+6oC
Stabilizeemissions550 ppm
+30C
Neededpath
450ppm+20C max
TechnologyMix
Efficiency
CCS
Efficiency: Plantoptimisation & retrofit
First CO2 capturedemo plant in the
world
Wind, solar &geothermal
N 1nuclear*
& biomass
N 1 hydro
* Conventional islands
-
7/28/2019 CSP TOWER BrightSourceEnergy
18/19
18
An Integrated Solution: Aligned Areas of Expertise
Heat ExchangerH C
Molten Salt Storage System
http://www.alstom.com/http://www.power.alstom.com/ -
7/28/2019 CSP TOWER BrightSourceEnergy
19/19
19
Conclusions
Solar thermal: CO2-free technology
Alstom & BrightSource offering fully integrated turnkey solar thermal plants
Tower maturing towards utility plant size