    11

    November 15-17, 2010

    4th Concentrated SolarThermal Summit

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    2/19

    22

    BrightSource Energy A CSP Success Story

    BSEs Pilot Plant Has Been Directly Producing 5400C High Pressure Steam

    from Concentrated Sunlight for Over Two Years

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    3/19

    3

    October Groundbreaking for Ivanpah Solar Electric Generating System

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    4/19

    4

    BSE: Four Years of Innovation and Achievement

    October, 2006:

    Technical and executive team with unmatched solar experience

    Innovative solar thermal power tower technology cost effective on paper

    Initial VC financing of US$31.5 million from enthusiastic, well-informed investors

    MOU with Pacific Gas & Electric for 500 MW

    No sites, no permits, no transmission approvals

    October, 2010:

    Backlog of 2.6 GW of signed, approved Power Purchase Agreements withPG&E and Southern California Edison

    Pilot plant operational for two years with its performance certified by multiple IEs

    Over US$300 million of corporate equity from world-class investors

    Solar-2-Steam plant under construction for Enhanced Oil Recovery operations

    Bechtel Power broken ground at Ivanpah, the worlds largest solar power project(392MW) - fully permitted with transmission access approved

    Term sheet signed by US Government to provide US$1.4 billion Ivanpah debt

    NRG Energy signed LOI to provide US$300 million of Ivanpah project equity

    Alstom power invested US$50 million and became strategic partner

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    5/19

    5

    BrightSources Formula for Success

    Success

    FinancialStrength

    TechnicalCredibility

    ProblemAnticipationand Solving

    GreatTechnology

    SolidBusiness

    Plan

    Talented,Proven Team

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    6/19

    6

    BSEs High Temp, High Pressure CSP Technology

    Heat ExchangerH C

    Molten Salt Storage System

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    7/197

    Solar Field Layout for 125MW BSE Plant Low Impact Design does not require site grading and uses dry cooling, not water

    Central power island reduces piping

    Three-Stage Installation Pylon, Heliostat, Wiring/Cabling. Sequence of installation circular, back to front.

    Numerous SF Installation teams work in parallel to reduce construction time

    Flat mirrors slightly curved into four focal lengths during heliostat assembly

    250m450m

    750m1000m

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    8/198

    BSEs Solid Business Plan

    Leverage decades of solar power generation experience

    Integrate conventional generation equipment with directproduction of steam from sunlight

    Prove technology at BSEs solar energy development center tosatisfaction of independent engineers, customers, investors,and the US Dept. of Energy

    Set the environmental bar high with features such as low impactdesign and dry cooling

    Assemble world-leading team of engineers, developers, projectfinancing specialists, and senior management

    Adopt goal of making CSP competitive with CCGT during peakperiods

    Address both power and industrial steam markets

    Build solid backlog in US, then address international markets

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    9/19

    99

    BrightSources Talented Proven Team

    The BrightSource Team Built 354MW SEGS Plants in 80s and 90s - Still Running Today

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    10/19

    10

    BSEs Financial Strength Over US$300 Equity

    Series A, October, 2006: >US$15 million Initial investors includedVantage Point Venture Partners, DFJ, DBL Investors, and Chevron

    Series B, March, 2007: >US$30 Million - Morgan Stanley becomessecond largest investor

    Series C, May, 2008: >US$100 Million - Google joins the group

    Series D, May, 2010: >US$150 Million Alstom Power and California

    State Teachers Retirement System - largest investors in the round

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    11/19

    11

    Credibility thru Successful Project Progression

    Solar EnergyDevelopment

    Center(OperationalOctober2008)

    Solar Thermal

    Chevron EORDemo Plant

    (ConstructionBegan May, 2009)

    Ivanpah SolarPower Complex

    (Construction BeganOctober, 2010)

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    12/19

    12

    BSEs Solar Energy Development Center

    Key Demonstration Accomplishments

    Worlds highest temperature and pressure solarthermal steam production known to be achieved

    Independent verification by RW Beck

    Over two years of successful operation

    Laboratory for software optimization and testing ofdesign, materials, and suppliers

    Key Design Parameters

    6MWth production capacity

    60 meter receiver tower

    1,640 heliostats

    12,000 meters of reflecting area

    Operational since October, 2008

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    13/19

    13

    Chevrons Coalinga Solar-2-Steam EOR Plant

    Scheduled for Operation in 3Q 2011

    Existing Enhanced OilRecovery Operations

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    14/19

    1414

    BSEs Ivanpah Solar Energy Generating Station

    Ivanpah Milestones

    392 MW PG&E and SCE PowerPurchase Agreements executed andapproved by CPUC

    $1.375 billion US DOE LoanGuarantee CCL received

    NRG Corporation will provide $300M

    of project equity for all three plants

    Bechtel Selected as EPC contractor& equity investor in all three plants

    Purchase orders issued for turbines,boilers, mirrors, etc.

    Groundbreaking Ceremony onOctober 27, 2010

    Transmission upgraded by 2Q 2012

    Plant CODs scheduled for 4Q 2012,1Q 2013, and 3Q 2011

    Ivanpah Site Layout

    Ivanpah 1 126MW

    Ivanpah 2 133MW

    Ivanpah 3 133MW

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    15/19

    15

    Successfully Bringing Technology to Market Establishing market credibility: Signed MOU for 500MW before Series A financing closed

    Site selection: Analyzed DNI and transmission and identified over 4GW of good sites within

    six months of beginning operations Raising project debt for second-generation technology: Submitted preliminary request for

    100% loan guarantee to US Department of Energy in December, 2006

    Key elements of successful project development in US:

    Transmission: Transmission access requests submitted 1Q 2007

    Permitting is critical and takes time: Utilized low-impact design with minimal site disturbance and dry cooling,submitted permit and site right-of-way requests in July, 2007

    Need creditworthy customer commitments: Signed 900MW of Power Purchase Agreements with Pacific Gas& Electric in February, 2008

    Must demonstrate technology: Dedicated pilot plant in June, 2008, fully operational inOctober, 2008, extensively vetted by customers, investors, and the US DOE.

    Capital intensive business requires financial depth and patient investors: Multiple roundsof funding from world-class investors based on solid achievement

    Big backlog required to fuel growth: Increased total backlog of signed and approved PPAsin the US to 2.6GW by mid-2009worlds largest CSP backlog

    World-class EPC contractor for Ivanpah: Select Bechtel Power

    Strategic investor/operator for Ivanpah: Signed LOI with NRB Energy

    International growth fueled with partnerships: Signed strategic partnership agreement withAlstom Power for selected countries.

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    16/19

    16

    The BrightSource Formula Equals Success

    Largest PPA backlog of any CSP company in the world.

    Only two CSP plants are currently under construction in the USboth by BrightSource: Ivanpah Solar Power Complex will be worlds largest. President Obama cited

    BrightSource and its Ivanpah project as examples of renewable energysuccess in his October 2 radio address.

    Chevrons Coalinga plant will be the worlds first plant to use direct sunlight toproduce steam for use in Enhanced Oil Recovery operations.

    The US Government signed term sheet to provide 100% ofIvanpahs project debt US$1.4 billion.

    NRG Energy, one of USs largest power generators signed LOI to

    invest US$300 million to be Ivanpahs majority owner and operator. Alstom Power, one of the worlds largest manufacturers of power

    generation equipment, and a major EPC contractor, has investedUS$55 million in BSE and is partnering in selected countries.

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    17/19

    17

    Alstom is the world leader in clean integrated solutions

    Alstom Clean PowerStrategy

    Emissions CO2(Gt/y)

    2005 Ref 20301000 ppm

    +6oC

    Stabilizeemissions550 ppm

    +30C

    Neededpath

    450ppm+20C max

    TechnologyMix

    Efficiency

    CCS

    Efficiency: Plantoptimisation & retrofit

    First CO2 capturedemo plant in the

    world

    Wind, solar &geothermal

    N 1nuclear*

    & biomass

    N 1 hydro

    * Conventional islands

  • 7/28/2019 CSP TOWER BrightSourceEnergy

    18/19

    18

    An Integrated Solution: Aligned Areas of Expertise

    Heat ExchangerH C

    Molten Salt Storage System

    http://www.alstom.com/http://www.power.alstom.com/
  • 7/28/2019 CSP TOWER BrightSourceEnergy

    19/19

    19

    Conclusions

    Solar thermal: CO2-free technology

    Alstom & BrightSource offering fully integrated turnkey solar thermal plants

    Tower maturing towards utility plant size