Page 1: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

CSP Overview PresentationCSP Overview Presentation

DISH STIRLING

PARABOLIC TROUGH

POWER TOWER

Tom Mancini CSP Program Manager Sandia National Laboratories 505.844.8643 [email protected]

TRM/2007 1

Page 2: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Facilities at the NSTTFFacilities at the NSTTF

NSTTF

Rotating Platform

Solar Furnace Component Testing

Engine Test FacilityDish Engine Testing

Tower Testing

NATIONAL SOLAR THERMAL TEST FACILITY

TRM/2007 2

Page 3: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

TRM/2007 3

What is CSP?What is CSP?

Solar concentration allows tailored design approaches for central and distributed power generation. *Also known as Solar Thermal Electric Power

Dish

TowerTrough

Page 4: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

What can CSP do?What can CSP do?

Concentrating Solar Power has demonstrated: • Utility-Scale Solar Power• High capacity factor and dispatchability• 130 plant-years of commercial operation

(9 plants, 354 MW)• 80 MW/year production/installation capacity• Dispatchable power for peaking and intermediate

loads (with storage or hybridization)• Distributed power for grid support and remote

applications

TRM/2007 4

Page 5: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

PS 10 Steam CyclePS 10 Steam Cycle

Once-through steam boiler similar to Solar 1

TRM/2007 5

Page 6: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

PS 10 Power TowerPS 10 Power Tower

PS 10 Plant Operational Fall 2006. Construction started on first PS 20 Plant.

TRM/2007 6

Page 7: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

The Value of Storage:The Value of Storage: Dispatchable PowerDispatchable Power

Solar Resource Load Storage/hybridization provide• decoupling of

energy collection and generation

• lower costs because storage is cheaper than incremental turbine costs

• higher value because power production can match utility needs

Generation w/ Storage

0 6 12 18 24

TRM/2007 7

Page 8: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Molten-SaltMolten-Salt Power TowerPower Tower

Power Tower or “Central Receiver”

Energy collection is uncoupled from

power production TRM/2007 8

Page 9: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Solar Two ResultsSolar Two Results

Molten-Salt Power tower technology was success­fully demonstrated at Solar Two and all of the test objectives were met.

• Receiver design validated• Receiver η = 88% • η of Storage > 98%• Dispatchability

demonstrated for > 6 days• 40MW (equivalent) Solar

Tres plant prop. in Spain

TRM/2007 9

Page 10: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

SEGS PlantsSEGS Plants

• Solar Electric Generating Stations (SEGS): 354 MW

• Total annual average solar-to-electric efficiency at 12%.

• Plants use conventional equipment and are “hybridized” for dispatchability (25%)

TRM/2007 10

Total reflective area > 2.3 Mill. m2

More than 117,000 HCEs 30 MW increment based on regulated power block size

Page 11: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

SEGS Deployment and Production

SEGS Deployment and Production

Solar Thermal Capacity

0

100

200

300

400

500

198519871989199119931995199719992001

YEAR

C ap

acity

in M

W

Annual Electricity Generation GWhr

0

100

200

300

400

500

600

700

800

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

YEAR

Gen

erat

ion

(GW

h) in

Solar Electric Generation Stations (SEGS)

Deployment and power production 1985 – 2002.

TRM/2007 11

Page 12: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

NevadaNevada SSolar Oneolar One

• 64 MW Capacity • 357,200m² Solar Field • 30 Minutes Thermal

Storage • Minimal Fossil fuel • Long term PPA

signed with Nevada Power

• EPC Notice to Proceed – January 2006

• Start Up in June 2007

TRM/2007 12

Page 13: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Nevada Solar OneTechnical Characteristics

Nevada Solar One Technical Characteristics

Annual electricity production estimated to be 140 - 150GWh

TRM/2007 13

Page 14: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

1-MW Organic Rankine1-MW Organic Rankine Cycle Plant at APSCycle Plant at APS

APS Saguaro Solar Plant

TRM/2007 14

Page 15: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

CSP Dish Stirling Systems

CSP Dish Stirling Systems

Technology Features:• High efficiency (Peak > 30%

net solar-to-electric)• Annual Efficiency ~ 22 – 25 % • Modularity (10, 25kW)• Autonomous operation• High-Efficiency Stirling

Engine

R&D focus is on Reliability improvement, engineering for mass production and cost reduction.

TRM/2007 15

Page 16: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Working Relationship with SES

Working Relationship with SES

New model of cooperation for the DOE Program: SES provides staff and funding, DOE funds SNL to support and provide testing. CRADA being completed.

TRM/2007 16

Page 17: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

DNI Solar Resourcein the Southwest

DNI Solar Resource in the Southwest

Screening Approach

Filters applied:• Direct-normal solar resource. • Sites > 6.75 kwh/m2/day. • Exclude environmentally sensitive

lands, major urban areas, etc. • Remove land with slope > 1%.• Only contiguous areas > 10 km2

Data and maps from the Renewable Resources Data Center at the National Renewable Energy Laboratory

TRM/2007 17

Page 18: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

CSP Deployment PotentialCSP Deployment Potential

Land Area Solar

Capacity

Solar Generation

Capacity State (mi2) (MW) GWh

AZ 19,279 2,467,663 5,836,517 CA 6,853 877,204 2,074,763 CO 2,124 271,903 643,105 NV 5,589 715,438 1,692,154 NM 15,156 1,939,970 4,588,417 TX 1,162 148,729 351,774 UT 3,564 456,147 1,078,879

Total 53,727 6,877,055 16,265,611

Bottom Line: Almost 7,000 GW Available Resource (Total U. S. Capacity is 950 GW)

TRM/2007 18

Page 19: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Project CostsProject Costs

• Sometimes represented as $/kW installed • Sometimes represented as the Levelized Cost of

Energy (LEC) from a plant (includes financing, O&M, profit, over the lifetime of the plant etc.)

• These are large power projects requiring 4 – 5 years to develop and deploy. – Financing terms – Proximity to/capacity of

substation– Plant ownership – Ownership/cost of land– Incentives – Transmission Capacity

TRM/2007 19

Page 20: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

CSP Reference PlantCSP Reference Plant

Parabolic Trough Technology Proxy for CSP • Current solar technology• Rankine cycle plants• 6-hours of thermal energy

storage

Finance Assumptions• Based on IPP financing

Breakdown of LEC for 100 MWe Reference System

TES & HTF 10%

PB & BOS 11%

Indirects 10%

Solar Field 39%

Taxes & Ins 10%

O&M 20%

TRM/2007 20

Page 21: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Cost of CSPCost of CSP

Cost

0 1000 2000 3000 4000

Cumulative New Capacity by 2015 (MW)

Assumes: -T rough Technology w ith 6 hours of TES -I PP Financing; 30-year PPA -C alifornia Property Tax exemption -I ncludes scale-up, R&D, learning effects -B arstow , California site

$.11/kwh (real) $.16/kwh (nominal)

0.12Current Technology Cost0.18

0.11 Reductions to0.16 0.10

Rea

l LC

OE

(200

5$/k

wh)

Bridge the Gap• Plant Size • Deployment• Financing• R&D

0.14 0.09

0.12 0.08

0.070.10 0.06

0.08 0.05

0.06 0.04

0.030.04 0.02

0.02 0.01

Cost Goals0.00 0.00 $.05-.07/kwh (real) $.08-.10/kwh (nominal)

Source: WGA Solar Task Force Summary Report

Nom

inal

LC

OE

($/k

wh)

TRM/2007 21

Page 22: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Markets in the WestMarkets in the West

• The DOE Energy Information Agency predicts for the Western U. S. the addition of 86 GW of capacity over the next 20 years

• Most of this is expected to be met with the addition of coal and natural gas fired generation

• Western states have demonstrated interest in developing renewable resources

• In many ways, states are more proactive than the federal government in providing incentives for solar energy development

TRM/2007 22

Page 23: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Government Incentives for CSP

Government Incentives for CSP

Federal Incentive: • Investment Tax Credit of 30% through end of 2008

(working on an 8 – 10 year extension)• Loan guarantee program

State Incentives: • Renewable Portfolio Standards • Solar “set asides” • State production tax credits• Property and sales tax relief• Possible state loan guarantee programs

TRM/2007 23

Page 24: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Projects in SW U. S.Projects in SW U. S.

• 1 MW trough/ORC in Arizona (APS, Acciona) operating• 64 MW trough electric project in Nevada (Nevada Power, Acciona)

commissioned June 2007 • 500 to 850 MW Dish Stirling plant (SCE, SES, Aug 2005)• 300 to 900 MW Dish Stirling plant (SDG&E, SES, Sep 2005)• 50 MW ISCCS plant (Victorville, Feb 07)• 553 MW Trough plant (SCE, Solel, July 2007)• 400 MW 3 solar towers (BrightSource, Aug 07)• 177 MW Linear Fresnel Reflector (AUSRA, PG&E, Nov 2007) AFC• 250 MW Solar Thermal (Beacon Solar, March 08)• 280 MW Parabolic Trough with storage (Abengoa, APS, Feb. 2008)• 250 MW Trough (Harper Lake Solar)• 250 MW Arizona PS Consortium RFP issued Dec 2007 • Other RFPs issued but not announced

TRM/2007 24

Page 25: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

Projects Around the WorldProjects Around the World

Algeria: 150 MW hybrid gas/trough (30 MW from solar) at Hassi R’mel (Abener, NEAL, 2006) Morocco: ISCCS for a 250 MW plant (30 to 50 MW from solar) (Abener, under contract) Egypt: 140 MW hybrid trough plant at Kuraymat (Iberdrola, Orascom, Dec 2007). Australia: 2 – 5 MW ISCCS CLFR Liddell South Africa: ESKOM in Phase V of molten-salt power tower development; currently performing an EIA. Israel: SOLEL signed a contract for a 150 MW trough plant. Mexico: 30 MW trough project being restructured Agua Prieto, Sonora. Spain: 10 MW PS 10, 20 MW PS 20 (Abengoa, 2006, 2008); Andasol 1 and 2 with 7.5 hours of storage (Cobra, Sener, Solar Millenium) under construction. Estimates of more than 3 GW under development.

TRM/2007 25

Page 26: CSP Overview Presentatiion - Department of Energy · CSP Overview Presentation CSP Overview Presentation ... • Utility-Scale Solar Power ... ISCCS for a 250 MW plant (30 to 50 MW

CSP WorldwideCSP Worldwide Deployment PlansDeployment Plans

4.56 GW

SPAIN ISRAEL IRAN CHINAUNITED STATES 1000 MW 400 MW 400 MW 500 MW1364 MW

MOROCCO JORDANEGYPTMEXICO 200 MW 130 MW140 MW240 MW INDIA 40 MW

SOUTH AFRICA 100 MW

TRM/2007 26