CSLS Renovations Summer 2012. Virginia M. Scott Academic Director. Overall. Overall. Student lounge. Large seminar room. Workstations. Dates and details. 1) The doors will shut at 6 pm on Monday, April 30. 2) Packing and moving from May 1 – May 10. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/1.jpg)
CSLS RenovationsSummer 2012
Virginia M. ScottAcademic Director
![Page 2: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/2.jpg)
Overall
![Page 3: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/3.jpg)
Overall
![Page 4: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/4.jpg)
![Page 5: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/5.jpg)
Student lounge
![Page 6: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/6.jpg)
Large seminar room
![Page 7: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/7.jpg)
Workstations
![Page 8: CSLS Renovations Summer 2012](https://reader036.vdocuments.site/reader036/viewer/2022070410/56814660550346895db381d0/html5/thumbnails/8.jpg)
Dates and details
1) The doors will shut at 6 pm on Monday, April 30. 2) Packing and moving from May 1 – May 10.3) Construction begins on Monday, May 14.4) Projected opening is on Monday, August 13. 5) Between May 1 and August 13 we will exist virtually.
(Todd and Feli will be working from off campus.)– We will NOT have access to the server.– We will NOT be able to digitize films or create materials during.– We WILL be reachable by e-mails and available to meet to talk about