Page 1: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

1

Company Profile

C.S.Impianti S.p.A

www.csimpianti.it

Page 2: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

2

General Information & Contacts

Head Office Via Leone Tolstoj, 86 20098 S. Giuliano Milanese (Milan), Italy

Phone: +39 02 9884871 Fax: +39 02 98242058 +39 02 98242055 E-mail: [email protected] website: www.csimpianti.it

Pubblic Register : R.E.A. 1233398 Tax Code:08570150154 VAT n°: 08570150154

Page 3: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

3

Offices space : 2200 SQ.M. Other 2000 SQ.M. are avaiable for projects that require a dedicated task force

Our offices

Page 4: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

4

Business Areas

upstream middlestream downstream

C.S.Impianti is a middle size EPC contractor offering Basic and Detailed Engineering, Procurement and Construction Services for the following industries: Oil & Gas Petrochemical and Chemical Power Plants

Page 5: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Our Company

5

Since 1986 C.S.Impianti provides to industrial companies its engineering services such as Basic and Detailed Engineering in the Oil & Gas, Petrochemical, Chemical and Power Plants. In the years following C.S.Impianti started to supply also Skid mounted Units and Packages and has grown to become a medium size EPC Contractor.

Since 1995, in line with its spirit of innovation and cost saving, C.S.Impianti has been using 3D intelligent project design systems. After 20 years C.S.Impianti has reached top level competence in the most popular programs: Intergraph PDS, Aveva PDMS, Smartplant3D, Tekla, Smartplant P&ID.

Since 1997 C.S.Impianti is Quality Certified. C.S.Impianti management system complies with ISO 9001:2008. In the same year, C.S.Impianti was awarded its first EPC contract

Page 6: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Our Company

6

Since 2000 C.S.Impianti operates in central Italy with its first Italian branch located in Fano. Fano is a small town located on the Adriatic coast, and is a strategic location for Pipeline, Pumping Stations and Compression Engineering.

Since 2004 C.S.Impianti founded and lead several consortiums, in order to provide integrated engineering services for Oil & Gas “Jumbo” Projects. The first was Polaris followed by Hexagon and Polimtech.

Since 2012 C.S.Impianti also operates overseas with its Canadian affiliated company C.S.Impianti Industrial Services and in Saudi Arabia with C.S.Impianti Arabia A new branch in southern Italy was opened in Val d’Agri (Marsicovetere) In this year C.S.Impianti founded and is actually leading COB Marine the most recent consortium created in order to develop EPC Projects.

Page 7: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

7

• To be a renowned EPC firm for main contractors around the world and becoming leaders in the management and execution of medium-sized Engineering, Procurement and Construction projects

Our vision

• To be an innovative Company focused on quality, cost saving and project time schedule reduction, providing our Clients with a Company capable of managing and developing EPC Projects by integrating and coordinating competences for Engineering, Procurement and Construction. C.S.Impianti project and management team carefully develops each stage of every project, emphasizing the importance of Safety, Environment and Quality.

Our mission

Page 8: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

8

Develop and establish partnerships and Joint Ventures in leading Oil & Gas territories such as Central Asia, The Middle East and Africa.

Expand our business by increasing the acquisition of EPC Contracts.

Expand our professional services to project management and control, on-site assistance, supervision during erection, commissioning, decommissioning and start up, ensuring full coverage during all stages of the project execution

Key strategic initiatives

Page 9: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Our services

PROJECT MANAGEMENT ENGINEERING

PROCUREMENT SERVICES & SUPPLY CONSTRUCTION

SUPERVISION OF SITE OPERATION SERVICES

9

Page 10: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

C.S. Impianti adopts new technologies for project management such as Oracle Primavera P6 management v.8.4 and Microsoft Project 2013 For: Project Portfolio

Management Project Cost Estimating,

Planning and Scheduling Project Control Construction Management

and Supervision

10

Project Management

Page 11: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Engineering

11

Basic Engineering • Conceptual Design development • Feasibility studies. • Basic Design development • H&MB, PFD and P&ID preparation • Design and Control Philosophy. • Functional Specifications for Process Systems. • Process Data Sheets

Detailed Engineering

• Detailed Design Development up to as- built: • Piping&layout • Civil&Structural • Electrical • Instrumentation&automation

• Technical Specification • Bid Technical evaluations • Follow up of suppliers activities and vendor drawings • Permitting Engineering • Operating, Safety and Maneinance manuals • Commissioning, Start up and Shut down procedures

Page 12: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Main Engineering software

12

Process • Aspentech AspenOne • Aspentech Hysys v.8

Piping & Layout • Aveva PDMS • Intergraph PDS • Intergraph Smart Plant 3D • Coade Caesar II

Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 • ROBOT

Electrical & Instrumental • Aveva Instrumentation • Intergraph INTOOLS • ZEUS 2

Page 13: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Procurement Services & Supply C.S.Impianti provides Procurement Services as main Contractor, directly issuing Purchase Orders and Services/Works Contracts, or as support to client project purchasing. C.S.Impianti procures goods and services from around the world, based on its clients technical specifications. The Company works to assure timely delivery of goods and execution of services in accordance with project schedules . C.S.Impianti continually updates its database of qualified Suppliers, and looks for the best quality & lowest prices on the market. All the functions of the procurement process follow Company Procedure and Quality/HSE guidelines.

13

Page 14: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Construction Services C.S.Impianti has a team of specialized Site Managers who can assist and supervise construction and erection works in the areas of: • Oil & Gas Plants • Petrochemical Plants • Chemical Plants • Power Plants • Industrial Plants • Refineries

14

Page 15: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Organization Chart

15

Page 16: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Group

C.S. Impianti Arabia

Engineering and contracting Co. LTD

EPC Contractor SAUDI ARABIA

C.S. Impianti S.p.A

Italian Firm with strong capability

in Engineering & Procurement

ITALY C.S. Impianti Industrial Services

Inc.

Multi-disciplinary Engineering and

3D Design Systems CANADA

16

Page 17: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Manpower

17

C.S.Impianti is capable to develop multidisciplinary projects up to 1.000.000 hours/year

Project Management 5%

Process 4%

Piping & Mech 40%

Civil 20%

Electrical 11%

Instrumentation & Automation

20%

Project Management Process Piping & Mech Civil Electrical Instrumentation & Automation

Page 18: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Company Policy HSE will be managed as carefully as other critical business activities. C.S.Impianti is committed to preventing all injuries and environmental accidents, creating a safe, healthy and injury-free workplace. We strive to keep workplace injuries equal to zero and minimize pollution and waste. We believe our clients are the core of our business and determinant to our success. Therefore we strive to assure a high level of customer satisfaction. Our priority is reinforcing the company’s image in the marketplace by assuring satisfaction of all parties involved, respecting obligations and taking care in assisting and communicating with clients.

18

Page 19: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Quality certified C.S.Impianti management system complies with ISO 9001:2008 standards for the following fields: polidisciplinary engineering for onshore and offshore plants in Oil & Gas, Petrochemical and Power Production procurement and construction of packages skid-mounted units. C.S.Impianti is fully committed to working in partnership with our clients and suppliers to meet its vision in becoming a leading global EPC company offering the highest level of quality in the development of EPC projects.

19

Page 20: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Significant

references 20

Page 21: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

MA'ADEN PROJECT- SOP PRODUCTION UNIT

21

YEAR: 2015/2016 CLIENT: DESMET BALLESTRA S.p.A. END USER: FLUOR LOCATION: Umm Wu’al – Saudi Arabia PROJECT : MA'ADEN PROJECT- SOP PRODUCTION UNIT

Detail Engineering for new plan for production of Potassium Sulphate (SOP) and Hydrochloric acid (HCl) from to Potassium Chloride (KCl) and Sulfuric acid (H2SO4) Following the main 5 Unit: • Unit 270 - Solid KCl Bulk Storage and Raw material

feeding• Unit 271 - Raw K2SO4 Production• Unit 272 - K2SO4 Fertilizer Grade Conditioning and

Packing• Unit 274 - Hcl Production• Unit 276 – Tank Farm for HCl and H2SO4

JOB DESCRIPTION Polidisciplinary Detailed Design including calculation reports, drawings, MTO, BOQ. The Design of all units has been developed with PDS (3D intelligent Desing System) for a total amount of 30.000 hours of engineering.

Page 22: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

QATIF – Producing Facilities GOSP 1

22

YEAR: 2002/2003 CLIENT: Snamprogetti S.p.A END USER: Aramco LOCATION: Kingdom of Saudi Arabia PROJECT : QATIF Producing facilities GOSP 1

New Qatif Gas Oil Separation Plant (GOSP1) to process 150.000 barrel/day of Arabian Medium Crude (AM) and 150.000 barrel/day of Arabian extra light (AXL) and a new ABU SAFAH GOSP to process 300.000 barrel/day of Arabian Medium Crude Oil. • Plant Q01: GOSP1 & WCH/Crude Oil manifold• Plant Q02: Water Oil Separation (WOSEP)• Plant Q03: Crude Stabilization• Plant Q04: Cogeneration & Utilities• Plant Q05: Gas Gathering (GC)• Plant Q06: Water Injection Plant (WIP)• Plant Q07: Producing Complex Facilities and Chemical storage• Plant Q11: Abu Safah GOSP & WCH• Plant Q12: Abu Safah Crude Stabilization• Utilities: Utility Air, Instrument Air, Cooling Water Supply, Cooling water return,

Drinking water (U/G), Utility water, Nitrogen gas, Fuel gas (HP and LP), HPsteam, MP steam, LP steam, Steam condensate, boiled feed water,demineralized water, Flare and Blowdown, caustic soda, Firewater (U/G), stormwater (U/G), Sanitary sewer (U/G), Oily water sewer (U/G).

JOB DESCRIPTION Polidisciplinary Detailed Design including calculation reports, drawings, MTO, BOQ.The Design of all units has been developed with PDS (3D intelligent Desing System) for a total amount of 70.000 hours of modelling , 500 models, 7.500 above ground lines and 3.500 Underground)

Page 23: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

New LNG Plant - 3Z Project-Arzew

23

YEAR: 2009/ 2010 CLIENT: Saipem S.p.A END USER: Sonatrach LOCATION: Algeria PROJECT: New LNG Plant – 3Z Project Arzew

Gas Pipeline System, and New LNG Plant in the Arzew Djedid Port industrial zone, with a capacity of 4.7 million tonnes of LNG per annum, constructed near the Algerian city of Arzew, about 400 kilometres west of Algiers.. The Project includes : • Process Unit• Utility Unit• Offsite Unit• Marine Infrastructure

JOB DESCRIPTION Polydisciplinary Detailed Design all developed with 3D PDS for the following units:

• Feed Gas conditioning• Acid Gas Removal• Dehydration• Fuel Gas• Liquefaction• Refrigeration• Fractionation• Hot Oil• Cooling Water

The detailed design include Calculation Reports, Drawings, MTO, BOQ

Page 24: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

New storage LPG/propane refrigerated

EPC

24

YEAR: 2013 – 2015 CLIENT : eni S.p.A END USER: eni S.p.A LOCATION: Italy – Porto Marghera (VE) PROJECT: New Refrigerated Storage LPG/propane Plant

Converting a dismissed ammonia storage area in a new cryogenic LPG and Propane Storage Plant, with a capacity of 50.000 sqm.

JOB DESCRIPTION Engineering, Procurement and Construction of a new storage LPG/Propane refrigerated Plant. The design was developed with PDMS 3D Design System composed by the following Units:

• No.5 Compressor Package• No.1 Odorization/Denaturization Package• No.1 Flare Package• No.1 Pumps Package• No.1 Heat Exchanger Package• No.1 Vessel Package• No.1 Cooling Towers Package• No.1 Marine Loading Arms Package• No.1 Land Loading Arms Package• No.1 Weight System Package• No.1 DCS Package

Page 25: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

MAY 2015 25

YEAR: 2014 – 2015 CLIENT: Saipem S.p.A END USER: Boscongo LOCATION: Congo PROJECT: Congo Marine XII Block Litchendjli Gas Development

Congo Marine XII Block Litchedjli Gas Development

EPC

JOB DESCRIPTION Engineering, Procurement and Construction for the Water Treatment Plant.

OILY WATER TREATMENT SYSTEM : No.2 units with different capacity, 4-19m3/h and 55m3/h. Design pressure 5barg, design temperature 85°C. Each unit includes the following packages:

• No.1 Filters Package• No.1 Skimmed Oil Tank Package• No.1 Chemical Dosing Package• No.1 Floatation Vessel Skid• No.1 CPI Separator Package• No.1 Pumps Skid• No.1 PSV Skid• No.1 PV for blanketing Skid• No.1 UCP Package

SANITARY TREATMENT SYSTEM: Capacity 0,4m3/h, Design pressure. 5barg, Design temperature:85°C The package includes the following: • MBBR Oxidation Tank• Sewage Pit• Air Blower Skid

Page 26: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Southern Swamp Associated Gas Solution (SSAGS) Project

Production Facilities EPC

26

YEAR: 2012- 2013 CLIENT : Saipem Contracting Nigeria LOCATION: Nigeria END USER: Shell Petroleum Development

Company of Nigeria Ltd

PROJECT: Southern Swamp Associated gas Solution (SSAGS) Project. The scope was to modify the existing flowstations located in Benisede, Opukushi, Tunu, Ogbotobo and to install a new gas Centralized Production Facilities (CPF) in Tunu .

JOB DESCRIPTION Supply of n°8 Fuel & Gas skid mounted Units . Each package includes the following main items:

• No.1 scrubber• No.1 electric heater complete with thyristor control

panel• No.2 cartridge filters

Capacity: 2MMSCFD Design pressure: 16 bar Design temperature: 0-120°C

Page 27: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

Husky Oil Sunrise Project

27

YEAR: 2012/2013 CLIENT: Saipem Canada LOCATION: Canada END USER: Husky Oil PROJECT: Husky Oil Sunrise Project

Phase I CPF&SRU

Two plants of 30,000 barrels per day. Production of bitumen using Steam assisted Gravity Drainage (SAGD) Technology

JOB DESCRIPTION: Polydisciplinary detailed engineering. The design has been developed using 3D PDMS Design System and TEKLA for the execution of the Structural design. To minimize the project execution it was determined the modularization of the Pipe rack: • 42 modules of Pipe Rack has been designed

including all the construction, lifting and erectiondetails

• The typical pipe rack module is composed by 6frames with 6m spam, 15 m high . Total emptyweight is about 37 ton.

• Each module is divided in 2 sub-modules: pipesare installed in in the lower level, while in the upperlevel hosts the cable trays.

• The connections between the modules are boltedtype in order to allow a faster assembly .

Page 28: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

REFERENCES

www.csimpianti.it C.S. Impianti S.p.A.

Page 29: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

2

C.S. Impianti S.p.A. www.csimpianti.it

CLIENT LOCATION PROJECT ACTIVITIES YEAR

ENI ITALY NEW STORAGE LPG/PROPANE

REFRIGERATED DEBOTTLENECKING FEASIBILITY STUDY 2017 on

going

DE NORA KUWAIT CPF WATER TREATMENT - OZONE

& OXIGEN GENERATOR PACKAGE MULTIDISCIPLINARY DETAIL ENGINEERING

2017 on

going

ABB ALGERIA BIR SEBA PROJECT INSTRUMENT, PIPING AND CIVIL MATERIAL

TAKE OFF

2017 on

going

ENIPROGETTI ITALY

COVA (CENTRO OLIO VAL

D'AGRI) UPGRADING OF OIL

TRANFER SYSTEM

PROCESS AND DETAIL CIVIL ENGINEERING 2017 on

going

ABB U.A.E. HALIBA - FIELD DEVELOPMENT

PROJECT PRELININARY INTRUMENT ENGINEERING 2016

ABB U.A.E. ASAB – CONTROL SYSTEM

UPGRADE PRELININARY INTRUMENT ENGINEERING 2016

SIRTEC-NIGI RUSSIA LNG PLANT VYSOTSK PROJECT PIPING AND CIVIL ENGINEERING 2016

STOGIT ITALY

PROJECTS FOR VARIUS GAS

CENTERS (SETTALA, RIPALTA,

CORTEMAGGIORE, BORDOLANO,

FIUME TRESTE)

MULTIDISCIPLINARY ENGINEERING FOR GAS

CENTER UPGRADING

2016 on

going

Page 30: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

CLARINET Kazakhstan SWS Water Treatment Recovery Plant FEED Endorsement 2016

STOGIT Italy

SUBSTITUTION OF PMCC

CLUSTER B

SETTALA GAS CENTER

Detail Engineering 2016

STOGIT Italy SETTALA Detail Engineering 2016

STOGIT Italy

SUBSTITUTION OF GAS

MEATERINF SYSTEM BRUGHERIO

GAS CENTER

Detail Engineering 2016

STOGIT Italy

INSTALLATION OF NEW LIQUID

COLLECTION TANK

SERNIANO GAS CENTER

Detail Engineering 2016 on

going

STOGIT Italy

FLARE SUBSTITUTION CLUSTER

B AND C

SETTALA GAS CENTER

Detail Enginnering 2016 on

going

STOGIT Italy

RATIONALIZATION OF

TREATMENT PLANT – MINERBIO

GAS CENTER

Feasibility Study 2016 on

going

TECNOMARE Egypt ZOHR PLATFORM Platform detailed Structural design 2016

ABB S.p.A. Algeria REHABILITATION DU TRAIN 200

DE L'USINE GPL Instrumentation Detail Engineering 2016 on

going

3

C.S. Impianti S.p.A. www.csimpianti.it

Page 31: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

ABB S.p.A. Tunisia NAWARA GAS TREATMENT

PLANT (NAWGTP) 430 - GABES Civil Detail Engineering 2015/2016

ENI Libya KK Station -Flare System FEED Multidisciplinary 2015 on

going

SAIPEM Saudi Arabia KHURAIS FACILITIES EXPANSION

& SATELLITE GOSP Civil Detail Engineering

2015 on

going

SAIPEM Saudi Arabia KHURAIS CENTRAL PROCESSING

FACILITY – Phase 2 Piping Detail Engineering

2015 on

going

DESMET

BALLESTRA

S.p.A.

Saudi Arabia MA'ADEN PROJECT- SOP

PRODUCTION UNIT Multidisciplinary Detail Engineering 2015/2016

ABB S.p.A. Tunisia NAWARA GAS TREATMENT

PLANT (NAWGTP) Basic and Detail Engineering for Fiscal Metering Skids

2015 on

going

ENI Div. E&P Algeria Menzel Ledjmet East Project

(MLE) Phase 2 Basic & FEED Multidisciplinary Engineering 2014/2015

ENI Div. E&P Italy COVA (Centro Olio Val D'Agri) Detailed Engineering Activities Related To The

Adaptation Of Plant Fire Detection 2014/2015

Saipem S.p.A. Italy Val D’Agri Area Pozzo MA4 e MA1/2 Activities Detailed Engineering Installation and Follow-

Up Buildings Electrical Area Pozzo MA4 e MA1/2 2014/2015

Saipem S.p.A. Italy Production Platform in Baronia Field Check and Endorsement of FEED Project 2014/2015

4

C.S. Impianti S.p.A. www.csimpianti.it

Page 32: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Saipem S.p.A. Venezuela Petrobicentenario Refinery Project Piping FEED activities 2014/2016

Tecnomare Congo Piattaforma Nennè

PP1/WHP3 Structure Detailed Engineering

TEKLA 3D 2014/2015

ETE Saudi Arabia Rabigh II Project

Naphta & Aromatic Package Building Engineering Endorsement , field activities As

Built & Manuals 2013/2015

Eni Div. E&P Italy COVA (Centro Olio Val D'Agri) -

Upgrade- Amine Unit Cooling System Multidisciplinary Detailed Engineering 2013 on

going

Saipem S.p.A. Saipem S.p.A. Versalis - Ferrara

New line EPDM

Debottlenecking existing lines -OSBL Civil & Piping FEED & Detailed Engineering 2013

on going

Saipem S.p.A. Turkey ARP STAR Project Piping Detailed Engineering for Hydogen HP Unit &

Flare 2013

Saipem S.p.A. Saudi Arabia Jazan Project Piping & Civil Detailed Engineering 2013

Saipem S.p.A. Iraq West Qurna Multidisciplinary detailed engineering 2012

ABB Iraq Khor Al Zubair Power Generation Plant Multidisciplinary Detailed Engineering 2012/2013

Saipem S.p.A.

Canada Canada

Husky Oil Sunrise Project Phase 1 CPF

and SRU Piping Detailed Engineering 2012/2013

5

C.S. Impianti S.p.A. www.csimpianti.it

Page 33: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Saipem S.p.A.

Canada Canada CNRL - Hydrotreaters Piping Detailed Engineering 2012/2013

Saipem S.p.A.

Canada Canada KKD STATOIL COENRE PCSA Multidisciplinary FEED 2012/2013

ENI Div. E&P Nigeria Nigeria OPL-245 Zabazaba & Etane

Field Development Project & Concept Selection Study 2012 / 2013

Eni Div. E&P Italy COVA (Centro Olio Val D'Agri) -

Upgrade- Gas Detection System Feasibility study 2012 /2013

ENI DIME Italy Various Project Basic & Detailed Engineering 2012

Saipem S.p.A. Kingdom of

Saudi Arabia Rabigh II Project

Naphta & Aromatic Package Civil & Structural Detailed Engineering 2012

Saipem S.p.A.

Canada Canada North West Red Water Project Civil Detailed Engineering 2012

ENI Div. E&P Italy Correggio Gas Centre Engineering activities for Plant Decommissioning 2012

Tecnomare S.p.A. Congo Litchendjili on-shore Project Civil FEED Engineering 2011 / 2012

Saipem S.p.A. Kuwait New BS 171 Civil & Piping FEED Engineering 2011 / 2012

6

C.S. Impianti S.p.A. www.csimpianti.it

Page 34: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

ENI Power S.p.A. Italy Ferrera Erbognone “Collegamento

Green Data Center ENI” Site supervision & Owner’s Engineering Activities 2011 / 2012

Engitec

Technologies U.S.A. New Technology Facility Flubor

Process Multidisciplinary F.E.E.D. Engineering 2011 / 2012

ENI Power S.p.A. Italy Ferrara Refinery 132 Kv

Electrical Power Supply Site supervision & Owner’s Engineering Activities 2011 / 2012

ENI Div. E&P Italy Val D’Agri Oil Center Upgrading

Project Polidisciplinary Engineering Activities 2011 / 2012

ENI Power S.p.A. Italy Brindisi Power Plant Decommissioning Services of GT4, GT5 & GT11 Units 2011

Saipem S.p.A. Kuwait Jurassic MAA

Refinery Civil & Piping FEED Engineering 2011

Saipem S.p.A. Libia Shah Gas Development Project U.A.E. Gas Treatment Plant - Civil Detailed Engineering 2011

ENI Power S.p.A. Italy Ferrera Erbognone – “Collegamento

Green Data Center ENI” Multidisciplinary Detailed Engineering 2010 / 2011

ENI Div. E&P Iraq Zubair Field Development Project Technical assistance & Follow up of EPC Contractors

Design 2010 / 2011

Saipem S.p.A. Italy Ferrera Erbognone P31770 Project Civil Detail Engineering 2010 / 2011

7

C.S. Impianti S.p.A. www.csimpianti.it

Page 35: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Saipem S.p.A. Iraq Zubair Upgrading Facilities Project Polidisciplinary Basic Engineering 2010 / 2011

Saipem S.p.A. U.A.E. Shah Gas Development Project Civil Detailed Engineering 2010 / 2011

ENI Div. E&P Algeria GRT ROM Flaring Down Follow-up of Detailed Engineering developed by Other 2009 / 2010

Stogit S.p.A. Italy Settala Gas Centre Basic Engineering for New Wells 2009 / 2010

ENI Power S.p.A. Italy Ferrara Refinery - 132 kV Electrical

Power Supply Civil and Electrical Detailed Engineering 2009 / 2010

Saipem S.p.A. Algeria Menzel Ledjmet East Project

(MLE) Multidisciplinary Detailed Engineering with PDMS 2009 / 2010

ENI Power S.p.A. Italy Livorno Refinery Primary Water

Desalination & Demineralization

System Process and Mechanical Detailed Engineering 2009 / 2010

ABB Algeria EL MERK Offsites Facilities Civil Detailed Engineering 2009 / 2010

ENI Div. E&P Algeria Menzel Ledjmet East Project (MLE) Technical assistance & Follow up of EPC Contractors

Design 2009 / 2010

ENI Div. E&P Egypt Repowering and Gas Upstream

Configuration Projects Feasibility Studies 2009 / 2010

8

C.S. Impianti S.p.A. www.csimpianti.it

Page 36: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

ENI Div. E&P Italy ENI Div. E&P Follow up of Basic Engineering 2009

ER SAI Kazakhstan Kashagan Field Development Project Structural and Piping Shop Drawings 2009

Saipem S.p.A. Algeria GNL-3Z-ARZEW FEED & Detailed Engineering with INTERGRAPH PDS

3D and TEKLA Structures 2008 / 2011

Saipem S.p.A. Kingdom of

Saudi Arabia Manifa Central Production Facilities

(ARAMCO) Polidisciplinary FEED Engineering with INTERGRAPH

PDS 3D 2008 / 2009

Tecnimont S.p.A. Italy SILFAB – Polysilicon Solar Grade –

Borgofranco D’Ivrea Polidisciplinary FEED for O.B.E. 2008 / 2009

ENI S.p.A. Italy Various Plants and Platforms As-built documents for P.E.D. 2008

Tecnimont S.p.A. Tatarstan REF Nizhnekamsk (RU) Taneco Piping Front-End Engineering 2008

Saipem S.p.A. Qatar QAFCO V – Fertilizer Complex Civil Detailed Engineering 2008

Saipem Energy

Services Nigeria-Libia Ebocha Field – Lybia Master Plan FEED Activities 2008

Saipem S.p.A. Kingdom of

Saudi Arabia Al-Jubail – Yambu Piping MTO 2008

9

C.S. Impianti S.p.A. www.csimpianti.it

Page 37: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

ENI Div. E&P Tunisia GAZ DU SUD Project Phase 2 Interconnecting Engineering Detailed 2007 / 2009

Stogit S.p.A. Italy Various Gas Centers Basic Design for new wells connections 2007 / 2009

Maire

Engineering

s.p.a. Chile Bocamina II Power Plant

Polidisciplinary Basic and Detailed Engineering

PDS 3D Modelling 2007 / 2008

Tecnimont S.p.A. Italy API Falconara Refinery Upgrading Polidisciplinary Basic and Detailed Engineering 2007 / 2008

Tecnimont S.p.A. U.A.E. PP/PE Borouge II Project Civil Detailed Engineering 2007 / 2008

Snamprogetti

S.p.A. Iran BANDAR ABBAS Gas Condensate

Refinery Project Polidisciplinary FEED Intergraph PDS 3D 2007 / 2008

Stogit S.p.A. Italy Glicol traps for Tresigallo, Brugherio,

Settala, Minerbio Plants Polidisciplinary Basic Engineering 2007 / 2008

Eni Div. E&P Italy Pineto, Crotone, Candela, Roseto,

Grottammare, Carrassai, Barbara Fields Survey for Location of ele/stru items in Hazardous Areas 2007 / 2008

Eni Div. E&P Croatia Annamaria A/B Ana/Vesna/Irina

Platforms Follow-up of Detailed Engineering developed by Other 2007 / 2008

10

C.S. Impianti S.p.A. www.csimpianti.it

Page 38: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Snamprogetti

S.p.A. Kingdom of

Saudi Arabia Khurais KCC Projects

GOSP & NLG of Khurais complex Polidisciplinary

Detail Engineering for Central Processing Facilities

(GOSP Train 1,2,3,4 - Inlet Outlet Facilities- Common

Area & Off Site) with Intergraph PDS 3D

2007

Tecnimont S.p.A. Russia HDPE Salavat Project Polidisciplinary Detailed Engineering

Intergraph PDS 3D 2007

Snamprogetti

S.p.A. Turkey Turkish Straits by-pass TSB Project Process Activities 2006 / 2007

Snamprogetti

S.p.A. Kingdom of

Saudi Arabia Qurayyah Seawater Treatment Plant

Project Polidisciplinary Detailed Engineering

Intergraph PDS 3D 2006 / 2007

Tecnimont S.p.A. Tatarstan PE Nizhnekamsk NKNK

Polyethylene 230 KT/Y Project Polidisciplinary Detailed Engineering

Intergraph PDS 3D 2006 / 2007

Sete – Latsis

Group Kingdom of

Saudi Arabia Seawater Desalination Plant in Al-

Khafji 3D modelling with INTERGRAPH PDS 3D 2006

Stogit S.p.A. Italy. Cortemaggiore Gas Center Storage Gas

Pressure Increasing Project (Upgrade) Polidisciplinary Basic Engineering 2006

Snamprogetti

S.p.A. Italy Adriatic LNG Project (ALP)

Project Process Activities 2006

Snamprogetti

S.p.A. Qatar Dolphin Condensate / LPG facilities Piping Detailed Engineering 2006

ENI S.p.A. –

E&P Div. Italy Santerno Gas Plant upgrading Basic Engineering & Tender preparation 2006

11

C.S. Impianti S.p.A. www.csimpianti.it

Page 39: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Snamprogetti

S.p.A. Italy Collalto Gas Center Process Activities for Plant Upgrading 2006

Tecnomare S.p.A. Italy Various Plants Process Activities for Plant Upgrading 2006

SEI S.p.A. Congo Ikalau South Project Process Activities 2006

ENI S.p.A.

Div. E&P Italy Various Plants Environmental Restoration 2006

SEI S.p.A Nigeria Awa Paloukou Firefighting and Process activities 2006

Stogit S.p.A. Italy Cortemaggiore / Minerbio /

Sabbioncello Gas Center Engineering for Units decommissioning 2005

Stogit S.p.A. Stogit S.p.A. Cortemaggiore Gas Center Polidisciplinary Basic Engineering for Gas Centre

Storage - Gas pressure Increasing Project 2005

Snamprogetti

S.p.A. Qatar Ras Gas Expansion Project – Phase II Civil Engineering 2005

Stogit S.p.A. Italy Brugherio Gas Center Feasibility Study for Storage Revamping 2005

Snamprogetti

S.p.A. Italy San Potito and Cotignola Gas Center Basic design for Gas Treatment and Compression units 2005

12

C.S. Impianti S.p.A. www.csimpianti.it

Page 40: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

ENGINEERING REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

ENI Med S.p.A. Italy Samperi Development Project Multidisciplinary Basic Engineering 2005

Tecnomare S.p.A. Kazakhstan Kashagan Project Development Detailed Engineering 2005

ENI Agip S.p.A. Italy Mezzocolle Gas Center Feasibility study for Plant development 2005 / 2006

Snamprogetti

S.p.A. Nigeria N-LNG Gas Supply Project T6 Front End Engineering Design 2005 / 2006

Snamprogetti

S.p.A. Italy Priolo Gargallo TAF Plant Piping & Civil Detailed Engineering 2005 / 2006

Snamprogetti

S.p.A. U.A.E. Ruwais 3rd NGL Train Project

(GASCO) Polidisciplinary Detailed Engineering

INTERGRAPH PDS 3D 2005 / 2006

Snamprogetti

S.p.A. Kingdom of

Saudi Arabia Khursaniyah Facilities Project

(ARAMCO) Khursaniyah Facilities Project (ARAMCO) 2005 / 2006

SEI S.p.A. Croatia Katarina Platform Process and Firefighting activities 2004 / 2005

ENI Agip S.p.A. Italy Ptf. Cervia “C” & Cervia “A” Basic Engineering for Platforms Upgrading 2004 / 2005

Snamprogetti

S.p.A. U.A.E. Bu Hasa Upgrading Project Polidisciplinary Detailed Engineering INTERGRAPH

PDS 3D 2003/2004

13

C.S. Impianti S.p.A. www.csimpianti.it

Page 41: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Snamprogetti

S.p.A. Kingdom of

Saudi Arabia QATIF Producing Facilities Projects –

GOSP 1 (ARAMCO) Piping and Civil Engineering with

INTERGRAPH PDS 3D 2002 /2003

Stogit S.p.A. Italy Cortemaggiore Gas Center Detailed Engineering for Working Gas Pressure

Increasing Project 2002 /2003

Stogit S.p.A. Italy Brugherio Gas Center Upgrading Feasibility Study and Tender Preparation 2001/2002

Snamprogetti

S.p.A. Kingdom of

Saudi Arabia Harad Al Crude Increment II Project

(ARAMCO) Multidisciplinary Detail Engineering INTERGRAPH

PDS 3D 2001/2002

Snamprogetti

S.p.A. Kuwait Installation of the new BS-131 Gas

Compression Unit Basic Design and Detailed Engineering 2001 /2002

ENGINEERING REFERENCES

14

C.S. Impianti S.p.A. www.csimpianti.it

Page 42: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

EPC REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No.1 FILTERS PACKAGE for Water

Treatment System 2014

on going

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No. 1 SKIMMED OIL TANKS SKID for

Water Treatment System 2014

on going

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No. 1 PUMPS PACKAGE for Water

Treatment System 2014

on going

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No. 1 CHEMICAL DOSING PACKAGE

for Water Treatment System 2014

on going

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No. 1 FLOTATION VESSEL PACKAGE

for Water Treatment System 2014

on going

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No. 1 CPI SEPARATOR PACKAGE for

Water Treatment System 2014

on going

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No. 1 UCP PACKAGE for Water

Treatment System 2014

on going

15

C.S. Impianti S.p.A. www.csimpianti.it

Page 43: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Saipem

S.p.A. Congo CONGO MARINE XII BLOCK

LITCHEDJILI GAS

DEVELOPMENT

EPC for No. 1 SANITARY PACKAGE for Water

Treatment System 2014

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.5 Compressor Packages 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Package Odorization / Denaturation 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Flare Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Pumps Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Heat Exchangers Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Vessels Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Cooling Towers Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Marine Loading Arms Package 2013

on going

16

EPC REFERENCES

C.S. Impianti S.p.A. www.csimpianti.it

Page 44: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

EPC REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Land Loading Arms Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 Weighs System Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 HVAC Package 2013

on going

Eni S.p.A. Italy NEW STORAGE LPG/PROPANE

REFRIGERATED EPC for No.1 DCS Package 2013

on going

Saipem

S.p.A. Italy BORDOLANO GAS STORAGE

PLANT EPC for No.1 Gas Dryer Package 2013 /2014

Erg S.p.A. Italy REVAMPING CTE / NUCENORD

(PRIOLO) EPC for Water Bath Heater Package 2013

Saipem

S.p.A. Nigeria SOUTHERN SWAMP

ASSOCIATED GAS SOLUTION

(SSAGS) EPC Contract for No.8 Fuel Gas Packages 2012/2013

Saipem

S.p.A. Iraq KHOR AL ZUBAIR PLANT

REHABILITATION EPC Contract for Catalyst Loading / Unloading

System 2011/2012

ENICHEM Italy BUTYLENE STORAGE

UPGRADING EPC Contract for Interconnecting 2005

17

C.S. Impianti S.p.A. www.csimpianti.it

Page 45: C.S.Impianti S.p · PDF file• Coade Caesar II . Civil & Structural • Harpaceas Tekla v.20 • SAP 2000 ... System) for a total amount of 70.000 hours of modelling , 500 models,

EPC REFERENCES

CLIENT LOCATION PROJECT ACTIVITIES YEAR

ENI Agip

S.p.A. Italy CO-GENERATION PLANT C/O

CAVONE OIL CENTER EPC contract for H2S removal skid unit 2002

KONE

Ascensori Italy STEEL STRUCTURE FOR

ELEVATORS EPC contract 2000

ENI Agip

S.p.A. Italy CASALBORSETTI GAS PLANT Engineering & Procurement for n°4 Glycol

Regeneration skids 1999

S.I.C.E. Egypt DARFEEL PLATFORM Support frames for Arrays (Photovoltaic system) 1998