Page 1: Crude Oil Washing Systems - 2000
Page 2: Crude Oil Washing Systems - 2000

CRUDEolLWASHINGSYSTEMSincluding amendments adopted by the MEPC at itsforty-third session (28 June to 2 July 1999)and by the Assembly at its twenty-first session(15 to 26 November 1999)

International Maritime OrganizationLondon, 2000

Page 3: Crude Oil Washing Systems - 2000

First published in 198Aby the INIIRNATIONAL MARffiME ORCANIZATION

4 Albert Embankment, London SEI 7SR .

Second edition 1982Third edition 1983Fourth edition 2000

Printed in the United Kingdom by Ashford Press

2 4 6 8 1 0 9 7 5 3 1

ISBN 92€01-509,M

IMO PUBLICATION

Sales number: IMO{17E

Copyright @) IMO 2000

Ail rights reserved.No part of this publication may, for sales purposes,

be reproduced, stored in a retieval system or transmittedin any form or by any meang electronic, electrostatic,magnetic tape, mechanical, photocopying or otherwisq

without prior permission in writing from theInternational Maritime Organization.

Page 4: Crude Oil Washing Systems - 2000

I_ l

FOREWORD

This publication contains:

o Revised Specifications for the design, operation and control of crude oil washing systems(resolution A.446(Xl), as amended by resolutions A.497(Xll) and 4.897(21));

o standard format for the Crude Oil Washing Operations and Equipment Manuals (resolutionMEPC.3(Xll), as amended by resolution MEPC.81(a3));

o examples of Crude Oil Washing Operations and Equipment Manuals;

o Cuidelines for in-port inspection of crude oil washing procedures.

REVISED SPECIFICATIONS

The International Conference on Tanker Safety and Pollution Prevention (TSPP Conference) convened bythe f nternational Maritime Organization (lMO) in February '1978 adopted, inter alia, the Protocol of 1978relating to the International Convention for the Prevention of Pollution from Ships,

'1973, which modifiedthe 1973 Convention.* MARPOL 73/75 (regulation 13 of Annex l) requires certain ships to operate with acargo tank cleaning system using crude oil washing. The crude oil washing installation, associatedequipment and arrangements must meet the requirements established by the Administration based on theSpecifications for the design, operation and control of crude oil washing systems adopted by theConference in resolution 15 and as may be revised by the Organization (regulation 138 of Annex I ofMARPOL 73/78).

The Conference requested the Organization to review and revise the Specifications, as necessary in orderthat the Revised Specifications would reflect the latest technology and practices which might be developedby the time of entry into force of MARPOL 73/78.

The task of reviewing and revising the Specifications was carried out by the Marine Environment ProtectionCommittee (MEPC) of the Organization at its 1Oth and 1 1th sessions as a matter of urgency. ln the courseof its work, the MEPC found that there was a need, not only to revise certain provisions of the Specifications,but also to agree on interpretations of some of the provisions.

The f MO Assembly, at its 1 1th session (November 19791, received and examined the recommendationsmade by the MEPC on this matter and adopted, by resolution A.446(Xl), the Revised Specifications for thedesign, operation and control of crude oil washing systems, together with agreed interpretations of certainof the provisions of the Revised Specifications. As stated in the resolution, the Revised Specificationssupersede the Specifications contained in the annex to resolution 15 of the TSPP Conference.

Since the 1 1th session of the Assembly, the MEPC has kept the Revised Specifications under review andrecommended certain amendments and additions both to the Revised Specifications and to the agreedinterpretations; these were adopted by the Assembly at its 12th session (November 1981)by resolutionA.497(Xl1), and at its 21st session (November 1999) by resolution A.897(21).

The attention of Covernments is drawn to the fact that the Assembly urged them to establish, in time for theentry into force of MARPOL 73/78, requirements for crude oil washing installations and associatedequipment and arrangements based on the Revised Specifications, and urged further that suchrequirements should not impose requirements over and above those laid down in the RevisedSpecifications.

i l l

* The 1973 Convention, as modified by its 1978 Protocol, is referred to throughout this publication as MARPOL 73/78.

Page 5: Crude Oil Washing Systems - 2000

Crude oil washing systems

CRUDE Ort WASHING OPERATIONS AND EQUIPMENT MANUAL

Every tanker which operates with crude oil washing, in accordance with regulation 13, must be provided

with an Operations and Equipment Manual approved by the Administration. The Manual must detail the

system ani equipment and specify operationai procedures (regulation 138 of Annex I of MARPOLT3/78)'

As the purpose of the Operations and Equipment Manual is not only to provide guidance to the crew of the

ship on the proper operation of the system but also to provide information on the system and its operational

procedures'for inspectors going on board for inspection in ports, the MEPC decided to develop a standard

format for the Manual. fhis wis adopted by the MEPC at its 12th session by resolution MEPC.3(Xll)' The

MEPC adopted revisions to the stand'ard foimat at its 43rd session by resolution MEPC'81(43). lt is hoped

that the standard format will help shipowners in preparing the Manuals for their ships and Administrations in

approving them.

The standard format contains:

r standardized wording for the introduction of the Manual;

o index of the Manual;

r eighteen sections, detailing the information or operational instructions to be provided under each

section as required by the*Revised Specifications for the design, operation and control of crude oil

washing systems, including the revised section 9 (resolution MEPC.81(43)).

Administrations may require information and operational instructions to be included in the Manual in

addition to those specified in the standard format. Such information should be included in part 2 of the

Manual. lf no such information or operational instructions are required, the Manual will consist of one part

only.

This publication also contains two examples of the Manual, developed by tanker owners in accordance with

the standard forma! for two actual tankers, one of which is a conventional pipeline tanker of about 31 5,000

tons deadweight and the other a full free flow tanker of about 27O,OOO tons deadweight. As will be seen

from these two examples, the information and operational instructions under the corresponding sections

vary considerably in their wording and presentation.

It should be noted in this connection that:

o what is standardized is the type of information to be included in the Manual under each section and

not its presentation;

o the two examples show how the Manuals may be presented. Although some sections may be

generally appltable to all ships, these are merely examples and should be treated as such.

The attention of Covernments is drawn to the recommendation made by the MEPC, inviting them to use

the standard format when approving the Manual and to ensure tha! if the language of the Manual is neither

English nor French, the Manual includes a translation into one of those languages.

GUIDELINES FOR IN.PORT INSPECTION

By resolution 7 the TSPP Conference recommended that the Organization take urgent action to develop

guidelines for the performance of in-port inspections of the resulis of cargo tank cleaning using crude oil

washing, which should be implemented by Covernments as soon as they are adopted by the Organization'

iv

Page 6: Crude Oil Washing Systems - 2000

The Conference recognized that in order to implement effectively the requirements of regulations 13 and1 3B of Annex I of MARPOLT3/78, continuing strong emphasis should be placed on the effective operationof crude oil washing procedures, and also that uniform"guidelines for the extent and particulars of in-portinspections of the results of cargo tank cleaning are a prerequisite for ensuring that crude oil tankers usingcrude oil washing systems comply at all times with the provisions of MARPOL 73/78.

The MEPC at its 12th session adopted the Cuidelines for in-port inspection of crude oil washing proceduresand requested the Secretariat to circulate them to Covernments. Governments were invited, by an MEPCcircular, to take note of the Guidelines for implementation.

Page 7: Crude Oil Washing Systems - 2000

CONTENTS

t Revised Specifications for the design, operation and control of crude oil washing systems

Resolution A.446(Xl), as amended by resolutions A.497(Xlt) and A.897(21)

Appendix | - List of changes when applying the specifications to new crudeoil tankers of 20,000 tons deadweight and above 13

Appendix tl - Training for persons intended to assume overall charge ofcrude oil washing 15

Appendix lll - Agreed interpretations of certain of the provisions of theRev isedSpec i f i ca t ions . . . . 17

ll Standard format for the Crude Oil Washing Operations and Equipment Manual

Resolution MEPC.3(Xll)

lntroduction . . .

Index of sections.

Sections 1 to '18

lll Examples of Crude Oil Washing Operations and Equipment Manuals

Explanatory note. .

Example 1 - Conventional pipeline tanker

Example 2 - Full free-flow tanker.

lV Cuidelines for in-port inspection of crude oil washing procedures 85

23

24

25

3 1

33

5 7

vil

Page 8: Crude Oil Washing Systems - 2000

II

I

REVISED SPECIFICATIONS FOR THEDESICN, OPERATION AND CONTROT OF

CRUDE OIT WASHING SYSTEMS

Page 9: Crude Oil Washing Systems - 2000

Crude oil washine systerns

1

2

3

lndex

Purpose

Application

Ceneral provisions3.1 Definitions3.2 Initial survey

Design criteria4.1 Piping4.2 Tank washing machines4.3 Pumps4.4 Stripping system4.5 Ballast lines .

Qualification of personnel . . . .

Operation6.'l Tankage to be crude oil washed6.2 Drainage and discharge ashore of cargo lines . .6.3 Filling of departure ballast tanks .6.4 Crude oil washing at sea6.5 Discharge of oily water effluents on ballast voyage6.6 Use and control of inert gas . .6.7 Precautions against electrostatic generation6 . 8 V a p o u r e m i s s i o n . . . . : .

Operations and Equipment Manual

Appendix | - List of changes when applying the Specifications to new crude oil tankers of20,000 tons deadweight and above

Appendix ll - Training of persons intended to assume overall charge of crude oil washing.

Appendix lll - Agreed interpretations of certain of the provisions of the Revised Specifications

Note: The Revised Specifications comprise the annex to resolution A.446(Xll, as amended by resolutions A.497(Xll) andA.897(21).

2

Page

3

3

33

1 01 01 01 01 01 0

1 1

347B9

9

91 0

5

6

1 3

1 5

1 7

Page 10: Crude Oil Washing Systems - 2000

Revrsed S pe cifi catio n s

1 Purpose

The purpose of these Specifications is to provide specific design criteria, operational requirements andcontrol and enforcement procedures for the crude oil washing of cargo tanks of crude oil carriers asspecified in section 2.

2 Application

2.1 These Specifications apply to:

(a) existing crude oil tankers of 40,000 tons deadweight and above in accordance with regulation13(B) of Annex I of MARPOL 73/78; and

(b) new crude oil tankers of 20,000 tons deadweight and above in accordance with regulation13(6) of Annex I of MARPOLT3/78, with the changes listed in appendix l.

Compliance of these ships with these Specifications shall be shown on the lnternational Oil PollutionPrevention Certificate as modified by MARPOL 73/78.

2.2 lf a crude oil that is not suitable for crude oil washing is intended to be carried as cargo in a ship thatis provided with only a crude oil washing system, then that ship must comply with segregated ballast tankrequirements in accordance with regulation 13(7) or dedicated clean ballast tank requirements inaccordance with regulation 13(9) of Annex I of MARPOL 73175.

3 General provisions

3.1 Definitions

For the purpose of these Specifications:

3.1.1 Arrival ballast means clean ballast as defined in regulation 1(16) of Annex I of MARPOL 73/78.

3.1.2 Departure ballast means ballast other than arrival ballast.

3.2 lnitial survey

The initial survey referred to in regulation 4 of Annex I of MARPOL 73/78 shall include a completeinspection of the crude oil washing equipment and arrangements and shall include, except for the casesspecified in 4.2.11, an examination of the tanks after they have been crude oil washed and the additionalcontrols as specified in 4.2."10 to ensure that the washing system efficiency is in accordance with theseSpecifications.

Design criteria

Piping

4.1.1 The crude oil washing pipes and all valves incorporated in the supply piping system shall be of steelor other equivalent material and shall be of adequate strength having regard to the pressure to which theymay be subjected, and shall be properly jointed and supported.

4.1.2 The crude oil washing system shall consist of permanent pipework and shall be independent of thefire mains and of any system other than for tank washing except that sections of the ship's cargo system maybe incorporated in the crude oil washing system provided that they meet the requirements applicable tocrude oil pipework. Notwithstanding the above requirements, in combination carriers the arrangementsmay allow:

4

4.1

Page 11: Crude Oil Washing Systems - 2000

Crude oil washine systems

(a) the removal of the equipmenf if necessary when carrying cargoes other than crude oil, pro-vided that, when reinstated, the system is as originally fitted and tested for oil tightness;

(b) the use of flexible hosepipes to connect the crude oil washing system to tank washing machinesif it is necessary to locate these machines in a cargo tank hatch cover. Such flexible hosepipesmust be provided with flanged connections and be manufactured and tested in accordancewith standards acceptable to the Administration and be consistent with the duties the hoses arerequired to perform. The length of these hoses shall be no greater than necessary to connectthe tank washing machines to an adjacent point just outside the hatch coaming. These hosesshall be removed to suitably prepared and protected stowage when not in use and be pressuretested by an authority acceptable to the Administration at intervals of not more than two and ahalf years.

4.1.3 Provision shall be made to prevent overpressure in the tank washing supply piping. Any relief devicefitted to prevent overpressure shall discharge into the suction side of the supply pump. Alternative methodsto the satisfaction of the Administration may be accepted provided an equivalent degree of safety andenvironmental protection is provided.

4.1.4 Where hydrant valves are fitted for water washing purposes on tank washing lines, all such valvesshall be of adequate strength and provision shall be made for such connections to be blanked off by blankflanges when washing lines may contain crude oil. Alternatively, hydrant valves shall be isolated from thecrude oil washing system by spade blanks.

4.1.5 All connections for pressure gauges or other instruments shall be provided with isolating valvesadjacent to the lines unless the fitting is of the sealed type.

4.1.6 No part of the crude oil washing system shall enter the machinery spaces. Where the tank washingsystem is fitted with a steam heater for use when water washing, the heater must be effectively isolatedduring crude oil washing by double shut-off valves or by clearly identifiable blanks.

4.1.7 Where a combined crude oil-water washing supply piping is provided the piping shall be sodesigned that it can be drained so far as is practicable of crude oil, before water washing is-commenced,into spaces designated in the Crude Oil Washing Operations and Equipment Manual. These spaces may bethe slop tank or other cargo spaces.

4.1.8 The piping system shall be of such diameter that the greatest number of tank cleaning machinesrequired, as specified in the Operations and Equipment Manual, can be operated simultaneously at thedesigned pressure and throughput. The arrangement of the piping shall be such that the required number oftank cleaning machines to each cargo compartment, as specified in the Operations and Equipment Manualreferred to in these Specifications, can be operated simultaneously.

4.1.9 The piping system shall be tested to one and one half times the working pressure after it has beeninstalled on the ship.

4.1.10The crude oil washing supply shall be anchored (firmly attached) to the ship's structure atappropriate locations, and means shall be provided to permit freedom of movement elsewhere toaccommodate thermal expansion and flexing of the ship. The anchoring shall be such that any hydraulicshock can be absorbed without undue movement of the supply piping- The anchors should normally besituated at the ends furthest from the entry of the crude oil supply piping. lf tank washing machines are usedto anchor the ends of branch pipes then special arrangements are necessary to anchor ihese sections whenthe machines are removed for any reason.

4.2 Tank washing machines

4.2.1 The tank washing machines for crude oil washing shall be permanently mounted and shall be of adesign acceptable to the Administration.

4

Page 12: Crude Oil Washing Systems - 2000

Revised Specifications

4"2.2 The performance characteristic of a tank washing machine is governed by nozzle diameter, working:":ssure and the movement pattern and timing. Each tank cleaning machine fitted shall have a characteristic=-c- that the sections of the cargo tank covered by that machine will be effectively cleaning within the time;:,ecmed in the Operations and Equipment Manual.

4.2"3 Tank washing machines shall be mounted in each cargo tank and the method of support shall be to--'re satisfaction of the Administration. Where the tank washing machines are positioned well below the decke', el to cater for protuberances in the tank, consideration may need to be given to additional support for::e rnachines and their supply piping.

1.2.4 Each machine shall be capable of being isolated by means of stop valves in the supply line. lf a deck--rounted tank washing machine is removed for any reason, provision shall be made to blank off the oil' iroply line to the machine for the period the machine is removed. Similarly, provision shall be made to close:re tank opening with a plate or equivalent means.

1.2.5 Where the drive units for the tank cleaning machines are not integral with the tank cleaningmachine, sufficient drive units shall be provided to ensure that no drive unit need be moved more thanf,r jce from its original position during cargo discharge to accomplish the washing programme as specified inre Operat ions and Equipment Manual.

1.2.6 The number and location of the tank washing machines shall be to the satisfaction of the\dministrat ion.

1.2.7 The location of the machines is dependent upon the characteristics detailed in 4.2.2 and upon theconfiguration of the internal structure of the tank.

4.2.8 The number and location of the machines in each cargo tank shall be such that all horizontal andr"ertical areas are washed by direct impingement or effectively by deflection or splashing of the impingingjeL In assessing an acceptable degree of jet deflection and splashing, particular attention shall be paid to thervashing of upward-facing horizontal areas and the following parameters shall be used:

(a) For horizontal areas of a tank bottom and the upper surfaces of a tank's stringers and otherlarge primary structural members, the total area shielded from direct impingement by deck orbottom transverses, main girders, stringers or similar large primary structural members shall notexceed 10"/" of the total horizontal area of tank bottom, the upper surface of stringers andother large primary structural members.

(b) For vertical areas of the sides of a tank, the total area of the tank's sides shielded from directimpingement by deck or bottom transverses, main girders, stringers or similar large primarystructural members shall not exceed 15"/" of the total area of the tank's sides.

(c) For existing crude oil tankers, the Administration may permit the percentages required in (a)and (b) above to be exceed for tanks having complicated internal structural members providedthat the percentages calculated over all the cargo tanks do not exceed 1Oo/"for horizontal areasand 15% for vertical areas.

In some installations it may be necessary to consider the fitting of more than one type of tank washingmachine in order to effect adequate coverage.

4.2.9 At the design stage the following minimum procedures shall be used to determine the area of thetank surface covered by direct impingement:

(.) Using suitable structural plans, lines are set out from the tips of each machine to those parts ofthe tank within the range of the jets.

(b) Where the configuration of the tanks is considered by the Administration to be complicated, apinpoint of light simulating the tip of the tank washing machine in a scale model of the tankshall be used.

Page 13: Crude Oil Washing Systems - 2000

Crude oil washins systerns

4.2.10 To confirm the effectiveness of the crude oil washing system and stripping system, the crude oilwashing operation should be witnessed to the satisfaction of the Administration.

(a) For ships that comply with regulation 13F(3), the crude oil washing operations are to be carriedout using the approved crude oil washing equipment and as specified in the approved Ope-rations and Equipment Manual. For at least one tank of a group of tanks of similar configuration,the Administration should:

(i) confirm the operation of the stripping system by observing the monitoring devices andmonitoring the oil level (by dipping or other means) during bottom washing;

(ii) monitor the proper operation of the washing machines with particular reference to supplypressure, cycle times and machine function.

On completion of washing and final draining, the tanks are to be hand dipped, as close aspractical to the forward end, centre and aft end in each tank and a record of these dips shouldbe made in the Operations and Equipment Manual. An Administration may require an internalexamination as described in subparagraph (b)(i) of this section, or by an alternative methodacceptable to the Administration, if deemed necessary.

(b) For ships other than those complying with regulation 13F(3), where fitted with cargo tanksintended to be used in certain circumstances as ballast tanks, the following requirements applyin addition to those specified in paragraph (a) of this section:

(i) To ensure that the tank is essentially free of clingage and deposits, the Administration mayrequire that the cleanliness of the tank be confirmed by a visual inspection made byentering the tanks after a crude oil washing but prior to any water rinse which may bespecified in the Operations and Equipment Manual. lf the tanks cannot be gas-freed forsafe entry of the surveyor, an internal examination should not be conducted and thestripping test specified in paragraph 4.2.10(bxii) will be acceptable.

In this case, the bottom of the tank to be inspected may be flushed with water andstripped in order to remove any wedge of liquid crude oil remaining on the tank bottombefore gas-freeing for entry. lf the flushing procedure is adopted, a similar but unflushedtank must be used for the test specified in (ii) below.

(ii) To verify the effectiveness of the stripping and drainage arrangements, a measurementshould be made of the amount of oil floating on top of the departure ballast. The ratio ofthe volume of oil on top of the total departure ballast water to the volume of tanks thatcontain this water should not exceed 0.00085. This test should be carried out after crudeoil washing and stripping in a tank similar in all relevant respects to the tank examined inaccordance with (b)(i) above, which has not been subjected to a water rinse or to theintervening water flushing permissible in (b)(i) above.

(iii) To verify the design, installation and operation of the system, the arrival ballast after atypical ballast voyage before which the arrival ballast tanks have been crude oil washedand during which the tanks have been water rinsed in accordance with the programme setout in the Operations and Equipment Manual, should be totally discharged to the loadingport harbour through an oil discharged monitoring and control (ODM) system approvedby the Administration. The oil content of the effluent in this test should not exceed

'15 ppm.Alternatively, the option of taking ballast water samples to be analysed in a shore-basedlaboratory is also acceptable.

(c) During all crude oil washing system surveys, internal visual inspections of the tanks by in-spectors should not be considered a mandatory requirement. When an Administration consi-ders that there is a possible failure of the crude oil washing system indicated by other crude oil

Page 14: Crude Oil Washing Systems - 2000

Revised S pecifi cation s

washing survey requirements, the Administration may require an internal examination of thetanks involved. lnternal examinations may be completed using alternative methods, e.g., videosurvey or other new technology, as accepted by the Administration.

rll. '11 \Vhere an Administration is satisfied that ships are similar in all relevant respects, the requirements of-! : I t need only be applied to one such ship. Furthermore, where a ship has a series of tanks that are;r-li lar in all relevant respects then, for that series of tanks, the requirements of a.2.10(a) need only beesolied to one tank of that series.

42.12 The design of the deck-mounted tank washing machines shall be such that means are provided,:rrernal to the cargo tanks, which, when crude oil washing is in progress, would indicate the rotation anda'c of the movement of the machine. Where the deck-mounted machine is of the non-programmable, dual.,azzle type, alternative methods to the satisfaction of the Administration may be accepted provided anequivalent degree of verification is attained.

1.2.13 Where submerged machines are required, they should be non-programmable and, in order toconnply with the requirements of 4.2.8, it must be possible to verify their rotation by one of the followingrrethods:

(a) by indicators external to the tank;

(b) by checking the characteristic sound pattern of the machine, in which case the operation of themachine shall be verified towards the end of each wash cycle. Where two or more submergedmachines are installed on the same supply line, valves shall be provided and arranged so thatoperation of each machine can be verified independently of the other machines on the samesupply l ine;

(c) by gas-freeing the tank and checking the operation of the machine with water during ballastvoyages. In this case the check shall take place after a maximum of six usages of the machinebut the interval between checks shall not exceed 12 months. Each verification shall be recordedin Supplement 2 to the Oil Record Book.

The method of verification shall be stated in the Operations and Equipment Manual.

4.3 Pumps

4.3.1 The pumps supplying crude oil to the tank cleaning machines shall be either the cargo pumps orpumps specifically provided for the purpose.

4.3.2 The capacity of the pumps shall be sufficient to provide the necessary throughput at the requiredpressure for the maximum number of tank cleaning machines required to be operated simultaneously asspecified in the Operations and Equipment Manual. In addition to the above requiremen! the pumps shall,if an eductor system is fitted for tank stripping be capable of supplying the eductor driving fluid to meet therequirements of 4.4.2.

4.3.3 The capacity of the pumps shall be such that the requirements of 4.3.2 can be met with any onepump inoperative. The pumping and piping arrangements shall be such that the crude oil washing systemcan be effectively operated with any one pump out of use.

4.3.4 The carriage of more than one grade of cargo shall not prevent crude oil washing of tanks.

4.3.5 To permit crude oil washing to be effectively carried out where the back pressure presented by theshore terminal is below the pressure required for crude oil washing, provision shall be made that such anadequate pressure to the washing machines can be maintained in accordance with 4.3.2.This requirementshall be met with any one cargo pump out of action. The minimum supply pressure required for crude oilwashing shall be specified in the Operations and Equipment Manual. Should this minimum supply pressurenot be obtainable, crude oil washing operations shall not be carried out.

Page 15: Crude Oil Washing Systems - 2000

Crude oil washine systems

4.4 Stripping systern

4.4.1 The design of the system for stripping crude oil from the bottom of every cargo tank shall be to thesatisfaction of the Administration.

4.4.2 The design and capacity of the tank stripping system shall be such that the bottom of the tank beingcleaned is kept free of accumulations of oil and sediment towards completion of the tank washing process.

4.4.3 The stripping system shall be capable of removing oil at a rate of 1.25 times the total throughput ofall the tank cleaning machines to be operated simultaneously when washing the bottom of the cargo tanksas described in the ship's Operations and Equipment Manual.

4.4.4 Means such as level gauges, hand dipping and stripping system performance gauges as referred to in4.4.8 shall be provided for checking that the bottom of every cargo tank is dry after crude oil washing.Suitable arrangements for hand dipping must be provided at the aftermost portion of a cargo tank and inthree other suitable locations unless other approved means are fitted for efficiently ascertaining that thebottom of every cargo tank is dry. For the purpose of this paragraph, the cargo tank bottom shall beconsidered "dry" if there is no more than a small quantity of oil near the stripping suction with noaccumulation of oil elsewhere in the tank.

4.4.5 Means shall be provided to drain all cargo pumps and lines at the completion of cargo discharge,where necessary, by connection to a stripping device. The line and pump draining shall be capable of beingdischarged both to a cargo tank and ashore. For discharge ashore a special small-diameter line shall beprovided for that purpose and connected outboard of the ship's manifold valve. For new oil tankers orexisting oil tankers not already fitted with such a line the cross-sectional area of this line shall not exceed10'/. of that of a main cargo discharge line. Where such a line is already fitted on an existing tanker, a cross-sectional area of not more than 25o/o of that of a main cargo discharge line may be accepted.

4.4.6 The means of stripping oil from the cargo tanks shall be by positive displacement pump, self-primingcentrifugal pump or eductor or other methods to the satisfaction of the Administration. Where a strippingline is connected to a number of tanks, means shall be provided for isolating each tank not being stripped atthat particular time.

4.4.7 The carriage of more than one grade of cargo shall not prevent crude oil washing of tanks.

4.4.8 Equipment shall be provided for monitoring the efficiency of the stripping system. All suchequipment shall have remote read-out facilities in the cargo control room or in some other safe andconvenient place easily accessible to the officer in charge of cargo and crude oil washing operations. Wherea stripping pump is provided, the monitoring equipment shall include, as appropriate, a flow indicator, or astroke counter or a revolution counter, and pressure gauges at the inlet and discharge connections of thepump or equivalent. Where eductors are provided, the monitoring equipment shall include pressure gaugesat the driving fluid intake and at the discharge and a pressure/vacuum gauge at the suction intake.

4.4.9 The internal structure of the tank shall be such that drainage of oil to the tank suctions of thestripping system is adequate to meet the requirements of 4.4.2 and 4.4.4. Care shall be taken that bothIongitudinai and transverse drainage are satisfactory and shall be verified during the inspection required by3 .2 and 4 .2 .10 .

4.4.10 The trim conditions for crude oil washing given in the Operations and Equipment Manual shall beadhered to. In general, trim by the stern is only important during the final stages of tank discharge and shallbe the maximum possible compatible with operational constraints but in no case less than that recordedduring the crude oi l washing pr ior to the inspect ion required by 3.2 and 4.2.1O.

8

Page 16: Crude Oil Washing Systems - 2000

Revrsed S pecifi cation s

45 Eallast lines

45.'l \\'here a separate ballast water system for ballasting cargo tanks is not provided, the arrangement;-a ce such that the cargo pump, manifolds and pipes used for ballasting can be safely and effectively:ran'ed of oil before ballasting.

5 Qualification of personnel

;.1 The training requirements of ships' personnel engaged in the crude oil washing of tankers shall be to:e satisfaction of the Administration.

5l lVhere a person such as the master, the chief officer or the cargo control officer assumes overall: 'ra'ge of a crude oil wash he shall:

(a) have at least one year's experience on oil tankers where his duties have included the dischargeof cargo and associated crude washing. Where his duties have not included crude oil washingoperations, he shall have completed a training programme in crude oilwashing in accordancewith appendix ll to these Specifications and satisfactory to the Administration;

(b) have participated at least twice in crude oil wash programmes one of which shall be on theparticular ship for which he is required to undertake the responsibility of cargo discharge.Alternatively, this latter participation may be acceptable if undertaken on a ship that is similar inall relevant respects; and

(c) be fully knowledgeable of the contents of the Operations and Equipment Manual.

5.3 Where other nominated persons are intended to have particular responsibilities as defined in theOperations and Equipment Manual, they shall have at least six months' experience on oil tankers where, inthe course of their duties, they should have been involved in the cargo discharge operation. In addition, theyshould have been instructed in the crude oil washing operation in the particular ship for which they arerequired to undertake this responsibility and be fully knowledgeable of the contents of the Operations andEquipment Manual. Appendix ll to these Specifications should be used as guidance in establishing thecontent of such instruction.

5 Operation

5.1 Tankage to be crude oilwashed

Before departure on a ballast voyage, after the complete discharge of cargo, sufficient tanks shall have beencrude oilwashed in accordance with the procedures specified in the Operations and Equipment Manual to

ensure that:

(a) as a minimum, sufficient tanks have been washed to permit compliance with the draught and

trim requirements of regulation 13(2)(a), (b) and (c) of Annex I of MARPOL 73/75 during all

phases of the ballast voyage; and

(b) account is taken of the ship's trading pattern and the expected weather conditions so that

additional ballast water is not put into tanks which have not been crude oil washed.

In addition to the tanks referred to in (a) above, approximately one quarter of all remaining tanks shall be

crude oil washed for sludge control on a rotational'basis, but these additional tanks may include the tanks

referred to in (b) above. Ho*"uer, for sludge control purposes, no tank need be crude oil washed more

than once in every four months. Crude oil wlshing shail not be conducted between the final discharge and

loading ports; that is to say, no crude oil washing shall be undertaken during the ballast voyage. Ballast

water ihall not be put into tanks that have not been crude oil washed. Water that is put into a tank which

has been crude oil washed but not water rinsed shall be regarded as dirty ballast.

Page 17: Crude Oil Washing Systems - 2000

Crude oil washing systerns

6.2 Drainage and discharge ashore of cargo lines

At the end of cargo discharge all cargo mains and stripping lines shall be drained and stripped and thedrainings and strippings discharged ashore via the special small-diameter line required by 4.4.5.1n additionall cargo tanks are to be stripped before the ship leaves its final port of discharge.

6.3 Filling of departure ballast tanks

Care shall be taken at the completion of crude oil washing of any departure ballast tank to strip the tank ascompletely as possible. Where departure ballast is loaded through cargo lines and pumps, these must bedrained and stripped of oil using the means required by 4.4.5 before ballast is loaded.

6.4 Crude oil washing at sea

AII crude oil washing must be completed before the ship leaves its final port of discharge. Where any tank iscrude oil washed while the ship is at sea between multiple discharge ports, the tank shall be left empty andavailable for inspection at the next discharge port before commencing the next ballast voyage. Thisinspection may consist of multiple sounding/dipping of the bottom of the tank when the tank is empty.Departure ballast tanks shall be ballasted prior to departure from port so that examination of the surface ofthe ballast water can be made. In the latter case the guidance given in 4.2.10(b) is relevant to the inspection.

6.5 Discharge of oily water effluents on ballast voyage

The discharge of departure ballast and any other water effluent discharged during the ballast voyage shallcomply with the requirements of regulation 9 of Annex I of MARPOL 73178.

6.6 Use and control of inert gas

On ships to which these Specifications apply, no tank shall be crude oil washed unless the inert gas systemrequired by regulation 13B(3) of Annex I of MARPOLT3ITS is in proper operation. Before each tank iscrude oil washed, the oxygen level shall be determined at a point 1 m from the deck and at the rniddleregion of the ullage space and neither of these determinations shall exceed S% by volume. Where tankshave complete or partial wash bulkheads, the determinations should be taken from similar levels in eachsection of the tank. The oxygen level of the inert gas being delivered during the washing process shall becont inuously monitored. l f dur ing crude oi l washing:

(a) the oxygen level of the inert gas being delivered exceeds 8% by volume; or

(b) the pressure of the atmosphere at the tanks is no longer positive

then the washing must be stopped until satisfactory conditions are restored.

6.7 Precautions againstelectrostaticgeneration

To avoid excessive electrostatic generation in the washing process due to the presence of water in the

crude oil washing fluid, the contents of any tank to be used as a source of crude oil washing fluid must first

be discharged by at least 1 m before being so used. Any tank used as a slop tank on the previous ballastvoyage shall be completely discharged and refilled with dry crude oil if that tank is to be used as a source ofwashing f lu id.

5.8 Vapour emission

On ships to which these Specifications apply there shall be means to avoid vapour emission during the fil l ingof departure ballast wherever local conditions require it. The method of preventing the emission ofhydrocarbon vapour into the atmosphere shall be:

1 0

Page 18: Crude Oil Washing Systems - 2000

Revised S p e cifi cati o n s

{a) by the use of permanent ballast tanks wherever these are sufficient to provide the minimumdeparture draught; or

{b) by containment of vapour in empty cargo tanks by simultaneous ballasting and cargo discharge.

4,rer'native methods to the satisfaction of the Administrations may be accepted provided an equivalentlegree of environmental protection is provided.

i Operations and Equipment Manual

irre Operations and Equipment Manual must be to the satisfaction of the Administration and shall containme rollowing information and operational instructions:

(a) The complete text of the Revised Specifications for the design, operation and control of crudeoil washing systems.

(b) A line drawing of the crude oil washing system showing the respective position of pumps, linesand washing machines which relate to the crude oil washing system.

(c) A description of the system and a listing of procedures for checking that equipment is workingproperly during crude oil washing operations. This shall include a listing of the system andequipment parameters to be monitored, such as line pressure, oxygen level, machine revolu-tions, duration of cycles, etc. The established values for these parameters shall be included. Theresults of the tests carried out in accordance with 4.2.10 and the values of all parameters

monitored during such tests shall also be included.

(d) Details of the requirements of section 6 of these Specifications together with advice andinstructions, where appropriate, in meeting these requirements such as:

(i) recommended methods and programmes of crude oil washing in order to accord with allforeseeable circumstances of cargo discharge restraints and to obtain maximum trimduring the completion of washing and draining of each tank;

(ii) the procedure on ships to avoid vapour emission in accordance with 6.8;

(ii i) the method of draining tanks which shall include information on optimum trim conditionsas required by 4.4.'lO;

(iv) the method of draining cargo pumps, cargo lines, crude oil washing lines and stripping

lines, the identification of spaces into which they may be drained and procedures for

discharge ashore of drainings and strippings via the smalldiameter discharge line on

completion of cargo discharge;

(v) typical washing programmes under various conditions of loading specifying:

(1) the tanks to be washed in accordance with 6'1;

(2) the method for washing each tank, that is, single or multi-stage;

(3) the number of tank washing machines to be used simultaneously;

(4) the duration of the crude oil wash and water rinse where the latter is appropriate;

1 1

Page 19: Crude Oil Washing Systems - 2000

Crude oil washine svstems

(e)

(0

(s)

(5) the volume of water used for water rinsg which shall be at least equal to that used inthe water rinse prior to the inspection required by 3.2 and 4.2.10; and

(6) the preferred order in which the tanks are to be washed;

(vi) the procedure for draining and stripping, where appropriate, cargo lines and pumps beforebeing used for the loading of departure ballasq

(vii) the procedure for water washing lines before discharge of departure ballast and theloading and final discharge of arrival ballast;

(viii)the procedure for verifying by sound patterns that bottom-mounted machines are ope-rating shall be carried out towards the end of the wash cycle for each tank. When carryingout such verification all other machines shall be shut down if necessary

(ix) precise details of procedure to ensure compliance with regulation 9 of Annex I ofMARPOL 73/78 in the discharge of departure ballas! the water flushing of lines and thedecanting of the slop tanks at sea.

The dangers of leakage from the crude oil washing system and the precautions necessary toprevent leakage and the action to be taken in the event of a leakage. Cuidance shall be givenon how the crude oil washing system is to be operationally tested for leakage before eachdischarge.

The method of preventing the entry of oil to the engine room through steam heaters asrequired by 4.1.6.

The personnel required at all times to conduct the dual operation of discharging cargo andcrude oil washing. The numbers of such personnel shall include:

(i) the person meeting the requirements of 5.2 who will have overall control of the crude oilwashing process;

(ii) those persons meeting the requirements of 5.3 who will be expected to undertake theactual operation; and

(iii) at least one person on deck at all times during washing to keep watch for leaks andmalfunctioning of equipmen! to test the oxygen content of tanks before washing, to checktank atmosphere pressure, to sound tank bottoms if required, to lift ullage floats if nec-essary and to change drive units when this is necessary

The duties of such persons are not necessarily mutually exclusive.

An effective means of communication between the watchkeeper on deck and the cargocontrol position so that in the event of a leak in, or malfunctioning of, the crude oil washingsystem the washing may be stopped as soon as possible.

The typical procedures for ballasting.

A precrude oil wash operational checklist for the use of the crew at each discharge which shallinclude the checking and calibration of all instruments.

The recommended intervals for on-board inspection and maintenance of crude oil washingequipment-in addition to statutory surveys. Reference should be made to technical manualssupplied by the manufacturers of the equipment.

A list of crude oils unsuitable for the crude oil washing process and their origin.

(h)

(i)

(t)

(k)

" t2

(l)

Page 20: Crude Oil Washing Systems - 2000

Revrsed Specifications: Appendix I

Appendix I

List of changes when applying the Specifications tonew crude oil tankers of 201000 tons deadweight

and aboveea."agraph:;,rylher List of changes

4J-10 Subparagraph (c) is not applicable.

5"1 Replace by the following:

5.1 Tankage to be crude oilwashed

5.1.1 Before departure on a ballast voyage:

(a) approximately one quarter of the cargo tanks shall be crude oil washed for sludgecontrol purposes on a rotational basis in accordance with the procedures specified inthe Operations and Equipment Manual. However, for these purposes/ no tank need becrude oil washed more than once in every four months; and

(b) if it is considered that additional ballast in a cargo tank or tanks may be required duringthe ballastvoyage under the conditions and provisions specified in regulation 13(3) ofAnnex I of MARPOLT3/78, the tank or tanks which may be used for this ballast shall becrude oil washed in accordance with the procedures specified in the Operations andEquipment Manual.

6.1.2 Ballast water shall not be put into cargo tanks that have not been crude oil washed. Waterthat is put into a tank which has been crude oil washed but not water rinsed shall be regarded asdirty ballast.

5.1.3 Crude oil washing shall not be conducted between the final discharge and loading ports; thatis to say, no crude oil washing shall be undertaken during the ballast voyage.

5.3 Replace by the following:

6.3 Ballasting of cargo tanks

Care shall be taken at the completion of crude oil washing of any cargo tank that might containballast to strip the tank as completely as possible. Where this ballast is filled through cargo lines andpumps, these must be drained and stripped of oil using the means required by 4.4.5.

6.4 The last two sentences are not applicable.

5.5 Replace by the following:

5.5 Discharge of oil water effluents on ballast voyage

The discharge of additional ballast from cargo tanks and any other water effluent discharged duringthe ballast voyage shall comply with the requirements of regulation 9 of Annex I of MARPOLT3/78.

6.8 This paragraph is not applicable.

7(dl Replace by the following:

7(d\ Details of the requirements of section 6 of these Specifications together with advice andinstructions, where appropriate, in meeting these requirements such as:

1 3

Page 21: Crude Oil Washing Systems - 2000

Crude oil washins systerns

(i)

(ii)

( i i i )

(vi)

recommended methods and programmes of crude oil washing in order to accord withall foreseeable circumstances of cargo discharge restraints and to obtain maximum trimduring the completion of washing and draining of each tank;

the method of draining tanks which shall include information on optimum trim condi-tions as required by 4.4.1O;

the method of draining cargo pumps, cargo lines, crude oil washing lines and strippinglines, and spaces into which they may be drained, together with the final dischargeashore via the small discharge line on completion of discharge;

typical washing programmes under various conditions of loading specifying:

(1) the tanks to be washed in accordance with 6.1;

(2) the method for washing each tank, that is, single or multi-stage;

(3) the number of tank washing machines to be used simultaneously;

(4) the duration of the crude oil wash and water rinse where the latter is appropriate;

The procedure for verifying by sound patterns that bottom-mounted machines areoperating shall be carried out towards the end of the wash cycle for each tank. Whencarrying out such verification all other machines shall be shut down if necessary.

(v)

1 4

Page 22: Crude Oil Washing Systems - 2000

Revised Specifications: Appendix ll

Appendix ll

Training for persons intended to assumeoverall charge of crude oil washing

lffio&rction

q;:'r .equired training shall be supervised instruction, conducted in a shore-based facility or aboard a suitably:o..uipp,ed ship having training facilities and instructors for this purpose, dealing with the principles involvedam dre application of these principles to ship operation.

- oran"ing up an Administration-approved syllabus of training, the Revised Specifications for the design,:oe"ation and control of crude oil washing systems of tankers shall be taken into account.

lrdn training shall include but not necessarily be limited to:

tr! An introduction to the principles of crude oil washing which shall include:- the characteristics of crude oil as a washing fluid and its contrast with water washing;- top washing;- bottom washing;- trim requirements;- methods of bleeding off from the cargo discharge;- maintenance of required washing fluid pressure;- washing at sea between discharge ports;- recirculatory washing;- relative priorities and requirements

cargo-only tanks.

(b) Equipment and design

for the departure ballast tanks, arrival ballast tanksand

(i) location of washing machines;

(ii) washing machines, deck-mounted and submerged:- types;- characteristics;- features of construction;- operatingparameters;

(ii i) drive units;

(iv) washing fluid supply and distribution systems;

(v) strippingsysterns;

(vi) means of sounding tanks;

(vii) inert gas requirements.

(c) Ceneralized crude oil washing procedures

(i) traditional pipeline shipfreeflow ship/partial free-flow ship;

(ii) single/multi-parcel cargoes;

(ii i) optimization of washing procedure in order to minimize extra berth time;

1 5

Page 23: Crude Oil Washing Systems - 2000

rCrude oil washing systems

(d)

(e)

(iv) ballasting for departure with various ship and pipeline configurations;

(v) procedure for washing at sea between discharge ports.

Associated procedure

(i) means for minimizing residues on board- stripping of cargo tanks;- draining and stripping of cargo lines;- final discharge of cargo ashore;

(ii) water rinsing of arrival ballast tanks;

(ii i) fi l l ing and ultimate discharge of arrival ballasq

(iv) discharge of departure ballast;

(v) build-up and decanting of residues in slop tank;

(vi) requirements of regulation 9 of Annex I of MARPOL 73/75;

(vii) avoidance of venting in port during ballasting operation.

Safety

(i) inert gas procedure;

(ii) maintenance and monitoring of inert gas quality and pressure;

(ii i) stopping of washing/discharge under abnormal inert gas conditions;

(iv) electrostatic generation and the precautions required to avoid iq

(v) pipeworkintegrity;

(vi) avoidance of surge pressures;

(vii) spillage.

Checklists

(i) before entering port;

(ii) before commencing crude oil washing;

(iii) after crude oil washing;

(iv) after sailing.

Regulatory enforcement procedures

(i) Operations and Equipment Manual;

(ii) Oil Record Book;

(iii) sounding of tanks;

(iv) measurement of oil on surface of departure ballast.

Maintenance of plant and equipment

(i) maintenance of equipment in accordance with manufacturers' instructions;

(ii) additional maintenance items.

Administrations shall ensure that the training facility issues an appropriate document to those qualified inaccordance with this appendix to serve as officers primarily responsible for crude oilwashing.

1 6

(0

(g)

(h)

Page 24: Crude Oil Washing Systems - 2000

4r.1 l . l

4 " 1 3

{ "1 .5

12.8

1.2.9

Revised Specifications: Appendix lll

Appendix l l l

Agreed interpretations of certain of the provisions ofthe Revised Specifications

This paragraph requires pipes and valves to be of steel or other equivalent material. As

classification societies permit grey cast iron for cargo piping with a maximum permissible workingoil pressure of 16 kglcm2, grey cast iron may be permitted in the supply system for crude oilw,ashing systems when complying with nationally approved standards.

The requirements of this paragraph allow alternative arrangements. One such alternative is thatwhere the system is served only by centrifugal pumps so designed that the pressure derivedcannot exceed that for which the piping is designed, a temperature sensing device located in thepump casing is required to stop the pump in the case of overheating.

On new oil tankers the steam heater referred to shall be located outside the machinery spaces.However, on an existing oil tanker with an existing steam heater located in the machinery spaces,no more additional isolation will be required other than that which isolates the crude oil washingsystem from the machinery spaces.

This paragraph requires each machine to be capable of being isolated by means of stop valves in

the supply line. Where more than one submerged machine is connected to the same supply line asingle isolating stop valve in the supply line may be acceptable provided the rotation of thesubmerged machines can be verified in accordance with paragraph a.2.13(a) or (c) of the RevisedSpecifications for the design, operation and control of crude oil washing systems.

With regard to the application of this paragraph a slop tank is considered as a cargo tank.

Cuidelines for the assessrnent of shadow diagrams

(a) Shadow diagrams (to be prepared in accordance with 4.2.9) must be on drawings the scaleof which must be at least:

(i) ' l:100 for tankers of less than 100,000 tons deadweigh[

(ii) ' l :200 for tankers of 100,000 tons deadweight and above.

(b) The drawings must provide at least a plan view, a profile view and an end elevation for eachtank, or for tanks considered to be similar.

(c) Sufficient detailed drawings of the vessel must be provided to check that all large primarystructural members have been included.

(d) The term large primary structural members is to be construed as those components of a tankstructure which contribute significant strength to the ship, such as web frames and girders. lt isintended that smaller components such as those that contribute to plate stiffening be excluded.ln general the following lists, in conjunction with the diagram showing structural components ofcargo tanks, may be used to amplify this interpretation. (See diagram on page 20'\

lnclude

web frames

girders

stringers

webs

main bracket

Disregard(i) longitudinals(ii) brackets

(iii) stiffeners(iv) ladders(v) pipe work

( i)

( i i )

( i i i )

(iv)

(v)

' t 7

Page 25: Crude Oil Washing Systems - 2000

Crude oil washing systems

lnclude

(vi) transverses(vii) crossties in transverse web

frames, unless it can be ve-rified by tank inspection thattheir presence does not af-fect the cleanliness of thetank. However, for the pur-pose of making an initial as-sessment where there areno more than two crosstiesand each is less than 1 /1 5 ofthe total depth of the tankthey may be ignored.

Disregard(vi) corrugations on corrugated bulkheads(vii) face plates

Shadows cast upon the underside of decks, web frames, centre and side girders can beignored.

Calculations must be provided either on the drawing or separately to show how the per-centages required by 4.2.8 have been arrived at. The calculations should be itemized so thatit is possible to relate each item with a particular shadow area.

Where a curved surface is presented to jets it is not necessary to provide exact geometricprojections to determine the resultant shadow. A reasonable estimate is acceptable.

For the purpose of determining the bottom area of wing tanks, the breadth of the tank is tobe taken as the horizontal distance measured across the top of the bottom longitudinalframes to the inside of the shell plating, midway between the tank bulkheads.

A swash bulkhead may be taken as a tank boundary. However, in this event the bulkheadmust be assumed to have no openings in it.

4.2.10 Water rinse means the water washing process carried out in connection with tank cleaning aftercrude oil washing and is not intended to be construed as limiting the amount of water needed inthe process.

a.2.10(c) (a) The oll monitoring system referred to in this paragraph means any approved system,including laboratory tests, which verifies that the oil content of the effluent does not exceedthe stated level. lf laboratory tests are to be conducted, standards contained in resolutionA.393(X) should be used as guidance. Oil tankers engaging in a trade where discharge ofcargo takes place in one port State and cargo loading in another port State create a specialproblem with respect to verification. Two alternatives available to confirm the tanker'scapability are:

(i) the tanker could be required to conduct the entire crude oil washing operations at thedischarge port/ taking inspectors to sea if necessary to observe water washing, handlingof departure ballast and discharge of arrival ballast;

(ii) co-ordination between the flag State Administration and port States to obtain the re.quired documentation.

However the test is performed, it should be decided on a caseby-case basis taking intoaccount the service of the tanker and the availability of surveyors.

(e)

(f)

(s)

(h )

( i )

1 8

Page 26: Crude Oil Washing Systems - 2000

Revised Specifications: Appendix I I I

(b) The expression totally discharged to the loading port harbour which is used in this paragraphshall be so construed as to mean the total quantity of arrival ballast except that quantitywhlch is to be retained on board as specified in section

'15 of the Operations and EquipmentManual.

4-&3 During bottom washing the stripping capacity shall be at least 1.25 times the total throughput ofail the machines that may be simultaneously in use according to paragraph 4.4.3. This does notnrean that all machines in a tank have to be operated simultaneously during bottom washing butthe boftom washing may be carried out in steps according to detailed procedures laid down in theOperations and Equipment Manual. The stripping capability should be at least'1.25 times thedrroughput of all machines that are in operation simultaneously during any stage of the bottomlvashing.

{f.15 In crude oil tankers having individual cargo pumps in each tanlt each pump having an individualpiping system, dispensation from the required special smalldiameter line may be given in caseswhere the combined amount of oil left in the tank after stripping and the volume of oil in thepiping system from the manifold to the tank is less than 0.00085 times the volume of the cargotank. lf a deepwell cargo pump system is provided with an evacuating system for retained oil, theabove consideration should also apply.

;J{b) This paragraph requires that officers who assume overall charge of a crude oil washing operationmust have participated in a crude oil washing operation on the ship for which they are required toundertake the responsibility for cargo discharge, or on a similar ship. However, for new ships, forships changing for the first time to the carriage of crude oil, for ships new to a particular owner, orfor ships which are changing registry in which it may not be possible to acquire the particularexperience, the Administration may accept as an alternative:

(i) a person such as a shore-based senior officer appointed by the company (additional to theship's complement) who is experienced in the operation of crude oil washing and is presentto advise the ship's personnel; or

(ii) a senior member of the crew such as the master, chief officer or cargo control officer whohas participated in at least four crude oil washing operations and is on board the ship;

provided that an Operations and Equipment Manual, in a language readily understood by theship's officers, is available on the ship.

1 9

Page 27: Crude Oil Washing Systems - 2000

-

Crude oil washine systerns

Diagram showing structural components of cargo tanks

I s = E Ig E # e E E , EE g # # g s E

EEq)

oJ

oEo)

l<C)oo

oaoo(d

l<ooo

oECD

EoEodl

otr(U

o=

6'€ '

.=o,o

J

lC(Eo

J

-oEEEC')co

J

(d

E

=g)

oJ

'6

a ) YP I ;.= lza =-o

c9.clo3

E(Eo-c*f

!ou,oo(UF

g e Sg g E6 @ . co ( 6

Joo

oo-)

20

Page 28: Crude Oil Washing Systems - 2000

t l

STANDARD FORMAT FORTHE CRUDE OIt WASHING

oPERATTONS AND EQUIPMENT MANUAT

Page 29: Crude Oil Washing Systems - 2000

Standard format for the COW Manual

STANDARD FORMAT FOR THECRUDE OIL WASHING OPERATIONS AND EQUIPMENT MANUAL

(The standard format consists of a standardized text of an introductionand of an index, and 17 or 18 sections depending on the type of tanker)

INTRODUCTION

This Manual is written in accordance with the requirements of regulation 138 of the Protocol of19tE ndating to the International Convention for the Prevention of Pollution from Ships, 1973 (MARPOL

3 ;8t.

I The purpose of the Manual is to meet the requirements for crude oil washing in accordance with the

ngis€d Specifications for the design, operation and control of crude oil washing systems (Assembly

esoft.rtbn A .446(Xl) as amended by resolutions A.a97(Xll) and A.897(21)). lt provides standard operational

Eilbnce in planning and performing a crude oilwashing programme and describes a safe procedure to be'folonr.red-

I Part 1 of the Manual contains all the information and operational instructions required by the

mer1ised Specifications. Part 2 of the Manual contains additional information and operational instructions"e+dred or accepted by the Administration.*

rl This Manual has been approved by the Administration and no alteration or revision shall be made to

anv part of it without the prior approval of the Administration.

\bre: The standard format comprises the annex to resolution MEPC.3(X||), as amended by resolution MEPC.8l(43).

' tf the Administration requires or accepts information and operational instructions in addition to those provided for by theSpecifications, they should be included in part 2 of the Manual. lf no such additional information or operating instructions€rerequired or accepied by the Administration, the Manual will consist of one part only, ln^d palagraph 3 should read: "This

Uanuat contains'all the'information and operational instructions required by the revised Specifications."

23

Page 30: Crude Oil Washing Systems - 2000

Crude oil washing systerns

Index of sections

Part 1

1 Text of the Revised Specifications . . . .

2 Drawings of the crude oil washing system

3 Description of the crude oil washing system and operationaland equipment parameters

4 Dangers of and precautions against oil leakage

5 Use and control of inert gas . .

6 Precautions against electrostatic hazards

7 Personnel requirements .

B Methods of communication

9 Determination of the suitability of a crude oil for usein crude oil washing

'10 Crude oil washing checklists

11 Approved methods and programmes for crude oil washing

12 Typical crude oil washing programmes . . . .

13 The method of draining cargo tanks'14 The method and procedures for draining cargo pumps

and l ines

15 Typical procedures for ballasting and the method of preventinghydrocarbon emission

16 Compliance procedures for regulation 9 of Annex I ofMARPOL 73/78

17 Inspections and maintenance of equipment

18 Procedure for changing from crude oil trade to product trade*

Part 2

Page

12sl[2s][2s]

12sl[2s]126l126l126)

126l12el12el[30]

[30]

[30]

[30]

[30]

[30]

[30]

Relevantparagraph(s)

of the RevisedSpecifications

7(a)

7(b)

7(c), 7(d)(viii)and 7(f)

7(e)

6.6

6 .7

z(e)7(h)

7(tl

7a)7(d)( i )

z(dXv)z(d)(iii)

z(d)(iv) and (vi)

7(dl(ii),7(i)

7(d)(vi), (vii)and (ix)

7(k)

(Additional information and operational instructions required or accepted by the Administration, if any)

* Section 18 is included in the Manual for a particular tanker oirly if applicable.

24

Page 31: Crude Oil Washing Systems - 2000

Standard format for the COW Manual

Contents of sections 1 to 18

SCIIrorN 1: THT OF THE REVISED SPECIFICATIONS

1lrnr seoio,n contains the complete text of the Revised Specifications for the design, operation and control of

m1m errln washing systems and the agreed interpretations of certain of the provisions of the Revised

Sm.cimcations (Assembly resolution A.447(Xl) as amended by resolutions A.497(Xll) and A.897(21)).

SEICTPN 2: DRAWINGS OF THE CRUDE OIt WASHING SYSTEM

*rs section contains line drawings showing:

(1) crude oil washing lines and valves;

(2) cargo pumps, lines and valves;

(3) ballast systems (where fitted);

(4) stripping systems;

(5) position of tank washing machines;

(6) position of holes for hand dipping and tank Sauges;

(7) inert gas deck distribution system.

SECilON 3: DESCRIPTION OF THE CRUDE Olt WASHINC SYSTEMAND OPERATION AND EQUIPMENT PARAMETERS

1'hk section contains a description of the cargo, ballasg washing and stripping systems and in addition

(1 )

(2)

(3)

(4)

(s)(6)

(7)

(8)

types of tank washing machines and their standpipe length inside the tanks;

revolutions of the machines;

methods of checking the operation of tank washing machines;

minimum operation pressure for crude oil washing;

maximum permitted oxygen level in cargo tanks;

duration of tank washing machine cycles;

results of the tests performed in accordance with paragraph 4.2.10(b) of the Revised Specifi-

cations and the method of computation;

method of preventing entry of oil into the engine room.

SE{CTION 4: DANGERS OF AND PRECAUTIONS AGAINST OIL TEAKAGE

This section contains information on the dangers of leakage from the crude oil washing system, the

precautions necessary to prevent leakage and the action to be taken in the event of leakage.

SECTION 5: USE AND CONTROL OF INERT GAS

This section contains information on the inert gas requirements and the instructions to cover those periods

when the inert gas pressure is released for reasons of cargo operation. ln addition it indicates the method

and procedures to be used for taking samples of the tank atmosphere.

25

Page 32: Crude Oil Washing Systems - 2000

Crude oil washine systems

SECTION 5: PRECAUTIONS AGAINST ELECTROSTATIC HAZARDS

This section contains details of the procedures for minimizing electrostatic generation.

SECTION 7: PERSONNET REQUIREMENTS

This section specifies the numbers of persons to be associated with the crude oil washing process and theirnecessary qualifications. Their names and ranks may be provided.on separate documents.

SECIION 8: METHODS OF COMMUNICATION

This section gives the details of communication between the watchkeeper on deck and the cargo controlposition so tha! in the event of a leak or malfunctioning of the crude oil washing system, the washing maybe stopped as soon as possible.

SECTION 9: DETERMINATION OF THE SUITABILITY OF A CRUDE OILFOR USE IN CRUDE OIL WASHING

This section contains guidance in determining the suitability of a crude oil for use in crude oil washing.

In lieu of a list of crude oils unsuitable for carriage and crude oil washing to be inserted in the Operationsand Equipment Manual the following standard text maybe used:

(1) For a tanker not fitted with heating coils

This tanker is not fitted with heating coils in the cargo tanks and should not carry cargoes whichwill require to be heated either to obtain pumpability criteria or to avoid excessive sludging ofboth the designated clean ballast tanks and the vessel's tanks to be washed for sludge control.

Notes and definitions:- Pumpability criterion is determined

temperature of the cargo prior to itsdischarge this viscosity should not600 centistokes.

- fxcessive sludging criterion is determined primarily by the crude oil's temperature throughoutis transportation and storage. lf the cargo's temperature is likely to drop below the crude oilcargo's cloud point temperature then sludging of cargo tanks ls to be expected. The cloudpoint temperature is the temperature at which the crude oil's wax and associated oil phaseseparates from the bulk liquid phase of the cargo.

(2) For a tanker fitted with heating coils in slop tank(s)

This tanker is fitted with heating coils only in her slop tank(s) and should not carry cargoeswhich will require to be heated for pumpability.

Notes;

lf sludge deposition is suspected or determined in the main cargo tanks then an alternative crudeoil washing programme should be utilized. Recommendations regarding this programme andprocedure are to be found in section 11 of this Manual.

(3) For a tanker fitted with heating coils

This tanker is fitted with heating coils in all the cargo tanks and, subject to the limitations of the

cargo heating system, can carry cargoes which require heating for either pumpability or sludgedeposition/control.

by the oil's kinematic viscosity at the observeddischarge. In order to attain optimum efficienq forexceed 250 centistokes and never in excess of

26

Page 33: Crude Oil Washing Systems - 2000

Standard format for the COW Manual

Grd guirhnce

ffi6igrr is drawn to the difficUlties which may be encountered with certain crude oils' During the

*rlrgrge of crude oils that exhibit the necessary criteria that would create either pumpability problems or

ry d"p*ition, crude oil washing of each tank scheduled for such an operation should be carried out

*,"*tttly with the discharging of the particular tank in order to minimize the effect on the crude oil

1lp36ipgs forcooling. Cooling will increase both the kinematic and dynamic viscosities* of the tank residues

mi fierefore affect the efficiency of the crude oil washing programme.

As a gEneral guidance to the suitability of an oil for crude oil washing on board this tanker, the following

crffina should be used:

For aromatic crude oils whose kinematic viscosity is the temperature controlling characteristic, the

hnematic viscosity of the oil used for crude oil washing should not exceed 60 centistokes at the oil

wash medium temperature;

o,r

For paraffinic crude oils whose pour point temperature is the controlling characteristic, the temp

erature of the cargo to be used for crude oil washing should exceed its cloud point temperature by

at least 10'C if excessive sludging is present and should only be used once in a "closed cycle"

washing programme.

The approximate cloud point temperature of an oil may be calculated by use of the following

formula where the pour point temperature (x) of the crude oil is known:

Cloud point temperature ('C) = 2O.2 (160'oozoa x ' o'11s7714) + 8

Wo*ed example:

Assume the pour point temperature is + 1oC.

Then:

= 2O.2 x (lg(o.oozo8 x l) - o.11s7714) + I= 2O.2 x (10o.007o8 - o.11s77141+ B= 2o.2 x (lgo.toeerto) * B= (20.2 x 0.7785896) +8= 15.72 + B

Answer: approx. cloud point = 24"C

or

Consult the accompanying graph (fig. 1), where if the pour point is known then the cloud point can

be extracted.

or

lf the pour point exceeds approximately 25'C then the Bondi test procedure could be used to

determine this temperature.

. Definitions: kinematjc viscosity is the measure of resistance to flow with gravitation under its own mass force. This is normallyr"p;Jil;"ntittok"r (cSt) or mm2/s. Dynamic v,:costty is the measure

-of resistance to flow with an induced shear stress or

j! f""r^ rate of sheai. This is deteimined from the equation of shear stress (in pascals (Pa)) divided. by rate of shear (inverse

ai tStll. The unit of dynamic viscosity is either the centipose (cps) or the millipascal second (mPa's).

27

I

iIt

Page 34: Crude Oil Washing Systems - 2000

Crude oil washine systems

Pour point temperature (oC)

Figure 1: Craph to determine pour point temperature

Bondi test procedure (see fg. 2)

This method will obtain the cloud point temperature of high pour point type crude oils.

Equipment and procedure

(1) Obtain a representative sample of the cargo. Do not allow the cargo sample to cool beforecommencing the test procedure.

Obtain a glass container (preferably nearly spherical) that is made of heat-temperature-resistantglass and fil l the container with the sample.

Insert a thermometer into the centre of the sample volume and heat the sample to a temperature of at least 30"C above the pour point temperature of the crude oil in a hot water bath.Do not tightly stopper the container during this process.

Prepare an alternative bath with water whose temperature is at least 15"C below the sample'spour point temperature. Have a clock or watch available with a second hand.

lmmerse the heated sample container into the cold bath and record at very regular intervals (atleast every 30 s) the temperature of the sample.

Craphically plot the sample temperature against time elapsed from the start of the test. De-termine the temperatures at which there was no loss of temperature with time elapsed. The firstsuch instance detected will be the approximate cloud point temperature and the secondinstance, if testing time is extended to the required period, will be the approximate pour pointtemperature of the crude oil.

O + o

(g

oo. ^-E J Co

'F

t 3 0^

25

-10

(2)

(3)

(4)

(5)

(6)

28

Page 35: Crude Oil Washing Systems - 2000

Standard format for the COW Manual

a

!a

!

Time (minutes)

Figure 2: Example Bondi test plot

SFCflON 10: CRUDE OIL WASHINC CHECKTISTS

-rs section contains operational checklists for the use of the crew at each discharge which shall include the

necking and calibration of all instruments.

SFCTION 11: APPROVED METHODS AND PROGRAMMESFOR CRUDE OIL WASHING

Tns section contains those details which form the basis of crude oil washing in the tanker and which are-€cessary to formulate a washing programme which will accord with all foreseeable circumstances of cargo

isdrarge restraints. lt includes information on:

(1) the minimum numberof tanks to bewashed in accordancewith paragraph 6.1 of the Revised

Specifications;

(2) the method of washing each tank, i.e., single or multi-stage;

(3) the number of tank washing machines to be used simultaneously;

(4) the crude oil washing pressure and means to maintain the required pressure;

(5) the duration of the crude oil wash;

(6) the preferred order in which tanks are to be washed;

(7) the minimum trim during completion of washing and draining tanks;

(8) when draining and stripping of tanks is to commence.

29

Page 36: Crude Oil Washing Systems - 2000

Crude oil washing systems

SECTION 12: TYPICAI CRUDE Olt WASHING PROCRAMMES

This section contains details of some typical washing programmes under various conditions of dischargesuch as single- or multi-port discharge and single- and multi-grade cargoes.

SECTION 13: THE METHOD OF DRAINING CARGO TANKS

This section contains a description of the method of draining cargo tanks and should include the parameterswhich indicate when the tank is dry and which will be at least all of those required by paragraph 4.4.8 of theRevised Specifications. The minimum trim conditions must be stated.

SECTION 14: THE METHOD AND PROCEDURES FOR DRA|N|NCCARGO PUMPS AND TINES

This section contains a description of the method and procedures for draining cargo pumps, cargo lines,crude oil washing lines and stripping lines and includes information on the use of the small-diameter line.

SECTION 15: TYPICAL PROCEDURES FOR BALLASTTNG AND THE METHODOF PREVENTING HYDROCARBON EMISSION

This section contains a description of typical procedures for ballasting and includes:

(1) the procedure for draining and stripping before loading ballast;

(2) the procedures for preventing hydrocarbon emission into the atmosphere.

SECTION 16: COMPLIANCE PROCEDURES FOR REcUtATtON 9oF ANNEX I OF MARPOL 73/75

This section contains information and procedures for water washing tanks and lines, discharge of departureballast and the decanting of slops at sea to ensure compliance with regulation 9.

SECTION 17: INSPECTIONS AND MAINTENANCE OF FeUtpMENT

This section contains information on procedures to be followed at recommended intervals for on-boardinpections and maintenance of crude oil washing equipment.

SECTION 18: PROCEDURES FOR CHANGINC FROM CRUDE OtL TRADETO PRODUCT TRADE*

This section contains operational procedures for changing from crude oil trade to product trade for a tankerwhich is fitted with separate independent pumping and piping arrangements for ballasting dedicated cleanballast tanks and which has been issued with two IOPP Certificates running concurrently with oneCertificate certifoing the tanker to be a crude oil tanker and the other certifying it to be a product carrier.

* Section 18 is included in the Manual for a particular tanker only if applicable.

30

Page 37: Crude Oil Washing Systems - 2000

i lt

EXAMPTES OF CRUDE OIt WASHINGOPERATIONS AND EQUIPMENT MANUALS

Explanatory note

Ilhc fotwing specimen Manuals were originally prepared by tanker owners for particular tankers whichfq33333333333333333333333333333333333333333333333333333333333333333333uished to be certified as COW tankers under MARPOL 73/75. The texts of the Manuals have beeniltriared in order to ensure conformity with the standard format but editing has been kept to ar-trnnm to show possible variations in the language and in the manner of presentation of the requirediffinin:ilion.

tu fte flag Administration of these tankers does not require the inclusion of any information orqcrdional instructions in addition to those provided for by the Revised Specifications, the specimenilr{flruals consist of one part only as explained in the introduction to the standard format.*

' fue page 23 of this publication.

Page 38: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

Example 1

Conventional pipeline tanker

; CRUDE OIL WASHTNG OPERATTONS AND EQUIPMENT MANUAT

Fdc'bffirc number or letters

hdEgirry

Hnight tonnage

33

Page 39: Crude Oil Washing Systems - 2000

Crude oil washins systems

INTRODUCTION

1 This Manual is written in accordance with the requirements of regulation 138 of the Protocol of1978 relating to the lnternational Convention for the Prevention of Pollution from Ships, 1923 (MARPOL73/78\.

The purpose of the Manual is to meet the requirements for crude oil washing in accordance with theRevised Specifications for the design, operation and control of crude oil washing systems (Assemblyresolution A.446(Xl) as amended by resolutions A.497(Xll) and A.897(21)). lt provides'standard operationalguidance in planning and performing a crude oilwashing programme and describes a safe procedure to befollowed.

3 This Manual contains all the information and operational instructions required by the RevisedSpecifications.

4 This Manual has been approved by the Administration and no alteration or revision shall be made toany part of it without the prior approval of the Administration.

34

Page 40: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

h,ril

:

til

t l

trtxil{

t5

lndex of sections

I

Td of the Revised Specifications . . . .

Or:alirgs of the crude oil washing system

Ilescription of the crude oil washing system and operationaland equipment parameters

Dilgers of and precautions against oil leakage

f|re and control of inert gas . .

h,ecautions against electrostatic hazards

ksonnel requirements . . . .

lileftods of communication

Urt of crude oils unsuitable for crude oil washing

ftrde oil washing checklists

Aeprord methods and programmes for crude oil washing

Ty;lird crude oil washing programmes . . . .

The method of draining cargo tanks

fhe method and procedures for drainingcugo pumps and lines

Ty1rird procedures for ballasting and the method of preventinglqflrocarbon emission

C-ornpliance procedures for regulation 9 of Annex Iof MARPOL 73/78

lrqections and maintenance of equipment

Prrocedures for changing from crude oil trade to product trade*

Page

136l137l140l

143l143l143l144l144l144l14sl146l14Bl[511

ls2l

ls2l[53]

Is4lIs4l

Relevantparagraph(s)

of the revisedSpecifications

7(a)

7(b)

7(c), 7(d) (viii)and 7(f)

7(e)

6.6

6 .7

7(el7(h)

7(t)

7a)7(d)(i)

z(dXv)z(d)(iii)

7(dXiv) and (vi)

7(d)(iil,7(il

7(d)(vi), (vii)and (ix)

7(k)IT

It

*ll-s specimen Manual as originally prepared by the tanker owner for a particular tanker did not include a sedion 18 as thepoadlres for changing from- cruile oii trade io product trade were not applicable. This section has been added as an

4 of how the information might be presented if required in a particular case.

35

Page 41: Crude Oil Washing Systems - 2000

Crude oil washing systems

SECTION 1: TEXT OF THE REVISED SPECIFICATIONS

This section contains the complete text of the Revised Specifications for the design, operation andcontrol of crude oil washing systems and the agreed interpretations of certain of the provisions of theRevised Specifications (Assembly resolution A.446(Xl) as amended by resolutions A.497(Xll) andA.Be7(21)).

(Text of the Revised Specifications to be inserted)

SECTION 2: DRAWINGS OF THE CRUDE Olt WASHING SYSTEM

This section contains line drawings showing:

(1) crude oil washing lines and valves;

(2) cargo pumps, lines and valves;

(3) ballast systems (where fitted);

(4) stripping systems;

(5) position of tank washing machines;

(6) position of holes for hand dipping and tank gauges;

(7) inert gas deck distribution system.

(See following pages for drawings)

36

Page 42: Crude Oil Washing Systems - 2000

.nrD

n

o

D

noJo

f,

o

j { + * x . xA 6 < s P a g q9 i R *

- 6 = ' 6 d

I p =C S_ -q6. =]E : " c . 5 g6 6 .* * i l E 5 E :

x c a

D A

"r [* =

o-JL o

o

h i 6

g

Df

4 o l4.;

Yto

rl

:

OJ

-c3

r_@

=o

O)

PI

-0J

:J

=.np .f

o-

,*;j

J l - , f l- l

-6;-

t---FLJtrtlL-J

t-I

J'tDi(

I

I t

r t ul l - l l r l_- l lr - l l - t - l

\

Page 43: Crude Oil Washing Systems - 2000

-o:!-*J r'

cgd 9 0

3=E

z

. t rUa

E

CJ-=U(d

oo

=

3

(g

'E

o--o(6

0)2(!

-o

(!

:bo

=cd

3

CJfif,

U6iq)

:lbo

i!

z9Fou@

o

3Eo

E

boc

s

0!

U

Page 44: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

Fgure 3: Inert gas tank distribution system and sounding points

8.E ' ac o

E s E . bo o o ) =s s E sq 9 5 <_ E i I i

-?-'t

b * O x l . @

CL

; i @

L Yo r -E E> ( d

aIn

l l

eot

€3oo

1Dt<I

i*g$,E sE - d

EE Ex > 5

ErEr E"N{ . [4 =

t {

. l r Q

" *ol '

t l r

t l

I

39

Page 45: Crude Oil Washing Systems - 2000

Crude oil washins systerns

SECTION 3: DESCRIPTION OF THE CRUDE OIL WASHING SYSTEMAND OPERATIONAL AND EQUIPMENT PARAMETERS

This section contains a description of the cargo, ballast, washing and stripping systems and in additionspecifies:

(1) types of tank washing machines and their standpipe length inside the tanks;

(2) revolutions of the machines;

(3) methods of checking the operation of tank washing machines;

(4) minimum operation pressure for crude oil washing;

(5) maximum permitted oxygen level in cargo tanks;

(6) duration of tank washing machine cycles;

(7) results of the tests performed in accordance with paragraph 4.2.10(bl of the RevisedSpecifications and the method of computation;

(B) method of preventing entry of oil into the engine room.

Cargo system

The tank system of this vessel consists of eight centre tanks and eight pairs of wings, but with No. 3 wingsreserved for permanent ballast and not connected into the cargo piping. The aftermost set of tanks, No. 8across, forms a triple slop tank arrangement. No. B port is the dirty slop tank with first separation across toNo. 8 starboard and thence a second separation into No. 8 centre. The total capacity of the three slop tanksis 20,000 m3.

Cargo is handled by four main cargo pumps each of rated capacity of 4,500 m3/h. Each pump has a700 mm suction line running the full length up to No. 1 across. No. 1 and No. 4 pumps are used todischarge the wing tanks and No. 2 and No. 3 pumps to discharge the centre tanks. There are crossoverlines between the pump suctions which permits a variation on the normal practice.

Stripping system

The pumps are of the VAC-STRIP type which enables them to drain tanks right out. Thus there is no strippingline but in each tank a small stripping suction bell-mouth, separately valved, is taken off the appropriate mainline. For water washing and occasional use during the closing stages of crude oil washing two eductors arefitted, each of rated capacity 900 m3/h, which are normally powered by either No. 2 or No. 3 cargo pump.These eductors can be put on to any of the four main suction lines, and thus drain any tank. They dischargedirectly into the dirty slop tank, No. 8 port.

One Duplex steam reciprocating pump of 350 m3/h is fitted for the purpose of line draining. lt has suctionconnections to the four main suction lines, the four cargo pumps, the discharge lines, the sea line and thecrude oil washing line. lt can discharge to the slop tank, the oilwater separator, the main discharge lines,overboard or through a special 250 mm line which runs along the deck and terminates outboard of themanifold gate valves. This latter 250 mm line should always be used for final line draining ashore.

Ballast system

Permanent baf last is carried in No. 3 wings and is handled by a separate pump of capacity 4,250 m3 /h.Thepump and tanks are not connected into the cargo pumps or lines and have their own separate sea suctionand discharge. The permanent ballast pump also has the capability of ballasting No. 1, No.4 and No.6centres over the top. Once the cargo is discharged from No. 1, No. 4 and No. 6 centres, these tanks shouldbe ballasted over the top concurrently with discharge of cargo from other tanks. They then form thedeparture ballast. On the subsequent ballast passage, No. 2, No. 5 and No. 7 centres should be washed and

4A

Page 46: Crude Oil Washing Systems - 2000

Example l: Conventional pipeline tanker

tfirier" -s.3r as the clean arrival ballast. Cargo tank ballast is discharged by No. 2 and No. 3 cargo pumps'frlnn:,-!- Tre pumproom high overboard discharge. Variations on the ballast arrangement are permissible to

:0tsrqrr r:;section and maintenance except that ballast should not normally be carried in wing tanks.

tnghiilsc srdern

- lrns t=-r. ,*ashing l ine, ei ther crude oi l or water, is fed from either No.2 or No.3 cargo pump or

flffer.-E:,*e,r the line may be fed from a cross-connection from the midships manifold. In the latter case, any

131"s; ;,r'"r3 or pumps could feed the washing line.

ilxrsrilner {ilr arer n'ashing, No. 2 or No. 3 pump should be used drawing from the clean slop tank, No. 8 centre,ffrr t',. : .rfr rvashings from the tank being washed drained back with an eductor which discharges into theilhry i,:,r rank, No. 8 port. One cargo pump operating in this closed cycle method is capable of driving bothy-n-r:::,*! itted and operates 10 tanl washing machines while maintaining a back pressure of 10 kg/cm2. For::rir:E :, ,.rashing, it is preferable to feed the washing line from the manifold as long as possible as it is not

lfTmer- -'.lr:ssary to take one cargo pump completely out of the discharge programme, and recirculation of' dqr*, :r rs avoided.

l'- te :, Tlust never be passed through the Butterworth heater which is situated in the pumproom. Apartrnxr* --,-, ng the heater, there is the chance of a ruptured or leaking tube allowing crude oil to pass back into

thne ={-i-e room via the steam system. Two spade blanks are fitted, one on the inlet side and one on the

ruutrr :,f,e of the heater, and these must always be in position when crude oil washing.

;:,r' ' rro€s of washing machines, the desired pressure on the wash line on deck is 10 kg/cm'. lf the

:rl,,ess-': nn the deck line falls below B kgf cm2, then crude oil washing should be stopped until such time ast'nrie :'"ssr.rre has been restored.

-tr :--rpiete crude oil washing system has been inspected and approved by the Administration, and no

di[]E-;:dl,{rs may be made to the system or any part of the system without the approval of the Administration.

-;nKs were inspected after crude oil washing in accordance with the requirements of paragraph" of the Revised Specifications and met the required standards of cleanliness, being essentially free

: r'rgage and deposits.

:;--ce of the departure ballast was examined in accordance with the requirements of paragraph- : of the Revised Specifications and was found to be satisfactory.

-;r= :*:€edure for computing the ratio of the volume of oil on top of the total departure ballast water to the,r,:r-*€ cf tanks that contain this water is described below:

Tanknumber

]. ] | r ' : '

Port,starboardor centre

Tank volume('nt)

Ullage spacein tank

(measured totop of oil layer)

(m)

oilthickness

(mm)

Volume of oil(' ' 't)

v* U, ta vx

Total Total

41

Page 47: Crude Oil Washing Systems - 2000

1 .

2 .

3 .

4.

Crude oil washing sysferns

Determine the thickness of the oil layer on the ballast water (t ).

Using the tank capacity tables:

.'l determine the aggregate volume (100%) of all tanks that contain departure ballast (V);

.2 determine the volume of the ballast water and oil layer in each tank from the ullage (U)";

.3 determine the volume of ballast water in each tank from the ullage plus the thickness of the oillayer (U, + t").

Subtract the value obtained in 2.3 from that obtained in 2.2 for each tank and add the resultant valuestogether to obtain the total volume of oil (v).

The ratio of the volume of oil on top of the total departure ballast water to the total volume of tankscontaining departure ballast water =

fi.

Washing machines

This vessel is fitted with 77 deck-mounted Butterworth Lavomatic machines, 13 bottom-mountedButterworth MP machines and 3 fixed bottom-mounted Butterworth K machines.

Decktnounted machines

Lavomatic S.A. single'n ozzle.

Those fitted in the centre tanks have a standpipe length of 4.8 m with a natural frequency of 6.19 Hz andthose fitted in the wings have a standpipe length of 4.O m and a natural frequency of 7.166 Hz. Thepropeller-induced frequency for this vessel at full speed is 5.666 Hz.

All machines have selective arc heads which enable their angular programme to be varied as required. Thetime taken to complete one full cycle is 67 minwhen operating at a pressure of 10 kg/cm2 and the output atthis pressure is'140 m37h. The full cycle consists of an arc from 0o to 120'to 0o to -30o to 0o.

The operation of these machines can be verified by observing the gearbox where both rotation andelevation are mechanically displayed.

Submerged machines, M P, singlenozzle

Thirteen of these machines are fitted; one at the forward end of No. 2, No. 4, No. 5, No. 6 and No. 7 wingsand, additionally, one at the after end of No. Z wings and No. 7 centre. They are positioned on thecentreline of the tank on level with the third stringer down. They are piped and valved separately from thedeck-mounted machines. Their programme is fixed and covers an arc of 240" which at an operatingpressure of '10 kglcm2 takes t h to complete. The output at this pressure is 100 m3/h.

To verify the operation of these machines, all other machines in the tank and in any adjacent tank should beshut off, and the movement of the machine identified by its sound pattern.

Submerged machines, nK", twin-nozzle

One of these is fitted underneath the bottom stringer at the aft end of each of No. 7 wings and one "Super

K" is fitted at the bottom of the dirty slop tank No. B port. They are valved and lined separately from anyother machines. Their capacity is 30 m3/h (60 m3/h for the "super K") and the time for one full cycle is 40min. A full cycle consists of one full revolution (360') of the machine.

42

Page 48: Crude Oil Washing Systems - 2000

MT]NMI\ 4; DANCERS OF AND PRECAUTIONS AGAINST OIt LEAKAGE

Example 1: Conventional pipeline tanker

l, rro mnrr 3':s;gl, e ro l erify their operation by sound pattern and therefore after six usages or at intervals of not

rmrm tr"a- - I nronths these machines must be sighted and seen to be working, using water.

l1ns ls::,tn contains information on the dangers of leakage from the crude oil washing system, the

Jil11r.-1n3!-r,:i1-s necessary to prevent leakage and the action to be taken in the event of leakage.

rffil."ig* :n :rrude oil from the system can be a potential fire and pollution hazard- Before arrival at the

dm,cnar*: !,:,ni the tank washing system should be pressure'tested and examined for leaks' Any leaks found

,lfiirrmmruil: :e .rade good and the resultant oil cleaned up.

Ill l lrmrnu:-€ :ressure test, specialattention should be given to inspection and tightening of valve glands and

mr fa-q=s 'n,i couplings on lines to prevent any leakage.

:ilM'rrlrg :-E f,ourse of oil washing, the system must be kept under continuous observation and on

rmmr*g;{rn oi rvashing it must be Jompletely drained of oil. lf it is necessary for the system to be cleaned

n*rlrJr-* 1: r:,-,- d be flushJd through with water into appropriate tanks; if the system is required to be gas-free it

, entjlated in the same way as cargo lines,

''l\mr ::- r: oil n'ashing must be stopped when any sign of leakage or fault in the tank wash system is

uitrx::',e-:n eidrer on deck or in the pump-room.

-;rs :ec.tlon contains information on the inert gas requirements and the instructions to cover those

:Err:,rs '.rfien the inert gas pressure is released for reasons of cargo operation. ln addition it indicates

:fi-e -etnod and procedures to be used for taking samples of the tank atmosphere.

ane ;;* n: ;rould arrive at the discharge port with all cargo tanks pressurized with good quality inert gas'lr*nss--: mar. be released for ullaging, sampling and water dips before discharge and at this stage the

Dymm,MEe3- es el in tanks should be checkld to ensure that it is below S% by volume. The supply of inert gas

rmLx-5; :€ commenced immediately before the commencement of cargo discharge to avoid a vacuum in.m,r*: jr dris means a safe condition will be maintained throughout discharge. Apart from this initial release

nr :il.-:si!.e the pressure in the cargo tanks should always be above atmospheric pressure' Under no

:rr':*n-rances should air be allowed to enter any tank which is to be crude oil washed.

ilnen:,-= :ach tank is washed, the oxygen content should be checked with the portable oxygen analyser to

*rTF-r: :rat it does not exceed B%bi volume. The sample should be taken at a point'l m below the deck

tr'T.: :":e middle region of the ullage space well cleai of the inert gas inlet point' (See section 2 of this

r4irlifr-La ;or the position of the sampling points.)

*"e :;de oil washing must be stopped if there is a failure of the inert gas plant or if the_ oxygen content of

ltri: :e r ered inert gas exceeds A%'Uv volume or if the pressure of the atmosphere in the cargo tanks falls

:urL:"*, affnospheric pressure.

,!*frri:-"es of oil and water can produce an electrically charged mist during tank washing. The use.of dry

:--,r€ s therefore important. To overcome the possibiity of developing such an electrically charged mist,

I

trC:nrlil|Oi\ 5: USE AND CONTROL OF INERT GAS

$frCTlON 6: PRECAUTIONS ACAINST ELECTROSTATIC HAZARDS

section contains details of the procedures for minimizing electrostatic generation.

43

Page 49: Crude Oil Washing Systems - 2000

1 .

2.

3 .

Crude oil washing systems

before crude oil washing is commenced any tank containing crude oil which is to be used as the crude oilwashing fluid is to be partially discharged to remove any water which has settled out during the voyage. Toensure adequate safety a minimum of 'l m depth of cargo is to be discharged in this way.

For the same reason, as the slop tank will invariably contain a mixture of retained oil residues and cargo, thewhole content of the slop tank should be discharged ashore before crude oil washing commences and thenbe refilled with fresh crude from the cargo discharge deck line, if the slop tank is to be used as a source ofwashing fluid. lt must be remembered that this refilling will take place after the discharge of the bottom 1 mdepth of cargo from other tanks, referred to above, has been completed.

SECTION 7: PERSONNET REQUIREMENTS

This section specifies the numbers of persons to be associated with the crude oil washing process andtheir necessary qualifications. Their names and rank may be provided on separate documents.

The following personnel are required to be on board to carry out the dual operation of discharging cargoand crude oil washing:

The master or chief officer who will have overall responsibility for the operation. He must meet therequirements of paragraph 5.2 of the Revised Specifications. (See section 1 of this Manual.)

The officer who will undertake the actual operation. He must meet the requirements of paragraph 5.3of the Revised Specifications. (See section 1 of this Manual.)

A minimum of one petty officer or rating who is to be on deck at all times during washing to keepwatch for leaks and malfunction of equipmen! to test the oxygen content of tanks before washing, tocheck tank atmosphere pressure, to sound tank bottoms when required and to lift ullage floats.

The duties of the persons referred to above are not necessarily mutually exclusive.

SECTION 8: METHODS OF COMMUNICATION

This section gives the details of communication between the watchkeeper on deck and the cargocontrol position so that, in the event of a leak or malfunctioning of the crude oil washing system, thewashing may be stopped as soon as possible.

This ship is equipped with hand-held walkietalkie radios which are certified intrinsically safe.

While crude oil washing is being carried ou! the man patrolling the deck for the purpose of monitoringmachines and checking against any oil leakage from the system must carry one of these walkietalkies.Additionally, in or in the immediate vicinity of the cargo control room, there must be a second man similarlyequipped with a walkie-talkie. The provision of two sets for crude oil washing purposes has priority over anyother requirements for walkietalkie. No valves should be opened or closed on the crude oil washing systemwithout the one party informing the other as to the action he is taking.

SECTION 9: LIST OF CRUDE OltS UNSUITABTE FOR CRUDE Olt WASHING

This section contains a list of crude oils unsuitable for crude oil washing.

This vessel is not fitted with heating coils in the cargo tanks and it should not carry cargoes which willrequire to be heated for pumpability.

44

Page 50: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

SfnruON 10: CRUDE OIL WASHINC CHECKTISTS

PRE-ARRIVAL CHECKS AT DISCHARCE PORT

1rs oection contains operational checklists for the use of the crew at each discharge which shall

rn;-Joe dne checking and calibration of all instruments.

ITEM

iHas terminal been notified?ils oxygen analysing equipment tested and working satisfactorily?

ls tank washing pipeline system isolated from water heater and engine room?

\ne all hydrant valves on tank washing line blanked?

\re all valves to fixed tank washing machines shut?

l'-ial'e tank cleaning lines been pressurized and leakages made good?

ll-lave portable drive units for fixed tank-washing machines been tested?

1-1ave pressure gauges on top discharge line, manifold and tank cleaning main been

chrecked?Has the stripping system monitoring equipment been checked?

!-las the communications system been checked and tested?

Has the organization plan been drawn up and posted with duties and responsibilities

defined?Have the discharge/crude oil wash operation plans been drawn up and posted?

ln cases where the terminal has a standard radio checklisg has this been completed and

transmitted?

ITEM

A - Before crude oil wash operation

Are all prearrival checks and conditions in order?

Has discharge/crude oil wash operation been discussed with both ship and shore staff

and is agreed plan readily available for easy reference?

Has communication link between deck/control station and control station/shore been

set up and is it working properly?

Have crude oil wash abort condition and procedures been discussed and agreed by both

ship and shore staff?

Have fixed and portable oxygen analysers been checked and are they working properly?

ls inert gas system working properly and is the oxygen content of inert gas being

delivered below 5"/" by volume?

ls oxygen content of tank(s) to be crude oil washed below B"/o by volume?

Have all cargo tanks positive inert gas pressure?

Has a resonsible person been assigned to check all deck lines for leaks as soon as

washing starts?Are the fixed machines set for the required washing method and are portable drive units,

if fitted, mounted and set?

Have valves and lines both in pump-room and on deck been checked?

59

1 D

CHECKLIST FOR USE BEFORE, DURINC AND AFTER CRUDE OIL WASH OPERATION

1 . 1 "

45

Page 51: Crude Oil Washing Systems - 2000

Crude oil washine systems

No. ITEM

12.'13 .

1 4 .

1 5 .

1 6 .

1 7 .

1 8 .

1 9 .

20.

2 1 .

22 .

23.24.25.26.

B - During crude oil wash operation

ls quality of inert gas being delivered frequently checked and recorded?

Are all deck lines and machines being frequently checked for leaks?

ls crude oil washing in progress in designated cargo tanks only?

ls the pressure in the tank wash line as specified in this Manual?

Are cycle times of tank washing machines as specified in this Manual?

Are the washing machines in operation, together with their drive units if applicable,frequently checked and are they working properly?

ls a responsible person stationed continuously on deck?

Will trim be satisfactory when bottom washing is in progress as specified in this Manual?

Will recommended tank draining method be followed?

Have ullage gauge floats been raised and housed in tanks being crude oil washed?

ls level in holding tank for tank washings frequently checked to prevent any possibility ofan overflow?

C - After crude oil wash operation

Are all valves between discharge line and tank wash line closed?

Has tank wash line been drained of crude oil?

Are all valves to washing machines closed?

Are cargo pumps, tanks and pipelines properly drained as specified in this Manual?

SECTION 11: APPROVED MFTHODS AND PROCRAMMES FOR CRUDE OIL WASHING

This section contains those details which form the basis of crude oil washing in the tanker and whichare necessary to formulate a washing programme which will accord with all foreseeablecircumstances of cargo discharge restraints. lt includes information on:

(1 ) the minimum number of tanks to be washed in accordance with paragraph 6.1 of the RevisedSpecifications;

(2) the method of washing each tank, i.e., single or multi-stage;

(3) the number of tank washing machines to be used simultaneously;

(4) the crude oil washing pressure and means to maintain the required pressure;

(5) the duration of the crude oil wash;

(6) the preferred order in which tanks are to be washed;

(7) the minimum trim during completion of washing and draining tanks;

(8) when draining and stripping of tanks is to commence.

Before departure on a ballast voyage, both the departure and arrival ballast tanks must have been crude oilwashed. These are No. 1, No.4 and No.6 centres and No.2, No.5 and No. 7 centres, respectively. lf forany operational or maintenance reason, there is the likelihood or intention to put ballast in any other tanksduring the voyage, then these tanks must also be crude oil washed. Additionally, one quarter of theremaining tanks must be crude oil washed for sludge control, but any exceptional ballast tanks asmentioned above may be included in the additional quarter required to be washed for sludge control.

46

Page 52: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

fir ::rr!! ',rng with the above policy and reconciling the objectives of ship safety, cargo out-turn, and

fmnur'nn_-T s;rip delay, the following principles should be applied.

&mmharse of wet oil

&g,;lL*se n: the electrostatic hazards involved, oilwhich may contain water should not be used for crude oilix.h6:nr+ di tanks to be discharged should therefore be debottomed by 1 m before any crude oil washing is

ffifrx-:g"t n particular, oil in slop tanks which have been used for load-on-top purposes must not be used. lf it

s xal- .ed to use slop tanks for the supply of wash oil, they should be discharged first, and then refilled with

o.* :rri ;Dl'n'r another tank.

gcryuemce of tank washing

e-1;pn, -..nould be given to crude oil washing departure ballast tanks first so that they are ready for ballastingr 'tr;5a1ira.d problems arise and so that over-thetop ballasting can be concurrent with discharge, thereby

fi,'rmjrs dre venting of tank gases to atmosphere within port areas.

ftfuse washing

tar:: :ark sl-rould be washed in two stages/ the side wash and the bottom wash, in order to minimize ship

me,a,* Ji..l iring bottom washing the oil depth should not be allowed to increase over 1 m and towards the

*:rfr :: ne rvashing, the bottom should be kept well drained to achieve the best results.

,Effin!il o{ washing

nf :::: ank being crude oil washed, all guns must be used.

*,'r: :ra'gramme of the deck-mounted machines shall be as follows:

!,-d,e rvash: two passes, 30"-max-30" (to be started when ullage reaches approximately 23 m)

iltrtom wash: three passes, 40'-0'-30'-0o

--E :,lttorn guns in the wing tanks and No. 7 centre are to be used in the bottom wash together with the

ue:{-T,ounted guns. Their cycle time is t h and they should be started when there is a depth of 1 mxry*,ar ng in the tank.

fi s =: iis point that the draining of the tank should be considered to be started and the trim of the ship

srr:r- . De not less than 4 m by the stern.

stuflman& washing

-: - -,irnize ship delay it is desirable to crude oil wash several tanks simultaneously, provided that:

' :.le maximum number of guns on any one centre tank, or pair of wing tanks, are in use at one time;

- :,.essure on the deck wash line does not fall below B kg/cm2; and

: rre normal maximum number of guns that can be operated at one time is'l 2 due to a maximum

rer-nrissible flow rate through the line of 5.5 m3/s;

ro\yever, if more than 12 guns are required to be operated simultaneously, then it will be necessary to

i:rut the block valve situated on the wash line main amidships and feed the forward section of the line+om the manifold bleed-off and the after section from the pump-room. In this way up to 24 guns may

ce operated at one time;

.r during the bottom washing the output of the guns does not exceed the available stripping capacity.

47

Page 53: Crude Oil Washing Systems - 2000

Supply of wash oil

The traditional method of tank washing using closed cycle recirculation via the slop tanks and eductors isnot suited to routing crude oil washing as it causes unnecessary delay. lt also increases risk of passingsediment through the machines and of using oil which has lost much of its solvent effect. The wash oiltherefore should be bled off from a cargo pump discharge or from the manifold crossover. To retain therequired pressure using the bleedoff method, it may be necessary to reduce the number of machines beingused, to ask the shore to increase back pressure or to fully close one of the ship's manifold valves. Under nocircumstances should butterfly manifold valves be throttled in order to control the tank wash line pressure,but it is possible to control the pressure by throttling in the discharge valve of the cargo pump used tosupply the wash oil.

Alternatively, it may be necessary to dedicate one main cargo pump to supplying the wash oil and acceptthe reduction in the rate of discharge.

Discharge of tank washings

In order to maintain as consistent a quality in out-turn as possible, recovered residues should be co-mingledwith the main cargo discharge. During multi-stage washing of the tank sides this co-mingling occursautomatically. During bottom washing, it is preferable to use the self-priming cargo pump to discharge thewashing oil and recovered residues direct with the cargo. Overheating of these pumps may be avoided bydraining several tanks simultaneously.

When discharge directly ashore is not possible, residues should be stripped into some convenient holdingtank, taking care to avoid any over-filling before the tank is periodically discharged to shore.

Recirculation of cargo, that is dedicating the same tank both for supplying the washing oil and for receivingthe recovered residues, should be avoided as long as possible. However this method does have to be usedwhen crude oil washing at sea between wvo discharge ports and on occasion towards the end of a parceldischarge when more than one grade is being carried.

SECTION 12: TYPICAL CRUDE OIL WASHING PROGRAMMES

This section contains details of some typical washing programmes under various conditions ofdischarge such as single.or multi-port discharge and single and multi-grade cargoes.

See following pages for typical programmes in bar diagram form.

48

Page 54: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

caiGo xaNofl i6'LAX

6ld!6brscxrncnc

I - l l - e c r t . i

LD . ! ' a l ! r i t '

r c l v c c o R L r t r a

r c ? v c r o a L r r a

r o j v ( r o a t r r (

t o a u c t o a L r n l

1 0 r r r t i i . . 4 . l rt .n . r r t r l r

F.. s.rr l. \. lc O snor rr* t r O ?r::r:..: li:t"'o € t Y r .

^oor r@rAL r i l t lnuc l lo rs A L L c l c l t { i l i r { i r q ! t c i r t r t } o e i o 6 ' d c t L t ! !

Poqi Slop exg{$ i r l ' t r rHqlar l asr '*a at- lorror ' ' \3 Att Rts{Al ' "5

s n l t c l o l D s Y c l t t { i f i t r l g 3 { o a s > l t o l q ' X f c l s e A r t '

L r { a ! t i . { r { G o t i ' 1 ^ { t 3 L r r t s i A t 8 ! } t l q H i l c o

L ' i c s s r ! ! B t l q r , d t > ! ' t ! < r t o t H o t C . { l l t i l ! ! l l i r P F ' { O } r l e t l l S l

o!t i t r ie l H9{c{Et

w rrr llt cl{Dt Fl

T! tol t l !o1.,{ : t ro +

lo i larto\D.

f f i i l l r o ^ { f ! l , o n r l o u e x r t r v

{ i r 1 I l r o . o o o | , - I r ' r

< t r { ( t i L s i l T , r { e r a A t 3 ?

i a G . r n * r J ! T r t s s L r i \ r t .

S e B J E ( a a e c H i i 6 t n Arfrtt rat iar{ ntui !

'DR'\r{r{c Tl{rh A{,

tq(Etrtc r tstAUcrrons

. tn rc \ ! r I aMrL{ )y to o ts o rL r f ^NtFE6 tnoc tou i : l

s r G N t o cr r ta lmf r l l r

!g ! ! ! j l DUt t o t r rcEh lo tn6nEss rkE oa lF^r lo rs od l lNco aaovc us ' l YH€ o l 'E

o r r ! ! c x r r r o F F r c t F

s !^MGr x^Mao ro ^ssr3 t wr rx caAGo rcA( , rEro @F[6 t a to GAK*aY A rEOVtF l lI o u r v o : r r c t e s t a v a i

c x r a f o r a r c l r

! o r t r c a r axta{

49

Page 55: Crude Oil Washing Systems - 2000

Exam pl e 1 : Co nv e nti o n al-P t W! t ngtan ke r

caico xaiDll1.6'LAX

6 . t t ' l . r ' G i

LD ! ' .a l l r r {

r o r ! c . o . ! r * l

r o a u c t o a l l r l

r o ! e c t o r t r t a

t . F . . i i . 5 {'o :::l;L': l:" "1 . r i . . . l . t 3 5 . I j- ' - -

c l ; . . v i t r r . ^ ' t ' O Fn ' r { - ' t r

o a l t r '

ot t ltr{c-D Hctlc{gl

{ $r tlY Gl{D! r'l

'T! ?olr llct , lC I i€ 4

fo .Air tor:D.

qir fr i r .a

aiar{ ctgiL

O ( n ' i t { a ? a r F A . '

f i i t t iL! isT,{e v{At 3B Sv6trCcf T0 <xlr6t

a G G t r r r * , , 1 ! r r 3 l 3 L r i r r l '

aG(ra t lo lNs t iucY lo i l

.. c$:t lrcaclr

. t , tqJ\r . I €vr(r)Yao ox orL rrA(! tEi l roclog'$

Iwit or lct t - *^r ' i

Srg i to

ff irrql owlrico^'oYe vrc" rrf ol 'E

6?-iIFc'rrr orrrctai t ^v t t t ^ r !D io ^55rs t f , t tH ca too rc i r ' t ' to mt t rc t a ro caF AY * ' loo ' f t

c x r e t o t a r c l rtd o r l lq l

l x taa

qt f . .4 . t$ l fT

49

Page 56: Crude Oil Washing Systems - 2000

€iaoa to{t '3 | 'o ' r ----;a---vJ r . r . r A J r a s t r

___err__Ni-.--.

a!!.- if,]]

F__j-

s r M c r 0 i t r r €

S , . M C , O F I ' r €

c ruoc i l ^$ rN6

! . b . a t ' r o i

AO0r l ro f a ! t f f 5 tau f r to lS

gfr.irJait ZH.

o € s t I

A L L < t u ! € O t ! w A i x r a 6

V,tc* goral i t Yl igAr{o

<ar{cutrt*rLY.

<o se csARtED our U3[ le ILESD ort r l€ l*oD

StJtglY SHou!! tt ah*ci Ff,oFl 8{ oR 8c ns snoY{t{'Dut l {c - roP xA3*r rao .

vAc Satr"Prrls fo Sr{ort

L.-ir^ri i",,k.t @!frivru 2(,5cJc @ C4.f:t!rj

fnrl , Glr

:i l?tvtSutr -lAr{R

Sfgegs Llilrr3 l�usf,

SArrAlfri l t cArl Ae

6E Cr | tCTED SETOR€

fPTlAPfcD fb ilArrt{Ar'l ?RArdrxe

cHAilBt it€ AacYE Pl4ti.

t r r€trE r i3rrr to{s

l@ oso, / t ru t , ,n . ,

o u r , t i O u " O r . ' C t e t r ) t H O C ' l E 1 3 r F € ' � J i l R ^ r r U \ 5 0 u t L r r ' O ̂ 6 J v ' r r ' 6 t " i ' I

6ei l" i ' (F ' t . otr 'crF' a r : ( ' l r M ' k " t r i t i l ' r | t ' r t ! r r : t r ! ' !

c ts t !a l&Aaa F

50

q6- r?€ /16r , roo

Page 57: Crude Oil Washing Systems - 2000

Crude oil washing systems

FOS Sqf r.\eR t4/tqlDOTSCHAFoTeG

n 0 r M c P o B r r N E

f ,o J M C.P OF l rN l

r c . a M c r o a l r N t

a0or l r0NA! tNSTiu f r ro rsf l L L

? u R t d c - f o p w A s r t r i o .

vQc Sat|PPFtg fO s{Aat

C a u l E O r \ ( A ! { r ' { G

WAe{ gorabi l WigArdo

c o.{c !trt *rLy.

<o t}e ciRRtED oua \r3rr tg

$upgrY sr{oulD !t -rixri FRoFI Eta

3\EED otr icas€Doe 8c As SHo{r{,

L.'r.xt[T lH

GN^OE rONN€I

J r - - - r a l g - . J - -

' l r a E a r a J L r 6 s r i l t ' 1 . O o o x - _ j l - _ : _ - ! . . - - - -

F6qcAao3 i i3. . t9o r tr il--err--.NSI au !ll]:l

-r------r----

ferrl

!r{:DrVtDuAL -lAiR

Grrr Sfn,eSS Llr'ilTS tlusr€Arrtlfrte, Chd je

G 'E CHtcr rD BsroRE

FTDAPTCD & ilAr*tArd aR'Artll{e

cHA{6t rlc Aacv€ pler{.

l sxEt ts t i l s l tudroNs

f f f i s r r { \ r r . . v r t o r a j t i ) r o r ( r n ^ e 3 t t R r q , l . a o u q t s

cx l l t a tc t i [ lF

g ! l1 j ! ! our Y t r . rc !p r ( ) ,€oor l t 1s rx t oorH^ lo !5 ou tLr lEo ABJva rPotB rFr "

o t t H t c a t t r o t f r c f E

l l ^ M t N l r ' M t r r r r r i \ , r . t P i t I r ^ r r J / w t a t : 1 i l ( , M a \ ) H r N r i s a i l r " . r i N ( 1 , r i A S A ' '

m osur,4tur .rr" ,

50

qs-|ru /2ar. rro0

Page 58: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

SECTION 13: THE METHOD OF DRAINING CARGO TANKS

This section contains a description of the method of draining cargo tanks and should include the

parameters which indicate when the tank is dry and which will be at least all of those required by

paragraph 4.4.8 of the Revised Specifications. The minimum trim conditions must be stated.

This vessel is fitted with a self-priming "Vac-Strip" system where it is possible to drain tanks dry with the main

cargo pumps. As a tank or tanks ipproach draining level the system is manually set in operation and

theieafter vacuum pumps automaticaliy draw off excess gases and the pump discharge valve closes as flow

decreases.

The optimum method to use is as follows:

With a number of tanks approaching draining level, i.e., approximately 1 m sounding, the system should be

set in operation and then when the first tank reaches 0.5 m the main suction(s) should be shut and the

process should be repeated for each tank until the last tank is reached. When the level in that tank reaches

b.S m the pump should be slowed to 800 rpm, the stripping suction(s) opened and the main suction shut

slowly. The tank will then drain until the area around the strum is oil free. This is indicated by the following:

1. Whessoe gauge at maximum ullage (gauge should be housed while crude oil washing);

2. flow trace absolutely zero with no fluctuation;

3. separator virtually empty;

4. discharge valve closed;

5. pump nozzle steam pressure falling;

6. vacuum on suction trace falls away;

7, pump casing temperature rising;

B. dips showing empty.

Thereafter the process should again be repeated for each tank back along the deck.

On occasions, for example at sea between discharge ports, it may prove necessary to employ the closed-

cycle system already deicribed in this Manual. However, where a different grade may be contained in the

centre slop tank it is possible to use No. 2 main cargo pump drawing from the port slop tank via No. 1

bottom line across the bottom pump-room crossover, and thence to the tank cleaning line and eductors.

When draining tanks using eductors, a good indication that a tank is empty is when the vacuum showing on

the remote eJuctor suction gauge in the cargo control room drops completely away. Again hand dipping

must be carried out as described when using the Vac-Strip system. Should for any reason the eductor drive

pressure fall away below 6 kg/cm2 then it is imperative that the eductor suction valves should be shut

immediately to prevent the contents of the slop tank running back through the eductors to the washing

tank.

When bottom crude oil washing of any tank nears completion, using either method of draining, the tank

washing machines in that tank should be shut off one at a time and when all washing is complete sufficient

time should be given to complete the draining.

It is important that when draining tanks, also using either system, the vessel is trimmed by the stern

sufficiently to enable the cargo to iun aft to the tank suction. The trim should be as much as possible with

due regard to berth security and tank stresses but should not be less than 4 m.

5'�|

Page 59: Crude Oil Washing Systems - 2000

Crude oil washing systerns

SECTION 14: THE METHOD AND PROCEDURES FOR DRAININGCARGO PUMPS AND LINES

This section contains a description of the method and procedures for draining cargo pumps, cargolines, crude oil washing lines and stripping lines and includes information on the use of the small-diameter line.

On completion of discharge, all top and bottom lines should be dropped back to either wing slop tank viathe direct loading drops and bottom pump-room crossovers. The port deck line can be dropped via the portdrip and No. 1 line to the port slop tan( and the starboard deck line via the starboard drop, No. 4 line, andto the starboard slop tank via the stripping suction. The shore staff should be asked to vent their loadingarms to permit the oil to drop back. At the same time the small bypass line on each cargo pump should beopened and the stripping pump set to drain the remains of each line individually to the port slop tank.

The tank wash line should be drained by the stripping pump. lf the eductor suction valves E2 and D2 areopened together with valves E3 and H3 then it will be possible for the stripping pump to drain the entiretank wash line to the port slop tank. A tank cleaning machine should be opened in one of the forward tanksto facilitate the line dropping back.

When all l ines are drained and cargo tanks dipped manually, the stripping pump can be set to discharge theline drainings in each wing slop tank via the direct stripping suctions discharging through the special 250 mmdiameter line to the manifold and thence to the shore.

SECTION 15: TYPICAL PROCEDURES FOR BAILASTING AND THE METHODOF PREVENTINC HYDROCARBON EMISSION

This section contains a description of typical procedures for ballasting and includes:

(1) the procedure for draining and stripping before loading ballasq

(2) the procedures for preventing hydrocarbon emission into the atmosphere.

The departure ballast tanks for this vessel are No. 1 centre, No. 3 wings, No. 4 centre, and No. 6 centretanks. No. 3 wing tanks are for permanent ballast only and are supplied by a dedicated ballast pump of4,250 m3 /h capacity with its own pipeline. No. 1 centre, No. 4 centre and No. 6 centre are cargo tanks butcan be supplied with ballast using the dedicated ballast pump via a separated discharge line over the upperdeck and by direct drops to these tanks.

The typical method of ballasting No. 1 centre, No. 4 centre and No. 6 centre is to plan the discharge so thatthey are discharged as early as possible. They must be crude oil washed and good care must be taken whilebottom washing, with frequent monitoring of soundings to ensure the tank bottoms are well cleared. Oncethe tanks are empty to the satisfaction of the chief officer, with the main suction and stripping valve controlslashed in the closed position together with all Lavomatic stop valves on those tanks checked shut, thenballasting to No. 1 centre, No. 4 centre and No. 6 centre can be commenced as soon as required.

During cargo discharge there is no hydrocarbon emission to atmosphere, with the vacant cargo space beingrepf aced by inert gas. Also, when ballasting No. 1, No. 4, and No. 6 centres concurrently with the dischargeof other tanks, again there should be no hydrocarbon emission as the rate of supply of inert gas is reducedautomatically to maintain the normal overpressure. However,il for any reason, cargo discharge is stoppedor slowed sufficiently so that the deck l.C. pressure increases due to the displacement of the incomingballast then once 1,000 mm WC is reached further ballasting should be postponed until the deck pressure isreduced by the resumption of cargo discharge.

52

Page 60: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

SECTION 15: COMPUANCE PROCEDURES FOR RECULATION 9

Departure ballast is taken in No. 1, No.4 and No.6 centres using the permanent ballast pump and the"over the top" line.

On the ballast voyage, it will be necessary to wash the arrival ballast tanks, No. 2, No. 5 and No. 7 centres,frll them with clean ballast and then discharge No. '1, No.4 and No.6 centres.

In order to wash the arrival ballast tanks, it is first necessary to charge the slop tanks with sea water. Theopportunity should be taken at this time to give an initial wash of top and bottom lines to the dirty slop tank.

The arrival ballast tanks should be washed with cold water on the closed-cycle system. Each tank mustreceive not less than the following wash:

One full cycle and one hour on bottom cycle 0" to 30". All guns must be used including the bottom-mounted machine in No. 7 centre.

On completion of the tank washing the vessel is then ready to receive clean ballast. Initially the pumps andlines to be used should be cleared to the dirty slop tank and thereafter clean ballast loaded to the requiredullage in No. 2, No. 5 and No. 7 centres. Before discharging the dirty ballast it will be necessary to dischargea sufficient quantity of water from the slop tanks to create sufficient ullage for the expected dirty ballastdrainings. An interface of the three slop tanks should therefore be taken to establish the limits to whichdischarge of slops can be taken without discharge of oil.

On commencement of slop tank discharge, both No. 2 and No. 3 main cargo pumps should be cleared,pumping from No. B centre through the eductors to the dirty slop tan( and thereafter to sea via the highoverboard discharge. Pumping from No. 8 centre should then be continued with the balance valves andlines open until sufficient ullage is obtained.

Once the water has been discharged from the slop tanks, the suction can be changed to No. 1 centre, No. 4centre and No. 6 centre, the pumps again cleared to the port slop tank via the eductor discharges andthereafter to sea via the high overboard discharge. Close visual attention must be paid to the overboarddischarge throughou! but particularly when the levels in each tank approach draining level. However, when2.5 m sounding in the first tank is reached, both main cargo pumps should be slowed to 800 rpm, and at1.5 m one cargo pump should be stopped. At 1 m sounding or at the first sight of any oil in the outgoingstream, discharge should be stopped and the system set up for educting the remainder of the dirty ballastback to the slop tanks. On completion the lines should again be washed to the slop tanks.

Once all tank washing and the ballast operations are complete the slop tank contents can be discharged.Preferably 24 h should be given for oil/water separation; this may have to be reduced, however, on shortvoyages, and then interface readings taken of each slop tank to establish the oil quantities in each tank. Thefree water can then be discharged, the centre and starboard tanks to 1 m from the oil layer, the port sloptank to 2 m from the oil layer. Again, very close attention must be paid to the overboard discharge.Thereafter the quantities remaining in the centre and starboard slop tanks should be transferred to the portslop tank using the stripping pump. Again, preferably 24 h should be allowed for separation and after aninterface establishing the oil layer has been taken, the free water can be discharged overside with thestripping pump to 1 m from the oil level and thereafter to the oil/water separator on deck at a slow rate(maximum 100 m3/h) until no further water can be discharged.

oF ANNEX I OF MARPOL 73/78

This section contains information and procedures for water washing tanks and lines, dischargedeparture ballast and the decanting of slops at sea to ensure compliance with regulation 9.

Page 61: Crude Oil Washing Systems - 2000

ery{e oil washing systerns

SECTION 17: INSPECTIONS AND MAINTENANCE OF EQUTPMENT

This section contains information on procedures to be followed at recommended intervals for on-board inspections and maintenance of crude oil washing equipment.

Deck-mounted machines

It is not intended that these machines be removedmechanical failure. However, in the event of such aprovided and must be kept in good order.

Normal maintenance will therefore consist of ensuring that the gearbox is topped up with lubricating oil, thefilter is clear, the stop valve is tight and the machine is carrying out its programme.

During periodic dry dock, the opportunity shall be taken to confirm that the nozzles are clear. This may bedone by observing the water jet.

Bottor*mounted machines

Maintenance of these machines shall consist of ensuring that the filter is clear and the stop valve is tight.

The correct operation of the machine, lube oil level and nozzle jet can be confirmed by observationwhenever a tank is in a gas-free condition, but inspections should be made after not more than six usages orat intervals of 12 months, whichever is the more frequent.

SECTION 18: PROCEDURES FOR CHANGING FROM CRUDE OtL TRADETO PRODUCT TRADE

This section contains operational procedures for changing from crude oil trade to product trade for atanker which is fitted with separate independent pumping and piping arrangements for ballastingdedicated clean ballast tanks and which has been issued with two IOPP Certificates runningconcurrently with one certificate certifying the tanker to be a crude oil tanker and the other certifyingit to be a product carrier.

Note: This section was not included in the Manual as originally prepared by the tanker owner as it was notapplicable to the particular tanker concerned. lt has been added to this specimen Manual as anexample of how the information relating to section 18 might be presented if required in a particularcase.

This oil tanker is equipped with a COW system for the crude oil trade and also has a CBT system for theproduct trade with separate independent pumping and piping arrangements for ballasting the dedicatedclean ballast tanks; it may therefore change from the crude oil trade to the product trade withoutundergoing a survey. When making this change from the crude oil trade operating with a COW system tothe product trade operating with dedicated clean ballast tanks, the following procedures shall be followed:

During the discharge of the crude oil cargo, the tanks that are to be used as dedicated clean ballasttanks when the vessel is in the product trade should be crude oil washed in accordance with theapproved methods and programmes contained in section 11 of this Manual. These tanks are to becrude oil washed in addition to those that are required to be crude oil washed by section 1 1.

To remove any oily water mixtures that might remain in the separate independent pumping and pipingarrangements, this separate system should be flushed by pumping sea water through the system intothe tanks before water washing commences. This flushing water should be discharged to the slop tankthrough the cargo piping connection to the tanks.

from the tanks unless there has been an actualfailure, a lifting tripod, chain block and tools are

1 .

2 .

54

Page 62: Crude Oil Washing Systems - 2000

Example 1: Conventional pipeline tanker

After discharging all flushing water from these tanks through the cargo piping connections, all valves in

the cargo pifing lines that lre connected to the tanks that are to be used as dedicated clean ballast

tanks should be closed and secured.

The tanks that are to be used as dedicated clean ballast tanks should be water washed in accordance

with the procedures used for preparing arrival ballast tanks contained in section 16 of this Manual

prior to the loading of the next cargo.

5. After completion of water washing of these tanks, all wash water should be discharged to the sloptank.

G- At the loading por! product cargo can be loaded on the vessel, but it may not be loaded into the tanksthat are designated as dedicated clean ballast tanks while the vessel is in the product trade.

7. The vessel should now operate as a product carrier with a CBT system and the Dedicated CleanBallast Tank Operation Manual should be used while the vessel is in this trade.

55

Page 63: Crude Oil Washing Systems - 2000

Example 2: Ful fre+flow tanker

,Example 2

Full free-flow tanker

CRUDE Ott WASHING OPERATIONS AND EQUIPMCNT MANUAT

Name of ship

Port of registry

Distinctive nurnber or lefters ; . . . . .

Deadweight tonnage

57

Page 64: Crude Oil Washing Systems - 2000

Crude oil w4shrng systems

INTRODUCTION

1 This Manual is written in accordance with the requirements of regulation 138 of the Protocol of1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973 (MARPOL73/78).

2 The purpose of the Manual is to meet the requirements for crude oil washing in accordance with theRevised Specifications for the design, operation and control of crude oil washing systems (Assemblyresolution A.446(Xl) as amended by resolutions A.a97(Xll) and A.897(21 )). lt provides standard operationalguidance in planning and performing a crude oilwashing programme and describes a safe procedure to befollowed.

3 This Manual contains all the information and operational instructions required by the RevisedSpecifications.

4 This Manual has been approved by the Administration and no alteration or revision shall be made toany part of it without the prior approval of the Administration.

58

Page 65: Crude Oil Washing Systems - 2000

Example 2: Fullfree-flow tanker

Part

1

2

5

Ai

5

6

1

8

9

1 0' t 1

1 2

1 3

1 4

lndex of sections

1

Text of the Revised Specifications . . . .

Drawings of the crude oil washing system

Description of the crude oil washing system and operationaland equipment parameters

Dangers of and precautions against oil leakage

Use and control of inert gas . .

Precautions against electrostatic hazards

Personnel requirements . . . .

Methods of communication

List of crude oils unsuitable for crude oil washing

Crude oil washing checklists

Approved methods and programmes for crude oil washing

Typical crude oil washing programmes . . . .

The method of draining cargo tanks

The method and procedures for draining cargo pumpsand lines

Typical procedures for ballasting and the method of preventinghydrocarbon emission

Compliance procedures for regulation 9of Annex I of MARPOL 73/78

Inspections and maintenance of equipment

Page

160l161l167l

[711

171l[ 7 l ] j

172l172l[72]

172l174l[76]

T7B]

lTBl

lTel

lB0l

[811

Relevantparagraph(s)

of the revisedSpecifications

7(a)

7(b\

7(c), 7(d)(viii)and 7(f)

7(e)

6.6

6 .7

7(e)

7(h)

7(t)

7A)

z(d)(i)

z(dXv)

7(d)(iii)

7(dXiv) and (vi)

7(d)(ii), 7(i)

7(d)(vi), (vii)and (ix)

7(k)

1 5

1 6

1 7

5 9

Page 66: Crude Oil Washing Systems - 2000

Crude oil washing systems

SECTION 1: TEXT OF THE REVTSED SPECIFICATIONS

This section contains the complete text of the Revised Specifications for the design, operation andcontrol of crude oil washing systems and the agreed interpretations of certain of the provisions of theRevised Specifications (Assembly resolution A.446 (Xl) as amended by resolutions A.497(Xll) and4.8e7(21).

(Text of the Revrsed Specifications to be inserted)

SECTION 2: DRAWINCS OF THE CRUDE Ott WASHTNG SYSTEM

This section contains line drawings showing:

(1) crude oil washing lines and valves;

(2) cargo pumps, lines and valves;

(3) ballast systems (where fitted);

(4) stripping systems;

(5) position of tank washing machines;

(6) position of holes for hand dipping and tank gauges;

(7) inert gas deck distribution system.

(See following pages for drawings)

60

Page 67: Crude Oil Washing Systems - 2000

- 1 - - - - - - - - " - - tt /9 /

t t /s t /, t /g t /c t /,!t /

-_-{__---_6 le $ t l Ia ! _ s J _ - _ _ L

\I

\

I

IIII

B

EE

2 lI

_jIIII

3 l'61

P I6 lo l

8 lo l

6 l

i lz l

IIIl- II

III

E l

p l

F I9 l

s l- 6 1

i l2 l

III

iII

E I

B I

o l

E I

z

€- o

l 9 ad < - l o - .E : E : 1 6 :o F n E t j g

; . 8 . 8

a '(_.,++F-{e

,EE.E

.E

'

. 9 1I 6I E

r gl ot 9l 6

I

6

E

E

c.)2

-oc(g

o:bD

=

3

s)

U

CJ

.99L'

.v

q

-OJ

LL

6 l

CJ

aq

Page 68: Crude Oil Washing Systems - 2000

(!

:

f

ad

U

.99L

E

bo

-o

. l l . i l_-fu------#*l-- i N i

I- - Y 6

t l g

l , !

; 3 ; s ; €3 3 3 3 32 2 2 2 2

Page 69: Crude Oil Washing Systems - 2000

:r"io l5

oIJ

f".'. .-- ' .'i"'-

=lgq

oUJ

9)

g)

o6

o

)I

-lt rG\

1 . ,i s-\ !t'

, 2 U

t n Il e l

' l F

r 0

: \ ,

?tl

tI

Page 70: Crude Oil Washing Systems - 2000

P

E ; :'P tsE

iII

iiI

- - lI

Ir-----1 |l * | I

I IED- - , i .

v

CJ2(g

-o

-:

tr

bD-'ao-

an

.99L

Page 71: Crude Oil Washing Systems - 2000

a' r 1 :o t - t a

od ; - i o . ' . :

l r l' l r l' l * II t li t r . l

f i I

l ' i

[email protected] @ . I

I

' i ' l ' lr l i

i * i . i. @ . , i+--. e . l %

| . I

' l r li . l

I r ll . r . l" l I Il ' l ' l

nI

* .

, ' . - i . . \ _ . i r i .' - 1

c)bo

oo-Y

-(d

o-o-

-

{.)

OJ

oou

a\

'6

E

I

'6

I

q)

ErO

bo

=(!

3

(!

-.F

0.)

.sou

Page 72: Crude Oil Washing Systems - 2000

. 3

UCJ

.doo

o)-.

N

IJ.

r!!i4#

' i " - ' . ' ' , , ' '

a)

h0

(E

t

C)3

Page 73: Crude Oil Washing Systems - 2000

Example 2: Fullfreeflow tanker

SECTION 3: DESCRIPTION OF THE CRUDE OIL WASHING SYSTEMAND OPERATIONAT AND EQUIPMENT PARAMETERS

This section contains a description of the cargo, ballast, washing and stripping systems and in addition

specnes:

(1) types of tank washing machines and their standpipe length inside the tanks;

(21 revolutions of the machines;

(3) methods of checking the operation of tank washing machines;

(4) minimum operation pressure for crude oil washing;

(5) maximum permitted oxygen level in cargo tanks;

(6) duration of tank washing machine cycles;

(7) results of the tests performed in accordance with paragraph 4'2.'10(b) of the Revised

Specifications and the method of computation;

(B) method of preventing entry of oil into the engine room'

The cargo system consists of '12 cargo

diagrammatically in section 2.tanks and three slop tanks' Details of layout are shown

The system is so designed that cargo is discharged from cargo tanks entirely by free flow. Discharge from

slop tanks is by speciJl suctions in Iach tank. cirgo (or ballait) loading is achieved by individual drop lines

to each of the cargo tanks and slop tanks. Ballasican also be freeflowed into wing tanks by gravity using

two sea inlets. The centre tanks and wing tanks are completely separated. This permits two grades of cargo

to be carried and also permits multi-port loadings and discharges.

In addition to ballast carried in cargo tanks, permanent ballast tanks are located in the forepeak and No' 6

wings. Details are shown diagramiratically in section 2. These tanks have their own independent loading

and discharging systems.

The normal cargo loading procedure is for arrival ballast to be discharged from centre tanks concurrently

with the loadinf of ."rgo'ln wing tanks. On completion of the loading of wing tanks, the deballasted centre

tanks are then loaded.

The normal cargo discharge procedure is for the wing tanks to be discharged first and then ballasted with

the departure Sallast lolicunently with the cargo d-ischarge from the centre tanks. During the ballast

passage, necessary water washing is carried orit and the arrival ballast loaded into centre tanks and

departure ballast discharged from wing tanks.

The slop tank arrangement provides a three-stage separation system consisting of a centre slop tank and

port and starboard *inJ rf op trnks which are interconnected by levelling lines and valves. All three tanks are

filled with clean sea wier to predetermined levels prior to commencingwater washing using arecirculatory

system. The tank *"rning, Je discharged into the centre slop tank "nd thun decanted into the starboard

wing slop tank and, frorn'there, decanied into the port wing slop tank. This provides efficient separation

since, at each stage of decanting, the slops are discharged at low velocity in an upward direction into the oil

scum near the surface of the liiuid in the tanks. The lentre slop tank may be used on its own as a single

separator, or the wing slop tanks may be used in tandem as double-stage separation units'

Four cargo pumps are provided. Allfour pumps may take direct suction from No. 4 centre tank' No' 1 and

f..fo. z pJmps may take suction from No. 4 port wing tank, and No. 3 and No. 4 pumps may take suction

from No. 4 starboard wing tank. The cargo pumps Jischarge to the manifold through two deck lines; the

67

Page 74: Crude Oil Washing Systems - 2000

Crude oil washing systems

inner pumps, No. 2 and No. 3, discharge through the port line and the outer pumps, No. 1 and No. 4,discharge through the starboard line. Cross-over lines at the pump suctions and discharge permit flexibility inthe selection of cargo pumps.

One general-purpose pump is provided and this is primarily used for crude oil washing, educting andstripping duties. lt is also used to discharge the slop tank on completion of the main cargo discharge. Thepump is self-priming through connection with an automatic stripping system.

Two eductors are provided. The motive power for the eductors is normally taken from the discharge of thegeneral-purpose pump. No. 1 and No. 2 cargo pumps may also be used to supply motive power to theeductors. Both eductors discharge into the centre or starboard slop tanks or in the case of clean ballast maydischarge overboard. The eductors may take direct suction from No. 4 centre tank or from the stripping ringmain. The stripping ring main is connected to all cargo tanks, with the exception of No. 4 centre tank.Eductors can be connected to the bilge system via interconnections with the stripping pump line.

A reciprocating stripping pump is provided. This takes direct suction from the centre slop tank or thestripping suction cross-over line or the outboard side of the manifold valves, port and starboard. The pumpdischarges directly to the oil/water separator of the cargo pump cross.over line or the outboard side of themanifold valves, port and starboard. The stripping pump is used for the stripping of pipelines and cargopumps to the centre slop tank and then the final stripping of that tank ashore.

Two sea inlets are provided. These enable any of the four cargo pumps, the general-purpose pump and thestripping pump to draw from the sea. The inlets can also be used for shipping ballast into the wing tanks bygravity. There are wvo high overboard discharges provided, port and starboard, for the discharge of ballastoverboard. These are taken from the cargo pump discharge crossover.

The cargo control room provides the focal point for all cargo handling, ballasting and tank cleaningoperations. Facilities are provided within the control room for remote control of the pumping equipmentand remote operation of the hydraulically operated valves situated in the pump-room. The inert gas systemperformance is monitored and the operation of the deck main isolating valve is controlled from the cargocontrol room. The bulkhead valves in the tank space and hydraulically operated valves on the upper deckare operated from five local control stations on the upper deck. The inert gas system mast riser vent isoperated from the forward local control station.

Draught gauge indicators are fitted in the cargo control room. The indicator system indicates the ship'sdraught at four positions; forward, aft, and midships port and starboard.

A water heater is fitted in the cargo pump-room for use when hot water tank washing is required. Duringcrude oil washing the heater is isolated from the tank cleaning system by means of the spectacle blanksprovided.

A Loadmaster computer is provided and is fitted in the cargo office adjacent to the cargo control room.

In addition to the standard ullage fittings, each cargo tank and each slop tank is fitted with a Whessoe gaugegiving visual ullage readings at the upper deck level. Additional gauges are fitted in the after ends of No. 4centre and No. 4 wing tanks, the forward fuel oil tank and No. 7 fuel oil bunker tanks. A remotereading tanklevel gauge for the centre slop tank is installed in the cargo control room.

68

Page 75: Crude Oil Washing Systems - 2000

Example 2: Fullfre*flow tanker

PUMP PARTICUHRS

Service No. Type Drive Capacity and pressure/headat the pumP

Cargo oil pumps

Cargo oilstripping pump

General-purpose pump

4

1

1

Horizontalcentrifugalvolute

Vertical duplexdoubleactingreciprocating

Horizontalcentrifugalvolute

Singlestage impulsesteam turbine

Steam reciprocating

Singlestage impulsesteam turbine

47oo m3/h oil (sp. gr. 0.85)at 140 m headPump speed: 1000 rPm

350 m3/h oil (sp. gr. 0.85)at 130 m headPump speed: 31 strokes/min

20oo m3lh oi l (sp. gr.0.85)at14O m headPurnp speed: 1650 rPm

EDUCTOR PARTICULARS

Service No. Tvoe Drive Capacity

Cargo oilstrippingeductors

No. 6 tankpermanentwater ballasteductors

Forepeak tankpermanentwater ballasteductor

2

2

I

Colar

Colar

Colar

Discharge fromNo. 1 or No.2 cargopump or general-purpose pump

Discharge from fire,bilge and general-service pumps

Discharge from fire,bilge and general-service pumps

Approximately aoO m3/hsea waterDriving fluid needed: 800 m3/h

Approximately 400 m3/hsea waterDriving fluid needed: 800 m3/h

Approximately 35 m3/h sea waterOriving fluid needed: zo m3 /h

3.1 The cargo tanks and slop tanks are fitted with VP-Matic and VP-Monomatic fixed tank washing

machines. These are manufactured by Victor Pyrate Limited. The machines have 2.6 m standpipes and 4re

fitted with either 32 mm or 38 mm single nozzLs. Natural vibration frequency of the machines is 10.83 Hz

(650 cycles/min) which is well in excess of the maximum frequency that the propeller can induce' The

Lyort and distribution of the machines are shown in diagrammatic form in section 2.

3.2 The machine nozzles rotate through 360" in the horizontal plane and through 140' in the vertical

plane. Each complete horizontal revolution moves the nozzle through 2.3" vertically. The combination of

irorizontal and vertical movement produces a close spiral cleaning path within the tank.

3.3 A total o{ 24 control boxes are provided for mounting onto the turbine housing of the VP-Matic

machines. This is a sufficient number for all wing tank VP-MatiLs to be fitied at the same time. The control

boxes provide the means for actuating the positiin of the nozzles during the tank cleaning cycle' When they

are fitied, the machines will autorn'aticaily operate when the crude oil supply valve is opened. VP-

Monomatic machines are fitted with permanentintegral control units. The controls are fitted with upper and

lower stops which can be adjusted to give a wash over. a selected arc. On reaching a stop the mechanism

trips and the nozzle then pioceeds o-n the return arc. The controls, settings and movements are visible

externally and can be visually checked at any stage.

Page 76: Crude Oil Washing Systems - 2000

Crude oil washins systerns

3.4 The minimum line pressure for crude oil washing is B bars. Normal working pressure is 10 bars.

3.5 Crude oil washing must only be carried out when the oxygen level in the tank is less than 8%. This isthe maximum permitted level.

3.5 The duration of the tank washing cycles at 10 bars line pressure for various arcs is as follows:

A cycfe consists of two complete passes of the nozzle through the designated vertical arc.

A maximum of 1B tank washing machines can be operated simultaneously.

3.7 During tests, the amount of oil floating on the departure ballast did not exceed the permitted ratiogiven in paragraph 4.2.10(b) of the Revised Specifications.

3.8 The procedure for computing the ratio of the volume of oil on top of the total departure ballastwater to the volume of tanks that contain this water is described below:

3.8.1 Determine the thickness of the oil layer on the ballast water (t*).

3.8.2 Using the tank capacity tables:

.1 determine the aggregate volume (100%) of all tanks that contain departure ballast (V);

.2 determine the volume of the ballast water and oil layer in each tank from the ullage (U,.);

.3 determine the volume of ballast water in each tank from the ullage plus the thickness of the oillayer (U" + 1").

3.8.3 Subtract the value obtained in 3.8.2.3 from that obtained in 3.8.2.2 for each tank and add theresultant values together to obtain the total volume of oil (v).

3.8.4 The ratio of the volume of oil on top of the total departure ballast water to the total volume of tankscontaining departure ballast water = V.

3.9 There is no part of the crude oil washing system in the machinery spaces other than the pump-room.Spectacle blanks are fitted to isolate the pumproom-sited heater from the system.

On completion of a crude oil wash programme, the crude oil washing piping is drained into the centre slop tank.

70

Limit of cycle 120" 1 00" 80" 600 40"

Time l n / m t n t h 4 6 m i n t h 2 4 m i n t h 4 m i n 42 min

Tanknumber

Port'starboardor centre

Tank volume(m')

Ullage spacein tank

(measured totop of oil layer)

(m)

oilthickness

(mm)

Volume of oil(rt)

X v, U, tx VX

Total v Total

Page 77: Crude Oil Washing Systems - 2000

Example 2: Fullfre*flow tanker

SECTION 4: DANGERS OF AND PRECAUTIONS AGAINST OIL LEAKACE

This section contains information on the dangers of leakage from the crude oil washing system, theprecautions necessary to prevent leakage and the action to be taken in the event of leakage.

Leakage of crude oil from the system can be a potential fire and pollution hazard. Before arrival at the

discharge port, the tank washing system should be pressuretested and examined for leaks. Any leaks found

should be made good and the resultant oil cleaned up.

During the pressure test, special attention should be given to the inspection and tightening of valve glands

and of flanges and couplings on lines to prevent any leakage.

During the course of oil washing the system must be kept under continuous observation and on completionof waihing it must be completely drained of oil. lf it is necessary for the system to be cleaned out, it should

be flushed through with water into appropriate tanks; if the system is required to be gas-free it should beventilated in the same way as cargo lines.

The crude oil washing must be stopped when any sign of leakage or fault in the tank wash system isdiscovered, either on deck or in the pumproom.

SECflON 5: USE AND CONTROL OF INERT GAS

This section contains information on the inert gas requirements and the instructions to cover thoseperiods when the inert gas pressure is released for reasons of cargo operation. ln addition it indicatesthe method and procedures to be used for taking samples of the tank atmosphere.

The ship should arrive at the discharge port with all cargo tanks pressurized with goodquality inert gas'

Pressure may be released for ullaging, sampling and water dips before discharge and at this stage the

oxygen level in tanks should be checked to ensure that it is below B% by volume. The supply of inert gas

must be commenced immediately before the commencement of cargo discharge so as to avoid a vacuum

in the tanks. By this means a safe condition will be maintained throughout discharge. Apart from this initialrelease of pressure the pressure in the cargo tanks should always be above atmospheric pressure. Under no

circumstances should air be allowed to enter any tank which is to be crude oil washed.

Before each tank is washed, the orygen content should be checked with the portable oxygen analyser to

ensure that it does not exceed S%by volume. Samples should be taken at a point 1 m below the deck and

at the middle region of the ullage space well clear of the inert gas inlet point. (See section 2 of this Manual

for the position of the sampling points.)

The crude oil washing must be stopped if there is a failure of the inert gas plant or if the oxygen content of

the delivered inert gai exceeds S%by volume or if the pressure of the tank atmosphere in the cargo tanks

falls below atmospheric pressure.

SECTION 6: PRECAUTIONS AGAINST ELECTROSTATIC HAZARDS

This section contains details of the procedures for minimizing electrostatic generation

Mixtures of oil and water can produce an electrically charged mist during tank washing. The use of dry

crude is therefore important. To prevent the possibility of developing such an electrically charged mist,

before crude oil washing is commenced any tank containing crude oil which is to be used as the crude oil

washing fluid is to be partially discharged to remove any water which has setded out during the voyage. To

ensure"adequate safeiy, a minimum of t rn depth of cargo is to be discharged in this way.

7'�|

Page 78: Crude Oil Washing Systems - 2000

Crude oil washine systems

For the same reason, as the slop tank will invariably contain a mixture of retained oil residues and cargo, thewhole content of the slop tank should be discharged ashore before crude oil washing commences and thenbe refilled with fresh crude from the cargo discharge deck line, if the slop tank is to be used as a source ofwashing fluid. lt must be remembered that this refilling will take place after the discharge of the bottom 1 mdepth of cargo from other tanks, referred to above, has been completed.

SECTION 7: PERSONNEL REQUIREMENTS

This section specifies the numbers of persons to be associated with the crude oil washing process andtheir necessary qualifications. Their names and rank may be provided on separate documents.

The following personnel are required to be on board to carry out the dual operation of discharging cargoand crude oil washing:

1. the master or chief officer who will have overall responsibility for the operation. He must meet therequirements of paragraph 5.2 of the Revised Specifications; (see section 'l of this Manual)

2. the orficer who will undertake the actual operation. He must meet the requirements of paragraph5.3 of the Revised Specifications; (see section 1 of this Manual)

3. a minimum of one petty officer or rating who is to be on deck at all times during washing to keepwatch for leaks and malfunction of equipment, to test the oxygen conent of tanks before washing, tocheck tank atmosphere pressure, to sound tank bottoms when required, and to lift ullage floats andto assist with changing drive units when this is necessary.

The duties of the persons referred to above are not necessarily mutually exclusive.

SECTION B: METHODS OF COMMUNICATION

This section gives the details of communication between the watchkeeper on deck and the cargocontrol position so that, in the event of a leak or malfunctioning of the crude oil washing system, thewashing may be stopped as soon as possible.

The ship is provided with portable VHF sets which operate on two frequencies. A set must be used by theperson at the cargo controls and another by the person supervising crude oil washing on deck.

SECTION 9: LIST OF CRUDE OILS UNSUITABLE FOR CRUDE OIL WASHING

This section contains a list of crude oils unsuitable for crude oil washing.

This vessel is not fitted with heating coils in the cargo tanks and it should not carry cargoes which willrequire to be heated for pumpability.

SECIION 10: CRUDE Olt WASHING CHECKLISTS

This section contains operational checklists for the use of the crew at each discharge which shallinclude the checking and calibration of all instruments.

72

Page 79: Crude Oil Washing Systems - 2000

Example 2: Fullfree-flow tanker

PRE.ARRIVAL CHECKS AT DISCHARGE PORT

No. ITEM

1 .

2 .

3 .

4.

5 .

6.

7.

B.

9.

1 0 .

1 1 .'12 .

1 3 .

Has terminal been notified? r ,,

ls oxygen analysing equiprnent tested and working satisfactorily? ,

ls tank washing pipeline system isolated from water heater and engine room?

Are all hydrant valves on tank washing line blanked?

Are all valves to fixed tank washing machines shut?

Have tank cleaning lines been pressurized and leakages made good?

Have portable drive units for fixed tank washing machines been tested?

Have pressure gauges on the top discharge line, manifold and tank cleaning main been

checked?

Has the stripping system monitoring equipment been checked?

Has the communications system been checked and tested?

Has the organization plan been drawn up and posted with duties and responsibilities defined?

Have the discharge/crude wash operation plans been drawn up and posted?

tn cases where the terminal has a standard radio checklist, has this been completed and

transmitted?

CHECKLIST FOR USE BEFORE, DURINC AND AFTER CRUDE OIL WASH OPERATION

1 .2 .

3 .

4.

5.6.

7.B.9.

1 0 .

1 1 .

A - Before crude oil wash oPeration

Are all the prearrival checks and conditions in order?

Has discharge/crude oil wash operation been discussed with both ship and shore staff and is

the agreed plan readily available for easy reference?

Has communication link between the deck/control station and control station/shore been set

ffii.,: ffi"JTtJ'r"rT:lt.onoi,ion and procedures been discussed and asreed bv bothship and shore staff?

Have fixed and portable oxygen analysers been checked and are they working properly?

ls inert gas system working properly and is the oxygen content of the inert gas being delivered

below 8"/" by volume?

fs oxygen content of tank(s) to be crude oil washed below B% by volume?

Have all cargo tanks positive inert gas pressure?

Has a responsible person been assigned to check all deck lines for leaks as soon as washing

starts?

Are the fixed machines set for the required washing method and are portable drive units, if

fitted, mounted and set?

Have valves and lines both in pump-room and on deck been checked?

73

Page 80: Crude Oil Washing Systems - 2000

Crude oil washine systems

No. ITEM

' t2.

1 3 .14 .1 5 .16 .' t7 .

'18.' t9.

20.2 '1 .22.

23.24.25.26.

B - During crude oil wash operation

ls quality of inert gas being delivered frequently checked and recorded?

Are all deck lines and machines being frequently checked for leaks?

ls crude oil washing in progress in designated cargo tanks only?ls the pressure in the tank wash line 8 bars or above?Are cycle times of tank washing machines as specified in this Manual?

Are the washing machines in operation, together with their drive units if applicable, frequentlychecked and working pr:operly?

ls a responsible person stationed continuously on deck?Will trim be satisfactory when bottom washing is in progress as specified in this Manual?

Will recommended tank draining method be followed?

Have ullage gauge floats been raised and housed in tanks being crude oil washed?

ls level in holding tank for tank washings frequently checked to prevent any possibility of anoverflow?

C - After crude oil wash operation

Are all valves between discharge line and tank wash line closed?

Has tank wash line been drained of crude oil?

Are all valves to washing machines closed?

Are cargo pumps, tanks and pipelines properly drained as specified in this Manual?

SECTION 11: APPROVED METHODS AND PROGRAMMESFOR CRUDE OIt WASHING

This section contains those details which form the basis of crude oil washing in the tanker and whichare necessary to formulate a washing programme which will accord with all foreseeablecircumstances of cargo discharge restraints. lt includes information on:

(1) the minimum number of tanks to be washed in accordance with paragraph 6.'l of the RevisedSpecifications;

(21 the method of washing each tank, i.e., single.or multi-stage;

(3) the number of tank washing machines to be used simultaneously;

(4) the crude oil washing pressure and means to maintain the required pressure;

(5) the duration of the crude oil wash;

(6) the preferred order in which tanks are to be washed;

(7) the minimum trim during completion of washing and draining tanks;

(8) when draining and stripping of tanks is to commence.

The cargo system comprises four centre tanks, four pairs of wing tanks, a centre slop tank within No. 4centre and a pair of wing slop tanks abaft No. 4 wing tanks. The system is served by four cargo pumps, onegeneral-purpose (GP) pump, two eductors and one stripping pump. The slop tanks form part of the maincargo system, with cargo being loaded on top of oily residues which remain from previous cargoes.

74

Page 81: Crude Oil Washing Systems - 2000

Example 2: Fullfree-flow tanker

Cargo pump capacities

Main cargo pump - 47OO m3/hCP pump - 2000 m'/hVEductor - 400 m3/hStripping pump - 350 m3/h

Discharge from main cargo tanks is by free flow through bulkhead sluice valves to No. 4 centre and No. 4wings, from which the main cargo pumps take suction. The slop tanks are discharged by direct suctionsserving individual compartments. The CP pump is used to provide the fluid for washing machines andeductors. Eductors are used for cargo stripping. ln the event of a CP pump failure either No. 1 or No. 2 main

cargo pump can be used instead. The stripping pump is used for the final stripping of pumps and lines.

A bottom ring main is provided, which seryes tanks 1 to 3, principally to facilitate stripping in water washing.

The standard procedure is to crude oil wash and discharge all wing cargo tanks first and, after stripping them

and draining the associated pipelines, to load departure ballast in the wings concurrently with the discharge

of cargo and crude oil washing of centre tanks and wing slop tanks. Deck lines are drained into the centre

slop tink and manifold lines; pump-room lines and pumps are drained via the stripping pump to the centre

slop tank. Finally, the centre slop tank is pumped ashore through the special 150 mm diameter line.

This procedure is not materially affected if different grades are loaded in wings and centres, nor if the wings

are discharged at one port and centre tanks at a second port. However, if it is required to discharge centre

tanks at one port and wing tanks at a second port it will be necessary to transfer cargo from the wing tanks

to the centre tanks to enable ballasting procedures to be carried out.

The procedure may be materially affected if more than one grade is loaded in the centre tanks or in the

wing tanks. tn this case, it will be necessary to discharge the first grade on the ring main using the CP pump.

11.1 In this ship, allwing cargo tanks are used for departure ballast and all centre cargo tanks for arrival

ballast. The slop ianks do not cirry ballast. Therefore, to comply with the requirements of paragraph 6.1 of

the Revised Specifications, all cargo tanks and one of the slop tanks must be crude oil washed prior to

sailing on a ballast voyage. However, a slop tank need not be washed more than once every four months

except that it is recommended that the centre slop tank be washed each time.

11.2 Tanks are crude oil washed by the multi-stage method. That is, they are washed in three stages(12O'-7O':70'-40":40"-0"). Each stage is given one and a half cycles (i.e., three passes of the machine

nozzle). During the final stage - the bottom wash - the first pass of the nozzle should commence with

about i m of clrgo remaining in the tank. During the second pass, the tank should be emptied and during

the final pass the tank bottom should be dry.

1 1 .3 The ship is fitted with 43 VP-Matic machines and 1 0 VP-Monomatic machines. There are 24 control

boxes provided for actuating VP-Matic machines. This allows all tanks required to be washed with only one

move of the control boxes. A total of 1B machines can be operated simultaneously.

11.4 During washing the optimum line pressure is 10 bars. The minimum permissible pressure is B bars.

11.5 Crude oil washing will continue throughout the cargo discharge programme. lt will commence

approximately 2 h after tfe commencement oidischarge and be completed prior to the final discharge of

the centre slop tank. At 10 bars pressure, the time taken to wash each tank is:

Top wash:Middle wash:Bottom wash:

1 2 O " - 7 O " : t h 1 9 m i n7Oo-4Oo: 48 min40"-0o : l-b-] rn!!, ,

T o t a l 3 h 1 0 m i n

1 1.6 As the ship is designed to discharge by the free-flow method, the tanks at the forward end of the ship

empty in advance of thoie aft because oJ the natural trim of the ship. The normal procedure therefore is to

75

Page 82: Crude Oil Washing Systems - 2000

Crude oil washins systems

begin with the first stage (top wash) in No. 1 and No. 2 wing tanks and follow this with the first stage (topwash) in No. 3 and No. 4 wings. The sequence is then for the second stage (middle wash) and third stage(bottom wash) in those tanks in the same alternating orders. The bottom stage must not be commenceduntil the depth of oil is about 1 m. On completion of the bottom washing of wing tanks, control boxes aremoved to the centre tanks and a washing sequence similar to that of the wing tanks carried out.

11.7 During the bottom washing and draining of tanks, the trim must be not less than 4 m.

11.8 As the ship is free flow, the draining of No. 1, No. 2 and No. 3 wings and centres is concurrent withcargo discharge. The draining of No. 4 wings and centre is to commence during the second pass of the tankcleaning machine nozzle during the bottom washing stage.

SECTION 12: TYPICAL CRUDE OIL WASHING PROCRAMMES

This section contains details of some typical washing programmes under various conditions ofdischarge such as single- or multi-port discharge and single and multi-grade cargoes.

Crude oil washing seguence in relation to cargo discharge

The following sequence is the basic programme and is easily adapted to all conditions of cargoes and ports.

Sequence Careo ooeration Pumo COW ooeration Pump

1 Commence discharge of centreslop tank

No. 1

2 Commence discharge of Nos. 1, 2,3 & 4 w i n s t a n k s

Nos. 1, 2,3 & 4

3 Wash centre sloptank

No. 1

4 8 m ullageW a s h N o s . 1 & 2wings1] cycles 120"-7O'

CP on No. 4wings

5 Refill centre slop tank with drycrude

6 W a s h N o s . 3 & 4wings 'l] cycles120 ' -70 '

7 17 m ullageW a s h N o s . 1 & 2wings 1] cycles70"-40"

8 W a s h N o s . 3 & 4wings 1] cycles70"-40"

9 26 m ullageW a s h N o s . 1 & 2wings 1] cycles400-00

76

Page 83: Crude Oil Washing Systems - 2000

Example 2: Fullfre*flow knker

Sequence Cargo operation Pump COW operation Pump

1 0 Commence discharge of Nos. 1, 2,3 & 4 c e n t r e t a n k s

Nos .2 &3

W a s h N o s . 3 & 4wings 1] cycles400-00

1 1 Strip No. 4 wings using eductors.Discharge Nos. 1, 2,3 & 4 centretanks

CPNos. 1, 2,3 & 4

't2 Check dips in wingtanks less than25 mm

1 3 Strip all wing tanks and lines tocentre slop tank

StrippingPumP

1 4 Commence flooding ballast intowing tanks

1 5 Discharge wing dop tanks No. 1

1 6 Wash requisite wingslop tank

C P o n N o . 4centre

1 7 9 m ullageWash Nos. 1, 2, 3centre tanks 1|cvcles 100'-70'

G P o n N o . 4centre

1 8 Wash No. 4 centretank 1] cycles'100"-70"

1 9 17 m ullageWash Nos . 1 ,2 ,3centre tanks 1|cvcfes 7Oo-4O"

20 Stop Nos. 1 & 4 PumPs. Drainpumps and lines to centre sloPtank

21 Commence PumPing ballast towins tanks

Nos. 1 &4

22 Wash No. 4 centretank 1| cycles70" -400

23 24 m ullageWash Nos. 1, 2 & 3centre tanks1| cycles400-00

24 Wash No. 4 centretank 1] cycles400-00

CP on centreslop tank

77

Page 84: Crude Oil Washing Systems - 2000

Crude oil washins systerns

Sequence Cargo operation Pump COW operation Pump

2 5 Check dips in Nos. 1,2 & 3 c e n t r e t a n k sand wing slop tanksless than 25 mm

26 Stop discharge while bottomwashing and strippine No.4 centre

2 7 Check dip in No. 4centre tank

28 Discharse centre slop tank GP

29 Strip Nos. 2 & 3 and CP pumpsand lines and manifolds to centreslop tank

30 Discharge centre slop tank viaspecial 150 mm l ine

SECTION 13: THE MFTHOD OF DRAINING CARGO TANKS

This section contains a description of the method of draining cargo tanks and should include theparameters which indicate when the tank is dry and which will be at least all of those required byparagraph 4.4.8 of the Revised Specifications. The minimum trim conditions must be stated.

Draining of No. 1 , No. 2 and No. 3 centre and wing tanks is by free flow into No. 4 centre and wings. No. 4centre and wings are drained by eductors which are powered by the GP pump, although No. 1 or No. 2main cargo pump can be used if the need arises. The wing slop tanks are also drained by the eductors. Finaldraining of the centre slop tank is by a steam reciprocating pump which discharges directly ashore throughthe special stripping line.

It can be verified that a tank is empty by fully extending the Whessoe gauge, which is housed during crudeoil washing, and by hand dipping.

To monitor the stripping system efficiency, cargo pump revolution indicators and eductor and strippingpump suction and discharge gauges are displayed in the cargo control room.

The minimum trim condition for draining tanks is 4 m by the stern.

SECTION 14: THE METHOD AND PROCEDURES FOR DRAININGCARGO PUMPS AND LINES

This section contains a description of the method and procedures for draining cargo pumps, cargolines, crude oil washing lines and stripping lines and includes information on the use of the small-diameter line.

14.1 Deck lines

14.1.1The starboard deck line is drained through the direct load lines into the wing slop tanks. This is priorto the ballasting operation.

78

Page 85: Crude Oil Washing Systems - 2000

Example 2: Fullfreeflow tanker

74.1.2 Direct load lines are drained into their individual cargo wing tanks. On completion, cargo wing tanks

are given a final strip using the stripping pump.This is prior to the ballasting operation.

74.1.g The port deck line and manifold lines are drained through the direct loading line into the centre slop

tank. Manifold pressure compensation valves are opened during this operation.

14.1.4 Direct load lines are drained into their individual cargo centre tanks. On completion, cargo centre

tanks are given a final strip using the stripping pump.

14.1.5 Manifold outboard areas are drained to the centre slop tank via the stripping pump and special

stripping line.

14.1.6 The crude oil washing line is drained to the centre slop tank via the fixed tank washing machine. To

equalize the pressure, the forward machine in No. 1 centre is opened.

14.2 Stripping line crossover and bypass lines

There is a stripping line crossover connecting the stripping pump suction to each of the cargo pumps and

Cp pump straineri. There are bypass lines with manual vllves fitted around the non-return valves in each

cargo pump and CP pump discharge line.

14.2.1Prior to pumping ballast, the bypass lines around No. 1 and No. 4 pump non-return valves are

opened and the prrpr-plur associated pipelines drained via the stripping pump to the centre slop tank.

14.2.2 On completion of cargo discharge, all pumproom and cargo tank lines that contain oil are strippedinto the centre slop tank usiig the stripping pump.To equalize the pressure, No. 1 centre tank suction

should be open.

On completion of the pumps and lines stripping programme, check that all valves are closed.

14.3 Special sttipping line

This line has the dual purpose of draining the outboard manifold lines to the centre slop tank and the final

draining of the centre slop tank to shore. ln this latter operation, the stripping line is set so that the strippingpump iakes suction from the centre slop tank and discharges to shore via the connection to the outboardside of one of the manifold valves. When the tank is drained, the pump is left running for approximately10 minutes to allow air to be pumped up the line'

SEC-TION 15: TYPICAL PROCEDURES FOR BATTASTING AND THE METHODOF PREVENTING HYDROCARBON EMISSION

This section contains a description of typical procedures for ballasting and includes:

(1) the procedure for draining and stripping before loading ballast;

(21 the procedures for preventing hydrocarbon emission into the atmosphere.

15.1 At the completion of discharge of wing cargo tanks, No. 4 wings are drained using the eductors.

Dips are taken in all wing cargo tanks to ensure that they are dry.

Ballast is loaded by gravity for the first two hours and then it is pumped using No' 1 and No. 4 cargo pumps'

Before the gravityio-adinjcommences, the starboard deck line must be drained and the tanks given the final

stripping in accordance with section 14.1.

prior to pumping ballast, No. 1 and No. 4 pumps must be stopped and the pumps plus associated pipelines

drained in accordance with section 14'2'

79

Page 86: Crude Oil Washing Systems - 2000

Crude oil washine systems

15.2 lnert gas supply must be regulated to obtain a slight positive pressure in tanks during discharge, butthis must be below a levelwhere emission to atmosphere occurs. When wing tanks are being ballasted, thedisplacement tank atmosphere is to be contained within the centre tanks which are being discharged. Theinert gas supply must be reduced so that the slight positive pressure is maintained in the system.

SECTION 16: COMPUANCE PROCEDURES FOR REGULATION 9oF ANNEX I OF MARPOL 73/78

This section contains information and procedures for water washing tanks and lines, discharge ofdeparture ballast and the decanting of slops at sea to ensure compliance with regulation 9.

16.1 Pump and line washing

The CP pump and lines are washed by taking suction from the sea and discharging round the manifold tothe centre slop tank.

The stripping pump and special stripping line are washed by taking suction from No. 3 cargo wing tanks(using the stripping ring main) and discharging back to the same tanks via the manifold drain lines.

No. 1 and No. 4 pumps and lines will have been washed during the loading of ballast during the cargodischarge operation.

No. 2 and No. 3 pumps and lines are washed during the loading of additional ballast in cargo wing tanks.Suction is taken from the sea and ballast discharged to wing tanks via the port and starboard deck lines anddirect loading lines. The direct loading lines to cargo centre tanks are also to be washed at this time.

Manifold lines are washed concurrently with the shipping of additional ballast. The manifold drain valves toNo. 3 wing cargo tanks and manifold crossover valves are opened. The drain line valves must remain openuntil ballasting is completed so as to ensure adequate washing of the whole deck line system.

16.2 Water washing of tanks

Water washing is carried out by the recirculatory system using all three slop tanks. Therefore, before theloading of the additional ballast is completed, each slop tank is to be partially filled through its respectivedirect load lines.

On completion of the ballastin& pumps and deck lines are to be drained and all centre tanks purged withinert gas to remove hydrocarbon gases. The centre tanks are then to be washed.

The CP pump takes suction from the port slop tank and supplies water to the tank washing line and to theeductors. Tank washing machines are set to wash one full cycle followed by a bottom wash. That is,0o-100o-0o-40o-0'. Tanks are to be washed sequentially and the eductors used to strip the washings. Theeductors discharge to the centre slop tank. Levelling valves between the centre and starboard slop tanksand the starboard and port slop tanks are to be open during this operation.

16.3 Discharge of departure ballast

Departure ballast is initially discharged overboard using either No. 1 or No. 4 pump on the freeflow system.When the ullage in No. 4 wing tanks is 22 m, the pump is to be slowed down and the discharge closelymonitored. When the first traces of discoloration are observed, the discharge overboard is to stop and thebalance discharged to the slop tanks. The eductors are used to drain No. 4 wing cargo tanks. The arrivalballast is loaded into the centre tanks via their direct load lines using either No. 2 or No. 3 pumpconcurrently with the discharge of the departure ballast.

80

Page 87: Crude Oil Washing Systems - 2000

SECTION 17: INSPECTIONS AND MAINTENANCE OF EQUIPMENT

This section contains information on procedures to be followed at recommended intervals for on-

board inspections and maintenance of crude oil washing equipment.

Example 2: Fullfree-flow tanker

On cornpletion of the discharge of departure ballast, all wing cargo tanks are to be purged with inert gas to

remove hydrocarbon gas. Any necessary water washing can then be done'

16.4 Decanting of slop tanks

After completing the ballast transfer and tank washing programmes, the oil/water interfaces in the three slop

tanks are to be measured. The water contents of these tanks are to be discharged overboard using the

stripping pump.The oil and oil/water mixture in the wing slop tanks is to be transferred to the centre slop

tanl'uiiti,e deck oil/water separator. Finally, the cargo pumps and CP pump are to be flushed through to

ensure that they are clean.

After a settling period, the stripping pump is used to discharge the centre slop tank contents through the oil/

water separator until the water bottom has been decanted.

The inspection and maintenance procedures for the crude oil washing equipment are contained in the

planned maintenance prograrr". These are to be carried out regularly to ensure that the equipment is

maintained in good working condition.

;, r l

8 1

Page 88: Crude Oil Washing Systems - 2000

IV

CUIDETINES FOR IN.PORT INSPECTIONOF CRUDE OIT WASHING PROCEDURES

Page 89: Crude Oil Washing Systems - 2000

Cuidelines for in-port inspection

CUIDELINES FOR IN.PORT INSPECTIONOF CRUDE OIt WASHING PROCEDURES

1 INTRODUCTION

1.1 Cuidelines for the in-port inspection of crude oil washing procedures as called for by resolution 7 ofthe lnternational Conference on Tanker Safety and Pollution Prevention, 1978, are required to provide auniform and effective control of crude oil washing to ensure compliance of ships at all times with theprovisions of the Protocol of 1978 relating to the International Convention for the Prevention of Pollutionfrom Ships, 1973 (MARPOL73/78).

1.2 The design of the crude oil washing installation is subject to the approval of the Administration of theflag State. However, although the operati-nd aspect of crude oil washing is also subject to the approval ofthJ same Administration it might be necessary for the authority of a port State to see to it that continuingcompliance with agreed procedures and parameters is ensured.

1.3 The Operations and Equipment Manual contains all the necessary information relating to theoperation of crude oil washing on a particular tanker. The objectives of the inspection are therefore toensure that the provisions of the Manual dealing with safety proceures and with pollution prevention arebeing strictly adhered to.

1.4 The method of the inspection is at the discretion of the authority of the port State and the actualinspection may cover the entire crude oil washing operation or only those parts of the operation whichoccur when the inspector is on board.

1.5 lnspection will be governed by articles 5 and 6 of MARPOL 73/78.

2 INSPECTIONS

2.1 A port State should make the appropriate arrangements so as to ensure compliance withrequirements governing the crude oil washing oi tankers. fhis is not, however, to be construed as relieving

- - ^ r L - e a L ^ ^ ^ ^ - ^ + i ^ ^ ; - , , ^ J ^ , + - L ^ ^ i ^terminal op"r"torr and shipowners of their obligations to ensure that the operation is undertaken in

accordance with the regulations.

2.2 The inspection may cover the entire operation of crude oil washing or only certain aspects of it. lt is

thus in the interest of all concerned that the ship's records with regard to the crude oil washing operations

are maintained at all times so that an inspector may verify those operations undertaken prior to his

inspection.

3 SHIP'S PERSONNEL

3.1 The person in charge and the other nominated persons who have responsibilities in respect of the

crude oil washing op"r"tLn should be identified. They musg if required, be .able to show that their

quaiincations mee-t the requirements as appropriate of paragraphs 5.2 and 5.3 of the Revised Specifications

for the design, operation and control of crude oil washing systems as adopted by IMO'

8.2 The verification may be accomplished by reference to the individual's discharge papers, testimonials

issued by the ship's operaior or by certificates issued by a training centre approved by an Administration'

The numbers of such personnel should be at least as stated in the Manual'

4 DOCUMENTATION

4.1 The following documents will be available for inspection:

Page 90: Crude Oil Washing Systems - 2000

Crude oil washing systerns

4.1.1 the International Oil Pollution Prevention Certificate, to determine:

.1 whether the vessel is fitted with a crude oil washing system as required in regulation 13(6) or (8)of Annex I of MARPOL 73/78; and

whether the crude oil washing system is according to and complying with the requirements ofregulation 13(B) of Annex t of MARPOL 73%78;

the identification of the Operations and Equipment Manual;

the validity of the Certificate;

4.1.2 the approved Operations and Equipment Manual;

4.1.3 the Oil Record Book and attached Supplement;

4.1.4 the Cargo Ship Safety Equipment Certificate to confirm that the inert gas system conforms toregufations contained in chapter ll-2 of the lnternational Convention for the Safety of Life at Sea, 1974, asmodified and added to by the Protocol of 1978.

INERT CAS SYSTEM

5.1 Regulations covering inert gas systems require that instrumentation shall be fitted for continuouslyindicating and permanently recording the pressure and oxygen content of the gas in the inert gas supplymain at all times when inert gas is being supplied. The permanent recorder should indicate if the system hasbeen operating in a satisfactory manner before and during the cargo discharge.

5.2 lf conditions specified in the Operations and Equipment Manual are not being met the washing mustbe stopped until satisfactory conditions are restored.

5.3 As a further precautionary measure, the oxygen level in each tank to be washed is to be determinedat the tank. The meters used should be calibrated and inspected to ensure that they are in good workingorder. Readings from tanks already washed in port prior to inspection should be available for checking. Spotchecks on readings may be instituted.

ELECTROSTATIC G EN ERATION

6.1 lt should be confirmed, either from the cargo log or by questioning the person in charge, thatpresence of water in the crude oil is being minimized as required by paragraph 6.7 of the RevisedSpecifications.

COMMUNICATION

7.1 lt should be established that effective means of communication exist between the person in chargeand the other persons concerned with the crude oil washing operation.

LEAKACE ON DECK

8.1 tnspectors should ensure that the crude oil washing piping system has been operationally tested forleakage before cargo discharge and that the fact has been noted in the ship's Oil Record Book.

B6

.3

.4

Page 91: Crude Oil Washing Systems - 2000

Cuidelines for in-port inspection

9 EXCTUSION OF OIt FROM ENGINE ROOM

g.1 lt should be ascertained that the method of excluding cargo oil from the machinery space is beingmaintained by inspecting the isolating arrangements of the tank washing heater (if fitted) or of any part ofthe tank washing system which enters the machinery space.

1O SUITABITITY OF THE CRUDE OIt

10.1 The types of crude oil being carried should not be on the list provided in the Operations andEquipment Manual as being unsuitable.

11 CHECKLIST

11.1 lt should be determined from the ship's records that the checks in the precrude wash operationalchecklist were carried out and that all instruments functioned correctly. Spot checks on certain items maybe instituted.

12 WASH PROGRAMMES

12.1 Where the tanker is engaged in a multipleport discharge the Oil Record Book should indicate iftanks were crude oil washed ai pievious discharge ports or at sea. lt should be determined that all tankswhich will be, or may be, used to contain ballast on the forthcoming voyage will be crude oil washed beforethe ship leaves the port. There is no obligation to wash any tank other than ballast tanks at a discharge port

except that each oi these other tanks must be washed at least in accordance with paragraph 6-'l of theReviied Specifications. The Oit Record Book should be inspected to check that this is being complied with'

12.2 All crude oil washing must be completed before a ship leaves its final port of discharge.

12.3 lf tanks are not being washed in one of the preferred orders given in the Manual, the inspectorshould satisfy himself that the reason for this and the proposed order of tank washing are acceptable.

12.4 For each tank being washed it should be ensured that the operation is in accordance with the

Operations and Equipment Manual in that:

.1 the operation of deck-mounted machines and submerged machines is verified by. referenceeither to indicators, or to the sound patterns of the machines, or by other approved methods;

.2 the deck-mounted machines, where applicable, are programmed as stated;

.3 the duration of the wash is as required;

.4 the number of tank washing machines being used simultaneously does not exceed that spe

cified.

13 STRIPPING OF TANKS

13.1 The minimum trim conditions and the parameters of the stripping operations are to be as stated in

the Operations and Equipment Manual.

13.2 All tanks which have been crude oil washed are to be stripped. The adequacy of the stripping is to be

checked by hand dipping at least in the aftermost hand dipping location in.each tank or by such other

means as are provid".i "nO described in the Manual. lt should be ascertained that the adequacy of stripping

has been checked or will be checked before the ship leaves its final port of discharge.

87

Page 92: Crude Oil Washing Systems - 2000

Crude oil washine systerns

BATLASTING

14.1 Tanks that were crude oil washed at sea will be recorded in the Oil Record Book. These tanks mustbe left empty between discharge ports for inspection at the next discharge port. Where these tanks are thedesignated departure ballast tanks they may be required to be ballasted at a very early stage of thedischarge. This is for operational reasons and also because they must be ballasted during cargo discharge ifhydrocarbon emission is to be contained on the ship. lf these tanks are to be inspected when empty, thismust be done shortly after the tanker berths. lf an inspector arrives after the tanks have begun acceptingballast, the sounding of the tank bottom will not be available to him. However, an examination of thesurface of the ballast water is then possible. The thickness of the oil film should not be greater than thatspecified in paragraph 4.2.10(b) of the Revised Specifications.

14.2 The tanks that are designated ballast tanks will be listed in the Manual. lt is, however, Ieft to thediscretion of the master or responsible officer to decide which tanks may be used for ballast on theforthcoming voyage. tt should be determined from the Oil Record Book that all such tanks have beenwashed before the tanker leaves its last discharge port. lt should be noted that where a tanker backJoads acargo of crude oil at an intermediate port into tanks designated for ballast then it should not be required towash those tanks at that particular port but at a subsequent port.

14.3 lt should be determined from the Oil Record Book that additional ballast water has not been put intotanks which had not been crude oil washed during previous voyages.

14.4 lt should be seen that the departure ballast tanks are stripped as completely as possible. Wheredeparture ballast is filled through cargo lines and pumps, these must be stripped either into another cargotank or ashore by the special smalldiameter line provided for this purpose.

14.5 The methods of avoiding vapour emission where locally required will be specified in the Manual andthey must be adhered to. The inspector should ensure that this is being complied with.

14.6 The typical procedures for ballasting listed in the Operations and Equipment Manual must beobserved. The inspector should ensure this is being complied with.

14.7 When departure ballast is to be shifted, the discharge into the sea must be in compliance withregulation 9 of Annex t of MARPOT 73/78. The Oil Record Book should be inspected to ensure that thevessel is complying with this.

88

Page 93: Crude Oil Washing Systems - 2000