crsi slabs on ground
TRANSCRIPT
-
7/22/2019 CRSI Slabs on Ground
1/1
d,adequatepreparationofsubgradefordrain-
rimeimportance.Dowelledexpansionjointsand
ionjointsshouldbecarefullylocated,includingex-
groundtodistributeconcentratedoruniform
ropertiesofthesubsoil andtheslabitself.An
s quiteinvolved.Slabsfortheverylightest occu-
an 4"thick,andslabsforother occupanciesmay
efollowingbeingaboutminimum:
s
cial
edwire
onditions;
ons.
albarns
wirefabric
400-500
ustrial
arages
wirefabric
0psf)and
strial
arages
wire
)t
onebot-
2"c/c,each
)t
onebot-
2"c/c,each
00psf)f
onebot-
8"to12"
oncreteFloorsonGround,"and"ConcreteAirportPave-
Association,33WestGrandAvenue,Chicago,Illinois,1952,and
sonGroundforWarehouseLoadings,"Aug.1957Journal,
ute,P.O.Box4754,RedfordSta.,Detroit19,Mich.
y,500 psf,useatleast3000 psiqualitycontrolledcon-
soilconditionswithextracare.Fillmaterialandcompaction
inaryhighwaypractice.Iflaboratorycontrolofcompactionis
tiescanbeincreasedintheratio oftheactualcompactioncoeffi-
y,1500psfthesubsoil conditionsshouldbeinvestigated
rcement2in.belowtopofslab;secondlayer,2 in.upfrom
STEELINSTITUTE
Publ
icDomain,
Google-d
igitized
/http://www.h
athitrust.org/access
_use#pd-g
oogle