Page 1: CRRSDR AEG 2016

The Final Phase of San Clemente Dam –Removal and Stream RestorationGodwin, W. , Waeber, J. , Wade, D, and McGowan, W

Annual Meeting, Association of Environmental & Engineering Geologists– Kona, Hawaii

September 21, 2016 Technical Session #1

Presented By:

William Godwin, P.G., C.E.G.

Page 2: CRRSDR AEG 2016

2

Outline

Project Location and History

Project Overview

Geology

Final Design Elements

Final Construction Phases

Dam Removal(s)

Instrumentation and Monitoring

Questions

Page 3: CRRSDR AEG 2016

3

Project Location

Page 4: CRRSDR AEG 2016

4

History of San Clemente Dam

Constructed between 1920

& 1921 by PIC

Owned and operated by California American Water

Built for drinking water storage for Monterey Peninsula

Fish ladder added later

Page 5: CRRSDR AEG 2016

5

Built in V-notch canyon below confluence of San Clemente Creek and Carmel River

Concrete arch dam106 feet high

300 foot width

1425 acre-feet – now 70 acre-feet

Over 2.5 million cubic yards of sediment

History of San Clemente Dam

Page 6: CRRSDR AEG 2016

6

Project Overview

Page 7: CRRSDR AEG 2016

7

Project Overview1990’s CDWR – DSOD issued safety order

Potential failure during MCE (7.0M Tularcitos fault) or PMF

2006 released a draft EIS

EIR Alternatives:Dam Strengthening ($50M)

Dam Removal

2008 CAW – preferred removal of the dam. Benefits: fish access, sediment replenishment, removal of hazard

Previous investigations by URS, MWH, Woodward-Clyde and Kleinfelder

URS provided an indicative design

Page 8: CRRSDR AEG 2016

8

Combined Flow Reach

Upper San Clemente Creek

Reroute Channel Sediment Stockpile

Upper Carmel River Reach

Former LocationOf Dam

Diversion Dike

Stabilized Sediment Slope

Project Overview - Layout

Page 9: CRRSDR AEG 2016

9

Project Overview – Key Stakeholders

$83M cost

Funding: California American Water

California Department of Fish & Wildlife

California Natural Resources Agency

California Wildlife Conservation Board

California State Coastal Conservancy

National Marine Fisheries Service – NOAA

Resources Legacy Fund

The Nature Conservancy

United States Fish & Wildlife Service

Page 10: CRRSDR AEG 2016

10

Project Overview – Project Team/ScheduleGranite Construction –General Contractor

Kleinfelder – Engineer of Record (EOR) and lead Civil/Geotechnical designer

Tetra Tech – H/H modeler, Channel Restoration design

Rana Creek, Habitat Restoration

Oversight

AECOM – Owners Engineer

WSC – Construction Mgr.

2013 Season: Geotechnical Investigation, initial diversion structures, overall design

2014 Season: Reroute Cut, Diversion Dike, Sediment Stockpile, design/construct

2015 Season: Stabilized Sediment Slope, dam removal, CFR channel design/construct

Page 11: CRRSDR AEG 2016

11

Regional Geology

Jennings 2010

Page 12: CRRSDR AEG 2016

12

Site Geology

History of Dam

Project Background

Project Overview

Geology of Location

Geotechnical Investigation

Challenges

Summary

Dibblee, T.W., and Minch, J.A.,“Geologic map of the Carmel Valley quadrangle, Monterey County, California,” published by Dibblee Geological Foundation in 2007,Accessed from http://ngmdb.usgs.gov/Prodesc/proddesc_83298.htm

Lt MesozoicGranodiorite

Lt MesozoicGranodiorite

Early MesosoicMetasedimentary& Granitic Rocks

Lt MesozoicQuartz Monzonite

MioceneSandstone

Lt MesozoicQuartz Diorite

Early MesosoicMetasedimentary& Granitic Rocks

Page 13: CRRSDR AEG 2016

13

Combined Flow Reach

Habitat Restoration

Upper Carmel River Reach

Dam Demo Plan

Stabilized Sediment Slope

2015 Final Design Elements

Page 14: CRRSDR AEG 2016

14

Diversion Dike (DD) Design

Page 15: CRRSDR AEG 2016

15

Stabilized Sediment Slope (SSS) Design

Page 16: CRRSDR AEG 2016

16

Combined Flow Reach (CFR) Design

Page 17: CRRSDR AEG 2016

17

CFR Design – Step Pool Plan

Page 18: CRRSDR AEG 2016

18

CFR Design - Step Pool Elevation

Page 19: CRRSDR AEG 2016

19

Construct Combined Flow Reach

Restore San Clemente Creek

Reroute Rock SillTop off Sediment Stockpile

Grade Upper Carmel River Reach

Remove Dam and Slide Debris

Remove Diversion Pipe and Cutoff

Complete Stabilized Sediment Slope

2015 Final Construction Elements

Final Reservoir Drain

Page 20: CRRSDR AEG 2016

20

Construction – Christmas Slide/pipe repairDec. 2014 landslide; Mar. 2015 debris removal and pipe repair

June 2015 right abutment and diversion pipe

Page 21: CRRSDR AEG 2016

21

Construction – Reservoir Dewatering

Page 22: CRRSDR AEG 2016

22

Construction - Diversion Dike (DD)

October 2014 view NE October 2015 view SW

Page 23: CRRSDR AEG 2016

23

Construction – Reroute Channel Rock Sill

Page 24: CRRSDR AEG 2016

24

Construction – Reroute Channel Rock Sill

Page 25: CRRSDR AEG 2016

25

Construction – SSS foundation mapping

Toe of SSS Transition beneath SSS

Page 26: CRRSDR AEG 2016

26

Construction – Geologic Strip MappingPotential for catastrophic landsliding and stream blockage

Page 27: CRRSDR AEG 2016

27

Evaluation – Catastrophic Landslide Risk

Geologic Map of Combined Flow Reach.

Page 28: CRRSDR AEG 2016

28

Failure of CFR valley ways leading to stream blockage due to runout.

Evaluation Methodology: Inputs:

Geologic data (borehole, strip mapping, GSI, RMR)

Scour Analysis (1000 flood event WSE, Erodibility Index K)

Slope Stability (Kh = 0.2 (1/2 of pga)

Analysis: Scour by Annandale (1995) of Required Stream Power vs K; Rock Mass Erodibility Index; Limit Equilibrium method for Slope Stability

Evaluation – Catastrophic Landslide Risk

Page 29: CRRSDR AEG 2016

29

Evaluation – Catastrophic Landslide RiskGeomechanical Model, Section 2

Pseudostatic Analysis, Section 2

Page 30: CRRSDR AEG 2016

30

(De) construction – dam removalUpstream Ramp and use Pneumatic hammer

Recycle rebar, bury concrete in SSS

Sigh…..No Explosives

Page 31: CRRSDR AEG 2016

31

(De) construction – DSOD Concerns

Left Abutment Rockfall Right Abutment Stability

Page 32: CRRSDR AEG 2016

32

Boulders for CFR Pools - Material Testing “Drop Test” at various quarries to measure durability. Eventually used mostly concretions from two quarries in Livermore valley

Page 33: CRRSDR AEG 2016

33

Construction – CFR pool construction

Step Pool sequence Field Supervision

Page 34: CRRSDR AEG 2016

34

Instrumentation installation and monitoring

Slope inclinometers (SI) along former reservoir rim and top of engineered embankments

Time Domain Reflectometers (TDR):

Deformation at depth

No magnitude

Reflective Survey Monuments:

All over slope

Measured biannually

Vibrating Wire Piezometers

Instrumentation data collection

Page 35: CRRSDR AEG 2016

35

Instrumentation installation and monitoring

TDR for Reroute, Left Slope Slope Inclinometer for SSS

Page 36: CRRSDR AEG 2016

36

Removal of 1883 Old Carmel River Dam

Page 37: CRRSDR AEG 2016

37

Sleepy Hollow Ford Bridge Construction

Page 38: CRRSDR AEG 2016

38

Slope stability and erosion reconnaissance

Instrumentation measurements (Slope Inclinometer, VWP, TDR and surface settlement markers)

Additional monitoring via Triggering Events

- 4.0M EQ w/in 50 miles

- 10yr flood event (>3,600 cfs)

Habitat die-off/ replacement

Win-win for everyone

Dam removal for safety

Restore ecological balance

Turnover to BLM

Path Forward – 5 year monitoring period

Page 39: CRRSDR AEG 2016

39

AcknowledgementsAman Gonzalez - California American Water

Brian Hussar – Granite Construction Company

Craig Hall, GE – GEI

Morley Beckman, PE – Kleinfelder

Jeff Richmond, CEG – Kleinfelder

Kami Deputy, PE – Shannon & Wilson

Merideth Beswick, PE, GIT - Kleinfelder

Page 40: CRRSDR AEG 2016

40

QUESTIONS?