create a new project click on the new icon. click on ok

56
CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Upload: prosper-casey

Post on 12-Jan-2016

238 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

CREATE A NEW PROJECT

Click on the NEW icon. Click on OK

Page 2: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

AutoCad opens with a blank screen. At the command line type NEW.

Page 3: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Type in the name of the drawing. Click CREATE PROJECT

Page 4: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Name the Project Click OK

Page 5: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Click OK

Page 6: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

You can click on a setting set and click on FINISH or Choose NEXT to alter the standard setting set for that scale.

Page 7: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

If you choose NEXT, a series of dialogue boxes will enable you to alter settings of your drawing setup.

Page 8: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Choose an appropriate drawing scale, and sheet size. Choose NEXT.

Page 9: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Appropriate coordinate zones can be selected. This can also be left as NONE, if you do not need to tie into specific zones. Select NEXT.

Page 10: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Text styles and sizes can be selected here. Leroy is generally used. If you select standard sizes, text sizes will be set in text format. Select NEXT.

Page 11: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

You can select a border, it is not necessary and can be added later. Select NEXT.

Page 12: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Select FINISH.

Page 13: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

This generates a dialogue box with all the selected settings for your review. Click OK.

Page 14: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Right click some where you don’t have any toolbar.

Page 15: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Select ACAD and Workspaces

Page 16: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

The Workspaces toolbar will appear.

Page 17: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Set your Workspaces toolbar where ever it fit on your screen. Click on the arrow and select Survey.

Page 18: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

A default screen will appear. Close these toolbars by clicking on the X’s.

Page 19: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Under Data Collection/Input, select DATA COLLECTION LINK.

Page 20: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Under Transfer select SEND/RECEIVE.

Page 21: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

With the RECEIVE tab active, select SEQUENTIAL. Check GET FILE… Select the type of Data collector you are using.

Page 22: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Still in the same screen, select CHOOSE DIRECTORY. Choose the SURVEY portion of the drawing you just set up. Click OK. Click RECEIVE.

Page 23: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

This screen will appear and will inform if transfer was successful. Close box.

Page 24: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Under CONVERSIONS, select CONVERT FILE FORMAT

Page 25: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

The data must be converted from the .CR5 format that it was imported to a Fieldbook format. Check COORDINATE FILE. Imput type=TDS COORDINATES. Select CHOOSE FILE. Under Survey in the appropriate file the .CR5 file you just imported should be listed. Click OPEN.

Page 26: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

On the lower half of the screen, select AutoDesk Softdesk FBK with Linework. Select CHOOSE FILE (this is where you are storing the Fieldbook.) Name the file with .fbk extension. Click SAVE.

Page 27: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

This dialogue box should appear with claims of success.

Page 28: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Still no survey? Under Data Collection/Input select IMPORT FIELD BOOK.

Page 29: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Find where you saved the field book and highlight the .fbk file you just created and click OPEN.

Page 30: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

A series of 4 questions will be on the command line. Answer them (NO) in this case. Click RETURN after each.

Page 31: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Still no survey data? Type Z (for Zoom)

Page 32: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Many Options! Type E (for extents)

Page 33: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

TA DA! The survey data should appear.

Page 34: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Now we want to create a surface, but before we have to create a point group. From Points select Point Management and then Point Group Manager.

Page 35: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

From the icons in the upper left corner click on the first one to the left. CREATE POINT GROUP

Page 36: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Name the point group. Highlight the INCLUDE tab. Identify which points you want included in the surface. You can do this by checking the INCLUDE ALL POINTS box. If there are points you do not want, from here you can check the EXLUDE tab and remove the individual points you do not want on the surface. An example would be if you do not want the bench mark shot on the surface because it is above the ground, it can be removed. Select OK

Page 37: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

The point group manager dialogue box will appear with all of the points to verify it. Shut it off.

Page 38: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

To create contour lines, you must create a surface with the point data you just loaded. With current survey open, select TERRAIN MODEL EXPLORER from the TERRAIN menu.

HOW TO INSTALL CONTOUR LINES

Page 39: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Right Click on TERRAIN. Left Click on CREATE NEW SURFACE.

Page 40: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Sign to open options. Right Click on POINT GROUPS. Left Click on ADD A POINT GROUP.

Page 41: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Select the Point Group you just made.

Page 42: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Right Click on SURRFACE. Select BUILD

Page 43: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Select OK.

Page 44: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

If all goes well, You should see this. Select OK.

Page 45: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

This dialogue box confirms the Surface Statistics of the surface, including the point data, which we just created. Confirm statistics, and shut the box off.

Page 46: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

STILL NO CONTOUR LINES!

Page 47: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

From the TERRAIN menu, select CREATE CONTOURS.

Page 48: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Confirm the settings and click OK.

Page 49: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Reply YES to Erase Old Contours.

Page 50: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

The contours here are very abrupt. The style can be smoother. Also labels can be applied to the contours globally. The text height can be set.

Page 51: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

From the TERRAIN Menu, select CONTOUR STYLE MANAGER.

Page 52: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

A variety of items can be altered here. The text height for the contour labels can be set. Precision can be set to 0 (zero places past the decimal).

Page 53: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

Under Contour Appearances Tab, Select ADD VERTICES. Slide the indicator to the right, until you reach the degree of smoothness you like. Select OK.

Page 54: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

The contours appear much smoother.

Page 55: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

With the surface already identified, and contours completed… From the TERRAIN menu, select CONTOUR LABELS. Select where you want the label to appear. (“group” implies you can select a group of contours to label at the same time.)

LABEL CONTOUR LINES

Page 56: CREATE A NEW PROJECT Click on the NEW icon. Click on OK

The command line directs you to select a starting point for the contours you want to label. Drag a line across those you want to label, assuming you selected ‘Group” interior or “Group” end. It will allow you to select as many different locations as you wish. When you have completed as many labels as you want Select ENTER.