![Page 1: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/1.jpg)
CRANE
What is crane ? A tall machine used for moving heavy objects by suspending them from a projecting arm with hook.
hseinfoquiz.com
![Page 2: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/2.jpg)
Crane lifting hazard
1. Overload.
2. High wind.
3. crane collapsing or toppling.
4. Contact with live overhead cables.
5. Uneven ground.
6. The load striking against objects or people while being maneuvered.
7. The arm (jib) of the crane striking against other structures during movement.
8. Poor maintenance of crane.
9. Failure to use the outriggers .
10. Incompetent operator and rigger.
![Page 3: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/3.jpg)
Precautions Carefully siting the crane on even, stable ground.
Checking that there are no obstructions, such as buildings or overhead lines.
Ensuring that the load to be lifted is within the safe lifting capacity of the crane.
Using the outriggers correctly.
Restricting use of the crane to trained and competent operators.
Barricade the swing radius of the crane
All equipment must be inspected by third party and validity of inspection must be checked
SWL of the crane and hook shall be marked and highlighted. * Fire extinguisher of approved type & capacity.
All loose material is to be removed from the top of the load
to be continued
![Page 4: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/4.jpg)
Precautions The load is clear of any obstruction.
The load is securely slung (use tie ropes).
Never stand or work under a suspended load.
Tag line must be used.
Periodical maintenance of crane.
![Page 5: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/5.jpg)
Requirement
![Page 6: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/6.jpg)
Web slings color code
![Page 7: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/7.jpg)
SWL FORMULA
![Page 8: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/8.jpg)
CRANE TERMINOLOGY
![Page 9: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/9.jpg)
CRAWLER CRANE
![Page 10: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/10.jpg)
TOWER CRANE
![Page 11: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/11.jpg)
OVERHEAD CRANE
![Page 12: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/12.jpg)
1. Mobile crane
2. Hydraulic crane
3. Overhead crane
4. Gantry crane
5. Tower crane
Types of Cranes
![Page 13: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/13.jpg)
Center of Gravity
Leverage
Stability
Structural Integrity
Cranes Lifting Principles
![Page 14: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/14.jpg)
• Refer to shipping ticket or other documentation
• Ensure lift calculations are correct
• Ensure load is within load chart rating for boom length and load radius of crane
• Crane is rated by the maximum weight it will lift at a minimum radius and minimum boom length – the further from its center point, the less it will lift
Load Moment Indicator
![Page 15: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/15.jpg)
Stay out of the swing radius of the crane
Make sure there are barrier guards showing swing radius
Stay out of the swing radius of the crane
Make sure there are barrier guards showing swing radius
Barricade Affected Area
![Page 16: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/16.jpg)
Types of slings include alloy steel chain, wire rope, metal mesh, natural or synthetic fiber rope, and synthetic web.
Rigging Equipment Slings
Wire rope Chain Metal mesh Synthetic
![Page 17: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/17.jpg)
Respond to signals from an appointed personnel… Here are the standard signals • Hoist with forearm vertical, forefinger pointing up and move hand in
small horizontal circles.
• Lower with arm extended downward, forefinger pointing down. Move hand in small horizontal circles
Move slowly-use one hand to give any motion signals and place the other hand without moving it in front of the hand in motion
![Page 18: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/18.jpg)
Here are the standard signals
Stop-Arm extended, palm down and move arm back and forth.
Trolley travel-Palm up, fingers closed, thumb pointing in direction of motion and jerk hand horizontally.
Emergency stop- Arm extended, palms down, Move hand right and left rapidly.
![Page 19: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/19.jpg)
HAND SIGNALS
![Page 20: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/20.jpg)
Never load beyond rated capacity
Label properly
Never shorten with knots, bolts, or any other device
Protect from sharp edges
Attach securely to the load
Protect hands and fingers
Use care when pulling a sling
Never drag a sling
Do not use a damaged or defective sling
Sling Rules
![Page 21: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/21.jpg)
• Hang slings on a wall
• Never leave on the ground
• Never expose to water, welding sparks, chemicals, etc.
Sling Storage
![Page 22: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/22.jpg)
Vertical
Choker
Basket
Sling Hitches
![Page 23: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/23.jpg)
![Page 24: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/24.jpg)
![Page 25: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/25.jpg)
![Page 26: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/26.jpg)
Operating Engineers National Hazmat Program
![Page 27: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/27.jpg)
![Page 28: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/28.jpg)
![Page 29: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/29.jpg)
![Page 30: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/30.jpg)
![Page 31: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/31.jpg)
LIFTING
![Page 32: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/32.jpg)
Running Rope (Removal)
6 broken wires (random) in 1 lay
3 broken wires 1 strand 1 lay
Wear equal to 1/3 original diameter of outside wires
Kinking, crushing, bird caging, corrosion, etc.
Heat damage (any source)
![Page 33: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/33.jpg)
Reduction in rope diameter (removal)
1/64 for rope upto 5/16
1/32 for rope upto 1/2
3/64 for rope upto 3/4
1/16 for rope upto 7/8 to 1 1/8
3/32 for rope upto 1 1/4 to 1 1/2
![Page 34: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/34.jpg)
Damaged wire rope must be taken out of service
Damaged wire rope must be taken out of service
Damaged Wire Rope Broken Strands
Crushed Rope
![Page 35: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/35.jpg)
Damaged web sling must be taken out of service
Damaged Web Sling
![Page 36: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/36.jpg)
UNSAFE PRACTICE
![Page 37: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/37.jpg)
UNSAFE ACT
![Page 38: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/38.jpg)
UNSAFE ACT AND CONDITION
![Page 39: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/39.jpg)
UNSAFE CONDITION
![Page 40: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/40.jpg)
hseinfoquiz.com
![Page 41: CRANE - HSE Info Quiz · Crane lifting hazard 1. Overload. 2. High wind. 3. crane collapsing or toppling. 4. Contact with live overhead cables. 5. Uneven ground. 6. The load striking](https://reader035.vdocuments.site/reader035/viewer/2022071411/61066af044ce4209e576d136/html5/thumbnails/41.jpg)
Badshah
hseinfoquiz.com