PROJECT MANUAL VOLUME 2 of 2 CONSTRUCT DUAL FOOD FT. HOOD, TEXAS AAFES PN: 3740-12-000002 CONTRACTS: COMBINED WORK – ALL TRADES BY: DATE: 15 MARCH 2017 SOLICITATION SPECIFICATIONS Illinois Design Firm License Number 184-002661 Post Office Box 820 600 West Main Street Suite 2 Carbondale, Illinois 62901 618 457 5709 Fax 618 457 5638 A R C H I T E C T S

Upload: others

Post on 16-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PROJECT MANUAL VOLUME 2 of 2 CONSTRUCT DUAL FOOD FT. HOOD, TEXAS AAFES PN: 3740-12-000002 CONTRACTS: COMBINED WORK – ALL TRADES

BY:

DATE: 15 MARCH 2017 SOLICITATION SPECIFICATIONS

Illinois Design Firm License Number 184-002661 Post Office Box 820 600 West Main Street ▪ Suite 2 Carbondale, Illinois 62901 618 ▪ 457 ▪ 5709 Fax 618 ▪ 457 ▪ 5638

A R C H I T E C T S

Page 2: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONSTRUCT DUAL FOOD FT. HOOD, TEXAS

AAFES PN: 3740-12-000002

ARCHITECT

h. michael bohnsack ARCHITECTS 600 West Main Street Suite 2

Carbondale, Illinois 62901 618 457 5709 Fax 457 5638

E-mail [email protected]

PROFESSIONAL CONSULTANTS

LAND SURVEYING/CIVIL ENGINEERING/LANDSCAPE ARCHITECTURE

Mach IV Engineering & Surveying LLC 211 North Broadway Suite 114

Green Bay, Wisconsin 54303 920 569 5765 Fax 569 5767 E-mail [email protected]

STRUCTURAL ENGINEERING

Hodge Structural Engineers, P.C. 22 Chestnut Street

Evansville, Indiana 47713 812 422 2558 Fax 422 3337

E-mail [email protected]

MECHANICAL/ELECTRICAL/FIRE PROTECTION ENGINEERING

McCoy & Howard Consulting Engineers, Inc. 413 West Main Street Post Office Box 581

Mt. Vernon, Illinois 62864 618 242 0473 Fax 242 2330

E-mail [email protected]

hmb PROJECT NO. 1304.0

15 MARCH 2017

© 2017 h. michael bohnsack ARCHITECTS

Page 3: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONSTRUCT DUAL FOOD FT. HOOD, TEXAS

AAFES PN: 3740-12-000002

ARCHITECT: h. michael bohnsack ARCHITECTS

Project Manual: Section 00 86 00

All Sections of Division 1 (Except Section 01 35 56)

Section 03 35 36

All Sections of Division 4

Section 05 40 00

Section 05 50 00

Section 05 52 00

All Sections of Division 6

All Sections of Division 7

All Sections of Division 8

All Sections of Division 9

SIGNATURE All Sections of Division 10

All Sections of Division 11

CURRENT DATE 15 March 2017 All Sections of Division 12

Section 31 31 16

LICENSE EXPIRATION DATE 30 Nov 2018 Section 32 14 00

Section 32 31 00 Drawing Sheets: All T-Sheets, All CA-Sheets, All A-Sheets, All FS-Sheets, Sheet LS-1.00

PROFESSIONAL LAND SURVEY/CIVIL ENGINEER: Mach IV Engineering & Surveying, LLC

Project Manual: Section 01 35 56

Section 22 11 13

Section 22 11 14

Section 31 10 00

Section 31 20 00

Section 31 21 00

Section 31 23 23

Section 31 23 33

Section 32 01 00

Section 32 13 13

Section 32 13 73

SIGNATURE Section 32 17 23

All Sections of Division 33

CURRENT DATE 15 March 2017

LICENSE EXPIRATION DATE 30 June 2017

Drawing Sheets: All C-Sheets

Page 4: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

LANDSCAPE ARCHITECT: Yellow Springs Design, LLC

Project Manual: Section 32 92 00

Section 32 93 00

SIGNATURE

CURRENT DATE 15 March 2017

LICENSE EXPIRATION DATE 31 Dec 2018

Drawing Sheets: All L-Sheets STRUCTURAL ENGINEER: Hodge Structural Engineers

Project Manual: Section 03 30 00

Section 05 12 00

Section 05 21 00

Section 05 31 00

SIGNATURE

CURRENT DATE 15 March 2017

LICENSE EXPIRATION DATE 30 Nov 2017

Drawing Sheets: All S-Sheets

Page 5: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL ENGINEER: McCoy & Howard Consulting Engineers, Inc.

Project Manual: Section 22 05 10

Section 22 05 12

Section 22 05 13

Section 22 05 19

Section 22 05 23

Section 22 05 29

Section 22 05 53

Section 22 07 19

Section 22 08 00

Section 22 11 16

Section 22 11 19

SIGNATURE Section 22 11 23

Section 22 13 16

CURRENT DATE 15 March 2017 Section 22 13 19

Section 22 14 13

LICENSE EXPIRATION DATE 30 Nov 2017 Section 22 14 23

Section 22 16 13 Section 22 34 00 Section 22 42 13 All Sections of Division 23 Drawing Sheets: Sheet CU-1.00, All M-Sheets, All P-Sheets

FIRE PROTECTION ENGINEER: McCoy & Howard Consulting Engineers, Inc.

Project Manual: All Sections of Division 21

SIGNATURE

CURRENT DATE 15 March 2017

LICENSE EXPIRATION DATE 30 Sep 2019

Drawing Sheets: Sheet FP-1.00

Page 6: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL ENGINEER: McCoy & Howard Consulting Engineers, Inc.

Project Manual: All Sections of Division 26

All Sections of Division 27

All Sections of Division 28

SIGNATURE

CURRENT DATE 15 March 2017

LICENSE EXPIRATION DATE 30 Nov 2017

Drawing Sheets: Sheet CU-2.00, Sheet CU-2.01, All E-Sheets

Page 7: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PROJECT MANUAL TOC – Table of Contents

TABLE OF CONTENTS TOC-1

CONSTRUCT DUAL FOOD FT. HOOD, TEXAS

AAFES PN: 3740-12-000002 BIDDING REQUIREMENTS PAGES CONTRACT REQUIREMENTS DIVISION 0 – BIDDING CONTRACTING List of Drawings 00 86 00-3 SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS Requirements of Ft. Hood 01 00 00-8 Summary of Work 01 10 00-10 Option Proposals 01 10 15-2 AAFES Furnished & Installed Equipment 01 10 17-4 AAFES Furnished/Contractor Installed Equipment 01 10 18-3 AAFES Safety Policies & Procedures 01 10 60-4 AAFES Safety Regulations & Codes 01 13 00-8 Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress Meetings 01 31 19-2 Construction Progress Schedule 01 32 00-3 Shop Drawings, Product Data & Submittals 01 33 00-18 AAFES Environmental Protection 01 35 43-10 Storm Water Pollution Prevention Measures 01 35 56-107 AAFES Weather Table 01 42 10-2 Quality Control 01 45 16-3

Testing Laboratory Services 01 45 29-4 Temporary Utilities 01 51 00-5 Field Offices & Sheds 01 52 00-3 Temporary Facilities, Barriers & Controls 01 55 00-9

Project Identification & Signs 01 58 00-2 Material & Equipment 01 65 00-2 Storage & Protection 01 66 00-3 Grades, Lines & Levels 01 73 13-1 Cutting & Patching 01 73 29-2 Cleaning 01 74 00-2 Construction Waste Management & Disposal (with Attachments) 01 74 19-16 Systems Start-up 01 75 00-3 Project Closeout (with DoD Form 1354 Attachments) 01 77 00-29 Project Record Documents 01 78 00-2 Sustainable Design Requirements 01 81 00-6 General Commissioning Requirements 01 91 00-3 DIVISION 2 - SITE CONDITIONS Subsurface Investigation & Geotechnical Report 02 31 00-39

Page 8: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TABLE OF CONTENTS TOC-2

DIVISION 3 – CONCRETE Cast-in-Place Concrete 03 30 00-11 Polished Concrete Floor Finish 03 35 36-9

DIVISION 4 – MASONRY Unit Masonry 04 20 00-21 Stone Masonry 04 43 00-15

DIVISION 5 – METALS Structural Steel 05 12 00-7 Steel Joists 05 21 00-5 Steel Deck 05 31 00-5 Cold-Formed Metal Framing 05 40 00-8 Metal Fabrications 05 50 00-18 Metal Railings 05 52 00-10

DIVISION 6 - WOOD & PLASTICS Rough Carpentry 06 10 00-7 Finish Carpentry 06 20 00-7 Fire Retardant Wood Treatment 06 30 00-4 Architectural Woodwork 06 40 00-11

DIVISION 7 - THERMAL & MOISTURE PROTECTION Building Insulation 07 21 00-9 Thermoplastic Membrane Roofing (TPO) 07 54 00-11 Preformed Metal Roof & Soffit Panels 07 61 03-11 Flashing & Sheet Metal 07 62 00-9 Firestopping 07 84 00-6 Building Joint Sealers 07 90 00-6

DIVISION 8 – DOORS & WINDOWS Metal Doors & Frames 08 11 00-7 Flush Wood Doors 08 14 16-5 Access Doors 08 31 00-5 Aluminum Curtain Walls & Entrance Doors 08 41 10-11 Finish Hardware 08 71 00-14 Glass & Glazing 08 81 00-9

DIVISION 9 – FINISHES Gypsum Drywall Systems 09 21 16-10 Tile 09 30 00-9 Acoustical Panel Ceilings 09 51 00-5 Resilient Tile Flooring 09 65 00-4 Fiberglass Reinforced Wall Panels (FRP) 09 77 00-4 Painting 09 90 00-8

DIVISION 10 – SPECIALTIES Specialty Signs 10 14 00-8 Toilet Compartments 10 21 13-5 Wall Surface Protection Systems 10 26 00-5 Toilet Accessories 10 28 13-5 Fire Extinguishers, Cabinets & Accessories 10 44 00-4 Metal Lockers 10 51 13-3 Fixed Sunshades & Canopies 10 71 10-7 Exterior Shutters 10 71 13-3

Page 9: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TABLE OF CONTENTS TOC-3

DIVISION 11 – EQUIPMENT

Food Service Equipment 11 40 00-7 Used Cooking Oil Equipment 11 80 00-6

DIVISION 12 – FURNISHINGS

Floor Mats & Frames 12 48 13-4 Site Furnishings 12 93 00-3

DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 – CONVEYING SYSTEMS (NOT USED)

DIVISION 21 – FIRE PROTECTION

Common Work Results for Fire Suppression 21 05 00-3 Facility Fire-Suppression Water-Service Piping 21 11 00-6 Wet Pipe Sprinkler Systems 21 13 13-11

DIVISION 22 – PLUMBING

General Provisions - Plumbing 22 05 10-5 Common Work Results for Plumbing 22 05 12-9 Common Motor Requirements for Plumbing Equipment 22 05 13-1 Meters and Gages for Plumbing Piping 22 05 19-3 General-Duty Valves for Plumbing Piping 22 05 23-4 Hangers and Supports for Plumbing Piping and Equipment 22 05 29-7 Identification for Plumbing Piping and Equipment 22 05 53-4 Plumbing Insulation 22 07 19-9 Commissioning of Plumbing 22 08 00-3 Water Service Taps and Service Line Installation 22 11 13-5 Cross Connection Control and Backflow Prevention 22 11 14-6 Domestic Water Piping 22 11 16-7 Domestic Water Piping Specialties 22 11 19-4 Domestic Water Pumps 22 11 23-4 Sanitary Waste and Vent Piping 22 13 16-5 Sanitary Waste Piping Specialties 22 13 19-4 Storm Drainage Piping 22 14 13-5 Storm Drainage Piping Specialties 22 14 23-3 Facility Natural-Gas Piping 22 16 13-10 Fuel-Fired Domestic Water Heaters 22 34 00-4 Commercial Plumbing Fixtures 22 42 13-5

DIVISION 23 – HEATING, VENTILATION & AIR CONDITIONING (HVAC)

Mechanical-General Provisions 23 01 00-3 Basic Materials and Methods-Mechanical 23 05 00-4 Common Motor Requirements for HVAC Equipment 23 05 13-2 Hangers and Supports for Mechanical 23 05 29-4 Identification for HVAC Piping and Equipment 23 05 53-4 Testing, Adjusting and Balancing of HVAC Systems 23 05 95-2 Mechanical Insulation 23 07 00-6 Commissioning of HVAC 23 08 00-4 Instrumentation and Control for HVAC 23 09 00-9 Sequence of Operations for HVAC Controls 23 09 93-2 Refrigerant Piping and Specialties 23 23 00-4 Metal Ductwork 23 31 13-4 Ductwork Accessories 23 33 00-3

Page 10: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TABLE OF CONTENTS TOC-4

Fans 23 34 23-3 Air Curtains 23 34 33-2 Air Terminal Units 23 36 00-3 Air Outlet and Inlet 23 37 13-2 Food Service Ventilation Systems 23 38 15-2 Packaged, Outdoor, Central-Station Air-Handling Units 23 74 13-6 Electric Unit Heaters 23 82 38-2 Heat Pump Systems 23 83 16-4

DIVISION 26 – ELECTRICAL

Medium Voltage Cable 26 05 13-7 Building Wire and Cable 26 05 19-3 Manufactured Wiring Systems 26 05 20-2 Grounding and Bonding 26 05 26-3 Supporting Devices 26 05 29-2 Conduit 26 05 33-5 Boxes 26 05 34-3 Cabinets and Enclosures 26 05 35-2 Duct Bank 26 05 43-4 Electrical Identification 26 05 53-3 Electric Controls 26 09 23-2 Enclosed Contactors 26 09 24-3 Occupancy Sensors 26 09 25-2 Pad Mounted Distribution Transformer 26 12 00-4 Panelboards 26 24 16-4 Electrical Sensing and Measurement 26 27 13-4 Wiring Devices 26 27 26-4 Enclosed Switches 26 28 17-2 Enclosed Motor Controllers 26 29 13-3 Surge Protection Devices (SPDs) 26 43 13-4 Interior Luminaires 26 51 00-4 Site Lighting 26 56 00-3 Testing 26 60 00-3

DIVISION 27 – COMMUNICATIONS

Telephone Service, Raceways and Wiring 27 15 00-3 Mass Notification System 27 51 17-9

DIVISION 28 – ALARMS & SURVEILLANCE

Fire Alarm 28 31 11-16

DIVISION 31 – EARTHWORK

Site Clearing 31 10 00-4 Earth Moving 31 20 00-8 Landscape Grading 31 21 00-2 Utility Backfill Materials 31 23 23-9 Excavation Backfill and Compaction for Utilities 31 23 33-13 Termite Control 31 31 16-3

Page 11: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TABLE OF CONTENTS TOC-5

DIVISION 32 – SITEWORK

Pavement Repair and Restoration 32 01 00-3 Hot Mix Asphalt Concrete Pavement 32 12 16-4 Concrete Paving 32 13 13-11 Concrete Paving Joint Sealants 32 13 73-5 Concrete Unit Pavers 32 14 00-7 Pavement Markings 32 17 23-2 Fences & Gates 32 31 00-5 Turf & Grasses 32 92 00-5 Plants 32 93 00-8

DIVISION 33 – UTILITIES

Pressure and Leakage Tests 33 01 10-3 Disinfecting Pipelines 33 01 15-10 Acceptance Testing for Sanitary Sewers 33 01 30-14 Tracer Wire 33 05 27-2 Piping-General Provisions 33 11 00-8 Polyvinyl Chloride (PVC) Pipe 33 11 11-6 Polyethylene Wrap 33 11 17-4 Gate Valves 33 12 16-2 Tapping Sleeves and Valves 33 12 17-5 Fire Hydrants 33 12 19-4 Gravity Sanitary Sewers 33 31 11-4 Precast Concrete Manholes 33 31 12-8 Sanitary Sewer Laterals 33 31 15-5 Storm Sewerage System 33 41 00-6

Page 12: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 1

DIVISION 21 – FIRE SUPPRESSION SECTION 21 05 00 - COMMON WORK RESULTS FOR FIRE SUPPRESSION

1. GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division, shall apply to Division 22 specifications sections.

1.2 SUMMARY

A. Section Includes: 1. Equipment installation requirements common to equipment sections. 2. Painting and finishing. 3. Supports and anchorages.

1.3 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, tunnels, and walk-in cooler/freezer.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in chases.

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.

F. The following are industry abbreviations for rubber materials:

1. EPDM: Ethylene-propylene-diene terpolymer rubber. 2. NBR: Acrylonitrile-butadiene rubber.

1.4 QUALITY ASSURANCE

A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code--Steel."

B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."

1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."

Page 13: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 2

2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.

C. Electrical Characteristics for Fire-Suppression Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.

B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.

1.6 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for fire-suppression installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Coordinate requirements for access panels and doors for fire-suppression items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Section 08 31 13, "Access Doors and Frames."

2. PRODUCTS

A. Not applicable.

3. EXECUTION

3.1 PIPING SYSTEMS - COMMON REQUIREMENTS

A. Install piping according to the following requirements and Division 21 Sections specifying piping systems.

B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on submittals.

C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.

D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

F. Install piping to permit valve servicing.

Page 14: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 3

G. Install piping at indicated slopes.

H. Install piping free of sags and bends.

I. Install fittings for changes in direction and branch connections.

J. Verify final equipment locations for roughing-in.

K. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.

3.2 PAINTING

A. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.

3.3 ERECTION OF METAL SUPPORTS AND ANCHORAGES

A. Refer to Section 05 50 00, "Metal Fabrications" for structural steel.

B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor fire-suppression materials and equipment.

C. Field Welding: Comply with AWS D1.1.

END 21 05 00

Page 15: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 - 1

DIVISION 21 – FIRE SUPPRESSION SECTION 21 11 00 - FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes fire-suppression water-service piping and related components from 5 foot outside the building in to the building. 1. Provide Fire Department Connection to site contractor for installation. 2. Install supervisory switches on post indicator valve provided by site contractor.

B. Related Sections: 1. Division 21 Section "Wet-Pipe Sprinkler Systems" for wet-pipe fire-suppression sprinkler systems

inside the building.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Field quality-control reports.

1.4 QUALITY ASSURANCE

A. Regulatory Requirements:

1. Comply with requirements of utility company supplying water. Include tapping of water mains and backflow prevention.

2. Comply with standards of authorities having jurisdiction for fire-suppression water-service piping, including materials, hose threads, installation, and testing.

B. Piping materials shall bear label, stamp, or other markings of specified testing agency.

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

D. Comply with the "Approval Guide," published by FM Global, or UL's "Fire Protection Equipment Directory" for fire-service-main products.

E. NFPA Compliance: Comply with NFPA 24 for materials, installations, tests, flushing, and valve and hydrant supervision for fire-suppression water-service piping.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Preparation for Transport: Prepare valves according to the following:

1. Ensure that valves are dry and internally protected against rust and corrosion.

Page 16: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 - 2

2. Protect valves against damage to threaded ends and flange faces. 3. Set valves in best position for handling. Set valves closed to prevent rattling.

B. During Storage: Use precautions for valves according to the following:

1. Do not remove end protectors unless necessary for inspection; then reinstall for storage. 2. Protect from weather. Store indoors and maintain temperature higher than ambient dew point

temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is necessary.

C. Handling: Use sling to handle valves and fire hydrants if size requires handling by crane or lift. Rig valves to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

D. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.

E. Protect stored piping from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside.

F. Protect flanges, fittings, and specialties from moisture and dirt.

G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.

1.6 PROJECT CONDITIONS

A. Interruption of Existing Fire-Suppression Water-Service Piping: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary water-distribution service according to requirements indicated:

1. Notify Owner and Architect/Engineer’s no fewer than seven days in advance of proposed interruption of service.

2. Do not proceed with interruption of service without Owner and Architect/Engineer’s written permission.

1.7 COORDINATION

A. Coordinate connection to water main with utility company.

PART 2 - PRODUCTS

2.1 PIPE AND FITTINGS

A. Service Piping: Match section 22 11 13.

2.2 FIRE-DEPARTMENT CONNECTIONS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Elkhart Brass Mfg. Company, Inc. 2. Fire-End & Croker Corporation. 3. Guardian Fire Equipment, Inc. 4. Kidde Fire Fighting. 5. Potter Roemer. 6. Reliable Automatic Sprinkler Co., Inc.

Page 17: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 - 3

B. Description: Freestanding, with cast-bronze body, thread inlets according to NFPA 1963 and matching local fire-department hose threads, and threaded bottom outlet. Include lugged caps, gaskets, and chains; lugged swivel connection and drop clapper for each hose-connection inlet; 18-inch high brass sleeve; and round escutcheon plate.

C. Standard: UL 405.

D. Connections: Two NPS 2-1/2 inlets and one outlet.

E. Inlet Alignment: Inline, horizontal.

F. Finish Including Sleeve: Polished chrome plated.

G. Escutcheon Plate Marking: "AUTO SPKR."

2.3 ALARM DEVICES

A. General: UL 753 and "Approval Guide," published by FM Global, listing, of types and sizes to mate and match piping and equipment.

B. Supervisory Switches: Single pole, double throw; designed to signal valve in other than fully open position.

2.4 SLEEVES

A. Cast-Iron Wall-Pipe Sleeves: Cast or fabricated of cast iron and equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop unless otherwise indicated.

B. Galvanized-Steel-Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.

C. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, standard-weight, zinc-coated, plain ends.

2.5 SLEEVE SEALS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Advance Products & Systems, Inc. 2. Calpico, Inc. 3. Metraflex, Inc. 4. Pipeline Seal and Insulator, Inc.

B. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.

C. Sealing Elements: EPDM-rubber or NBR interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

D. Pressure Plates: Carbon steel.

E. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating of length required to secure pressure plates to sealing elements.

Page 18: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 - 4

2.6 GROUT

A. Standard: ASTM C 1107, Grade B, posthardening and volume adjusting, dry, hydraulic-cement grout.

B. Characteristics: Nonshrink; recommended for interior and exterior applications.

C. Design Mix: 5000-psi, 28-day compressive strength.

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 PIPING INSTALLATION

A. Comply with NFPA 24 and section 22 11 13 for fire-service-main piping materials and installation.

B. Extend fire-suppression water-service piping and connect to water-supply source and building fire-suppression water-service piping systems at locations and pipe sizes indicated.

1. Terminate fire-suppression water-service piping at building floor slab until building-water-piping systems are installed. Terminate piping with caps, plugs, or flanges as required for piping material. Make connections to building's fire-suppression water-service piping systems when those systems are installed.

3.2 ALARM DEVICE INSTALLATION

A. General: Comply with NFPA 24 for devices and methods of valve supervision. Underground valves with valve box do not require supervision.

B. Supervisory Switches: Supervise valves in open position. 1. Indicator Posts: Drill and thread hole in upper-barrel section at target plate. Install switch, with

toggle against target plate, on barrel of indicator post.

3.3 CONNECTIONS

A. Connect fire-suppression water-service piping to interior fire-suppression piping.

3.4 SLEEVE INSTALLATION

A. General Requirements: Install sleeves for pipes and tubes passing through penetrations in exterior walls.

1. Exception: Sleeves are not required for core-drilled holes.

B. Cut sleeves to length for mounting flush with both surfaces.

C. For exterior wall penetrations below grade, seal annular space between sleeves and piping using sleeve seals.

D. Seal space outside of sleeves in concrete walls with grout.

E. Install the following sleeve materials:

1. Galvanized steel pipe sleeves for pipes smaller than NPS 6. 2. Cast-iron wall-pipe sleeves for pipes NPS 6 and larger.

Page 19: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 - 5

3.5 SLEEVE SEAL INSTALLATION

A. Install sleeve seals in sleeves in exterior concrete floor slabs and walls at fire-suppression water-service piping entries into the building.

B. Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble sleeve seal components and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.6 FIELD QUALITY CONTROL

A. Use test procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described below.

B. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Fill pipeline 24 hours before testing and apply test pressure to stabilize system. Use only potable water.

C. Hydrostatic Tests: Test at not less than one-and-one-half times the working pressure, or 200 psig, whichever is greater, for two hours.

1. Comply with NFPA-13.

D. Prepare test and inspection reports.

3.7 IDENTIFICATION

A. Install continuous underground detectable warning tape during backfilling of trench for underground fire-suppression water-service piping. Locate below finished grade, directly over piping. Underground warning tapes are specified in Division 31 Section "Earth Moving."

B. Permanently attach equipment nameplate or marker indicating plastic fire-suppression water-service piping or fire-suppression water-service piping with electrically insulated fittings, on main electrical meter panel. Comply with requirements for identifying devices in Division 22 Section "Identification for Plumbing Piping and Equipment."

3.8 CLEANING

A. Clean and disinfect fire-suppression water-service piping as follows:

1. Purge new piping systems and parts of existing systems that have been altered, extended, or repaired before use.

2. Use purging procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in NFPA 24 for flushing of piping. Flush piping system with clean, potable water until dirty water does not appear at points of outlet.

3. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or do as follows: a. Fill system or part of system with water/chlorine solution containing at least 50 ppm of

chlorine; isolate and allow to stand for 24 hours. b. Drain system or part of system of previous solution and refill with water/chlorine solution

containing at least 200 ppm of chlorine; isolate and allow to stand for three hours. c. After standing time, flush system with clean, potable water until no chlorine remains in

water coming from system.

Page 20: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 11 00 - 6

d. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedure if biological examination shows evidence of contamination.

B. Prepare reports of purging activities.

3.9 VALVE SCHEDULE

A. Indicator-post underground fire-suppression water-service valves NPS 3 and larger shall be 175-psig, UL-listed or FM-approved, iron, nonrising-stem gate valves with indicator-post flange.

END 21 11 00

Page 21: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 1

DIVISION 21 – FIRE SUPPRESSION SECTION 21 13 13 - WET PIPE SPRINKLER SYSTEMS

1. GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division, shall apply to Division 21 specifications sections.

1.2 SUMMARY

A. Section Includes:

1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Sprinklers. 4. Alarm devices. 5. Pressure gages.

1.3 RELATED WORK

A. Related Sections:

1. Section 09 9123, “Interior Painting.” 2. Division 26 Electrical.

1.4 DEFINITIONS

A. Standard-Pressure Sprinkler Piping: Wet-pipe sprinkler system piping designed to operate at working pressure of 175 psig maximum.

1.5 SYSTEM DESCRIPTIONS

A. Wet-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water that is connected to water supply through alarm valve. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts fusible link or destroys frangible device.

1.6 PERFORMANCE REQUIREMENTS

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.

B. Delegated Design: Design sprinkler system(s) using performance requirements and design criteria indicated.

1. Contractor shall perform his own flow test for water supply data used in his hydraulic calculations.

C. Sprinkler system design shall be approved by authorities having jurisdiction.

1. Margin of Safety for Available Water Flow and Pressure: 5 percent, including losses through water-service piping, valves, and backflow preventers.

2. Maximum Protection Area per Sprinkler – 130 sq. ft. 3. Total Combined Hose-Stream Demand Requirement:

a. 250 gpm, 60 minutes.

Page 22: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 2

D. Seismic Performance: Sprinkler piping shall withstand the effects of earthquake motions determined according to NFPA 13 and ASCE/SEI 7.

1.7 SUBMITTALS

A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Shop Drawings: For wet-pipe sprinkler systems. Include plans, elevations, sections, details, and attachments to other work.

1. Wiring Diagrams: For power, signal, and control wiring.

C. Delegated-Design Submittal: For sprinkler systems indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified NICET level III designer responsible for their preparation, and a licensed fire protection engineer.

D. Coordination Drawings: Sprinkler systems, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:

1. Domestic water piping. 2. HVAC ductwork. 3. Items penetrating finished ceiling include the following:

a. Lighting fixtures. b. Air outlets and inlets.

E. Qualification Data: For qualified Installer, NICET designer, and fire protection engineer.

F. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 13, that have been approved by authorities having jurisdiction, including hydraulic calculations if applicable.

G. Welding certificates.

H. Fire-hydrant flow test report.

I. Field Test Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 13. Include "Contractor's Material and Test Certificate for Aboveground Piping."

J. Field quality-control reports.

K. Operation and Maintenance Data: For sprinkler specialties to include in emergency, operation, and maintenance manuals.

L. Water Quality Test Report: For suitability of water for using schedule 10 piping.

M. All submittals shall be submitted to Ft. Hood fire department concurrently with the submittal to A/E.

1.8 QUALITY ASSURANCE

A. Installer Qualifications:

1. Installer's responsibilities include designing, fabricating, and installing sprinkler systems. Base calculations on results of fire-hydrant flow test.

B. Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.

Page 23: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 3

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

D. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the following:

1. NFPA 13, "Installation of Sprinkler Systems." 2. NFPA 24, "Installation of Private Fire Service Mains and Their Appurtenances."

E. Military Standards: Sprinkler system equipment, specialties, accessories, installation and testing shall comply with the following:

1. UFC 3-600-01 “Fire Protection Engineering for Facilities” dated 26 September 2006, with March 2013 Change #3.

1.9 COORDINATION

A. Coordinate layout and installation of sprinklers with other construction that penetrates ceilings, including light fixtures, HVAC equipment, and partition assemblies.

1.10 EXTRA MATERIALS

A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Sprinkler Cabinets: Finished, wall-mounted, steel cabinet with hinged cover, and with space for minimum of six spare sprinklers plus sprinkler wrench. Include number of sprinklers required by NFPA 13 and sprinkler wrench. Include separate cabinet with sprinklers and wrench for each type of sprinkler used on Project.

2. PRODUCTS

2.1 PIPING MATERIALS

A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, and fitting materials, and for joining methods for specific services, service locations, and pipe sizes.

2.2 STEEL PIPE AND FITTINGS.

A. Schedule 40, Black-Steel Pipe: ASTM A 53/A 53M, Grade B. Pipe ends may be factory or field formed to match joining method.

B. Black-Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M, standard-weight, seamless steel pipe with threaded ends.

C. Uncoated, Steel Couplings: ASTM A 865, threaded.

D. Uncoated, Gray-Iron Threaded Fittings: ASME B16.4, Class 125, standard pattern.

E. Malleable- or Ductile-Iron Unions: UL 860.

F. Cast-Iron Flanges: ASME 16.1, Class 125.

G. Steel Flanges and Flanged Fittings: ASME B16.5, Class 150.

H. Steel Welding Fittings: ASTM A 234/A 234M and ASME B16.9.

I. Grooved-Joint, Steel-Pipe Appurtenances:

Page 24: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 4

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Grinnell. b. Anvil. c. Tyco Fire & Building Products LP. d. Victaulic Company.

2. Pressure Rating: 175 psig minimum. 3. Uncoated, Grooved-End Fittings for Steel Piping: ASTM A 47/A 47M, malleable-iron

casting or ASTM A 536, ductile-iron casting; with dimensions matching steel pipe. 4. Grooved-End-Pipe Couplings for Steel Piping: AWWA C606 and UL 213, rigid pattern,

unless otherwise indicated, for steel-pipe dimensions. Include ferrous housing sections, EPDM-rubber gasket, and bolts and nuts.

2.3 PIPING JOINING MATERIALS

A. Pipe-Flange Gasket Materials: ASME B16.21, nonmetallic and asbestos free.

1. Class 125, Cast-Iron Flanges and Class 150, Bronze Flat-Face Flanges: Full-face gaskets.

2. Class 250, Cast-Iron Flanges and Class 300, Steel Raised-Face Flanges: Ring-type gaskets.

B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.

C. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for general-duty brazing unless otherwise indicated.

D. Welding Filler Metals: Comply with AWS D10.12M/D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

2.4 LISTED FIRE-PROTECTION VALVES

A. General Requirements:

1. Valves shall be UL listed or FM approved. 2. Minimum Pressure Rating for Standard-Pressure Piping: 175 psig (1200 kPa).

B. Ball Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Anvil International, Inc. b. Victaulic Company. c. NIBCO.

2. Standard: UL 1091 except with ball instead of disc. 3. Valves NPS 1-1/2 (DN 40) and Smaller: Bronze body with threaded ends. 4. Valves NPS 2 and NPS 2-1/2 (DN 50 and DN 65): Bronze body with threaded ends or

ductile-iron body with grooved ends. 5. Valves NPS 3 (DN 80): Ductile-iron body with grooved ends.

C. Bronze Butterfly Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Global Safety Products, Inc. b. Milwaukee Valve Company.

Page 25: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 5

c. NIBCO.

2. Standard: UL 1091. 3. Pressure Rating: 175 psig (1200 kPa). 4. Body Material: Bronze. 5. End Connections: Threaded.

D. Iron Butterfly Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Kennedy Valve; a division of McWane, Inc. b. Milwaukee Valve Company. c. NIBCO INC. d. Tyco Fire & Building Products LP. e. Victaulic Company.

2. Standard: UL 1091. 3. Pressure Rating: 175 psig (1200 kPa). 4. Body Material: Cast or ductile iron. 5. Style: Lug or wafer. 6. End Connections: Grooved.

E. Check Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. AFAC Inc. b. American Cast Iron Pipe Company; Waterous Company Subsidiary. c. Anvil International, Inc. d. Clow Valve Company; a division of McWane, Inc. e. Crane Co.; Crane Valve Group; Crane Valves. f. Crane Co.; Crane Valve Group; Jenkins Valves. g. Crane Co.; Crane Valve Group; Stockham Division. h. Kennedy Valve; a division of McWane, Inc. i. Milwaukee Valve Company. j. Mueller Co.; Water Products Division. k. NIBCO INC. l. Potter Roemer. m. Reliable Automatic Sprinkler Co., Inc. n. Tyco Fire & Building Products LP. o. Victaulic Company. p. Viking Corporation.

2. Standard: UL 312. 3. Pressure Rating: 250 psig. 4. Type: Swing check. 5. Body Material: Cast iron. 6. End Connections: Flanged or grooved.

F. Iron OS&Y Gate Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. American Cast Iron Pipe Company; Waterous Company Subsidiary. b. American Valve, Inc. c. Clow Valve Company; a division of McWane, Inc. d. Crane Co.; Crane Valve Group; Crane Valves. e. Crane Co.; Crane Valve Group; Jenkins Valves.

Page 26: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 6

f. Crane Co.; Crane Valve Group; Stockham Division. g. Hammond Valve. h. Milwaukee Valve Company. i. Mueller Co.; Water Products Division. j. NIBCO INC.

2. Standard: UL 262. 3. Pressure Rating: 250 psig minimum. 4. Body Material: Cast or ductile iron. 5. End Connections: Flanged or grooved.

G. Indicating-Type Butterfly Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Anvil International, Inc. b. Global Safety Products, Inc. c. Kennedy Valve. d. Milwaukee Valve Company. e. NIBCO. f. Tyco Fire & Building Products LP. g. Victaulic Company.

2. Standard: UL 1091. 3. Pressure Rating: 175 psig minimum. 4. Valves NPS 2 and Smaller:

a. Valve Type: Ball or butterfly. b. Body Material: Bronze. c. End Connections: Threaded.

5. Valves NPS 2-1/2 and Larger: a. Valve Type: Butterfly. b. Body Material: Cast or ductile iron. c. End Connections: Flanged, grooved, or wafer.

6. Valve Operation: Integral electrical, 115-V ac, prewired, two-circuit, supervisory switch indicating device.

2.5 TRIM AND DRAIN VALVES

A. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory” or "Approval Guide," published by FM Global, listing.

2. Pressure Rating: 175 psig minimum.

B. Angle Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Fire Protection Products, Inc. b. United Brass Works, Inc. c. NIBCO.

C. Ball Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Page 27: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 7

a. Conbraco Industries, Inc.; Apollo Valves. b. Fire-End & Croker Corporation. c. Fire Protection Products, Inc. d. Milwaukee Valve Company. e. NIBCO INC. f. Tyco Fire & Building Products LP. g. Victaulic Company. h. Watts Water Technologies, Inc.

2.6 SPRINKLER SPECIALTY PIPE FITTINGS

A. Branch Outlet Fittings:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Anvil International, Inc. b. National Fittings, Inc. c. Shurjoint Piping Products. d. Tyco Fire & Building Products LP. e. Victaulic Company.

2. Standard: UL 213. 3. Pressure Rating: 175 psig minimum. 4. Body Material: Ductile-iron housing with EPDM seals and bolts and nuts. 5. Type: Mechanical-T and -cross fittings. 6. Configurations: Snap-on and strapless, ductile-iron housing with branch outlets. 7. Size: Of dimension to fit onto sprinkler main and with outlet connections as required to

match connected branch piping. 8. Branch Outlets: Grooved, plain-end pipe, or threaded.

B. Flexible, Sprinkler Hose Fittings:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Fivalco Inc. b. FlexHead Industries, Inc. c. Gateway Tubing, Inc.

2. Standard: UL 1474. 3. Type: Flexible hose for connection to sprinkler, and with bracket for connection to ceiling

grid. 4. Pressure Rating: 175 psig minimum. 5. Size: Same as connected piping, for sprinkler.

2.7 SPRINKLERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Globe Fire Sprinkler Corporation. 2. Reliable Automatic Sprinkler Co., Inc. 3. Tyco Fire & Building Products LP. 4. Victaulic Company. 5. Viking Corporation.

B. General Requirements:

Page 28: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 8

1. Standard: UL's "Fire Protection Equipment Directory" or "Approval Guide," published by FM Global, listing.

2. Pressure Rating for Residential Sprinklers: 175 psig maximum. 3. Pressure Rating for Automatic Sprinklers: 175 psig minimum.

C. Automatic Sprinklers with Heat-Responsive Element: 1. Nonresidential Applications: UL 199. 2. Characteristics: Quick-response with Dscharge Coefficient K of 8.0, and for "Ordinary"

temperature classification rating unless otherwise indicated or required by application.

D. Sprinkler Finishes:

1. Chrome plated. 2. Bronze. 3. Painted.

E. Sprinkler Escutcheons: Materials, types, and finishes for the following sprinkler mounting applications. Escutcheons for concealed, flush, and recessed-type sprinklers are specified with sprinklers.

F. Sprinkler Guards:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Reliable Automatic Sprinkler Co., Inc. b. Tyco Fire & Building Products LP. c. Victaulic Company. d. Viking Corporation.

2. Standard: UL 199. 3. Type: Wire cage with fastening device for attaching to sprinkler.

2.8 ESCUTCHEONS

A. General: Manufactured ceiling, floor, and wall escutcheons and floor plates.

B. One-Piece, Stamped-Steel Escutcheons: Chrome-plated finish with set-screw.

C. Split-Plate, Stamped-Steel Escutcheons: Chrome-plated finish with concealed hinge, set-screw.

D. One-Piece Floor Plates: Cast-iron flange with holes for fasteners.

E. Split-Casting Floor Plates: Cast brass with concealed hinge.

3. EXECUTION

3.1 PREPARATION

A. Perform fire-hydrant flow test according to NFPA 13 and NFPA 291. Use results for system design calculations required in "Quality Assurance" Article.

B. Report test results promptly and in writing to A/E and fire department.

3.2 PIPING INSTALLATION

A. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical.

Page 29: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 9

1. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Architect before deviating from approved working plans.

B. Piping Standard: Comply with requirements for installation of sprinkler piping in NFPA 13.

C. Install seismic restraints on piping. Comply with requirements for seismic-restraint device materials and installation in NFPA 13.

D. Use listed fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.

E. Install unions adjacent to each valve in pipes NPS 2 and smaller.

F. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.

G. Install "Inspector's Test Connections" in sprinkler system piping, complete with shutoff valve, and sized and located according to NFPA 13.

H. Install sprinkler piping with drains for complete system drainage.

I. Install hangers and supports for sprinkler system piping according to NFPA 13. Comply with requirements for hanger materials in NFPA 13.

J. Fill sprinkler system piping with water.

3.3 JOINT CONSTRUCTION

A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure ratings same as or higher than system's pressure rating for aboveground applications unless otherwise indicated.

B. Install unions adjacent to each valve in pipes NPS 2 and smaller.

C. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.

D. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

E. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.

F. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with gasket and bolts according to ASME B31.9.

G. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads. 2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or

damaged.

H. Welded Joints: Construct joints according to AWS D10.12M/D10.12, using qualified processes and welding operators according to "Quality Assurance" Article.

1. Shop weld pipe joints where welded piping is indicated. Do not use welded joints for galvanized-steel pipe.

Page 30: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 10

I. Steel-Piping, Cut-Grooved Joints: Cut square-edge groove in end of pipe according to AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe joints.

J. Steel-Piping, Roll-Grooved Joints: Roll rounded-edge groove in end of pipe according to AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe grooved joints.

K. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.

3.4 VALVE AND SPECIALTIES INSTALLATION

A. Install listed fire-protection valves, trim and drain valves, specialty valves and trim, controls, and specialties according to NFPA 13 and authorities having jurisdiction.

3.5 SPRINKLER INSTALLATION

A. Install sprinklers in suspended ceilings in center of narrow dimension of acoustical ceiling panels.

B. At contractor’s option, install sprinklers into flexible, sprinkler hose fittings and install hose into bracket on ceiling grid.

3.6 ESCUTCHEON INSTALLATION

A. Install escutcheons for penetrations of walls, ceilings, and floors.

B. Escutcheons for New Piping:

1. Piping with Fitting or Sleeve Protruding from Wall: One piece, deep pattern. 2. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One piece, stamped

steel with set-screw or spring clips. 3. Bare Piping at Ceiling Penetrations in Finished Spaces: One piece or split plate,

stamped steel with set-screw. 4. Bare Piping in Unfinished Service Spaces: One piece, stamped steel with spring clips.

3.7 IDENTIFICATION

A. Install labeling and pipe markers on equipment and piping according to requirements in NFPA 13.

B. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Section 26 05 53, "Identification for Electrical Systems."

3.8 FIELD QUALITY CONTROL

A. Perform tests and inspections.

B. Tests and Inspections:

1. Leak Test: After installation, charge systems and test for leaks. Repair leaks and retest until no leaks exist.

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

3. Flush, test, and inspect sprinkler systems according to NFPA 13, "Systems Acceptance" Chapter.

4. Energize circuits to electrical equipment and devices. 5. Start and run excess-pressure pumps. 6. Coordinate with fire-alarm tests. Operate as required. 7. Coordinate with fire-pump tests. Operate as required.

Page 31: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WET PIPE SPRINKLER SYSTEMS 21 13 13 - 11

8. Verify that equipment hose threads are same as local fire-department equipment.

C. Sprinkler piping system will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

3.9 CLEANING

A. Clean dirt and debris from sprinklers.

B. Remove and replace sprinklers with paint other than factory finish.

3.10 PIPING SCHEDULE

A. Sprinkler specialty fittings may be used, downstream of control valves, instead of specified fittings.

B. Standard-pressure, wet-pipe sprinkler system, NPS 2 and smaller, shall be one of the following:

1. Schedule 40, black-steel pipe with threaded ends; uncoated, gray-iron threaded fittings; and threaded joints.

C. Standard-pressure, wet-pipe sprinkler system, NPS 2-1/2 to NPS 4, shall be one of the following:

1. Schedule 40, black-steel pipe with roll-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints if water analysis shows water is non-corrosive.

D. Standard-pressure, wet-pipe sprinkler system, NPS 5 and larger, shall be one of the following:

1. Schedule 40, black-steel pipe with roll-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.

3.11 SPRINKLER SCHEDULE

A. Use sprinkler types in subparagraphs below for the following applications:

1. Rooms without Ceilings: Upright sprinklers. 2. Rooms with Suspended Ceilings: Recessed sprinklers. 3. Wall Mounting: Sidewall sprinklers. 4. Spaces Subject to Freezing: Upright, pendent sprinklers attached to anti-freeze system;

and sidewall, dry sprinklers as indicated.

B. Provide sprinkler types in subparagraphs below with finishes indicated.

1. Recessed Sprinklers: Factory painted white, with bright factory painted white escutcheon.

2. Upright: Brass. 3. Sidewall: Factory painted white, with bright factory painted white escutcheon. 4. Dry Pendent: Chrome. 5. Dry Sidewall: Chrome.

END 21 13 13

Page 32: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL PROVISION - PLUMBING 22 05 10-1

DIVISION 22 - PLUMBING SECTION 22 05 10 - GENERAL PROVISIONS - PLUMBING

PART 1 - GENERAL

1.1 WORK INCLUDES

A. General administrative and procedural requirements for the plumbing installations.

B. Related Sections:

1. General Provisions of the contract, including the Division 00 and Division 01, shall apply to Division 22 specification sections.

1.2 QUALITY CONTROL

A. The following publications form a part of this specification to the extent they are applicable.

1. All work must be performed in accordance with the requirements of local, county, state and national codes and regulations including the requirements of the following: (a) International Building Code, 2012.

(b) National Electrical Code, 2014. (c) International Plumbing Code, 2012. (d) International Mechanical Code, 2012. (e) Occupational Safety and Health Act. of 1970. (f) For work not specifically listed above, use standards and codes of the National Fire

Protection Association.

1.3 REGULATORY REQUIREMENTS

A. All equipment, apparatus and systems shall be rated, tested, fabricated and/or installed in accordance with the applicable industry standard mentioned. The following list will serve to clarify abbreviations that appear in other sections of this specification: (1) AGA American Gas Association. (2) ARI Air Conditioning and Refrigeration Institute (3) ANSI American National Standards Institute (4) ASE Association of Safety Engineers (5) ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineer (6) ASME American Society of Mechanical Engineers (7) AWWA American Water Works Association (8) EPA Environmental Protection Agency (9) FS Federal Specifications (10) IBR Institute of Boiler and Radiator Manufacturers (11) IEEE Institute of Electrical and Electronics Engineers (12) MCAA Mechanical Contractors' Association of American (13) NEMA National Electrical Manufacturers Association (14) NFPA National Fire Protection Association (15) NSC National Safety Council (16) NSF National Sanitation Foundation (17) SBI Steel Boiler Institute Industry (18) UL Underwriters Laboratories (19) ASTM American Society for Testing and Materials.

1.4 DEFINITIONS

A. FURNISH: The term furnish means supply and deliver to the Project Site, ready for unloading, unpacking, assembly, installation and similar operations.

Page 33: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL PROVISION - PLUMBING 22 05 10-2

B. INSTALL: The term install describes operations at the Project Site including the actual unloading, unpacking, assembly, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations.

C. PROVIDE: The term provides means to furnish and install, complete and ready for intended use.

1.5 SHOP DRAWINGS AND SUBMITTALS

A. See Division 01 for requirements for shop drawings and product data. B. Asbestos-Free Material/Product: Prior to approval of the material/product to be used, the

manufacturer/supplier shall furnish the Architect/Engineer with written certification that the material/product contains no asbestos. This certificate is mandatory before approval will be issued. Submittals furnished without the asbestos-free certification will be returned to the Contractor with no action taken until such certification is provided.

C. See applicable sections to this Division for items requiring shop drawings.

1.6 MATERIALS AND WORKMANSHIP

A. Materials, the style, make or quality of which is specifically designated, shall be as specified. B. Contractor shall furnish necessary materials in ample quantities and as frequently as required to avoid

delay in the progress of the Work, and shall so store them as to prevent interference with other work.

1.7 DEFECTIVE WORK AND MATERIAL

A. All materials or work found to be defective or not in strict conformity with the drawings or different from requirements of the drawings and specifications or defaced or injured through negligence of Contractor or his employees, or through action of fire or weather will be rejected and shall be immediately removed from premises by Contractor and satisfactory materials and work substituted without delay.

B. All defective work or imperfect work shall be corrected immediately on notice from Architect/Engineer.

No previous inspection or certificate on account shall be held to relieve Contractor from his obligation to furnish sound materials and to perform good and satisfactory work.

1.8 COOPERATION AND COORDINATION

A. Contractor shall confer with other contractors at the site before installing his work to avoid interferences so that maximum head room and clearances may be maintained. In event that interferences develop between work of various contractors, Architect/Engineer's decision will be final and no additional compensation will be allowed for changes required.

B. Particular attention shall be paid to situations where recessed equipment, pipes and lights occur, or

where the work of several trades occurs together above suspended ceilings, in pipe shafts or in areas where space is limited.

C. All fixtures, equipment, devices, switches, outlets, pumps, etc., shall be positioned to avoid all

interferences with and to assure proper coordination with work of all other trades, cases, partitions, wall, floor and ceiling patterns, architectural features, etc. All recessed devices, fixtures, etc., shall be coordinated with all wall, floor and ceiling patterns. Architect/Engineer will reconcile conflicts and adjustments where such adjustments are warranted.

1.9 PROTECTION OF EQUIPMENT AND SYSTEMS

A. Contractor shall keep all his respective pipe openings closed by means of plugs or caps to prevent entrance of foreign matter during construction and cover all fixtures, equipment, and apparatus as required to protect them against dirt, water, chemical or mechanical damage both before and after installation. Any such fixtures, equipment or apparatus damaged prior to final acceptance of the Work shall be restored to its original condition or replaced by Contractor at no

Page 34: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL PROVISION - PLUMBING 22 05 10-3

cost to Owner.

1.10 CONTRACT DRAWINGS

A. The layout shown on the Contract Drawings is necessarily diagrammatic but shall be followed as closely as actual construction and as other work will allow. The dimensions of work as shown on the Contract Drawings are not as-built dimensions. No measurements shall be scaled from the drawings and used as definite dimensions for laying out or fitting work in place.

B. The layout of manufactured equipment as shown on the drawings shall be checked and the exact

location shall be determined from the dimensions of equipment shop drawings approved by the Architect/Engineer.

1.11 MAINTENANCE MANUAL AND OPERATING INSTRUCTIONS

A. Upon completion of the Work, Contractors shall provide the Architect/Engineer with three copies of maintenance manual for all equipment furnished and installed under his Work. Manuals shall be in substantial 3-ring binders with project name and number inscribed on face and hinged back. Manual shall include roster of all Owner training session attendees. The manual shall, however, first be approved by the Architect/Engineer.

B. The manual shall include manufacturer's lubricating and operating instructions and parts list and serial numbers for all operating machinery, including drive information, and motor horsepower, amperage, and voltage readings on all phases, valve chart, sequence of operation, index following the order listed in the specifications, warranties in the name of the Installation, and a list of manufacturers, service firms and subcontractors names and telephone numbers.

C. Training attendance rosters for each training session shall be included in manuals. Roster will identify training subject, date, attendees name, job title, office symbol, grade/rank, and telephone number.

D. All switches, controls, and safety devices shall be clearly and permanently marked with embossed or printed plates as to purpose and as to operation and shall be tested in the presence of the Architect/Engineer designated representative to ensure that he understands their function and purpose.

E. Upon completion of the Work, Contractors shall put the systems into service. Contractors shall be entirely responsible for the equipment during all testing operations including the lubricating and turning on and off of such apparatus.

1.12 PROJECT RECORD AND CLOSEOUT DOCUMENTS

A. Refer to Division 01 Closeout procedures for requirements. The following paragraphs supplement the

requirements of Division 01. B. Mark Drawings to indicate revisions to piping and ductwork, size and location both exterior and

interior; including locations of coils, dampers and other control devices, filters, boxes, and similar units requiring periodic maintenance or repair; actual equipment locations, dimensioned for column lines; actual inverts and locations of underground piping; concealed equipment, dimensioned to column lines; mains and branches of piping systems, with valves and control devices located and numbered, concealed unions located, and with items requiring maintenance located (i.e., traps, strainers, expansion compensators, tanks, etc.); Change Orders; concealed control system devices.

C. Mark Specifications to indicate addenda, approved substitutions, change orders, actual equipment

and materials used.

1.13 DELIVERY, STORAGE AND HANDLING

A. Deliver products to project properly identified with names, model numbers, types, grades, compliance

labels, and similar information needed for distinct identifications; adequately packaged and protected to prevent damage during shipment, storage and handling.

Page 35: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL PROVISION - PLUMBING 22 05 10-4

B. Store equipment and materials at the site, unless off-site storage is authorized in writing. Protect

stored equipment and materials from damage. C. Coordinate deliveries of plumbing materials and equipment to minimize construction site congestion.

Limit each shipment of materials and equipment to the items and quantities needed for the smooth and efficient flow of installations.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 ACCESSIBILITY

A. Install equipment and materials to provide required access for servicing and maintenance. Coordinate the final location of concealed equipment and devices requiring access with final location of required access panels and doors. Allow ample space for removal of all parts that require replacement or servicing.

B. Extend all grease fittings to an accessible location. C. Refer to the Division 08: Access Doors and Frames.

3.2 ROUGH-IN

A. Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected.

B. Refer to equipment specifications in Divisions 02 through 33 for rough-in requirements.

3.3 PLUMBING INSTALLATIONS

A. General: sequence, coordinate, and integrate the various elements of plumbing systems, materials, and equipment. Comply with the following requirements: (1) Coordinate plumbing equipment and materials installation with other building components. (2) Verify all dimensions by field measurements. (3) Arrange for chases, slots, and openings in other building components to allow for plumbing

installation. (4) Coordinate the installation of required supporting devices and sleeves to be set in poured in

place concrete and other structural components, as they are constructed. (5) Sequence, coordinate and integrate installations of plumbing materials and equipment for

efficient flow of the Work. Give particular attention to large equipment requiring positioning prior to closing-in the building.

(6) Coordinate the cutting and patching of building components to accommodate the installation of plumbing equipment and materials.

(7) Where mounting heights are not detailed or dimensioned, install plumbing services and overhead equipment to provide maximum headroom possible.

(8) Install plumbing equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations.

(9) Coordinate the installation of plumbing materials and equipment above ceiling with suspension system, light fixtures, and other installations.

(10) Install access panel or doors where units are concealed behind finished surface. Access panels and doors are specified in Division 8 Section “Access Doors and Frames.”

(11) Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope.

Page 36: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL PROVISION - PLUMBING 22 05 10-5

(12) Coordinate connection of plumbing systems with exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Provide required connection for each service.

(13) Install systems, materials, and equipment to conform with approved submittal data, including coordination drawings, to greatest extent possible. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Where coordination requirements conflict with individual system requirements, refer conflict to the Architect/Engineer.

(14) Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed expose in finished spaces.

3.4 CUTTING AND PATCHING

A. This Article specifies the cutting and patching of mechanical equipment, components, and materials to include removal and legal disposal of selected materials, components, and equipment.

B. Refer to Section 01 73 29 for general requirements for cutting and patching. C. Refer to Division 26 for requirements for cutting and patching electrical equipment, components, and

materials. D. Do not endanger or damage installed Work through procedures and processes of cutting and

patching. E. Arrange for repairs required to restore other work, because of damage caused as a result of plumbing

installations. F. No additional compensation will be authorized for cutting and patching Work that is necessitated by ill-

timed, defective, or non-conforming installations. G. Perform cutting, fitting, and patching of plumbing equipment and materials required to:

(1) Uncover Work to provide for installation of ill-timed work. (2) Remove and replace defective work. (3) Remove and replace Work not conforming to requirements of the Contract Documents. (4) Remove samples of installed Work as specified for testing. (5) Upon written instruction from the Architect/Engineer, uncover and restore Work to provide for

Architect/Engineer’s representative observation of concealed work.

H. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas.

3.5 CLEANING

A. Refer to the Division 01 for general requirements for final cleaning.

3.6 COMMISSIONING

A. Accomplish commissioning of plumbing system and equipment in accordance Section 01 91 00.

END OF SECTION 22 05 10

Page 37: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-1

DIVISION 22 - PLUMBING SECTION 22 05 12 - COMMON WORK RESULTS FOR PLUMBING

PART 1 - GENERAL

1.1 WORK INCLUDES

A. This Section includes the following:

1. Piping materials and installation instructions common to most piping systems. 2. Transition fittings. 3. Dielectric fittings. 4. Mechanical sleeve seals. 5. Sleeves. 6. Escutcheons. 7. Grout. 8. Equipment installation requirements common to equipment sections. 9. Painting and finishing. 10. Concrete bases. 11. Supports and anchorages.

1.2 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in chases.

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.

F. The following are industry abbreviations for plastic materials:

1. ABS: Acrylonitrile-butadiene-styrene plastic. 2. CPVC: Chlorinated polyvinyl chloride plastic. 3. PE: Polyethylene plastic. 4. PVC: Polyvinyl chloride plastic.

G. The following are industry abbreviations for rubber materials:

1. EPDM: Ethylene-propylene-diene terpolymer rubber. 2. NBR: Acrylonitrile-butadiene rubber.

1.3 SUBMITTALS

A. Product Data: For the following:

1. Transition fittings.

Page 38: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-2

2. Dielectric fittings. 3. Mechanical sleeve seals. 4. Escutcheons.

B. Welding certificates.

1.4 QUALITY ASSURANCE

A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural Welding Code--Steel."

B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."

1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping." 2. Certify that each welder has passed AWS qualification tests for welding processes

involved and that certification is current.

C. Electrical Characteristics for Plumbing Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified, at no cost to exchange service. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.

B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.

1.6 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for plumbing installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Coordinate locations and size requirements for access panels and doors for plumbing items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Division 8 Section "Access Doors and Frames."

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:

1. Subject to compliance with requirements, provide products by the manufacturers specified.

2.2 PIPE, TUBE, AND FITTINGS

A. Refer to individual Division 22 piping Sections for pipe, tube, and fitting materials and joining methods.

Page 39: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-3

B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.

2.3 JOINING MATERIALS

A. Refer to individual Division 22 piping Sections for special joining materials not listed below.

B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.

1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated. a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges. b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.

2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.

C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.

D. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.

E. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.

F. Brazing Filler Metals: AWS A5.8, BCuP Series, copper-phosphorus alloys for general-duty brazing, unless otherwise indicated.

G. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

H. Solvent Cements for Joining Plastic Piping: 1. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656. 2. Comply with LEED requirements.

2.4 TRANSITION FITTINGS

A. Flexible Transition Couplings for Underground Nonpressure Drainage Piping: ASTM C 1173 with elastomeric sleeve, ends same size as piping to be joined, and corrosion-resistant metal band on each end.

1. Manufacturers: a. Cascade Waterworks Mfg. Co. b. Fernco, Inc. c. Mission Rubber Company. d. Plastic Oddities, Inc.

2.5 DIELECTRIC FITTINGS

A. Description: Combination fitting of copper alloy and ferrous materials with threaded, solder-joint, plain, or weld-neck end connections that match piping system materials.

B. Insulating Material: Suitable for system fluid, pressure, and temperature.

C. Dielectric Unions: Factory-fabricated, union assembly, for 250-psig minimum working pressure at 180 deg F.

1. Manufacturers: a. Capitol Manufacturing Co.

Page 40: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-4

b. Central Plastics Company. c. Eclipse, Inc. d. Epco Sales, Inc. e. Hart Industries, International, Inc. f. Watts Industries, Inc.; Water Products Div. g. Zurn Industries, Inc.; Wilkins Div.

D. Dielectric Flanges: Factory-fabricated, companion-flange assembly, for 150- or 300-psig minimum working pressure as required to suit system pressures.

1. Manufacturers: a. Capitol Manufacturing Co. b. Central Plastics Company. c. Epco Sales, Inc. d. Watts Industries, Inc.; Water Products Div.

E. Dielectric-Flange Kits: Companion-flange assembly for field assembly. Include flanges, full-face- or ring-type neoprene or phenolic gasket, phenolic or polyethylene bolt sleeves, phenolic washers, and steel backing washers.

1. Manufacturers: a. Advance Products & Systems, Inc. b. Calpico, Inc. c. Central Plastics Company. d. Pipeline Seal and Insulator, Inc.

2. Separate companion flanges and steel bolts and nuts shall have 150- or 300-psig minimum working pressure where required to suit system pressures.

F. Dielectric Couplings: Galvanized-steel coupling with inert and noncorrosive, thermoplastic lining; threaded ends; and 300-psig minimum working pressure at 225 deg F.

1. Manufacturers: a. Calpico, Inc. b. Lochinvar Corp.

G. Dielectric Nipples: Electroplated steel nipple with inert and noncorrosive, thermoplastic lining; plain, threaded, or grooved ends; and 300-psig minimum working pressure at 225 deg F .

1. Manufacturers: a. Perfection Corp. b. Precision Plumbing Products, Inc. c. Sioux Chief Manufacturing Co., Inc. d. Victaulic Co. of America.

2.6 MECHANICAL SLEEVE SEALS

A. Description: Modular sealing element unit, designed for field assembly, to fill annular space between pipe and sleeve.

1. Manufacturers: a. Advance Products & Systems, Inc. b. Calpico, Inc. c. Metraflex Co. d. Pipeline Seal and Insulator, Inc.

2. Sealing Elements: EPDM interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

3. Pressure Plates: Plastic or Stainless steel. Include two for each sealing element.

Page 41: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-5

4. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.

2.7 SLEEVES

A. Galvanized-Steel Sheet: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.

B. Steel Pipe: ASTM A 53, Type E, Grade B, Schedule 40, galvanized, plain ends.

C. Cast Iron: Cast or fabricated "wall pipe" equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.

D. Stack Sleeve Fittings: Manufactured, cast-iron sleeve with integral clamping flange. Include clamping ring and bolts and nuts for membrane flashing.

1. Underdeck Clamp: Clamping ring with set screws.

2.8 ESCUTCHEONS

A. Description: Manufactured wall and ceiling escutcheons and floor plates, with an ID to closely fit around pipe, tube, and insulation of insulated piping and an OD that completely covers opening.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with polished chrome-plated finish.

C. One-Piece, Cast-Brass Type: With set screw.

1. Finish: Polished chrome-plated and rough brass.

D. Split-Casting, Cast-Brass Type: With concealed hinge and set screw.

1. Finish: Polished chrome-plated and rough brass.

2.9 GROUT

A. Description: ASTM C 1107, Grade B, nonshrink and nonmetallic, dry hydraulic-cement grout.

1. Characteristics: Post-hardening, volume-adjusting, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications.

2. Design Mix: 5000-psi, 28-day compressive strength. 3. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 PIPING SYSTEMS - COMMON REQUIREMENTS

A. Install piping according to the following requirements and Division 22 Sections specifying piping systems.

B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved.

C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.

Page 42: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-6

D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

F. Install piping to permit valve servicing.

G. Install piping at indicated slopes.

H. Install piping free of sags and bends.

I. Install fittings for changes in direction and branch connections.

J. Install piping to allow application of insulation.

K. Install piping to avoid running above electrical panels.

L. Select system components with pressure rating equal to or greater than system operating pressure.

M. Install escutcheons for penetrations of walls, ceilings, and floors according to the following:

1. New Piping: a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type. b. Chrome-Plated Piping: One-piece, cast-brass type with polished chrome-plated

finish. c. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-

brass type with polished chrome-plated finish. d. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece or split-casting,

cast-brass type with polished chrome-plated finish. e. Bare Piping in Unfinished Service Spaces: One-piece, cast-brass type with rough-

brass finish. f. Bare Piping in Equipment Rooms: One-piece, cast-brass type.

N. Sleeves are not required for core-drilled holes.

O. Install sleeves for pipes passing through concrete and masonry walls and concrete floor.

P. Install sleeves for pipes passing through concrete and masonry walls, gypsum-board partitions, and concrete floor and roof slabs.

1. Cut sleeves to length for mounting flush with both surfaces. a. Exception: Extend sleeves installed in floors of mechanical equipment areas or

other wet areas 2 inches (50 mm) above finished floor level. Extend cast-iron sleeve fittings below floor slab as required to secure clamping ring if ring is specified.

2. Install sleeves in new walls and slabs as new walls and slabs are constructed. 3. Install sleeves that are large enough to provide 1/4-inch annular clear space between

sleeve and pipe or pipe insulation. Use the following sleeve materials: a. Steel Pipe Sleeves: For pipes smaller than NPS 6 . b. Steel Sheet Sleeves: For pipes NPS 6 and larger, penetrating gypsum-board

partitions.

4. Except for underground wall penetrations, seal annular space between sleeve and pipe or pipe insulation, using joint sealants appropriate for size, depth, and location of joint. Refer to Division 7 Section "Joint Sealants" for materials and installation.

Page 43: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-7

Q. Aboveground, Exterior-Wall Pipe Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.

1. Install steel pipe for sleeves smaller than 6 inches in diameter. 2. Install cast-iron "wall pipes" for sleeves 6 inches and larger in diameter. 3. Mechanical Sleeve Seal Installation: Select type and number of sealing elements

required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.

R. Underground, Exterior-Wall Pipe Penetrations: Install cast-iron "wall pipes" for sleeves. Seal pipe penetrations using mechanical sleeve seals. Select sleeve size to allow for 1-inch annular clear space between pipe and sleeve for installing mechanical sleeve seals.

1. Mechanical Sleeve Seal Installation: Select type and number of sealing elements required for pipe material and size. Position pipe in center of sleeve. Assemble mechanical sleeve seals and install in annular space between pipe and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.

S. Verify final equipment locations for roughing-in.

T. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.

3.2 PIPING JOINT CONSTRUCTION

A. Join pipe and fittings according to the following requirements and Division 22 Sections specifying piping systems.

B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.

E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube" Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.

F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.

H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.

Page 44: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-8

I. Plastic Piping Solvent-Cement Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

1. Comply with ASTM F 402 for safe-handling practice of cleaners, primers, and solvent cements.

2. ABS Piping: Join according to ASTM D 2235 and ASTM D 2661 Appendixes. 3. CPVC Piping: Join according to ASTM D 2846/D 2846M Appendix. 4. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket

fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.

5. PVC Nonpressure Piping: Join according to ASTM D 2855. 6. PVC to ABS Nonpressure Transition Fittings: Join according to ASTM D 3138 Appendix.

J. Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212.

3.3 PIPING CONNECTIONS

A. Make connections according to the following, unless otherwise indicated:

1. Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection to each piece of equipment.

2. Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final connection to each piece of equipment.

3. Dry Piping Systems: Install dielectric unions and flanges to connect piping materials of dissimilar metals.

4. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.

3.4 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS

A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.

B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.

C. Install plumbing equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.

D. Install equipment to allow right of way for piping installed at required slope.

3.5 PAINTING

A. Painting of plumbing systems, equipment, and components is specified in Division 9 Section "Painting."

B. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.

3.6 CONCRETE BASES

A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's written instructions and according to seismic codes at Project.

1. Construct concrete bases of dimensions indicated, but not less than 4 inches larger in both directions than supported unit.

2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of the base.

Page 45: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON WORK RESULTS FOR PLUMBING 22 05 12-9

3. Install epoxy-coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor.

4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

5. Install anchor bolts to elevations required for proper attachment to supported equipment. 6. Install anchor bolts according to anchor-bolt manufacturer's written instructions. 7. Use 3000-psi, 28-day compressive-strength concrete and reinforcement as specified in

Division 3 Section "Cast-in-Place Concrete."

3.7 GROUTING

A. Mix and install grout for plumbing equipment base bearing surfaces, pump and other equipment base plates, and anchors.

B. Clean surfaces that will come into contact with grout.

C. Provide forms as required for placement of grout.

D. Avoid air entrapment during placement of grout.

E. Place grout, completely filling equipment bases.

F. Place grout on concrete bases and provide smooth bearing surface for equipment.

G. Place grout around anchors.

H. Cure placed grout.

END OF SECTION 22 05 12

Page 46: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 22 05 13 - 1

DIVISION 22 - PLUMBING

SECTION 22 05 13 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

PART 1 - GENERAL

1.1 WORK INCLUDES

A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:

1. Motor controllers. 2. Torque, speed, and horsepower requirements of the load. 3. Ratings and characteristics of supply circuit and required control sequence. 4. Ambient and environmental conditions of installation location.

PART 2 - PRODUCTS

2.1 GENERAL MOTOR REQUIREMENTS

A. Comply with requirements in this Section except when stricter requirements are specified in plumbing equipment schedules or Sections.

B. Comply with NEMA MG 1 unless otherwise indicated.

C. Comply with IEEE 841 for severe-duty motors.

2.2 MOTOR CHARACTERISTICS

A. Duty: Continuous duty at ambient temperature of 40 deg C.

B. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with indicated operating sequence, and without exceeding nameplate ratings or considering service factor.

2.3 SINGLE-PHASE MOTORS

A. Motors larger than 1/20 hp shall be one of the following, to suit starting torque and requirements of specific motor application:

1. Permanent-split capacitor. 2. Split phase. 3. Capacitor start, inductor run. 4. Capacitor start, capacitor run. 5. ECM.

B. Bearings: Prelubricated, antifriction ball bearings or sleeve bearings suitable for radial and thrust loading.

C. Motors 1/20 HP and Smaller: Shaded-pole or ECM type.

D. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation. Thermal-protection device shall automatically reset when motor temperature returns to normal range.

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 22 05 13

Page 47: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

METERS AND GAGES FOR PLUMBING PIPING 22 05 19 - 1

DIVISION 22 - PLUMBING SECTION 22 05 19 - METERS AND GAGES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Liquid-in-glass thermometers.

B. Dial-type pressure gages.

C. Gage attachments.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 LIQUID-IN-GLASS THERMOMETERS

A. Metal-Case, Industrial-Style, Liquid-in-Glass Thermometers:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Weksler. b. Palmer Wahl Instrumentation Group. c. Trerice, H. O. Co. d. Weiss Instruments, Inc. e. Winters Instruments - U.S.

2. Standard: ASME B40.200. 3. Case: Cast aluminum, 9-inch nominal size unless otherwise indicated. 4. Case Form: Adjustable angle unless otherwise indicated. 5. Tube: Glass with magnifying lens and red organic liquid. 6. Tube Background: Nonreflective aluminum with permanently etched scale markings graduated in

deg F. 7. Window: Glass. 8. Stem: Aluminum and of length to suit installation.

a. Design for Thermowell Installation: Bare stem.

9. Connector: 1-1/4 inches, with ASME B1.1 screw threads. 10. Accuracy: Plus or minus 1 percent of scale range or one scale division, to a maximum of 1.5

percent of scale range.

2.2 PRESSURE GAGES

A. Direct-Mounted, Metal-Case, Dial-Type Pressure Gages:

Page 48: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

METERS AND GAGES FOR PLUMBING PIPING 22 05 19 - 2

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. AMETEK, Inc.; U.S. Gauge. b. Ashcroft Inc. c. Marsh. d. Palmer Wahl Instrumentation Group. e. Trerice. f. Weksler g. Weiss Instruments, Inc. h. Winters Instruments - U.S.

2. Standard: ASME B40.100. 3. Case: Liquid-filled type; cast aluminum or drawn steel; 4-1/2-inch nominal diameter. 4. Pressure-Element Assembly: Bourdon tube unless otherwise indicated. 5. Pressure Connection: Brass, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and bottom-

outlet type unless back-outlet type is indicated. 6. Movement: Mechanical, with link to pressure element and connection to pointer. 7. Dial: Nonreflective aluminum with permanently etched scale markings graduated in psi. 8. Pointer: Dark-colored metal. 9. Window: Glass. 10. Ring: Stainless steel. 11. Accuracy: Grade B, plus or minus 2 percent of middle half of scale range.

2.3 GAGE ATTACHMENTS

A. Snubbers: ASME B40.100, brass; with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and piston-type surge-dampening device. Include extension for use on insulated piping.

B. Valves: Brass or stainless-steel needle, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install direct-mounted pressure gages in piping tees with pressure gage located on pipe at the most readable position.

B. Install valve and snubber in piping for each pressure gage for fluids.

C. Install thermometers in the following locations:

1. Outlet of each water heater. 2. Inlets and outlets of each domestic water heat exchanger. 3. Inlet and outlet of each domestic hot-water storage tank. 4. Outlet of each mixing valve.

D. Install pressure gages in the following locations:

1. Building water service entrance into building. 2. Inlet and outlet of each pressure-reducing valve.

3.2 CONNECTIONS

A. Install meters and gages adjacent to machines and equipment to allow service and maintenance of meters, gages, machines, and equipment.

3.3 ADJUSTING

A. Adjust faces of meters and gages to proper angle for best visibility.

Page 49: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

METERS AND GAGES FOR PLUMBING PIPING 22 05 19 - 3

3.4 THERMOMETER SCALE-RANGE SCHEDULE

A. Scale Range for Domestic Cold-Water Piping: 0 to 100 deg F.

B. Scale Range for Domestic Hot-Water Piping: 0 to 250 deg F.

3.5 PRESSURE-GAGE SCALE-RANGE SCHEDULE

A. Scale Range for Water Service Piping: 0 to 100 psi.

B. Scale Range for Domestic Water Piping: 0 to 100 psi.

END OF SECTION 22 05 19

Page 50: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23 - 1

DIVISION 22 - PLUMBING SECTION 22 05 23 - GENERAL-DUTY VALVES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Bronze ball valves.

B. Bronze swing check valves.

C. Related Sections:

1. Division 22 plumbing piping Sections for specialty valves applicable to those Sections only. 2. Division 22 Section "Identification for Plumbing Piping and Equipment" for valve tags and

schedules. 3. Division 22 Section “Facility Water Distribution Piping” for general-duty and specialty valves for

site construction piping.

1.3 DEFINITIONS

A. CWP: Cold working pressure.

B. EPDM: Ethylene propylene copolymer rubber.

C. NBR: Acrylonitrile-butadiene, Buna-N, or nitrile rubber.

D. NRS: Nonrising stem.

E. OS&Y: Outside screw and yoke.

F. RS: Rising stem.

G. SWP: Steam working pressure.

1.4 SUBMITTALS

A. Product Data: For each type of valve indicated.

1.5 QUALITY ASSURANCE

A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.

B. ASME Compliance:

1. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria. 2. ASME B31.1 for power piping valves. 3. ASME B31.9 for building services piping valves.

Page 51: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23 - 2

C. NSF Compliance: NSF 61 for valve materials for potable-water service.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Prepare valves for shipping as follows:

1. Protect internal parts against rust and corrosion. 2. Protect threads, flange faces, grooves, and weld ends. 3. Set angle, gate, and globe valves closed to prevent rattling. 4. Set ball and plug valves open to minimize exposure of functional surfaces. 5. Set butterfly valves closed or slightly open. 6. Block check valves in either closed or open position.

B. Use the following precautions during storage:

1. Maintain valve end protection. 2. Store valves indoors and maintain at higher than ambient dew point temperature. If outdoor

storage is necessary, store valves off the ground in watertight enclosures.

C. Use sling to handle large valves; rig sling to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS FOR VALVES

A. Refer to valve schedule articles for applications of valves.

B. Valve Pressure and Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

C. Valve Sizes: Same as upstream piping unless otherwise indicated.

D. Valve Actuator Types: 1. Handlever: For quarter-turn valves NPS 6 and smaller except plug valves. 2. Wrench: For plug valves with square heads. Furnish Owner with 1 wrench for every 5 plug

valves, for each size square plug-valve head.

E. Valves in Insulated Piping: With 2-inch stem extensions and the following features: 1. Ball Valves: With extended operating handle of non-thermal-conductive material, and protective

sleeve that allows operation of valve without breaking the vapor seal or disturbing insulation. 2. Butterfly Valves: With extended neck.

F. Valve-End Connections:

1. Flanged: With flanges according to ASME B16.1 for iron valves. 2. Grooved: With grooves according to AWWA C606. 3. Solder Joint: With sockets according to ASME B16.18. 4. Threaded: With threads according to ASME B1.20.1.

2.2 BALL VALVES

A. Two-Piece, Full-Port, Bronze or Brass Ball Valves with Bronze or Brass Trim:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. American Valve, Inc.

Page 52: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23 - 3

b. Conbraco Industries, Inc.; Apollo Valves. c. Crane Co.; Crane Valve Group; Crane Valves. d. Hammond Valve. e. Milwaukee Valve Company. f. NIBCO INC. g. Red-White Valve Corporation. h. Watts Regulator Co.; a division of Watts Water Technologies, Inc.

2. Description: a. Standard: MSS SP-110. b. SWP Rating: 150 psig. c. CWP Rating: 600 psig. d. Body Design: Two piece. e. Body Material: Bronze or Brass. f. Ends: Threaded or sweat. g. Seats: PTFE or TFE. h. Stem: Bronze or Brass. i. Ball: Chrome-plated brass. j. Port: Full.

2.3 BRONZE SWING CHECK VALVES

A. Class 125, Bronze Swing Check Valves with Bronze Disc:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. American Valve, Inc. b. Crane Co.; Crane Valve Group; Crane Valves. c. Crane Co.; Crane Valve Group; Jenkins Valves. d. Crane Co.; Crane Valve Group; Stockham Division. e. Hammond Valve. f. Kitz Corporation. g. Milwaukee Valve Company. h. NIBCO INC. i. Powell Valves. j. Red-White Valve Corporation. k. Watts Regulator Co.; a division of Watts Water Technologies, Inc. l. Zy-Tech Global Industries, Inc.

2. Description: a. Standard: MSS SP-80, Type 3. b. CWP Rating: 200 psig. c. Body Design: Horizontal flow. d. Body Material: ASTM B 62, bronze. e. Ends: Threaded. f. Disc: Bronze.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

Page 53: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GENERAL-DUTY VALVES FOR PLUMBING PIPING 22 05 23 - 4

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Do not attempt to repair defective valves; replace with new valves.

3.2 VALVE INSTALLATION

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valves in horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow full stem movement.

E. Install check valves for proper direction of flow and as follows:

1. Swing Check Valves: In horizontal position with hinge pin level.

3.3 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

3.4 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valve applications are not indicated, use the following:

1. Shutoff Service: Ball valves. 2. Throttling Service: Ball valves.

B. If valves with specified SWP classes or CWP ratings are not available, the same types of valves with higher SWP classes or CWP ratings may be substituted.

C. Select valves, except wafer types, with the following end connections:

1. For Copper Tubing, NPS 2 and Smaller: solder ends. 2. For Steel Piping, NPS 2 and Smaller: threaded ends.

3.5 DOMESTIC, HOT- AND COLD-WATER VALVE SCHEDULE

A. Pipe NPS 2 and Smaller: 1. Ball Valves: Two piece, full port. 2. Bronze Swing Check Valves: Class 125, nonmetallic disc.

B. Pipe NPS 2-1/2 and Larger: 1. Full port two piece ball valves.

END OF SECTION 22 05 23

Page 54: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 29 - 1

DIVISION 22 - PLUMBING SECTION 22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Metal pipe hangers and supports.

B. Trapeze pipe hangers.

C. Thermal-hanger shield inserts.

D. Fastener systems.

E. Pipe positioning systems.

F. Equipment supports.

G. Related Sections:

1. Division 5 Section "Metal Fabrications" for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports.

1.3 DEFINITIONS

A. MSS: Manufacturers Standardization Society of The Valve and Fittings Industry Inc.

1.4 PERFORMANCE REQUIREMENTS

A. Structural Performance: Hangers and supports for plumbing piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.

1.5 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Welding certificates.

1.6 QUALITY ASSURANCE

A. Structural Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."

B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.

Page 55: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 29 - 2

PART 2 - PRODUCTS

2.1 METAL PIPE HANGERS AND SUPPORTS

A. Carbon-Steel Pipe Hangers and Supports:

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components. 2. Galvanized Metallic Coatings: Pregalvanized or hot dipped. 3. Nonmetallic Coatings: Plastic coating, jacket, or liner. 4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support

bearing surface of piping. 5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

B. Copper Pipe Hangers:

1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel .

2.2 TRAPEZE PIPE HANGERS

A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.

2.3 THERMAL-HANGER SHIELD INSERTS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Carpenter & Paterson, Inc. 2. Clement Support Services. 3. ERICO International Corporation. 4. National Pipe Hanger Corporation. 5. PHS Industries, Inc. 6. Pipe Shields, Inc.; a subsidiary of Piping Technology & Products, Inc. 7. Piping Technology & Products, Inc. 8. Rilco Manufacturing Co., Inc. 9. Value Engineered Products, Inc.

B. Insulation-Insert Material for Cold Piping: ASTM C 552, Type II cellular glass with 100-psig minimum compressive strength and vapor barrier.

C. Insulation-Insert Material for Hot Piping: ASTM C 552, Type II cellular glass with 100-psig minimum compressive strength.

D. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.

E. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.

F. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.

2.4 PIPE STANDS

A. General Requirements for Pipe Stands: Shop- or field-fabricated assemblies made of manufactured corrosion-resistant components to support roof-mounted piping.

B. Compact Pipe Stand: One-piece plastic unit with integral-rod roller, pipe clamps, or V-shaped cradle to support pipe, for roof installation without membrane penetration.

Page 56: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 29 - 3

C. Low-Type, Single-Pipe Stand: One-piece stainless-steel base unit with plastic roller, for roof installation without membrane penetration.

D. High-Type, Single-Pipe Stand:

1. Description: Assembly of base, vertical and horizontal members, and pipe support, for roof installation without membrane penetration.

2. Base: Plastic. 3. Vertical Members: Two or more stainless-steel, continuous-thread rods. 4. Horizontal Member: Stainless-steel rod with plastic or stainless-steel, roller-type pipe support.

E. High-Type, Multiple-Pipe Stand:

1. Description: Assembly of bases, vertical and horizontal members, and pipe supports, for roof installation without membrane penetration.

2. Bases: One or more; plastic. 3. Vertical Members: Two or more protective-coated-steel channels. 4. Horizontal Member: Protective-coated-steel channel. 5. Pipe Supports: Galvanized-steel, clevis-type pipe hangers.

F. Roof Mounted Piping Supports: Pre-manufactured supports by “Miro” Industries or equivalent.

2.5 PIPE POSITIONING SYSTEMS

A. Description: IAPMO PS 42, positioning system of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications.

2.6 EQUIPMENT SUPPORTS

A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.

2.7 MISCELLANEOUS MATERIALS

A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.

B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.

1. Properties: Nonstaining, noncorrosive, and nongaseous. 2. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength.

PART 3 - EXECUTION

3.1 HANGER AND SUPPORT INSTALLATION

A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.

B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.

1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.

2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.

C. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.

Page 57: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 29 - 4

D. Pipe Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture. See Division 22 plumbing fixture Sections for requirements for pipe positioning systems for plumbing fixtures.

E. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

F. Equipment Support Installation: Fabricate from welded-structural-steel shapes.

G. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

H. Install lateral bracing with pipe hangers and supports to prevent swaying.

I. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.

J. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

K. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

L. Insulated Piping:

1. Attach clamps and spacers to piping. a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation. b. Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with

clamp sized to match OD of insert. c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.

2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation. a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate

for pipe NPS 4 and larger if pipe is installed on rollers.

3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees. a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate

for pipe NPS 4 and larger if pipe is installed on rollers.

4. Shield Dimensions for Pipe: Not less than the following: a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick. b. NPS 4: 12 inches long and 0.06 inch thick. c. NPS 5 and NPS 6: 18 inches long and 0.06 inch thick.

5. Pipes NPS 8 and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.

6. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.

3.2 EQUIPMENT SUPPORTS

A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.

B. Grouting: Place grout under supports for equipment and make bearing surface smooth.

Page 58: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 29 - 5

C. Provide lateral bracing, to prevent swaying, for equipment supports.

3.3 METAL FABRICATIONS

A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.

B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding work; and with the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. 4. Finish welds at exposed connections so no roughness shows after finishing and so contours of

welded surfaces match adjacent contours.

3.4 ADJUSTING

A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.

3.5 PAINTING

A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surfaces.

1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils.

B. Touchup: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal are specified in Division 9 painting Sections.

C. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780.

3.6 HANGER AND SUPPORT SCHEDULE

A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.

D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.

E. Use carbon-steel pipe hangers and supports and metal trapeze pipe hangers and attachments for general service applications.

F. Use copper-plated pipe hangers and copper attachments for copper piping and tubing in contact with the hanger.

Page 59: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 29 - 6

G. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes.

2. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4, to allow off-center closure for hanger installation before pipe erection.

3. Adjustable, Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of noninsulated, stationary pipes NPS 3/4 to NPS 8 (DN 20 to DN 200).

H. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to NPS 24. 2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to

NPS 24 if longer ends are required for riser clamps.

I. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads. 2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations. 3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings. 4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building

attachments. 5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F (49 to 232 deg C) piping

installations.

J. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types: 1. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction,

to attach to top flange of structural shape. 2. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams,

channels, or angles. 3. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams. 4. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are

considerable and rod sizes are large. 5. C-Clamps (MSS Type 23): For structural shapes. 6. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange

edge. 7. Side-Beam Clamps (MSS Type 27): For bottom of steel I-beams. 8. Steel-Beam Clamps with Eye Nuts (MSS Type 28): For attaching to bottom of steel I-beams for

heavy loads. 9. Linked-Steel Clamps with Eye Nuts (MSS Type 29): For attaching to bottom of steel I-beams for

heavy loads, with link extensions. 10. Malleable-Beam Clamps with Extension Pieces (MSS Type 30): For attaching to structural steel. 11. Welded-Steel Brackets: For support of pipes from below or for suspending from above by using

clip and rod. Use one of the following for indicated loads: a. Light (MSS Type 31): 750 lb. b. Medium (MSS Type 32): 1500 lb. c. Heavy (MSS Type 33): 3000 lb.

12. Side-Beam Brackets (MSS Type 34): For sides of steel or wooden beams. 13. Plate Lugs (MSS Type 57): For attaching to steel beams if flexibility at beam is required. 14. Horizontal Travelers (MSS Type 58): For supporting piping systems subject to linear horizontal

movement where headroom is limited.

K. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

Page 60: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 22 05 29 - 7

1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.

2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.

3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.

L. Comply with MSS SP-69 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.

M. Comply with MFMA-103 for metal framing system selections and applications that are not specified in piping system Sections.

N. Use powder-actuated fasteners or mechanical-expansion anchors instead of building attachments where required in concrete construction.

O. Use pipe positioning systems in pipe spaces behind plumbing fixtures to support supply and waste piping for plumbing fixtures.

END OF SECTION 22 05 29

Page 61: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 05 53 - 1

DIVISION 22 - PLUMBING SECTION 22 05 53 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Equipment labels.

B. Warning signs and labels.

C. Pipe labels.

D. Valve tags.

E. Warning tags.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Equipment Label Schedule: Include a listing of all equipment to be labeled with the proposed content for each label.

C. Valve numbering scheme.

D. Valve Schedules: For each piping system to include in maintenance manuals.

1.4 COORDINATION

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

PART 2 - PRODUCTS

2.1 EQUIPMENT LABELS

A. Plastic Labels for Equipment:

1. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/16 inch 1/8 inch thick, and having predrilled holes for attachment hardware.

2. Letter Color: Black. 3. Background Color: White.

Page 62: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 05 53 - 2

4. Maximum Temperature: Able to withstand temperatures up to 160 deg F. 5. Minimum Label Size: Length and width vary for required label content, but not less than

2-1/2 by 3/4 inch. 6. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24

inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

7. Fasteners: Stainless-steel self-tapping screws. 8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

B. Label Content: Include equipment's Drawing designation or unique equipment number, Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified.

2.2 WARNING SIGNS AND LABELS

A. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/16 inch thick, and having predrilled holes for attachment hardware.

B. Letter Color: Black.

C. Background Color: White.

D. Maximum Temperature: Able to withstand temperatures up to 160 deg F .

E. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

F. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

G. Fasteners: Stainless-steel self-tapping screws.

H. Label Content: Include caution and warning information, plus emergency notification instructions.

2.3 PIPE LABELS

A. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service, and showing flow direction.

B. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to partially cover circumference of pipe and to attach to pipe without fasteners or adhesive.

C. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

D. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings, pipe size, and an arrow indicating flow direction.

1. Flow-Direction Arrows: Integral with piping system service lettering to accommodate both directions, or as separate unit on each pipe label to indicate flow direction.

2. Lettering Size: At least 1-1/2 inches high.

Page 63: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 05 53 - 3

2.4 VALVE TAGS

A. Valve Tags: Stamped or engraved with 1/4-inch letters for piping system abbreviation and 1/2-inch numbers.

1. Tag Material: Brass, 0.032-inch, minimum thickness, and having predrilled or stamped holes for attachment hardware.

2. Fasteners: Brass S-hook.

B. Valve Schedules: For each piping system, on 8-1/2-by-11-inch bond paper. Tabulate valve number, piping system, system abbreviation (as shown on valve tag), location of valve (room or space), normal-operating position (open, closed, or modulating), and variations for identification. Mark valves for emergency shutoff and similar special uses.

1. Valve-tag schedule shall be included in operation and maintenance data.

2.5 WARNING TAGS

A. Warning Tags: Preprinted or partially preprinted, accident-prevention tags, of plasticized card stock with matte finish suitable for writing.

1. Size: 3 by 5-1/4 inches minimum. 2. Fasteners: Reinforced grommet and wire. 3. Nomenclature: Large-size primary caption such as "DANGER," "CAUTION," or "DO NOT

OPERATE." 4. Color: Yellow background with black lettering.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean piping and equipment surfaces of substances that could impair bond of identification devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.

3.2 EQUIPMENT LABEL INSTALLATION

A. Install or permanently fasten labels on each major item of mechanical equipment.

B. Locate equipment labels where accessible and visible.

3.3 PIPE LABEL INSTALLATION

A. Piping Color-Coding: Painting of piping is specified in Division 9 Section "Interior Painting."

B. Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

1. Near each valve and control device. 2. Near each branch connection, excluding short takeoffs for fixtures and terminal units.

Where flow pattern is not obvious, mark each pipe at branch. 3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures.

Page 64: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 05 53 - 4

4. At access doors, manholes, and similar access points that permit view of concealed piping.

5. Near major equipment items and other points of origination and termination. 6. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in

areas of congested piping and equipment. 7. On piping above removable acoustical ceilings. Omit intermediately spaced labels.

C. Pipe Label Color Schedule:

1. Domestic Water Piping: a. Background Color: White. b. Letter Color: Blue.

2. Sanitary Waste and Storm Drainage Piping: a. Background Color: White. b. Letter Color: Yellow.

3.4 VALVE-TAG INSTALLATION

A. Install tags on valves and control devices in piping systems, except check valves; valves within factory-fabricated equipment units; shutoff valves; faucets; convenience and lawn-watering hose connections; and similar roughing-in connections of end-use fixtures and units. List tagged valves in a valve schedule.

B. Valve-Tag Application Schedule: Tag valves according to size, shape, and color scheme and with captions similar to those indicated in the following subparagraphs:

1. Valve-Tag Size and Shape: a. Cold Water: 1-1/2 inches, round. b. Hot Water: 1-1/2 inches, round.

2. Valve-Tag Color: a. Cold Water: Natural. b. Hot Water: Natural.

3. Letter Color: a. Cold Water: Black. b. Hot Water: Black.

3.5 WARNING-TAG INSTALLATION

A. Write required message on, and attach warning tags to, equipment and other items where required.

END OF SECTION 22 05 53

Page 65: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 1

DIVISION 22 - PLUMBING SECTION 22 07 19 - PLUMBING INSULATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Insulation of plumbing piping, including the following:

1. Insulation Materials: a. Flexible elastomeric. b. Mineral fiber.

2. Insulating cements. 3. Adhesives. 4. Mastics. 5. Lagging adhesives. 6. Sealants. 7. Factory-applied jackets. 8. Field-applied PVC fitting covers.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated. Include thermal conductivity, thickness, and jackets (both factory and field applied, if any).

1.4 QUALITY ASSURANCE

A. Installer Qualifications: Skilled mechanics who have successfully completed an apprenticeship program or another craft training program certified by the Department of Labor, Bureau of Apprenticeship and Training.

B. Fire-Test-Response Characteristics: Insulation and related materials shall have fire-test-response characteristics indicated, as determined by testing identical products per ASTM E 84, by a testing and inspecting agency acceptable to authorities having jurisdiction. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, with appropriate markings of applicable testing and inspecting agency.

1. Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Packaging: Insulation material containers shall be marked by manufacturer with appropriate ASTM standard designation, type and grade, and maximum use temperature.

Page 66: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 2

1.6 COORDINATION

A. Coordinate size and location of supports, hangers, and insulation shields specified in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment."

B. Coordinate clearance requirements with piping Installer for piping insulation application and equipment Installer for equipment insulation application. Before preparing piping Shop Drawings, establish and maintain clearance requirements for installation of insulation and field-applied jackets and finishes and for space required for maintenance.

1.7 SCHEDULING

A. Schedule insulation application after pressure testing systems and, where required, after installing and testing heat tracing. Insulation application may begin on segments that have satisfactory test results.

B. Complete installation and concealment of plastic materials as rapidly as possible in each area of construction.

PART 2 - PRODUCTS

2.1 INSULATION MATERIALS

A. Comply with requirements in Part 3 schedule articles for where insulating materials shall be applied.

B. Products shall not contain asbestos, lead, mercury, or mercury compounds.

C. Flexible Elastomeric: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Type I for tubular materials and Type II for sheet materials.

1. Manufacturer: Subject to compliance with requirements, provide insulation by one of the following: a. Aeroflex USA Inc. b. Armacell LLC. c. RBX Corporation. d. Halstead.

D. Mineral-Fiber Blanket Insulation: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C 553, Type II and ASTM C 1290, Type I. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

1. Manufacturer: Subject to compliance with requirements, provide insulation by one of the following: a. CertainTeed Corp. b. Johns Manville. c. Knauf Insulation. d. Manson Insulation Inc. e. Owens Corning.

E. Mineral-Fiber, Preformed Pipe Insulation:

1. Manufacturer: Subject to compliance with requirements, provide insulation by one of the following: a. Johns Manville. b. Knauf Insulation. c. Manson Insulation Inc. d. Owens Corning.

Page 67: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 3

2. Type I, 850 deg F Materials: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTM C 547, Type I, Grade A, with factory-applied ASJ. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

2.2 ADHESIVES

A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated, unless otherwise indicated.

B. Flexible Elastomeric Adhesive: Comply with MIL-A-24179A, Type II, Class I.

1. Manufacturer: Subject to compliance with requirements, provide products by one of the following: a. Aeroflex USA Inc. b. Armacell LCC. c. Foster Products Corporation, H. B. Fuller Company. d. RBX Corporation. e. Halstead.

2. For indoor applications, use adhesive that has a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

C. Mineral-Fiber Adhesive: Comply with MIL-A-3316C, Class 2, Grade A.

1. Manufacturer: Subject to compliance with requirements, provide products by one of the following: a. Childers Products, Division of ITW. b. Foster Products Corporation, H. B. Fuller Company. c. ITW TACC, Division of Illinois Tool Works. d. Marathon Industries, Inc. e. Mon-Eco Industries, Inc.

2. For indoor applications, use adhesive that has a VOC content of 80 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

D. PVC Jacket Adhesive: Compatible with PVC jacket.

1. Manufacturer: Subject to compliance with requirements, provide products by one of the following: a. Dow Chemical Company. b. Johns-Manville. c. P.I.C. Plastics, Inc. d. Speedline Corporation.

E. Adhesives shall comply with LEED requirements.

2.3 MASTICS

A. Materials shall be compatible with insulation materials, jackets, and substrates; comply with MIL-C-19565C, Type II.

B. Vapor-Barrier Mastic: Solvent based; suitable for indoor use on below ambient services.

1. Manufacturer: Subject to compliance with requirements, provide products by one of the following: a. Childers Products, Division of ITW. b. Foster Products Corporation, H. B. Fuller Company. c. ITW TACC, Division of Illinois Tool Works. d. Marathon Industries, Inc. e. Mon-Eco Industries, Inc.

Page 68: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 4

2. Water-Vapor Permeance: ASTM F 1249, 0.05 perm (0.03 metric perm) at 35-mil (0.9-mm) dry film thickness.

3. Service Temperature Range: 0 to 180 deg F (Minus 18 to plus 82 deg C). 4. Solids Content: ASTM D 1644, 44 percent by volume and 62 percent by weight. 5. Color: White.

C. Mastics shall comply with LEED requirements.

2.4 SEALANTS

A. ASJ Flashing Sealants, and Vinyl, PVDC, and PVC Jacket Flashing Sealants:

1. Materials shall be compatible with insulation materials, jackets, and substrates. 2. Fire- and water-resistant, flexible, elastomeric sealant. 3. Service Temperature Range: Minus 40 to plus 250 deg F (Minus 40 to plus 121 deg C). 4. Color: White.

B. Sealants shall comply with LEED requirements.

2.5 FACTORY-APPLIED JACKETS

A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:

1. ASJ: White, kraft-paper, fiberglass-reinforced scrim with aluminum-foil backing; complying with ASTM C 1136, Type I.

2. ASJ-SSL: ASJ with self-sealing, pressure-sensitive, acrylic-based adhesive covered by a removable protective strip; complying with ASTM C 1136, Type I.

2.6 FIELD-APPLIED FITTING COVERS

A. PVC Fitting Covers: High-impact-resistant, UV-resistant PVC complying with ASTM D 1784, Class 16354-C; thickness as scheduled; roll stock ready for shop or field cutting and forming. Covers shall not exceed ASTM E-84 25 flame spread and 50 smoke developed rating.

1. Manufacturer: Subject to compliance with requirements, provide products by one of the following: a. Johns Manville. b. P.I.C. Plastics, Inc. c. Proto PVC Corporation. d. Speedline Corporation.

2. Adhesive: As recommended by jacket material manufacturer. 3. Color: White. 4. Factory-fabricated fitting covers to match jacket if available; otherwise, field fabricate.

2.7 TAPES

A. ASJ Tape: White vapor-retarder tape matching factory-applied jacket with acrylic adhesive, complying with ASTM C 1136.

1. Manufacturer: Subject to compliance with requirements, provide products by one of the following: a. Avery Dennison Corporation, Specialty Tapes Division. b. Compac Corp. c. Ideal Tape Co., Inc., an American Biltrite Company. d. Venture Tape; 1540 CW Plus, 1542 CW Plus, and 1542 CW Plus/SQ. e. 3M.

Page 69: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 5

2. Width: 3 inches. 3. Thickness: 11.5 mils. 4. Adhesion: 90 ounces force/inch in width. 5. Elongation: 2 percent. 6. Tensile Strength: 40 lbf/inch in width. 7. ASJ Tape Disks and Squares: Precut disks or squares of ASJ tape.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions for compliance with requirements for installation and other conditions affecting performance of insulation application.

1. Verify that systems and equipment to be insulated have been tested and are free of defects. 2. Verify that surfaces to be insulated are clean and dry. 3. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.

B. Surface Preparation: Clean and prepare surfaces to be insulated. Before insulating, apply a corrosion coating to insulated surfaces as follows: 1. Carbon Steel: Coat carbon steel operating at a service temperature between 32 and 300 deg F

with an epoxy coating. Consult coating manufacturer for appropriate coating materials and application methods for operating temperature range.

C. Mix insulating cements with clean potable water; if insulating cements are to be in contact with stainless-steel surfaces, use demineralized water.

3.3 GENERAL INSTALLATION REQUIREMENTS

A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of equipment and piping including fittings, valves, and specialties.

B. Install insulation materials, forms, vapor barriers or retarders, jackets, and thicknesses required for each item of equipment and pipe system as specified in insulation system schedules.

C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.

D. Install insulation with longitudinal seams at top and bottom of horizontal runs.

E. Install multiple layers of insulation with longitudinal and end seams staggered.

F. Do not weld brackets, clips, or other attachment devices to piping, fittings, and specialties.

G. Keep insulation materials dry during application and finishing.

H. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufacturer.

I. Install insulation with least number of joints practical.

Page 70: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 6

J. Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.

1. Install insulation continuously through hangers and around anchor attachments. 2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs

from point of attachment to supported item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.

3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by insulation material manufacturer.

4. Cover inserts with jacket material matching adjacent pipe insulation. Install shields over jacket, arranged to protect jacket from tear or puncture by hanger, support, and shield.

K. Apply adhesives, mastics, and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses.

L. Install insulation with factory-applied jackets as follows:

1. Draw jacket tight and smooth. 2. Cover circumferential joints with 3-inch wide strips, of same material as insulation jacket. Secure

strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c. 3. Overlap jacket longitudinal seams at least 1-1/2 inches. Install insulation with longitudinal seams

at bottom of pipe. Clean and dry surface to receive self-sealing lap. Staple laps with outward clinching staples along edge at 4 inches o.c. a. For below ambient services, apply vapor-barrier mastic over staples.

4. Cover joints and seams with tape as recommended by insulation material manufacturer to maintain vapor seal.

5. Where vapor barriers are indicated, apply vapor-barrier mastic on seams and joints and at ends adjacent to pipe flanges and fittings.

M. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness.

N. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.

O. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.

P. For above ambient services, do not install insulation to the following:

1. Vibration-control devices. 2. Testing agency labels and stamps. 3. Nameplates and data plates. 4. Manholes. 5. Handholes. 6. Cleanouts.

3.4 PENETRATIONS

A. Insulation Installation at Interior Wall and Partition Penetrations (Not Fire Rated): Install insulation continuously through walls and partitions.

B. Insulation Installation at Fire-Rated Wall and Partition Penetrations: Install insulation continuously through penetrations of fire-rated walls and partitions.

Page 71: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 7

1. Comply with requirements in Division 07 Section "Penetration Firestopping" firestopping and fire-resistive joint sealers.

3.5 GENERAL PIPE INSULATION INSTALLATION

A. Requirements in this article generally apply to all insulation materials except where more specific requirements are specified in various pipe insulation material installation articles.

B. Insulation Installation on Fittings, Valves, Strainers, Flanges, and Unions:

1. Install insulation over fittings, valves, strainers, flanges, unions, and other specialties with continuous thermal and vapor-retarder integrity, unless otherwise indicated.

2. Insulate pipe elbows using preformed fitting insulation or mitered fittings made from same material and density as adjacent pipe insulation. Each piece shall be butted tightly against adjoining piece and bonded with adhesive. Fill joints, seams, voids, and irregular surfaces with insulating cement finished to a smooth, hard, and uniform contour that is uniform with adjoining pipe insulation.

3. Insulate tee fittings with preformed fitting insulation or sectional pipe insulation of same material and thickness as used for adjacent pipe. Cut sectional pipe insulation to fit. Butt each section closely to the next and hold in place with tie wire. Bond pieces with adhesive.

4. Insulate valves using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. For valves, insulate up to and including the bonnets, valve stuffing-box studs, bolts, and nuts. Fill joints, seams, and irregular surfaces with insulating cement.

5. Insulate strainers using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. Fill joints, seams, and irregular surfaces with insulating cement. Insulate strainers so strainer basket flange or plug can be easily removed and replaced without damaging the insulation and jacket. Provide a removable reusable insulation cover. For below ambient services, provide a design that maintains vapor barrier.

6. Insulate flanges and unions using a section of oversized preformed pipe insulation. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker.

7. Cover segmented insulated surfaces with a layer of finishing cement and coat with a mastic. Install vapor-barrier mastic for below ambient services and a breather mastic for above ambient services. Reinforce the mastic with fabric-reinforcing mesh. Trowel the mastic to a smooth and well-shaped contour.

8. For services not specified to receive a field-applied jacket except for flexible elastomeric install fitted PVC cover over elbows, tees, strainers, valves, flanges, and unions. Terminate ends with PVC end caps. Tape PVC covers to adjoining insulation facing using PVC tape.

C. Insulate instrument connections for thermometers, pressure gages, pressure temperature taps, test connections, flow meters, sensors, switches, and transmitters on insulated pipes, vessels, and equipment. Shape insulation at these connections by tapering it to and around the connection with insulating cement and finish with finishing cement, mastic, and flashing sealant.

3.6 FLEXIBLE ELASTOMERIC INSULATION INSTALLATION

A. Seal longitudinal seams and end joints with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

B. Insulation Installation on Pipe Flanges:

1. Install pipe insulation to outer diameter of pipe flange.

Page 72: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 8

2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.

3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with cut sections of sheet insulation of same thickness as pipe insulation.

4. Secure insulation to flanges and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

C. Insulation Installation on Pipe Fittings and Elbows:

1. Install mitered sections of pipe insulation. 2. Secure insulation materials and seal seams with manufacturer's recommended adhesive to

eliminate openings in insulation that allow passage of air to surface being insulated.

D. Insulation Installation on Valves and Pipe Specialties:

1. Install preformed valve covers manufactured of same material as pipe insulation when available. 2. When preformed valve covers are not available, install cut sections of pipe and sheet insulation to

valve body. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.

3. Install insulation to flanges as specified for flange insulation application. 4. Secure insulation to valves and specialties and seal seams with manufacturer's recommended

adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.

3.7 MINERAL-FIBER INSULATION INSTALLATION

A. Insulation Installation on Straight Pipes and Tubes: 1. Where vapor barriers are indicated, seal longitudinal seams, end joints, and protrusions with

vapor-barrier mastic and joint sealant. 2. For insulation with factory-applied jackets on above ambient surfaces, secure laps with outward

clinched staples at 6 inches (150 mm) o.c. 3. For insulation with factory-applied jackets on below ambient surfaces, do not staple longitudinal

tabs but secure tabs with additional adhesive as recommended by insulation material manufacturer and seal with vapor-barrier mastic and flashing sealant.

B. Insulation Installation on Pipe Flanges:

1. Install preformed pipe insulation to outer diameter of pipe flange. 2. Make width of insulation section same as overall width of flange and bolts, plus twice the

thickness of pipe insulation. 3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent

straight pipe segments with mineral-fiber blanket insulation. 4. Install jacket material with manufacturer's recommended adhesive, overlap seams at least 1 inch,

and seal joints with flashing sealant.

C. Insulation Installation on Pipe Fittings and Elbows:

1. Install preformed sections of same material as straight segments of pipe insulation when available.

2. When preformed insulation elbows and fittings are not available, install mitered sections of pipe insulation, to a thickness equal to adjoining pipe insulation. Secure insulation materials with wire or bands.

D. Insulation Installation on Valves and Pipe Specialties:

1. Install preformed sections of same material as straight segments of pipe insulation when available.

Page 73: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PLUMBING INSULATION 22 07 19 - 9

2. When preformed sections are not available, install mitered sections of pipe insulation to valve body.

3. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.

4. Install insulation to flanges as specified for flange insulation application.

3.8 FINISHES

A. Exterior Flexible Elastomeric Thermal Insulation: After adhesive has fully cured, apply two coats of insulation manufacturer's recommended protective coating.

3.9 PIPING INSULATION SCHEDULE, GENERAL

A. Acceptable preformed pipe and tubular insulation materials and thicknesses are identified for each piping system and pipe size range. If more than one material is listed for a piping system, selection from materials listed is Contractor's option.

B. Items Not Insulated: Unless otherwise indicated, do not install insulation on the following: 1. Underground piping. 2. Chrome-plated pipes and fittings unless there is a potential for personnel injury.

3.10 INDOOR PIPING INSULATION SCHEDULE

A. Domestic Cold Water:

1. Insulation shall be one of the following: a. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1 inch thick.

2. Piping in wall spaces and chases only:

a. Flexible Elastomeric: 1 inch thick.

B. Domestic Hot and Recirculated Hot Water:

1. Insulation shall be one of the following: a. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1 inch thick.

2. Piping in wall spaces and chases only:

a. Flexible Elastomeric: 1 inch thick.

C. Exposed Sanitary Drains, Domestic Water, Domestic Hot Water, and Stops for Plumbing Fixtures for People with Disabilities:

1. All Pipe Sizes: Insulation shall be the following: a. Flexible Elastomeric: Pre-manufactured kit.

D. Horizontal Storm Water Piping Inside the Building:

1. All Pipe Sizes: Insulation shall be one of the following: a. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1 inch thick.

E. Roof and Overflow Drain Bodies:

1. All Pipe Sizes: Insulation shall be one of the following: a. Flexible Elastomeric: 1 inch thick. b. Mineral-Fiber, Preformed Pipe Insulation, Type I: 1 inch thick.

END OF SECTION 22 07 19

Page 74: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMISSIONING OF PLUMBING 22 08 00 - 1

DIVISION 22 - PLUMBING SECTION 22 08 00 - COMMISSIONING OF PLUMBING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Commissioning process requirements for plumbing systems, assemblies, and equipment.

B. Related Sections:

1. Division 01 Section "General Commissioning Requirements" for general commissioning process requirements.

1.3 DEFINITIONS

A. Commissioning Plan: A document that outlines the organization, schedule, allocation of resources, and documentation requirements of the commissioning process.

B. CxA: Commissioning Authority.

C. Systems, Subsystems, Equipment, and Components: Where these terms are used together or separately, they shall mean "as-built" systems, subsystems, equipment, and components.

1.4 CONTRACTOR'S RESPONSIBILITIES

A. Perform commissioning tests at the direction of the CxA.

B. Participate in plumbing systems, assemblies, equipment, and component maintenance orientation and inspection as directed by the CxA.

C. Provide information requested by the CxA for final commissioning documentation.

D. Provide measuring instruments and logging devices to record test data, and provide data acquisition equipment to record data for the complete range of testing for the required test period.

1.5 CxA'S RESPONSIBILITIES

A. Provide Project-specific construction checklists and commissioning process test procedures for actual plumbing systems, assemblies, equipment, and components to be furnished and installed as part of the construction contract.

B. Direct commissioning testing.

C. Provide test data, inspection reports, and certificates in Systems Manual.

Page 75: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMISSIONING OF PLUMBING 22 08 00 - 2

1.6 COMMISSIONING DOCUMENTATION

A. Provide the following information to the CxA for inclusion in the commissioning plan:

1. Plan for delivery and review of submittals, systems manuals, and other documents and reports. 2. Identification of installed systems, assemblies, equipment, and components including design

changes that occurred during the construction phase. 3. Process and schedule for completing construction checklists and manufacturer's prestart and

startup checklists for plumbing systems, assemblies, equipment, and components to be verified and tested.

4. Certificate of completion certifying that installation, prestart checks, and startup procedures have been completed.

5. Certificate of readiness certifying that plumbing systems, subsystems, equipment, and associated controls are ready for testing.

6. Test and inspection reports and certificates. 7. Corrective action documents.

1.7 SUBMITTALS

A. Certificates of readiness.

B. Certificates of completion of installation, prestart, and startup activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TESTING PREPARATION

A. Certify that plumbing systems, subsystems, and equipment have been installed, calibrated, and started and are operating according to the Contract Documents.

B. Certify that plumbing instrumentation and control systems have been completed and calibrated, that they are operating according to the Contract Documents, and that pretest set points have been recorded.

C. Set systems, subsystems, and equipment into operating mode to be tested (e.g., normal shutdown, normal auto position, normal manual position, unoccupied cycle, emergency power, and alarm conditions).

D. Inspect and verify the position of each device and interlock identified on checklists.

E. Testing Instrumentation: Install measuring instruments and logging devices to record test data as directed by the CxA.

3.2 GENERAL TESTING REQUIREMENTS

A. Provide technicians, instrumentation, and tools to perform commissioning test at the direction of the CxA.

B. Test all operating modes, interlocks, control responses, and responses to abnormal or emergency conditions, and verify proper response of building automation system controllers and sensors.

Page 76: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMISSIONING OF PLUMBING 22 08 00 - 3

C. The CxA along with the plumbing subcontractor shall prepare detailed testing plans, procedures, and checklists for plumbing systems, subsystems, and equipment.

D. Tests will be performed using design conditions whenever possible.

E. Simulated conditions may need to be imposed using an artificial load when it is not practical to test under design conditions. Before simulating conditions, calibrate testing instruments. Provide equipment to simulate loads. Set simulated conditions as directed by the CxA and document simulated conditions and methods of simulation. After tests, return settings to normal operating conditions.

F. The CxA may direct that set points be altered when simulating conditions is not practical.

G. If tests cannot be completed because of a deficiency outside the scope of the plumbing system, document the deficiency and report it to the Owner. After deficiencies are resolved, reschedule tests.

3.3 PLUMBING SYSTEMS, SUBSYSTEMS, AND EQUIPMENT TESTING PROCEDURES

A. Pipe system cleaning, flushing, hydrostatic tests, and chemical treatment requirements are specified in Division 22 piping Sections. Plumbing subcontractor shall prepare a pipe system cleaning, flushing, and hydrostatic testing plan. Provide cleaning, flushing, testing, and treating plan and final reports to the CxA. Plan shall include the following:

1. Sequence of testing and testing procedures for each section of pipe to be tested, identified by pipe zone or sector identification marker. Markers shall be keyed to Drawings for each pipe sector, showing the physical location of each designated pipe test section. Drawings keyed to pipe zones or sectors shall be formatted to allow each section of piping to be physically located and identified when referred to in pipe system cleaning, flushing, hydrostatic testing, and chemical treatment plan.

2. Description of equipment for flushing operations. 3. Minimum flushing water velocity. 4. Tracking checklist for managing and ensuring that all pipe sections have been cleaned, flushed,

hydrostatically tested, and chemically treated.

END OF SECTION 22 08 00

Page 77: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 13 – Water Service Taps and

Service Line Installation

Water Service Taps and Service Line Installation 22 11 13 - 1

PART1: GENERAL 1.01 SECTION INCLUDES

A. Tapping existing and/or new water mains and furnishin g and insta lling new service lines for water.

PART 2: PRODUCTS 2.01 MATERIAL S

A. Copper Tubing: Provide Type K “soft” copper service line s. Where existing service piping is d etermined to be ‘Copper’ new service piping shall b e ‘Copper Tubing’ to match existing.

B. Polyethylene Pipe and Tubing: In a ccordance with AWWA C901 when specif ied

on the Drawings or approved by the AW Project Manager. Refer to the below chart for acceptable service line materials.

Acceptable Service Line Materials and Application Material 3/4" 1" 1.5" 2" Greater than 2” Type K Copper X X X X HDPE X X X X X PVC SDR 21 X X PVC C 900/905 X Ductile Iron X

D. All service lines must have both a corporation stop and curb stop. E. Corporation Main Stops: AWWA C800 as modified in this Section:

1. Inlet End: AWWA standard thread. 2. Valve Body: Tapered plug type, O-ring seat ball type, or rub ber seat ball

type. 3. Outlet End: Flared-copper connection for use wit h Type K, soft copper o r

compression-type fitting.

F. Provide tap s for water line types and sizes in accordance with pipe tapping schedule located in Table 1 at end of this Section.

G. Dual Strap Saddles: Fusion epoxy coated saddles are acceptable as noted.

Page 78: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 13 – Water Service Taps and

Service Line Installation

Water Service Taps and Service Line Installation 22 11 13 - 2

H. Taps for PVC Watermains: Use dua l-strap or single, wide-band strap saddles or Wet Tapping Sleeves which provide full supp ort around circumference of pipe and bearin g area of sufficien t width along a xis of pipe, 2-inches minimum, ensuring th at pipe will not be distorted when saddle is tightened. Provide approved stainless-steel tapping saddle with AWWA standard thread.

I. Taps for St eel Pipe: Not allowed, unless specifically approved by AW Project

Manager. Use saddle only when tap is approved on steel pipe.

J. Curb Stops and Brass Fittings: AWWA C800 as modified in this Section.

1. Inlet End: Flared copper connection or compression-type fitting 2. Valve Body: Straight-through or angled, meter-stop design e quipped with

following:

a. O-ring seal straight plug type. b. Rubber seat ball type.

3. Outlet End: Female, iron-pipe threa d or swivel-nut, meter-spud thread on

3/4-inch and finch stops and 2-hole flange on 1½ and 2-inch sizes. 4. Fittings: Pro vide approved fittings. Use same size open e nd wrenches

and tapping machines as used with respective Mueller fittings. 5. Factory Testing of Brass Fittings:

a. Submerge in water for 10 seconds at 85 psi wit h stop in bo th closed

and open positions.

b. Reject fittin g that shows air leakage. AW Project Manager ma y confirm tests locally. Entire lot from which samples were taken will be rejected when random sampling discloses unsatisfactory fittings.

K. Angle Stops: In accor dance with AWWA C800; groun d-key, stop type with

bronze lo cking head stop cap; inlet and out let threads conform to ap plication tables of AWWA C800; and inlets flared connection or compression.

1. Outlet for 3/4-inch and 1-inch size: Meter swivel nut with saddle support. 2. Outlet for 1½ -inch through 2-inch size: O-ring sealed meter flange, iron

pipe thread.

L. Fittings: In accordance with AWWA C800 and AWWA C901 and following:

1. Castings: S mooth, free from burrs, scale s, blisters, sand holes, and defects which would make them unfit for intended use.

Page 79: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 13 – Water Service Taps and

Service Line Installation

Water Service Taps and Service Line Installation 22 11 13 - 3

2. Nuts: Smooth cast and has symmetrical hexagonal wrench flats. 3. Flare-Joint Fittings: Smooth cast. Machine seating surfaces for metal-to-

metal seal to proper taper or curve, free from pits or protrusions. 4. Thread fittin gs, of all t ypes, shall have NPT or AWWA threads, a nd

protect male threaded ends in shipment by pl astic coat ing, or approved equal.

5. Compression tube fittings shall have Buna-N beveled gasket. 6. Stamp of manufacturer's name or trademark and of fitting size on body.

PART 3: EXECUTION 3.01 GENERAL

A. For service lines and lateral conn ections larg er than those allowed in Pipe Tapping Schedule, 4-in ch minimu m size Wet Cut shall be installed with an approved Tapping Valve and appurtenances included.

B. Tapped collars of appro priate sizes: Approved in new const ruction only provided

they are set at right angles to proposed meter location.

C. Use tapping machine manufactured for pressure tapping purposes for 2-inch and smaller service taps on pressurized water lines.

D. For new meter or whe n existing meter is in conflict with proposed pavement

improvements, locate w ater meters one foot inside street r ight-of-way, or when this is not feasible, on e foot on c urb side of sidewalk. Contact AW Project Manager when major landscaping or trees conflict with service line and meter box location. No additio nal payment w ill be made for work on customer side of meter.

E. New location and installation of existing small meter shall conform to

requirements of Section - Water Meters. 3.02 SERVI CE INSTALLATION

A. Set service taps at right angles to proposed meter locatio n and locate taps in upper pipe segment within 45° of pipe springline.

B. Install service lines in open-cut trench in accordance with Section 31 23 3 3

Excavation, Backfill and Compaction for Utilities. Install service lines under paved roadways, other paved areas and areas indicated on Drawings via boring.

C. Lay service lines with a minimum cover as required by local minimum standards.

Page 80: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 13 – Water Service Taps and

Service Line Installation

Water Service Taps and Service Line Installation 22 11 13 - 4

D. Service line s across e xisting stre et (push-un ders): Pull service line through prepared hole under paving. Use o nly full lengths of tubing. Take care not to damage copper tubing when pulling it through hole.

E. Maintain service lines free of dirt and foreign matter.

F. Install service line s so that top of meter will be 4 to 6-i nches belo w finishe d

grade. 3.03 CURB STOP INSTALLATION

A. Set curb st ops or angle stops at outer end of service line inside of m eter box. Secure opening in curb stop to prevent unwanted material from entering. In close quarters, make S-curve in field. Do not flatten tube. In 3/4-inch an d 1-inch services, install meter coupling, swivel-nut, or curb stop ahead of meter. Install straight meter coupling on outlet end of meter.

3.04 SEQUENCE OF OPERATIONS

A. Open trench for propo sed service line in accordance with Section 31 23 33 Excavation, Backfill and compaction for Utilities.

B. Install curb stop.

C. With curb stop open and prior t o connectin g service line to meter in sla ck

position, op en corporation stop and flush service line thoroughly. Cl ose curb stop, leaving corporation stop in full-open position.

D. Check service line for apparent leaks. Repair leaks before proceeding.

E. Schedule inspection with AW Project Manager prior to backfilling. After

inspection, backfill in accordance with Section 31 23 33 - Excavation, Backfill and compaction for Utilities.

F. In applicatio n where a meter box is present, install meter box centered over

meter with top of lid flush with finished grade.

Page 81: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 13 – Water Service Taps and

Service Line Installation

Water Service Taps and Service Line Installation 22 11 13 - 5

Table 1 PIPE TAPPING SCHEDULE WATERMAIN TYPE AND DIAMETER

SERVICE SIZE 3/4" 1” 1-1/2” 2”

4” Cast Iron or Ductile Iron

DIRECT DSS, WBSS DSS, WBSS DSS, WBSS

4” Asbestos Cement WBSS TS TS TS

4” PVC (AWWA C900) DSS, WBSS DSS, WBSS DSS, WBSS TS

6” and 8” Cast Iron or Ductile Iron

DIRECT DSS, WBSS DSS, WBSS DSS, WBSS

6” and 8” Asbestos Cement WBSS TS TS TS

6” and 8” Cast Iron or Ductile Iron

DIRECT DSS, WBSS DSS, WBSS DSS, WBSS

6” and 8” PVC (AWWA C900)

DSS, WBSS DSS, WBSS DSS, WBSS TS

12” Cast Iron or Ductile Iron

DIRECT DSS, WBSS DSS, WBSS DSS, WBSS

12” Asbestos Cement WBSS TS TS TS

12” PVC (AWWA C900)

DSS, WBSS DSS, WBSS DSS, WBSS DSS, WBSS

16” and Up Cast Iron or Ductile Iron

DIRECT DWBSS DWBSS DWBSS

16” and Up Asbestos Cement

DWBSS TS TS TS

16” and Up PVC (AWWA C900)

DWBSS DWBSS DWBSS DWBSS

DSS - DUAL STRAP SADDLES WBSS - WIDE BAND STRAP SADDLES DWBSS - DUAL WIDE BAND STRAP SADDLES TS - TAPPING SLEEVE DIRECT - DIRECT TAP INTO PIPE WALL

END OF SECTION 22 11 13

Page 82: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 14 – Cross Connection Control

and Backflow Prevention

Cross Connection Control and Backflow Prevention 22 11 14 - 1

PART 1: GENERAL

1.01 SUMMARY

A. This Sectio n includes water-distribution backflow prevention products and installation specifications.

1.02 DELIVERY, STORAGE, AND HANDLING

A. Deliver backflow prevention device s in a clean and undamaged condition. Store backflow prevention devices off the ground. Backflow prevention assemblies shall be delivered and stored in accor dance with AWWA C210, AW WA C213, and AWWA C550.

B. Keep interio r of backflo w preventio n devices free from water, dirt, a nd other foreign matter The port openings shall be covered with plastic, cardb oard, or wood while in transit and during storage in the field. These covers shall remain in place until the backflow assembly is ready to be installed.

C. Backflow assemblies shall not be stored in contact with bare ground.

D. Backflow assemblies shall not be stacked. Do not stack other pr oducts on backflow prevention devices.

1.03 PROJECT CONDITIONS

A. Interruption of Existing Water-Distribution Service: Do not interrupt service to facilities occupied by AW or others unless permitted under the following conditions and then only after arra nging to provide temporary water-di stribution service according to requirements indicated:

1. Notify Owner no fewer than two weeks in advance of proposed interruption of service.

2. Do not proceed with int erruption of water-distribution service without A W Project Manager’s written permission.

1.04 COORDI NATION

A. Coordinate connection to water main with AW Project Manager.

Page 83: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 14 – Cross Connection Control

and Backflow Prevention

Cross Connection Control and Backflow Prevention 22 11 14 - 2

PART 2: PRODUCTS

2.01 BACKFL OW PREVENTERS

A. General: The type of backflow prevention device furnished for a particular installation shall be in accordance with Ame rican Water ’s Cross C onnection Practice Manual

B. Reduced-Pressure Principle Backflow Preventers:

1. Reduced-pressure prin ciple ba ckflow prevention device shall meet t he requirements of ANSI/ AWWA C511 and ASSE 1013. Reduced-pressure principle backflow prevention device shall be as listed on the University o f Southern California Foundation for Cross Connectio n Control and Hydraulic Research Fo undation "Manual of Cross Connection Control" most current list.

2. Reduced-pressure prin ciple backflow preventi on device shall consist of two indepe ndently-operated, sprin g-loaded, wye-pattern, poppet-type check valves designed for installation in a normal horizonta l flow attitude. An independent spring- loaded relie f valve shall be located between the two check valves. Backf low prevention assembly shall be manufactured as a complete unit incl uding test cocks, and u pstream and downstream isolation gat e valves. Test cocks shall be arranged such that backflo w prevention device can be tested w ithout removing backflo w prevention device from the line.

3. Isolation gat e valves furnished with backflow p revention assembly shall be as specified in this Section.

4. Reduced-pressure prin ciple backflow preventi on device shall include an integral sensing system that autom atically opens a relief valve whene ver the differen tial pressur e between the in let supply and the reduced pressure zo ne drops to 2 psi. Relief valve shall remain open until a positive pressure differ ential of 2 psi is re- established. If pressur e upstream of first check valve drops to atmospheric or below, relief val ve shall remain fully open and provide an internal air gap bet ween the first check valve and the wa ter level in t he reduced pressure zone. Reduced-pressure principle backf low prevention device shall also b e constructe d such that any minor leakage of second check valve will result in visi ble flow from the relief valve, even if first check valve is totally disabled.

5. Reduced-pressure prin ciple backf low preventi on device shall have all bronze bodies for sizes 3-inches a nd smaller and cast iron bodies f or sizes 4- inches and larg er. Check valve and relief valve springs shall be stainless steel, and a ll other intern al working parts sha ll be bronze a nd stainless steel. Check valve and relief valve sea ts shall be stainless steel or bronze and shall be field replace able without removing the device from

Page 84: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 14 – Cross Connection Control

and Backflow Prevention

Cross Connection Control and Backflow Prevention 22 11 14 - 3

the service line. Cast iron bodie s shall be coated with a two-part thermosetting epoxy coating in accordance with ANSI/AWWA C550.

6. Backflow prevention device shall b e designed for a working pressure of 150 psi and a temperature range of 32°F to 140 °F.

C. Double Check, Backflow-Prevention Assemblies:

1. Double ch eck valve backflow prevention device shall meet the requirements of ANSI/AWWA C510 and ASSE 1015. Double check valve backflow pr evention device shall be as list ed on the University of Southern California Foundation for Cross Connectio n Control and Hydraulic Research Fo undation "Manual of Cross Connection Control" most current list.

2. Double check valve backflow pre vention device shall consist of t wo independently operated, spring load ed, wye pat tern, poppet type check valves designed for in stallation in a normal horizontal f low attitude. Backflow prevention assembly shall be manufa ctured as a complete unit including test cocks, and upstream and downstream isolation gate valves. The test cocks shal l be arranged such that backflow prevention device can be tested without removing backflow prevention device from the line.

3. Isolation gat e valves furnished with backflow p revention assembly shall be as specified in this Section.

4. Double check valve ba ckflow prevention device shall open under normal flow conditions at a pressure differential not less than 1 psi at each che ck valve. Check valves sh all close w hen downstream pressure is greater than supply pressure.

5. Double check valve ba ckflow prevention device shall ha ve all bron ze bodies for sizes 2-inches and smaller and cast iron bodies for sizes 2 1/2-inches and larger. Check valve sp rings shall be stainless steel, and all other internal working parts shall be bronze and stainless steel. Check valve seats shall be stainless st eel or bro nze and shall be fie ld replaceable without removing the device from t he service line. Cast iron bodies shall be coated with a t wo-part thermosetting ep oxy coating in accordance with ANSI/AWWA C550.

6. Backflow prevention device shall b e designed for a working pressure of 150 psi and a temperature range of 32°F to 140 °F.

2.02 ISOLATI ON VALVES

A. General: Backflow prevention device assembly shall be furnished complete with upstream and downstream isolation gate valves.

Page 85: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 14 – Cross Connection Control

and Backflow Prevention

Cross Connection Control and Backflow Prevention 22 11 14 - 4

B. Gate valves 2-inches in size and smaller shall b e all bronze valves conforming to Federal Specificat ion WW-V-54, Type I, Class A designed for a working pressure of 150 psi. Bronze for valve body and inter nals sha ll meet the requirements of ASTM B61. Valves shall be furnished with screwed ends, hand wheel operator, non-rising stem, one-piece solid wedge disc, and union bonnet.

C. Gate valves 3 to 12-inches shall be in conformance to Section 33 12 1 6 – Gate Valves.

2.03 PROT ECTIVE ENCLOSURES

A. Freeze-Protection Enclosures:

1. Description: Insu lated enclosure designed to protect aboveground water piping, equipment, or s pecialties from freezing and dama ge, with heat source to maintain minimum intern al temperature of 40°F when extern al temperatures reach as low as minus 34°F.

a. Standard: ASSE 1060. b. Class I: For equipment or devices other than pressure or atmospheric

vacuum breakers. c. Class I-V: For pressure or atmospheric vacuum breaker equipment or

devices. Include drain opening in housing.

1) Housing: Reinforced fiberglass construction.

a) Size: Of dimensions indicated, b ut not less than those required for access and service of protected unit.

b) Drain opening for units with drain connection. c) Access doors with locking devices. d) Insulation inside housing. e) Anchoring devices for attaching housing to concrete base.

2) Electric he ating cable or heater with self-limiting temperature control.

B. Enclosure Bases:

1. Description: 4-inch minimum thickness 3000 psi concrete, of dimensions required to extend at least 6-inches beyond edges of enclosure housings. Include openings for piping.

PART 3: EXECUTION

3.01 INSTALLAT ION

A. Backflow Prevention Assemblies

Page 86: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 14 – Cross Connection Control

and Backflow Prevention

Cross Connection Control and Backflow Prevention 22 11 14 - 5

1. Install ba ckflow prevention assemblies in accordan ce with t he

manufacturer's written installation instruction s and as shown on th e Drawings, if available.

2. Install backflow prevention assemblies so th at assemblies are ea sily accessible for testing, maintenance, and repair.

3. Install ba ckflow prevention asse mblies horizontally, with 18-inche s minimum clearance between finished grade and lowest point on bottom of backflow prevention assembly.

B. Connecting Piping and Supports

1. Joints for backflow prevention assembly conn ections to inlet and outlet piping shall be installe d under Specificat ion Section 33 1 1 00 Piping – General Provisions.

2. Piping and f ittings for units 3-inches and larger in size shall have flanged joints.

3. Piping, fittin gs and valves for units 3-inches and larger in size shall be properly supported with concrete foundations and adjustable pipe support stands as shown on the Drawings, if available.

C. Reduced-Pressure Principle Backflow Prevention Assembly Drain

1. Install drain for discha rge from reduced-pressure principle backflo w prevention device relief valve.

3.02 FIELD TESTING

A. Hydrostatic Test: Hydrostatically test backflow prevention assembly with piping in which backflow prevention assembly is installed.

B. Functional Test - Perform functional test of ba ckflow prevention assemblies after

backflow p revention assemblies are installe d and hydrostatic te sting is completed.

C. Perform functional tests in the presence of the following:

1. AW Project Manager

D. Functional t ests performed when AW Project Manager is not present shall be

repeated at no additional cost to the AW.

E. Functional test shall be performed by certified backflow prevention device tester.

F. Perform fun ctional te st on each ba ckflow prevention asse mbly. Verif y proper operation of backflow prevention assemblies.

Page 87: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 22 – Plumbing Section 22 11 14 – Cross Connection Control

and Backflow Prevention

Cross Connection Control and Backflow Prevention 22 11 14 - 6

G. Functional Test Report: Backflow prevention device tester shall submit copies of backflow prevention device functional tests.

H. Failed Test: Repeat failed tests at no additional cost to the AW.

I. Defects - I f any defects are de tected during testing, correct d efects b y adjustment, repair, modification , o r replacement. Backflo w prevention device s shall only be repaired by a certified backflow prevention device technician.

J. Re-test backflow prevention assemblies following correction of defects. Backflow prevention devices sha ll only be r etested by a certified backflow pr evention device tester. Re-test backflow pre vention assemblies at no addition al cost to AW.

3.03 CLEANING

A. Clean grease, oil, or any other f oreign substance from exterior surfaces of backflow prevention assemblies.

END OF SECTION 22 11 14

Page 88: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING 22 11 16 - 1

DIVISION 22 - PLUMBING SECTION 22 11 16 - DOMESTIC WATER PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Underground and aboveground domestic water pipes, tubes, fittings, and specialties from 5 foot beyond the building to inside the building and within the building.

B. Specialty valves.

C. Flexible connectors.

1.3 PERFORMANCE REQUIREMENTS

A. Seismic Performance: Domestic water piping and support and installation shall withstand effects of earthquake motions determined according to ASCE/SEI 7.

1.4 SUBMITTALS

A. Product Data: For the following products: 1. Piping. 2. Fittings.

B. Water Test Reports: Specified in "Cleaning" Article.

1.5 QUALITY ASSURANCE

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

B. Comply with NSF 61 for potable domestic water piping and components.

1.6 PROJECT CONDITIONS

A. Interruption of Existing Water Service: Do not interrupt water service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary water service according to requirements indicated:

1. Notify Contracting Officer no fewer than seven days in advance of proposed interruption of water service.

2. Do not proceed with interruption of water service without Contracting Officer’s written permission.

1.7 COORDINATION

A. Coordinate sizes and locations of concrete bases with actual equipment provided.

Page 89: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING 22 11 16 - 2

PART 2 - PRODUCTS

2.1 PIPING MATERIALS

A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, fitting materials, and joining methods for specific services, service locations, and pipe sizes.

2.2 COPPER TUBE AND FITTINGS

A. Hard Copper Tube: ASTM B 88, Type L water tube, drawn temper.

1. Cast-Copper Solder-Joint Fittings: ASME B16.18, pressure fittings. 2. Wrought-Copper Solder-Joint Fittings: ASME B16.22, wrought-copper pressure fittings. 3. Bronze Flanges: ASME B16.24, Class 150, with solder-joint ends. 4. Copper Unions: MSS SP-123, cast-copper-alloy, hexagonal-stock body, with ball-and-

socket, metal-to-metal seating surfaces, and solder-joint or threaded ends.

B. Soft Copper Tube: ASTM B 88, Type K water tube, annealed temper.

1. Copper Solder-Joint Fittings: ASME B16.22, wrought-copper pressure fittings.

C. Water Service Piping from 5 foot outside the building to inside the building: Match section 22 11 33.

2.3 PIPING JOINING MATERIALS

A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch (3.2 mm) thick or ASME B16.21, nonmetallic and asbestos free, unless otherwise indicated; full-face or ring type unless otherwise indicated.

B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.

C. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to ASTM B 813.

D. Brazing Filler Metals: AWS A5.8/A5.8M, BCuP Series, copper-phosphorus alloys for general-duty brazing unless otherwise indicated.

PART 3 - EXECUTION

3.1 EARTHWORK

A. Comply with requirements in Division 31 for excavating, trenching, and backfilling.

3.2 PIPING INSTALLATION

A. Drawing plans, schematics, and diagrams indicate general location and arrangement of domestic water piping. Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.

B. Install copper tubing under building slab according to CDA's "Copper Tube Handbook."

C. Install shutoff valve, hose-end drain valve, strainer, pressure gage, and test tee with valve, inside the building at each domestic water service entrance. Comply with requirements in Division 22 Section "Meters and Gages for Plumbing Piping" for pressure gages and Division 22 Section "Domestic Water Piping Specialties" for drain valves and strainers.

Page 90: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING 22 11 16 - 3

D. Install domestic water piping with 0.25 percent slope downward toward drain, and plumb.

E. Rough-in domestic water piping for water-meter installation according to utility company's requirements.

F. Install piping concealed from view and protected from physical contact by building occupants unless otherwise indicated and except in equipment rooms and service areas.

G. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

H. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal, and coordinate with other services occupying that space.

I. Install piping adjacent to equipment and specialties to allow service and maintenance.

J. Install piping to permit valve servicing.

K. Install nipples, unions, special fittings, and valves with pressure ratings the same as or higher than system pressure rating used in applications below unless otherwise indicated.

L. Install piping free of sags and bends.

M. Install fittings for changes in direction and branch connections.

N. Install unions in copper tubing at final connection to each piece of equipment, machine, and specialty.

O. Install piping to avoid running above electric panels.

3.3 JOINT CONSTRUCTION

A. Ream ends of pipes and tubes and remove burrs.

B. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.

C. Brazed Joints: Join copper tube and fittings according to CDA's "Copper Tube Handbook," "Brazed Joints" Chapter.

D. Soldered Joints: Apply ASTM B 813, water-flushable flux to end of tube. Join copper tube and fittings according to ASTM B 828 or CDA's "Copper Tube Handbook."

E. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.

3.4 VALVE INSTALLATION

A. General-Duty Valves: Comply with requirements in Division 22 Section "General-Duty Valves for Plumbing Piping" for valve installations.

B. Install shutoff valve close to water main on each branch and riser serving plumbing fixtures or equipment, on each water supply to equipment, and on each water supply to plumbing fixtures that do not have supply stops. Use ball valves.

C. Install drain valves for equipment at base of each water riser, at low points in horizontal piping, and where required to drain water piping. Drain valves are specified in Division 22 Section "Domestic Water Piping Specialties."

Page 91: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING 22 11 16 - 4

1. Hose-End Drain Valves: At low points in water mains, risers, and branches. 2. Stop-and-Waste Drain Valves: Instead of hose-end drain valves where indicated.

3.5 HANGER AND SUPPORT INSTALLATION

A. Comply with requirements in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment" for pipe hanger and support products and installation.

1. Vertical Piping: MSS Type 8 or 42, clamps. 2. Individual, Straight, Horizontal Piping Runs:

a. 100 Feet and Less: MSS Type 1, adjustable, steel clevis hangers. b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers.

3. Multiple, Straight, Horizontal Piping Runs 100 Feet or Longer: MSS Type 44, pipe rolls. Support pipe rolls on trapeze.

4. Base of Vertical Piping: MSS Type 52, spring hangers.

B. Support vertical piping and tubing at base and at each floor.

C. Rod diameter may be reduced one size for double-rod hangers, to a minimum of 3/8 inch.

D. Install hangers for copper tubing with the following maximum horizontal spacing and minimum rod diameters:

1. NPS 3/4 and Smaller: 60 inches with 3/8-inch rod. 2. NPS 1 and NPS 1-1/4: 72 inches with 3/8-inch rod. 3. NPS 1-1/2 and NPS 2: 96 inches with 3/8-inch rod. 4. NPS 2-1/2: 108 inches with 1/2-inch rod. 5. NPS 3 to NPS 5: 10 feet with 1/2-inch rod. 6. NPS 6: 10 feet with 5/8-inch rod.

E. Install supports for vertical copper tubing every 10 feet.

3.6 CONNECTIONS

A. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to equipment and machines to allow service and maintenance.

C. Connect domestic water piping to exterior water-service piping. Use dielectric flanges to join dissimilar piping materials.

D. Connect domestic water piping to water-service piping with shutoff valve; extend and connect to the following:

1. Water Heaters: Cold-water inlet and hot-water outlet piping in sizes indicated, but not smaller than sizes of water heater connections.

2. Plumbing Fixtures: Cold- and hot-water supply piping in sizes indicated, but not smaller than required by plumbing code. Comply with requirements in Division 22 plumbing fixture Sections for connection sizes.

3. Equipment: Cold- and hot-water supply piping as indicated, but not smaller than equipment connections. Provide shutoff valve and union for each connection. Use flanges instead of unions for NPS 2-1/2 and larger.

3.7 IDENTIFICATION

A. Identify system components. Comply with requirements in Division 22 Section "Identification for Plumbing Piping and Equipment" for identification materials and installation.

Page 92: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING 22 11 16 - 5

3.8 FIELD QUALITY CONTROL

A. Perform tests and inspections.

B. Piping Inspections:

1. Do not enclose, cover, or put piping into operation until it has been inspected and approved by authorities having jurisdiction.

2. During installation, notify authorities having jurisdiction at least one day before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction: a. Roughing-in Inspection: Arrange for inspection of piping before concealing or

closing-in after roughing-in and before setting fixtures. b. Final Inspection: Arrange final inspection for authorities having jurisdiction to

observe tests specified below and to ensure compliance with requirements.

3. Reinspection: If authorities having jurisdiction find that piping will not pass tests or inspections, make required corrections and arrange for reinspection.

4. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.

C. Piping Tests:

1. Fill domestic water piping. Check components to determine that they are not air bound and that piping is full of water.

2. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit a separate report for each test, complete with diagram of portion of piping tested.

3. Leave new, altered, extended, or replaced domestic water piping uncovered and unconcealed until it has been tested and approved. Expose work that was covered or concealed before it was tested.

4. Cap and subject piping to static water pressure of 50 psig above operating pressure, without exceeding pressure rating of piping system materials. Isolate test source and allow to stand for four hours. Leaks and loss in test pressure constitute defects that must be repaired.

5. Repair leaks and defects with new materials and retest piping or portion thereof until satisfactory results are obtained.

6. Prepare reports for tests and for corrective action required.

D. Domestic water piping will be considered defective if it does not pass tests and inspections.

E. Prepare test and inspection reports.

3.9 ADJUSTING

A. Perform the following adjustments before operation:

1. Close drain valves, hydrants, and hose bibbs. 2. Open shutoff valves to fully open position. 3. Open throttling valves to proper setting. 4. Adjust balancing valves in hot-water-circulation return piping to provide adequate flow.

a. Manually adjust ball-type balancing valves in hot-water-circulation return piping to provide flow of hot water in each branch.

b. Adjust calibrated balancing valves to flows indicated.

5. Remove plugs used during testing of piping and for temporary sealing of piping during installation.

6. Remove and clean strainer screens. Close drain valves and replace drain plugs.

Page 93: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING 22 11 16 - 6

7. Remove filter cartridges from housings and verify that cartridges are as specified for application where used and are clean and ready for use.

8. Check plumbing specialties and verify proper settings, adjustments, and operation.

3.10 CLEANING

A. Clean and disinfect potable domestic water piping as follows:

1. Purge new piping and parts of existing piping that have been altered, extended, or repaired before using.

2. Use purging and disinfecting procedures prescribed by authorities having jurisdiction; if methods are not prescribed, use procedures described in either AWWA C651 or AWWA C652 or follow procedures described below: a. Flush piping system with clean, potable water until dirty water does not appear at

outlets. b. Fill and isolate system according to either of the following:

1) Fill system or part thereof with water/chlorine solution with at least 50 ppm of chlorine. Isolate with valves and allow to stand for 24 hours.

2) Fill system or part thereof with water/chlorine solution with at least 200 ppm of chlorine. Isolate and allow to stand for three hours.

c. Flush system with clean, potable water until no chlorine is in water coming from system after the standing time.

d. Submit water samples in sterile bottles to authorities having jurisdiction. Repeat procedures if biological examination shows contamination.

B. Prepare and submit reports of purging and disinfecting activities.

C. Clean interior of domestic water piping system. Remove dirt and debris as work progresses.

3.11 PIPING SCHEDULE

A. Transition and special fittings with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated.

B. Flanges and unions may be used for aboveground piping joints unless otherwise indicated.

C. Fitting Option: Extruded-tee connections and brazed joints may be used on aboveground copper tubing.

D. Under-building-slab, domestic water, building service piping, NPS 2 and smaller shall be the following:

1. Soft copper tube, ASTM B 88, Type K; wrought-copper solder-joint fittings; and brazed joints.

E. Under-building-slab, domestic water, building-service piping, NPS 3 to NPS 4 shall be the following:

1. Soft copper tube, ASTM B 88, Type K; wrought-copper solder-joint fittings; and brazed joints.

F. Aboveground domestic water piping, NPS 4 and smaller shall be the following:

1. Hard copper tube, ASTM B 88, Type L (ASTM B 88M, Type B); cast- or wrought- copper solder-joint fittings joints.

Page 94: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING 22 11 16 - 7

3.12 VALVE SCHEDULE

A. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply:

1. Shutoff Duty: Use ball valves for piping NPS 2 and smaller. Use ball valves with flanged ends for piping NPS 2-1/2 and larger.

2. Throttling Duty: Use ball valves for piping NPS 2 and smaller. Use ball valves with flanged ends for piping NPS 2-1/2 and larger.

3. Drain Duty: Hose-end drain valves.

B. Use check valves to maintain correct direction of domestic water flow to and from equipment.

END OF SECTION 22 11 16

Page 95: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING SPECIALTIES 22 11 19 - 1

DIVISION 22 - PLUMBING SECTION 22 11 19 - DOMESTIC WATER PIPING SPECIALTIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Vacuum breakers.

B. Hose bibs.

C. Wall hydrants.

D. Water hammer arresters.

E. Trap primers.

1.3 PERFORMANCE REQUIREMENTS

A. Minimum Working Pressure for Domestic Water Piping Specialties: 125 psig, unless otherwise indicated.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Operation and Maintenance Data: For domestic water piping specialties to include in emergency, operation, and maintenance manuals.

1.5 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. NSF Compliance:

1. Comply with NSF 14, "Plastics Piping Components and Related Materials," for plastic domestic water piping components.

2. Comply with NSF 61, "Drinking Water System Components - Health Effects; Sections 1 through 9."

PART 2 - PRODUCTS

2.1 HOSE BIBBS

A. Hose Bibbs:

Page 96: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING SPECIALTIES 22 11 19 - 2

1. Standard: ASME A112.18.1 for sediment faucets. 2. Body Material: Bronze. 3. Seat: Bronze, replaceable. 4. Supply Connections: NPS 3/4 threaded or solder-joint inlet. 5. Outlet Connection: Garden-hose thread complying with ASME B1.20.7. 6. Pressure Rating: 125 psig. 7. Vacuum Breaker: Integral, nonremovable, drainable, hose-connection vacuum breaker

complying with ASSE 1011. 8. Finish for Equipment Rooms: Rough bronze, or chrome or nickel plated. 9. Finish for Service Areas: Chrome or nickel plated. 10. Finish for Finished Rooms: Chrome or nickel plated. 11. Operation for Equipment Rooms: Operating key. 12. Operation for Service Areas: Operating key. 13. Operation for Finished Rooms: Operating key. 14. Include operating key with each operating-key hose bibb. 15. Include wall flange with each chrome- or nickel-plated hose bibb.

2.2 WALL HYDRANTS

A. Nonfreeze Wall Hydrants: 1. Manufacturers: Subject to compliance with requirements, provide products by one of the

following: a. Josam Company. b. MIFAB, Inc. c. Prier Products, Inc. d. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc. e. Tyler Pipe; Wade Div. f. Watts Drainage Products Inc. g. Woodford Manufacturing Company. h. Zurn Plumbing Products Group.

2. Standard: ASME A112.21.3M for concealed-outlet, self-draining wall hydrants. 3. Pressure Rating: 125 psig. 4. Operation: Loose key. 5. Casing and Operating Rod: Of length required to match wall thickness. Include wall

clamp. 6. Inlet: NPS 3/4. 7. Outlet: Concealed, with integral vacuum breaker and garden-hose thread complying with

ASME B1.20.7. 8. Box: Deep, flush mounting with cover. 9. Box and Cover Finish: Polished nickel bronze.

2.3 DRAIN VALVES

A. Ball-Valve-Type, Hose-End Drain Valves:

1. Standard: MSS SP-110 for standard-port, two-piece ball valves. 2. Pressure Rating: 400-psig (2760-kPa) minimum CWP. 3. Size: NPS 3/4 (DN 20). 4. Body: Copper alloy. 5. Ball: Chrome-plated brass. 6. Seats and Seals: Replaceable. 7. Handle: Vinyl-covered steel. 8. Inlet: Threaded or solder joint. 9. Outlet: Threaded, short nipple with garden-hose thread complying with ASME B1.20.7

and cap with brass chain.

Page 97: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING SPECIALTIES 22 11 19 - 3

B. Gate-Valve-Type, Hose-End Drain Valves:

1. Standard: MSS SP-80 for gate valves. 2. Pressure Rating: Class 125. 3. Size: NPS 3/4. 4. Body: ASTM B 62 bronze. 5. Inlet: NPS 3/4 threaded or solder joint. 6. Outlet: Garden-hose thread complying with ASME B1.20.7 and cap with brass chain.

C. Stop-and-Waste Drain Valves:

1. Standard: MSS SP-110 for ball valves or MSS SP-80 for gate valves. 2. Pressure Rating: 200-psig minimum CWP or Class 125. 3. Size: NPS 3/4. 4. Body: Copper alloy or ASTM B 62 bronze. 5. Drain: NPS 1/8 side outlet with cap.

2.4 WATER HAMMER ARRESTERS

A. Water Hammer Arresters:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. AMTROL, Inc. b. Josam Company. c. MIFAB, Inc. d. PPP Inc. e. Sioux Chief Manufacturing Company, Inc. f. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc. g. Tyler Pipe; Wade Div. h. Watts Drainage Products Inc. i. Zurn Plumbing Products Group; Specification Drainage Operation.

2. Standard: ASSE 1010 or PDI-WH 201. 3. Type: Metal bellows or Copper tube with piston. 4. Size: ASSE 1010, Sizes AA and A through F or PDI-WH 201, Sizes A through F.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Refer to other Division 22 Sections for piping joining materials, joint construction, and basic installation requirements.

B. Install backflow preventers where indicated. Comply with authorities having jurisdiction. 1. Install drain for backflow preventers with atmospheric-vent drain connection with air-gap

fitting, fixed air-gap fitting, or equivalent positive pipe separation of at least two pipe diameters in drain piping and pipe to floor drain. Locate air-gap device attached to or under backflow preventer. Simple air breaks are not acceptable for this application.

2. Do not install bypass piping around backflow preventers.

3.2 CONNECTIONS

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping and specialties.

B. Ground equipment according to Division 26 Section "Grounding and Bonding."

Page 98: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PIPING SPECIALTIES 22 11 19 - 4

C. Connect wiring according to Division 26 Section "Conductors and Cables."

3.3 FIELD QUALITY CONTROL

A. Perform the following tests and prepare test reports:

1. Test each pressure vacuum breaker reduced-pressure-principle backflow preventer according to authorities having jurisdiction and the device's reference standard.

B. Remove and replace malfunctioning domestic water piping specialties and retest as specified above.

END OF SECTION 22 11 19

Page 99: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PUMPS 22 11 23 - 1

DIVISION 22 - PLUMBING SECTION 22 11 23 - DOMESTIC WATER PUMPS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Horizontally mounted, in-line, separately coupled centrifugal pumps.

B. Thermostats and time clocks for domestic hot water recirculation pumps.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated. Include materials of construction, rated capacities, certified performance curves with operating points plotted on curves, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Operation and Maintenance Data: For domestic water pumps to include in operation and maintenance manuals.

C. Complete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replaceable parts: 1. Include complete list indicating all components of the systems. 2. Include complete diagrams of the internal wiring for each item of equipment. 3. Diagrams shall have their terminals identified to facilitate installation, operation and

maintenance.

D. Completed System Readiness Checklist provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 0800 Commission of Plumbing Systems.

1.4 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. UL Compliance: Comply with UL 778 for motor-operated water pumps.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Retain shipping flange protective covers and protective coatings during storage.

B. Protect bearings and couplings against damage.

C. Comply with pump manufacturer's written rigging instructions for handling.

1.6 COORDINATION

A. Coordinate sizes and locations of concrete bases with actual equipment provided.

Page 100: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PUMPS 22 11 23 - 2

PART 2 - PRODUCTS

2.1 HORIZONTALLY MOUNTED, IN-LINE, SEPARATELY COUPLED CENTRIFUGAL PUMPS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Bell & Gossett. 2. TACO. 3. Grundfos.

B. Description: Factory-assembled and -tested, in-line, single-stage, separately coupled, overhung-impeller centrifugal pumps designed for installation with pump and motor shafts mounted horizontal.

C. Pump Construction:

1. Casing: Bronze radially split with threaded companion-flange connections for pumps with NPS 2 pipe connections and flanged connections for pumps with NPS 2-1/2 pipe connections.

2. Impeller: Bronze statically and dynamically balanced, closed, and keyed to shaft. 3. Shaft and Shaft Sleeve: Steel shaft, with copper-alloy shaft sleeve. 4. Coupling: Flexible. 5. Seal: Mechanical, with carbon-steel rotating ring, stainless-steel spring, ceramic seat,

and rubber bellows and gasket. 6. Bearings: Oil-lubricated; bronze-journal or ball type. 7. Shaft Coupling: Flexible, capable of absorbing torsional vibration and shaft

misalignment.

D. Motor: Single speed, with grease-lubricated ball bearings; and resiliently mounted to pump casing.

E. Capacities and characteristics shall be as scheduled on drawings.

2.2 MOTORS

A. Comply with NEMA designation, temperature rating, service factor, enclosure type, and efficiency requirements for motors specified in Division 22 Section "Common Motor Requirements for Plumbing Equipment."

1. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load will not require motor to operate in service factor range above 1.0.

2. Controllers, Electrical Devices, and Wiring: Comply with requirements for electrical devices and connections specified in Division 26 Sections.

2.3 CONTROLS

A. Thermostats: Electric; adjustable for control of hot-water circulation pump.

1. Type: Strap-on temperature sensor, for installation on piping. 2. Range: 65 to 200 deg F. 3. Enclosure: NEMA 250, Type 4X. 4. Operation of Pump: On or off. 5. Transformer: Provide if required. 6. Power Requirement: 120 V, ac. 7. Settings: Start pump at 105 deg F and stop pump at 120 deg F.

B. Time Clocks: Seven day programmable with one occupied period per day.

Page 101: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PUMPS 22 11 23 - 3

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine roughing-in of domestic-water-piping system to verify actual locations of connections before pump installation.

3.2 INSTALLATION

A. Support pumps from piping, per manufacturer’s instructions.

B. Install horizontally mounted, in-line, separately coupled centrifugal pumps with shaft(s) horizontal.

C. Install thermostats in hot-water return piping.

D. Install time clocks adjacent to pumps.

3.3 CONNECTIONS

A. Comply with requirements for piping specified in Division 22 Section "Domestic Water Piping." Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to pumps to allow service and maintenance.

C. Connect domestic water piping to pumps. Install suction and discharge piping equal to or greater than size of pump nozzles.

1. Install shutoff valve and strainer on suction side of each pump, and check, shutoff, and throttling valves on discharge side of each pump. Install valves same size as connected piping. Comply with requirements for valves specified in Division 22 Section "General-Duty Valves for Plumbing Piping" and comply with requirements for strainers specified in Division 22 Section "Domestic Water Piping Specialties."

D. Comply with Division 26 Sections for electrical connections, and wiring methods.

E. Connect thermostats and timeclocks to pumps that they control.

3.4 IDENTIFICATION

A. Comply with requirements for identification specified in Section 22 0553.

3.5 STARTUP AND TESTING

A. Make tests as recommended by product manufacturer and listed standards and under actual or simulated operating conditions and provide full compliance with design and specified requirements. Tests of the various items of equipment shall be performed simultaneously with the system of which each item is an integral part.

B. System Test: After installation is completed provided an operational test of the completed system including flow rates, pressure compliance, alarms and all control functions.

C. When any defeats are detected, correct defects and repeat test.

Page 102: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DOMESTIC WATER PUMPS 22 11 23 - 4

D. The commissioning agent will observe startup and contractor testing of selected equipment. Coordinate the startup and contractor testing schedules with the resident engineer and commissioning agent. Provide a minimum of 7 days prior to notice.

3.6 ADJUSTING

A. Adjust domestic water pumps to function smoothly, and lubricate as recommended by manufacturer.

B. Adjust initial temperature set points.

C. Set field-adjustable switches and circuit-breaker trip ranges as indicated.

D. Set time clock for schedule selected by Contracting Officer.

END OF SECTION 22 11 23

Page 103: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE AND VENT PIPING 22 13 16 - 1

DIVISION 22 - PLUMBING SECTION 22 13 16 - SANITARY WASTE AND VENT PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Soil, waste, and vent piping from 5 foot beyond the building to inside the building including the following:

1. Pipe, tube, and fittings. 2. Special pipe fittings.

1.3 DEFINITIONS

A. ABS: Acrylonitrile-butadiene-styrene plastic.

B. EPDM: Ethylene-propylene-diene terpolymer rubber.

C. LLDPE: Linear, low-density polyethylene plastic.

D. NBR: Acrylonitrile-butadiene rubber.

E. PE: Polyethylene plastic.

F. PVC: Polyvinyl chloride plastic.

G. TPE: Thermoplastic elastomer.

1.4 PERFORMANCE REQUIREMENTS

A. Components and installation shall be capable of withstanding the following minimum working pressure, unless otherwise indicated:

1. Soil, Waste, and Vent Piping: 10-foot head of water.

B. Seismic Performance: Soil, waste, and vent piping and support and installation shall be capable of withstanding the effects of seismic events determined according to ASCE 7, "Minimum Design Loads for Buildings and Other Structures."

1.5 SUBMITTALS

A. Product Data: For pipe, tube, fittings, and couplings.

B. LEED Submittal:

1. Product Data for Credit EQ 4.1: For solvent cements and adhesive primers, including printed statement of VOC content.

C. Field quality-control inspection and test reports.

Page 104: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE AND VENT PIPING 22 13 16 - 2

1.6 QUALITY ASSURANCE

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

B. Comply with NSF 14, "Plastics Piping Systems Components and Related Materials," for plastic piping components. Include marking with "NSF-DWV" for plastic drain, waste, and vent piping; "NSF-drain" for plastic drain piping; "NSF-tubular" for plastic continuous waste piping; and "NSF-sewer" for plastic sewer piping.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.

2.2 PIPING MATERIALS

A. Refer to Part 3 "Piping Applications" Article for applications of pipe, tube, fitting, and joining materials.

2.3 PVC PIPE AND FITTINGS

A. Solid-wall PVC Pipe: ASTM D 2665, drain, waste, and vent.

1. PVC Socket Fittings: ASTM D 2665, socket type, made to ASTM D 3311, drain, waste, and vent patterns.

B. Solvent Cement and Adhesive Primer:

1. Use PVC solvent cement that has a VOC content of 510 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

2. Use adhesive primer that has a VOC content of 550 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

PART 3 - EXECUTION

3.1 EXCAVATION

A. Refer to Division 31 for excavating, trenching, and backfilling.

3.2 PIPING APPLICATIONS

A. Aboveground, soil, waste and vent piping shall be the following:

1. Solid wall PVC pipe, PVC socket fittings, and solvent cemented joints.

B. Underground, soil, waste, and vent piping shall be the following: 1. Solid wall PVC pipe, PVC socket fittings, and solvent-cemented joints.

Page 105: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE AND VENT PIPING 22 13 16 - 3

3.3 PIPING INSTALLATION

A. Basic piping installation requirements are specified in Division 22 Section "Common Work Results for Plumbing."

B. Install cleanouts at grade and extend to where building sanitary drains connect to building sanitary sewers.

C. Install cast-iron sleeve with water stop and mechanical sleeve seal at each service pipe penetration through foundation wall. Select number of interlocking rubber links required to make installation watertight. Sleeves and mechanical sleeve seals are specified in Division 22 Section "Common Work Results for Plumbing."

D. Install wall-penetration fitting at each service pipe penetration through foundation wall. Make installation watertight.

E. Make changes in direction for soil and waste drainage and vent piping using appropriate branches, bends, and long-sweep bends. Sanitary tees and short-sweep 1/4 bends may be used on vertical stacks if change in direction of flow is from horizontal to vertical. Use long-turn, double Y-branch and 1/8-bend fittings if 2 fixtures are installed back to back or side by side with common drain pipe. Straight tees, elbows, and crosses may be used on vent lines. Do not change direction of flow more than 90 degrees. Use proper size of standard increasers and reducers if pipes of different sizes are connected. Reducing size of drainage piping in direction of flow is prohibited.

F. Lay buried building drainage piping beginning at low point of each system. Install true to grades and alignment indicated, with unbroken continuity of invert. Place hub ends of piping upstream. Install required gaskets according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements. Maintain swab in piping and pull past each joint as completed.

G. Install soil and waste drainage and vent piping at the following minimum slopes, unless otherwise indicated: 1. Horizontal Sanitary Drainage Piping 2-1/2” and smaller: 2 percent downward in direction

of flow. 2. Horizontal Sanitary Drainage Piping 3” to 6”: 1 percent downward in direction of flow. 3. Horizontal Sanitary Drainage Piping 8” and larger: 1/2 percent downward in direction of

flow. 4. Vent Piping: 1 percent down toward vertical fixture vent or toward vent stack.

H. Install underground PVC soil and waste drainage piping according to ASTM D 2321.

I. Do not enclose, cover, or put piping into operation until it is inspected and approved by authorities having jurisdiction.

3.4 JOINT CONSTRUCTION

A. Basic piping joint construction requirements are specified in Division 22 Section "Common Work Results for Plumbing”.

B. PVC Nonpressure Piping Joints: Join piping according to ASTM D 2665.

3.5 HANGER AND SUPPORT INSTALLATION

A. Pipe hangers and supports are specified in Division 22 Section "Hangers and Supports for Plumbing Piping and Equipment." Install the following:

1. Vertical Piping: MSS Type 8 or Type 42, clamps. 2. Install individual, straight, horizontal piping runs according to the following:

Page 106: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE AND VENT PIPING 22 13 16 - 4

a. MSS Type 1, adjustable, steel clevis hangers. 3. Base of Vertical Piping: MSS Type 52, spring hangers.

B. Install supports according to Division 22 Section "Hangers and Supports."

C. Support vertical piping and tubing at base and at each floor.

D. Rod diameter may be reduced 1 size for double-rod hangers, with 3/8-inch minimum rods.

E. Install hangers for PVC piping with the following maximum horizontal spacing and minimum rod diameters:

1. NPS 1-1/2 and NPS 2: 48 inches with 3/8-inch rod. 2. NPS 3: 48 inches with 1/2-inch rod. 3. NPS 4 and 5: 48 inches with 5/8-inch rod. 4. NPS 6: 48 inches with 3/4-inch rod. 5. NPS 8 to NPS 12: 48 inches with 7/8-inch rod.

F. Install supports for vertical PVC piping every 48 inches.

G. Support piping and tubing not listed above according to MSS SP-69 and manufacturer's written instructions.

3.6 CONNECTIONS

A. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Connect soil and waste piping to exterior sanitary sewerage piping. Use transition fitting to join dissimilar piping materials.

C. Connect drainage and vent piping to the following:

1. Plumbing Fixtures: Connect drainage piping in sizes indicated, but not smaller than required by plumbing code.

2. Plumbing Fixtures and Equipment: Connect atmospheric vent piping in sizes indicated, but not smaller than required by authorities having jurisdiction.

3. Plumbing Specialties: Connect drainage and vent piping in sizes indicated, but not smaller than required by plumbing code.

4. Equipment: Connect drainage piping as indicated. Provide shutoff valve, if indicated, and union for each connection. Use flanges instead of unions for connections NPS 2-1/2 and larger.

3.7 FIELD QUALITY CONTROL

A. During installation, notify authorities having jurisdiction at least 24 hours before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction.

1. Roughing-in Inspection: Arrange for inspection of piping before concealing or closing-in after roughing-in and before setting fixtures.

2. Final Inspection: Arrange for final inspection by authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.

B. Reinspection: If authorities having jurisdiction find that piping will not pass test or inspection, make required corrections and arrange for reinspection.

C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.

D. Test sanitary drainage and vent piping according to procedures of authorities having jurisdiction or, in absence of published procedures, as follows:

Page 107: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE AND VENT PIPING 22 13 16 - 5

1. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit separate report for each test, complete with diagram of portion of piping tested.

2. Leave uncovered and unconcealed new, altered, extended, or replaced drainage and vent piping until it has been tested and approved. Expose work that was covered or concealed before it was tested.

3. Roughing-in Plumbing Test Procedure: Test drainage and vent piping, except outside leaders, on completion of roughing-in. Close openings in piping system and fill with water to point of overflow, but not less than 10-foot head of water. From 15 minutes before inspection starts to completion of inspection, water level must not drop. Inspect joints for leaks.

4. Finished Plumbing Test Procedure: After plumbing fixtures have been set and traps filled with water, test connections and prove they are gastight and watertight. Plug vent-stack openings on roof and building drains where they leave building. Introduce air into piping system equal to pressure of 1-inch wg. Use U-tube or manometer inserted in trap of water closet to measure this pressure. Air pressure must remain constant without introducing additional air throughout period of inspection. Inspect plumbing fixture connections for gas and water leaks.

5. Repair leaks and defects with new materials and retest piping, or portion thereof, until satisfactory results are obtained.

6. Prepare reports for tests and required corrective action.

3.8 CLEANING

A. Clean interior of piping. Remove dirt and debris as work progresses.

B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.

C. Place plugs in ends of uncompleted piping at end of day and when work stops.

3.9 PROTECTION

A. Exposed PVC Piping: Protect plumbing vents exposed to sunlight with two coats of water-based latex paint.

END OF SECTION 22 13 16

Page 108: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 1

DIVISION 22 - PLUMBING SECTION 22 13 19 - SANITARY WASTE PIPING SPECIALTIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Cleanouts.

B. Floor drains.

C. Miscellaneous sanitary drainage piping specialties.

1.3 DEFINITIONS

A. ABS: Acrylonitrile-butadiene-styrene plastic.

B. FOG: Fats, oils, and greases.

C. FRP: Fiberglass-reinforced plastic.

D. HDPE: High-density polyethylene plastic.

E. PE: Polyethylene plastic.

F. PP: Polypropylene plastic.

G. PVC: Polyvinyl chloride plastic.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated. Include rated capacities, operating characteristics, and accessories for the following:

1. Cleanouts. 2. Floor drains. 3. Miscellaneous sanitary drainage piping specialties.

B. Operation and Maintenance Data: For drainage piping specialties to include in emergency, operation, and maintenance manuals.

1.5 QUALITY ASSURANCE

A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing agency.

B. Comply with NSF 14, "Plastics Piping Components and Related Materials," for plastic sanitary piping specialty components.

Page 109: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 2

1.6 COORDINATION

A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified in Division 3.

B. Coordinate size and location of roof penetrations.

PART 2 - PRODUCTS

2.1 CLEANOUTS

A. Cleanouts:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Josam. b. Sioux Chief. c. Smith, Jay R. d. Wade. e. Zurn.

2. Standard: ASME A112.36.2M for cast iron for cleanout test tee. 3. See schedule on drawings.

2.2 FLOOR DRAINS

A. Cast-Iron Floor Drains:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Josam. b. Sioux Chief. c. Smith, Jay R. d. Wade. e. Zurn.

2. Standard: ASME A112.6.3. 3. See schedule on drawings.

2.3 MISCELLANEOUS SANITARY DRAINAGE PIPING SPECIALTIES

A. Deep-Seal Traps:

1. Description: Cast-iron or bronze casting, with inlet and outlet matching connected piping and cleanout trap-seal primer valve connection.

2. Size: Same as connected waste piping. a. NPS 2: 4-inch-minimum water seal. b. NPS 2-1/2 and Larger: 5-inch- minimum water seal.

B. Floor-Drain, Trap-Seal Primer Fittings:

1. Description: Cast iron, with threaded inlet and threaded or spigot outlet, and trap-seal primer valve connection.

2. Size: Same as floor drain outlet with NPS 1/2 side inlet.

Page 110: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 3

PART 3 - EXECUTION

3.1 INSTALLATION

A. Refer to Division 22 Section "Common Work Results for Plumbing" for piping joining materials, joint construction, and basic installation requirements.

B. Install cleanouts in aboveground piping and building drain piping according to the following, unless otherwise indicated:

1. Size same as drainage piping up to NPS 4. Use NPS 4 for larger drainage piping unless larger cleanout is indicated.

2. Locate at each change in direction of piping greater than 45 degrees. 3. Locate at minimum intervals of 50 feet for piping NPS 4 and smaller and 100 feet for larger

piping. 4. Locate at base of each vertical soil and waste stack.

C. For floor cleanouts for piping below floors, install cleanout deck plates with top flush with finished floor.

D. For cleanouts located in concealed piping, install cleanout wall access covers, of types indicated, with frame and cover flush with finished wall.

E. Install floor drains at low points of surface areas to be drained. Set grates of drains flush with finished floor, unless otherwise indicated. Install floor sinks square with walls.

1. Position floor drains for easy access and maintenance. Install floor-drain flashing collar or flange so no leakage occurs between drain and adjoining flooring. Maintain integrity of waterproof membranes where penetrated.

F. Assemble open hub drain fittings and install with top of hub 1 inch above floor.

G. Install deep-seal traps on floor drains and other waste outlets, where indicated.

H. Install floor-drain, trap-seal primer fittings on inlet to floor drains that require trap-seal primer connection.

1. Exception: Fitting may be omitted if trap has trap-seal primer connection. 2. Size: Same as floor drain inlet.

I. Install air-gap fittings on draining-type backflow preventers and on indirect-waste piping discharge into sanitary drainage system.

J. Install traps on plumbing specialty drain outlets. Omit traps on indirect wastes unless trap is indicated.

K. Install escutcheons at wall, floor, and ceiling penetrations in exposed finished locations and within cabinets and millwork. Use deep-pattern escutcheons if required to conceal protruding pipe fittings.

3.2 CONNECTIONS

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to equipment to allow service and maintenance.

3.3 FIELD QUALITY CONTROL

A. Tests and Inspections:

1. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.

Page 111: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 4

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

3.4 PROTECTION

A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.

B. Place plugs in ends of uncompleted piping at end of each day or when work stops.

END 22 13 19

Page 112: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING 22 14 13 - 1

DIVISION 22 - PLUMBING SECTION 22 14 13 - STORM DRAINAGE PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Storm drainage piping from 5 foot beyond the building to inside the building including the following:

1. Pipe, tube, and fittings. 2. Special pipe fittings.

1.3 DEFINITIONS

A. ABS: Acrylonitrile-butadiene-styrene plastic.

B. LLDPE: Linear, low-density polyethylene plastic.

C. PE: Polyethylene plastic.

D. PVC: Polyvinyl chloride plastic.

E. TPE: Thermoplastic elastomer.

1.4 PERFORMANCE REQUIREMENTS

A. Components and installation shall be capable of withstanding the following minimum working-pressure, unless otherwise indicated:

1. Storm Drainage Piping: 10-foot head of water.

B. Seismic Performance: Soil, waste, and vent piping and support and installation shall be capable of withstanding the effects of seismic events determined according to ASCE 7, "Minimum Design Loads for Buildings and Other Structures."

1.5 SUBMITTALS

A. Product Data: For pipe, tube, fittings, and couplings.

B. LEED Submittal:

1. Product Data for Credit EQ 4.1: For solvent cements and adhesive primers, including printed statement of VOC content.

C. Field quality-control inspection and test reports.

1.6 QUALITY ASSURANCE

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

Page 113: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING 22 14 13 - 2

B. Comply with NSF 14, "Plastics Piping Systems Components and Related Materials," for plastic piping components. Include marking with "NSF-drain" for plastic drain piping and "NSF-sewer" for plastic sewer piping.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection: 1. Manufacturers: Subject to compliance with requirements, provide products by one of the

manufacturers specified.

2.2 PIPING MATERIALS

A. Refer to Part 3 "Piping Applications" Article for applications of pipe, tube, fitting, and joining materials.

2.3 PVC PIPE AND FITTINGS

A. Solid-wall PVC Pipe: ASTM D 2665, drain, waste, and vent.

1. PVC Socket Fittings: ASTM D 2665, socket type, made to ASTM D 3311, drain, waste, and vent patterns.

B. Solvent Cement and Adhesive Primer:

1. Use PVC solvent cement that has a VOC content of 510 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

2. Use adhesive primer that has a VOC content of 550 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

PART 3 - EXECUTION

3.1 EXCAVATION

A. Refer to Division 31 for excavating, trenching, and backfilling.

3.2 PIPING APPLICATIONS

A. Flanges and unions may be used on aboveground pressure piping, unless otherwise indicated.

B. Aboveground storm drainage piping shall be the following:

1. Solid wall PVC pipe PVC socket fittings and solvent cemented joints.

C. Underground storm drainage piping shall be the following: 1. Solid wall PVC pipe, PVC socket fittings, and solvent cemented joints.

3.3 PIPING INSTALLATION

A. Storm sewer and drainage piping outside the building are specified in Division 33.

B. Basic piping installation requirements are specified in Division 22 Section "Common Work Results for Plumbing."

C. Install cleanouts at grade and extend to where building storm drains connect to building storm sewers. Cleanouts are specified in Division 22 Section "Sanitary Waste and Vent Piping Specialties."

Page 114: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING 22 14 13 - 3

D. Install cast-iron sleeve with water stop and mechanical sleeve seal at each service pipe penetration through foundation wall. Select number of interlocking rubber links required to make installation watertight. Sleeves and mechanical sleeve seals are specified in Division 22 Section "Common Work Results for Plumbing."

E. Install wall-penetration fitting system at each service pipe penetration through foundation wall. Make installation watertight.

F. Install cast-iron soil piping according to CISPI's "Cast Iron Soil Pipe and Fittings Handbook," Chapter IV, "Installation of Cast Iron Soil Pipe and Fittings."

G. Make changes in direction for storm drainage piping using appropriate branches, bends, and long-sweep bends. Do not change direction of flow more than 90 degrees. Use proper size of standard increasers and reducers if pipes of different sizes are connected. Reducing size of drainage piping in direction of flow is prohibited.

H. Lay buried building storm drainage piping beginning at low point of each system. Install true to grades and alignment indicated, with unbroken continuity of invert. Place hub ends of piping upstream. Install required gaskets according to manufacturer's written instructions for use of lubricants, cements, and other installation requirements. Maintain swab in piping and pull past each joint as completed.

I. Install storm drainage piping at the following minimum slopes, unless otherwise indicated:

1. Building Storm Drain: 1 percent downward in direction of flow for piping unless otherwise indicated.

2. Horizontal Storm-Drainage Piping: 1 percent downward in direction of flow unless otherwise indicated.

J. Sleeves are not required for cast-iron soil piping passing through concrete slabs-on-grade if slab is without membrane waterproofing.

K. Install underground PVC storm drainage piping according to ASTM D 2321.

L. Do not enclose, cover, or put piping into operation until it is inspected and approved by authorities having jurisdiction.

3.4 JOINT CONSTRUCTION

A. Basic piping joint construction requirements are specified in Section 22 0511.

B. PVC Nonpressure Piping Joints: Join piping according to ASTM D 2665.

3.5 HANGER AND SUPPORT INSTALLATION

A. Pipe hangers and supports are specified in Division 22 Section "Hangers and Supports." Install the following:

1. Vertical Piping: MSS Type 8 or Type 42, clamps. 2. Individual, Straight, Horizontal Piping Runs: According to the following:

a. 100 Feet and Less: MSS Type 1, adjustable, steel clevis hangers. b. Longer Than 100 Feet: MSS Type 43, adjustable roller hangers. c. Longer Than 100 Feet, if Indicated: MSS Type 49, spring cushion rolls.

3. Multiple, Straight, Horizontal Piping Runs 100 Feet or Longer: MSS Type 44, pipe rolls. Support pipe rolls on trapeze.

4. Base of Vertical Piping: MSS Type 52, spring hangers.

B. Install supports according to Division 22 Section "Hangers and Supports."

C. Support vertical piping and tubing at base and at each floor.

Page 115: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING 22 14 13 - 4

D. Rod diameter may be reduced 1 size for double-rod hangers, with 3/8-inch minimum rods.

E. Install hangers for PVC piping with the following maximum horizontal spacing and minimum rod diameters:

1. NPS 1-1/2 and NPS 2: 48 inches with 3/8-inch rod. 2. NPS 3: 48 inches with 1/2-inch rod. 3. NPS 4 and NPS 5: 48 inches with 5/8-inch rod. 4. NPS 6: 48 inches with 3/4-inch rod. 5. NPS 8 to NPS 12: 48 inches with 7/8-inch rod.

F. Install supports for vertical PVC piping every 48 inches.

G. Support piping and tubing not listed above according to MSS SP-69 and manufacturer's written instructions.

3.6 CONNECTIONS

A. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Connect interior storm drainage piping to exterior storm drainage piping.

C. Connect storm drainage piping to roof drains and storm drainage specialties.

3.7 FIELD QUALITY CONTROL

A. During installation, notify authorities having jurisdiction at least 24 hours before inspection must be made. Perform tests specified below in presence of authorities having jurisdiction.

1. Roughing-in Inspection: Arrange for inspection of piping before concealing or closing-in after roughing-in.

2. Final Inspection: Arrange for final inspection by authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements.

B. Reinspection: If authorities having jurisdiction find that piping will not pass test or inspection, make required corrections and arrange for reinspection.

C. Reports: Prepare inspection reports and have them signed by authorities having jurisdiction.

D. Test storm drainage piping according to procedures of authorities having jurisdiction or, in absence of published procedures, as follows:

1. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit separate report for each test, complete with diagram of portion of piping tested.

2. Leave uncovered and unconcealed new, altered, extended, or replaced storm drainage piping until it has been tested and approved. Expose work that was covered or concealed before it was tested.

3. Test Procedure: Test storm drainage piping, except outside leaders, on completion of roughing-in. Close openings in piping system and fill with water to point of overflow, but not less than 10-foot head of water. From 15 minutes before inspection starts to completion of inspection, water level must not drop. Inspect joints for leaks.

4. Repair leaks and defects with new materials and retest piping, or portion thereof, until satisfactory results are obtained.

5. Prepare reports for tests and required corrective action.

3.8 CLEANING

A. Clean interior of piping. Remove dirt and debris as work progresses.

Page 116: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING 22 14 13 - 5

B. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.

C. Place plugs in ends of uncompleted piping at end of day and when work stops.

END 22 14 13

Page 117: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING SPECIALTIES 22 14 23 - 1

DIVISION 22 - PLUMBING SECTION 22 14 23 - STORM DRAINAGE PIPING SPECIALTIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Roof drains.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

1.4 QUALITY ASSURANCE

A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing agency.

PART 2 - PRODUCTS

2.1 METAL ROOF DRAINS

A. Cast-Iron, Large-Sump, General-Purpose Roof Drains:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Josam. b. Sioux Chief. c. Smith, Jay R. d. Wade. e. Zurn.

2. Standard: ASME A112.6.4, for general-purpose roof drains. 3. Body Material: Cast iron. 4. Dimension of Body: As scheduled. 5. Combination Flashing Ring and Gravel Stop: Required. 6. Flow-Control Weirs: Not required. 7. Outlet: Bottom. 8. Extension Collars: As required by roofing supplier. 9. Underdeck Clamp: Required. 10. Expansion Joint: Not required. 11. Sump Receiver Plate: Required. 12. Dome Material: PE. 13. Perforated Gravel Guard: Not required. 14. Vandal-Proof Dome: Not required. 15. Water Dam: Not required.

B. Cast-Iron, Large-Sump, Emergency Overflow Roof Drains:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Page 118: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING SPECIALTIES 22 14 23 - 2

a. Josam Company. b. Smith, Jay R. Mfg. Co. c. Watts Water Technologies, Inc. d. Zurn Plumbing Products Group; Specification Drainage Operation.

2. Standard: ASME A112.6.4, for general-purpose roof drains. 3. Body Material: Cast iron. 4. Dimension of Body: As scheduled. 5. Combination Flashing Ring and Gravel Stop: Required. 6. Flow-Control Weirs: Not required. 7. Outlet: Bottom. 8. Extension Collars: As required by roofing supplier. 9. Underdeck Clamp: Required. 10. Expansion Joint: Not required. 11. Sump Receiver Plate: Required. 12. Dome Material: PE. 13. Perforated Gravel Guard: Not required. 14. Vandal-Proof Dome: Not required. 15. Water Dam: Required, 2 inches high minimum.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install roof drains according to roof membrane manufacturer's written installation instructions. Roofing materials are specified in Division 7 Sections.

1. Install flashing collar or flange of roof drain to prevent leakage between drain and adjoining roofing. Maintain integrity of waterproof membranes where penetrated.

2. Install expansion joints, if indicated, in roof drain outlets. 3. Position roof drains for easy access and maintenance.

B. Install conductor nozzles at exposed bottom of conductors where they spill onto grade.

C. Install cleanouts in aboveground piping and building drain piping according to the following instructions unless otherwise indicated:

1. Use cleanouts the same size as drainage piping up to NPS 4. Use NPS 4 for larger drainage piping unless larger cleanout is indicated.

2. Locate cleanouts at each change in direction of piping greater than 45 degrees. 3. Locate cleanouts at minimum intervals of 50 feet for piping NPS 4 and smaller and 100 feet for

larger piping. 4. Locate cleanouts at base of each vertical soil and waste stack.

D. For floor cleanouts for piping below floors, install cleanout deck plates with top flush with finished floor.

E. For cleanouts located in concealed piping, install cleanout wall access covers, of types indicated, with frame and cover flush with finished wall.

F. Install wall cleanouts in vertical conductors. Install access door or cover in wall.

3.2 CONNECTIONS

A. Comply with requirements for piping specified in Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

Page 119: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

STORM DRAINAGE PIPING SPECIALTIES 22 14 23 - 3

3.3 PROTECTION

A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and to prevent damage from traffic or construction work.

B. Place plugs in ends of uncompleted piping at end of each day or when work stops.

END 22 14 23

Page 120: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 1

DIVISION 22 - PLMBING SECTION 22 16 13 - FACILITY NATURAL-GAS PIPING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Natural gas piping including the following:

1. Pipes, tubes, and fittings. 2. Piping specialties. 3. Piping and tubing joining materials. 4. Valves. 5. Pressure regulators. 6. Gas meter.

1.3 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Meter/Service Regulator Assembly: Piping, valves, service regulator, meter and specialities by Ft Hood DPW.

E. Point of Delivery: Piping outlet of service-regulator/meter assembly.

F. Natural Gas Piping: Piping that conveys natural gas from point of delivery to natural gas utilization equipment in or on building including line and equipment regulators, gas valves, and specialities.

1.4 PERFORMANCE REQUIREMENTS

A. Minimum Operating-Pressure Ratings:

1. Piping and Valves: 100 psig minimum unless otherwise indicated.

B. Natural-Gas System Pressures within Buildings: 11”-7” W.C..

1.5 SUBMITTALS

A. Product Data: For each type of the following:

1. Piping specialties.

Page 121: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 2

2. Valves. Include pressure rating, capacity, settings, and electrical connection data of selected models.

B. Welding certificates.

C. Field quality-control reports.

D. Operation and Maintenance Data: For motorized gas valves, pressure regulators and service meter to include in emergency, operation, and maintenance manuals.

1.6 QUALITY ASSURANCE

A. Steel Support Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."

B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Handling Flammable Liquids: Remove and dispose of liquids from existing natural-gas piping according to requirements of authorities having jurisdiction.

B. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.

C. Store and handle pipes and tubes having factory-applied protective coatings to avoid damaging coating, and protect from direct sunlight.

D. Protect stored PE pipes and valves from direct sunlight.

1.8 PROJECT CONDITIONS

A. Perform site survey, research base utility records, and verify existing utility locations. Contact utility-locating service for area where Project is located.

B. Coordinate gas service piping and regulator/meter assembly with Baltimore Gas and Electric Company.

1.9 COORDINATION

A. Coordinate sizes and locations of concrete bases with actual equipment provided.

B. Coordinate requirements for access panels and doors for valves installed concealed behind finished surfaces. Comply with requirements in Division 8 Section "Access Doors and Frames."

PART 2 - PRODUCTS

2.1 PIPES, TUBES, AND FITTINGS

A. Steel Pipe: ASTM A 53/A 53M, black steel, Schedule 40, Type E or S, Grade B.

1. Malleable-Iron Threaded Fittings: ASME B16.3, Class 150, standard pattern. 2. Wrought-Steel Welding Fittings: ASTM A 234/A 234M for butt welding and socket welding.

Page 122: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 3

3. Unions: ASME B16.39, Class 150, malleable iron with brass-to-iron seat, ground joint, and threaded ends.

4. Forged-Steel Flanges and Flanged Fittings: ASME B16.5, minimum Class 150, including bolts, nuts, and gaskets of the following material group, end connections, and facings: a. Material Group: 1.1. b. End Connections: Threaded or butt welding to match pipe. c. Lapped Face: Not permitted underground. d. Gasket Materials: ASME B16.20, metallic, flat, asbestos free, aluminum o-rings, and

spiral-wound metal gaskets. e. Bolts and Nuts: ASME B18.2.1, carbon steel aboveground and stainless steel

underground.

B. Polyethylene (PE) Pipe: ASTM D2513 SDR 11 pipe with ASTM D2683 socket type fittings.

2.2 PIPING SPECIALTIES

A. Appliance Flexible Connectors:

1. Indoor, Movable-Appliance Flexible Connectors: Comply with ANSI Z21.69. 2. Operating-Pressure Rating: 0.5 psig. 3. End Fittings: Zinc-coated steel. 4. Threaded Ends: Comply with ASME B1.20.1. 5. Maximum Length: 72 inches (1830 mm).

B. Quick-Disconnect Devices: Comply with ANSI Z21.41.

1. Copper-alloy convenience outlet and matching plug connector. 2. Nitrile seals. 3. Hand operated with automatic shutoff when disconnected. 4. For indoor or outdoor applications. 5. Adjustable, retractable restraining cable.

2.3 JOINING MATERIALS

A. Joint Compound and Tape: Suitable for natural gas.

B. Welding Filler Metals: Comply with AWS D10.12/D10.12M for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

2.4 MANUAL GAS SHUTOFF VALVES

A. General Requirements for Metallic Valves, NPS 2 and Smaller: Comply with ASME B16.33.

1. CWP Rating: 125 psig. 2. Threaded Ends: Comply with ASME B1.20.1. 3. Tamperproof Feature: Locking feature for valves indicated in "Underground Manual Gas Shutoff

Valve Schedule" and "Aboveground Manual Gas Shutoff Valve Schedule" Articles. 4. Listing: Listed and labeled by an NRTL acceptable to authorities having jurisdiction for valves 1

inch and smaller. 5. Service Mark: Valves 1-1/4 inches to NPS 2 shall have initials "WOG" permanently marked on

valve body.

B. General Requirements for Metallic Valves, NPS 2-1/2 and Larger: Comply with ASME B16.38.

1. CWP Rating: 125 psig. 2. Flanged Ends: Comply with ASME B16.5 for steel flanges. 3. Tamperproof Feature: Locking feature for valves indicated in "Underground Manual Gas Shutoff

Valve Schedule" and "Aboveground Manual Gas Shutoff Valve Schedule" Articles. 4. Service Mark: Initials "WOG" shall be permanently marked on valve body.

Page 123: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 4

C. Two-Piece, Full-Port, Bronze Ball Valves with Bronze Trim: MSS SP-110.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. BrassCraft Manufacturing Company; a Masco company. b. Conbraco Industries, Inc.; Apollo Div. c. Lyall, R. W. & Company, Inc. d. McDonald, A. Y. Mfg. Co. e. Perfection Corporation; a subsidiary of American Meter Company.

2. Body: Bronze, complying with ASTM B 584. 3. Ball: Chrome-plated bronze. 4. Stem: Bronze; blowout proof. 5. Seats: Reinforced TFE; blowout proof. 6. Packing: Threaded-body packnut design with adjustable-stem packing. 7. Ends: Threaded, flared, or socket as indicated in "Underground Manual Gas Shutoff Valve

Schedule" and "Aboveground Manual Gas Shutoff Valve Schedule" Articles. 8. CWP Rating: 600 psig. 9. Listing: Valves NPS 1 and smaller shall be listed and labeled by an NRTL acceptable to

authorities having jurisdiction. 10. Service: Suitable for natural-gas service with "WOG" indicated on valve body.

D. Cast-Iron, Lubricated Plug Valves: MSS SP-78.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Flowserve. b. Homestead Valve; a division of Olson Technologies, Inc. c. McDonald, A. Y. Mfg. Co. d. Milliken Valve Company. e. Mueller Co.; Gas Products Div. f. R&M Energy Systems, A Unit of Robbins & Myers, Inc.

2. Body: Cast iron, complying with ASTM A 126, Class B. 3. Plug: Bronze or nickel-plated cast iron. 4. Seat: Coated with thermoplastic. 5. Stem Seal: Compatible with natural gas. 6. Ends: Threaded or flanged as indicated in "Underground Manual Gas Shutoff Valve Schedule"

and "Aboveground Manual Gas Shutoff Valve Schedule" Articles. 7. Operator: Square head or lug type with tamperproof feature where indicated. 8. Pressure Class: 125 psig. 9. Listing: Valves NPS 1 and smaller shall be listed and labeled by an NRTL acceptable to

authorities having jurisdiction. 10. Service: Suitable for natural-gas service with "WOG" indicated on valve body.

2.5 PRESSURE REGULATORS

A. General Requirements:

1. Single stage and suitable for natural gas. 2. Steel jacket and corrosion-resistant components. 3. Elevation compensator. 4. End Connections: Threaded for regulators NPS 2 and smaller; flanged for regulators NPS 2-1/2

and larger.

B. Line Pressure Regulators: Comply with ANSI Z21.80.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Page 124: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 5

a. Actaris. b. American Meter Company. c. Eclipse Combustion, Inc. d. Fisher Control Valves and Regulators; Division of Emerson Process Management. e. Invensys. f. Maxitrol Company. g. Richards Industries; Jordan Valve Div.

2. Body and Diaphragm Case: Cast iron or die-cast aluminum. 3. Springs: Zinc-plated steel; interchangeable. 4. Diaphragm Plate: Zinc-plated steel. 5. Seat Disc: Nitrile rubber resistant to gas impurities, abrasion, and deformation at the valve port. 6. Orifice: Aluminum; interchangeable. 7. Seal Plug: Ultraviolet-stabilized, mineral-filled nylon. 8. Single-port, self-contained regulator with orifice no larger than required at maximum pressure

inlet, and no pressure sensing piping external to the regulator. 9. Pressure regulator shall maintain discharge pressure setting downstream, and not exceed 150

percent of design discharge pressure at shutoff. 10. Overpressure Protection Device: Factory mounted on pressure regulator. 11. Atmospheric Vent: Factory- or field-installed, stainless-steel screen in opening if not connected to

vent piping. 12. Maximum Inlet Pressure: 5 psig.

2.6 DIELECTRIC FITTINGS

A. Dielectric Unions:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Capitol Manufacturing Company. b. Central Plastics Company. c. Hart Industries International, Inc. d. McDonald, A. Y. Mfg. Co. e. Watts Regulator Co.; Division of Watts Water Technologies, Inc. f. Wilkins; Zurn Plumbing Products Group.

2. Minimum Operating-Pressure Rating: 150 psig. 3. Combination fitting of copper alloy and ferrous materials. 4. Insulating materials suitable for natural gas. 5. Combination fitting of copper alloy and ferrous materials with threaded, brazed-joint, plain, or

welded end connections that match piping system materials.

B. Dielectric Flanges:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Capitol Manufacturing Company. b. Central Plastics Company. c. Watts Regulator Co.; Division of Watts Water Technologies, Inc. d. Wilkins; Zurn Plumbing Products Group.

2. Minimum Operating-Pressure Rating: 150 psig. 3. Combination fitting of copper alloy and ferrous materials. 4. Insulating materials suitable for natural gas. 5. Combination fitting of copper alloy and ferrous materials with threaded, brazed-joint, plain, or

welded end connections that match piping system materials.

C. Dielectric-Flange Kits:

Page 125: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 6

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Advance Products & Systems, Inc. b. Calpico Inc. c. Central Plastics Company. d. Pipeline Seal and Insulator, Inc.

2. Minimum Operating-Pressure Rating: 150 psig. 3. Companion-flange assembly for field assembly. 4. Include flanges, full-face- or ring-type neoprene or phenolic gasket, phenolic or PE bolt sleeves,

phenolic washers, and steel backing washers. 5. Insulating materials suitable for natural gas. 6. Combination fitting of copper alloy and ferrous materials with threaded, brazed-joint, plain, or

welded end connections that match piping system materials.

2.7 LABELING AND IDENTIFYING

A. Detectable Warning Tape: Acid- and alkali-resistant, PE film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches wide and 4 mils thick, continuously inscribed with a description of utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches deep; colored yellow.

B. Trace Wire: Provide continuous #12 THW copper trace wire for buried natural gas piping.

2.8 GAS METER

A. Provide rotary type gas meter complying with AGA B109.3. Meter assembly shall include a strainer immediately upstream of the meter. Meter shall have over-pressure protection per ASME B31.8. Meter shall have a pulse switch initiator capable of operating up to speeds of 500 pulses per minute with no false pulses. The initiator shall require no field adjustments and shall provide the maximum number of pulses up to 500 per minute that is obtainable from the manufacturer. It shall provide not less than one pulse per 1000 cubic feet of gas. The meter shall be temperature compensating. Acceptable manufacturers are IMAC Systems, American Gas Meter Company, Schlumberger or Rockwell/Equimeter. Provide Metz-Connect LF-S14 LON digital input module (P/N 11085813-US) data gathering device located in Mechanical/Electrical Room 120.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine roughing-in for natural-gas piping system to verify actual locations of piping connections before equipment installation.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Close equipment shutoff valves before turning off natural gas to premises or piping section.

B. Inspect natural-gas piping according to NFPA 54 to determine that natural-gas utilization devices are turned off in piping section affected.

C. Comply with NFPA 54 requirements for prevention of accidental ignition.

Page 126: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 7

3.3 OUTDOOR PIPING INSTALLATION

A. Comply with NFPA 54 for installation and purging of natural-gas piping.

3.4 INDOOR PIPING INSTALLATION

A. Comply with NFPA 54 for installation and purging of natural-gas piping.

B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.

C. Arrange for pipe spaces, chases, slots, sleeves, and openings in building structure during progress of construction, to allow for mechanical installations.

D. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas.

E. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

F. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

G. Locate valves for easy access.

H. Install natural-gas piping at uniform grade of 2 percent down toward drip and sediment traps.

I. Install piping free of sags and bends.

J. Install fittings for changes in direction and branch connections.

K. Verify final equipment connection locations for roughing-in.

L. Comply with requirements in Sections specifying gas-fired appliances and equipment for roughing-in requirements.

M. Drips and Sediment Traps: Install drips at points where condensate may collect, including service-meter outlets. Locate where accessible to permit cleaning and emptying. Do not install where condensate is subject to freezing.

1. Construct drips and sediment traps using tee fitting with bottom outlet plugged or capped. Use nipple a minimum length of 3 pipe diameters, but not less than 3 inches long and same size as connected pipe. Install with space below bottom of drip to remove plug or cap.

N. Concealed Location Installations:

1. Above Accessible Ceilings: Natural-gas piping, fittings, valves, and regulators may be installed in accessible spaces without containment conduit.

O. Use eccentric reducer fittings to make reductions in pipe sizes. Install fittings with level side down.

P. Connect branch piping from top or side of horizontal piping.

Q. Install unions in pipes NPS 2 and smaller, adjacent to each valve, at final connection to each piece of equipment. Unions are not required at flanged connections.

Page 127: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 8

3.5 VALVE INSTALLATION

A. Install manual gas shutoff valve for each gas appliance ahead of corrugated stainless-steel tubing, aluminum, or copper connector.

B. Install regulators and overpressure protection devices with maintenance access space adequate for servicing and testing.

3.6 PIPING JOINT CONSTRUCTION

A. Ream ends of pipes and tubes and remove burrs.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Threaded Joints:

1. Thread pipe with tapered pipe threads complying with ASME B1.20.1. 2. Cut threads full and clean using sharp dies. 3. Ream threaded pipe ends to remove burrs and restore full inside diameter of pipe. 4. Apply appropriate tape or thread compound to external pipe threads unless dryseal threading is

specified. 5. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.

Do not use pipe sections that have cracked or open welds.

D. Welded Joints:

1. Construct joints according to AWS D10.12/D10.12M, using qualified processes and welding operators.

2. Bevel plain ends of steel pipe. 3. Patch factory-applied protective coating as recommended by manufacturer at field welds and

where damage to coating occurs during construction.

E. Flanged Joints: Install gasket material, size, type, and thickness appropriate for natural-gas service. Install gasket concentrically positioned.

3.7 HANGER AND SUPPORT INSTALLATION

A. Comply with requirements for pipe hangers and supports specified in Division 22 Section "Hangers and Supports."

B. Install hangers for horizontal steel piping with the following maximum spacing and minimum rod sizes:

1. NPS 1 and Smaller: Maximum span, 96 inches; minimum rod size, 3/8 inch. 2. NPS 1-1/4: Maximum span, 108 inches; minimum rod size, 3/8 inch. 3. NPS 1-1/2 and NPS 2: Maximum span, 108 inches; minimum rod size, 3/8 inch. 4. NPS 2-1/2 to NPS 3-1/2: Maximum span, 10 feet; minimum rod size, 1/2 inch. 5. NPS 4 and Larger: Maximum span, 10 feet; minimum rod size, 5/8 inch.

3.8 CONNECTIONS

A. Install natural-gas piping electrically continuous, and bonded to gas appliance equipment grounding conductor of the circuit powering the appliance according to NFPA 70.

B. Install piping adjacent to appliances to allow service and maintenance of appliances.

C. Connect piping to appliances using manual gas shutoff valves and unions. Install valve within 72 inches of each gas-fired appliance and equipment. Install union between valve and appliances or equipment.

Page 128: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 9

D. Sediment Traps: Install tee fitting with capped nipple in bottom to form drip, as close as practical to inlet of each appliance.

3.9 PAINTING

A. Comply with requirements in Division 9 painting Sections for painting interior and exterior natural-gas piping.

B. Paint exposed, exterior metal piping, valves, service regulators, service meters and meter bars, earthquake valves, and piping specialties, except components, with factory-applied paint or protective coating.

1. Alkyd System: MPI EXT 5.1D. a. Prime Coat: Alkyd anticorrosive metal primer. b. Intermediate Coat: Exterior alkyd enamel matching topcoat. c. Topcoat: Exterior alkyd enamel flat. d. Color: Gray.

C. Damage and Touchup: Repair marred and damaged factory-applied finishes with materials and by procedures to match original factory finish.

3.10 METER INSTALLATION

A. Meter shall be installed in accordance with ASME B31.8.

B. A two conductor 22 AWG cable shall be routed from the meter pulse output to the LF-S14 data gathering device located in Mechanical/Electrical Room 120. Cable shall be installed in conduit complying with Division 27 requirements.

C. A two conductor cable shall be installed from the LON digital input module to the ILON smart server provided under Division 26. Approximately 2 feet of spare cable shall be provided at both ends for the Ft. Hood Energy team to connect the LON input module to the ILON smart server.

D. ILON 600 and LON digital input module shall be installed in a NEMA 1, 12x12x4 inch enclosure.

3.11 FIELD QUALITY CONTROL

A. Perform tests and inspections.

B. Tests and Inspections:

1. Test, inspect, and purge natural gas according to NFPA 54 and authorities having jurisdiction.

C. Natural-gas piping will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

3.12 INDOOR AND OUTDOOR PIPING SCHEDULE FOR SYSTEM PRESSURES LESS THAN 5 PSIG

A. Aboveground piping shall be the following:

1. Steel pipe NPS 2” and smaller: Malleable-iron fittings and threaded joints. 2. Steel pipe NPS 2-1/2” and larger: Wrought-steel fittings and welded joints.

3.13 ABOVEGROUND MANUAL GAS SHUTOFF VALVE SCHEDULE

A. Piping valves for pipe sizes NPS 2 and smaller shall be bronze or brass ball valve.

Page 129: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FACILITY NATURAL-GAS PIPING 22 16 13 - 10

B. Piping valves for pipe sizes NPS 2-1/2 and larger shall be cast-iron, lubricated plug valve.

C. Valves in branch piping for single appliance shall be one of the following: 1. Two-piece, regular-port, bronze or brass ball valves with bronze trim.

END 22 16 13

Page 130: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FUEL-FIRED DOMESTIC WATER HEATERS 22 34 00 - 1

DIVISION 22 - PLUMBING SECTION 22 34 00 - FUEL-FIRED DOMESTIC WATER HEATERS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Commercial, high-efficiency, instantaneous gas water heaters.

B. Water heater accessories.

1.3 SUBMITTALS

A. Product Data: For each type and size of water heater indicated. Include rated capacities, operating characteristics, furnished specialties, and accessories.

B. LEED Submittal:

1. Product Data for Prerequisite EA 2: Documentation indicating that units comply with ASHRAE/IESNA 90.1, Section 7 - "Service Water Heating."

C. Operation and Maintenance Data: For water heaters to include in emergency, operation, and maintenance manuals.

D. Warranty: Special warranty specified in this Section.

1.4 QUALITY ASSURANCE

A. Source Limitations: Obtain same type of water heaters through one source from a single manufacturer.

B. Product Options: Drawings indicate size, profiles, and dimensional requirements of water heaters and are based on the specific system indicated. Refer to Division 1 Section "Product Requirements."

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

D. ASHRAE/IESNA 90.1 Compliance: Applicable requirements in ASHRAE/IESNA 90.1.

E. ASME Compliance:

1. Where ASME-code construction is indicated, fabricate and label commercial water heater storage tanks to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

2. Where ASME-code construction is indicated, fabricate and label commercial, finned-tube water heaters to comply with ASME Boiler and Pressure Vessel Code: Section IV.

F. Comply with NSF 61, "Drinking Water System Components - Health Effects; Sections 1 through 9" for all components that will be in contact with potable water.

Page 131: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FUEL-FIRED DOMESTIC WATER HEATERS 22 34 00 - 2

1.5 COORDINATION

A. Coordinate size and location of concrete bases with Architectural and Structural Drawings.

1.6 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of fuel-fired water heaters that fails in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following: a. Faulty operation of controls. b. Deterioration of metals, metal finishes, and other materials beyond normal use.

2. Warranty Period(s): From date of Substantial Completion: a. Commercial, Gas Water Heaters:

1) Controls and Other Components: Three years. b. Compression Tanks: One year.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.

B. Commercial, High-Efficiency, Instantaneous Gas Water Heaters:

1. Manufacturers: a. Bradford White Corporation. b. Rinnai. c. Smith, A. O. Water Products Company. d. State Industries, Inc.

2. Description: Manufacturer's proprietary design to provide at least 95 percent combustion efficiency at optimum operating conditions. Following features and attributes may be modified or omitted if water heater otherwise complies with requirements for performance.

3. Burner or Heat Exchanger: Comply with UL 795 or approved testing agency requirements for high-efficiency water heaters and for natural-gas fuel.

4. Temperature Control: Adjustable thermostat. 5. Safety Controls: Automatic, high-temperature-limit and low-water cutoff devices or systems. 6. Capacity and Characteristics: See schedule on drawings

2.2 WATER HEATER ACCESSORIES

A. Combination Temperature and Pressure Relief Valves: Include relieving capacity at least as great as heat input, and include pressure setting less than water heater working-pressure rating. Select each relief valve with sensing element that extends into storage tank.

1. Gas Water Heaters: ANSI Z21.22/CSA 4.4.

2.3 SOURCE QUALITY CONTROL

A. Test and inspect water heater storage tanks, specified to be ASME-code construction, according to ASME Boiler and Pressure Vessel Code.

Page 132: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FUEL-FIRED DOMESTIC WATER HEATERS 22 34 00 - 3

B. Hydrostatically test commercial water heater storage tanks before shipment to minimum of one and one-half times pressure rating.

PART 3 - EXECUTION

3.1 WATER HEATER INSTALLATION

A. Install water heaters level and plumb, according to layout drawings, original design, and referenced standards. Maintain manufacturer's recommended clearances. Arrange units so controls and devices needing service are accessible.

B. Install gas water heaters according to NFPA 54.

C. Install gas shutoff valves on gas supplies to gas water heaters without shutoff valves.

D. Install gas pressure regulators on gas supplies to gas water heaters without gas pressure regulators if gas pressure regulators are required to reduce gas pressure at burner.

E. Install automatic gas valves on gas supplies to gas water heaters, if required for operation of safety control.

F. Install combination temperature and pressure relief valves in top portion of storage tanks. Use relief valves with sensing elements that extend into tanks. Extend commercial-water-heater, relief-valve outlet, with drain piping same as domestic water piping in continuous downward pitch, and discharge by positive air gap onto closest floor drain.

G. Install water heater drain piping as indirect waste to spill by positive air gap into open drains or over floor drains. Install hose-end drain valves at low points in water piping for water heaters that do not have tank drains. Refer to Division 22 Section "Plumbing Specialties" for hose-end drain valves.

H. Install thermometer on outlet piping of water heaters. Refer to Division 22 Section "Meters and Gages" for thermometers.

I. Install schedule 40 PVC exhaust and intake piping and fittings for inlet and outlet of condensing water heat and terminate through the roof in accordance with manufacturer’s instructions and recommendation.

J. Install condensate drain tubing from water heater to nearest floor drain.

K. Fill water heaters with water.

3.2 CONNECTIONS

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to water heaters to allow service and maintenance. Arrange piping for easy removal of water heaters.

C. Ground equipment according to Division 26 Section "Grounding and Bonding."

D. Connect wiring according to Division 26 Section "Conductors and Cables."

3.3 FIELD QUALITY CONTROL

A. Perform the following field tests and inspections and prepare test reports: 1. Leak Test: After installation, test for leaks. Repair leaks and retest until no leaks exist. 2. Operational Test: After electrical circuitry has been energized, confirm proper operation.

Page 133: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FUEL-FIRED DOMESTIC WATER HEATERS 22 34 00 - 4

3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

B. Remove and replace water heaters that do not pass tests and inspections and retest as specified above.

3.4 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain commercial water heaters. Refer to Division 01 Section "Closeout Procedures."

END 22 34 00

Page 134: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMERICAL PLUMBING FIXTURES 22 42 13 - 1

DIVISION 22 - PLUMBING SECTION 22 42 13 - COMMERICAL PLUMBING FIXTURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General administrative and procedural requirements for the plumbing installations.

B. General Provisions of the contract, including Division 00 and Division 01, shall apply to Division 22 specifications sections.

1.2 WORK INCLUDES

A. Faucets for lavatories, showers and sinks.

B. Flushometers.

C. Toilet seats.

D. Protective shielding guards.

E. Fixture supports.

F. Water closets.

G. Urinals.

H. Lavatories.

I. Kitchen sinks.

J. Service basins.

K. Owner-furnished fixtures.

L. Related Sections include the following: 1. Division 10 Section "Toilet and Bath Accessories."

1.3 DEFINITIONS

A. ABS: Acrylonitrile-butadiene-styrene plastic.

B. Accessible Fixture: Plumbing fixture that can be approached, entered, and used by people with disabilities.

C. Cast Polymer: Cast-filled-polymer-plastic material. This material includes cultured-marble and solid-surface materials.

D. Cultured Marble: Cast-filled-polymer-plastic material with surface coating.

E. Fitting: Device that controls the flow of water into or out of the plumbing fixture. Fittings specified in this Section include supplies and stops, faucets and spouts, shower heads and tub spouts, drains and tailpieces, and traps and waste pipes. Piping and general-duty valves are included where indicated.

F. FRP: Fiberglass-reinforced plastic.

G. PMMA: Polymethyl methacrylate (acrylic) plastic.

Page 135: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMERICAL PLUMBING FIXTURES 22 42 13 - 2

H. PVC: Polyvinyl chloride plastic.

I. Solid Surface: Nonporous, homogeneous, cast-polymer-plastic material with heat-, impact-, scratch-, and stain-resistance qualities.

1.4 SUBMITTALS

A. Product Data: For each type of plumbing fixture indicated. Include selected fixture and trim, fittings, accessories, appliances, appurtenances, equipment, and supports. Indicate materials and finishes, dimensions, construction details, and flow-control rates.

B. LEED Submittal:

1. Product Data for Credit WE 2, 3.1, and 3.2: Documentation indicating flow and water consumption requirements.

C. Operation and Maintenance Data: For plumbing fixtures to include in emergency, operation, and maintenance manuals.

D. Warranty: Special warranty specified in this Section.

1.5 QUALITY ASSURANCE

A. Source Limitations: Obtain plumbing fixtures, faucets, and other components of each category through one source from a single manufacturer.

1. Exception: If fixtures, faucets, or other components are not available from a single manufacturer, obtain similar products from other manufacturers specified for that category.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

C. Regulatory Requirements: Comply with requirements in ICC A117.1, "Accessible and Usable Buildings and Facilities"; Public Law 90-480, "Architectural Barriers Act"; and Public Law 101-336, "Americans with Disabilities Act"; for plumbing fixtures for people with disabilities.

D. Regulatory Requirements: Comply with requirements in Public Law 102-486, "Energy Policy Act," about water flow and consumption rates for plumbing fixtures.

E. NSF Standard: Comply with NSF 61, "Drinking Water System Components--Health Effects," for fixture materials that will be in contact with potable water.

F. Select combinations of fixtures and trim, faucets, fittings, and other components that are compatible.

G. Comply with the following applicable standards and other requirements specified for plumbing fixtures:

1. Enameled, Cast-Iron Fixtures: ASME A112.19.1M. 2. Porcelain-Enameled, Formed-Steel Fixtures: ASME A112.19.4M. 3. Slip-Resistant Bathing Surfaces: ASTM F 462. 4. Solid-Surface-Material Lavatories and Sinks: ANSI/ICPA SS-1. 5. Stainless-Steel Commercial, Handwash Sinks: NSF 2 construction. 6. Vitreous-China Fixtures: ASME A112.19.2M. 7. Water-Closet, Flush Valve, Tank Trim: ASME A112.19.5. 8. Water-Closet, Flushometer Tank Trim: ASSE 1037.

H. Comply with the following applicable standards and other requirements specified for lavatory and sink faucets:

Page 136: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMERICAL PLUMBING FIXTURES 22 42 13 - 3

1. Backflow Protection Devices for Faucets with Side Spray: ASME A112.18.3M. 2. Backflow Protection Devices for Faucets with Hose-Thread Outlet: ASME A112.18.3M. 3. Diverter Valves for Faucets with Hose Spray: ASSE 1025. 4. Faucets: ASME A112.18.1. 5. Hose-Connection Vacuum Breakers: ASSE 1011. 6. Hose-Coupling Threads: ASME B1.20.7. 7. Integral, Atmospheric Vacuum Breakers: ASSE 1001. 8. NSF Potable-Water Materials: NSF 61. 9. Pipe Threads: ASME B1.20.1. 10. Sensor-Actuated Faucets and Electrical Devices: UL 1951. 11. Supply Fittings: ASME A112.18.1. 12. Brass Waste Fittings: ASME A112.18.2.

I. Comply with the following applicable standards and other requirements specified for miscellaneous fittings:

1. Atmospheric Vacuum Breakers: ASSE 1001. 2. Brass and Copper Supplies: ASME A112.18.1. 3. Manual-Operation Flushometers: ASSE 1037. 4. Plastic Tubular Fittings: ASTM F 409. 5. Brass Waste Fittings: ASME A112.18.2. 6. Sensor-Operation Flushometers: ASSE 1037 and UL 1951.

J. Comply with the following applicable standards and other requirements specified for miscellaneous components: 1. Flexible Water Connectors: ASME A112.18.6. 2. Floor Drains: ASME A112.6.3. 3. Grab Bars: ASTM F 446. 4. Hose-Coupling Threads: ASME B1.20.7. 5. Off-Floor Fixture Supports: ASME A112.6.1M. 6. Pipe Threads: ASME B1.20.1. 7. Plastic Toilet Seats: ANSI Z124.5. 8. Supply and Drain Protective Shielding Guards: ICC A117.1.

PART 2 - PRODUCTS

2.1 PLUMBING FIXTURES

A. See schedule.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine roughing-in of water supply and sanitary drainage and vent piping systems to verify actual locations of piping connections before plumbing fixture installation.

B. Examine cabinets, counters, floors, and walls for suitable conditions where fixtures will be installed.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 AAFES FURNISHED CONTRACTOR INSTALLED EQUIPMENT

A Provide rough-ins and final connections to all Exchange furnished equipment including shut off valves, piping, traps, etc. necessary to connect up equipment after it has be installed in place.

B. Install all faucets, sinks drains, tailpieces, overflows, traps, etc. furnished loose with all Exchange

furnished equipment.

Page 137: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMERICAL PLUMBING FIXTURES 22 42 13 - 4

C. All exposed piping readily visible for Exchange furnished equipment shall be chrome plated red brass pipe and fittings. Braces for support of exposed piping shall be chrome plated.

D. Pending installation of Exchange furnished equipment, all service lines shall be suitably capped,

plugged and protected. All water lines shall be valved.

E. Furnish vacuum breakers, pressure regulators solenoid valves, traps, piping, etc. as required for installation of equipment.

3.3 INSTALLATION

A. Assemble plumbing fixtures, trim, fittings, and other components according to manufacturers' written instructions.

B. Install off-floor supports, affixed to building substrate, for wall-mounting fixtures.

1. Use carrier supports with waste fitting and seal for back-outlet fixtures. 2. Use carrier supports without waste fitting for fixtures with tubular waste piping. 3. Use chair-type carrier supports with rectangular steel uprights for accessible fixtures.

C. Install back-outlet, wall-mounting fixtures onto waste fitting seals and attach to supports.

D. Install floor-mounting fixtures on closet flanges or other attachments to piping or building substrate.

E. Install wall-mounting fixtures with tubular waste piping attached to supports.

F. Install counter-mounting fixtures in and attached to casework.

G. Install fixtures level and plumb according to roughing-in drawings.

H. Install water-supply piping with stop on each supply to each fixture to be connected to water distribution piping. Attach supplies to supports or substrate within pipe spaces behind fixtures. Install stops in locations where they can be easily reached for operation.

1. Exception: Use ball, gate, or globe valves if supply stops are not specified with fixture.

I. Install trap and tubular waste piping on drain outlet of each fixture to be directly connected to sanitary drainage system.

J. Install tubular waste piping on drain outlet of each fixture to be indirectly connected to drainage system.

K. Install flushometer valves for accessible water closets and urinals with handle mounted on wide side of compartment. Install other actuators in locations that are easy for people with disabilities to reach.

L. Install toilet seats on water closets.

M. Install trap-seal liquid in dry urinals.

N. Install faucet-spout fittings with specified flow rates and patterns in faucet spouts if faucets are not available with required rates and patterns. Include adapters if required.

O. Install water-supply flow-control fittings with specified flow rates in fixture supplies at stop valves.

P. Install faucet flow-control fittings with specified flow rates and patterns in faucet spouts if faucets are not available with required rates and patterns. Include adapters if required.

Q. Install traps on fixture outlets. 1. Exception: Omit trap on fixtures with integral traps. 2. Exception: Omit trap on indirect wastes, unless otherwise indicated.

Page 138: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMERICAL PLUMBING FIXTURES 22 42 13 - 5

R. Install escutcheons at piping wall ceiling penetrations in exposed, finished locations and within cabinets and millwork. Use deep-pattern escutcheons if required to conceal protruding fittings. Escutcheons are specified in Division 22.

S. Set service basins in leveling bed of cement grout. Grout is specified in Division 22.

T. Seal joints between fixtures and walls, floors, and countertops using sanitary-type, one-part, mildew-resistant silicone sealant. Match sealant color to fixture color. Sealants are specified in Division 7 Section "Joint Sealants."

3.4 CONNECTIONS

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

B. Connect fixtures with water supplies, stops, and risers, and with traps, soil, waste, and vent piping. Use size fittings required to match fixtures.

3.5 FIELD QUALITY CONTROL

A. Verify that installed plumbing fixtures are categories and types specified for locations where installed.

B. Check that plumbing fixtures are complete with trim, faucets, fittings, and other specified components.

C. Inspect installed plumbing fixtures for damage. Replace damaged fixtures and components.

D. Test installed fixtures after water systems are pressurized for proper operation. Replace malfunctioning fixtures and components, then retest. Repeat procedure until units operate properly.

3.6 ADJUSTING

A. Operate and adjust faucets and controls. Replace damaged and malfunctioning fixtures, fittings, and controls.

B. Adjust water pressure at faucets and flushometer valves to produce proper flow and stream.

C. Replace washers and seals of leaking and dripping faucets and stops.

3.7 CLEANING

A. Clean fixtures, faucets, and other fittings with manufacturers' recommended cleaning methods and materials. Do the following: 1. Remove faucet spouts and strainers, remove sediment and debris, and reinstall strainers and

spouts. 2. Remove sediment and debris from drains.

B. After completing installation of exposed, factory-finished fixtures, faucets, and fittings, inspect exposed finishes and repair damaged finishes.

3.8 PROTECTION

A. Provide protective covering for installed fixtures and fittings.

B. Do not allow use of plumbing fixtures for temporary facilities unless approved in writing by Owner.

END 22 42 13

Page 139: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL - GENERAL PROVISIONS 23 01 00-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 01 00 - MECHANICAL - GENERAL PROVISIONS

PART 1 - GENERAL 1.1 WORK INCLUDES

A. General Provisions of the contract, including the following, shall apply to Division 23 Specification Sections: Solicitation Documents and Division 00 and Division 01 of the specifications.

B. The Work to be performed under this Division shall include all labor, materials, equipment,

transportation, construction plant, and facilities necessary to provide a complete and satisfactory system ready to use. Wherever the words "the Contractor" or "this Contractor" appears in this Division, they refer to the Contractor for the work specified in that Section. This Contractor shall examine all Drawings and all Sections of the Specifications and shall be responsible for ascertaining to what extent other Drawings and Sections affect the Work herein specified.

1.2 CODES, REGULATIONS, AND STANDARDS

A. All work must be performed in accordance with the requirements of local, county, state and national codes and regulations including the requirements of the following: 1. 2012 International Building Code. 2. 2014 National Electrical Code. 3. 2012 International Plumbing Code. 4. 2012 International Mechanical Code. 5. Occupational Safety and Health Act. of 1970 6. Life Safety Code, N.F.P.A. No. 101. 7. For work not specifically listed above, use standards and codes of the National Fire

Protection Association.

B. All equipment, apparatus and systems shall be rated, tested, fabricated and/or installed in accordance with the applicable industry standard mentioned. The following list will serve to clarify abbreviations that appear in other sections of this specification: 1. AABC Associated Air Balance Council 2. ADC Air Diffusion Council 3. AGA American Gas Association. 4. AMCA Air Moving and Conditioning Association 5. ARI Air Conditioning and Refrigeration Institute 6. ANSI American National Standards Institute 7. ASE Association of Safety Engineers 8. ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineer 9. ASME American Society of Mechanical Engineers 10. AWWA American Water Works Association 11. EPA Environmental Protection Agency 12. FS Federal Specifications 13. IBR Institute of Boiler and Radiator Manufacturers 14. IEEE Institute of Electrical and Electronics Engineers 15. MCAA Mechanical Contractors' Association of American 16. NEMA National Electrical Manufacturers Association 17. NSC National Safety Council 18. NSF National Sanitation Foundation 19. SBI Steel Boiler Institute Industry 20. SMACNA Sheet Metal and Air Conditioning Contractors National Association 21. UL Underwriters Laboratories 22. ASTM American Society for Testing and Materials. 23. NEBB National Environmental Balancing Bureau. 24. NEC National Electric Code (NFPA 70).

Page 140: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL - GENERAL PROVISIONS 23 01 00-2

1.3 DEFINITIONS

A. FURNISH: The term furnish means supply and deliver to the Project Site, ready for unloading, unpacking, assembly, installation and similar operations.

B. INSTALL: The term install describes operations at the Project Site including the actual unloading,

unpacking, assembly, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations.

C. PROVIDE: The term provides means to furnish and install, complete and ready for intended use.

1.4 SHOP DRAWINGS AND SUBMITTALS

A. See Division 01 for requirements for shop drawings and product data.

B. Asbestos-Free Material/Product: Prior to approval of the material/product to be used, the manufacturer/supplier shall furnish the Contracting Officer with written certification that the material/product contains no asbestos. This certificate is mandatory before approval will be issued. Submittals furnished without the asbestos-free certification will be returned to the Contractor with no action taken until such certification is provided.

C. See applicable sections to this Division for items requiring shop drawings.

1.5 MATERIALS AND WORKMANSHIP

A. Materials, the style, make or quality of which is specifically designated, shall be as specified.

B. Contractor shall furnish necessary materials in ample quantities and as frequently as required to avoid delay in the progress of the Work, and shall so store them as to prevent interference with other work.

1.6 DEFECTIVE WORK AND MATERIAL

A. All materials or work found to be defective or not in strict conformity with the drawings or different from requirements of the drawings and specifications or defaced or injured through negligence of Contractor or his employees, or through action of fire or weather will be rejected and shall be immediately removed from premises by Contractor and satisfactory materials and work substituted without delay.

B. All defective work or imperfect work shall be corrected immediately on notice from

Architect/Engineer. No previous inspection or certificate on account shall be held to relieve Contractor from his obligation to furnish sound materials and to perform good and satisfactory work.

1.7 COOPERATION AND COORDINATION

A. Contractor shall confer with other contractors at the site before installing his work to avoid interferences so that maximum head room and clearances may be maintained. In event that interferences develop between work of various contractors, Architect/Engineer’s decision will be final and no additional compensation will be allowed for changes required.

B. Particular attention shall be paid to situations where recessed equipment, pipes and lights occur,

or where the work of several trades occurs together above suspended ceilings, in pipe shafts or in areas where space is limited.

C. All fixtures, equipment, devices, switches, outlets, pumps, etc., shall be positioned to avoid all

interferences with and to assure proper coordination with work of all other trades, cases, partitions, wall, floor and ceiling patterns, architectural features, etc. All recessed devices, fixtures, etc., shall be coordinated with all wall, floor and ceiling patterns.

Page 141: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL - GENERAL PROVISIONS 23 01 00-3

1.8 PROTECTION OF EQUIPMENT AND SYSTEMS

A. Contractor shall keep all his respective pipe openings closed by means of plugs or caps to prevent entrance of foreign matter during construction and cover all fixtures, equipment, and apparatus as required to protect them against dirt, water, chemical or mechanical damage both before and after installation. Any such fixtures, equipment or apparatus damaged prior to final acceptance of the Work shall be restored to its original condition or replaced by Contractor at no cost to Owner.

1.9 CONTRACT DRAWINGS

A. The layout shown on the Contract Drawings is necessarily diagrammatic but shall be followed as closely as actual construction and as other work will allow. The dimensions of work as shown on the Contract Drawings are not as-built dimensions. No measurements shall be scaled from the drawings and used as definite dimensions for laying out or fitting work in place.

B. The layout of manufactured equipment as shown on the drawings shall be checked and the exact

location shall be determined from the dimensions of equipment shop drawings. 1.10 MAINTENANCE MANUAL AND OPERATING INSTRUCTIONS

A. Upon completion of the Work, Contractors shall provide with three copies of maintenance manual for all equipment furnished and installed under his Work. Manuals shall be in substantial 3-ring binders with project name and number inscribed on face and hinged back.

B. The manual shall include manufacturer's lubricating and operating instructions and parts list and

serial numbers for all operating machinery, including drive information, and motor horsepower, amperage, and voltage readings on all phases, valve chart, sequence of operation, index following the order listed in the specifications, warranties in the name of the Installation, and a list of manufacturers, service firms and subcontractors names and telephone numbers.

C. Training attendance rosters for each training session shall be included in manuals. Roster will

identify training subject, date, attendees name, job title, office symbol, grade/rank, and telephone number.

D. All switches, controls, and safety devices shall be clearly and permanently marked with embossed

or printed plates as to purpose and as to operation and shall be tested in the presence of the Owner designated representative to ensure that he understands their function and purpose.

E. Upon completion of the Work, Contractors shall put the systems into service. Contractors shall be

entirely responsible for the equipment during all testing operations including the lubricating and turning on and off of such apparatus.

1.11 PROJECT RECORD AND CLOSEOUT DOCUMENTS

A. See Division 01 for red lining of all documents during construction to reflect "as-built" conditions.

END 23 01 00

Page 142: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BASIC MATERIALS AND METHODS – MECHANICAL 23 05 00-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 05 00 - BASIC MATERIALS AND METHODS - MECHANICAL

PART 1 - GENERAL 1.1 WORK INCLUDES

A. Provide all material as specified in this Section. 1.2 QUALITY ASSURANCE

A. Each major component of equipment shall have the manufacturer's name, address, model number and rating on a plate securely affixed in a conspicuous place.

B. Code ratings, labels or other data which are die-stamped or otherwise affixed to the surface of the

equipment shall be in easily visible location. 1.3 PRODUCT DELIVERY STORAGE AND HANDLING

A. Follow manufacturer's directions in delivery, storage, protection and handling of all equipment and materials.

B. Deliver and store equipment and materials to the site in original containers, suitably sheltered

from the elements and mechanical injury, but readily accessible for inspection until installed.

C. Items subject to moisture damage shall be stored in dry, heated spaces.

D. Ascertain, from examination of building, whether any special temporary access openings in the building(s) will be required for admission of apparatus furnished under this Division.

E. Machinery movers shall not rig, tie to, or rest weight upon any building member of any part of

building premises or make use of any stairway until specific permission is obtained from Architect/Engineer.

F. Permission to rig to or in any way make use of any part of building premises shall not relieve

Installer of responsibility for any damage resulting from, or because of said rigging or use. 1.4 PROTECTION

A. Keep pipe openings closed by means of plugs or caps to prevent entrance of foreign matter, and cover all fixtures, equipment and apparatus as required to protect them against dirt, water, chemical or mechanical damage both before and after installation.

B. Fixtures, equipment or apparatus damaged prior to final acceptance of work shall be restored to

original condition or replaced by Installer. C. Equipment shall be inherently safe and moving parts shall be covered with guards which meet

OSHA requirements.

D. Provide protective guards for devices such as or similar to thermostats, valves, switches and sprinkler heads which are so located as to be readily subject to tampering, accidental damage, or vandalism.

PART 2 - PRODUCTS 2.1 PIPING MATERIALS

A. All piping and fittings shall be manufactured in the United States. Each length of pipe and each fitting shall be marked with the manufacturer's name or trademark and the specification code to which it conforms.

Page 143: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BASIC MATERIALS AND METHODS – MECHANICAL 23 05 00-2

2.2 SLEEVES

A. Provide pipe sleeves for all penetrations of piping through floors and walls.

B. Wall sleeves for interior partitions and ceilings shall be 20 gauge galvanized steel with lock joints.

C. Sleeves for piping that is to be insulated shall be large enough to allow insulation to pass through the sleeve.

D. Pack the space between the interior surface of all sleeves and pipes or pipe insulation with fire

resistant, sound and waterproofing caulking materials. 2.3 ESCUTCHEONS

A. Provide set-screw chrome plated escutcheons (not friction-dependant) on all exposed pipe or pipe insulation passing through or into finished walls, partitions, ceiling and floors. Escutcheons at insulated pipes shall be large enough to encircle insulation without penetrating vapor barrier or jacket.

2.4 CONDUIT AND WIRING

A. Wiring systems provided under Division 23 shall be as specified in Division 26.

B. All electrical terminals shall be labeled.

C. Provide wiring diagrams inside each cabinet.

D. Conduit shall provide a continuous ground and shall be heavy wall galvanized in slabs and where subject to damage and EMT where protected or out of the way.

E. Final connections to equipment shall be flexible.

PART 3 - EXECUTION 3.1 JOINTING OF PIPING

A. Threads shall be full and clean cut, and ends of pipe shall be reamed. When threaded joints are assembled, the male thread shall be thoroughly coated with Teflon paste or an aerobic curing thread sealant to serve as a joint sealer. Paint all the exposed threads. (Teflon tape may be used at contractor's option.) Care shall be taken to keep the paint and all other foreign matter from entering the interior of the piping. Each section of pipe and all fittings shall be carefully inspected for dirt, grease, or other foreign matter on the inside and where necessary they shall be properly cleaned before assembly. It shall be the Contractor's responsibility to thoroughly clean the piping systems after completion to the satisfaction of the Contracting Officer in cases where proper cleaning was not done at time of installation.

B. Soldered or brazed joints made with fittings having pre-inserted rings of solder or brazing alloy

shall have the tube and fittings cleaned bright and fluxed. The joint shall be heated sufficiently to make a tight connection. Tubes and fittings without such rings, shall be cleaned bright, fluxed and heated until the solder is drawn into the joint by capillarity and the connection is tight. Flux shall be water soluble binder flux. All solder and flux shall be lead free.

3.2 EXPANSION AND CONTRACTION

A. Provisions shall be made for expansion and contraction in all piping. Piping shall be installed in a manner such that joints will not develop leaks. All expansion shall be taken up by swing-connections, and this Contractor shall be responsible for the installation of these connections whether or not they are shown on the Drawings with specific means for relieving expansion and contraction. Slip-type expansion joints shall not be used. Particular care must be exercised at

Page 144: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BASIC MATERIALS AND METHODS – MECHANICAL 23 05 00-3

branches on underground piping to allow free movement at branch connection to main. 3.3 INSTALLATION OF PIPING

A. Piping shall be installed on long continuous lengths, with a minimum number of joints. Joints, where necessary shall be carefully made to insure against leakage.

B. All piping shall be firmly supported using hangers, brackets and braces to prevent sagging and/or

lateral movement. All hangers, brackets, and other supports shall be securely fastened to the construction as may be required and in a manner acceptable to the Architect/Engineer. All piping shall be install to maintain maximum head room. Nothing shall be suspended from the roof deck.

C. Arrangement of all piping shall be as shown on plans. It is especially necessary that all mains be

installed with view to accessibility in case of repair and location of pipe lines and spacing between same shall be so made that there will be no conflict between pipe lines by the several trades.

D. Contractor shall give careful consideration to clearances and locations of lines and type of fittings

used to obtain these clearances. Provide maximum headroom in all cases. Piping shall be installed parallel to building walls and at a height so as not to obstruct any portion of a window, light fixture, doorway, pipe tunnel or passageway. Ascertain from the drawings heights of all suspended ceilings, size of all pipe shafts in which piping is to be concealed, and location and size of structural members in and adjacent to all pipe shafts.

E. Where interferences develop in the field, Contractor shall offset or reroute piping as required to

clear such interferences. In all cases consult architectural drawings for exact location of pipe spaces, ceiling heights, or other architectural details before installing piping.

F. At the low point in piping, and elsewhere as shown on the drawings, install a dirt pocket at least 6

in. deep with a cap at bottom constructed of pipe fittings not less than 3 in. for connections 3 in. and larger and of the full diameter of the connection served where smaller than 3 in.

G. Under no circumstances shall the size of piping shown on the drawings be changed without

written approval of the Architect/Engineer.

H. Provide eccentric reducers where required for proper drainage or venting of horizontal pipe lines. Reducing fittings shall be used for all changes of pipe size and bushings shall not, under any circumstances, be used.

I. Unions or flanges are to be installed on the equipment side of all valves in pipe connections from

mains to equipment, to enable equipment to be drained and disconnected without necessitating the draining of mains.

J. Valves must be arranged for easy access and be within easy reach and the piping shall be

arranged to accomplish this. 3.4 HANGERS, SUPPORTS AND INSERTS

A. Provide all hangers, supports, bracing, inserts, beams, anchors, guides, sleeves and miscellaneous steel for the proper support, alignment, expansion and contraction of piping and equipment.

B. Hanger supports shall be securely fastened to structural members by approved beam clamps and

clips, concrete inserts, anchors, or other appropriate methods agreed upon with the Architect/Engineer.

C. Maximum spacing of hangers and supports for steel piping shall be as follows:

Pipe Size Spacing 1/2" and 3/4" Not over 6'-0" 1" and 1-1/4" Not over 8'-0" 1-1/2" thru 3" Not over 10'-0"

Page 145: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BASIC MATERIALS AND METHODS – MECHANICAL 23 05 00-4

4" and 6" Not over 12'-0"

D. Hanger and support spacing for copper piping shall not exceed 8 ft. on centers.

E. Additional hangers and supports shall be provided to minimize undesirable stress on valve bodies, other fittings and equipment.

F. Provide all supplemental angles, channels and plates of adequate sizes where bracing or

supports are required for piping and curbs between structural members. 3.5 OPENINGS IN CONSTRUCTION

A. All cutting required that may be necessary for the installation of this Work shall be done by this Contractor, and all patching and repairing shall be done by workmen competent in the trade required at the expense of this Contractor. The Contractor shall be responsible for arranging the work so that minimum cutting will be required. All rubbish and excess material involved in such cutting shall be promptly removed from the building and disposed of by this Contractor. Cutting through the floor or roof system shall be done only with approval of the Architect/Engineer so as to avoid cutting beams or the structural system. Approval must be obtained from the Architect/Engineer before cutting operations begin to avoid damage to the structure. All cutting must be carefully and neatly accomplished so as to minimize noise and dusting or staining of surrounding finishes.

END 23 05 00

Page 146: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 13 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 05 13 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

PART 1 - GENERAL

1.1 WORK INCLUDES

A. Provide single-phase and polyphase, general-purpose, horizontal, small and medium, squirrel-cage induction motors for use on ac power systems up to 600 V and installed at equipment manufacturer's factory or shipped separately by equipment manufacturer for field installation.

1.2 COORDINATION

A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:

1. Motor controllers. 2. Torque, speed, and horsepower requirements of the load. 3. Ratings and characteristics of supply circuit and required control sequence. 4. Ambient and environmental conditions of installation location.

PART 2 - PRODUCTS

2.1 GENERAL MOTOR REQUIREMENTS

A. Comply with requirements in this Section except when stricter requirements are specified in HVAC equipment schedules or Sections.

B. Comply with NEMA MG 1 unless otherwise indicated.

C. Comply with IEEE 841 for severe-duty motors.

2.2 MOTOR CHARACTERISTICS

A. Duty: Continuous duty at ambient temperature of 40 deg C and at altitude of 3300 feet above sea level.

B. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with indicated operating sequence, and without exceeding nameplate ratings or considering service factor.

2.3 POLYPHASE MOTORS

A. Description: NEMA MG 1, Design B, medium induction motor.

B. Efficiency: Premium efficiency.

C. Service Factor: 1.15.

D. Variable speed drive duty.

E. Rotor: Random-wound, squirrel cage.

F. Bearings: Regreasable, shielded, antifriction ball bearings suitable for radial and thrust loading.

G. Temperature Rise: Match insulation rating.

Page 147: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 13 - 2

H. Insulation: Class F.

2.4 SINGLE-PHASE MOTORS

A. Motors larger than 1/20 hp shall be one of the following, to suit starting torque and requirements of specific motor application:

1. Permanent-split capacitor. 2. Split phase. 3. Capacitor start, inductor run. 4. Capacitor start, capacitor run. 5. ECM.

B. Multispeed Motors: Variable-torque, permanent-split-capacitor type.

C. Bearings: Prelubricated, antifriction ball bearings or sleeve bearings suitable for radial and thrust loading.

D. Motors 1/20 HP and Smaller: Shaded-pole or ECM type.

E. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation. Thermal-protection device shall automatically reset when motor temperature returns to normal range.

PART 3 - EXECUTION (Not Applicable)

END 23 05 13

Page 148: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR MECHANICAL 23 05 29-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 05 29 - HANGERS AND SUPPORTS FOR MECHANICAL

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Hangers and supports for mechanical piping and equipment. 1.3 DEFINITIONS

A. Terminology used in this Section is defined in MSS SP-90. 1.4 PERFORMANCE REQUIREMENTS A. Design seismic restraint hangers and supports, for piping and equipment.

B. Design and obtain approval from authority with jurisdiction over seismic restraint hangers and supports for piping and equipment.

1.5 SUBMITTALS

A. General: Submit the following according to Division 01.

B. Product data for each type of hanger and support.

C. Submit pipe hanger and support schedule showing manufacturer's Figure No., size, location, and features for each required pipe hanger and support.

1.6 QUALITY ASSURANCE

A. Qualify welding processes and welding operators according to AWS D1.1 "Structural Welding Code - Steel."

1. Certify that each welder has satisfactorily passed AWS qualification tests for welding

processes involved and, it pertinent, has undergone recertification.

B. Qualify welding processes and welding operators according to ASME "Boiler and Pressure Vessel Code," Section IX, "Welding and Brazing Qualifications."

C. Listing and Labeling: Provide hangers and supports, that are listed and labeled as defined in NFPA

70, Article 100.

1. UL and FM Compliance: Hangers, supports, and components include listing and labeling by UL and FM where used for fire protection piping systems.

2. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" (NRTL) as defined in OSHA Regulation 1910.7.

D. Licensed Operators: Use operators that are licensed by powder-operated tool manufacturers to

operate their tools and fasteners. PART 2 - PRODUCTS 2.1 MANUFACTURED UNITS

Page 149: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR MECHANICAL 23 05 29-2

A. Hangers, Supports, and Components: Factory-fabricated according to MSS SP-58.

1. Components include galvanized coatings where installed for piping and equipment that will not have a field-applied finish.

2. Pipe attachments include nonmetallic coating for electrolytic protection where attachments are in direct contact with copper tubing.

B. Thermal-Hanger Shield Inserts: 100 psi average compressive strength, waterproofed calcium silicate,

encased with sheet metal shield. Insert and shield cover entire circumference of pipe and are of length indicated by manufacturer for pipe size and thickness of insulation.

2.2 MISCELLANEOUS MATERIALS

A. Structural Steel: ASTM A 36/A 36M, steel plates, shapes, and bars, black and galvanized.

B. Bolts and Nuts: ASME B18.10 or ASTM A 183, steel, hex-head, track bolts and nuts.

C. Washers: ASTM F 844, steel, plain, flat washers.

D. Grout: ASTM C 1107, Grade B, nonshrink, nonmetallic.

1. Characteristic include post-hardening, volume-adjusting, dry, hydraulic-cement-type grout that is nonstaining, noncorrosive, nongaseous and is recommended for both interior and exterior applications.

2. Design Mix: 5000psi, 28 day compressive strength. 3. Water: Potable. 4. Packaging: Premixed and factory-packaged.

PART 3 - EXECUTION 3.1 HANGERS AND SUPPORT APPLICATIONS

A. Specific hanger requirements are specified in the Section specifying the equipment and systems.

B. Comply with MSS SP-69 for pipe hanger selections and applications that are not specified in piping specification Sections.

3.2 HANGERS AND SUPPORT INSTALLATION

A. General: Comply with MSS SP-69 and SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.

B. Arrange for grouping of parallel runs of horizontal piping supported together on field-fabricated,

heavy-duty trapeze hangers where possible.

C. Install supports with maximum spacings complying with MSS SP-69.

D. Where pipes of various sizes are supported together by trapeze hangers, space hangers for smallest pipe size or install intermediate supports for smaller diameter pipes as specified above for individual pipe hangers.

E. Install building attachments to structural steel. Space attachments within maximum piping span

length indicated in MSS SP-69. Install additional attachments at concentrated loads, including valves, flanges, guides, strainers, expansion joints, and at changes in direction of piping.

F. Install mechanical-anchor fasteners in concrete after concrete is placed and completely cured. Install

according to fastener manufacturer's written instructions. Do not use in lightweight concrete slabs or in concrete slabs less than 4 inches thick.

Page 150: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR MECHANICAL 23 05 29-3

G. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers, and other accessories.

H. Heavy-Duty Steel Trapezes: Field-fabricate from ASTM A 36 steel shapes selected for loads being

supported. Weld steel according to AWS D-1.1.

I. Install hangers and supports to allow controlled movement of piping systems, permit freedom of movement between pipe anchors, and facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

K. Load Distribution: Install hangers and supports so that piping live and dead loading and stresses from

movement will not be transmitted to connected equipment.

L. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and so that maximum pipe deflections allowed by ASME B31.9 "Building Services Piping" is not exceeded.

M. Insulated Piping: Comply with the following installation requirements.

1. Clamps: Attach clamps, including spacers (if any), to piping with clamps projecting through

insulation; do not exceed pipe stresses allowed by ASME B31.9. 1. Clamps: Attach clamps, including spacers (if any), to piping with clamps projecting through insulation; do not exceed pipe stresses allowed by ASME B31.9.

2. Saddles: Install protection saddles MSS Type 39 where insulation without vapor barrier is indicated. Fill interior voids with segments of insulation that match adjoining pipe insulation.

3. Shields: Install MSS Type 40, protective shields on cold piping with vapor barrier. Shields span an arc of 180 degrees and have dimensions in inches not less than the following: NPS (Inches) LENGTH (Inches) THICKNESS (Inches)

1/4 to 3-1/2 12 0.048 4 12 0.060 5 and 6 18 0.060

4. Insert Material: Length at least as long as the protective shield. 5. Thermal-Hanger Shields: Install with insulation of same thickness as piping.

3.3 EQUIPMENT SUPPORTS

A. Fabricate structural steel stands to suspend equipment from structure above or support equipment above floor.

B. Grouting: Place grout under supports for equipment, and make a smooth bearing surface.

3.4 METAL FABRICATION

A. Cut, drill, and fit miscellaneous metal fabrications for pipe and equipment supports. B. Fit exposed connections together to form hairline joints. Field-weld connections that cannot be

shop-welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1 procedures for manual shielded metal-arc welding, appearance and quality of welds, methods used in correcting welding work, and the following:

1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.

2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. 4. Finish welds at exposed connections so that no roughness shows after finishing, and so that

contours of welded surfaces match adjacent contours. 3.5 ADJUSTING

Page 151: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HANGERS AND SUPPORTS FOR MECHANICAL 23 05 29-4

A. Hanger Adjustment: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

3.6 PAINTING

A. Touching Up: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal is specified in Division 9 Section "Painting."

B. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply

galvanizing-repair paint to comply with ASTM A 780.

END 23 05 29

Page 152: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 53 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 05 53 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Provide equipment labels.

B. Provide pipe labels.

C. Provide duct labels.

D. Provide stencils.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Equipment Label Schedule: Include a listing of all equipment to be labeled with the proposed content for each label.

1.4 COORDINATION

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

PART 2 - PRODUCTS

2.1 EQUIPMENT LABELS

A. Plastic Labels for Equipment:

1. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, and having predrilled holes for attachment hardware.

2. Letter Color: White. 3. Background Color: Black. 4. Maximum Temperature: Able to withstand temperatures up to 160 deg F. 5. Minimum Label Size: Length and width vary for required label content, but not less than

2-1/2 by 3/4 inch. 6. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24

inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

7. Fasteners: Stainless-steel rivets. 8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

B. Label Content: Include equipment's Drawing designation or unique equipment.

Page 153: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 53 - 2

C. Equipment Label Schedule: For each item of equipment to be labeled, on 8-1/2-by-11-inch bond paper. Tabulate equipment identification number and identify Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified. Equipment schedule shall be included in operation and maintenance data.

2.2 PIPE LABELS

A. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service, and showing flow direction.

B. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to cover full circumference of pipe and to attach to pipe without fasteners or adhesive.

C. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

D. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings, pipe size, and an arrow indicating flow direction.

1. Flow-Direction Arrows: Integral with piping system service lettering to accommodate both directions, or as separate unit on each pipe label to indicate flow direction.

2. Lettering Size: At least 1-1/2 inches high.

2.3 DUCT LABELS

A. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, and having predrilled holes for attachment hardware.

B. Letter Color: White.

C. Background Color: Yellow.

D. Maximum Temperature: Able to withstand temperatures up to 160 deg F.

E. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

F. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

G. Fasteners: Stainless-steel self-tapping screws.

H. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

I. Duct Label Contents: Include identification of duct service using same designations or abbreviations as used on Drawings, duct size, and an arrow indicating flow direction.

1. Flow-Direction Arrows: Integral with duct system service lettering to accommodate both directions, or as separate unit on each duct label to indicate flow direction.

2. Lettering Size: At least 1-1/2 inches high.

Page 154: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 53 - 3

2.4 STENCILS

A. Stencils: Prepared with letter sizes according to ASME A13.1 for piping; minimum letter height of 1-1/4 inches for ducts; and minimum letter height of 3/4 inch for access panel and door labels, equipment labels, and similar operational instructions.

1. Stencil Material: Fiberboard or metal. 2. Identification Paint: Exterior, alkyd enamel in colors according to ASME A13.1 unless

otherwise indicated.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean piping and equipment surfaces of substances that could impair bond of identification devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.

3.2 EQUIPMENT LABEL INSTALLATION

A. Permanently fasten labels on each major item of mechanical equipment.

B. Locate equipment labels where accessible and visible.

3.3 PIPE LABEL INSTALLATION

A. Stenciled Pipe Label Option: Stenciled labels may be provided instead of manufactured pipe labels, at Installer's option. Install stenciled pipe labels complying with ASME A13.1, on each piping system.

1. Identification Paint: Use for contrasting background. 2. Stencil Paint: Use for pipe marking.

B. Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

1. Near each valve and control device. 2. Near each branch connection, excluding short takeoffs for fixtures and terminal units.

Where flow pattern is not obvious, mark each pipe at branch. 3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures. 4. At access doors, manholes, and similar access points that permit view of concealed

piping. 5. Near major equipment items and other points of origination and termination. 6. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in

areas of congested piping and equipment. 7. On piping above removable acoustical ceilings. Omit intermediately spaced labels.

C. Pipe Label Color Schedule:

1. Comply with ASME Standard A13.1.

3.4 DUCT LABEL INSTALLATION

A. Install plastic-laminated duct labels with permanent adhesive on air ducts in the following color codes:

Page 155: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 53 - 4

1. Blue: For cold-air supply ducts. 2. Green: For exhaust-, outside-, relief-, return-, and mixed-air ducts. 3. ASME A13.1 Colors and Designs: For hazardous material exhaust.

B. Stenciled Duct Label Option: Stenciled labels, showing service and flow direction, may be provided instead of plastic-laminated duct labels, at Installer's option, if lettering larger than 1 inch high is needed for proper identification because of distance from normal location of required identification.

C. Locate labels near points where ducts enter into concealed spaces and at maximum intervals of 50 feet in each space where ducts are exposed or concealed by removable ceiling system.

D. Omit duct labeling on exposed ductwork.

END 23 05 53

Page 156: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEMS 23 05 95-1

DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING SECTION 23 05 95 – TESTING, ADJUSTING, AND BALANCING

OF HVAC SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES

A. The HVAC systems will be tested and balanced by an independent testing and balancing (TAB) agency under separate contract with AAFES.

PART 2 - PRODUCTS - NOT APPLICABLE PART 3 - EXECUTION 3.1 TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEMS

The HVAC systems will be tested and balanced by an independent testing and balancing agency that is certified by AABC or NEBB.

A. The independent air testing and balancing agency (TAB) shall perform the balancing and testing

of the HVAC in accordance with the procedures of AABC or NEBB to analyze, balance, adjust and test air and water moving equipment, air and water distribution systems including kitchen exhaust hood systems.

B. The HVAC Contractor shall put all heating, ventilating and air conditioning systems and equipment

into operation and shall continue the operation of same during each working day of testing and balance and shall place the automatic temperature control system in satisfactory operation before the TAB agency shall begin work.

C. Prior to the final acceptance of the HVAC systems by the Contracting Officer, the Contractor shall

allow the TAB agency to schedule this work in cooperation with other trades involved and comply with the completion date of the project.

D. The Contractor shall make available to the TAB agency a complete copy of shop drawing

submittal data on mechanical equipment including performance curves (fans and pumps, chillers, air distribution devices, etc.) necessary to test and balance the HVAC systems.

E. The Contractor shall schedule the following necessary personnel:

1. Automatic Temperature Control Manufacturer's Service Representative to set

adjustments of automatic operated damper and devices to operate as specified, and/or noted, including setting of all controls for proper calibrations.

2. Mechanics - To operate, adjust, replace or repair the HVAC equipment that is found requiring any change/replacement in the pulleys, belts, dampers, valves, etc., of Contractors furnished and installed equipment.

3. Electrician - To assist in any problems resulting from any of the power or control wiring installation, including replacement of starters, and heater elements.

F. The Contractor shall make any changes in pulleys, belts and dampers or the addition of dampers as required for correct balance of the system as recommended by TAB agency, at no cost to Owner/Government.

G. The Contractor shall make all necessary corrections within 48 hours upon notification of TAB

agency of the deficiencies requiring adjustment, (piece-meal correction is not acceptable) and within 10 working days for items that require replacement or installation.

Page 157: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TESTING, ADJUSTING, AND BALANCING OF HVAC SYSTEMS 23 05 95-2

H. The Contractor shall leave all air filters replaced prior to the start of testing and balancing activity.

I. If the Contractor had scheduled the TAB agency to perform the work and the HVAC systems are

not ready to be tested and balanced, any additional cost required to extend the TAB work shall be at the Contractor's expense.

END 23 05 95

Page 158: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL INSULATION 23 07 00-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 07 00 - MECHANICAL INSULATION

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. External insulation of ductwork, where indicated and specified. B. Insulation of interior condensate drain piping. C. Insulation of refrigerant suction piping.

1.3 DEFINITIONS

A. Hot Surfaces: Normal operating temperatures of 100 deg F or higher.

B. Dual-Temperature Surfaces: Normal operating temperatures that vary from hot to cold.

C. Cold Surfaces: Normal operating temperatures less than 75 deg. F.

D. Thermal Resistivity: r-values represent the reciprocal of thermal conductivity (k-value). Thermal conductivity is the rate of heat flow through a homogenous material exactly 1 inch thick. Thermal resistivities are expressed by the temperature difference in degrees F between two exposed faces required to cause one Btu to flow through one square foot of material, in one hour, at a given mean temperature.

E. Density: Is expressed in lb/sq.ft.

1.4 SUBMITTALS

A. General: Submit the following according to Division 1 requirements.

B. Product data for each type of mechanical insulation identifying k-value, thickness, and accessories.

1. Provide cements that comply with LEED requirements. 1.5 QUALITY ASSURANCE

A. Fire Performance Characteristics: Conform to the following characteristics for insulation including facings, cements, and adhesives, when tested according to ASTM E 84, by UL or other testing or inspecting organization acceptable to the authority having jurisdiction. Label insulation with appropriate markings of testing laboratory.

1. Interior Insulation: Flame spread rating of 25 or less and a smoke developed rating of 50 or

less. 2. Exterior Insulation: Flame spread rating of 75 or less and a smoke developed rating of 150 or

less. 1.6 SEQUENCING AND SCHEDULING

A. Schedule insulation application after testing of piping and duct systems. PART 2 - PRODUCTS

Page 159: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL INSULATION 23 07 00-2

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Glass Fiber: a. Certain Teed Corporation. b. Knauf Fiberglass GmbH. c. Johns-Manville. d. Owens-Corning Fiberglass Corporation.

2. Flexible Elastomeric Cellular:

a. Armstrong World Industries, Inc. b. Halstead Industrial Products. c. Rubatex Corporation. d. Aeroflex.

2.2 GLASS FIBER

A. Materials: Inorganic glass fibers, bonded with a thermosetting resin.

B. Jacket: All-purpose, factory-applied, laminated glass-fiber-reinforced, flame-retardant kraft paper and aluminum foil having self-sealing lap.

C. Blanket: ASTM C 553, Type II, Class F-1, jacketed flexible blankets.

1. Thermal Conductivity: 0.32 average maximum, at 75 deg F. mean temperature.

D. Adhesive: Produced under the UL Classification and follow up service.

1. Type: Non-flammable, solvent-based. 2. Service Temperature Range: Minus 20 to 180 deg F.

E. Vapor Barrier Coating: Waterproof coating recommended by insulation manufacturer for outside

service. 2.3 FLEXIBLE ELASTOMERIC CELLULAR

A. Material: Flexible expanded closed-cell structure with smooth skin on both sides.

1. Tubular Materials: ASTM C 534, Type I. 2. Sheet Materials: ASTM C 534, Type II.

B. Thermal Conductivity: 0.25 average maximum at 75 deg F.

C. Coating: Water based latex enamel coating recommended by insulation manufacturer.

2.4 ADHESIVES

A. Flexible Elastomeric Cellular Insulation Adhesive: Solvent-based, contact adhesive recommended by insulation manufacturer.

2.5 JACKETS

A. General: ASTM C 921, Type 1, except as otherwise indicated.

B. Foil and Paper Jacket: Laminated glass-fiber-reinforced, flame-retardant kraft paper and aluminum foil.

1. Water Vapor Permeance: 0.02 perm maximum, when tested according to ASTM E 96. 2. Puncture Resistance: 50 beach units minimum, when tested according to ASTM D 781.

Page 160: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL INSULATION 23 07 00-3

2.6 ACCESSORIES AND ATTACHMENTS

A. Glass Cloth and Tape: Woven glass fiber fabrics, plain weave, presized a minimum of 8 ounces per sq.yd. 1. Tape Width: 4 inches. 2. Cloth Standard: MIL-C-20079H, Type I. 3. Tape Standard: MIL-C-20079H, Type II.

B. Bands: 3/4 inch wide, in one of the following materials compatible with jacket:

1. Stainless Steel: Type 304, 0.020 inch thick. 2. Galvanized Steel: 0.005 inch thick. 3. Aluminum: 0.007 inch thick. 4. Brass: 0.01 inch thick. 5. Nickel-Copper Alloy: 0.005 inch thick.

C. Wire: 14 gage nickel copper alloy, 16 gage, soft-annealed stainless steel, or 16 gage, soft-annealed

galvanized steel.

D. Corner Angles: 28 gage, 1 inch by 1 inch aluminum, adhered to 2 inch by 2 inch Kraft paper.

E. Anchor Pins: Capable of supporting 20 pounds each. Provide anchor pins and speed washers of sizes and diameters as recommended by the manufacturer for insulation type and thickness.

F. Coating: Ultra-violet light protective finish for exterior elastomeric insulation.

2.8 SEALING COMPOUNDS

A. Vapor Barrier Compound: Water-based, fire-resistive composition:

1. Water Vapor Permeance: 0.08 perm maximum. 2. Temperature Range: Minus 20 to 180 deg F.

B. Weatherproof Sealant: Flexible-elastomer-based, vapor-barrier sealant designed to seal metal joints.

1. Water Vapor Permeance: 0.02 perm maximum. 2. Temperature Range: Minus 50 to 250 deg. F. 3. Color: Aluminum.

C. Comply with LEED requirements. PART 3 - EXECUTION 3.1 PREPARATION

A. Surface Preparation: Clean, dry, and remove foreign materials such as rust, scale, and dirt.

B. Mix insulating cements with clean potable water. Mix insulating cements contacting stainless-steel surfaces with demineralized water. 1. Follow cement manufacturers printed instructions for mixing and portions.

3.2 INSTALLATION, GENERAL

A. Refer to schedules at the end of this Section for materials, forms, jackets, and thicknesses required for each mechanical system.

Page 161: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL INSULATION 23 07 00-4

B. Select accessories compatible with materials suitable for the service. Select accessories that do no corrode, soften, or otherwise attack the insulation or jacket in either the wet or dry state.

C. Install vapor barriers on insulated pipes, ducts, and equipment having surface operating temperatures

below 60 deg. F.

D. Apply insulation material, accessories, and finishes according to the manufacturers printed instructions.

E. Install insulation with smooth, straight, and even surfaces.

F. Seal joints and seams to maintain vapor barrier on insulation requiring a vapor barrier.

G. Seal penetrations for hangers, supports, anchors, and other projections in insulation requiring a vapor

barrier.

H. Seal Ends: Except for flexible elastomeric insulation, taper ends at 45 degree angle and seal with lagging adhesive. Cut ends of flexible elastomeric cellular insulation square and seal with adhesive.

I. Apply adhesives and coatings at manufacturers recommended coverage-per-gallon rate.

J. Keep insulation materials dry during application and finishing.

K. Item Not Insulated: Unless otherwise indicated do not apply insulation to the following systems,

materials, and equipment.

1. Metal ducts with duct liner. 2. Factory-insulated flexible ducts. 3. Factory-insulated plenums, casings, terminal boxes, and filter boxes and sections. 4. Flexible connectors for ducts and pipes. 5. Vibration control devices. 6. Testing laboratory labels and stamps. 7. Nameplates and data plates. 8. Access panels and doors in air distribution systems. 9. Piping specialties including air chambers, unions, plug valves, and flow regulators.

3.3 PIPE INSULATION INSTALLATION, GENERAL

A. Tightly butt longitudinal seams and end joints. Bond with adhesive.

B. Stagger joints on double layers of insulation.

C. Apply insulation continuously over fittings, valves, and specialties, except as otherwise indicated.

D. Apply insulation with a minimum number of joints.

E. Roof Penetrations: Apply insulation for interior applications to a point even with the top of the roof flashing. Seal wit vapor barrier coating. Apply insulation for exterior applications butted tightly to interior insulation ends. Extend metal jacket for exterior insulation outside roof flashing at least 2 inches below top of roof flashing. Seal metal jacket to roof flashing with vapor barrier coating.

F. Exterior Wall Penetrations: For penetrations of below grade exterior walls, extend metal jacket for

exterior insulation through penetration to a point 2 inches from interior surface of wall inside the building. Seal ends of metal jacket with vapor barrier coating. Secure metal jacket ends with metal band. At point where insulation metal jacket contacts mechanical sleeve seal, insert cellular glass preformed pipe insulation to allow sleeve seal tightening against metal jacket. Tighten and seal sleeve to jacket to form a watertight seal.

G. Interior Walls and Partitions Penetrations: Apply insulation continuously through walls and partitions,

except fire-rated walls and partitions. Apply an aluminum jacket with factory-applied moisture over

Page 162: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL INSULATION 23 07 00-5

insulation. Extend 2 inches from both surfaces of wall or partition. Secure aluminum jacket with metal bands at both ends. Seal ends of jacket with vapor barrier coating. Seal around penetration with joint sealer. Refer to Division 7 Section Joint Sealants.

H. Fire-Rated Walls and Partitions Penetrations: Terminate insulation at penetrations through fire-rated

walls and partitions. Seal insulation ends with vapor barrier coating. Seal around penetration with firestopping or fire-resistant joint sealer. Refer to Division 7 for firestopping and fire-resistant joint sealers.

I. Flanges, Fittings, and Valves - Interior Exposed and Concealed: Coat pipe insulation ends with vapor

barrier coating. Apply premolded, precut, or field-fabricated segments of insulation around flanges, unions, valves, and fittings. Make joints tight. Bond with adhesive.

1. Use same material and thickness as adjacent pipe insulation. 2. Overlap nesting insulation by 2 inches or 1-pipe diameter, which ever is greater. 3. Apply materials with adhesive, fill voids with mineral fiber insulating cement. Secure with wire

or tape. 4. Insulate elbows and tees smaller than 3 inches pipe size with premolded insulation. 5. Insulate elbows and tees 3 inches and larger with premolded insulation or insulation material

segments. Use at least 3 segments for each elbow. 6. Cover insulation, except for metal jacketed insulation, with PVC fitting covers and seal

circumferential joints with butt strips. 7. Cover insulation, except for metal jacketed insulation, with 2 layers of lagging adhesive to a

minimum thickness of 1/16 inch. Install glass cloth between layers. Overlap adjacent insulation by 2 inches in both directions from joint with glass cloth and lagging adhesive.

J. Hangers and Anchors: Apply insulation continuously through hangers and around anchor

attachments. Install saddles, shields, and inserts as specified in section 23 05 29.

1. Inserts and Shields: Cover hanger inserts and shields with jacket material matching adjacent pipe insulation.

3.4 FLEXIBLE ELASTOMERIC CELLULAR PIPE INSULATION INSTALLATION

A. Slip insulation on the pipe before making connections wherever possible. Seal joints with adhesive. Where the slip-on technique is not possible, cut one side longitudinally and apply to the pipe. Seal seams and joints with adhesive.

B. Valves, Fittings, and Flanges: Cut insulation segments from pipe or sheet insulation. Bond to valve,

fitting, and flange and seal joints with adhesive.

1. Miter cut materials to cover soldered elbows and tees. 2. Fabricate sleeve fitting covers from flexible elastomeric cellular insulation for screwed valves,

fittings, and specialties. Miter cut materials. Overlap adjoining pipe insulation. 3.5 DUCT INSULATION

A. Blanket Insulation: Install tight and smooth. Secure to ducts having long sides or diameters as follows: 1. Smaller Than 24 Inches: Bonding adhesive applied in 6 inch wide transverse strips on 12

inch centers. 2. 24 Inches and Larger: Anchor pins spaced 12 inches apart each way. Apply bonding

adhesive to prevent sagging of the insulation. 3. Overlap joints 3 inches. 4. Seal joints, breaks, and punctures with vapor barrier compound.

3.6 FINISHES

A. Paint finished insulation as specified in Division 9.

Page 163: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MECHANICAL INSULATION 23 07 00-6

B. Flexible Elastomeric Cellular Insulation: After adhesive has fully cured, apply 2 coats of protective

coating to exposed insulation. 3.7 APPLICATIONS

A. General: Materials and thicknesses are specified in schedules at the end of this Section.

B. Interior, Piping Systems: Unless otherwise indicated, insulate the following piping systems:

1. Refrigerant suction piping. 2. Refrigerant hot gas piping.

C. Duct Systems: Unless otherwise indicated, insulate the following duct systems:

1. Interior concealed rigid supply and tempered outside air ductwork.

3.8 PIPE INSULATION SCHEDULES

A. General: Abbreviations used in the following schedules include:

1. Pipe Sizes: NPS - Nominal Pipe Size.

B. CONDENSATE DRAIN PIPING AND REFRIGERANT SUCTION AND HOT GAS PIPING

PIPE THICKNESS VAPOR FIELD- SIZES MATERIALS IN BARRIER APPLIED (NPS) INCHES REQ’D JACKET Up to 1-1/4” Flexible Elastomeric 1/2 Yes None 1-1/2” and lgr Flexible Elastomeric 1 Yes None

3.9 DUCT SYSTEMS INSULATION SCHEDULE

A. INTERIOR CONCEALED RIGID HVAC SUPPLY AND TEMPERED OUTSIDE AIR DUCTS AND PLENUMS

THICKNESS VAPOR FIELD-

MATERIAL FORM IN BARRIER APPLIED INCHES REQ’D JACKET

Glass Fiber Blanket 2 Yes None

END 23 07 00

Page 164: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMISSIONING OF HVAC 23 08 00 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 08 00 - COMMISSIONING OF HVAC

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Commissioning process requirements for HVAC&R systems, assemblies, and equipment.

B. Related Sections:

1. Division 01 Section "General Commissioning Requirements" for general commissioning process requirements.

1.3 DEFINITIONS

A. Commissioning Plan: A document that outlines the organization, schedule, allocation of resources, and documentation requirements of the commissioning process.

B. CxA: Commissioning Authority.

C. HVAC&R: Heating, Ventilating, Air Conditioning, and Refrigeration.

D. Systems, Subsystems, Equipment, and Components: Where these terms are used together or separately, they shall mean "as-built" systems, subsystems, equipment, and components.

1.4 CONTRACTOR'S RESPONSIBILITIES

A. Perform commissioning tests at the direction of the CxA.

B. Attend construction phase controls coordination meeting.

C. Attend testing, adjusting, and balancing review and coordination meeting.

D. Participate in HVAC&R systems, assemblies, equipment, and component maintenance orientation and inspection as directed by the CxA.

E. Provide information requested by the CxA for final commissioning documentation.

F. Provide measuring instruments and logging devices to record test data, and provide data acquisition equipment to record data for the complete range of testing for the required test period.

1.5 CxA'S RESPONSIBILITIES

A. Provide Project-specific construction checklists and commissioning process test procedures for actual HVAC&R systems, assemblies, equipment, and components to be furnished and installed as part of the construction contract.

Page 165: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMISSIONING OF HVAC 23 08 00 - 2

B. Direct commissioning testing.

C. Verify testing, adjusting, and balancing of Work are complete.

D. Provide test data, inspection reports, and certificates in Systems Manual.

1.6 COMMISSIONING DOCUMENTATION

A. Provide the following information to the CxA for inclusion in the commissioning plan:

1. Plan for delivery and review of submittals, systems manuals, and other documents and reports. 2. Identification of installed systems, assemblies, equipment, and components including design

changes that occurred during the construction phase. 3. Process and schedule for completing construction checklists and manufacturer's prestart and

startup checklists for HVAC&R systems, assemblies, equipment, and components to be verified and tested.

4. Certificate of completion certifying that installation, prestart checks, and startup procedures have been completed.

5. Certificate of readiness certifying that HVAC&R systems, subsystems, equipment, and associated controls are ready for testing.

6. Test and inspection reports and certificates. 7. Corrective action documents. 8. Verification of testing, adjusting, and balancing reports.

1.7 SUBMITTALS

A. Certificates of readiness.

B. Certificates of completion of installation, prestart, and startup activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TESTING PREPARATION

A. Certify that HVAC&R systems, subsystems, and equipment have been installed, calibrated, and started and are operating according to the Contract Documents.

B. Certify that HVAC&R instrumentation and control systems have been completed and calibrated, that they are operating according to the Contract Documents, and that pretest set points have been recorded.

C. Certify that testing, adjusting, and balancing procedures have been completed and that testing, adjusting, and balancing reports have been submitted, discrepancies corrected, and corrective work approved.

D. Set systems, subsystems, and equipment into operating mode to be tested (e.g., normal shutdown, normal auto position, normal manual position, unoccupied cycle, emergency power, and alarm conditions).

E. Inspect and verify the position of each device and interlock identified on checklists.

F. Check safety cutouts, alarms, and interlocks with smoke control and life-safety systems during each mode of operation.

Page 166: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMISSIONING OF HVAC 23 08 00 - 3

G. Testing Instrumentation: Install measuring instruments and logging devices to record test data as directed by the CxA.

3.2 TESTING AND BALANCING VERIFICATION

A. Prior to performance of testing and balancing Work, provide copies of reports, sample forms, checklists, and certificates to the CxA.

B. Notify the CxA at least 10 days in advance of testing and balancing Work, and provide access for the CxA to witness testing and balancing Work.

C. Provide technicians, instrumentation, and tools to verify testing and balancing of HVAC&R systems at the direction of the CxA.

1. The CxA will notify testing and balancing Agency 10 days in advance of the date of field verification. Notice will not include data points to be verified.

2. The testing and balancing Agency shall use the same instruments (by model and serial number) that were used when original data were collected.

3. Failure of an item includes, other than sound, a deviation of more than 10 percent. Failure of more than 10 percent of selected items shall result in rejection of final testing, adjusting, and balancing report. For sound pressure readings, a deviation of 3 dB shall result in rejection of final testing. Variations in background noise must be considered.

4. Remedy the deficiency and notify the CxA so verification of failed portions can be performed.

3.3 GENERAL TESTING REQUIREMENTS

A. Provide technicians, instrumentation, and tools to perform commissioning test at the direction of the CxA.

B. Scope of HVAC&R testing shall include entire HVAC&R installation, from central equipment for heat generation and refrigeration through distribution systems to each conditioned space. Testing shall include measuring capacities and effectiveness of operational and control functions.

C. Test all operating modes, interlocks, control responses, and responses to abnormal or emergency conditions, and verify proper response of building automation system controllers and sensors.

D. The CxA along with the HVAC&R Subcontractor, testing and balancing Agency, and HVAC&R Instrumentation and Control Subcontractor shall prepare detailed testing plans, procedures, and checklists for HVAC&R systems, subsystems, and equipment.

E. Tests will be performed using design conditions whenever possible.

F. Simulated conditions may need to be imposed using an artificial load when it is not practical to test under design conditions. Before simulating conditions, calibrate testing instruments. Provide equipment to simulate loads. Set simulated conditions as directed by the CxA and document simulated conditions and methods of simulation. After tests, return settings to normal operating conditions.

G. The CxA may direct that set points be altered when simulating conditions is not practical.

H. The CxA may direct that sensor values be altered with a signal generator when design or simulating conditions and altering set points are not practical.

I. If tests cannot be completed because of a deficiency outside the scope of the HVAC&R system, document the deficiency and report it to the Owner. After deficiencies are resolved, reschedule tests.

J. If the testing plan indicates specific seasonal testing, complete appropriate initial performance tests and documentation and schedule seasonal tests.

Page 167: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

COMMISSIONING OF HVAC 23 08 00 - 4

3.4 HVAC&R SYSTEMS, SUBSYSTEMS, AND EQUIPMENT TESTING PROCEDURES

A. Rooftop Unit Testing and Acceptance Procedures: Testing requirements are specified in Division 23 Sections. Provide submittals, test data, inspection records, and certifications to the CxA.

B. HVAC&R Instrumentation and Control System Testing: Field testing plans and testing requirements are specified in Division 23 Sections "Instrumentation and Control for HVAC" and "Sequence of Operations for HVAC Controls." Assist the CxA with preparation of testing plans.

C. HVAC&R Distribution System Testing: Provide technicians, instrumentation, tools, and equipment to test performance of air and refrigerant distribution systems; special exhaust; and other distribution systems, including HVAC&R terminal equipment and unitary equipment.

END 23 08 00

Page 168: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 09 00 - INSTRUMENTATION AND CONTROL FOR HVAC

PART 1 - GENERAL

1.1 WORK INCLUDES

A. Control equipment for RT-1 system, including control components for air terminals. Dampers and actuators provided with rooftop unit.

B. Install power and signal wiring to ventilation air terminals.

C. Conduit and wiring to utility meters pulse generators.

D. Interlock wiring for hood exhaust fans and associated rooftop unit.

E. Connect to Lonworks interface panel provided under Section 23 83 16.

1.2 DEFINITIONS

A. DDC: Direct digital control.

B. I/O: Input/output.

C. MS/TP: Master slave/token passing.

D. PC: Personal computer.

E. PID: Proportional plus integral plus derivative.

F. RTD: Resistance temperature detector.

1.3 SYSTEM PERFORMANCE

A. Comply with the following performance requirements:

1. Object Command: Reaction time of less than two seconds between operator command of a binary object and device reaction.

2. Object Scan: Transmit change of state and change of analog values to control units or workstation within six seconds.

3. Alarm Response Time: Annunciate alarm at workstation within 45 seconds. Multiple workstations must receive alarms within five seconds of each other.

4. Program Execution Frequency: Run capability of applications as often as five seconds, but selected consistent with mechanical process under control.

5. Performance: Programmable controllers shall execute DDC PID control loops, and scan and update process values and outputs at least once per second.

6. Reporting Accuracy and Stability of Control: Report values and maintain measured variables within tolerances as follows: a. Space Temperature: Plus or minus 1 deg F. b. Ducted Air Temperature: Plus or minus 1 deg F. c. Outside Air Temperature: Plus or minus 2 deg F. d. Dew Point Temperature: Plus or minus 3 deg F. e. Temperature Differential: Plus or minus 0.25 deg F.

1.4 SEQUENCE OF OPERATION: See 23 09 93.

1.5 SUBMITTALS

Page 169: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 2

D. Product Data: Include manufacturer's technical literature for each control device. Indicate dimensions, capacities, performance characteristics, electrical characteristics, finishes for materials, and installation and startup instructions for each type of product indicated.

1. DDC System Hardware: Bill of materials of equipment indicating quantity, manufacturer, and model number. Include technical data for operator workstation equipment, interface equipment, control units, transducers/transmitters, sensors, actuators, valves, relays/switches, control panels, and operator interface equipment.

2. Control System Software: Include technical data for operating system software, operator interface, color graphics, and other third-party applications.

3. Controlled Systems: Instrumentation list with element name, type of device, manufacturer, model number, and product data. Include written description of sequence of operation including schematic diagram.

E. Shop Drawings: Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

1. Bill of materials of equipment indicating quantity, manufacturer, and model number. 2. Schematic flow diagrams showing fans, pumps, coils, dampers, valves, and control

devices. 3. Wiring Diagrams: Power, signal, and control wiring. 4. Details of control panel faces, including controls, instruments, and labeling. 5. Written description of sequence of operation. 6. Schedule of dampers including size, leakage, and flow characteristics. 7. DDC System Hardware:

a. Wiring diagrams for control units with termination numbers. b. Schematic diagrams and floor plans for field sensors and control hardware. c. Schematic diagrams for control, communication, and power wiring, showing

trunk data conductors and wiring between operator workstation and control unit locations.

8. Control System Software: List of color graphics indicating monitored systems, data (connected and calculated) point addresses, output schedule, and operator notations.

9. Controlled Systems: a. Schematic diagrams of each controlled system with control points labeled and

control elements graphically shown, with wiring. b. Drawings showing mounting, routing, and wiring of elements including bases

and special construction. c. Points list.

F. Data Communications Protocol Certificates: Certify that each proposed DDC system component complies with Lonworks standards.

G. Software and Firmware Operational Documentation: Include the following:

1. Software operating and upgrade manuals. 2. Program Software Backup: On a magnetic media or compact disc, complete with data

files. 3. Device address list. 4. Printout of software application and graphic screens. 5. Software license required by and installed for DDC workstations and control systems.

H. Operation and Maintenance Data: For HVAC instrumentation and control system to include in emergency, operation, and maintenance manuals. In addition to items specified in Division 01 Section "Operation and Maintenance Data," include the following:

1. Maintenance instructions and lists of spare parts for each type of control device and compressed-air station.

Page 170: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 3

2. Interconnection wiring diagrams with identified and numbered system components and devices.

3. Keyboard illustrations and step-by-step procedures indexed for each operator function. 4. Inspection period, cleaning methods, cleaning materials recommended, and calibration

tolerances. 5. Calibration records and list of set points.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: Automatic control system manufacturer's authorized representative who is trained and approved for installation of system components required for this Project.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

1.7 DELIVERY, STORAGE, AND HANDLING

D. Factory-Mounted Components: Where control devices specified in this Section are indicated to be factory mounted on equipment, arrange for shipping of control devices to equipment manufacturer.

E. System Software: Update to latest version of software at Project completion.

1.8 COORDINATION

A. Coordinate location of sensors, thermostats, humidistats, and other exposed control sensors with plans and room details before installation.

B. Coordinate supply of conditioned electrical branch circuits for control units and operator workstation.

F. Coordinate equipment with Division 26 to achieve compatibility of communication interfaces.

G. Coordinate equipment with Division 26 to achieve compatibility with starter coils and annunciation devices.

H. Coordinate equipment with Division 26 to achieve compatibility with motor starters and annunciation devices.

1.9 WARRANTY

A. Provide one year parts and labor warranty.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Subject to compliance with requirements, provide products by one of the following:

1. Honeywell. 2. Trane. 3. TAC. 4. Johnson Controls.

Page 171: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 4

2.2 CONTROL SYSTEM

A. Control system shall consist of sensors, indicators, actuators, final control elements, interface equipment, other apparatus, accessories, and software connected to distributed controllers operating in multiuser, multitasking environment on token-passing network and programmed to control mechanical systems.

2.3 DDC EQUIPMENT

A. Local Control Units: Modular, comprising processor board with electronically programmable, nonvolatile, read-only memory; and backup power source.

1. Units monitor or control each I/O point, process information, and download from or upload to operator workstation or diagnostic terminal unit.

2. Stand-alone mode control functions operate regardless of network status. Functions include the following: a. Global communications. b. Discrete/digital, analog, and pulse I/O. c. Monitoring, controlling, or addressing data points.

3. Local operator interface provides for download from or upload to operator workstation or diagnostic terminal unit.

B. I/O Interface: Hardwired inputs and outputs may tie into system through controllers. Protect points so that shorting will cause no damage to controllers. 1. Binary Inputs: Allow monitoring of on-off signals without external power. 2. Pulse Accumulation Inputs: Accept up to 10 pulses per second. 3. Analog Inputs: Allow monitoring of low-voltage (0- to 10-V dc), current 4 to 20 mA), or

resistance signals. 4. Binary Outputs: Provide on-off or pulsed low-voltage signal, selectable for normally open

or normally closed operation. 5. Analog Outputs: Provide modulating signal, either low voltage (0- to 10-V dc) or current

(4 to 20 mA). 6. Tri-State Outputs: Provide two coordinated binary outputs for control of three-points,

floating-type electronic actuators. 7. Universal I/Os: Provide software selectable binary or analog outputs.

C. Power Supplies: Transformers with Class 2 current-limiting type or overcurrent protection; limit connected loads to 80 percent of rated capacity. DC power supply shall match output current and voltage requirements and be full-wave rectifier type with the following:

1. Output ripple of 5.0 mV maximum peak to peak. 2. Combined 1 percent line and load regulation with 100-mic.sec. response time for 50

percent load changes. 3. Built-in overvoltage and overcurrent protection and be able to withstand 150 percent

overload for at least 3 seconds without failure.

D. Power Line Filtering: Internal or external transient voltage and surge suppression for workstations or controllers with the following:

1. Minimum dielectric strength of 1000 V. 2. Maximum response time of 10 nanoseconds. 3. Minimum transverse-mode noise attenuation of 65 dB. 4. Minimum common-mode noise attenuation of 150 dB at 40 to 100 Hz.

Page 172: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 5

2.4 UNITARY CONTROLLERS

D. Unitized, capable of stand-alone operation with sufficient memory to support its operating system, database, and programming requirements, and with sufficient I/O capacity for the application.

1. Configuration: Local keypad and display; diagnostic LEDs for power, communication, and processor; wiring termination to terminal strip or card connected with ribbon cable; memory with bios; and 72-hour battery backup.

2. Operating System: Manage I/O communication to allow distributed controllers to share real and virtual object information and allow central monitoring and alarms. Perform scheduling with real-time clock. Perform automatic system diagnostics; monitor system and report failures.

3. Enclosure: NEMA 1.

2.5 ELECTRONIC SENSORS

A. Description: Vibration and corrosion resistant; for wall, immersion, or duct mounting as required.

B. Temperature Sensors and Transmitters:

1. Manufacturers: a. BEC Controls Corporation. b. Ebtron, Inc. c. Johnson Controls. d. I.T.M. Instruments Inc. e. MAMAC Systems, Inc. f. RDF Corporation.

2. Accuracy: Plus or minus 0.5 deg F at calibration point. 3. Wire: Twisted, shielded-pair cable. 4. Insertion Elements in Ducts: Single point, 8 inches (200 mm) long; use where not

affected by temperature stratification or where ducts are smaller than 9 sq. ft. 5. Averaging Elements in Ducts: 72 inches (1830 mm) long, flexible; use where prone to

temperature stratification or where ducts are larger than 10 sq. ft.

6. Outside-Air Sensors: Watertight inlet fitting, shielded from direct sunlight.

C. Pressure Transmitters/Transducers:

1. Static-Pressure Transmitter: Nondirectional sensor with suitable range for expected input, and temperature compensated. a. Accuracy: 2 percent of full scale with repeatability of 0.5 percent. b. Output: 4 to 20 mA. c. Building Static-Pressure Range: 0- to 0.25-inch wg. d. Duct Static-Pressure Range: 0- to 5-inch wg.

2. Differential-Pressure Switch (Air or Water): Snap acting, with pilot-duty rating and with suitable scale range and differential.

3. Pressure Transmitters: Direct acting for gas, liquid, or steam service; range suitable for system; linear output 4 to 20 mA.

2.6 STATUS SENSORS

A. Status Inputs for Electric Motors and Fans: Comply with ISA 50.00.01, current-sensing fixed- or split-core transformers with self-powered transmitter, adjustable and suitable for 175 percent of rated motor current.

Page 173: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 6

B. Electronic Damper Position Indicator: Visual scale indicating percent of travel and 2- to 10-V dc, feedback signal.

2.7 ACTUATORS

A. Electric Motors: Size to operate with sufficient reserve power to provide smooth modulating action or two-position action.

1. Comply with requirements in Division 23 Section "Common Motor Requirements for HVAC Equipment."

2. Permanent Split-Capacitor or Shaded-Pole Type: Gear trains completely oil immersed and sealed. Equip spring-return motors with integral spiral-spring mechanism in housings designed for easy removal for service or adjustment of limit switches, auxiliary switches, or feedback potentiometer.

3. Nonspring-Return Motors for Dampers Larger Than 25 Sq. Ft.: Size for running torque of 150 in. x lbf and breakaway torque of 300 in. x lbf.

4. Spring-Return Motors for Dampers Larger Than 25 Sq. Ft.: Size for running and breakaway torque of 150 in. x lbf.

B. Electronic Actuators: Direct-coupled type designed for minimum 60,000 full-stroke cycles at rated torque.

1. Dampers: Size for running torque calculated as follows: a. Parallel-Blade Damper with Edge Seals: 7 inch-lb/sq. ft. of damper. b. Opposed-Blade Damper with Edge Seals: 5 inch-lb/sq. ft. of damper. c. Parallel-Blade Damper without Edge Seals: 4 inch-lb/sq. ft of damper. d. Opposed-Blade Damper without Edge Seals: 3 inch-lb/sq. ft. of damper. e. Dampers with 2- to 3-Inch wg of Pressure Drop or Face Velocities of 1000 to

2500 fpm: Increase running torque by 1.5. f. Dampers with 3- to 4-Inch wg of Pressure Drop or Face Velocities of 2500 to

3000 fpm: Increase running torque by 2.0.

2. Coupling: V-bolt and V-shaped, toothed cradle. 3. Overload Protection: Electronic overload or digital rotation-sensing circuitry. 4. Fail-Safe Operation: Mechanical, spring-return mechanism. Provide external, manual

gear release on nonspring-return actuators. 5. Proportional Signal: 2- to 10-V dc or 4 to 20 mA, and 2- to 10-V dc position feedback

signal. 6. Temperature Rating: Minus 22 to plus 122 deg F.

2.8 CONTROL CABLE

A. Electronic and fiber-optic cables for control wiring shall comply with Division 27.

PART 3- EXECUTION

3.1 EXAMINATION

A. Verify that power supply is available to control units and Exchange furnished operator workstation.

B. Verify that duct, pipe, and equipment-mounted devices are installed before proceeding with installation.

3.2 INSTALLATION

A. Install software in control units and operator workstation(s). Implement all features of programs to specified requirements and as appropriate to sequence of operation.

Page 174: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 7

B. Connect and configure equipment and software to achieve sequence of operation specified.

C. Verify location of sensors with Drawings and room details before installation. Install devices 48 inches above the floor.

1. Install averaging elements in ducts and plenums in crossing or zigzag pattern.

D. Install guards on thermostats and sensors in the following locations:

1. Entrances. 2. Public areas. 3. Where indicated.

E. Install automatic dampers according to Division 23 Section "Air Duct Accessories."

F. Install damper motors on outside of duct in warm areas, not in locations exposed to outdoor temperatures.

G. Install labels and nameplates to identify control components according to Division 23 Section "Identification for HVAC Piping and Equipment."

H. Install electronic and fiber-optic cables according to Division 27.

3.3 ELECTRICAL WIRING AND CONNECTION INSTALLATION

A. Install raceways, boxes, and cabinets according to Division 26.

B. Install building wire and cable according to Division 26.

C. Install signal and communication cable according to Division 27.

1. Conceal cable, except in mechanical rooms and areas where other conduit and piping are exposed.

2. Install cables in raceway in mechanical and electrical rooms. 3. Install cable drops to space sensors in raceway. 4. Install concealed cable tight to structure with tie wraps. Install drops to room sensors in

raceway. 5. Bundle and harness multiconductor instrument cable in place of single cables where

several cables follow a common path. 6. Fasten flexible conductors, bridging cabinets and doors, along hinge side; protect

against abrasion. Tie and support conductors. 7. Number-code or color-code conductors for future identification and service of control

system, except local individual room control cables. 8. Install wire and cable with sufficient slack and flexible connections to allow for vibration

of piping and equipment.

D. Connect hand-off-auto selector switches to override automatic interlock controls when switch is in hand position.

3.4 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust field-assembled components and equipment installation, including connections, and to assist in field testing. Report results in writing.

B. Perform the following field tests and inspections and prepare test reports:

Page 175: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 8

1. Operational Test: After electrical circuitry has been energized, start units to confirm proper unit operation. Remove and replace malfunctioning units and retest.

2. Test and adjust controls and safeties. 3. Test calibration of electronic controllers by disconnecting input sensors and stimulating

operation with compatible signal generator. 4. Test each point through its full operating range to verify that safety and operating control

set points are as required. 5. Test each control loop to verify stable mode of operation and compliance with sequence

of operation. Adjust PID actions. 6. Test each system for compliance with sequence of operation. 7. Test software and hardware interlocks. 8. Coordinate testing with AAFES Commissioning Agent.

C. DDC Verification:

1. Verify that instruments are installed before calibration, testing, and loop or leak checks. 2. Check instruments for proper location and accessibility. 3. Check instrument installation for direction of flow, elevation, orientation, insertion depth,

and other applicable considerations. 4. Check flow instruments. Inspect tag number and line and bore size, and verify that inlet

side is identified and that meters are installed correctly. 5. Check pressure instruments, piping slope, installation of valve manifold, and self-

contained pressure regulators. 6. Check temperature instruments and material and length of sensing elements. 7. Check DDC system as follows:

a. Verify that DDC controller power supply is from emergency power supply, if applicable.

b. Verify that wires at control panels are tagged with their service designation and approved tagging system.

c. Verify that spare I/O capacity has been provided. d. Verify that DDC controllers are protected from power supply surges.

8. Coordinate checking with AAFES Commissioning Agent.

D. Replace damaged or malfunctioning controls and equipment and repeat testing procedures.

3.5 ADJUSTING

A. Calibrating and Adjusting:

1. Calibrate instruments. 2. Make three-point calibration test for both linearity and accuracy for each analog

instrument. 3. Calibrate equipment and procedures using manufacturer's written recommendations and

instruction manuals. Use test equipment with accuracy at least double that of instrument being calibrated.

4. Control System Inputs and Outputs: a. Check analog inputs at 0, 50, and 100 percent of span. b. Check analog outputs using milliampere meter at 0, 50, and 100 percent output. c. Check digital inputs using jumper wire. d. Check digital outputs using ohmmeter to test for contact making or breaking. e. Check resistance temperature inputs at 0, 50, and 100 percent of span using a

precision-resistant source.

5. Pressure: a. Calibrate pressure transmitters at 0, 50, and 100 percent of span. b. Calibrate pressure switches to make or break contacts, with adjustable

differential set at minimum.

6. Temperature:

Page 176: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INSTRUMENTATION AND CONTROL FOR HVAC 23 09 00 - 9

a. Calibrate resistance temperature transmitters at 0, 50, and 100 percent of span using a precision-resistance source.

b. Calibrate temperature switches to make or break contacts.

7. Stroke and adjust control dampers with positioners, following manufacturer's recommended procedure, so that valve and damper is 0, 50, and 100 percent closed.

8. Provide diagnostic and test instruments for calibration and adjustment of system. 9. Provide written description of procedures and equipment for calibrating each type of

instrument. Submit procedures review and approval before initiating startup procedures.

B. Adjust initial temperature and humidity set points.

3.6 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain HVAC instrumentation and controls. Refer to Division 01 Section "Demonstration and Training." Provide minimum of one 8 hour workday. Coordinate with Owner and Architect/Engineer.

END 23 09 00

Page 177: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 23 09 93 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

PART 1. GENERAL

1.1 SECTION INCLUDES

A. Control sequences for HVAC systems, subsystems, and equipment.

1.2 DEFINITIONS

A. DDC: Direct digital control.

1.3 UNIT OPERATING SEQUENCE

A. Rooftop Unit with Humidity Control (RT 1):

1. Occupied Time Schedule: a. Input Devices: DDC system time schedule, hood fan current sensors. b. Output Devices: DDC system and digital outputs. c. Action: Change temperature setpoints, fan status, and low leakage outside air

damper position.

2. Supply Air Temperature: a. Input Device: Duct mounted sensor. b. Output Device: Digital outputs to control cooling stages and heating stages. c. Action: Cycle cooling/heating stages to maintain supply air temperature setpoint

of 70 degrees F.

3. Humidity Control: Provided by hot gas reheat coil. a. Input Device: Space humidity sensor. b. Output Device: Cooling stages; digital output to activate the refrigerant hot gas

coil. c. Action: Activate cooling stages when air humidity exceeds 55% (adjustable).

Control refrigerant hot gas coil to maintain supply air setpoint.

4. Air Volume Control: a. Input Device: Duct mounted pressure sensor. b. Output Device: Variable Speed Drive on supply fan. c. Action: Modulate fan speed to maintain duct static pressure setpoint.

5. Display:

a. Supply air temperature setpoint. b. Supply air temperature. c. Heating stage status. d. Cooling stage status. e. Supply fan status output. f. Supply fan status verification. g. Humidity setpoint. h. Space Humidity. i. Reheat coil status. j. Supply fan speed. k. Duct static pressure setpoint. l. Duct static pressure.

B. Ventilation Air Terminals:

Page 178: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 23 09 93 - 2

1. Occupancy: a. Input Devices: Time schedule at workstation, Co2 sensors, hood fan current

sensors. b. Output Devices: DDC system binary outputs. c. Action: Report occupancy and enable occupied air volume setpoint.

(1) Occupied Setpoint: 100% open unless noted otherwise. (2) Unoccupied Setpoint: 0% open. (3) Co2 Sensor: Boxes controlled by Co2 sensors shall modulate damper to

maintain Co2 setpoint below 900 ppm, unless driven full open by exhaust hood interlock.

2. Air Volume: a. Input Device: Sensing grid in air terminal. b. Output Device: Electronic damper actuators. c. Action: Modulate damper to maintain air volume or Co2 setpoint. Fully open

scheduled terminals with operation of exhaust fans.

3. Display: a. Room/area served. b. Room occupied/unoccupied status. c. Room air volume. d. Room air volume setpoint. e. Air volume alarm if air flow falls more than 15% below setpoint for more than 10

minutes. f. Air-damper position as percent open.

1.4 EXHAUST FANS

A. Exhaust Fan E-5: Interlock with rooftop unit RT-1.

B. Range hood fans: Provide current sensors to start rooftop unit RT-1 and open ventilation air terminals when fans E-1, E-2, E-3, E-4 or E-9 are started.

1.5 UTILITY METERS

A. Water: Provide digital input for pulse generator by others.

B. Electricity: Provide digital input for pulse generator by others.

C. Natural Gas: Provide digital input for pulse generator. See 22 16 13.

PART 2. PRODUCTS (Not Applicable)

PART 3. EXECUTION (Not Applicable)

END 23 09 93

Page 179: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

REFRIGERANT PIPING AND SPECIALTIES 23 23 00-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 23 00 - REFRIGERANT PIPING AND SPECIALTIES

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Piping system and refrigerant for Variable Refrigerant Flow (VRF) HVAC system. 1.3 RELATED SECTIONS

A. Section 09 9100 - Painting. 1.4 REFERENCES

A. ASHRAE 15 - Safety Code for Mechanical Refrigeration.

B. ASHRAE 34 - Number Designation of Refrigerants.

C. ASME - Boiler and Pressure Vessel Codes, SEC 9 - Qualification Standard for Welding and Brazing Procedures, Welders, Brazers, and Welding and Brazing Operators.

D. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. E. ASME B16.26 - Cast Copper Alloy Fittings For Flared Copper Tubes.

F. ASME B31.5 - Refrigeration Piping.

G. ASTM B280 - Seamless Copper Tube for Air Conditioning and Refrigeration Field Service.

H. AWS A5.8 - Brazing Filler Metal.

1.5 SYSTEM DESCRIPTION

A. Where more than one piping system material is specified ensure system components are compatible and joined to ensure the integrity of the system is not jeopardized. Provide necessary joining fittings. Ensure flanges, union, and couplings for servicing are consistently provided.

B. Provide pipe hangers and supports in accordance with MSS SP69 unless indicated otherwise.

1.6 SUBMITTALS

A. Submit under provisions of Division 01.

B. Product Data: Provide general assembly of specialties, including manufacturers catalogue information. Provide manufacturers catalog data including load capacity.

C. Test Reports: Indicate results of leak test, acid test.

1.7 PROJECT RECORD DOCUMENTS

A. Submit under provisions of Division 01.

B. Record exact locations of equipment and refrigeration accessories on record drawings.

Page 180: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

REFRIGERANT PIPING AND SPECIALTIES 23 23 00-2

1.8 OPERATION AND MAINTENANCE DATA

A. Submit under provisions of Division 01.

B. Maintenance Data: Include instructions for changing cartridges, assembly views, spare parts lists. 1.9 QUALIFICATIONS

A. Installer: Company specializing in performing the work of this section with minimum 3 years experience. 1.10 REGULATORY REQUIREMENTS

A. Conform to ASME B31.9 for installation of piping system.

B. Products Requiring Electrical Connection: Listed and classified by UL, as suitable for the purpose indicated.

C. All refrigeration work shall be done by certified Technicians in accordance with Federal Register 40CFR, Part 82, subpart F.

1.11 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, protect and handle products to site.

B. Deliver and store piping and specialties in shipping containers with labeling in place.

C. Protect piping and specialties from entry of contaminating material by leaving end caps and plugs in place until installation.

D. Dehydrate and charge components such as piping and receivers, seal prior to shipment, until connected into

system. PART 2 - PRODUCTS 2.1 PIPING

A. Copper Tubing: ASTM B280, Type ACR hard drawn or annealed.

1. Fittings: ASME B16.22 wrought copper. 2. Joints: Braze, AWS A5.8 BCuP silver/phosphorus/copper alloy with melting range 1190 to 1480

degrees F.

B. Pipe Supports and Anchors:

1. Conform to MSS SP58, MSS SP69, and MSS SP89. 2. Hangers for Pipe Sizes 1/2 to 1-1/2 Inch: Adjustable swivel, split ring. 3. Hangers for Pipe Sizes 2 Inches and Over: Carbon steel, adjustable, clevis. 4. Multiple or Trapeze Hangers: Steel channels with welded spacers and hanger rods. 5. Wall Support for Pipe Sizes to 3 Inches: Cast iron hook. 6. Vertical Support: Steel riser clamp. 7. Copper Pipe Support: Carbon steel ring, adjustable, copper plated. 8. Hanger Rods: Mild steel threaded both ends, threaded one end, or continuous threaded.

2.2 REFRIGERANT

A. Refrigerant: ASHRAE 34:

1. R-410A.

Page 181: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

REFRIGERANT PIPING AND SPECIALTIES 23 23 00-3

B. Ozone-Depleting Substances:

1. Class I Substance, as used in this clause, means any substance designated as class 1 by the Environmental Protection Agency (EPA) 40 CFR Part 82), including but not limited to chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform.

2. Class II Substance, as used in this clause, means any substance designated as class II by EPA (40 CFR Part 82), including but not limited to, hydrochlorofluorocarbons.

3. As required by 42 USC 767j (b), (c), and (d) and 40 CFR Part 82, Subpart E, the Contractor shall label products which contain class I or class II ozone depleting substances or are manufactured with a process that uses class I or class II ozone depleting substances, or containers of class I or class II ozone depleting substances, as follows:

WARNING: Contains (or manufactured with, if applicable) _______________, (a) substance(s) which harm(s) public health and the environment by destroying ozone in the upper atmosphere. The Contractors shall insert the name of the substance(s).

C. Refrigeration Equipment and Air Conditioners: for Contracts for services for maintenance, repair, or disposal

of any equipment using class I or class II ozone depleting substances as a refrigerant, such as refrigerators, chillers, freezers, or air conditioners, including motor vehicle air conditioners: The contractor shall comply with the applicable requirements of Sections 608 and 609 of the Clean Air Act (42 USC 7671g, National Recycling and Emission Reduction Program and 7671h, Servicing of Motor Vehicle Air Conditioners) as each or both apply to the contract.

D. Use of Recycled Materials: To the greatest extent practicable, contractor shall use recycled materials and

materials and equipment that are recyclable.

PART 3 - EXECUTION 3.1 PREPARATION

A. Ream pipe and tube ends. Remove burrs.

B. Remove scale and dirt inside and outside pipe before assembly.

C. Prepare piping connections to equipment with flanges or unions. 3.2 INSTALLATION

A. Install refrigeration piping and specialties in accordance with VRF manufacturer's instructions.

B. Route piping in orderly manner parallel to building structure, and maintain gradient.

C. Install piping to conserve building space and not interfere with use of space.

D. Group piping whenever practical at common elevations and locations. Slope piping one percent in direction of oil return.

E. Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment.

F. Pipe Hangers and Supports:

1. Install in accordance with ASTM B31.5, ASTM F708 and MSS SP89. 2. Support horizontal piping as scheduled. 3. Install hangers to provide minimum 1/2 inch space between finished covering and adjacent work. 4. Place hangers within 12 inches of each horizontal elbow. 5. Support vertical piping at every floor. Support riser piping independently of connected horizontal

piping.

Page 182: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

REFRIGERANT PIPING AND SPECIALTIES 23 23 00-4

6. Where several pipes can be installed in parallel and at same elevation, provide multiple or trapeze hangers.

7. Provide copper plated hangers and supports for copper piping.

G. Arrange piping to return oil to compressor. Provide traps and loops in piping, and provide double risers as required. Slope horizontal piping 0.40 percent in direction of flow.

H. Provide clearance for installation of insulation and access to valves and fittings.

I. Provide access to concealed valves and fittings. Coordinate size and location of access doors with other

trades.

J. Flood piping system with nitrogen when brazing.

K. Prepare unfinished pipe, fittings, supports, and accessories ready for finish painting. Refer to Division 09.

L. Follow ASHRAE 15 and system manufacturer’s instructions and procedures for charging and purging of systems and for disposal of refrigerant.

N. Install piping in compliance with equipment manufacturer’s instructions.

O. Fully charge completed system with refrigerant after testing.

3.3 FIELD QUALITY CONTROL

A. Field inspection and testing will be performed under provisions of Division 01.

B. Test refrigeration system in accordance with ASME B31.5.

C. Pressure test system according to heat pump system manufacturer’s instructions. 3.4 SCHEDULES

A. Pipe Hanger Spacing: HANGER ROD

PIPE SIZE MAX. HANGER SPACING DIAMETER Inches Feet Inches 1/2 to 1-1/4 6.5 3/8 1-1/2 to 2 10 3/8 2-1/2 to 3 10 1/2

END 23 23 00

Page 183: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

METAL DUCTWORK 23 31 13-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 31 13 - METAL DUCTWORK

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Sheet metal ductwork for air distribution systems including accessories.

B. Welded Carbon Steel ductwork for Popeye’s hood exhaust.

C. Prefabricated exhaust ductwork for Burger King exhaust. 1.3 QUALITY ASSURANCE

A. Codes and Standards:

1. SMACNA Standards: Comply with SMACNA's "HVAC Duct Construction Standards, Metal and Flexible" for fabrication and installation of metal ductwork.

2. ASHRAE Standards: Comply with ASHRAE Handbook, Equipment Volume, Chapter 1 "Duct Construction", for fabrication and installation of metal ductwork.

3. NFPA Compliance: Comply with NFPA 90A "Standard for the Installation of Air Conditioning and Ventilating Systems" and NFPA 90B "Standard for the Installation of Warm Air Heating and Air Conditioning Systems". Comply with NFPA-96 and International Mechanical Code for installation of exhaust hood ductwork.

B. Field Reference Manual: Have available for reference at project field office, copy of SMACNA "HVAC

Duct Construction Standards, Metal and Flexible". 1.4 SUBMITTALS

A. Product Data: Submit manufacturer's technical product data and installation instructions for metal ductwork materials and products in accord with Division 1.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Protection: Protect shop-fabricated and factory-fabricated ductwork, accessories and purchased products from damage during shipping, storage and handling. Prevent end damage and prevent dirt and moisture from entering ducts and fittings.

B. Storage: Where possible, store ductwork inside and protect from weather. Where necessary to store

outside, store above grade and enclose with waterproof wrapping. PART 2 - PRODUCTS 2.1 DUCTWORK MATERIALS

A. Sheet Metal: Except as otherwise indicated, fabricate ductwork from galvanized sheet steel complying with ASTM A 527, lockforming quality; with G 90 zinc coating in accordance with ASTM A 525; and mill phosphatized for exposed locations.

B. Carbon Steel Sheets: Comply with ASTM A 1008A/A 1008M. C. Exposed round ductwork shall be spiral seam construction.

Page 184: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

METAL DUCTWORK 23 31 13-2

D. Stainless Steel Sheets: Comply with ASTM A408A or 480M, type 304 or 316. E. Burger King hood ductwork shall be Metal-Fab double-lined PIC series.

2.2 MISCELLANEOUS DUCTWORK MATERIALS

A. General: Provide miscellaneous materials and products of types and sizes indicated and, where not otherwise indicated, provide type and size required to comply with ductwork system requirements including proper connection of ductwork and equipment.

B. Fittings: Provide radius type fittings fabricated of multiple sections with maximum 15 degree change

of direction per section. Unless specifically detailed otherwise, use 45 degree laterals and 45 degree elbows for branch takeoff connections. Where 90 degree branches are indicated, provide conical type tees.

C. Duct Sealant: Non-hardening, non-migrating mastic or liquid elastic sealant, type applicable for

fabrication/installation detail, as compounded and recommended by manufacturer specifically for sealing joints and seams in ductwork.

1. Comply with LEED requirements.

D. Duct Cement: Non-hardening migrating mastic or liquid neoprene based cement, type applicable for

fabrication/installation detail, as compounded and recommended by manufacturer specifically for cementing fitting components, or longitudinal seams in ductwork.

1. Comply with LEED requirements.

E. Ductwork Support Materials: Except as otherwise indicated, provide hot-dipped galvanized steel

fasteners, anchors, rods, straps, trim and angles for support of ductwork. 2.3 FABRICATION

A. Shop fabricate ductwork in 4, 8, 10 or 12-ft. lengths, unless otherwise indicated or required to complete runs. Preassemble work in shop to greatest extent possible, so as to minimize field assembly of systems. Disassemble systems only to extent necessary for shipping and handling. Match-mark sections for reassembly and coordinated installation.

B. Shop fabricate ductwork of gages and reinforcement complying with SMACNA "HVAC Duct

Construction Standards".

C. Fabricate duct fittings to match adjoining ducts, and to comply with duct requirements as applicable to fittings. Except as otherwise indicated, fabricate elbows with center-line radius equal to associated duct width; and fabricate to include turning vanes in elbows where shorter radius is necessary. Limit angular tapers to 30 deg. for contracting tapers and 20 deg. for expanding tapers.

D. Fabricate ductwork with accessories installed during fabrication to the greatest extent possible. Refer

to Division 23 section "Ductwork Accessories" for accessory requirements. E. Fabricated concealed hood exhaust ductwork of 16 gage carbon steel with welded joints. Fabricate

exposed hot exhaust ductwork of 18 gage stainless. Material and fabrication shall comply with NFPA-96. Joints shall be externally welded liquid tight.

PART 3 - EXECUTION 3.1 INSPECTION

A. General: Examine areas and conditions under which metal ductwork is to be installed. Do not

Page 185: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

METAL DUCTWORK 23 31 13-3

proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer.

3.2 INSTALLATION OF METAL DUCTWORK

A. General: Assemble and install ductwork in accordance with recognized industry practices which will achieve air-tight (5% leakage for systems rated 3" and under; 1% for systems rated over 3") and noiseless (no objectionable noise) systems, capable of performing each indicated service. Install each run with minimum number of joints. Align ductwork accurately at connections, within 1/8" misalignment tolerance and with internal surfaces smooth. Support ducts rigidly with suitable ties, braces, hangers and anchors of type which will hold ducts true-to-shape and to prevent buckling. Support vertical ducts at every floor.

B. Field Fabrication: Complete fabrication of work at project as necessary to match shop-fabricated

work and accommodate installation requirements.

C. Routing: Locate ductwork runs, except as otherwise indicated, vertically and horizontally and avoid diagonal runs wherever possible. Locate runs as indicated by diagrams, details and notations or, if not otherwise indicated, run ductwork in shortest route which does not obstruct useable space or block access for servicing building and its equipment. Hold ducts close to walls, overhead construction, columns, and other structural and permanent enclosure elements of building. Limit clearance to 1/2" where furring is shown for enclosure or concealment of ducts, but allow for insulation thickness, if any. Where possible, locate insulated ductwork for 1" clearance outside of insulation. Wherever possible in finished and occupied spaces, conceal ductwork from view, by locating in mechanical shafts, hollow wall construction or above suspended ceilings. Do not encase horizontal runs in solid partitions, except as specifically shown. Coordinate layout with suspended ceiling and lighting layouts and similar finished work.

D. Penetrations: Where ducts pass through interior partitions and exterior walls, conceal space between

construction opening and duct or duct insulation with sheet metal flanges of same gage as duct. Overlap opening on 4 sides by at least 1-1/2". Fasten to duct and substrate. 1. Where ducts pass through fire-rated floors, walls, or partitions, provide firestopping between

duct and substrate, in accordance with requirements of SMACNA.

E. Coordination: Coordinate duct installations with installation of accessories, dampers, coil frames, equipment, controls and other associated work of ductwork system.

F. Installation: Install metal ductwork in accordance with SMACNA HVAC Duct Construction Standards. F. Popeye’s hood ductwork: Install Popeye’s hood exhaust ductwork in compliance with NFPA-96 and

International Mechanical Code.

G. Burger King hood ductwork: Install in compliance with Metal-Fab and Gaylord Instructions.

3.3 EQUIPMENT CONNECTIONS

A. General: Connect metal ductwork to equipment as indicated, provide flexible connection for each ductwork connection to equipment mounted on vibration isolators, and/or equipment containing rotating machinery. Provide access doors as indicated.

3.4 ADJUSTING AND CLEANING

A. Clean ductwork internally, unit by unit as it is installed, of dust and debris. Clean external surfaces of foreign substances which might cause corrosive deterioration of metal or, where ductwork is to be painted, might interfere with painting or cause paint deterioration.

Page 186: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

METAL DUCTWORK 23 31 13-4

B. Temporary Closure: At ends of ducts which are not connected to equipment or air distribution devices

at time of ductwork installation, provide temporary closure of polyethylene film or other covering which will prevent entrance of dust and debris until time connections are to be completed.

END 23 31 13

Page 187: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DUCTWORK ACCESSORIES 23 33 00-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 33 00 - DUCTWORK ACCESSORIES

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Ductwork accessories. 1.3 QUALITY ASSURANCE

A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of ductwork accessories, of types and sizes required, whose products have been in satisfactory use in similar service for not less than 3 years.

B. Codes and Standards:

1. SMACNA Compliance: Comply with applicable portions of SMACNA "HVAC Duct Construction Standards, Metal and Flexible".

2. Industry Standards: Comply with ASHRAE recommendations pertaining to construction of ductwork accessories, except as otherwise indicated.

3. NFPA Compliance: Comply with applicable provisions of NFPA 90A "Air Conditioning and Ventilating Systems", pertaining to installation of ductwork accessories.

1.4 SUBMITTALS

A. General: Submit the following in accord with Division 01.

B. Product Data: Submit manufacturer's technical product data for each type of ductwork accessory, including dimensions, capacities, and materials of construction; and installation instructions.

C. Maintenance Data: Submit manufacturer's maintenance data including parts lists for each type of

duct accessory. Include this data, product data, and shop drawings in maintenance manual; in accordance with Division 01.

PART 2 - PRODUCTS 2.1 DAMPERS

A. Low Pressure Manual Dampers: Provide dampers of single blade type or multiblade type, constructed in accordance with SMACNA "HVAC Duct Construction Standards".

B. Manufacturer: Subject to compliance with requirements, provide dampers of one of the following:

1. Air Balance, Inc. 2. Nailor. 3. American Warming & Ventilating, Inc. 4. Arrow Louver and Damper. 5. Greenheck. 6. National Controlled Air. 7. Ruskin Mfg. Co. 8. Leader.

C. Motorized dampers specified in 23 09 00. 2.2 TURNING VANES

Page 188: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DUCTWORK ACCESSORIES 23 33 00-2

A. Fabricated Turning Vanes: Provide fabricated turning vanes and vane runners, constructed in

accordance with SMACNA "HVAC Duct Construction Standards".

B. Manufactured Turning Vanes: Provide turning vanes constructed of 1-1/2" wide curved blades set at 3/4" o.c., supported with bars perpendicular to blades set at 2" o.c., and set into side strips suitable for mounting in ductwork.

C. Acoustic Turning Vanes: Provide acoustic turning vanes constructed of airfoil shaped aluminum

extrusions with perforated faces and fiberglass fill.

D. Manufacturer: Subject to compliance with requirements, provide turning vanes of one of the following: 1. Aero Dyne Co.

2. Airsan Corp. 3. Anemostat Products Div.; Dynamics Corp. of America. 4. Duro Dyne Corp. 5. Environmental Elements Corp.; Subs. Koppers Co., Inc. 6. Hart & Cooley Mfg. Co. 7. Register & Grille Mfg. Co., Inc. 8. Souther, Inc.

2.3 DUCT HARDWARE

A. General: Provide duct hardware, manufactured by one manufacturer for all items on project, for the following: 1. Test Holes: Provide in ductwork at fan inlet and outlet, and elsewhere as indicated, duct test

holes, consisting of slot and cover, for instrument tests. 2. Quadrant Locks: Provide for each damper, quadrant lock device on one end of shaft; and

end bearing plate on other end for damper lengths over 12". Provide extended quadrant locks and end extended bearing plates for externally insulated ductwork.

B. Manufacturer: Subject to compliance with requirements, provide duct hardware of one of the

following: 1. Ventfabrics, Inc.

2. Young Regulator Co. 3. Duro Dyne Corp.

2.4 FLEXIBLE CONNECTIONS

A. General: Provide flexible duct connections wherever ductwork connects to vibration isolated equipment. Construct flexible connections of neoprene-coated flameproof fabric crimped into duct flanges for attachment to duct and equipment. Make airtight joint. Provide adequate joint flexibility to allow for thermal, axial, transverse, and torsional movement, and also capable of absorbing vibrations of connected equipment.

B. Manufacturer: Subject to compliance with requirements, provide flexible connections of one of the

following:

1. Duro Dyne Corp. 2. Flexaust (The) Co. 3. Ventfabrics, Inc.

PART 3 - EXECUTION 3.1 INSPECTION

A. Examine areas and conditions under which ductwork accessories will be installed. Do not proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer.

Page 189: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DUCTWORK ACCESSORIES 23 33 00-3

3.2 INSTALLATION OF DUCTWORK ACCESSORIES

A. Install ductwork accessories in accordance with manufacturer's installation instructions, with applicable portions of details of construction as shown in SMACNA standards, and in accordance with recognized industry practices to ensure that products serve intended function.

B. Install turning vanes in square or rectangular 90 deg. elbows in supply and exhaust air systems, and

elsewhere as indicated.

C. Coordinate with other work, including ductwork, as necessary to interface installation of ductwork accessories properly with other work.

D. Install manual damper at each branch duct take-off.

3.3 FIELD QUALITY CONTROL

A. Operate installed ductwork accessories to demonstrate compliance with requirements. Test for air leakage while system is operating. Repair or replace faulty accessories, as required to obtain proper operation and leakproof performance.

3.4 ADJUSTING AND CLEANING

A. Adjusting: Adjust ductwork accessories for proper settings, install fusible links in fire dampers and adjust for proper action. 1. Label access doors in accordance with Division-23 section "Mechanical Identification".

2. Final positioning of manual dampers is specified in Division-23, Section "Testing, Adjusting, and Balancing".

B. Cleaning: Clean factory-finished surfaces. Repair any marred or scratched surfaces with

manufacturer's touch-up paint.

END 23 33 00

Page 190: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FANS 23 34 23-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 34 23 - FANS

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. All materials, equipment, tools, labor, etc required to complete the installation of the fans as shown on the drawings and as specified.

1.3 SUBMITTALS

A. General: Submit the following in accord with Division 01.

B. Product data for selected models, including specialties, accessories; and the following: 1. Certified fan performance curves with system operating conditions indicated. 2. Certified fan sound power ratings. 3. Motor ratings and electrical characteristics plus motor and fan accessories. 4. Materials gages and finishes, including color charts. 5. Dampers, including housings, linkages, and operators.

C. Maintenance data for fans, for inclusion in Operation and Maintenance Manual specified in Division

01. 1.4 QUALITY ASSURANCE

A. UL Compliance: Fans and components shall be UL listed and labeled.

B. Nationally Recognized Testing Laboratory and NEMA Compliance (NRTL): Fans and components shall be NRTL listed and labeled. The term "NRTL" shall be as defined in OSHA Regulation 1910.7.

C. NEMA Compliance: Motors and electrical accessories shall comply with NEMA standards.

D. Electrical Component Standard: Components and installation shall comply with NFPA 70 "National

Electrical Code." 1.5 DELIVERY, STORAGE AND HANDLING

A. Lift and support units with the manufacturer's designated lifting or supporting points.

B. Disassemble and reassemble units as required for movement into the final location following manufacturer's written instructions.

C. Deliver fan units as a factory-assembled unit to the extent allowable by shipping limitations, with

protective crating and covering. 1.6 SEQUENCING AND SCHEDULING

A. Coordinate the installation of roof curbs, equipment supports, and roof penetrations specified in Division 07.

B. Coordinate the size and location of structural steel support members.

Page 191: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FANS 23 34 23-2

PART 2 - PRODUCTS 2.1 MANUFACTURERS

A. Subject to compliance with requirements, provide products by one of the following. 1. Cook (Loren) Co. 2. Greenheck Fan Corp. 3. Burger King Exhaust Fans shall be models scheduled – NO SUBSTITUTIONS.

2.2 FANS, GENERAL

A. General: Provide fans that are factory fabricated and assembled, factory tested, and factory finished, with indicated capacities and characteristics.

B. Fans and Shafts: Statically and dynamically balanced and designed for continuous operation at the

maximum rated fan speed and motor horsepower. 1. Fan Shafts: Turned, ground, and polished steel designed to operate at no more than 70

percent of the first critical speed at the top of the speed range of the fan's class.

C. Belt Drives: Factory mounted, with final alignment and belt adjustment made after installation. 1. Service Factor: 1.4.

D. Belts: Oil-resistant, nonsparking, and nonstatic. E. Motors and Fan Wheel Pulleys: Adjustable pitch for use with motors through 15 HP; fixed pitch for

use with motors larger than 15 HP. Select pulley so that pitch adjustment is at the middle of the adjustment range at fan design conditions. 1. Belt Guards: Provide steel belt guards for motors mounted on the outside of the fan cabinet.

F. Shaft Bearings: Provide type indicated, having a median like "Rating Life" (AFBMA L) of 200,000

calculated in accordance with AFBMA Standard 9 for ball bearings and AFBMA Standard 11 for roller bearings.

2.3 CENTRIFUGAL ROOF VENTILATORS

A. Description: Belt-driven centrifugal fans consisting of housing, wheel, fan shaft, bearings, motor and disconnect switch, drive assembly, and accessories.

B. Housing: Heavy-gage, removable, spun-aluminum, dome top and outlet baffle; venture inlet cone. C. Fan Wheel: Aluminum hub and wheel with backward-inclined blades. D. Belt-Driven Drive Assembly: Resiliently mounted to housing, with the following features:

1. Fan Shaft: Turned, ground, and polished steel; keyed to wheel hub. 2. Shaft Bearings: permanently lubricated, permanently sealed, self-aligning ball bearings. 3. Pulleys: Cast iron, adjustable pitch motor pulley. 4. Fan and motor isolated from exhaust airstream.

E. Accessories:

1. Disconnect Switch: Nonfusible type, with thermal overload protection mounted inside fan housing, factory wired through internal aluminum conduit.

2. Bird Screens: Removable, ½ inch mesh, aluminum or brass wire. 3. Dampers: Counterbalanced, parallel blade, backdraft dampers mounted in wall sleeve;

factory set to close when fan stops. 4. Roof Curbs: Prefabricated galvanized steel curbs with internal insulation. 5. Accessories to meet NFPA-96 as scheduled.

a. Include curb extensions as required to locate fan discharge minimum of 40” above roof deck.

2.4 MOTORS

Page 192: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FANS 23 34 23-3

A. See Section 23 05 13.

B. Starters, Electrical Devices, and Wiring: Electrical devices and connections are specified in Division

26. PART 3 - EXECUTION 3.1 EXAMINATION

A. Examine areas and conditions, with Installer present, for compliance with requirements for installation tolerances, housekeeping pads, and other conditions affecting performance of fans.

B. Do not proceed until unsatisfactory conditions have been corrected.

3.2 INSTALLATION, GENERAL

A. Install fans level and plumb, in accordance with manufacturer's written instructions. Support units as described below, using the vibration control devices indicated. Vibration control devices are specified in Division 23.

1. Secure roof-mounted fans to roof curbs with stainless steel hardware.

B. Arrange installation of units to provide access space around air handling units for service and

maintenance. 3.3 CONNECTIONS

A. Duct installations and connections are specified in other Division 23 sections. Make final duct connections with flexible connections.

B. Electrical Connections: The following requirements apply:

1. Electrical power wiring is specified in Division 26. 2. Temperature control wiring and interlock wiring are specified in Section 23 0900. 3. Grounding: Connect unit components to ground in accordance with the National Electrical

Code. 3.4 ADJUSTING, CLEANING, AND PROTECTING

A. Adjust damper linkages for proper damper operation.

B. Clean unit cabinet interiors to remove foreign material and construction dirt and dust. Vacuum clean fan wheel and cabinet.

END 23 34 23

Page 193: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

AIR CURTAINS 23 34 33 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 34 33 - AIR CURTAINS

PART 1 - GENERAL

1.1 WORK INCLUDES

A. Air curtains.

1.2 SUBMITTALS

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories for each unit.

B. Operation and Maintenance Data: For air curtains to include in maintenance manuals.

1.3 QUALITY ASSURANCE

A. Product Options: Drawings indicate size, profiles, and dimensional requirements of air curtains and are based on the specific product indicated. Refer to Division 01 Section "Product Requirements."

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

C. Comply with AMCA 220, "Test Methods for Air Curtain Units," for airflow, outlet velocity, and power consumption.

D. Comply with NSF 37, "Air Curtains for Entranceways in Food and Food Service Establishments."

1.4 COORDINATION

A. Coordinate layout and installation of air curtains and suspension system components with other construction, including light fixtures, fire-suppression-system components, and partition assemblies.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Subject to compliance with requirements, provide products by one of the following: 1. Berner International Corp. 2. Mars Air Products; Mars Air Door Division. 3. Leading Edge.

2.2 MATERIALS

A. Housing Materials: Galvanized steel with electrostatically applied epoxy enamel finish over powdered mirror.

B. Intake Louvers: Integral part of the housing.

C. Discharge Nozzle: Integral part of the housing, containing adjustable air-directional vanes.

2.3 FANS

A. Fans: Centrifugal, forward curved, double width, double inlet statically and dynamically balanced.

Page 194: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

AIR CURTAINS 23 34 33 - 2

B. Fan Drives: Direct.

2.4 MOTORS

A. Motor Type: Resiliently mounted, continuous duty, with integral thermal-overload protection.

B. Bearings: Permanently sealed, lifetime, prelubricated, ball bearings.

2.5 ACCESSORIES

A. Mounting Brackets: Adjustable mounting brackets for drum-type roll-up doors.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and conditions where air curtains will be installed for compliance with requirements for installation tolerances and other conditions affecting performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Install air curtains with clearance for equipment service and maintenance.

3.3 CONNECTIONS

A. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical Systems."

B. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and Cables."

END 23 34 33

Page 195: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

AIR TERMINAL UNITS 23 36 00 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 36 00 - AIR TERMINAL UNITS

PART 1 - GENERAL

1.1 WORK INCLUDES

A. Shutoff, single-duct air terminal units without electric reheat coils.

1.2 PERFORMANCE REQUIREMENTS

A. Structural Performance: Hangers and supports shall withstand the effects of gravity loads and stresses within limits and under conditions described in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible.”

1.3 SUBMITTALS

A. Product Data: For each type of the following products, including rated capacities, furnished specialties, sound-power ratings, and accessories.

1. Air terminal units. 2. Liners and adhesives. 3. Sealants and gaskets.

B. Operation and Maintenance Data: For air terminal units to include in emergency, operation, and maintenance manuals. In addition to items specified in Division 01 Section "Operation and Maintenance Data," include the following:

1. Instructions for resetting minimum and maximum air volumes.

1.4 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1.

PART 2 - PRODUCTS

2.1 SHUTOFF, SINGLE-DUCT AIR TERMINAL UNITS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Krueger. 2. Price. 3. Titus.

B. Configuration: Volume-damper assembly inside unit casing with control components inside a protective metal shroud.

C. Casing: 0.034-inch steel, single wall.

1. Casing Lining: Adhesive attached coated, fibrous-glass duct liner complying with ASTM C 1071, and having a maximum flame-spread index of 25 and a maximum smoke-developed index of 50, for both insulation and adhesive, when tested according to ASTM E 84. a. Cover liner with nonporous foil.

2. Air Inlet: Round stub connection or S-slip and drive connections for duct attachment.

Page 196: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

AIR TERMINAL UNITS 23 36 00 - 2

3. Air Outlet: S-slip and drive connections. 4. Access: Removable panels for access to parts requiring service, adjustment, or maintenance;

with airtight gasket. 5. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in

ASHRAE 62.1.

D. Volume Damper: Galvanized steel with peripheral gasket and self-lubricating bearings.

1. Maximum Damper Leakage: ARI 880 rated, 2 percent of nominal airflow at 3-inch wg inlet static pressure.

2. Damper Position: Normally open.

2.2 HANGERS AND SUPPORTS

A. Hanger Rods for Noncorrosive Environments: Stainless steel rods and nuts.

B. Air Terminal Unit Attachments: Sheet metal screws, blind rivets, or self-tapping metal screws; compatible with duct materials.

C. Trapeze and Riser Supports: Steel shapes and plates for units with steel casings; aluminum for units with aluminum casings.

D. Channel Support System: Shop- or field-fabricated support assembly made of slotted steel channels rated in tension, compression, and torsion forces and with accessories for attachment to braced component at one end and to building structure at the other end. Include matching components and corrosion-resistant coating.

2.3 SOURCE QUALITY CONTROL

A. Factory Tests: Test assembled air terminal units according to ARI 880.

1. Label each air terminal unit with plan number, nominal airflow, maximum and minimum factory-set airflows, coil type, and ARI certification seal.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install air terminal units according to NFPA 90A, "Standard for the Installation of Air Conditioning and Ventilating Systems."

B. Install air terminal units level and plumb. Maintain sufficient clearance for normal service and maintenance.

3.2 HANGER AND SUPPORT INSTALLATION

A. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Chapter 4, "Hangers and Supports." Each unit’s supports shall be designed to withstand 150% of unit weight in the vertical plane and 50% of unit weight in the horizontal plane.

B. Building Attachments: Structural-steel fasteners appropriate for construction materials to which hangers are being attached.

C. Hangers Exposed to View: Threaded rod and angle or channel supports.

D. Install upper attachments to structures. Select and size upper attachments with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

Page 197: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

AIR TERMINAL UNITS 23 36 00 - 3

3.3 CONNECTIONS

A. Connect ducts to air terminal units according to Section 23 31 13.

B. Make connections to air terminal units with flexible connectors complying with requirements in Section 23 3300.

3.4 IDENTIFICATION

A. Label each air terminal unit with plan number, nominal airflow, and maximum and minimum factory-set airflows. Comply with requirements in Division 23 Section "Identification for HVAC Piping and Equipment" for equipment labels and warning signs and labels.

END 23 36 00

Page 198: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

AIR OUTLET AND INLET 23 37 13-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 37 13 - AIR OUTLET AND INLET

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. All grilles, registers, and diffusers. 1.3 QUALITY ASSURANCE

A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of air outlets and inlets of types and capacities required, whose products have been in satisfactory use in similar service for not less than 5 years.

B. Codes and Standards:

1. ARI Compliance: Test and rate air outlets and inlets in accordance with ARI 650 "Standard

for Air Outlets and Inlets". 2. ASHRAE Compliance: Test and rate air outlets and inlets in accordance with ASHRAE 70

"Method of Testing for Rating the Air Flow Performance of Outlets and Inlets". 3. ADC Compliance: Test and rate air outlets and inlets in certified laboratories under

requirements of ADC 1062 "Certification, Rating and Test Manual". 4. ADC Seal: Provide air outlets and inlets bearing ADC Certified Rating Seal. 5. AMCA Compliance: Test and rate louvers in accordance with AMCA 500 "Test Method for

Louvers, Dampers and Shutters". 6. AMCA Seat: Provide louvers bearing AMCA Certified Rating Seal. 7. NFPA Compliance: Install air outlets and inlets in accordance with NFPA 90A "Standard for

the Installation of Air Conditioning and Ventilating Systems". 1.4 SUBMITTALS

A. General: Submit the following in accord with Division 1.

B. Product Data: Submit manufacturer's technical product data for air outlets and inlets including the following: 1. Schedule of air outlets and inlets indicating drawing designation, room location, number

furnished, model number, size, and accessories furnished. 2. Data sheet for each type of air outlet and inlet, and accessory furnished; indicating

construction, finish, and mounting details. 3. Performance data for each type of air outlet and inlet furnished, including aspiration ability,

temperature and velocity traverses, throw and drop, and noise criteria ratings. Indicate selections on data.

1.5 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Deliver air outlets and inlets wrapped in factory-fabricated fiber-board type containers. Identify on outside of container type of outlet or inlet and location to be installed. Avoid crushing or bending and prevent dirt and debris from entering and settling in devices.

B. Store air outlets and inlets in original cartons and protect from weather and construction work traffic.

Where possible, store indoors; when necessary to store outdoors, store above grade and enclose with waterproof wrapping.

Page 199: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

AIR OUTLET AND INLET 23 37 13-2

PART 2 - PRODUCTS 2.1 GRILLES, REGISTERS, AND DIFFUSERS

A. General: Units are scheduled on the drawings.

B. Finish Compatibility: Provide with border styles that are compatible with adjacent finish systems. Refer to general construction drawings and specifications for types of finish systems which will contain each type of air device.

C. Manufacturer: Subject to compliance with requirements, provide air devices of one of the following:

1. Krueger. 2. Price. 3. Titus.

PART 3 - EXECUTION 3.1 INSPECTION

A. Examine areas and conditions under which air outlets and inlets are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. General: Install air outlets and inlets in accordance with manufacturer's written instructions and in accordance with recognized industry practices to insure that products serve intended functions.

B. Coordinate with other work, including ductwork and duct accessories, as necessary to interface

installation of air outlets and inlets with other work.

C. Locate ceiling air diffusers, registers, and grilles, as indicated on general construction "Reflected Ceiling Plans". Unless otherwise indicated, locate units in center of acoustical ceiling modules.

END 23 37 13

Page 200: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FOOD SERVICE VENTILATION SYSTEMS 23 38 15-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 38 15 – FOOD SERVICE VENTILATION SYSTEMS

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Provide:

1. Complete Food Service Ventilating systems including canopy, filters, lights, ductwork, surrounding stainless steel panels and extinguishing system.

2. Extinguishing system may be factory installed or field fabricated. 1.3 QUALITY ASSURANCE

A. Regulatory Requirements:

1. National Fire protection Association, NFPA: a. 90A: Installation of Air Conditioning and Ventilating Systems. b. 96: Installation of Equipment for the Removal of Smoke and Grease-Laden

Vapor from Commercial Cooking Equipment. c. 17A: Wet Chemical Extinguishing Systems.

2. National Sanitary Foundation, NSF:

a. Seal of approval.

3. Underwriter's Laboratories, UL: a. UL listed and labeled components.

1.4 SUBMITTALS

A. Submit in accordance with Division 01.

B. Product Data:

1. Submit manufacturer's product data and installation instructions.

C. Shop Drawings:

1. Submit layout of entire extinguishing system including nozzles, piping, and fused links. PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS

A. Exhaust Hoods: See Schedule.

B. Extinguishing System:

1. Ansul or Amerex as scheduled.

2.2 CANOPY HOODS:

A. Construction:

Page 201: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FOOD SERVICE VENTILATION SYSTEMS 23 38 15-2

1. 18 gauge stainless steel, Type 304. 2. Canopy internal supports consisting of angles and channels to reinforce and prevent

vibration and fatigue. 3. Canopy fabricated as one piece and shipped as one piece.

B. Filter:

1. Canopy filter housing of same material as canopy liner, complete with UL classified

extractor type aluminum grease filters full length. 2. Filter shall provide constant pressure drop. 3. Filter housing shall terminate at bottom with pitched drip tray full length of canopy and

shall be equipped with grease cup for easy removal and daily cleaning.

C. Extinguishing System:

1. System shall protect range hoods, exhaust ducts, filters and appliances. 2. Automatic operation initiated by fusible metallic links with temperature ratings in

accordance with below referenced installation manual. 3. Piping:

a. Pipe: Standard weight, Schedule 40; black steel; chrome-sleeved where exposed.

b. Fittings: Malleable-iron, ductile-iron, steel or cast-iron; of standard weight. c. Pipe reamed and cleaned before assembly and after assembly.

4. Provide manual release station, located as indicated on drawings, for each extinguishing

system. Provide permanent plastic laminate tag at each pull station, clearly indicating hood served.

5. Provide set of dry contacts for contacts for fire alarm system. PART 3 - EXECUTION 3.1 INSPECTION

A. General: Examine areas and conditions under which exhaust hoods are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.

3.2 INSTALLATION OF HOODS

A. Install hoods and extinguishing systems as indicated on Drawings and in accord with NFPA 96 and 17A.

B. Provide all miscellaneous framing, anchors, and brackets necessary to properly support hoods.

C. Install piping and extinguishing systems in compliance with manufacturer’s requirements and

recommendations. 3.3 FIELD QUALITY CONTROL

A. Start-Up:

1. Provide start-up supervision. 2. Provide instruction to AAFES Personnel on system operation. 3. Provide field certification by system manufacturer. 4. Provide acceptance test observed by Base Fire Department personnel. Test

extinguishing system in conjunction with fire alarm tests. Contractor shall provide all material and labor to conduct the test(s).

END 23 38 15

Page 202: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR CONDITIONING UNITS 23 74 13-1

DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING SECTION 23 74 13 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provision of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section

1.2 SUMMARY

A. This section includes:

1. Provide and install packaged, outdoor, central-station air-handling units (rooftop units) with the following components and accessories, where specified. a. Direct-expansion cooling. b. Gas furnace. c. Hot gas reheat coil. d. Integral temperature controls. e. Roof curb. f. Miscellaneous steel at curb and duct openings.

1.3 DEFINITIONS

A. DDC: Direct-digital controls.

B. ECM: Electrically commutated motor.

C. RTU: Rooftop unit. As used in this Section, this abbreviation means packaged, outdoor, central-station air-handling units. This abbreviation is used regardless of whether the unit is mounted on the roof or on a concrete base on ground.

D. Supply-Air Fan: The fan providing supply air to conditioned space. "Supply air" is defined as the air entering a space from air-conditioning, heating, or ventilating apparatus.

E. Supply-Air Refrigerant Coil: Refrigerant coil in the supply-air stream to absorb heat (provide cooling) during cooling operations. "Supply air" is defined as the air entering a space from air-conditioning, heating, or ventilating apparatus.

1.4 SUBMITTALS

A. Comply with Division 1.

B. Product Data: Include manufacturer's technical data for each RTU, including rated capacities, dimensions, required clearances, characteristics, furnished specialties, and accessories.

C. Shop Drawings: Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

1. Wiring Diagrams: Power, signal, and control wiring.

D. Operation and Maintenance Data: For RTUs to include in emergency, operation, and maintenance manuals. Comply with Division 1.

E. Warranty: Special warranty specified in this Section.

Page 203: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR CONDITIONING UNITS 23 74 13-2

1.5 QUALITY ASSURANCE

A. ARI Compliance:

1. Comply with ARI 210/240 and ARI 340/360 for testing and rating energy efficiencies for RTUs.

2. Comply with ARI 270 for testing and rating sound performance for RTUs.

B. ASHRAE Compliance:

1. Comply with ASHRAE 15 for refrigeration system safety. 2. Comply with ASHRAE 33 for methods of testing cooling and heating coils. 3. Comply with applicable requirements in ASHRAE 62.1-2004, Section 5 - "Systems and

Equipment" and Section 7 - "Construction and Startup."

C. ASHRAE/IESNA 90.1 Compliance: Applicable requirements in ASHRAE/IESNA 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."

D. NFPA Compliance: Comply with NFPA 90A and NFPA 90B.

E. UL Compliance: Comply with UL 1995.

F. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

1.6 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to replace components of RTUs that fails in materials or workmanship within specified warranty period.

1. Warranty Period for Compressors: Manufacturer's standard, but not less than five years from date of Substantial Completion.

2. Warranty Period for Gas Furnace Heat Exchangers: Manufacturer's standard, but not less than 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Aaon. 2. Trane. 3. Daikin.

2.2 CASING

A. General Fabrication Requirements for Casings: Formed and reinforced insulated panels, fabricated to allow removal for access to internal parts and components, with joints between sections sealed. Access to fans, filters and controls shall be through hinged panels with tool-less fasteners.

B. Exterior Casing Material: Galvanized steel with factory-painted finish, with pitched roof panels and knockouts with grommet seals for electrical and piping connections and lifting lugs.

C. Casing Insulation and Adhesive: Comply with NFPA 90A or NFPA 90B.

Page 204: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR CONDITIONING UNITS 23 74 13-3

1. Materials: ASTM C 1071, Type I. 2. Thickness: 1 inch (25 mm). 3. Liner materials shall have air-stream surface coated with an erosion- and temperature-

resistant coating or faced with a plain or coated fibrous mat or fabric. 4. Liner Adhesive: Comply with ASTM C 916, Type I.

D. Condensate Drain Pans: Formed sections of galvanized steel sheet, a minimum of 2 inches (50 mm) deep, and complying with ASHRAE 62.1-2004.

1. Drain Connections: Threaded nipple. 2. Pan-Top Surface Coating: Corrosion-resistant compound.

E. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.

2.3 FANS

A. Supply-Air Fans: Centrifugal; with permanently lubricated, single-speed motor installed on an adjustable fan base resiliently mounted in the casing.

B. Condenser-Coil Fan: Propeller, mounted on shaft of permanently lubricated motor.

2.4 COILS

A. Supply-Air Refrigerant Coil and Hot Gas Heat Reclaim Coil:

1. Aluminum plate fin and seamless copper tube in steel casing with equalizing-type vertical distributor.

2.5 REFRIGERANT CIRCUIT COMPONENTS

A. Number of Refrigerant Circuits: Two minimum.

B. Compressor: Hermetic, scroll, mounted on vibration isolators; with internal overcurrent and high-temperature protection, internal pressure relief, and crankcase heater.

C. Refrigeration Specialties:

1. Refrigerant: 410A. 2. Expansion valve with replaceable thermostatic element. 3. Refrigerant filter/dryer. 4. Manual-reset high-pressure safety switch. 5. Automatic-reset low-pressure safety switch. 6. Minimum off-time relay. 7. Automatic-reset compressor motor thermal overload. 8. Brass service valves installed in compressor suction and liquid lines. 9. Low-ambient kit high-pressure sensor.

2.6 AIR FILTRATION

A. Minimum arrestance according to ASHRAE 52.1, and a minimum efficiency reporting value (MERV) according to ASHRAE 52.2. 1. Pleated: Minimum MERV 13. 2. Depth: 2” pleated disposable.

2.7 GAS FURNACE

A. Description: Factory assembled, piped, and wired; complying with ANSI Z21.47 and NFPA 54.

Page 205: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR CONDITIONING UNITS 23 74 13-4

B. Burners: Stainless steel.

1. Fuel: Natural gas. 2. Ignition: Electronically controlled electric spark or hot-surface igniter with flame sensor.

C. Heat-Exchanger and Drain Pan: Aluminized or stainless steel.

D. Power Vent: Integral, motorized centrifugal fan interlocked with gas valve.

E. Safety Controls:

1. Gas Control Valve: Two stage. 2. Gas Train: Single-body, regulated, redundant, 24-V ac gas valve assembly containing

pilot solenoid valve, pilot filter, pressure regulator, pilot shutoff, and manual shutoff.

2.8 DAMPERS

A. Outdoor Air Dampers: Low leakage parallel- or opposed-blade galvanized-steel dampers mechanically fastened to cadmium plated or galvanized-steel operating rod in reinforced cabinet. Leakage rate shall not exceed 3 cfm/sf at 1.0” wc pressure.

2.9 ELECTRICAL POWER CONNECTION

A. Provide for single connection of power to unit with unit-mounted disconnect switch accessible from outside unit and control-circuit transformer with built-in overcurrent protection.

1. Provide through the base connection.

2.10 CONTROLS

A. See Section 23 0900.

2.11 ACCESSORIES

A. Hail guards of galvanized steel, painted to match casing.

B. Roof Curb: Full perimeter sheet metal curb with wood nailer; neoprene sealing strips, and internal insulation. Slope to match roof.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of RTUs.

B. Examine roughing-in for RTUs to verify actual locations of piping and duct connections before equipment installation.

C. Examine roofs for suitable conditions where RTUs will be installed.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Roof Curb: Install curb level and secure, according to NRCA's "Low-Slope Membrane Roofing Construction Details Manual," Illustration "Raised Curb Detail for Rooftop Air Handling Units and Ducts." Install RTUs on curbs and coordinate roof penetrations and flashing with roof construction

Page 206: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR CONDITIONING UNITS 23 74 13-5

specified in Division 07 Section "Roof Accessories." Secure RTUs to upper curb rail, and secure curb base to roof framing or concrete base with anchor bolts.

B. Unit Support: Install unit level on structural curbs. Coordinate wall penetrations and flashing with wall construction. Secure RTUs to structural support with anchor bolts.

3.3 CONNECTIONS

A. Install condensate drain, minimum connection size, with trap and indirect connection to nearest roof drain.

B. Install piping adjacent to RTUs to allow service and maintenance.

1. Gas Piping: Comply with applicable requirements in Division 23 Section “Natural-Gas Piping." Connect gas piping to burner, full size of gas train inlet, and connect with union and shutoff valve with sufficient clearance for burner removal and service.

C. Duct installation requirements are specified in other Division 23 Sections. Drawings indicate the general arrangement of ducts. The following are specific connection requirements:

1. Install ducts to termination at top of roof curb. 2. Remove roof decking only as required for passage of ducts. Do not cut out decking

under entire roof curb. 3. Connect supply ducts to RTUs with flexible duct connectors specified in Division 23

Section "Air Duct Accessories."

3.4 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections. Report results in writing.

B. Perform tests and inspections and prepare test reports.

1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing. Report results in writing.

C. Tests and Inspections:

1. After installing RTUs and after electrical circuitry has been energized, test units for compliance with requirements.

2. Inspect for and remove shipping bolts, blocks, and tie-down straps. 3. Operational Test: After electrical circuitry has been energized, start units to confirm

proper motor rotation and unit operation. 4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls

and equipment.

D. Remove and replace malfunctioning units and retest as specified above.

3.5 STARTUP SERVICE

A. Engage a factory-authorized service representative to perform startup service.

B. Complete installation and startup checks according to manufacturer's written instructions and do the following:

1. Inspect for visible damage to unit casing. 2. Inspect for visible damage to furnace combustion chamber.

Page 207: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR CONDITIONING UNITS 23 74 13-6

3. Inspect for visible damage to compressor, coils, and fans. 4. Inspect internal insulation. 5. Verify that labels are clearly visible. 6. Verify that clearances have been provided for servicing. 7. Verify that controls are connected and operable. 8. Verify that filters are installed. 9. Clean condenser coil and inspect for construction debris. 10. Clean furnace flue and inspect for construction debris. 11. Connect and purge gas line. 12. Remove packing from vibration isolators. 13. Inspect operation of barometric relief dampers. 14. Verify lubrication on fan and motor bearings. 15. Inspect fan-wheel rotation for movement in correct direction without vibration and binding. 16. Adjust fan belts to proper alignment and tension. 17. Start unit according to manufacturer's written instructions.

a. Start refrigeration system. b. Do not operate below recommended low-ambient temperature. c. Complete startup sheets and attach copy with Contractor's startup report.

18. Inspect and record performance of interlocks and protective devices; verify sequences. 19. Operate unit for an initial period as recommended or required by manufacturer. 20. Perform the following operations for both minimum and maximum firing. Adjust burner for

peak efficiency. a. Measure gas pressure on manifold. b. Inspect operation of power vents. c. Measure combustion-air temperature at inlet to combustion chamber. d. Measure flue-gas temperature at furnace discharge.

21. Adjust and inspect high-temperature limits. 22. Inspect outdoor-air dampers for proper stroke and interlock with return-air dampers. 23. After startup and performance testing and prior to Substantial Completion, replace

existing filters with new filters.

3.6 CLEANING AND ADJUSTING

A. After completing system installation and testing, adjusting, and balancing RTU and air-distribution systems, clean filter housings and install new filters.

3.7 DEMONSTRATION

A. Train Owner maintenance personnel to adjust, operate, and maintain rooftop air handling units.

END 23 74 13

Page 208: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRIC UNIT HEATERS 23 82 38 - 1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 82 38 – ELECTRIC UNIT HEATERS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDES

A. Heaters with propeller fans and electric-resistance heating coils.

1.3 SUBMITTALS

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories for each product indicated.

B. Operation and Maintenance Data: For cabinet unit heaters to include in emergency, operation, and maintenance manuals specified in Division 01.

1.4 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

PART 2 - PRODUCTS

2.1 WALL MOUNTED HEATERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Berko 2. Markel 3. QMark 4. Trane

B. Description: An assembly including chassis, electric heating coil, fan, motor, and controls. Comply with UL 2021.

C. Cabinet:

1. Front Panel: 18 Ga steel louver, fastened with tamperproof fasteners. 2. Finish: Baked enamel over baked-on primer with manufacturer's standard color selected by

Architect, applied to factory-assembled and -tested wall and ceiling heaters before shipping. 3. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in

ASHRAE 62.1.

D. Surface-Mounting Cabinet Enclosure: Steel with finish to match cabinet.

E. Electric-Resistance Heating Coil: Nickel-chromium heating wire, free from expansion noise and hum, embedded in magnesium oxide refractory and sealed in corrosion-resistant metallic sheath. Terminate

Page 209: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRIC UNIT HEATERS 23 82 38 - 2

elements in stainless-steel, machine-staked terminals secured with stainless-steel hardware, and limit controls for high temperature protection.

F. Fan: Aluminum propeller directly connected to motor.

1. Motor: Permanently lubricated. Comply with requirements in Division 23 Section "Common Motor Requirements for HVAC Equipment."

G. Controls: Unit-mounted thermostat with “off” position.

H. Electrical Connection: Factory wire motors and controls for a single field connection with disconnect switch.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas to receive unit heaters for compliance with requirements for installation tolerances and other conditions affecting performance.

B. Examine roughing-in for electrical connections to verify actual locations before unit heater installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Install in compliance with manufacturer’s instructions.

3.3 CONNECTIONS

A. Comply with safety requirements in UL 1995.

B. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical Systems."

C. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and Cables."

3.4 FIELD QUALITY CONTROL

A. Perform the following field tests and inspections and prepare test reports:

1. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.

2. Operate electric heating elements through each stage to verify proper operation and electrical connections.

3. Test and adjust controls and safety devices. Replace damaged and malfunctioning controls and equipment.

B. Remove and replace malfunctioning units and retest as specified above.

3.5 ADJUSTING

A. Adjust initial temperature set points.

END 23 82 38

Page 210: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HEAT PUMP SYSTEMS 23 83 16-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING SECTION 23 83 16 – HEAT PUMP SYSTEMS

PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Drawing and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications Sections, apply to this Section.

1.2 SUMMARY A. This Section includes the following:

1. Air cooled condensing units. 2. DX fan-coil units, including condensate drain alarm controls. 3. Refrigerant to hot water heat exchanger module. 4. Heat pump system controls

1.3 SUBMITTALS: In Accord with Division 01.

A. Product Data: Include rated capacities; shipping, installed, and operating weights; dimensions; required clearances; methods for assembling components; furnished specialties; accessories; and installation and startup instructions for each model indicated.

B. Wiring Diagrams: Detail wiring for power, signal, and control systems and differentiate between

manufacturer-installed and field-installed wiring.

C. Field Test Reports: Indicate and interpret test results for compliance with performance requirements.

D. Maintenance Data: For each unit to include in the maintenance manuals specified in Section 01730.

1. Include a parts list for each unit, control, and accessory; troubleshooting maintenance guide; and servicing and preventive maintenance procedures and schedule.

E. Warranties: Special warranties specified in this Section.

1.4 QUALITY ASSURANCE

A. Listing and Labeling: Provide electrically operated equipment specified in this Section that is listed and labeled.

1. The Terms "Listed" and "Labeled": As defined in NFPA 70, Article 100.

2. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" as defined in OSHA Regulation 1910.7.

B. Fabricate and label refrigeration system according to ASHRAE 15, "Safety Code for Mechanical

Refrigeration."

C. Comply with NFPA 70.

D. Comply with UL 303, "Refrigeration and Air Conditioning Condensing and Compressor Units." 1.5 WARRANTY

A. General Warranty: The special warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents.

Page 211: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HEAT PUMP SYSTEMS 23 83 16-2

B. Special Warranty: A written warranty, executed by Contractor and signed by manufacturer, agreeing to

replace compressors that fail in materials and workmanship within the specified warranty period, provided manufacturer's written instructions for installation, operation, and maintenance have been followed.

1. Warranty Period: Manufacturers standard, but not less than 5 years from date of Substantial

Completion. PART 2 - PRODUCTS 2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide condensing units by one of the following:

1. Ductless Heating/Cooling Systems:

a. Mitsubishi. b. Daikin. c. LG. d. Trane. e. Carrier.

2. If a manufacturer requires a “3 pipe system” in lieu of the “2 pipe system” indicated on the drawings, the contractor shall provide the additional piping at no cost to AAFES.

2.2 CONDENSING UNITS, AIR COOLED

A. Description: Factory assembled and tested, air cooled; consisting of compressors, condenser coils, fans, motors, refrigerant reservoirs, and operating controls.

B. Compressor: Rotary type, hermetically sealed and isolated for vibration.

1. Motor: Include thermal- and current-sensitive overload devices and contactor.

C. Condenser: Copper-tube, aluminum-fin coil, with liquid subcooler.

D. Condenser Fan: Direct-drive, aluminum propeller fan; with permanently lubricated fan motor with

thermal-overload protection.

E. Casing: Steel, finished with baked enamel; with removable panels for access to controls, weep holes for water drainage, and mounting holes in base. Mount service valves, fittings, and gage ports on exterior of casing.

2.3 AIR HANDLING UNITS

A. Provide air handling unit of style, size, and capacities as indicated on the drawings. Units shall consist of indoor coil, fan and motor in insulated sheet metal cabinet. Unit shall have single disconnect.

B. Unit enclosure shall be insulated and constructed of cold-rolled steel, finished with baked enamel. Large

access panels shall provide easy access to all components.

C. Fan shall be forward curved with double inlet, mounted on motor shaft, dynamically and statically balanced. The multi-speed fan motor shall be factory lubricated, have internal overload protection, be resiliently mounted. Fan motor assembly shall be removable for service.

D. Coil shall be constructed with aluminum plate fins mechanically bonded to nonferrous tubing with all

joints brazed. Coil shall have factory installed; refrigerant metering device; refrigerant line fittings which permit mechanical connections. Condensate pans shall be equipped with primary and auxiliary drain connections. Auxiliary drain connection shall be fitted with UL 508 water level protection device to shut

Page 212: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HEAT PUMP SYSTEMS 23 83 16-3

down the unit on detection of condensate. 2.4 CONTROLS

A. Controls shall be provided by heat pump system manufacturer.

B. Controls shall control fan-coil heating/cooling capacity to maintain setpoints. C. Provide interface panel for connection of proprietary heat pump controls to Lonwork controls provided

under Section 23 09 00. 2.5 MOTORS

A. Motor Construction: NEMA MG 1, general purpose, continuous duty, Design B. 2.6 SOURCE QUALITY CONTROL

A. Verification of Performance: Rate condensing units according to ARI 210/240.

B. Testing Requirements: Factory test sound-power-level ratings according to ARI 270. PART 3 - EXECUTION 3.1 INSTALLATION

A. Install units according to manufacturer's written instructions.

B. Install units level and plumb, firmly anchored in locations indicated; maintain manufacturer's recommended clearances.

C. Install control wiring in compliance with manufacturer’s instructions, Division 26 requirements for class II

wiring and in compliance with NEC. 3.2 CONNECTIONS

A. Connect refrigerant tubing to unit's quick-connect fittings. Install tubing so it does not interfere with access to unit. Install furnished accessories.

B. Connect refrigerant piping to condensing units; maintain required access to unit. Install furnished field-mounted accessories.

3.3 FIELD QUALITY CONTROL

A. Leak Test: After installation, charge systems with refrigerant and oil and test for leaks. Repair leaks and replace lost refrigerant and oil.

B. Operational Test: After electrical circuitry has been energized, start units to confirm proper operation,

product capability, and compliance with requirements. 1. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and

equipment.

C. Remove and replace malfunctioning units with new units and retest. 3.4 CLEANING

Page 213: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

HEAT PUMP SYSTEMS 23 83 16-4

A. After completing system installation, including outlet fittings and devices, inspect exposed finish. Clean units to remove dirt and construction debris and repair damaged finishes.

3.5 COMMISSIONING

A. Verify that units are installed and connected according to the Contract Documents.

B. Complete installation and startup checks according to manufacturer's written instructions and do the following: 1. Inspect for physical damage to unit casing. 2. Verify that access doors move freely and are weathertight. 3. Clean units and inspect for construction debris. 4. Check that all bolts and screws are tight. 5. Adjust vibration isolation and flexible connections. 6. Verify that controls are connected and operational.

C. Lubricate bearings on fans.

D. Verify that fan wheel is rotating in the correct direction and is not vibrating or binding.

E. Start unit according to manufacturer's written instructions.

1. Complete manufacturer's starting checklist.

F. Check operation of condenser capacity control device.

G. Verify that vibration isolation and flexible connections properly dampen vibration transmission to

structure.

H. After startup and performance test, lubricate bearings and adjust belt tension. 3.6 DEMONSTRATION

A. Startup Services: Engage a factory-authorized service representative to train Owner's maintenance personnel as specified below:

1. Train Owner's maintenance personnel on procedures and schedules related to startup and

shutdown, troubleshooting, servicing, and preventive maintenance. 2. Review data in the maintenance manuals. Refer to Division 1 Section "Contract Closeout."

3. Review data in the maintenance manuals. Refer to Division 1 Section "Operation and Maintenance Data."

4. Schedule training with Owner, through Architect, with at least 7 days' advance notice.

END 23 83 16

Page 214: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MEDIUM VOLTAGE CABLE 26 05 13-1

DIVISION 26 - ELECTRICAL SECTION 26 05 13 - MEDIUM VOLTAGE CABLE

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Medium voltage cable. B. Cable terminations.

1.2 REFERENCES A. IEEE C2 - National Electrical Safety Code. B. IEEE 48 - Test Procedures and Requirements for High- Voltage Alternating-Current Cable

Terminations. C. NEMA WC 3 - Rubber-Insulated Wire and Cable for the Transmission and Distribution of

Electrical Energy. D. NEMA WC 5 - Thermoplastic-Insulated Wire and Cable for the Transmission and Distribution of

Electrical Energy. E. NEMA WC 7 - Cross-Linked-Thermosetting-Polyethylene- Insulated Wire and Cable for the

Transmission and Distribution of Electrical Energy. F. NEMA WC 8 - Ethylene-Propylene-Rubber-Insulated Wire and Cable for the Transmission and

Distribution of Electrical Energy. G. NETA ATS - Acceptance Testing Specifications for Electrical Power Distribution Equipment and

Systems (International Electrical Testing Association). H. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS FOR REVIEW A. Section Division 01 – Submittals. B. Product Data: Provide for cable, terminations, and accessories.

1.4 SUBMITTALS FOR CLOSEOUT A. Section Division 01 – Project Record Documents. B. Project Record Documents: Record actual sizes and locations of cables. C. Certification of Compliance: Indicate approval of installation by Military Installation authority having

jurisdiction. D. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by

Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, and installation of Product.

E. Test Reports: Indicate results of cable test in tabular form and in plots of current versus voltage

for incremental voltage steps, and current versus time at 30 second intervals at maximum voltage.

1.5 QUALIFICATIONS

Page 215: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MEDIUM VOLTAGE CABLE 26 05 13-2

A. Manufacturer: Company specializing in manufacturing Products specified in this Section with minimum three years documented experience.

B. Installer: Company specializing in installing Products specified in this Section with minimum three

years documented experience.

1.6 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70 and IEEE C2. B. Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified

and indicated.

1.7 DELIVERY, STORAGE, AND HANDLING A. Accept cable and accessories on site in manufacturer's packaging. Inspect for damage. B. Store and protect in accordance with manufacturer's instructions. C. Protect from weather. Provide adequate ventilation to prevent condensation.

1.8 FIELD MEASUREMENTS A. Verify routing and termination locations of cable bank prior to rough-in. B. Cable routing is shown on Drawings in approximate locations unless dimensioned. Route as

required to complete wiring system. PART 2 - PRODUCTS 2.1 MEDIUM VOLTAGE CABLE

A. Description: NEMA WC 7; EPR type. 133% insulation level. B. Voltage: 15 kV. C. Conductor: Copper, concentric, stranded, with semi-conductive conductor shield. D. Construction: Single conductor with metal tape insulation shielding. E. Insulation Jacket: PVC.

2.2 MODULAR CABLE TERMINATION

A. Description: IEEE 48; Class 1, molded rubber cable termination in kit form with stress cone,

ground clamp, non-tracking rubber skirts, load break connector, rubber cap, and aerial lug.

2.3 TAPE TERMINATION A. IEEE 48; Class 1, tape termination kit with semi-conductive tape, stress control tape, splicing

tape, vinyl plastic tape, stress cone, mechanical ground straps, and cable preparation kit.

2.4 FIREPROOFING TAPE A. Provide tape U.L. listed and labeled for the purpose.

2.5 POTHEADS

Page 216: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MEDIUM VOLTAGE CABLE 26 05 13-3

A. Description: IEEE 48; Class 1 termination. Pothead with porcelain insulators, cable connector and aerial lug, sealed cable entrance and support, and insulating compound.

B. Conductors: One.

2.6 CABLE TERMINATIONS

A. Description: IEEE 48; Class 2 porcelain insulator cable terminator in kit form. 2.7 CAST EPOXY CABLE TERMINATION

A. Description: IEEE 48; Class 1, cast epoxy cable termination in kit form with stress cone, shield ground connections, wet porcelain rain shield for outdoor units, epoxy resin molding material, and accessories and molds required for proper application.

B. Construction: Single conductor with metal tape insulating shielding. C. Insulation Jacket: PVC.

PART 3 - EXECUTION 3.1 EXAMINATION

A. Verify that raceway is ready to receive cable.

3.2 PREPARATION A. Use swab to clean raceways before pulling cables.

3.3 INSTALLATION A. Avoid abrasion and other damage to cables during installation. B. Use suitable lubricants and pulling equipment. C. Sustain cable pulling tensions and bending radii below recommended limits. D. Ground cable shield at each termination and splice. E. Install cables in manholes along wall providing longest route. F. Arrange cable in manholes to avoid interference with duct entrances. G. Fireproof cables in manholes using fireproofing tape in half-lapped wrapping. Extend fireproofing

one inch into duct.

3.4 FIELD QUALITY CONTROL A. Inspect exposed cable sections for physical damage. B. Inspect cable for proper connections as shown on Drawings. C. Inspect shield grounding, cable supports, and terminations for proper installation. D. Inspect and test in accordance with NETA ATS, except Section 4. E. Perform inspections and tests listed in NETA ATS, Section 7.3.

3.5 PROTECTION

Page 217: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MEDIUM VOLTAGE CABLE 26 05 13-4

A. Protect installed cables from entrance of moisture.

3.6 TEST AND RECORDS

A. Prior to energizing the cable, testing of the cable shall be performed in the presence of the Contracting Officer.

B. Exposed ends of cable shall be prepared and cleaned prior to testing in order to minimize any

leakage current. C. Cable circuit ends must be cleaned and guarded for personnel safety during cable testing. Circuits

not under test in the immediate vicinity shall be grounded. D. Exposed circuit ends under test require a minimum separation from all elements not subjected to

a test of 1 inch (25.4 mm) per 10 kV of test potential. After testing, cables shall be grounded for a minimum of 4 times (4X) as long as the test voltage was applied during the hi-potential tests to assure complete discharge.

E. When all cable, splices and terminations have been tested in accordance with Appendix A, and

test results have been accepted by the Contracting Officer, the cable system may be placed in service as per the outage procedure.

F. After the installation of the primary cables the contractor shall employ an independent third part

electrical testing firm to test cables per this specification. The testing firm shall be a full member company of the InterNational Electrical Testing Association (NETA). The testing firm shall submit proof of membership.

G. The electrical testing firm Contractor shall use calibrated test equipment for "Hi-potting" cables.

The "Hi-pot" tests shall be performed at the times directed in this specification. The Contractor shall furnish all instruments and personnel required for the tests, and electrical power will be furnished to the contractor on an "as is available" basis; otherwise Contractor supplies generator. A Cable High Potential Test Certificate (blank form) will be furnished to the contractor. The contractor shall fill out the appropriate information on this form at the time of making the test for approval.

3.7 TEST PROCEDURE

A. All medium voltage cables installed shall be tested as follows, using D.C. hi-potential. (Note: This is not a grounding or switching procedures; see outage procedure for grounding and switching sequence).

1. Field Testing of New Cables After Installation: The cable shall be tested after installation and installation of stress relief devices. Both ends of the cable shall be isolated from air break switches, transformers, etc. Remove all grounds from cable to be "hi-potted". (Note: If conductors are left connected to the equipment, the hi-pot test shall not exceed the rating of the equipment). For cables terminated with a 200 Amp elbow connector, elbows shall be placed on an insulated parking bushing prior to test. For cables terminated with a 600 Amp T-splice connector, the T-splice shall be capped prior to test.

2. Field Testing of New Cables Jointed to Existing Cable a. After acceptance tests for new cables, rated at 15KV, have been made and new

cables are spliced to existing cables, a second test of the entire cable run, from termination to termination, shall be made. This is only applicable where an existing cable is introduced into the circuit.

b. The procedure for testing shall be the same as indicated above, except that the test voltage will be reduced to the values indicated on the appropriate form.

c. This test is also applicable for testing of exiting 15 kv rated cable where it is important to test the integrity of the cable.

Page 218: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MEDIUM VOLTAGE CABLE 26 05 13-5

3. Dissipation of the charge build-up on the conductors shall be allowed to drain off through the

test set and voltmeter circuit. After the potential drops below 95% of the test value, the conductor shall be solidly grounded. The grounds shall be left on all conductors for a minimum of 4 times (4X) as long as the test voltage was applied during hi-potential tests and/or as long as someone is handling the conductors.

3.8 FAULTY CABLE

A. Contractor Furnished: In the event that any new contractor-furnished cable fails to meet any of the above tests, the entire faulty cable shall be removed and new cable shall be installed and tested at no increase in the contract price.

Page 219: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MEDIUM VOLTAGE CABLE 26 05 13-6

PREPARED BY:

PROJECT LOCATION:

PROJECT NO:

CHECKED BY:

CABLE HI POTENTIAL TEST

SPEC. NO.: 16121

DATE:

REV. B 10/01

CERTIFICATE, 15KV CLASS NEW INSTALLATION

ELECTRICAL

CONTRACT NO. __________________________________ DATE _____________________ CABLE OR DESIGNATION ________________________________________________________________ LOCATION _____________________________________________________________________________ _______________________________________________________________________________________ CABLE SIZE ____________________________________________________________________________ INSULATION AND JACKET TYPE ________________________ LENGTH _____________________ FT MAX. CURRENT AFTER 100% TEST VOLTAGE APPLIED _______________________________________ CABLE ACCEPTABLE ____________________________ NOT ACCEPTABLE ________________________ TEST CONDUCTED BY: _____________________________________________________________________ TEST WITNESSED BY: ______________________________________________________________________ REMARKS: ________________________________________________________________________________ TEMPERATURE: ________________ F WEATHER CONDITIONS: _______________________________ __________________________________________________________________________________________ 15KV RATED, EPR, 133% INSULATION LEVEL, HI-POTENTIAL TEST FOR INITIAL INSTALLATION TEST (NEW CABLE) STEP

VOLTAGE LEVEL**

DURATION

TIME ELAPSE

MICRO AMPS *

POLARIZATION INDEX =

= STEP 4 STEP 9

1 15 KV 1 Min. 1 Min.

2 30 KV 1 Min. 2 Min.

3 45 KV 1 Min. 3 Min.

4 50 KV 1 Min. 4 Min. _________________

5 50 KV 1 Min. 5 Min.

6 50 KV 1 Min. 6 Min.

7 50 KV 1 Min. 7 Min.

8 50 KV 1 Min. 8 Min.

9 50 KV 1 Min. 9 Min. _________________ = ____________

* READING AT END OF 1 MIN. DURATION PRIOR TO RAISING VOLTAGE TO NEXT STEP. ** BETWEEN EACH STEP RAISE VOLTAGE UNIFORMLY. NOTE: STOP TEST IF CURRENT STEADILY INCREASES AT CONSTANT VOLTAGE. POLARIZATION RESULTS: IF 1.25 - 2.0 GOOD IF BELOW 1.0 FAILURE IF 1.0 - 1.25 MARGINAL

Page 220: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MEDIUM VOLTAGE CABLE 26 05 13-7

PREPARED BY:

PROJECT LOCATION:

PROJECT NO.:

CHECKED BY:

CABLE HI POTENTIAL TEST

SPEC. NO.: 16121

DATE:

REV. B 10/01

CERTIFICATE, 15KV CLASS EXISTING INSTALLATION

ELECTRICAL

CONTRACT NO. __________________________________ DATE _____________________ CABLE OR DESIGNATION ________________________________________________________________ LOCATION _____________________________________________________________________________ _______________________________________________________________________________________ CABLE SIZE ____________________________________________________________________________ INSULATION AND JACKET TYPE ________________________ LENGTH _____________________ FT MAX. CURRENT AFTER 100% TEST VOLTAGE APPLIED _______________________________________ CABLE ACCEPTABLE ____________________________ NOT ACCEPTABLE ________________________ TEST CONDUCTED BY: _____________________________________________________________________ TEST WITNESSED BY: ______________________________________________________________________ REMARKS: ________________________________________________________________________________ TEMPERATURE: ________________ F WEATHER CONDITIONS: _______________________________ __________________________________________________________________________________________ 15KV RATED, EPR, 133% INSULATION LEVEL, HI-POTENTIAL TEST FOR EXISTING CABLE AND FOR NEW CABLE SPLICED TO EXISTING CABLE. STEP

VOLTAGE LEVEL**

DURATION

TIME ELAPSE

MICRO AMPS *

POLARIZATION INDEX =

= STEP 2 STEP 7

1 15 KV 1 Min. 1 Min.

2 22V 1 Min. 2 Min. _________________

3 22V 1 Min. 3 Min.

4 22V 1 Min. 4 Min.

5 22V 1 Min. 5 Min.

6 22V 1 Min. 6 Min.

7 22V 1 Min. 7 Min. ________________ = _____________

* READING AT END OF 1 MIN. DURATION PRIOR TO RAISING VOLTAGE TO NEXT STEP. ** BETWEEN EACH STEP RAISE VOLTAGE UNIFORMLY. NOTE: STOP TEST IF CURRENT STEADILY INCREASES AT CONSTANT VOLTAGE. POLARIZATION RESULTS: IF 1.25 - 2.0 GOOD IF BELOW 1.0 FAILURE IF 1.0 - 1.25 MARGINAL

END OF SECTION 26 05 13

Page 221: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BUILDING WIRE AND CABLE 26 05 19-1

DIVISION 26 - ELECTRICAL SECTION 26 05 19 - BUILDING WIRE AND CABLE

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Building wire and cable. B. Wiring connectors and connections.

1.2 REFERENCES A. NECA Standard of Installation (National Electrical Contractors Association). B. NETA ATS - Acceptance Testing Specifications for Electrical Power Distribution Equipment and

Systems (International Electrical Testing Association). C. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS FOR REVIEW A. Division 01 - Submittals: Procedures for submittals. B. Product Data: Provide for each cable type.

1.4 SUBMITTALS FOR INFORMATION A. Division 01 – Submittals: Procedures for submittals. B. Test Reports: Indicate procedures and values obtained. C. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use

stipulated by product testing agency specified under Regulatory Requirements.

1.5 SUBMITTALS AT PROJECT CLOSEOUT A. Division 01 – Project Record Documents. B. Project Record Documents: Record actual locations of components and circuits.

1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing products specified in this Section with

minimum three years documented experience.

1.7 REGULATORY REQUIREMENTS A. Conform to NFPA 70. B. Furnish building wire and wiring connectors listed and classified by Underwriters Laboratories Inc.,

as suitable for the purpose specified and indicated.

1.8 PROJECT CONDITIONS A. Verify that field measurements are as indicated. B. Conductor sizes are based on copper. C. Wire and cable routing indicated is schematic unless dimensioned.

Page 222: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BUILDING WIRE AND CABLE 26 05 19-2

1.9 COORDINATION

A. Where wire and cable destination is indicated and routing is not shown, determine exact routing

and lengths required.

PART 2 - PRODUCTS 2.1 BUILDING WIRE

A. Description: Single conductor insulated wire. B. Conductor: Copper. C. Insulation Voltage Rating: 600 volts. D. Insulation: NFPA 70, Type THHN-2/THWN-2. E. Use standard color coding for phase A, phase B, phase C, neutral and ground: Insulation: 1. 208/120 volt circuits: black, red, blue, white, green.

PART 3 - EXECUTION 3.1 EXAMINATION

A. Verify that interior of building has been protected from weather. B. Verify that mechanical work likely to damage wire and cable has been completed. C. Verify that raceway installation is complete and supported.

3.2 PREPARATION A. Completely and thoroughly swab raceway before installing wire.

3.3 WIRING METHODS A. Use wiring methods indicated. B. All branch circuit and feeder wiring shall be installed in raceways.

3.4 INSTALLATION A. Route wire and cable as required to meet Project Conditions. B. Install cable in accordance with the NECA "Standard of Installation” and NFPA 70. C. Use stranded conductors for power circuits. D. Use stranded conductors for control circuits. E. Use conductor not smaller than 12 AWG for power and lighting circuits. F. Use conductor not smaller than 14 AWG for fused control circuits. G. Unless a larger size is indicated on plans, use 10 AWG conductors for 20 ampere, 120 volt

branch circuits with homeruns longer than 75 feet.

Page 223: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BUILDING WIRE AND CABLE 26 05 19-3

H. Use solid copper for conductors #12 and smaller. Use stranded for conductors #10 and larger. I. Pull all conductors into raceway at same time. J. Use suitable wire pulling lubricant for building wire 4 AWG and larger. K. Neatly train and lace wiring inside boxes, equipment, and panelboards. L. Clean conductor surfaces before installing lugs and connectors. M. Make splices, taps, and terminations to carry full ampacity of conductors with no perceptible

temperature rise. N. Use split bolt connectors for copper conductor splices and taps, 6 AWG and larger. Tape

uninsulated conductors and connector with electrical tape to 150 percent of insulation rating of conductor.

O. Use solderless pressure connectors with insulating covers for copper conductor splices and taps,

8 AWG and smaller. P. Use insulated spring wire connectors with plastic caps for copper conductor splices and taps, 10

AWG and smaller. Q. Identify and color code wire and cable under provisions of Section 16195. Identify each conductor

with its circuit number or other designation indicated.

3.5 FIELD QUALITY CONTROL A. Inspect and test in accordance with NETA ATS, except Section 4. B. Perform inspections and tests listed in NETA ATS, Section 7.3.1.

3.6 INSULATION RESISTANCE TESTS A. Perform tests after cables have been installed in raceways, but before connection to lugs. Notify

Contracting Officer at least 14 days prior to cable tests. B. Measure resistance line-to-ground using a commercial meggar tester. Apply 1000 volts DC to

cables 2 AWG and larger and record DC insulation resistance for each circuit conductor. Minimum acceptable level is 50 megohms.

C. Record test results and include in O and M manual.

END OF SECTION 26 05 19

Page 224: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MANUFACTURED WIRING SYSTEMS 26 05 20-1

DIVISION 26 - ELECTRICAL SECTION 26 05 20 - MANUFACTURED WIRING SYSTEMS

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Prefabricated flexible cable assemblies. B. Distribution units. C. Cable accessories.

1.2 REFERENCES A. ANSI/NFPA 70 - National Electrical Code.

1.3 SUBMITTALS A. Submit under provisions of Division 01 – Submittals. B. Shop Drawings: Indicate distribution box, switch box, outlet, and cable layout and branch circuit

configuration. C. Product Data: Provide for each cable type and for each fitting and accessory. D. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by

Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, and installation of Product.

E. Provide voltage drop calculation showing wire size that will support use per NEC guidelines.

1.4 PROJECT RECORD DOCUMENTS A. Submit under provisions of Division 01 – Project Record and Closeout Documents. B. Record actual locations of cable assemblies and branch circuit arrangements.

1.5 OPERATION AND MAINTENANCE DATA

A. Submit under provisions of Division 01 – Project Record and Closeout Documents. B. Maintenance Data: Include replacement parts list.

1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing Products specified in this Section with

minimum three years experience.

1.7 REGULATORY REQUIREMENTS A. Conform to requirements of ANSI/NFPA 70. B. Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose

specified and shown. 1.8 FIELD MEASUREMENTS

A. Verify that field measurements are as indicated on shop drawings.

Page 225: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MANUFACTURED WIRING SYSTEMS 26 05 20-2

1.9 COORDINATION A. Furnish luminaire connectors to luminaire manufacturer for factory installation.

PART 2 - PRODUCTS 2.1 MANUFACTURERS

A. AMP Inc. B. Hubbell Wiring Devices C. Siemens Co. D. Light Fixture Manufacturer.

2.2 MANUFACTURED WIRING SYSTEMS A. Cable Assemblies: Factory assembled units with appropriate connector on each end, with lengths

and circuit configurations as required. B. Voltage: 120 or 277 volts. C. Switching Unit Assemblies: Cable assembly with 6 inch pigtail on one end. Provide cables

configured for 3-way and 4-way switches where required. D. Luminaire Connector Assemblies: Connector suitable for mounting in luminaire body knockout.

At Contractor’s option, provide connector factory mounted in luminaire. E. Accessories: Provide manufacturer's standard accessories, including cable extenders,

distribution tees, and switching assemblies. PART 3 - EXECUTION 3.1 INSTALLATION

A. Install Products in accordance with manufacturer's instructions. B. Support cable by means of straps and clamps independently of ceiling suspension system. C. Support cable minimum 24” above suspended ceiling to avoid contact with and interference with

removal of ceiling panels. D. Arrange cable to avoid interference with access to other work.

END 0F SECTION 26 05 20

Page 226: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GROUNDING AND BONDING 26 05 26-1

DIVISION 26 - ELECTRICAL SECTION 26 05 26 - GROUNDING AND BONDING

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Grounding electrodes and conductors. B. Equipment grounding conductors. C. Bonding.

1.2 REFERENCES A. NETA ATS - Acceptance Testing Specifications for Electrical Power Distribution Equipment and

Systems (International Electrical Testing Association). B. NFPA 70 - National Electrical Code.

1.3 GROUNDING SYSTEM DESCRIPTION A. Metal underground water pipe. B. Effectively grounded metal frame of the building. C. Rod electrode. D. Concrete encased electrode.

1.4 PERFORMANCE REQUIREMENTS A. Grounding System Resistance: 5 ohms maximum.

1.5 SUBMITTALS FOR REVIEW A. Division 01 – Submittals: Procedures for submittals. B. Product Data: Provide for grounding electrodes and connections.

1.6 SUBMITTALS FOR INFORMATION A. Division 01 - Submittals: Submittals for information. B. Test Reports: Indicate overall resistance to ground. C. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by

Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, and installation of Product.

1.7 SUBMITTALS FOR CLOSEOUT

A. Division 01 – Project Record and Closeout Documents: Procedures for submittals. B. Record actual locations of components and grounding electrodes.

1.8 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing the Products specified in this section with

minimum three years documented experience.

Page 227: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GROUNDING AND BONDING 26 05 26-2

1.9 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70. B. Products: Listed and classified by Underwriters Laboratories, Inc.

PART 2 - PRODUCTS 2.1 ROD ELECTRODES

A. Material: Copper-clad steel. B. Diameter: 3/4 inch. C. Length: 10 feet.

2.2 MECHANICAL CONNECTORS A. Manufacturers: Burndy or approved equal. B. Material: Bronze.

2.3 EXOTHERMIC CONNECTIONS A. Manufacturers: Cadweld or approved equal.

2.4 WIRE A. Material: Stranded copper. Unless noted otherwise, provide with green insulation. B. Size: As required by NEC.

2.5 GROUND BUSHING/LUG

A. Insulated metallic grounding bushings, tin-plated open-type lug dual rated for CU-AL conductors, thermoplastic liners rated 105 degree C, die cast zinc, to provide a smooth, well-rounded bearing surface for wires or cable at the end of threaded conduit or a conduit connector as required by the NEC.

2.6 ISOLATED GROUNDING CONDUCTORS

A. Green-colored insulation with continuous yellow stripe. On feeders with isolated ground, identify grounding conductor at both ends of conductors and at any boxes or splice locations with alternating bands of green and yellow tape. Provide at least three bands of green and two bands of yellow tape.

PART 3 - EXECUTION 3.1 EXAMINATION

A. Verify that final backfill and compaction has been completed before driving rod electrodes.

3.2 INSTALLATION

A. Install rod electrodes at exterior of building near service equipment. Install additional rod

electrodes as required to achieve specified resistance to ground.

Page 228: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

GROUNDING AND BONDING 26 05 26-3

B. Provide 3/0 AWG bare copper grounding electrode conductor and connect to reinforcing steel in foundation footing. Bond steel together using tie wires so there is a minimum of 40 feet of continuous bar to which to bond grounding electrode conductor.

C. Provide 3/0 AWG bare copper grounding electrode conductor and connect to metal cold water

pipe. Metal cold water pipe must be in continuous direct contact with the earth a minimum of 10 feet. Make connection a maximum of 5 feet from the point of entrance to the building.

D. Provide bonding to meet Regulatory Requirements. E. In addition to bonded equipment grounding conductors, provide isolated grounding conductors for

circuits shown on plans. Conductors shall be 12 AWG unless noted otherwise and one per circuit. F. Equipment Grounding Conductor: Provide separate, insulated conductor within each feeder and

branch circuit raceway. Terminate each end on suitable lug, bus, or bushing. G. Where multiple ground terminal strips are provided with new panels, run solid bare #8AWG

between all ground terminal strips.

3.3 FIELD QUALITY CONTROL A. Inspect and test in accordance with NETA ATS, except Section 4. B. Perform inspections and tests listed in NETA ATS, Section 7.13.

C. Maximum acceptable resistance to ground shall be 5 ohms.

END OF SECTION 26 05 26

Page 229: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SUPPORTING DEVICES 26 05 29-1

DIVISION 26 - ELECTRICAL SECTION 26 05 29 - SUPPORTING DEVICES

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Conduit and equipment supports. B. Anchors and fasteners.

1.2 REFERENCES A. NECA - National Electrical Contractors Association. B. ANSI/NFPA 70 - National Electrical Code.

1.3 SUBMITTALS A. Submit under provisions of Division 01 – Submittals. B. Product Data: Provide manufacturer's catalog data for fastening systems. C. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by

Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product.

1.4 REGULATORY REQUIREMENTS

A. Conform to requirements of ANSI/NFPA 70. B. Furnish products listed and classified by Underwriters Laboratories, Inc.

PART 2 - PRODUCTS 2.1 PRODUCT REQUIREMENTS

A. Materials and Finishes: Provide adequate corrosion resistance. B. Provide materials, sizes, and types of anchors, fasteners and supports to carry the loads of

equipment and conduit. Consider weight of wire in conduit when selecting products. C. Anchors and Fasteners: 1. Concrete Structural Elements: Use precast insert system or expansion anchors and

preset inserts. 2. Steel Structural Elements: Use beam clamps or welded fasteners. 3. Concrete Surfaces: Use self-drilling anchors and expansion anchors. 4. Hollow Masonry, Plaster, and Gypsum Board Partitions: Use toggle bolts and hollow wall

fasteners. 5. Solid Masonry Walls: Use expansion anchors and preset inserts. 6. Sheet Metal: Use sheet metal screws. 7. Wood Elements: Use wood screws.

2.2 STEEL CHANNEL A. Manufacturer: Unistrut (P1000 unless otherwise noted) or approved equal. B. Description: Galvanized or painted steel. (1-5/8” square.)

Page 230: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SUPPORTING DEVICES 26 05 29-2

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install products in accordance with manufacturer's instructions. B. Provide anchors, fasteners, and supports in accordance with NECA "Standard of Installation",

NFPA 70 and maximum distance between conduit support tables. C. Do not fasten supports to pipes, ducts, mechanical equipment, ceiling support wires, and conduit. D. Do not use spring steel clips and clamps. E. Do not use powder-actuated anchors. F. Do not drill or cut structural members. G. Fabricate supports from structural steel or steel channel. Rigidly weld members or use hexagon

head bolts to present neat appearance with adequate strength and rigidity. Use spring lock washers under all nuts.

H. Install surface-mounted cabinets and panelboards with minimum of four anchors. I. In wet and damp locations use steel channel supports to stand cabinets and panelboards one inch

off wall. J. Use sheet metal channel to bridge studs above and below cabinets and panelboards recessed in

hollow partitions.

END OF SECTION 26 05 29

Page 231: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONDUIT 26 05 33-1

DIVISION 26 - ELECTRICAL SECTION 26 05 33 - CONDUIT

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Metal conduit. B. Flexible metal conduit. C. Liquidtight flexible metal conduit. D. Electrical metallic tubing. E. Nonmetallic conduit. F. Flexible nonmetallic conduit. G. Fittings and conduit bodies.

1.2 RELATED SECTIONS

A. Section Division 01 – Roofing Penetrations. B. Section Division 01 – Firestopping.

C. Section 26 05 34 – Boxes.

D. Section 26 05 26 – Grounding and Bonding.

E. Section 26 05 29 – Supporting Devices.

F. Section 26 05 53 – Electrical Identification.

1.3 REFERENCES

A. Conduit and tubing shall meet the requirements of the latest editions of following standards: 1. ANSI C80.1 - Rigid Steel Conduit, Zinc Coated. 2. ANSI C80.3 - Electrical Metallic Tubing, Zinc Coated. 3. ANSI/NEMA FB 1 - Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit and Cable

Assemblies. 4. ANSI/NFPA 70 - National Electrical Code. 5. NECA "Standard of Installation." 6. NEMA RN 1 - Polyvinyl Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit

and Intermediate Metal Conduit. 7. NEMA TC 3 - PVC Fittings for Use with Rigid PVC Conduit and Tubing.

1.4 DESIGN REQUIREMENTS

A. Conduit Size: ANSI/NFPA 70. Limit conductor cross sectional area to no more than 40% of

conduit cross sectional area.

1.5 SUBMITTALS A. Submit under provisions of Division 01 – Submittals.

Page 232: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONDUIT 26 05 33-2

B. Product Data: Provide for metallic conduit, flexible metal conduit, liquid tight flexible metal conduit, metallic tubing, nonmetallic conduit, fittings, conduit bodies.

1.6 PROJECT RECORD DOCUMENTS

A. Submit under provisions of Division 01 – Project Record Documents. B. Accurately record actual routing of interior conduits larger than 2 inches on project record

documents and of all underground conduits regardless of size. For locations of underground conduits provide dimensions indicating locations and depth.

1.7 REGULATORY REQUIREMENTS

A. Conform to requirements of ANSI/NFPA 70. B. Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose

specified and shown.

1.8 DELIVERY, STORAGE, AND HANDLING A. Accept conduit on site. Inspect for damage. B. Protect conduit from corrosion and entrance of debris by storing above grade. Provide

appropriate covering. C. Protect PVC conduit from sunlight.

1.9 PROJECT CONDITIONS A. Verify that field measurements are as shown on Drawings. B. Verify routing and termination locations of conduit prior to rough-in. C. Conduit routing is shown schematically on Drawings unless dimensioned. Route as required to

complete wiring system.

PART 2 - PRODUCTS 2.1 CONDUIT REQUIREMENTS

A. Minimum Size: ¾” inch unless otherwise specified. B. Underground Installations: 1. More than Five Feet outside Foundation Wall: Use rigid steel conduit, intermediate metal

conduit, plastic coated rigid steel conduit or thickwall nonmetallic (Schedule 40 PVC) conduit.

2. Within Five Feet Inside Foundation Wall: Use rigid steel conduit, intermediate metal conduit, plastic coated rigid steel conduit or thickwall nonmetallic (Schedule 40 PVC) conduit.

3. Under Slab on Grade: Use rigid steel conduit, intermediate metal conduit, plastic coated rigid steel conduit or thickwall nonmetallic (Schedule 40 PVC) conduit.

C. Outdoor Locations, Above Grade: Use rigid steel or intermediate metal conduit. D. Wet and Damp Interior Locations Above Floor Slab: Use rigid steel conduit, intermediate metal

conduit or electrical metallic tubing. Use wet and/or damp location fittings. E. Dry Interior Locations Above Floor Slab (Including Hollow Stud Partitions):

Page 233: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONDUIT 26 05 33-3

1. Concealed: Use rigid steel, intermediate metal conduit or electrical metallic tubing. 2. Exposed: Use rigid steel, intermediate metal conduit or electrical metallic tubing.

2.2 METAL CONDUIT

A. Rigid Steel Conduit: ANSI C80.1. B. Intermediate Metal Conduit (IMC): Rigid steel. C. Fittings and Conduit Bodies: ANSI/NEMA FB 1; material to match conduit, threaded connections.

2.3 PVC COATED METAL CONDUIT A. Description: NEMA RN 1; rigid steel conduit with external PVC coating, 40 mil thick. B. Fittings and Conduit Bodies: ANSI/NEMA FB 1; steel fittings with external PVC coating to match

conduit. 2.4 FLEXIBLE METAL CONDUIT

A. Description: Interlocked steel construction. B. Fittings: ANSI/NEMA FB 1.

2.5 LIQUIDTIGHT FLEXIBLE METAL CONDUIT A. Description: Interlocked steel construction with PVC jacket. B. Fittings: ANSI/NEMA FB 1.

2.6 ELECTRICAL METALLIC TUBING (EMT) A. Description: ANSI C80.3; galvanized tubing. B. Fittings and Conduit Bodies: ANSI/NEMA FB 1; steel compression type or set screw type.

2.7 NONMETALLIC CONDUIT A. Description: NEMA TC 2; Schedule 40 PVC. B. Fittings and Conduit Bodies: NEMA TC 3.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install conduit in accordance with NECA "Standard of Installation” and NFPA 70. B. Install nonmetallic conduit in accordance with manufacturer's instructions and NFPA 70. C. Provide supports as required by NEC maximum distance between conduit support tables. Arrange

supports to prevent misalignment during wiring installation. D. Support conduit using coated steel or malleable iron straps, lay-in adjustable hangers, clevis

hangers, and split hangers. Where possible, support conduits in ceiling cavity space at the level of structural roof joists.

E. Group related conduits; support using conduit rack. Construct rack using steel channel; provide

space on each rack for 25 percent additional conduits.

Page 234: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONDUIT 26 05 33-4

F. Fasten conduit supports to building structure and surfaces under provisions of Section 16190.

DO NOT SUPPORT CONDUITS DIRECTLY FROM ROOF DECK. G. Do not support conduit with wire or perforated pipe straps. Remove wire used for temporary

supports. H. Do not attach conduit to ceiling support wires. Fasten individual conduits to roof joists. I. Arrange conduit to maintain headroom and present neat appearance. J. Route exposed conduit parallel and perpendicular to walls. K. Route conduit installed above accessible ceilings parallel and perpendicular to walls. L. Route conduit under slab directly from point-to-point where possible. Avoid conduit crossovers

where possible. M. Do not install conduit in floor slab on grade or floor slab above grade. Run conduits 1-1/2” and

below on grade at bottom of gravel sub-base. Conduits larger than 1-1/2” shall be trenched in below grade so top of conduit is at top of grade.

N. Maintain minimum 6-inch clearance between conduit and piping. O. Maintain 12 inch clearance between conduit and surfaces with temperatures exceeding 104

degrees F. P. Cut conduit square using saw or pipe cutter; de-burr cut ends before joining. Q. Bring conduit to shoulder of fittings; fasten securely. R. Join nonmetallic conduit using cement as recommended by manufacturer. Wipe nonmetallic

conduit dry and clean before joining. Apply full even coat of cement to entire area inserted in fitting. Allow joint to cure for 10 minutes, minimum. Use only an approved hotbox bender to make bends in nonmetallic conduit.

S. Use conduit hubs or sealing locknuts to fasten conduit to sheet metal boxes in damp and wet

locations and to cast boxes. T. Install no more than equivalent of three 90-degree bends between boxes (no more than two 90-

degree bends for conduits containing telephone cables, fire alarm cables, intrusions system cables, local area network (LAN) cables, etc.). Use conduit bodies to make sharp changes in direction, as around beams. Use hydraulic one-shot bender to fabricate factory elbows for bends in metal conduit larger than 2 inch size.

U. Avoid moisture traps; provide junction box with drain fitting at low points in conduit system. V. Provide expansion/deflection couplings to accommodate expansion and deflection where conduit

crosses seismic joints or expansion joints. Such couplings shall have braided copper bonding jumpers.

W. Provide suitable pull string in each empty conduit except sleeves less than 20 feet long and

nipples. X. Use suitable caps to protect installed conduit against entrance of dirt and moisture. Y. Ground and bond conduit under provisions of Section 26 05 26. Z. Identify conduit under provisions of Section 26 05 53.

Page 235: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONDUIT 26 05 33-5

AA. Where conduits for telephone cables, cash register cables, etc. are stubbed from wall boxes or cabinets to above accessible ceilings, turn conduits out of wall approximately 12 inches above accessible ceiling. Coordinate location with other trades. Provide bushing on end of conduit to prevent signal cable contact with sharp metal. Provide tag on end of conduit indicating type and location of utilization outlet (example: TELEPHONE - BREAK ROOM).

BB. In interior locations, turn nonmetallic conduits through floor slab using rigid steel elbows.

Continue raceway above floor slab using metallic conduit. CC. Where conduits turn up into switchboard, padmount transformer or large utilization equipment,

provide grounding bushings on ends of conduits, and bond to equipment grounding terminal strip or lugs using bonding jumper sized according to NFPA 70.

DD. Where conduits enter boxes and cabinets, provide bushings with plastic insulated throat for

conduits 1 inch and larger. EE. Seismic Bracing: provide seismic bracing for suspended conduits 2” or larger and trapeze

hangers at interval of 20 feet or less. Bracing shall consists of 1-5/8" square channel both parallel and perpendicular to conduit, and fastened to roof joist at 45 degree angle relative to vertical.

FF. AC and MC cable shall not be acceptable for use on this project. Except as specified in Section 26

05 20.

GG. Paint exposed conduit to match adjacent surface.

3.2 INTERFACE WITH OTHER PRODUCTS A. Install conduit to preserve fire resistance rating of partitions and other elements, using materials

and methods under the provisions of Division 01. B. Route conduit through roof openings for piping and ductwork or through suitable roof jack with

pitch pocket. Coordinate location with roofing installation.

END OF SECTION 26 05 33

Page 236: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BOXES 26 05 34-1

DIVISIION 26 - ELECTRICAL SECTION 26 05 34 - BOXES

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Wall and ceiling outlet boxes. B. Pull and junction boxes.

1.2 REFERENCES A. NECA - Standard of Installation. B. NEMA FB 1 - Fittings and Supports for Conduit and Cable Assemblies. C. NEMA OS 1 - Sheet-steel Outlet Boxes, Device Boxes, Covers, and Box Supports. D. NEMA OS 2 - Nonmetallic Outlet Boxes, Device Boxes, Covers and Box Supports. C. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum). D. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS

A. Submittals under provisions of Division 01 – Submittals. B. Product Data: Provide dimensions, materials, and accessories.

1.4 SUBMITTALS FOR CLOSEOUT

A. Division 01 – Project Record and Closeout Documents. B. Record actual locations and mounting heights of outlet, pull, and junction boxes on project record

documents.

1.5 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70. B. Provide Products listed and classified by Underwriters Laboratories, Inc., as suitable for the

purpose specified and indicated. PART 2 - PRODUCTS 2.1 OUTLET BOXES

A. Sheet Metal Outlet Boxes: NEMA OS 1, galvanized steel. 1. Luminaire and Equipment Supporting Boxes: Rated for weight of equipment supported;

include male fixture studs where required. 2. Concrete Ceiling Boxes: Concrete type. B. Cast Boxes: NEMA FB 1, Type FD, cast feralloy. Provide gasketed cover by box manufacturer.

Provide threaded hubs. C. Wall Plates for Finished Areas: As specified in Section 16141.

Page 237: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BOXES 26 05 34-2

D. Weatherproof exterior boxes to house receptacles: Receptacle shall be installed flush with wall. The cast aluminum receptacle cover shall have ports to allow two 3/8” diameter cords to pass through and must not protrude over 4-½” from wall surface. Enclosure must have gasket between enclosure and mounting surface to assure that the enclosure is weathertight in use per NEC 410-57b. Hubbell #WP700 or equal.

2.2 PULL AND JUNCTION BOXES

A. Sheet Metal Boxes: NEMA OS 1, galvanized steel. B. Hinged Enclosures: As specified in Section 16160. C. Surface Mounted Cast Metal Box: NEMA 250, Type 6; flat-flanged, surface mounted junction box: 1. Material: Galvanized cast iron. 2. Cover: Furnish with ground flange, neoprene gasket, and stainless steel cover screws. D. In-Ground Box: NEMA 250, Type 6, inside flanged, recessed cover box for flush mounting: 1. Material: Polymer concrete. 2. Cover: Nonskid cover with neoprene gasket and stainless steel cover screws. 3. Cover Legend: "ELECTRIC" or “TELEPHONE” as appropriate.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install boxes in accordance with NECA "Standard of Installation." D. Install in locations as shown on Drawings, and as required for splices, taps, wire pulling,

equipment connections and compliance with regulatory requirements. E. Set wall mounted boxes at elevations to accommodate mounting heights indicated. F. Electrical boxes are shown on Drawings in approximate locations unless dimensioned. Adjust

box location up to 10 feet if required to accommodate intended purpose. G. Orient boxes to accommodate wiring devices as specified in Section 26 27 26. H. Maintain headroom and present neat mechanical appearance. I. Install pull boxes and junction boxes above accessible ceilings and in unfinished areas only. J. Inaccessible Ceiling Areas: Install outlet and junction boxes no more than 6 inches from ceiling

access panel or from removable recessed luminaire. K. Install boxes to preserve fire resistance rating of partitions and other elements. L. Coordinate mounting heights and locations of outlets mounted above counters, benches, and

backsplashes. M. Locate outlet boxes to allow luminaires positioned as shown on reflected ceiling plan. N. Unless otherwise indicated on plans, align adjacent wall mounted outlet boxes for switches,

manual starters, interval timers, thermostats, and similar devices. Align wall mounted boxes for receptacles, telephone jacks, local area network outlets, and the like. Where such devices are shown in close proximity on plans, locate adjacent outlets with no more than 4 inch space between adjacent boxes.

O. Use flush mounting outlet boxes in all areas except mechanical rooms and electrical closets.

Page 238: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

BOXES 26 05 34-3

P. Unless otherwise indicated on plans, locate flush mounting boxes in masonry wall to require

cutting of masonry unit corner only. Coordinate masonry cutting to achieve neat opening. Q. Do not install flush mounting boxes back-to-back in walls; provide minimum 6 inches separation. R. Secure flush mounting box to interior wall and partition studs. Accurately position to allow for

surface finish thickness. After finished wall material is applied, provide box extensions for all boxes with setback more than 1/8 inch.

S. Use stamped steel bridges to fasten flush mounting outlet box between studs. T. Install flush mounting box without damaging wall insulation or reducing its effectiveness. U. Use adjustable steel channel fasteners for hung ceiling outlet box. V. DO NOT FASTEN BOXES TO CEILING SUPPORT WIRES OR DIRECTLY TO ROOF DECK. W. Support boxes independently of conduit. X. Use gang box where more than one device is mounted together. Do not use sectional box.

Provide metal barrier plates between gangs to separate line voltage from low voltage systems and where voltage between adjacent light switches exceeds 300 volts.

Y. Use 4” square box with plaster ring for single device outlets. Z. Use cast outlet box in exterior locations exposed to the weather and wet locations. Provide vapor

seals at conduit entrances to these boxes. Use U.L. listed sealing compound. AA. Large Pull Boxes: Use hinged enclosure in interior dry locations, surface-mounted cast metal box

in other locations. Z. Provide pull boxes in feeder circuits as required but at least every 150 feet in straight runs. AA. Identify all junction boxes by panel and circuit number on outside cover with legible permanent ink

marker on outside face of cover.

3.2 INTERFACE WITH OTHER PRODUCTS A. Coordinate installation of outlet box for equipment connected to allow accessibility of box and

proper operation of equipment.

3.3 ADJUSTING A. Adjust flush-mounting outlets to make front flush with finished wall material. B. Install knockout closures in unused box openings.

3.4 CLEANING A. Division 01 – Cleaning: Clean installed work. B. Clean interior of boxes to remove dust, debris, and other material. C. Clean exposed surfaces and restore finish. D. Check boxes for the presence of drywall screws, concrete residue, and other sharp objects.

Remove all sharp objects.

END OF SECTION 26 05 34

Page 239: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CABINETS AND ENCLOSURES 26 05 35-1

DIVISION 26 - ELECTRICAL SECTION 26 05 35 - CABINETS AND ENCLOSURES

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Hinged cover enclosures. B. Cabinets. C. Terminal blocks. D. Accessories.

1.2 REFERENCES A. NECA Standard of Installation (National Electrical Contractors Association). B. NEMA 250 - Enclosures for Electrical Equipment (1000 Volts Maximum). C. NEMA ICS 4 - Terminal Blocks for Industrial Control Equipment and Systems. D. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS FOR REVIEW A. Division 01 – Submittals: Procedures for submittals. B. Product Data: Provide manufacturer's standard data for enclosures and cabinets.

1.4 SUBMITTALS FOR INFORMATION A. Division 01 – Submittals: Submittals for information. B. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by

Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, and installation of Product.

1.5 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70. B. Products: Listed and classified by Underwriters Laboratories, Inc.

1.6 MAINTENANCE MATERIALS A. Division 01 – Project Record and Closeout Documents. B. Furnish two of each key. Cabinets and enclosures shall be keyed to same key as panel boards.

PART 2 - PRODUCTS 2.1 MANUFACTURERS

A. Hoffman B. Square D

Page 240: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CABINETS AND ENCLOSURES 26 05 35-2

C. General Electric

2.2 HINGED COVER ENCLOSURES A. Construction: NEMA 250, Type 1 inside, or 3R where exposed to weather or moisture, steel

enclosure. B. Covers: Continuous hinge, held closed by flush latch operable by key. Covers in damp and wet

locations shall have continuous gasket. C. Provide removable interior metal panel for mounting terminal blocks and electrical components;

finish with white enamel. Provide standoff devices for separation of equipment mounting panel from enclosure.

D. Enclosure Finish: Manufacturer's standard enamel.

2.3 CABINETS A. Boxes: Galvanized steel. B. Backboard: Provide white enamel finished metal backboard for mounting terminal blocks or other

devices. C. Fronts: Steel, Flush type with door with concealed hinge, and flush lock keyed to match branch

circuit panelboard. Finish with gray baked enamel. D. Provide metal barriers to form separate compartments wiring of different systems and voltages. E. Provide accessory feet for free-standing equipment.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install in accordance with NECA "Standard of Installation” and NFPA 70. B. Install enclosures and boxes plumb. Anchor securely to wall and structural supports at each

corner under the provisions of Section 26 05 29. C. Install cabinet fronts plumb.

3.2 CLEANING A. Division 01 – Cleaning: Clean installed work. B. Clean electrical parts to remove conductive and harmful materials. C. Remove dirt and debris from enclosure. D. Clean finishes and touch up damage.

END OF SECTION 26 05 35

Page 241: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DUCT BANK 26 05 43-1

DIVISION 26 - ELECTRICAL SECTION 26 05 43 - DUCT BANK

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Metal conduit.

B. Duct. C. Precast concrete manholes. D. Precast concrete handholes.

1.2 RELATED SECTIONS

A. Division 31 - Excavation.

B. Division 31 - Backfilling.

C. Division 03 - Concrete Formwork.

D. Division 03 - Concrete Reinforcement.

E. Division 03 - Cast-In-Place Concrete.

F. Division 22 - Plumbing. 1.3 REFERENCES

A. ANSI C80.1 - Rigid Steel Conduit, Zinc-Coated.

B. ASTM A48 - Gray Iron Castings.

C. ASTM C857 - Minimum Structural Design Loading for Underground Precast Concrete Utility Structures.

D ASTM C858 - Underground Precast Concrete Utility Structures.

E. ASTM C891 - Installation of Underground Precast Utility Structures. F. ASTM C1037 - Inspection of Underground Precast Utility Structures.

G. IEEE C2 - National Electrical Safety Code.

H. NEMA FB 1 - Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit and Cable Assemblies.

I. NEMA TC 2 - Electrical Plastic Tubing (EPT) and Conduit (EPC-40 and EPC-80).

J. NEMA TC 3 - PVC Fittings for Use with Rigid PVC Conduit and Tubing.

K. NEMA TC 6 - PVC and ABS Plastic Utilities Duct for Underground Installation.

L. NEMA TC 9 - Fittings for ABS and PVC Plastic Utilities Duct for Underground Installation.

M. NEMA TC 10 - PVC and ABS Plastic Communications Duct and Fittings for Underground

Installation.

Page 242: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DUCT BANK 26 05 43-2

N. NEMA TC 14 - Filament-Wound Reinforced Thermosetting Resin Conduit and Fittings.

O. NFPA 70 - National Electrical Code.

P. UL 651A - Type EB and A PVC Conduit and HDPE Conduit. 1.4 SUBMITTALS FOR REVIEW

A. Division 01 - Submittals: Procedures for submittals.

B. Product Data: Provide for metallic conduit, nonmetallic conduit, and warning tape.

C. Shop Drawings: Indicate dimensions, reinforcement, size and locations of opening and accessory locations for precast manholes and handholes.

1.5 SUBMITTALS FOR INFORMATION

A. Division 01 - Submittals: Submittals for information.

B. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, and installation of Product.

1.6 SUBMITTALS FOR CLOSEOUT

A. Division 01 - Project Closeout.

B. Project Record Documents: Record actual routing and elevations of underground conduit and duct. 1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.

1.8 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70 and IEEE C2.

B. Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for the purpose specified and indicated.

1.9 FIELD MEASUREMENTS

A. Verify that field measurements are as indicated.

B. Verify routing and termination locations of duct bank prior to excavation for rough-in.

C. Duct bank routing is shown in approximate locations unless dimensions are indicated. Route as required to complete duct system.

D. Verify locations of manholes and handholes prior to excavating for installation.

E. Manhole and handhole locations are shown in approximate locations unless dimensions are

indicated. Locate as required to complete ductbank system. PART 2 - PRODUCTS

Page 243: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DUCT BANK 26 05 43-3

2.1 RIGID STEEL CONDUIT

A. Rigid Steel Conduit: ANSI C80.1.

B. Fittings: NEMA FB 1, steel. 2.2 PLASTIC CONDUIT

A. Rigid Plastic Conduit: NEMA TC 2, Schedule 40 PVC, with fittings and conduit bodies to NEMA TC 3.

2.3 PLASTIC DUCT

A. Plastic Utilities Duct: NEMA TC 6; PVC.

B. Plastic Utility Duct Fittings: NEMA TC 9.

C. Plastic Communications Duct and Fittings: NEMA TC 6; PVC. 2.4 POLYMER CONCRETE HANDHOLE

A. 17” x 30” open bottom with 12” gravel base. Hubbell #PT1730BA18 or equal. B. 8000LB cover with two hex head bolts. Provide “Electric” or “Communication” label as required.

2.5 ACCESSORIES

A. Underground Warning Tape: 4 inch wide plastic tape, detectable type, colored as noted below and suitable warning legend describing buried utility lines per A.P.W.A.

1. Red – Caution Buried Electric Line Below. 2. Purple – Caution Buried Reclaimed Water Line Below. 3. Orange – Caution Buried Telephone Line Below.

PART 3 - EXECUTION 3.1 DUCT BANK INSTALLATION

A. Install all duct to locate top of ductbank minimum 36 inches below finished grade.

B. Install duct with minimum slope of 4 inches per 100 feet (0.33 percent). Slope duct away from building entrances.

C. Cut duct square using saw or pipe cutter; de-burr cut ends.

D. Insert duct to shoulder of fittings; fasten securely.

E. Join nonmetallic duct using adhesive as recommended by manufacturer.

F. Wipe nonmetallic duct dry and clean before joining. Apply full even coat of adhesive to entire area inserted in fitting. Allow joint to cure for 20 minutes, minimum.

G. Install no more than equivalent of three 90-degree bends between pull points.

H. Provide suitable fittings to accommodate expansion and deflection where required.

I. Stagger duct joints vertically in concrete encasement 6 inches minimum.

J. Use suitable separators and chairs installed not greater than 4 feet on centers.

Page 244: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DUCT BANK 26 05 43-4

K. Band ducts together before backfilling or placing concrete.

L. Securely anchor duct to prevent movement during concrete placement.

M. Place concrete under provisions of Division 03. Use mineral pigment to color concrete red for power. Orange for communications.

N. Provide minimum 3-inch concrete cover at bottom, top, and sides of secondary ductbank.

O. Provide suitable nylon pull string in each empty duct except sleeves and nipples.

P. Swab duct. Use suitable caps to protect installed duct against entrance of dirt and moisture.

Q. Backfill trenches under provisions of Division 31.

R. Interface installation of underground warning tape with backfilling specified in Division 31. Install tape 6 inches below finished surface.

S. Terminate duct at manhole entries using bell end.

T. Provide reinforcing per raceway details.

U. Connect to manhole wall using dowels.

V. Connect to existing concrete encasements using dowels.

W. Accomplished changes in direction of runs exceeding a total of 10 degrees, either vertically or horizontally, by long sweeping bends having a minimum radius of 7.62 m (25ft.). Long sweeps may be made up of one or more curved or straight sections and/or combinations thereof. Bends made manually will not reduce the internal diameter of the conduit. There will be no more than the equivalent of two 90 degree bend (180) degrees total between pull points, including offset and kicks with a curvature radius of less than 30 m (100 ft.). Back-to back 90 degree bends will be avoided.

X. Where the radius is less than 12m (40ft.), 4.6m (15ft.) radius-manufactured bends must be used. If possible, the entire change in direction should be made with a single arc of 4.6m (15ft.) radius. Manufactured bends may be used on subsidiary/lateral conduits at the riser pole or building entrance. Manufactured bend will have a minimum radius of 10 times the internal diameter of the conduit in accordance with NEC Chapter 9 and ANSI/TIA/SIA-758.

Y. Bends and sweeps will be concrete-encased to protect the duct from the pressures developed while pulling cables. Where a duct enters a building and sweeps up through a floor slab, galvanized RSC will be used. For ducts transitioning from the lower duct window of a maintenance hole to the nominal trench depth, the transition will be accomplished in no less than 9.1m (30 linear ft) from the maintenance hole in order to reduce the radius of the bends. The duct should be concrete-encased in the transition area.

3.2 PRE-CAST HANDHOLE INSTALLATION

A. Division 01: Manufacturer’s instructions. B. Excavate for handhole installation under the provisions of Division 31.

C. Install and seal in accordance with ASTM C891.

D. Install handholes plumb.

E. Coordinate with final grading to bring handhole cover to finished elevation.

F. Backfill handhole excavation under the provisions of Division 31.

END OF SECTION 26 05 43

Page 245: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL IDENTIFICATION 26 05 53-1

DIVISION 16 - ELECTRICAL Section 26 05 53 – Electrical Identification

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Nameplates. B. Wire and cable markers. C. Conduit markers.

1.2 REFERENCES A. ANSI/NFPA 70 - National Electrical Code.

1.3 SUBMITTALS A. Submit under provisions of Division 01 – Submittals. B. Product Data: Provide catalog data for nameplates, labels, and markers. C. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by

Product testing agency specified under regulatory requirements. Include instructions for storage, handling, protection, examination, preparation and installation of Product.

1.4 REGULATORY REQUIREMENTS

A. Conform to requirements of ANSI/NFPA 70. B. Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose

specified and shown. PART 2 - PRODUCTS 2.1 NAMEPLATES

A. Nameplates: Engraved three-layer laminated plastic, white letters on black background. Screw

on type with two self tapping screws. Mastic type nameplates not allowed. B. Locations: 1. Main disconnect switch. 2. Each lighting and appliance panelboard. 3. Each breaker in distribution panel. 4. Each safety switch. 5. Each automatic motor starter. Indicate correct fuse size for combination starters and

drives. 6. Relays and contactors. Indicate loads controlled. 7. Time switches. Indicate load controlled. 8. Fire alarm and mass notification equipment cabinets. Label to match plans. 9. Where more than two switches are located adjacent to each other or where switches

control loads not in same space. 10. Where noted on plans. C. Letter Size: 1. Use 1/8 inch letters for identifying individual equipment and loads such as safety switches,

motor starters, and relays.

Page 246: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL IDENTIFICATION 26 05 53-2

2. Use 1/4 inch letters for identifying grouped equipment and loads such as panelboards, switchboards, and motor control centers.

2.2 WIRE MARKERS

A. Description: Cloth, tape, split sleeve, or tubing type wire markers. B. Locations: Each conductor at distribution equipment panelboard gutters, pull boxes, outlet and

junction boxes, and each load connection. C. Legend: 1. Power and Lighting Circuits: Branch circuit or feeder circuit number. 2. Control Circuits: Control wire number corresponding to applicable control schematics.

2.3 CONDUIT MARKERS A. Location: Conduit couplings and junction box covers shall be painted to indicate system that

conduit serves. B. Color: 1. 208 Volt System: Natural conduit. 2. Fire Alarm System: Red. 3. Comm/Data: Blue

2.4 UNDERGROUND WARNING TAPE

A. Description: 6 inch wide plastic tape, detectable type, A.P.W.A. colored tape with suitable warning legend describing buried electrical lines. Detection shall be by means of continuous integral metal conductor factory installed in warning tape. 1. Red – “Caution Buried Electric Line Below.” 2. Orange – “Caution Buried Telephone Line Below.”

2.5 COVER PLATES

A. Provide ½” black on clear adhesive label tape on each device coverplate centered between top of the coverplate and the device. Label shall indicate panel and branch circuit number (example LA-1). This label will be in addition to any labeling required to indicate loads controlled when multiple light switches are grouped together.

PART 3 - EXECUTION 3.1 PREPARATION

A. Degrease and clean surfaces to receive nameplates.

3.2 APPLICATION A. Install nameplate parallel to equipment lines. B. Secure nameplate to equipment front using screws. C. Identify conduit using field painting under provisions of Section 09910. D. Field paint colored couplings on each conduit longer than 6 feet and conduit stubs. E. Color:

Page 247: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL IDENTIFICATION 26 05 53-3

1. 208 Volt System: Natural conduit. 2. Fire Alarm System: Red. 3. Comm/Data: Blue F. Identify underground conduits using underground warning tape. Install one tape per trench at 12

inches above conduits or duct bank.

END OF SECTION 26 05 53

Page 248: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRIC CONTROLS 26 09 23-1

DIVISION 26 - ELECTRICAL SECTION 26 09 23 - ELECTRIC CONTROLS

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Time switches. 1.2 RELATED SECTIONS

A. Section 26 05 35 - Enclosures: Cabinets and terminal blocks.

B. Section 26 09 24 - Enclosed Contactors. 1.3 REFERENCES

A. NEMA ICS 1 - General Standards for Industrial Control Systems.

B. NEMA ICS 2 - Standards for Industrial Control Devices, Controllers and Assemblies.

C. NEMA ICS 6 - Enclosures for Industrial Controls and Systems.

D. NFPA 70 - National Electrical Code. 1.4 SUBMITTALS

A. Submit under provisions of Division 01.

B. Product Data: Provide for each component showing electrical characteristics and connection requirements.

C. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by Product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product.

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.

1.6 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70.

B. Furnish Products listed and classified by Underwriters Laboratories, Inc. PART 2 - PRODUCTS 2.1 TIME SWITCHES

A. Time switches shall be programmable, astronomic, seven day plus 365 day solid state electronic type, capable of independent programming of two (2) independent channels, with programmable automatic daylight savings time adjustment, and shall be housed in a lockable, non-metallic, surface mount case.

B. Switches shall be capable of fully independent 7 day scheduling, with minimum of 3 ON and 3 Off times per

channel per day, plus a special 365 holiday schedule, assigned by month and day.

Page 249: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRIC CONTROLS 26 09 23-2

C. They shall be capable of independent duty cycling during the scheduled ON time, with up to 3 patterns per channel per day and built-in 5 minute short cycle protection.

D. They shall have independent timed override for each channel for manual control and be programmable

independently per channel per day, from 1 minute to 23 hours and 59 minutes.

E. Switches shall have brown-out protection and automatic 4 second load staggering when channels are programmed to be ON at the same time or after power outages and shall be equipped with a rechargeable carry-over system for up to 14 hours of carry-over. Switches shall perform a self-test every 60 seconds to assure a fail-safe operation.

F. Time switches shall be powered by a 120VAC, 60HZ source. Contact configuration to be N.O. (N.C.) For

each channel, with a rating of 15 amperes ballast, 120/240/277VAC. Contact closure on time switch shall be momentary for pilot control of mechanically held contactors and relays.

G. Manufacturers for time switches:

1. Time Switch: Tork #DZM200BP-0 with USB-MMP option and software.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install equipment according to manufacturer’s written instructions.

B. Train and lace wiring in cabinets.

C. Program time switches according to instructions from Contracting Officer.

D. Label each time switch with engraved nameplate.

E. Label each time switch load contact indicating contactors controlled by each load contact.

F. Provide two hours training of AAFES personnel in programming operations. G. Provide programming module and PC based software for programming of time switch. Turn module program

and software instructions over to AAFES at completion of project. Obtain hand receipt and include with O & M manuals.

END OF SECTION 26 09 23

Page 250: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED CONTACTORS 26 09 24-1

DIVISION 26 - ELECTRICAL SECTION 26 09 24 - ENCLOSED CONTACTORS

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. General purpose contactors. B. Lighting contactors.

1.2 REFERENCES A. NEMA ICS 6 - Enclosures for Industrial Controls and Systems. B. NEMA ICS 2 - Industrial Control Devices, Controllers, and Assemblies. C. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS FOR REVIEW A. Division 01 – Submittals: Procedures for submittals. B. Product Data: Provide dimensions, size, voltage ratings and current ratings.

1.4 SUBMITTALS FOR INFORMATION

A. Division 01 - Submittals: Submittals for information. B. Submit manufacturer's installation instructions.

1.5 PROJECT CLOSEOUT SUBMITTALS A. Division 01 – Phase Turnover and Contract Closeout. B. Record actual locations of each contactor and indicate circuits controlled on project record

documents. C. Maintenance Data: Include instructions for replacing and maintaining coil and contacts.

1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing the Products specified in this section with

minimum three years documented experience.

1.7 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70. B. Provide Products listed and classified by Underwriters Laboratories, Inc., as suitable for the

purpose specified and indicated.

PART 2 - PRODUCTS 2.1 GENERAL PURPOSE CONTACTORS

A. Manufacturers:

Page 251: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED CONTACTORS 26 09 24-2

1. General Electric. 2. Siemens. 1. Square D. 4. ASCO. 5. Allen-Bradley. 6. Cutler Hammer. B. Description: NEMA ICS 2, AC general purpose magnetic contactor. C. Coil Voltage: 277 volts, 60 Hertz or as indicated. Separate latching and unlatching coils with coil

clearing contacts in series with each coil to ensure only momentary contact. D. Poles: As scheduled or indicated. E. Size: As scheduled or indicated. F. Enclosure: ANSI/NEMA ICS 6, Type as required to meet conditions of installation. G. Surface mount in janitor, mechanical and electrical spaces. Surface mount above panels where

panel is surface mounted. Flush mount above flush mounted panel or surface mount above accessible ceiling.

H. Label per Section 26 05 53.

2. 2 LIGHTING CONTACTORS A. Manufacturers: 1. General Electric. 2. Siemens. 3. Square D. 4. Asco. 5. Allen-Bradley. 6. Cutler Hammer. B. Description: NEMA ICS 2, magnetic lighting contactor. C. Configuration: Mechanically held, 3 wire control. D. Coils: 120 volts, 60 Hertz. Separate latching and unlatching coils with clearing contacts in series

with each coil to ensure only momentary energization of coils. E. Poles: As scheduled or indicated. F. Contact Rating: As scheduled or indicated. Match branch circuit overcurrent protection,

considering derating for continuous loads. G. Enclosure: ANSI/NEMA ICS 6, Type as required to meet conditions of installation. H. Accessories: 1. Auxiliary Contacts: Two field convertible. I. Label per Section 26 05 53.

PART 3 - EXECUTION 3.1 INSTALLATION

Page 252: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED CONTACTORS 26 09 24-3

A. Mount contactors true and plumb according to manufacturer’s written instructions. B. Ensure proper operation by several open/close operations of the load contacts.

3.2 CLEANING

A. Division 01 – Cleaning: Cleaning installed work. B. Touch up scratched or marred surfaces to match original finish. C. Clean dust and debris from interior and exterior of contactors.

3.3 LABELLING

A. Provide engraved nameplate per 26 05 53. Nameplate shall indicate contactor designation and branch circuits controlled. Example: “CONTACTOR CA-1” on first line; “CKTS SL 1, 5, 9” on second line.

END OF SECTION 26 09 24

Page 253: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

OCCUPANCY SENSORS 26 09 25-1

DIVISION 26 - ELECTRICAL SECTION 26 09 25 - OCCUPANCY SENSORS

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Occupancy sensors for lighting control. 1.2 RELATED SECTIONS

A. Section 26 05 19 - Building Wire and Cable.

B. Section 26 05 33 - Conduit.

C. Section 26 05 34 - Boxes. 1.3 REFERENCES

A. NFPA 70 - National Electrical Code. 1.4 SUBMITTALS

A. In accordance with Division 01 – Submittals, provide:

1. Product Data: Provide electrical ratings, adjustment ranges, enclosure type, outline dimensions, mounting dimensions, and terminal connection information.

2. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by Product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product.

3. CAD generated lighting plans for each building marked by occupancy sensor manufacturer showing proper product, location, and orientation of each sensor.

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.

1.6 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70. B. Provide Products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose

specified and indicated. PART 2 - PRODUCTS 2.1 SENSORS

A. Ceiling mounted dual technology sensors shall employ both passive infrared and ultrasonic detection methods. Sensors shall have a multiple segmented lens and provide coverage for up to a 40' x 40' room.

B. Wall mounted combination dual technology sensor with integral light switch shall employ both passive

infrared and ultrasonic detection methods. Sensors shall have a multi-segmented lens and provide coverage for the room they serve.

C. All sensors shall be capable of operating normally with any electronic ballasts and compact fluorescent

lamp systems.

Page 254: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

OCCUPANCY SENSORS 26 09 25-2

D. Coverage of sensors shall remain constant after sensitivity control has been set. No automatic reduction shall occur in coverage due to the cycling of air conditioner or heating fans.

E. All sensors shall have readily accessible, user adjustable controls for time delay (0 - 15 minutes) and

sensitivity.

F. In the event of failure, a bypass manual “override on” shall be provided on each sensor. When bypass is utilized, control shall divert to a wall switch until sensor is replaced.

G. All sensors shall provide a method of indication to verify that motion is being detected during testing and

that the unit is working.

H. All sensors shall have no leakage current to load, in manual or in Auto/Off mode, for safety purposes and shall have voltage drop protection.

2.2 CIRCUIT CONTROL HARDWARE - CU

A. Control unit(s) shall mount through a 2" knock-out on a standard electrical enclosure and be an integrated, self-contained unit consisting internally of an isolated load switching control relay and a transformer to provide low-voltage power. Transformer shall provide power to a maximum of four (4) sensors and shall power to a larger number of sensors where indicated on plans.

B. Relay contacts shall have ratings of:

1. 20A - 277 VAC Ballast. 2. Where noted on plans, provide relays with two (2) load contacts.

C. Control wiring between sensors and controls units shall be Class II, 18-24 AWG, stranded UL Classified,

jacketed cable. Cable shall be plenum rated. 2.3 MANUFACTURERS

A. Leviton.

B. Wattstopper. C. Hubble. PART 3 - EXECUTION 3.1 INSTALLATION

A. Locate and aim sensors in the correct location required for complete coverage. Rooms shall have ninety (90) to one hundred (100) percent coverage. The locations and quantities of sensors shown on the drawings are diagrammatic and indicate only the rooms which are to be provided with sensors. Provide additional sensors if required to properly and completely cover the respective room.

B. Meet with the manufacturer’s factory authorized representative, at the jobsite, to verify

placement of sensors and installation criteria prior to beginning work.

C. Locate sensors to ensure the best possible coverage in the available space and to overcome local difficulties due to space limitations or interference of structural components. Provide training necessary to familiarize Owner’s key personnel with the operation, use, adjustment, and problem solving diagnosis of the occupancy sensing devices and systems.

END OF SECTION 26 09 25

Page 255: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PAD MOUNTED DISTRIBUTION TRANSFORMERS 26 12 00-1

DIVISION 26 - ELECTRICAL SECTION 26 12 00 - PAD MOUNTED DISTRIBUTION TRANSFORMERS

PART 1 GENERAL 1.1 SECTION INCLUDES

A. Liquid filled pad mounted distribution transformers. 1.2 RELATED SECTIONS

A. Division 01 - Concrete Reinforcement: Reinforcing steel for transformer pads.

B. Division 01 - Cast-In-Place Concrete: Pads for transformer support. 1.3 REFERENCES

A. ANSI C37.47 - Specifications for Distribution Fuse Disconnecting Switches, Fuse Supports, and Current-Limiting Fuses.

B. ANSI C57.12.00 - General Requirements for Liquid-Immersed Distribution, Power, and Regulating

Transformers.

C. ANSI C57.12.26 - Pad-Mounted Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers for Use with Separable Insulated High-Voltage Connectors, High Voltage 34 500 Grd Y/19 920 Volts and Below; 2500 kVA and Smaller.

D. ANSI C57.12.28 - Switchgear and Transformers--Pad-Mounted Equipment--Enclosure Integrity.

E. ANSI C57.12.55 - Conformance Standard for Transformers--Dry-Type Transformers Used in Unit

Installations, Including Unit Substations.

F. ANSI C57.12.90 - Test Code for Liquid-Immersed Distribution Power, and Regulating Transformers and Guide for Short-Circuit Testing of Distribution and Power Transformers.

G. ANSI C57.13 - Requirements for Instrument Transformers.

H. IEEE C57.106 - Guide for Acceptance and Maintenance of Insulating Oil in Equipment.

I. IEEE C57.111 - Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in Transformers.

J. IEEE C57.121 - Guide for Acceptance and Maintenance of Less Flammable Hydrocarbon Fluid in

Transformers.

K. IEEE 386 - Separable Insulated Connector Systems for Power Distribution Systems Above 600 V.

L. NEMA AB1 - Molded Case Circuit Breakers.

M. NEMA 260 - Safety Labels for Padmounted Switchgear and Transformers Sited in Public Areas.

N. NETA ATS - Acceptance Testing Specifications for Electrical Power Distribution Equipment (International Electrical Testing Association).

O. NFPA 70 - National Electrical Code.

1.4 SUBMITTALS FOR REVIEW

A. Division 01 – Submittals: Procedures for submittals.

Page 256: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PAD MOUNTED DISTRIBUTION TRANSFORMERS 26 12 00-2

B. Shop Drawings: Indicate electrical characteristics and connection requirements, outline dimensions, connection and support points, weight, specified ratings and materials.

C. Product Data: Provide electrical characteristics and connection requirements, standard model design tests,

and options. 1.5 SUBMITTALS FOR INFORMATION

A. Division 01 - Submittals: Submittals for information.

B. Test Reports: Indicate procedures and results for specified factory and field testing and inspection.

C. Submit manufacturer's installation instructions.

D. Manufacturer's Certificate: Certify that Products meet or exceed specified requirements.

E. Manufacturer's Field Reports: Indicate activities on site, final adjustments and overcurrent protective device coordination curves, adverse findings, and recommendations.

1.6 PROJECT CLOSEOUT SUBMITTALS

A. Division 01 – Project Record and Closeout Documents: Submittals for project closeout.

B. Include copy of manufacturer's certified drawings in project record documents.

C. Maintenance Data: Include maintenance instructions for cleaning methods; cleaning materials recommended; procedures for sampling and maintaining fluid.

1.7 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.

B. Testing Agency: Company member of International Electrical Testing Association and specializing in testing

products specified in this section with minimum three years documented experience. 1.8 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70. 1.9 DELIVERY, STORAGE, AND HANDLING

A. Accept transformers on site. Inspect for damage. 1.10 FIELD MEASUREMENTS

A. Verify that field measurements are as indicated on shop drawings. 1.11 MAINTENANCE MATERIALS

A. Division 01 – Project Record and Closeout Documents

B. Furnish two each of any special tools required to operate and maintain transformer. 1.12 EXTRA PRODUCTS

A. Division 01 – Project Record and Closeout Documents.

B. Furnish three of each size and type fuse. Provide cabinet or rack inside transformer to store spare fuses.

Page 257: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PAD MOUNTED DISTRIBUTION TRANSFORMERS 26 12 00-3

PART 2 - PRODUCTS 2.1 LIQUID-FILLED TRANSFORMERS

A. Liquid-filled Transformers: ANSI C57.12.26, three phase, pad mounted, self-cooled transformer unit.

B. Cooling and Temperature Rise; ANSI C57.12.00; Class OA. 55 degrees C, self-cooled.

C. Insulating Liquid: Oil conforming to IEEE C57.106. Insulating liquid shall be free of polychlorinated biphenyls (PCB’s).

2.2 SERVICE CONDITIONS

A. Meet requirements for usual service conditions described in ANSI C57.12.00, IEEE C57.12.01 and for specified unusual service conditions, if any.

B. Maximum Ambient Temperature: 104 degrees F.

C. Altitude: 100 feet.

D. Load Current Harmonic Factor: 0.05 per unit, maximum.

2.3 RATINGS

A. Capacity: As indicated on plans.

B. Primary Voltage: 12.47 kV, delta connected.

C. Taps: 2 - 2-1/2% FCAN, 2 - 2-1/2% FCBN.

D. Secondary Voltage: 120/208 volts, wye connected.

E. Impedance: ANSI standard.

F. Basic Impulse Level: 125 kV. G. Provide copper windings.

2.4 ACCESSORIES

A. Accessories: ANSI C57.12.00, standard accessories and magnetic liquid level gage, dial type thermometer. B. Tap Changer: Externally-operated type.

C. Primary Terminations: Bushing wells to IEEE 386; provide six for loop. Include bushings for insulated

loadbreak connectors.

D. Primary Switching: Gang operated, two position switch.

E. Primary Overcurrent Protection: Bayonet-type, liquid-immersed, expulsion fuses.

F. Secondary Terminations: Spade lugs.

G. Other Accessories: Primary distribution class lightning arrestors; secondary current transformers conforming to ANSI C57.13. Mount in primary bushing wells.

2.5 FABRICATION

A. Conform to the requirements of ANSI C57.12.28.

Page 258: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PAD MOUNTED DISTRIBUTION TRANSFORMERS 26 12 00-4

2.6 FACTORY FINISHING

A. Clean surfaces before applying paint.

B. Apply corrosion-resisting primer to all surfaces.

C. Apply finish coat of baked enamel paint to 4 mils thick.

D. Finish Color: Manufacturer's standard finish. 2.7 SOURCE QUALITY CONTROL

A. Provide factory tests to ANSI C57.12.90. Include routine tests as defined in ANSI C57.12.00 and the following other tests:

1. Impedance voltage and load loss. 2. Dielectric tests. 3. Audible sound level. 4. Short circuit capability. 5. Zero-phase-sequence impedance voltage. 6. Temperature rise. 7. Telephone influence factor (TIF).

B. Test insulating liquid samples in accordance with IEEE C57.121.

PART 3 - EXECUTION 3.1 EXAMINATION

A. Verify that support pads provided under Division 31 are ready to receive Products. 3.2 INSTALLATION

A. Install plumb and level.

B. Install safety labels to NEMA 260. 3.3 FIELD QUALITY CONTROL

A. Inspection and test in accordance with NETA ATS, except Section 4.

B. Perform inspections and tests listed in NEMA ATS, Section 7.2. 3.4 ADJUSTING

A. Division 01 - Project Record and Closeout Documents: Adjusting installed work.

B. Adjust primary taps so that secondary voltage is above and within 2 percent of rated voltage. 3.5 CLEANING

A. Clean dust and debris from interior of primary and secondary compartments and from exterior of transformer.

END OF SECTION 26 12 00

Page 259: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PANELBOARDS 26 24 16-1

DIVISION 26 - ELECTRICAL SECTION 26 24 16 - PANELBOARDS

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Distribution panelboards. B. Branch circuit panelboards.

1.2 RELATED SECTIONS

A. Section 26 05 26 – Grounding and Bonding. B. Section 26 05 53 – Electrical Identification.

C. Section 26 28 13 – Fuses.

D. Section 26 43 13 – Transient Voltage Surge Suppressor (TVSS).

E. Section 26 27 13 – Electrical Sensing and Measurement.

1.3 REFERENCES

A. NECA Standard of Installation (published by the National Electrical Contractors Association). B. NEMA AB1 - Molded Case Circuit Breakers. C. NEMA ICS 2 - Industrial Control Devices, Controllers and Assemblies. D. NEMA KS1 - Enclosed and Miscellaneous Distribution Equipment Switches (600 Volts Maximum). E. NEMA PB 1 - Panelboards. F. NEMA PB 1.1 - Instructions for Safe Installation, Operation and Maintenance of Panelboards

Rated 600 Volts or Less. G. NETA ATS - Acceptance Testing Specifications for Electrical Power Distribution Equipment

(published by the International Electrical Testing Association). H. NFPA 70 - National Electrical Code.

1.4 SUBMITTALS FOR REVIEW A. Division 01 – Submittals: Procedures for submittals. B. Shop Drawings: Indicate outline and support point dimensions, voltage, main bus ampacity,

integrated short circuit ampere rating, circuit breaker and fusible switch arrangement and sizes. C. Arrange circuit breakers in panels same as shown on plans.

1.5 SUBMITTALS FOR INFORMATION A. Division 01 – Submittals: Submittals for information. B. Submit manufacturer's installation instructions. Indicate application conditions and limitations of

use stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, and installation of Product.

Page 260: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PANELBOARDS 26 24 16-2

1.6 SUBMITTALS FOR CLOSEOUT A. Division 01 – Project Record and Closeout Documents: Submittals for project closeout. B. Record actual locations of panelboards and record actual circuiting arrangements in project

record documents. C. Maintenance Data: Include spare parts listing; source and current prices of replacement parts

and supplies; and recommended maintenance procedures and intervals.

1.7 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing the Products specified in this section with

minimum three years documented experience.

1.8 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70. B. Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for the purpose

specified and indicated.

1.9 MAINTENANCE MATERIALS A. Division 01 – Project Record and Closeout Documents.

PART 2 - PRODUCTS 2.1 DISTRIBUTION PANELBOARDS

A. Manufacturers: 1. General Electric. 2. Siemens. 3. Square D. 4. Cutler Hammer. B. Description: NEMA PB 1, circuit breaker type.

C. Service Conditions: 1. Temperature: 100 degrees F. 2. Altitude: 1000 feet. D. Panelboard Bus: Copper, ratings as indicated. Provide copper ground bus in each panelboard.

E. Minimum Integrated Short Circuit Rating: 10,000 amperes rms symmetrical for 208 volt panelboards.

Provide higher ratings where indicated. Series rating not allowed. F. Molded Case Circuit Breakers: NEMA AB 1, circuit breakers with integral thermal and instantaneous

magnetic trip in each pole. Provide circuit breakers UL listed as Type HACR for heating, air conditioning, or refrigeration equipment branch circuits. Provide circuit breakers UL listed SWD for NO-OFF control of lighting or other loads.

G. Provide handle locks for certain breakers. H. Enclosure: NEMA PB 1, Type 1 for dry locations, type 3R for exterior locations.

I. Cabinet Front: Surface type, fastened with hinge and latch, hinged door with flush lock, metal

directory frame, finish in manufacturer's standard gray enamel.

Page 261: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PANELBOARDS 26 24 16-3

J. Where multiple section panel cabinets are specified, all cabinets shall be of same dimensions.

2.2 LIGHTING AND APPLIANCE PANELBOARDS

A. Manufacturers: 1. General Electric. 2. Siemens. 3. Square D. 4. Cutler Hammer. B. Description: NEMA PB1, circuit breaker type, lighting and appliance branch circuit panelboard. C. Panelboard Bus: Copper, ratings as indicated. Provide copper ground bus in each panelboard;

provide insulated ground bus where scheduled. D. Minimum Integrated Short Circuit Rating: 10,000 amperes rms symmetrical for 208 volt

panelboards. Provide higher ratings where indicated. Series rating not allowed. E. Molded Case Circuit Breakers: NEMA AB 1, bolt-on type thermal magnetic trip circuit breakers,

with common trip handle for all poles, listed as Type SWD for lighting circuits, Type HACR for heating, air conditioning, or refrigeration equipment circuits, Class A ground fault interrupter circuit breakers where scheduled. Do not use tandem circuit breakers.

F. Enclosure: NEMA PB 1, Type 1 for dry locations, type 3R for exterior locations. G. Cabinet Box: 6 inches deep, 20 inches wide. Where multiple section panel cabinets are specified,

all cabinets shall be of same dimensions. H. Cabinet Front: With concealed trim clamps, door in door type hinge, metal directory frame, and

flush lock all keyed alike. Finish in manufacturer's standard gray enamel. I. Where multiple section panel cabinets are specified, all cabinets shall be of same dimensions.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install panelboards in accordance with NEMA PB 1.1 and the NECA "Standard of Installation." B. Install panelboards plumb. Install recessed panelboards flush with wall finishes. C. Height: 6 feet to top of panelboard; install panelboards taller than 6 feet with bottom no more than

4 inches above floor and with handle of top circuit breaker no more than 6'-6" above floor. D. Provide filler plates for unused spaces in panelboards. E. Provide typed circuit directory for each branch circuit panelboard. Revise directory to reflect

circuiting changes required to balance phase loads. F. Provide screw-on type engraved plastic nameplates under the provisions of Section 26 05 53. G. Provide spare conduits out of each recessed panelboard to an accessible location above ceiling.

Stub spare conduits out of wall minimum 6" below roof joist in areas with exposed roof structure. See Riser Diagram. Identify each as SPARE.

H. Ground and bond panelboard enclosure according to Section 26 05 26.

Page 262: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

PANELBOARDS 26 24 16-4

I. Do not splice conductors in panelboard cabinets. J. Land only one conductor to each circuit breaker. Where multiple conductors are used, splice in

junction box before entering panelboard.

K. Where multiple ground terminal strips are provided with new panels, run solid, bare, #8AWG between all ground terminal strips.

L. Provide and install arc flash warning signs per NEC 110.16. M. Rigidly mount surface mounted panels to unistrut supports spanning a minimum of two studs.

Panel shall be supported at a minimum of two locations vertically. Provide similar installation at masonry construction. Toggle bolts shall not be used.

3.2 FIELD QUALITY CONTROL

A. Inspect and test in accordance with NETA ATS, except Section 4. B. Perform inspections and tests listed in NETA ATS, Section 7.4 for switches, Section 7.5 for circuit

breakers.

3.3 CLEANING A. Division 01 – Cleaning: Clean installed work. B. Touch up scratched or marred surfaces to match original finish. C. Clean dust and debris from interior and exterior of panelboards.

END OF SECTION 26 24 16

Page 263: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL SENSING AND MEASUREMENT 26 27 13-1

DIVISION 26 - ELECTRICAL SECTION 26 27 13 - ELECTRICAL SENSING AND MEASUREMENT

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Watthour meters. B. Instrument transformers.

1.2 RELATED SECTIONS

A. Section 26 12 00 - Pad Mounted Distribution Transformers

B. Section 26 24 16 - Panelboards 1.3 REFERENCES

A. ANSI C12 - Code for Electricity Metering.

B. ANSI C39.1 - Requirements for Electrical Analog Indicating Instruments.

C. ANSI C57.13 - Requirements for Instrument Transformers.

D. NFPA 70 - National Electrical Code. 1.4 SUBMITTALS

A. Submit under provisions of Division 01.

B. Product Data: Provide electrical ratings, adjustment ranges, enclosure type, outline dimensions, mounting dimensions, and terminal connection information.

C. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use stipulated by

Product testing agency. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product.

D. Maintenance manual shall provide:

1. Condensed description of how the equipment operates. 2. Block diagram indicating major assemblies. 3. Troubleshooting information 4. Preventive maintenance\ 5. Spare parts information.

E. Installation Drawings. Drawings shall indicate but not be limited to the following:

1. Elementary diagrams and wiring diagrams with terminals identified of kilowatt meter, current transformers, protocol modules, telephone lines. For each meter installation, provide a diagram identified by the building number.

2. One-line diagram, including meters, switch (es), current transformers, protocol modules, telephone outlets, and fuses. For each meter installation, provide a diagram identified by the building number.

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.

Page 264: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL SENSING AND MEASUREMENT 26 27 13-2

1.6 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70.

B. Provide Products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and indicated.

1.7 SYSTEM DESCRIPTION

A. The metering and reading system, consisting of LonWorks WNC WattNode Electric Meter and ILON 600 IP/Server will be used to record the facility electricity consumption and other values for base monitoring and billing purposes.

B. Metering components are part of a system that includes the physical meter data recorder function and

communications (modern) method. Project shall include sufficient metering components to measure the parameters identified and to store and communicate the values as required in the following sections.

1. The purpose of the following specifications is to achieve meter equipment compatibility with the

Army metering program pursuant to Public Law 109-58, Section 103 of the Energy Policy Act of 2005. The intent is for all advanced meters to report their data to an installation-centric energy reporting and management system such as a utility monitoring and control system (UMCS). The advanced meters must provide data at least daily and measure at least hourly consumption of electricity. The means for meter data transmission using open-protocols such as ANSUCEA 709.1 b (LonTalk) and over low cost transport media (ILAN). These specifications provide the needed support of data transmission system alternatives in addition to meeting the minimum standards for energy consumption data recording and reporting. The meters will be capable of integrating with the Army’s communication networks supported by the Network Enterprise Command (NEC).

PART 2 - PRODUCTS 2.1 WATTHOUR METERS

A. Watthour meter:

1. WattNode Logger Model # WNC-3Y-208-FT10-L 2. Contact Continental Control Systems, Boulder Co. 303-444-7422

B. IP Server:

1. ILON 600 2.2 METERING TRANSFORMERS

A. Shall have an output of 333mv as required for the Wattnode Model # WNC-3Y-208-FT10-L. Bar, wound, or window-type transformers are acceptable; and except for window-type units installed over insulated buses, transformers shall have a BIL rating consistent with the rated BIL of the associated switchgear or electric power apparatus bushings, buses or conductors.

B. Current transformers shall have the indicated ratios. The continuous thermal-current rating factor (TCR) shall not be less than 2.0. Other thermal and mechanical ratings of current transformers and their primary leads shall be coordinated with the design of the circuit breaker and shall be not less than the momentary rating of the associated circuit breaker.

C. Current Transformers: ANSI C57.13; 5 ampere secondary, bar or window type, with primary/secondary ratio as required or shown on Drawings, burden and accuracy consistent with connected metering and relay devices, 60 Hertz. Primary ampere rating shall be 60 to 80 percent of service equipment ampere rating.

D. Provide metering CT’s in transformer and run metering wiring in separate 1-1/2” conduit to meter.

Page 265: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL SENSING AND MEASUREMENT 26 27 13-3

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Current transformer shall be installed in the Main distribution panel (MDP) cabinet in the electrical room. Electric meters and associated metering hardware shall be installed in accordance with NFPA 70 close to or on the MDP and can be of split core type for ease of installation, manufacturer’s recommendation and as shown on plans. Enclosure shall be sized as required by the 2008 National Electrical Code.

C. LonWorks WNC WattNode Electric Meter shall be located in the electrical room. Electric meters and associated metering hardware shall be installed in accordance with NFPA 70 close to or on panel MDP. LonWorks WNC WattNode Electric Meter shall be installed in a NEMA 1, 8” tall x 10” wide x 6” deep enclosure with hinged door and Key Lock Mechanism standard key mech CH751. LonWorks WNC WattNode Electric Meter and associated metering hardware shall be installed in accordance with NFPA 70, and manufacturer’s recommendation. The voltage phase wires shall follow NEC code 230.82 with an added fusible disconnect located outside the MDP close to the Wattnode enclosure. Fuses shall be rated .5 amps, 600v fast blow. A 2-conductor (22 AWG) LoN cable shall be routed from all meters to the ILON 600 location through ¾” conduit. Approximately 2 feet of cable shall be provided at both ends for final connection (termination) by DPW Energy Branch.

D. All advanced electric meters shall be configured and commissioned with the most current Plug-IN software from the manufacture. The contractor shall as a requirement for installation acquire at their expense the necessary LonMark commissioning tool such as, Lon Watcher, Lon Builder, Lon Maker or equivalent. At final inspection performance verification test (PVT)) of the metering real-time data and communication system will be tested using the contractor’s tools and commissioning data bases. All DB’s will be turned over to the Energy Team at completion of final inspection.

E. ILON 600 IP/Server shall be located at the Telephone Terminal Board (TTB) shown on the drawings. ILON 600 Smart server shall be installed in a NEMA 1, 12” tall x 12” wide x 4” deep enclosure with hinged door and latch for pad lock. ILON 600 Smart server shall be installed in accordance with NFPA 70 and manufacturer’s recommendations. A CAT 6 LAN communication cable shall be routed from the ILON 600 location through ¾” conduit to the base patch panel. Approximately 2 feet of cable shall be provided at both ends for final connection (termination) by DPW Energy Branch.

3.2 TESTING

A. Upon completion of acceptance checks and tests, the Contractor shall show by demonstration in service that circuits and devices are in good operating condition and properly performing that intended function. The DPW Energy Branch, Store Manager and Contracting Officer shall be given 14 days’ advance notice of the dates and times of checking and testing. A sign in sheet shall be used to document the event and included with the O & M manual.

B. The Contractor shall conduct the onsite Performance verification test (PVT) with a DPW Energy

Branch representative on site for approval before the final inspection. This will give the contractor time to correct any meter reading errors before the final inspection. The PVT will consist of the contractor using their applied tools: external calibrated test equipment (Power quality Analyzer), Lon device commissioning software tool, and device Plug-in and Lon interface adaptor. Documenting and comparing the test equipment data: Volts, Amps, Watts, and PF data to the Lon device plug-in tool where the metered real time data can be viewed. This test validates the meter real time readings against the external test equipment. Any negative power numbers or errors in readings will be corrected at this point before acceptance. The following Plug-in Views will be

Page 266: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ELECTRICAL SENSING AND MEASUREMENT 26 27 13-4

required for turn in with the Devices Lon DB, and PVT written documentation for future Warranty requirements and Final meter validation acceptance. 1. Plug-in Info Page 2. Plug-in Multi–meter page 3. Plug-in Power page 4. Plug-in Energy Page

C. TECHNICAL SUPPORT POC: TECHNICAL SUPPORT (FORT HOOD, TX) Hubert (Huey) Keaton Directorate of Public Works (DPW) Energy Management

Phone (254)535-8558 DC# 145*2*40300

END OF SECTION 26 17 13

Page 267: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WIRING DEVICES 26 27 26-1

DIVISION 26 - ELECTRICAL SECTION 26 27 26 - WIRING DEVICES

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Wall switches. B. Receptacles. C. Device plates and decorative box covers.

1.2 REFERENCES A. NECA - Standard of Installation. B. NEMA WD 1 - General Requirements for Wiring Devices. C. NEMA WD 6 - Wiring Device -- Dimensional Requirements. D. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS FOR REVIEW A. Division 01- Submittals: Procedures for submittals. B. Product Data: Provide manufacturer's catalog information showing dimensions, colors, and

configurations.

1.4 SUBMITTALS FOR INFORMATION A. Division 01 - Submittals: Submittals for information. B. Submit manufacturer's installation instructions.

1.5 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing the Products specified in this section with

minimum three years documented experience.

1.6 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70. B. Provide Products listed and classified by Underwriters Laboratories, Inc., as suitable for the

purpose specified and indicated. PART 2 - PRODUCTS 2.1 WALL SWITCHES

A. Manufacturers: 1. Hubbell 2. Pass & Seymour 3. Leviton 4. G.E. B. Description: NEMA WD 1, Heavy-Duty, AC only general-use snap switch. Provide single pole,

double pole, three-way, four way, pilot light, or momentary contact type as indicated.

Page 268: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WIRING DEVICES 26 27 26-2

C. Body and Handle: Plastic with toggle handle. D. Indicator Light: Separate pilot strap; red lens. E. Ratings: 1. Voltage: 120-277 volts, AC. 2. Current: 20 amperes. F. For control of mechanically held contactors or relays; provide three position, momentary contact

switches with spring return to center off position. Momentary contact switches shall be rated 120/277 volt, 20 amperes.

G. Color: Architect shall select from manufacturers standard colors. Note: Architect may chose

multiple colors throughout project.

2.2 RECEPTACLES A. Manufacturers: 1. Hubbell 2. Pass & Seymour 3. Leviton 4. G.E. B. Description: NEMA WD 1, heavy duty, specification grade receptacle. In barber shop and beauty

shop waiting area, provide safety type receptacles which shall discourage insertion of foreign object into receptacle by small children.

C. Device Body: Nylon. D. Configuration: NEMA WD 6, type as specified and indicated. E. Convenience Receptacle: Type 5-20. F. GFCI Receptacle: Convenience receptacle with integral ground fault circuit interrupter to meet

regulatory requirements. Devices shall utilize “Lock Out” technology to ensure outlet can not be used if ground fault protection fails. Device shall have status LED.

G. Isolated Ground Receptacle: Type 5-20. Provide with orange body and plate. H. Color: Architect shall select from manufacturers standard colors. Note: Architect may chose

multiple colors throughout project. 2.3 WALL PLATES

A. Decorative Cover Plate: Smooth nylon in all areas except food prep. Devices in food prep shall be

stainless steel. Manufacturer same as device manufacturer. Color to match device. B. Exterior Wall Receptacle Cover: Receptacles shall be installed flush with wall. The cast aluminum

receptacle cover shall have ports to allow two 3/8” diameter cords to pass through and must not protrude over 4-½” from wall surface. Recessed enclosure must have gasket between the enclosure and the mounting surface to assure that the enclosure is “Weather proof while in use.” The enclosure shall be UL Listed. Provide Hubbell #WP700 or equal.

PART 3 - EXECUTION

Page 269: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WIRING DEVICES 26 27 26-3

3.1 EXAMINATION A. Verify that outlet boxes are installed at proper height. B. Verify that wall openings are neatly cut and will be completely covered by wall plates. C. Verify that floor boxes are adjusted properly to ensure covers will be flush with floor covering. D. Verify that branch circuit wiring installation is completed, tested, and ready for connection to wiring

devices.

3.2 PREPARATION A. Provide extension rings to bring outlet boxes flush with finished surface. B. Clean debris from outlet boxes.

3.3 INSTALLATION A. Install in accordance with NECA "Standard of Installation." B. Install devices plumb and level. C. Install switches with OFF position down. D. Install receptacles with grounding pole on top. E. After connecting wires to GFCI receptacles, wrap terminals with four layers of electrician’s tape. F. Connect wiring device grounding terminal to branch circuit equipment grounding conductor. G. Install decorative plates on switch, receptacle, and blank outlets in finished areas. H. Connect wiring devices by wrapping conductor around screw terminal when using solid

conductors. Provide crimp on lugs for terminations when using stranded conductors. I. Install galvanized steel plates on outlet boxes and junction boxes in unfinished areas and above

accessible ceilings.

J. Provide ½” black on clear adhesive label tape on each device coverplate centered between top of the coverplate and the device indicating panel and branch circuit number. This label will be in addition to any labeling required to indicate loads controlled when multiple light switches are grouped together.

3.4 INTERFACE WITH OTHER PRODUCTS

A. Coordinate locations of outlet boxes provided under Section 26 05 34 to obtain mounting heights

indicated on drawings.

3.5 FIELD QUALITY CONTROL A. Inspect each wiring device for defects. B. Operate each wall switch with circuit energized and verify proper operation. C. Verify that each receptacle device is energized. D. Test each receptacle device for proper polarity. E. Test each GFCI receptacle device for proper operation.

Page 270: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

WIRING DEVICES 26 27 26-4

3.6 CLEANING

A. Section Division 01 – Project Record and Closeout Documents: Clean installed work. B. Clean exposed surfaces to remove splatters and restore finish.

END OF SECTION 26 27 63

Page 271: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED SWITCHES 26 28 17-1

DIVISION 26 - ELECTRICAL SECTION 26 28 17 - ENCLOSED SWITCHES

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Fusible switches. B. Nonfusible switches.

1.2 REFERENCES A. NECA - Standard of Installation (published by the National Electrical Contractors Association). B. NEMA FU1 - Low Voltage Cartridge Fuses. C. NEMA KS1 - Enclosed and Miscellaneous Distribution Equipment Switches (600 Volts Maximum). D. NETA ATS - Acceptance Testing Specifications for Electrical Power Distribution Equipment and

Systems (published by the International Electrical Testing Association). E. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS FOR REVIEW A. Division 01 – Submittals: Procedures for submittals. B. Product Data: Provide switch ratings and enclosure dimensions.

1.4 SUBMITTALS FOR CLOSEOUT A. Division 01 – Project Record and Closeout Documents: Submittals for project closeout. B. Record actual locations of enclosed switches in project record documents.

1.5 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing the Products specified in this section with

minimum three years documented experience.

1.6 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70. B. Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for the purpose

specified and indicated. PART 2 - PRODUCTS 2.1 MANUFACTURERS

A. General Electric. B. Siemens. C. Square D. D. Cutler Hammer.

Page 272: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED SWITCHES 26 28 17-2

2.2 FUSIBLE SWITCH ASSEMBLIES

A. Description: NEMA KS 1, Type HD, enclosed load interrupter knife switch. Handle lockable in

OFF position. B. Fuse clips: Designed to accommodate NEMA FU1, Class R fuses. Provide rejection clips to

prevent the use of other than Class R fuses.

2.3 NONFUSIBLE SWITCH ASSEMBLIES A. Description: NEMA KS 1, Type HD enclosed load interrupter knife switch. Handle lockable in

OFF position.

2.4 ENCLOSURES A. Fabrication: NEMA KS 1. 1. Interior Dry Locations: Type 1. 2. Exterior Locations: Type 3R.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install in accordance with NECA "Standard of Installation." B. Install fuses in fusible disconnect switches with fuse labels visible from fronts of enclosures. C. Apply adhesive tag on inside door of each fused switch indicating NEMA fuse class and size

installed. D. Provide engraved nameplates for switches not in sight of controlled loads. Indicate load type and

location and correct fuse size for fusible switches.

3.2 FIELD QUALITY CONTROL A. Inspect and test in accordance with NETA ATS, except Section 4. B. Perform inspections and tests listed in NETA ATS, Section 7.5.

3.3 CLEANING A. Division 01 – Cleaning: Clean installed work. B. Touch up scratched or marred surfaces to match original finishes. C. Clean dust and debris from interior and exterior of cabinet.

END OF SECTION 26 28 17

Page 273: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED MOTOR CONTROLLERS 26 29 13-1

DIVISION 26 - ELECTRICAL SECTION 26 29 13 - ENCLOSED MOTOR CONTROLLERS

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Manual motor starters.

B. Magnetic motor starters.

C. Combination magnetic motor starters.

1.2 REFERENCES

A. NFPA 70 - National Electrical Code.

B. UL 198C - High-Interrupting Capacity Fuses; Current Limiting Type.

C. UL 198E - Class R Fuses.

D. NECA "Standard of Installation," published by National Electrical Contractors Association.

E. NEMA AB 1 - Molded Case Circuit Breakers.

F. NEMA ICS 2 - Industrial Control Devices, Controllers, and Assemblies.

G. NEMA ICS 6 - Enclosures for Industrial Controls and Systems.

H. NEMA KS 1 - Enclosed Switches.

1.3 SUBMITTALS

A. Submit under provisions of Division 01 – Submittals.

B. Product Data: Provide catalog sheets showing voltage, controller size, ratings and size of

switching and overcurrent protective devices, short circuit ratings, dimensions, and enclosure details.

C. Test Reports: Indicate field test and inspection procedures and test results.

D. Manufacturer's Installation Instructions: Indicate application conditions and limitations of use

stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with NECA Standard of Installation. 1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing the Products specified in this section with

minimum three years documented experience.

1.6 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70.

Page 274: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED MOTOR CONTROLLERS 26 29 13-2

B. Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose specified and indicated.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Square D.

B. Siemens.

C. G.E. D. Cutler Hammer.

2.2 MANUAL CONTROLLERS

A. Manual Motor Controller: NEMA ICS 2, AC general-purpose Class A manually operated,

full-voltage controller without overload element, red pilot light, when not in sight of controlled motor and toggle operator. Flush mount in finished spaces such as toilets and janitor closets.

B. Enclosure: NEMA ICS 6; Type 1 unless otherwise noted.

2.3 AUTOMATIC CONTROLLERS

A. Magnetic Motor Controllers: NEMA ICS 2, AC general-purpose Class A magnetic controller for

induction motors rated in horsepower.

B. Coil operating voltage: 120 volts, 60 Hertz.

C. Overload Relay: NEMA ICS; melting alloy.

D. Enclosure: NEMA ICS 6, Type 1 for interior, dry locations, Type 3R for exterior locations.

2.4 PRODUCT OPTIONS AND FEATURES

A. Auxiliary Contacts: NEMA ICS 2, 2 each normally open and normally closed.

B. Cover Mounted Pilot Devices: NEMA ICS 2, heavy duty type, HAND-OFF-AUTO rotary switch unless noted otherwise.

C. Pilot Device Contacts: NEMA ICS 2, Form Z, rated A150. D. Pushbuttons Where Required: Unguarded STOP, shrouded START unless noted otherwise.

E. Indicating Lights: LED type red RUN light unless otherwise noted.

F. Relays: NEMA ICS 2.

G. Control Power Transformers: 120 volt secondary, in each motor starter. Provide fused secondary,

and bond unfused leg of secondary to enclosure.

2.5 DISCONNECTS

A. Combination Controllers: Combine motor controllers with thermal magnetic circuit breaker, motor circuit protector or non-fusible switch disconnect as shown in common enclosure.

B. Non-fusible Switch Assemblies: NEMA RS-1 enclosed knife switch with externally operable

handle.

Page 275: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

ENCLOSED MOTOR CONTROLLERS 26 29 13-3

PART 3 -EXECUTION

3.1 INSTALLATION

A. Install enclosed controllers where indicated, in accordance with manufacturer's instructions.

B. Install enclosed controllers plumb. Provide supports in accordance with Section 26 05 29.

C. Height: 5 ft to operating handle, switch, or pushbutton.

D. Provide screw-on type engraved plastic nameplates under the provisions of Section 26 05 53.

Nameplates shall indicate load type and location and correct fuse size for fusible combination controllers.

E. Provide neatly typed label inside each motor controller door identifying motor served, nameplate

horsepower, full load amperes, code letter, service factor, and voltage/phase rating.

3.2 FIELD QUALITY CONTROL

A. Inspect and test each enclosed controller to NEMA ICS 2.

3.3 CLEANING

A. Division 01 – Cleaning: Cleaning installed work.

B. Touch up scratched or marred surfaces to match original finish.

C. Clean dust and debris from interior and exterior of motor controller.

END OF SECTION 26 29 13

Page 276: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SURGE PROTECTION DEVICES (SPD) 26 43 13-1

DIVISION 26 - ELECTRICAL SECTION 26 43 13 - SURGE PROTECTIVE DEVICES (SPDs)

PART 1 - GENERAL 1.1 WORK INCLUDES

A. Contractor provide:

1. SPD units mounted integral panelboards as indicated on riser diagram. 1.2 RELATED SECTIONS

A. Section 26 24 16 – Panelboards.

1.3 REQUIREMENTS OF REGULATORY AGENCIES

A. Underwriters Laboratory (UL) B. American National Standards Institute (ANSI) C. Institute of Electrical and Electronics Engineers (IEEE) D. National Electrical Manufacturers Association (NEMA) E. National Fire Protection Association (NFPA) F. Occupational Safety and Health Act (OSHA) G. Federal Information Processing Standards, Pub 94 (FIPS) H. ANSI/IEEE C62.41, Recommended Practice for Surge Voltages in Low-Voltage AC Power

Circuits, Category C I. ANSI/IEEE C62.45, Guide on Surge Testing for Equipment Connected to Low-Voltage AC Power

Circuits. J. UL 1449, Current Edition – Surge Protective Devices K. UL 1283 L. NEMA LS-1, Low Voltage Surge Protective Devices M. NEC Article 285

1.4 SUBMITTALS

A. In accordance with Division 01, provide:

1. Shop drawings and product data sheets indication physical and electrical characteristics in accordance with Division 1.

2. UL1449 file card copies. 3. Third party test results verifying label ratings.

1.5 WARRANTY

A. Warrant all equipment for ten (10) years from date of substantial completion.

Page 277: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SURGE PROTECTION DEVICES (SPD) 26 43 13-2

PART 2 - PRODUCTS 2.1 MANUFACTURERS

A. Liebert.

B. Current Technology.

C. EFI Electronics.

D. United Power.

E. Leviton.

F. Square D.

G. Seimens ITE.

H. G.E. 2.2 ELECTRICAL REQUIREMENTS A. SPD Types 1. Service Entrance: SPD shall be UL 1449 labeled as Type 1 or Type 4 intended for Type 1 or

Type 2 applications, verifiable at UL.com, without need for external or supplemental overcurrent controls.

2. Distribution Panel and Motor Control Center: SPD shall be UL 1449 labeled as Type 4 intended for Type 1 or Type 2 applications, verifiable at UL.com, without need for external or supplemental overcurrent controls.

3. Branch Panels: The panelboard shall be UL 67 listed and the SPD shall be UL 1449 labeled as Type 1 or as Type 4 intended for Type 1 or Type 2 applications

B. Nominal System Operating Voltages

1. 208Y/120 VAC, 3-phase, 4 wire, plus ground for panelboard units.

C. Maximum Continuous Operating Voltages (MCOV)

1. 125% of nominal system operating voltage.

D. Operating Frequency

1. 60 Hertz.

E. Seven (7) Protection Modes on Grounded Wye System

1. L-G, L-N and N-G (L = Line, N = Neutral, and G = Ground).

F. The SPD shall be UL Tested and labeled as a complete assembly to a symmetrical fault current

rating greater than or equal to the rating of the connected panel, in accordance with NEC Article 285, without the requirement of a dedicated breaker feeder to obtain the fault current withstand rating.

G. The Voltage Protection Rating (VPR) shall be tested with the integral disconnect in accordance with

UL-1449, Third Edition. The UL VPR values shall not exceed the following (including disconnect). If the device is remote mounted it shall be fed by a circuit breaker and the UL VPR rating shall include the breaker in series with the SPD.

H. Maximum UL 1449 Voltage Surge (Category C1)

Page 278: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SURGE PROTECTION DEVICES (SPD) 26 43 13-3

System Voltage L-N, L-G, N-G Modes 208Y/120 VAC 800V

I. Protection and Filtering Elements:

1. The SPD shall have a maximum surge current rating of:

Service Entrance 300 kA per mode. Devices that derive a maximum surge current rating by adding test results of individual components are not acceptable. Test documentation of kA rating shall be required. Devices must be rated per mode, not per PHASE per NEMA.

2. The SPD device repetitive surge current capacity shall be tested utilizing a 1.2x50ms, 20kV

open circuit voltage, 8x20ms, 10kA short circuit Category C3 test waveform (as defined by ANSI/IEEE C62.41-1991 and ANSI/IEEE C62.45-1992) at one minute intervals. A failure is defined as either performance degradation or more than 10% deviation of clamping voltage at the specified surge current. The service entrance device shall be capable of surviving a minimum of 20,000 C3 impulses without failure or performance degradation of more than 10%. Downstream devices shall be capable of surviving a minimum of 5,000 C3 impulses without failure or performance degradation of more than 10%.

3. The SPD device shall be capable of surviving a minimum of 5,000 surges using a 10x1000ms impulse (1kV, 4kA for 277/480V devices, .5kV, 2kA for 120/208V devices), confirmed by an independent nationally recognized test lab (R&B Labs).

4. Systems using selenium, gas tubes or silicon avalanche diodes in surge current path are not acceptable.

5. The Maximum Continuous Operating Voltage (MCOV) for all voltage configurations shall be 125% of nominal or greater.

6. The fusing system shall be capable of allowing the rated maximum surge current to pass through without fuse operation. Systems utilizing a fusing system that opens below the maximum surge current level are unacceptable. The fusing system shall be included in the surge current testing.

J. The SPD shall incorporate a UL 1283 listed EMI/RFI filter with minimum attenuation of – 50dB at

100kHz. K. The SPD shall be UL labeled with 20kA I-nominal (I-n).

L. Overcurrent Protection:

1. Fuses rated for 200 KAIC (integral fused disconnect).

M. Diagnostic Monitoring:

1. Fuse monitoring. 2. MOV monitoring. 3. Green/red indicator lights for each phase. Red light indicating damaged phase. 4. Form C contacts for remote annunciation of unit status. 5. Press-to-test diagnostics to verify operational integrity of monitoring system. 6. Surge event counter and audible alarm. 7. Remote status monitor.

N. Serviceability:

1. SPD system module(s) must be field replaceable by qualified individuals or licensed

Electricians.

O. Equipment Mounting:

Page 279: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SURGE PROTECTION DEVICES (SPD) 26 43 13-4

1. Distribution Panel SPD – The SPD shall include an integral disconnect switch which has been tested to the surge current rating of the SPD and match or exceed the fault current rating of the board per NEC 285. The Disconnect must switch the phases and neutral. Use of circuit breakers for disconnect mean is not acceptable due to impedance and the requirement for neutral disconnect. The SPD shall be mounted integral to the equipment.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Install SPD units per manufacturer's written recommendations.

B. Verify SPD unit ratings with service rating and voltage characteristics, and with Electrical Requirements section of this specification. Ensure proper system configuration and coordination prior to ordering any equipment.

C. Do not drill or tap equipment bus bars. Use suitable bolted bus connectors.

D. Connect separately mounted SPD units to equipment with input conductors that are as short and

straight as practically possible. Twist input conductors to reduce inductance.

E. Provide source breaker or fused disconnect switch for SPD units sized in accordance with SPD manufacturer's recommendations.

F. Ground equipment and SPD units per manufacturer's recommendations, NEC, and Section 26 05 26.

G. Provide mounting brackets, bus bar, breaker stabs, and filler pieces for unused spaces.

3.2 FIELD QUALITY CONTROL

A. Perform SPD unit tests according to manufacturer's instructions. Provide verification of test results to Architect/Engineer.

B. Provide services of manufacturer's factory trained Engineer for length of time required to:

1. Coordinate installation. 2. Conduct functional tests on all equipment and field test listed herein. 3. Provide training during normal working hours to AAFES's personnel in operation, testing,

adjusting, and maintenance. 4. Submit written report to Architect/Engineer and AAFES stating results of tests conducted and

listing personnel trained. 3.3 ADJUSTMENT AND CLEANING

A. Adjust operating mechanisms for free mechanical movement.

B. Tighten bus connections and mechanical fasteners, in accordance with manufacturer's published torque value recommendations and UL 486A and B.

C. Touch-up scratched or marred surfaces to match original finish.

D. Clean interior and exterior of enclosure.

END OF SECTION 26 43 13

Page 280: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INTERIOR LUMINAIRES 26 51 00-1

DIVISION 26 - ELECTRICAL SECTION 26 51 00 - INTERIOR LUMINAIRES

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Interior luminaires and accessories. B. Exit signs. C. Ballasts. D. Lamps. E. Luminaire accessories.

1.2 REFERENCES A. ANSI C78.379 - Electric Lamps - Incandescent and High-Intensity Discharge Reflector Lamps -

Classification of Beam Patterns. B. ANSI C82.1 - Ballasts for Fluorescent Lamps - Specifications. C. ANSI C82.4 - Ballasts for High-Intensity Discharge and Low Pressure Sodium Lamps (Multiple

Supply Type). D. NEMA WD 6 - Wiring Devices-Dimensional Requirements. E. NFPA 70 - National Electrical Code. F. NFPA 101 - Life Safety Code.

1.3 SUBMITTALS FOR REVIEW A. Division 01 – Submittals: Procedures for submittals. B. Shop Drawings: Indicate dimensions and components for each luminaire that is not a standard

product of the manufacturer. Provide ballast information for each fixture. C. Product Data: Provide dimensions, ratings, and performance data.

1.4 SUBMITTALS FOR INFORMATION A. Division 01 – Submittal: Submittals for information. B. Submit manufacturer's installation instructions. Indicate application conditions and limitations of

use stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, and installation of Product.

1.5 SUBMITTALS FOR CLOSEOUT

A. Division 01 – Project Record and Closeout Documents: Submittals for project closeout. B. Submit manufacturer's operation and maintenance instructions for each product. C. Warranty for normal ballasts, exit signs, and emergency standby ballasts.

1.6 QUALIFICATIONS

Page 281: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INTERIOR LUMINAIRES 26 51 00-2

A. Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.

1.7 REGULATORY REQUIREMENTS

A. Conform to requirements of NFPA 70. B. Conform to requirements of NFPA 101. C. Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for the purpose

specified and indicated. PART 2 - PRODUCTS 2.1 LUMINAIRES

A. Furnish products as scheduled. Contractors wishing to submit voluntary substitutions shall submit

complete cut sheet information showing fixture dimensions, options and photometrics. Alternate fixtures must be received at engineers’ office minimum two weeks prior to bidding. Engineers’ evaluation shall be final. Fixtures submitted without prior approval will be returned to contractor without comment.

2.2 FLUORESCENT BALLASTS

A. Manufacturers: 1. Universal Ballast or prior approved equal. B. Unless otherwise noted, programmed start fluorescent ballasts shall be Universal Ballast solid

state electronic type for use with T8 fluorescent lamps. Ballasts shall have a total harmonic distortion of 10% or less, minimum ballast factor of 0.87 and a minimum power factor of 0.95. Where noted on plans, provide high output having a ballast factor of 1.15. Maximum input wattage for normal ballast factor ballasts shall be as follows:

120V 1. One lamp: 28 watts. 2. Two lamps: 50 watts. 3. Three lamps: 78 watts 4. Four lamps: 103 watts. C. Certify fluorescent ballast design by Certified Ballast Manufacturer, Inc.

2.3 HIGH INTENSITY DISCHARGE (HID) BALLASTS A. Manufacturers: 1. Sylvania. 2. General Electric. 3. Philips. 4. Advance. 5. Universal. 6. Venture. B. Description: ANSI C82.4, metal halide ballast as indicated on schedule, suitable for lamp

specified. Provide high power factor ballasts with best commercially available sound rating and pulse start where available.

C. Voltage: As indicated on schedule volts unless otherwise noted.

2.4 FLUORESCENT LAMP EMERGENCY BALLASTS

Page 282: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INTERIOR LUMINAIRES 26 51 00-3

A. Manufacturers: Bodine, ITOA or approved equal. B. Description: Emergency battery power supply suitable for installation in ballast compartment of

fluorescent luminaire or for remote mounting. C. Ratings: Ballasts to power one F28 lamp: 1400 lumens. Ballasts to power two F28 lamps: 3000

lumens. Provide ballast canister for two lamp ballast for remote mounting above luminaire. Contractor to provide wire and conduit between ballast and luminaire.

D. Battery: Sealed pure lead type, rated for 10 year life. Provide 3 year full warranty. E. Include TEST switch and AC ON indicator light, installed to be operable and visible from the

outside of an assembled luminaire. F. Input Current Ratings: 1450 – 3500 Lumen = 280 mA. 900- 1400 Lumen = 55 mA.

2.5 LAMPS A. Lamp Manufacturers: 1. General Electric Wattmiser Series or prior approved equal. B. Lamp Types: As specified for luminaire. C. Unless otherwise noted 4 foot fluorescent lamps shall be low-mercury premium grade T8 type

instant start type rated 28 watts maximum, 2600 lumens minimum, 3500 degrees Kelvin, rendering index (CRI) of 85 or greater. Lamps shall pass federal TCLP criteria (low mercury).

D. Metal halide lamps shall have a constant color temperature of 3000 degrees Kelvin, shall be pulse

and have CRI = 85. E. Lamps of each type shall be by one manufacturer. F. Low-Mercury Lamps: Comply with EPA’s to toxicity characteristic leaching procedure test; shall

yield less than 0.2 mg of mercury per liter when tested per NEMA LL1 standards. G. Compact Fluorescent Lamps: 4-pin low mercury, CRI 80 (min), 3500 deg K, average rated life of

10,000 hours unless otherwise noted.

1. 26W: T4 double or triple tube rated 1800 initial lumens (min). 2. 42W: T4 triple tube rated 3200 initial lumens (min).

PART 3 - EXECUTION 3.1 INSTALLATION

A. Support recessed luminaires independent of ceiling framing. For recessed fluorescent

luminaires, provide four hanger wires fastened at corners of luminaires and at structural joists. Provide two hanger wires for recessed downlights. Supports wires shall be same type and gauge as ceiling support wires.

B. Locate recessed ceiling luminaires as indicated on reflected ceiling plan. C. Support surface mounted luminaires on grid ceiling directly from building structure. D. Install surface mounted luminaires and exit signs plumb and adjust to align with building lines and

with each other. Secure to prevent movement.

Page 283: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

INTERIOR LUMINAIRES 26 51 00-4

E. Install recessed luminaires to permit removal from below. F. Install accessories furnished with each luminaire. G. Connect luminaires to branch circuit outlets provided under Section 16130 using flexible conduit.

In exposed grid ceiling areas, use premanufactured wiring systems at contractor’s option. H. Make wiring connections to branch circuit using building wire with insulation suitable for

temperature conditions within luminaire. I. Bond products and metal accessories to branch circuit equipment grounding conductor. J. Install specified lamps in each luminaire.

3.2 FIELD QUALITY CONTROL A. Operate each luminaire after installation and connection. Inspect for proper connection and

operation.

3.3 ADJUSTING A. Aim and adjust luminaries as directed. B. Position exit sign directional arrows as indicated.

3.4 CLEANING A. Division 01 – Cleaning: Cleaning installed work. B. Clean electrical parts to remove conductive and deleterious materials. C. Remove dirt and debris from enclosures. D. Clean photometric control surfaces as recommended by manufacturer. E. Clean finishes and touch up damage.

3.5 PROTECTION OF FINISHED WORK A. Prior to final acceptance, relamp luminaires that have failed lamps.

END OF SECTION 26 51 00

Page 284: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SITE LIGHTING 26 56 00-1

DIVISION 26 - ELECTRICAL SECTION 26 56 00 - SITE LIGHTING

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Exterior luminaires and accessories. B. Poles.

1.2 REFERENCES A. ANSI C78.379 - Electric Lamps - Incandescent and High-Intensity Discharge Reflector Lamps -

Classification of Beam Patterns. B. ANSI C82.1 - Ballasts for Fluorescent Lamps-Specifications. C. ANSI C82.4 - Ballasts for High-Intensity-Discharge and Low Pressure Sodium Lamps

(Multiple-Supply Type). D. IES RP-8 - Recommended Practice for Roadway Lighting. E. IES RP-20 - Lighting for Parking Facilities. F. NFPA 70 - National Electrical Code.

1.3 SUBMITTALS FOR REVIEW A. Division 01 – Submittals: Procedures for submittals. B. Shop Drawings: Indicate dimensions and components for each luminaire which is not a standard

Product of the manufacturer. C. Product Data: Provide dimensions, ratings, photometric data, and performance data. D. Provide Auto Cad drawing from lighting manufacturer showing photometric data from pole and

building mounted light fixtures. Submittal shall show all relevant information used in calculations. Auto Cad drawings available from engineer. Request drawings minimum 2 weeks prior to need.

1.4 SUBMITTALS FOR INFORMATION A. Division 01 – Submittals: Submittals for information. B. Test Reports: Indicate measured illumination levels. C. Submit manufacturer's installation instructions. Indicate application conditions and limitations of

use stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product.

D. Provide computer generated photometric layout at parking lot and building perimeter lighting

levels. 1.5 SUBMITTALS FOR CLOSEOUT

A. Division 01 – Project Record and Closeout Documents: Submittals for project closeout. B. Maintenance Data: For each luminaire.

Page 285: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SITE LIGHTING 26 56 00-2

C. Ballast warranty.

1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing the Products specified in this section with

minimum three years documented experience.

1.7 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70. B. Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for the purpose

specified and indicated.

1.8 DELIVERY, STORAGE, AND HANDLING A. Transport, handle, store, and protect products to avoid damage to poles, luminaires, lenses, and

paint finishes. B. Store poles and luminaires in original shipping containers.

1.9 COORDINATION A. Furnish bolt templates and pole mounting accessories to installer of pole foundations. B. Furnish one gallon of touch-up paint. Provide the paint formula to AAFES manager and include

with O & M manual for future access to paint. Obtain singed receipt showing manufacturer and paint model number.

PART 2 - PRODUCTS 2.1 LUMINAIRES AND ACCESSORIES

A. Provide luminaires, poles, and accessories as scheduled on plans. B. Poles shall be high density aluminum. C. Pole/luminare assembly shall be rated for 100 mph wind loads with a 1.3 gust factor.

2.2 LAMPS A. Lamp Types: As specified for luminaire. B. Lamps shall be as specified for luminaire.

2.3 POLES

A. Material and Finish: 1. Aluminum, dark bronze, square cross section, 0.170 inch minimum wall thickness. 2. Concrete base. Hand rub with grout to give finished appearance.

B. Accessories:

1. Handhole. 2. Anchor bolts. 3. Built-in pole vibration dampeners. 4. Provide in-line fusing at each site lighting pole accessible via handhole at each pole base.

Size fusing at 150% of fixture load.

Page 286: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

SITE LIGHTING 26 56 00-3

C. Loading Capacity Ratings:

1. Steady Wind: 100 miles per hour, minimum.

PART 3 - EXECUTION 3.1 INSTALLATION

A. Provide reinforced concrete bases for lighting poles at locations indicated, in accordance with

Division 31. B. Install poles plumb. Provide double nuts to adjust plumb. Grout around each base. C. Install lamps in each luminaire. D. Bond luminaires and metal accessories to branch circuit equipment grounding conductor. Provide

supplementary grounding electrode at each pole.

3.2 FIELD QUALITY CONTROL A. Operate each luminaire after installation and connection. Inspect for improper connections and

operation. 3.3 CLEANING

A. Division 01 – Cleaning: Cleaning installed work. B. Clean electrical parts to remove conductive and deleterious materials. C. Remove dirt and debris from enclosure. D. Clean photometric control surfaces as recommended by manufacturer. E. Clean finishes. Use touch-up paint to cover scratched or damaged surfaces.

3.4 PROTECTION OF FINISHED WORK

A Relamp luminaires which have failed lamps at beneficial occupancy.

END OF SECTION 26 56 00

Page 287: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TESTING 26 60 00-1

DIVISION 26 - ELECTRICAL SECTION 26 60 00 - TESTING

PART 1 - GENERAL 1.1 WORK INCLUDES

A. Provide:

1. Testing of electrical components and systems: a. Insulation resistance test. b. Grounding electrode test. c. Continuity test. d. Voltage test. e. Phase relationship verification. f. Fire alarm acceptance test. g. Power transmission equipment test.

2. Test reports. 3. Correction of defective components or systems. 4. Retest of corrected components, systems.

1.2 SUBMITTALS

A. Test Reports: Submit seven (7) copies of all test reports to Contracting Officer.

1. Type each test report on 8-1/2 inch x 11 inch paper. Include: a. Project Number. b. Project title and location. c. Test performed. d. Date performed. e. Test equipment used. f. Contractor's name, address and telephone number. g. Testing firm's name, address and telephone number if other than Contractor. h. Name (s) and title (s) of person (s):

1. Performing test. 2. Observing test.

i. Statement verifying each test. j. Nameplate data from each motor and equipment item tested. k. Test results. l. Retest results after correction of defective components, systems.

2. For each copy, assemble all test reports and bind them in a folder. Label each folder,

"Electrical Test Reports". PART 2 - PRODUCTS 2.1 MATERIALS: Furnish all equipment, manpower and casual labor to perform specified testing. PART 3 - EXECUTION 3.1 PREPARATION

A. When temporary electrical service is used for testing, do not energize any equipment or portion of permanent system that exceeds capacity of temporary service.

B. Ensure that all electrical work is complete and ready for testing.

Page 288: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TESTING 26 60 00-2

C. Disconnect all devices or equipment that might be damaged by application of test voltages, voltage of

reversed phase sequence or other test procedures. 3.2 TESTING: Conduct tests and adjust equipment to verify compliance with specified performance. 3.3 INSULATION RESISTANCE TESTS

A. Resistance measured; line-to-ground.

B. Perform testing on the following items: Min. Acceptance

Item Tested Voltage of Test Resistance in Megohms 1. No. 2 and larger

cables (600V) 1000V 50 2. Motors 500V 5 3. Switchboard and Panelboard Buses 1000V 25

3.4 GROUNDING ELECTRODE TEST: Measure and record ground resistance from system neutral connection at

service entrance to convenient ground reference point using suitable ground testing equipment. Maximum acceptable resistance: 10 ohms. When resistance exceeds 10 ohms drive and bond another ground rod, one ground rod length away and repeat test.

3.5 CONTINUITY TESTS: Test branch circuits and control circuits to determine continuity of wiring and

connections. 3.6 VOLTAGE TESTS

A. Make and record voltage tests and recorded at the following listed points. Conduct tests under normal load conditions.

1. Service entrance at main panel. 2. Terminals of all motors.

3.7 PHASE RELATIONSHIP

A. Examine connections to equipment for proper phase relationships. Verify proper motor rotation. 3.8 FIRE ALARM ACCEPTANCE TEST

A. Have the fire alarm acceptance test performed by the Alarm Company Representative and Installing Contractor in the presence of the Base Fire Chief's Representative.

B. Acceptance Test Procedures:

EXPECTED INDICATION ON PANEL/RECEIVING STATION PREMISES AND REMOTE STATION

1. Normal Power to Panel (Normal) 2. Disconnect Power to Panel (Trouble) 3. Activate Detection Device (Alarm) 4. Silence Alarm Signaling Devices (Trouble) 5. Return Normal Power to Panel & Reset Panel (Normal) 6. Place Each Function Switch in an Abnormal Position (Trouble) 7. Remove supervised Devices from System (During

this portion of testing, ensure proper wire has been used and devices are properly installed.)

8. Return Supervised Device to System (Normal) 9. Disconnect Normal Power to Panel (Trouble) 10. Activate Detector(s) for each Zone (Alarm) 11. Inspect all Horns Zone Indication, and Auxiliary Devices (Working List)

Page 289: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TESTING 26 60 00-3

12. Silence Horns (Alarm/Trouble) 13. Reset System (Trouble) 14. Return Normal Power to System (Normal) 15. Place Panel in Alarm Condition. Disconnect Primary

Power Source for a Minimum of 15 Seconds and Return to Normal Power. (The above transfer procedure shall not cause a loss of an alarm condition at Receiving Station.)

3.9 CORRECTION OF DEFECTS

A. When tests disclose any unsatisfactory workmanship or equipment furnished under this Contract, correct defects and retest. Repeat tests until satisfactory results are obtained.

B. When any wiring or equipment is damaged by tests, repair or replace such wiring or equipment. Test

repaired items to ensure satisfactory operation.

END OF SECTION 26 60 00

Page 290: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TELEPHONE SERVICE, RACEWAYS AND WIRING 27 15 00-1

DIVISION 27 - COMMUNICATIONS SECTION 27 15 00 - TELEPHONE SERVICE, RACEWAYS AND WIRING

PART 1 - GENERAL 1.1 SECTION INCLUDES

A. Telephone service raceways and cables. B. Equipment and terminal backboards, building entrance terminals, and gas tube protectors. C. Premises wiring and outlets.

1.2 REFERENCES A. EIA/TIA 568B - Commercial Building Wiring Standard. B. EIA/TIA 569 - Commercial Building Standard for Telecommunications Pathways and Spaces. C. Directorate of Information Management (DOIM). Communications Squadron Standards. D. National Fire Protection Association (NFPA). NFPA 70 - National Electrical Code.

1.3 SYSTEM DESCRIPTION A. Telephone Service Entrance Raceway: Nonmetallic conduit(s) from point of telephone utility

connection to building service. Provide concrete encasement for lengths under paved areas. B. DSN Telephone Service Cable: 50 pair exchange grade copper cable for Base connection. C. Commercial Telephone Service Cable: Furnished and installed by Century Link. D. Premises Wiring: AAFES furnished / AAFES installed. E. Accessories: Connector blocks, building entrance terminals, gas tube protectors, jacks, etc. F. Grounding. G. The telephone system equipment is AAFES furnished / AAFES installed by Exponent Systems.

1.4 SUBMITTALS A. Submit under provisions of Division 01 – Submittals. B. Product data for cables, outlets, and accessories.

1.5 PROJECT RECORD DOCUMENTS

A. Submit under provisions of Division 01 – Project Record and Closeout Documents. B. Record actual locations and sizes of raceways and outlets.

1.6 QUALITY ASSURANCE A. Perform Work in accordance with EIT/TIA, DOIM and commercial telephone utility’s rules and

regulations.

1.7 QUALIFICATIONS

Page 291: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TELEPHONE SERVICE, RACEWAYS AND WIRING 27 15 00-2

A. Installer: Workers specializing in installing telephone premises wiring with minimum three years documented experience.

B. Contractors responsible for installing telecom cabling will have a minimum “Technician” BISCI

certification. C. Submit names and qualifications of installers and five similar projects for each installer.

1.8 REGULATORY REQUIREMENTS A. Conform to requirements of NFPA 70. B. Furnish Products listed and classified by Underwriters Laboratories, Inc. as suitable for purpose

specified and indicated.

1.9 SUBMITTALS FOR REVIEW A. Division 01 - Submittals: Procedure for submittals. B. Product data: for cables, jacks, and accessories. C. Test: Manufacturer’s certified on-reel test results. D. Samples: Provide 12" sample of each cable type. Choose samples to show all information printed

on jacket. E. Test Results.

PART 2 - PRODUCTS 2.1 TELEPHONE TERMINATION BACKBOARDS

A. Material: Plywood. B. Size: As indicated, 3/4 inch thick. Coordinate with base fire department when area of any back

board exceeds 32 sq. ft. C. The telephone back board shall be painted with two coats of fire retardant paint to match the

surrounding walls. 2.2 TELEPHONE CABLES

A. Premise cabling shall be AAFES furnished / AAFES installed. B. Building DSN service cable shall be 24 AWG copper, number of pairs as indicated on plans.

Cable shall be jelly filled with rodent resistant black outer jacket. Cable shall have a bonded aluminum shield. Cable shall meet REA specifications for type PE exchange grade cable.

2.3 JACKS – AAFES FURNISHED / AAFES INSTALLED

2.4 PATCH PANELS – AAFES FURNISHED / AAFES INSTALLED

2.5 GROUNDING

A. Provide a single point ground for all communications electronic equipment. Ground shall be by a copper ground plate width x length of terminal board. Install ground plate along bottom edge of terminal board. Connect ground riser with #1 AWG directly connected to ground plate with no taps. Resistance shall be 10 ohms or less measured from main ground point.

Page 292: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TELEPHONE SERVICE, RACEWAYS AND WIRING 27 15 00-3

PART 3 - EXECUTION 3.1 INSTALLATION

A. Stub minimum ¾” conduit (or larger where indicated) from each outlet location up to roof level.

Provide bushing at end of conduit. B. Provide wire and cable in accordance with manufacturer’s instructions and in accordance with

EIA/TIA 568. C. Finish paint termination backboards with durable white enamel under the provisions of Division 09

prior to installation of telephone equipment. D. Support raceways, backboards, and cabinets under the provisions of Section 26 05 29. E. Install termination backboards plumb, and attach securely to building wall at each corner. F. An appointed Quality Control (QC) representative from the NEC shall observe operational tests,

and analyze both observed, and annotated test results provided by the contractor. Any system, equipment, or hardware that does not meet Department of Defense (DoD), manufacturer’s or requirement’s standards shall not be accepted.

G. All discrepancies must be retested/inspected and the results certified correct, in writing, by the

NEC QC representative prior to any final acceptance. H. The contractor shall perform the following cable tests on all cables: 1. Conductor OHM’s resistance. 2. Cable shield continuity. 3. Conductor continuity including testing all pairs for; opens, shorts, grounds, crosses, splits,

reversed and transposed pairs. 4. Insulation resistance test between all groups including grounds and/or shields, and a

minimum of 20% of the total conductors in each group. 5. All voice circuits on DSN service cable shall be toned out, tested for opens, shorts,

grounds, and crossed pairs.

END OF SECTION 27 15 00

Page 293: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-1

DIVISION 27 - COMMUNICATIONS SECTION 27 51 17 - MASS NOTIFICATION SYSTEM

PART 1. GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

B. The design of this Mass Notification system incorporates specific components beyond that required for a fire alarm system, but is directly interfaced through hardware with the fire alarm system.

C. Shall be in accordance with Military document UFC 4-021-01.

1.2 SUMMARY

A. The United States Military has developed provisions for Mass Notification of personnel in the event of threats other than fire. Threats could vary from land attacks, sea attacks, chemical attacks, radiological attacks, and others.

B. The system components, supervision, and basic installation practices shall comply with criteria outlined in NFPA 72 and the Americans with Disabilities Act.

1.3 DEFINITIONS

A. FACP: Fire alarm control panel.

B. MNCP: Mass Notification Control Panel.

C. UFC: Unified Facilities Criteria.

D. LED: Light-emitting diode.

E. NICET: National Institute for Certification in Engineering Technologies.

F. Definitions in NFPA 72 apply to fire alarm terms used in this Section.

G. AHJ: Authority Having Jurisdiction is an individual responsible for review, inspection, and/or approval of a system and shall include the building official, fire marshal, engineer, architect, or owner’s insurance representative. For this project, the AHJ shall be Base fire chief.

1.4 REFERENCES

A. Military Documents:

1. UFC 3-600-01 Fire Protection Engineering For Facilities 2. UFC 3-600-02 Inspection, Testing, and Maintenance of Fire Protection Systems 3. UFC 4-021-01 Mass Notification Systems For Facilities

B. National Fire Protection Association (NFPA):

1. NFPA 70 National Electrical Code 2. NFPA 72 National Fire Alarm Code

C. Underwriters' Laboratories, Inc. (UL): Appropriate UL equipment standards:

1. UL 864, Ninth Edition, Control Panels.

Page 294: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-2

2. UL 38 Manually Actuated Signaling Boxes. 3. UL 1971, Standard for Visual Signaling Appliances.

D. State and Local Building Codes as adopted and/or amended by The Authority Having Jurisdiction (AHJ).

E. ADA, and/or State and local equivalency standards as adopted by The Authority Having Jurisdiction.

1.5 SYSTEM DESCRIPTION

A. Mass notification is the capability to provide real-time information to all building occupants or personnel in the immediate vicinity of a building during emergency situations. To reduce the risk of mass casualties, there must be a timely means to notify building occupants of threats and what should be done in response to those threats. Pre-recorded and live voice emergency messages are required to provide this capability.

B. Failure of either the mass notification control panel or the fire alarm control panel shall still provide for a minimum means of occupant notification by the remaining system.

C. All equipment furnished shall be new and the latest state of the art products by manufacturers, engaged in the manufacturing and sale of analog fire detection and/or UL listed communication devices for over five years.

D. The system as specified is subject to review, full testing, and approval by each of the Authorities Having Jurisdiction, and shall be turned over to the owner in an operational condition.

E. The contractor shall provide a representative as requested for project meetings such as to assist in coordination of crafts.

1.6 PERFORMANCE REQUIREMENTS

A. Comply with all referenced documents.

B. Mass Notification initiation shall be by one or more of the following devices:

1. Manual stations 2. Switches located with the main panel and any remote microphones

C. Mass Notification activation shall initiate the following actions:

1. Display action initiated on the mass notification control panel. 2. Initiate the appropriate alert tone and pre-recorded message for the respective alert switch

activated. 3. Activate the mass notification strobes throughout the building. 4. Mass notification shall have alert priority over fire alarm system. Thus, if fire alarm is also in

alarm state, the fire alarm audible alarms shall stop during the mass notification messages. All prerecorded messages shall automatically shut-off after 10 minutes. At end of 10 minutes, the mass notification devices shall shut off and fire alarm notification devices shall reactivate.

5. Mass notification signals shall not be displayed as alarm conditions. Text descriptions shall clearly indicate appropriate condition.

6. Transmit the signal to the monitoring station.

D. Supervisory signal initiation shall be by one or more of the following devices or actions:

1. Display the origin of the supervisory condition report at the local fire alarm control panel and/or mass notification panel.

2. Activate supervisory audible and dedicated visual signals. 3. Provide a means for silencing a supervisory signal shall be permitted only if it is key-operated,

located in a locked enclosure, or arranged to provide equivalent protection against unauthorized

Page 295: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-3

use. Such a means shall be permitted only if it transfers the supervisory indication to a lamp or other visible indicator and subsequent supervisory signals in other zones cause the supervisory notification appliance(s) to re-sound.

4. Record within system history the initiating device and time of occurrence of the event. 5. Transmit the signal to the monitoring station.

E. System trouble signal initiation shall be by one or more of the following devices or actions:

1. Display at the local fire alarm control panel and or mass notification panel the origin of the trouble condition report.

2. Activate trouble audible and visual signals at the control panels and as indicated on the drawings. 3. Silence audible signals via a trouble acknowledge switch. 4. Trouble reports for primary system power failure to the master control shall be optionally delayed

for a period of time not greater than 200 seconds. Trouble conditions that have been restored to normal shall be automatically removed from the trouble display queue and not require operator intervention. This feature shall be software selectable and shall not preclude the logging of trouble events to the historical file.

5. Record within system history, the occurrence of the event, the time of occurrence and the device initiating the event.

6. Transmit the signal to the monitoring station.

F. System Trouble and Supervisory Signal Actions: Initiate audible and visual signals at the main panels and remote annunciators.

G. Power and Voltage Limitations:

1. Power supplies shall be sized to furnish the total connected load in a worst-case condition plus 25% spare capacity. (i.e. 4A supply x .25 spare = 1A reserve.)

2. Voltage drop calculations for wiring runs demonstrating worst-case condition. Unless otherwise approved by the engineer, voltage drop calculations shall be performed using the Lump-Sum approach. Calculations must include and clearly indicate wire length out and back to panel. Calculations shall be provided for horn, strobe, and speaker circuits.

3. Device current values for voltage calculations shall be based on the lowest nameplate voltage. (i.e. current values at a voltage of 20 volts shall be used when available rather than current values for 24 volts.)

4. Notification Appliance Circuit (NAC) design shall incorporate a 25% spare capacity for future expansion.

5. In no case shall indicating/evacuation circuits be designed or measured to have an end-of-line voltage below 20 volts or the manufactures nameplate voltage, whichever is higher.

H. Notification zones and circuits shall be defined and configured such that organizational zones within a building can be isolated for zone evacuation, and/or isolation during testing conditions.

1.7 SUBMITTALS

A. Comply with submittal requirements in Section 28 31 11, Fire Alarm System.

1.8 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Qualifications: See Section 28 31 11, Fire Alarm System, for qualification requirements.

1.9 PROJECT CONDITIONS

A. See Section 28 31 11, Fire Alarm System, for criteria.

Page 296: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-4

1.10 SEQUENCING AND SCHEDULING

A. See Section 28 31 11, Fire Alarm System, for criteria.

PART 2. PRODUCTS

2.1 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Mass notification control panels a. Madahcom (Wireless Transceiver/Basewide Communications) b. Monaco Enterprises Inc. (Wireless transceiver/Basewide Communications)

2. Wire and Cable: a. Comtran Corporation. b. Helix/HiTemp Cables, Inc.; a Draka USA Company. c. Rockbestos-Suprenant Cable Corporation; a Marmon Group Company. d. West Penn Wire/CDT; a division of Cable Design Technologies.

3. Audible and Visual Signals: a. Strobes, Horns, Speakers and Speaker Strobes as specified in Section 2.04.

2.2 MASS NOTIFICATION COMPONENTS

A. Multi-Function Mass Notification Control Panel (MNCP)

1. The system shall be a Single channel voice evacuation system incorporating user selectability of 8 distinct sounds for tone signaling, and the incorporation of a digital voice module for prerecorded messaging. The system shall incorporate microphone override. The system shall have the capability of utilizing a remote microphone station with redundant controls of the evacuation system control panel.

2. A hand held microphone shall be provided and, upon activation, shall take priority over any tone signal, recorded message or remote microphone operation in progress, while maintaining the strobe NAC Circuits activation.

3. The system shall be capable of interconnection with a larger base wide notification system that includes operation from a central communication center and an outdoor public notification system provided by the same manufacturer.

4. Specific Components to include: • Safepath Multifunction Control Panel for Fire/Mass Notification, Telephone Paging,

Messaging and Background Music. • 80, 160, or 320 Watt Audio Boosters, Red • Strobe Power Supply - 8 Amp w/Sync Con/Man Pwr • 15 Watt Supervised Horn • Remote Strobe/Multi-Candela, Red Wall • ceiling strobes. White with clear lens and red lettering “FIRE” for fire alarm strobes. White

with amber lens for mass notification. Factory mount on speaker where indicated. • Remote Strobe, Multi Candela, White Wall • Ceiling 8” UL Speaker • Addressable Paging Splitter • Model SP4-TZC Telephone Zone Controller • Appropriate consoles, batteries, modules, kits, and mounting accessories • remote microphone and local operator control with integral HVAC shutdown pushbutton. • Battery capacity for 24 hours supervision and 60 minutes alarm.

B. Circuits:

1. Signaling Line Circuits: NFPA 72, Class A, Style 6. 2. Notification-Appliance Circuits: NFPA 72, Class B for speakers, Class A for strobes.

Page 297: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-5

3. Actuation of alarm notification appliances including emergency voice communications shall occur within 10 seconds after the activation of an initiating device.

4. Electrical monitoring for the integrity of wiring external to the mass notification panel. 5. Power Supply for Supervision Equipment: Supply for audible and visual equipment for

supervision of the ac power shall be from a dedicated dc power supply, and power for the dc component shall be from the ac supply.

6. Alarm Silencing, Trouble, and Supervisory Alarm Reset: Manual reset at the mass notification panel and remote annunciators, after initiating devices are restored to normal.

7. Silencing-switch operation halts alarm operation of notification appliances and activates an "alarm silence" light. Display of identity of the alarm zone or device is retained.

8. Subsequent alarm signals from other devices or zones reactivate notification appliances until silencing switch is operated again.

9. When alarm-initiating devices return to normal and system reset switch is operated, notification appliances operate again until alarm silence switch is reset.

C. Walk Test: A test mode to allow one person to test alarm and supervisory features of initiating devices. If testing ceases while in walk-test mode, after a preset delay, the system shall automatically return to normal.

D. Remote Microphone (Local Operator’s Control):

1. System shall be capable of adding up to three (3) remote microphones. 2. The Remote Microphone station shall be compatible with the Supervised Audio, Fire and

Emergency Evacuation System. 3. The unit shall incorporate a Push-To-Talk (PTT) microphone, redundant controls and system

status indicators of/for the system. 4. The unit shall incorporate microphone override of any tone generation or prerecorded

messages. 5. The unit shall be fully supervised from the control panel. 6. The unit shall be made of steel and be flush mounted.

7. The unit shall be equipped with a thumb lock. The unit shall be painted white. The unit shall have a 3 YEAR WARRANTY.

8. The approvals for this unit shall include: UL Standard 864, Ninth Edition, and FCC Part 15. 9. Unit shall have integral HVAC shutdown pushbutton.

E. Function of Amplifier:

1. Automatic transmission of different pre-recorded announcements to the facility, or for manual transmission of announcements by use of the central-control microphone. Amplifiers shall be UL 1711 listed.

2. Allow the application of and evacuation signal to indicated number of zones. 3. Programmable tone and message sequence selection. Provide separate tone/message

sequence for fire alarm and mass notification alarms. 4. Digitally recorded messages for "Evacuation" and "All Clear." All messages to be reviewed

and approved by AHJ. See 28 31 11 – 2.2B11. 5. Generate tones to be sequenced with audio messages of the type recommended by

NFPA 72 and that are compatible with tone patterns of the notification-appliance circuits of the FACP.

6. Status Annunciator: Indicate the status of various voice/alarm speaker zones. 7. Primary Power: 24-V dc obtained from 120-V ac service and a power-supply module.

Initiating devices, notification appliances, signaling lines, trouble signal, supervisory signal, and supervisory and digital alarm communicator transmitter shall be powered by the 24-V dc source.

8. The alarm current draw of the mass notification system shall not exceed 80 percent of each respective power-supply module ratings.

9. Power supply shall have a dedicated circuit breaker with handle lock for this connection. Provide a red label at circuit breakers and identify it with "FIRE ALARM/MASS NOTIFICATION SYSTEM."

Page 298: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-6

F. Primary Power: 24V dc obtained from 120V ac service and a power-supply module. Initiating devices, notification appliances, signaling lines, trouble signal, supervisory signal, and supervisory digital alarm communicator transmitter shall be powered by the 24V dc source.

G. Secondary Power: 24-V dc supply system with batteries and automatic battery charger and an automatic transfer switch.

1. Batteries: Sealed lead calcium. 2. Battery and Charger Capacity: Comply with NFPA 72. 3. Provide minimum 72 hours standby and 60 minutes alarm back-up power. Plus 25% spare

capacity.

H. Surge Protection:

1. Install surge protection on normal ac power for the control panel, each power supply, and all accessories. Comply with Division 16 Section "Transient Voltage Suppression" for auxiliary panel suppressors.

2. Install surge protectors recommended by control panel manufacturer. Install on all system wiring external to the building housing the control panel. This shall include power, telephone, and radio transmitter wiring.

I. Instructions: Computer printout or typewritten instruction card mounted behind a plastic or glass cover in a stainless-steel or aluminum frame. Include interpretation and describe appropriate response for displays and signals. Briefly describe the functional operation of the system under normal, alarm, and trouble conditions.

2.3 MANUAL ACTIVATION STATIONS

A. Description: UL 38 listed; Color shall be white, operating instructions and label in contrasting color. Station shall show visible indication of operation. Mounted on recessed outlet box.

1. Single action mechanism requiring one action to initiate an alarm, pull-lever type, with integral addressable module, arranged to communicate manual-station status (normal, alarm, or trouble) to the MNCP.

2. Station Reset: Key-operated switch.

2.4 NOTIFICATION APPLIANCES

A. Description: Equipped for mounting as indicated and with screw terminals for system connections.

B. Visible Alarm Devices: Combination fire/mass notification Xenon strobe lights listed under UL 1638 and 1971. Mass notification strobe shall be amber translucent lens. There shall be no wording on this strobe. Fire alarm strobe shall be clear polycarbonate with “FIRE” engraved in 1” high letters on lens. Provide a white aluminum trim.

1. Rated Light Output: As indicated on the Drawings

C. Manufacturer shall provide wall mount devices and/or ceiling mount devices as indicated on drawings. Provide special backbox for surface mounting of dual system indicating devices. Wheelock #SBL2-W or equal.

D. Evacuation Speakers:

1. UL 1480 listed, as specified in Section 2.2-5 above 2. Range Units: Rated .1/8, 1/4, 1/2, 1, 2 watts at 70-volts, unless otherwise noted on the plans. 3. Mounting: Flush mount in areas with suspended accoustical tile or gypsumboard ceilings.

Surface mount in areas with exposed structure. Provide minimum 60 degree symmetrical dispension.

4. Matching Transformers: Tap range matched to the acoustical environment of the speaker location.

Page 299: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-7

5. Device shall be capable of multiple alert tones as indicated on plans or as required by the respective military facility.

6. Provide steel back box suitable for surface or recess mounting as required. Provide perforated aluminum grille factory painted white.

2.5 REMOTE ANNUNCIATOR

A. Trouble and supervisory conditions with the mass notification circuits shall be indicated on the fire alarm control panel and remote annunciators.

2.6 TELEPHONE ACCESS

A. System shall be capable of activation and voice messaging through a telephone connection and shall be listed for such use.

B. Coordinate zone requirements with Contracting Officer prior to shop drawing preparation or installation of wiring. Plan for maximum 10 zones.

2.7 REMOTE COMMUNICATIONS

A. Mass notification panel shall be capable of integration with a site-wide wireless communication system UL listed for emergency notification.

B. Provide a Monaco BTXM transceiver with D21 compatibilities to receive base wide mass notification communication messages. This transceiver shall be separate from the transceiver described in Section 28 31 11 – Fire Alarm. Provide a wall mounted antenna, mast, lightning arrestor, and all required accessories. Trim antenna to base operating frequency. Coordinate frequency selection with base AT/FP office prior to trimming.

C. Mass notification panel shall be capable of silencing all AF/AI paging and music system equipment. Contractor shall field coordinate locations of AF/AI equipment with Contracting Officer. Connections shall be made such that in event of fire alarm or mass notification alarm, the AFFES equipment will be silenced until mass notification or fire alarm is cleared. Contractor to coordinate with AAFES equipment installer and provide all relay and connections to AAFES equipment as required to accomplish shutdown.

2.8 WIRE AND CABLE

A. Wire and cable for mass notification systems shall be UL listed and labeled as complying with NFPA 70, Article 760 and shall be in accordance with requirement of Section 28 31 11, Fire Alarm System.

PART 3. EXECUTION

3.1 EQUIPMENT INSTALLATION

A. Notification equipment shall be installed and mounted in accordance with design documents and specific mounting details.

B. Control panels shall be mounted in a neat, orderly, and space-limiting manner. Details in drawings shall be used as a guide and represent allotted space.

C. No portion of a mass notification system shall be installed prior to having plans on site that have been reviewed, approved, and stamped by the appropriate reviewing agency and/or AHJ. This includes wiring. Approved stamped plans shall be on site at all times while the system is in the installation stage.

Page 300: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-8

3.2 BACK BOXES

A. All speakers are to be installed in at least a 4-inch square deep box with extension ring to limit potential damage to wiring.

B. 5" Square Boxes 2-7/8" x 5" (67 cubic inch) deep metal box with a 5" extension ring shall be allowed. If used, careful consideration in the centering of finished devices is required due to larger box size when mounted to studs.

C. Manual push/pull stations shall be located on walls such that tamper resistant covers can be installed as may be indicated, or in the future. Therefore, a 3-inch clearance from other switches, window openings, door frames, etc. shall be provided on each side of a manual pull station and 4 inches clear area above and below the manual pull station.

D. Provide special backbox for surface mounting of dual system indicating devices. Wheelock #SBL2-W or equal.

3.3 WIRING INSTALLATION

A. Wiring shall be installed in accordance with Section 28 31 11, Fire Alarm System,

3.4 IDENTIFICATION

A. Identify system components, wiring, cabling, and terminals according to Division 26 Section "Electrical Identification."

B. Each conductor shall be identified as shown on the drawings at each end and at terminal points with wire markers. Attach permanent wire markers within 2 inches of the wire termination. Marker legends shall be visible.

C. Install instructions frame in a location visible from the FACP.

D. Paint power supply circuit breaker(s) red and label “FIRE ALARM”.

E. All initiating devices shall have permanent making indicated address in FACP.

3.5 GROUNDING

A. Ground the MNCP and associated circuits; comply with IEEE 1100.

3.6 FIELD QUALITY CONTROL

A. Contractor Pre-Testing and Record of Completion Testing shall be conducted prior to scheduling commission testing and shall comply with criteria in Section 28 31 11.

3.7 ACCEPTANCE TESTING

A. System commission testing shall be conducted per criteria in Section 28 31 11.

B. Testing shall include the initial activation of the fire alarm system and then a subsequent and sequential activation of the mass notification system. This sequence shall be reversed. System function shall comply with criteria of this Section.

C. System commission testing shall verify that the criteria outlined in this specification are complied with.

D. Contractor shall conduct speaker intelligibility walk thru with fire department representative. Speakers shall be activated and taps adjusted as needed on a room by room basis to ensure message intelligibility.

Page 301: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

MASS NOTIFICATION SYSTEM 27 51 17-9

3.8 FINAL DOCUMENTATION

A. Final documentation shall be submitted following the criteria in Section 28 31 11, Fire Alarm System.

3.9 FINAL SYSTEM TRAINING

A. Very detailed system training shall be provided to the owner following the criteria in Section 28 31 11, Fire Alarm System.

3.10 ADJUSTING AND FOLLOW-UP

A. Mass notification system adjusting, inspection, and testing shall comply with the criteria in Section 28 31 11, Fire Alarm System.

3.11 WARRANTY AND SERVICES

A. The contractor shall warranty the entire system for electrical and mechanical failures for a period of one year. The warranty shall begin with the completion of the commissioning testing or when beneficial use to the owner is determined and so documented.

B. The mass notification control panel shall have a 3-year manufacturer warranty.

END OF SECTION 27 51 17

Page 302: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-1

DIVISION 28 – ALARMS AND SURVEILLANCE SECTION 28 31 11 - FIRE ALARM

PART 1. GENERAL

1.1 SUMMARY

A. Fire protection systems are life-safety systems and will therefore be designed, installed, tested, and expected to perform as such.

B. This Section includes fire alarm systems.

C. Related Sections include the following:

1. Division 27: “Mass Notification System”.

1.2 DEFINITIONS

A. FACP: Fire alarm control panel.

B. MNCP: Mass notification control panel.

C. LED: Light-emitting diode.

D. NICET: National Institute for Certification in Engineering Technologies.

E. Definitions in NFPA 72 apply to fire alarm terms used in this Section.

F. AHJ: Authority Having Jurisdiction is an individual responsible for review, inspection, and/or approval of a system and shall include the building official, fire marshal, engineer, Contracting Officer, or Owners insurance representative. For this project, the AHJ shall be Base fire chief.

1.3 REFERENCES

A. All references shall be of the latest edition.

B. National Fire Protection Association (NFPA):

1. NFPA 13 Standard For The Installation of Sprinkler Systems 2. NFPA 70 National Electrical Code 3. NFPA 72 National Fire Alarm Code 4. NFPA 90A Standard For The Installation of Air Conditioning And Ventilating Systems 5. NFPA 101 Life Safety Code

C. Underwriters' Laboratories, Inc. (UL): Appropriate UL equipment standards:

1. UL 864 Control Panels. 2. UL 268 Smoke Detectors. 3. UL 268A Smoke Detectors (HVAC). 4. UL 38 Manually Actuated Signaling Boxes. 5. UL 346 Water flow Indicators for Fire Protection Signaling. 6. UL 1971, Standard for Visual Signaling Appliances.

D. Building Codes:

1. International Building Code 2. International Fire Code

Page 303: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-2

E. ADA, and/or State and local equivalency standards as adopted by The Authority Having Jurisdiction.

F. Military Unified Facilities Criteria:

1. UFC 3-600-1 2. UFC 3-600-02 3. UFC 4-021-01

1.4 SYSTEM DESCRIPTION

A. Noncoded, analog-addressable system; automatic sensitivity control of certain smoke detectors; and multiplexed signal transmission.

B. All equipment furnished shall be new and the latest state of the art products of a single manufacturer, engaged in the manufacturing and sale of analog fire detection devices for over ten years.

C. The system as specified shall be reviewed, fully tested and approved by each of the Authorities Having Jurisdiction, and turned over to the owner in an operational condition.

D. In the interest of job coordination and responsibilities the installing contractor shall contract with a single supplier for fire alarm equipment, engineering, programming, inspection and testing.

E. The contractor shall provide a representative as requested for project meetings such as to assist in coordination of trades.

1.5 PERFORMANCE REQUIREMENTS

A. Comply with NFPA 72.

B. Fire alarm signal initiation shall be by one or more of the following devices:

1. Manual stations. 2. Smoke or heat detectors. 3. Automatic sprinkler system water flow. 4. Fire extinguishing system operation.

C. Fire alarm signal shall initiate the following actions:

1. Sound evacuation signals or voice messages and display a custom screen/message defining the building/zone/room in alarm and the specific alarm point initiating the alarm.

2. Log to the system history archives all activity pertaining to the alarm condition. 3. Activate visual strobe signals throughout the facility. 4. Visual signals shall be programmable to flash until system reset or additional alarm silencing, as

required. 5. A signal dedicated to sprinkler system water flow alarm shall not be silenced while the sprinkler

system is flowing at a rate of flow equal to a single head.

D. Supervisory signal initiation shall be by one or more of the following devices or actions:

1. Signal from the Mass Notification Control Panel. 2. Display the origin of the supervisory condition report at the local fire alarm control panel. 3. Activate supervisory audible and dedicated visual signal. 4. A means for silencing a supervisory signal shall be permitted only if it is key-operated, located in a

locked enclosure, or arranged to provide equivalent protection against unauthorized use. Such a means shall be permitted only if it transfers the supervisory indication to a lamp or other visible indicator and subsequent supervisory signals in other zones cause the supervisory notification appliance(s) to re-sound.

5. Record within system history the initiating device and time of occurrence of the event. 6. Transmit the signal to the monitoring station. 7. Emergency stop of HVAC equipment.

Page 304: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-3

E. System trouble signal initiation shall be by one or more of the following devices or actions:

1. Signal from the Mass Notification Panel. 2. Display at the local fire alarm control panel the origin of the trouble condition report. 3. Activate trouble audible and visual signals at the control panel and as indicated on the drawings. 4. Silence audible signals from the fire alarm control panel via a trouble acknowledge switch. 5. Trouble reports for primary system power failure to the master control shall be optionally delayed for a

period of time not greater than 200 seconds. Trouble conditions that have been restored to normal shall be automatically removed from the trouble display queue and not require operator intervention. This feature shall be software selectable and shall not preclude the logging of trouble events to the historical file.

6. Record within system history, the occurrence of the event, the time of occurrence and the device initiating the event.

7. Transmit the signal to the monitoring station. 8. Emergency stop of HVAC equipment.

F. System Trouble and Supervisory Signal Actions: Ring trouble alarm and annunciate at the FACP and remote annunciators.

G. Power and Voltage Limitations:

1. Battery capacity calculations. Battery size shall be a minimum of 125% of the calculated requirement.

2. Power supplies shall be sized to furnish the total connected load in a worst-case condition plus 25% spare capacity. (i.e. 4A supply x .25 spare = 1A reserve.)

3. Voltage drop calculations for wiring runs demonstrating worst-case condition. Unless otherwise approved by the engineer, voltage drop calculations shall be performed using the Lump-Sum approach using device nominal rating voltage. Calculations must include and clearly indicate wire length out and back to panel. Calculations shall be provided for strobe and speaker circuits.

4. Device current values for voltage calculations shall be based on the lowest nameplate voltage. (i.e. current values at a voltage of 16 volts shall be used when available rather than current values for 24 volts.)

5. Notification Appliance Circuit (NAC) design shall incorporate a 25% spare capacity for future expansion.

6. In no case shall indicating/evacuation circuits be designed or measured to have an end-of-line voltage below 16 volts or the manufacturers nameplate voltage, whichever is higher.

1.6 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: All submittals shall be submitted to the Contracting Officer for review. The contractor shall include the following information in submittals.

1. Shop Drawings shall be prepared and signed by persons with the following qualifications: a. Registered Fire Protection Engineer. b. Fire alarm certified by NICET, minimum Level IV. Trained and certified by manufacturer in

fire alarm system design.

2. System Operation Description: Detailed description for this Project, including method of operation and supervision of each type of circuit and sequence of operations for manually and automatically initiated system inputs and outputs. Manufacturer's standard descriptions for generic systems are not acceptable.

3. Device Address List: Coordinate final system programming with owner and base fire department. 4. System riser diagram with device addresses, conduit sizes, and cable and wire types and sizes. 5. Wiring Diagrams: Power, signal, and control wiring. Include diagrams for equipment and for

system with all terminals and interconnections identified. Show wiring color code. 6. Batteries: Size calculations. 7. Duct Smoke Detectors: Performance parameters and installation details for each detector,

verifying that each detector is listed for the complete range of air velocity, temperature, and humidity possible when air-handling system is operating. Coordinating the installation of duct

Page 305: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-4

smoke detectors and access to them. Show critical dimensions that relate to placement and support of sampling tubes, the detector housing, and remote status and alarm indicators. Locate detectors according to manufacturers written recommendations.

8. Elevation Details: Details shall be provided showing mounting of wall and ceiling devices. Where exposed or pocketed ceilings are involved, specific dimensioned details of detector and notification devices shall be provided.

9. Device Mounting Details: Details of device back-box requirements shall be provided. 10. Floor Plans: Indicate final outlet locations showing address of each addressable device. Show

size and route of cable and conduits. CADD files for floor plans may be obtained through General Contractor from the Architect/Engineer. Allow for minimum two week return.

11. Provide Wav files for base review of prerecorded alarm messages. a. Fire: (Temporal Code 3) (Female Voice) – “Attention, a fire emergency has been reported

in the building. Please remain calm and leave the building by the nearest exit or exit stairway. Do not use the elevators. (provide a two second pause) Attention, a fire emergency has been reported in the building. Please remain calm and leave the building by the nearest exit or exit stairway. Do not use the elevators.”

b. Weather: (Slow Woop Tone x 5 seconds) (Female Voice) – “Attention, the national Weather Service has issued a severe weather alert for this area. Tune into local radio and television stations for further guidance.”

c. Suspicious Activity: (Slow Woop Tone x 5 seconds) (Female Voice) – “Attention, a possible breach in security has been reported. Please remain calm. You are instructed to take appropriate security measures and to report suspicious personnel, vehicles, packages or activities to security personnel.”

d. Toxic Chemical Hazard: (Slow Woop Tone 5 seconds) (Female Voice) “Attention, a toxic chemical hazard has been reported. Seek shelter immediately, close doors and windows, shut off heating, ventilation and air conditioning, seek shelter immediately.”

e. Tornado Warning: (Slow Woop Tone x 5 seconds) (Female Voice) “Attention, a tornado warning has been issued for Fort Hood. Take shelter immediately. I repeat, a tornado warning has been issued for Fort Hood, take shelter immediately.”

f. Active Shooter: (Slow Woop Tone x 5 second) (Female Voice) “Attention, active shooter warning, active shooter warning, seek shelter immediately. Initiate active shooter protocols.”

g. All Clear: (Slow Woop Tone x 5 seconds) (Female Voice) “Attention, the declared emergency no longer exists; I repeat the declared emergency no longer exists.

h. Test: (Slow Woop Tone x 5 seconds) (Female Voice) “Attention, this is a test of the Fort Hood emergency warning system. This is only a test. If this had been an actual emergency, additional instructions would be broadcast. This is only a test.”

C. Cut Sheets, Calculations, and other Design Documents: Each set of shop drawings shall be

accompanied with supportive submittal documentation. This documentation shall be quality bound and shall be organized and numerically tabbed into the following sections.

1. Fire Alarm Control Panels, Power Supplies and Annunciators 2. Detection Devices 3. Audio/Visual Devices 4. System Components, Modules and Relays 5. Battery Calculations and cut sheets (summary of results shall also be on plans) 6. Voltage Calculations (summary of results shall also be on plans) 7. Compatibility Listings (matrix, table, or info showing device compatibility) 8. Operating Instructions for entire System (This will include a copy of what will be posted adjacent

to FACP) 9. Manufacturers Inspection instructions and other maintenance criteria from NFPA 72 and UFC 3-

600-02 10. Designer and installer certificates (documents prepared by a PE do not require certificate, but are

required to be sealed.)

D. Qualification Data: Copies of certificates for installers and documenting approved manufacture representation shall be provided.

Page 306: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-5

E. Field quality-control test reports. 100% of alarm devices shall be tested for correct operation and resetting. Tester shall provide spread sheet format listing address, device description, date tested, pass, fail and date corrected columns as a minimum. Tester’s shall sign and date report. Report to be given to fire department prior to scheduling acceptance testing. Also include copy in O & M manual.

F. Operation and Maintenance Data: For fire alarm system to include in emergency, operation, and maintenance manuals. Comply with NFPA 72, Appendix A, recommendations for Owner's manual. Include abbreviated operating instructions for mounting at the FACP.

G. Submittals to Authorities Having Jurisdiction: In addition to distribution requirements for submittals specified in Division 1 Section "Submittals," make an identical submittal to authorities having jurisdiction. To facilitate review, include copies of annotated Contract Drawings as needed to depict component locations. Resubmit if required to make clarifications or revisions to obtain approval. On receipt of comments from authorities having jurisdiction, submit them to Contracting Officer for review.

H. Documentation:

1. Approval and Acceptance: Provide the "Record of Completion" form according to NFPA 72 to Owner and authorities having jurisdiction.

2. Record of Completion Documents: Provide the "Permanent Records" according to NFPA 72 to Owner. Format of the written sequence of operation shall be the optional input/output matrix. (a) Typed hard copies on paper to Owner.

I. A copy of these fire alarm specifications shall be included with all submittal packages including those to the engineer, owner, and local AHJ’s.

J. Incomplete submittals shall be returned without review, unless previously approved by the Contracting Officer.

1.7 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Qualifications:

1. The contractor shall submit copies of all required Licenses and Bonds as required in the State having jurisdiction to the Contracting Officer upon award of contract, and engineer upon request.

2. The contractor shall employ on staff a minimum of one NICET level IV Fire Alarm Technician, a registered Fire Protection Engineer, a professional engineer registered in the State of the installation, or a Certified Safety Professional with proven experience in fire alarm systems. This individual shall make regular site visits as necessary to oversee the system installation. This individual will be held accountable for system oversight, code compliance, and quality of installation. This requirement shall apply to the fire alarm contractor and any other contractor installing portions of the system such as wiring and/or devices by an electrical contractor. Qualified individual shall immediately provide evidence of qualification upon request.

3. At least one NICET Level II Fire Alarm Technician shall be present and have oversight anytime fire alarm equipment and/or wiring is being installed. This requirement shall apply to the fire alarm contractor and any other contractor installing portions of the system such as wiring and/or devices by an electrical contractor. Technician shall immediately provide evidence of qualification upon request.

4. Fire alarm shop drawings shall be prepared and signed by a Registered Fire Protection Engineer with proven and documented experience/training in fire alarm system design and codes. Plans not prepared by the Registered Fire Protection Engineer or under the direct supervision (same employment) of the Registered Fire Protection Engineer shall not be approved. Design documents shall bear a seal of the engineer.

5. The Contracting Officer may accept a testing or qualification body other than NICET, if submitted and approved prior to bidding the project,. Evidence of qualification and means for verification shall be provided in writing to the Contracting Officer with sufficient time for evaluating such

Page 307: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-6

request prior to awarding of contract. However, such qualifications shall be specifically focused towards fire alarm system design, installation, and codes. Qualifications for other low voltage systems such as security, access control, telephone, etc. shall not be approved.

6. The State approved or licensed fire alarm contractor whose name appears on the system and who is responsible for system warranty and service shall have sole authority to establish installation responsibilities. Thus, if any portion is to be wired or installed by a separate contractor (such as an electrical contractor), then the fire alarm contractor will by contract select and warrant such contractor. An electrical or other contractor not licensed by the state and/or not meeting qualification requirements of this specification shall not dictate installation conditions for this system.

PART 2. PRODUCTS

2.1 MANUFACTURERS

A. Base approved Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. FACP and Equipment: a. Simplex. b. Monaco. c. Notifier; a Honeywell Company. d. Siemens Building Technologies, Inc.; a Cerberus Division.

2. Wire and Cable: a. Comtran Corporation. b. Helix/HiTemp Cables, Inc.; a Draka USA Company. c. Rockbestos-Suprenant Cable Corporation; a Marmon Group Company. d. West Penn Wire/CDT; a division of Cable Design Technologies.

3. Audible and Visual Signals: a. Gentex Corporation. b. System Sensor; a GE-Honeywell Company. c. Wheelock, Inc.

2.2 FIRE ALARM CONTROL PANEL (FACP)

A. General Description:

1. Modular, power-limited design with electronic modules, UL 864 listed. 2. Addressable initiation devices that communicate device identity and status.

a. Smoke sensors shall additionally communicate sensitivity setting and allow for adjustment of sensitivity at the FACP.

b. Temperature sensors shall additionally test for and communicate the sensitivity range of the device.

3. Addressable control circuits for operation of mechanical equipment. 4. Interface with the Mass Notification Control Panel. (Refer to Division 27: “Mass Notification

System”.)

B. Alphanumeric Display and System Controls: Arranged for interface between human operator at the FACP and addressable system components including annunciation and supervision. Display alarm, supervisory, and component status messages and the programming and control menu.

1. Annunciator and Display: Liquid-crystal type, three line(s) of 80 characters, minimum. 2. Keypad: Arranged to permit entry and execution of programming, display, and control

commands; and to indicate control commands to be entered into the system for control of smoke-detector sensitivity and other parameters.

C. Circuits:

1. Signaling Line Circuits: NFPA 72, Class A, Style 6.

Page 308: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-7

2. Notification-Appliance Circuits: NFPA 72, Class A, Style Z. 3. Actuation of alarm notification appliances, emergency voice communications, annunciation,

elevator recall, and actuation of suppression systems shall occur within 10 seconds after the activation of an initiating device.

4. Electrical monitoring for the integrity of wiring external to the FACP for mechanical equipment shutdown is not required, provided a break in the circuit will cause food preparation equipment shutdown, and other peripheral functions equipment to shut down.

D. Smoke-Alarm Verification:

1. Initiate audible and visible indication of an "alarm verification" signal at the FACP. 2. Activate a listed and approved "alarm verification" sequence at the FACP and the detector. 3. Record events by the system memory. 4. Sound general alarm. 5. Cancel FACP indication and system reset if the alarm is not verified.

E. Audible Notification: Evacuation speakers shall be capable of sounding temporal pattern 3, complying with ANSI S3.41.

F. Power Supply for Supervision Equipment: Supply for audible and visual equipment for supervision of the ac power shall be from a dedicated dc power supply, and power for the dc component shall be from the ac supply.

G. Alarm Silencing, Trouble, and Supervisory Alarm Reset: Manual reset at the FACP and remote annunciators, after initiating devices are restored to normal.

1. Silencing-switch operation halts alarm operation of notification appliances and activates an "alarm silence" light. Display of identity of the alarm zone or device is retained.

2. Subsequent alarm signals from other devices or zones reactivate notification appliances until silencing switch is operated again.

3. When alarm-initiating devices return to normal and system reset switch is operated, notification appliances operate again until alarm silence switch is reset.

H. Walk Test: A test mode to allow one person to test alarm and supervisory features of initiating devices. Enabling of this mode shall require the entry of a password. The FACP and annunciators shall display a test indication while the test is underway. If testing ceases while in walk-test mode, after a preset delay, the system shall automatically return to normal.

I. Remote Smoke-Detector Sensitivity Adjustment: Controls shall select specific addressable smoke detectors for adjustment, display their current status and sensitivity settings, and control of changes in those settings. Allow controls to be used to program repetitive, time-scheduled, and automated changes in sensitivity of specific detector groups. Record sensitivity adjustments and sensitivity-adjustment schedule changes in system memory, and make a print-out of the final adjusted values on the system printer.

J. Transmission to Remote Alarm Receiving Station: Provide automatic transmission alarm, trouble, and supervisory signals to a remote alarm station by means of a Monaco BTXM FM signal transceiver.

K. Service Modem: Ports shall be RS-232 for system printer and for connection to a dial-in terminal unit.

1. The dial-in port shall allow remote access to the FACP for programming changes and system diagnostic routines. Access by a remote terminal shall be by encrypted password algorithm.

L. Primary Power: 24-V dc obtained from 120-V ac service and a power-supply module. Initiating devices, notification appliances, signaling lines, trouble signal, supervisory signal, and supervisory and digital alarm communicator transmitter shall be powered by the 24-V dc source.

1. The alarm current draw of the entire fire alarm system shall not exceed 80 percent of the power-supply module rating.

2. Power supply shall have a dedicated branch circuit. Provide handle lock at branch circuit breakers. Apply red paint to branch circuit breakers per NPFA 72.

Page 309: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-8

M. Secondary Power: 24-V dc supply system with batteries and automatic battery charger and an automatic transfer switch.

1. Batteries: Sealed lead calcium. 2. Battery and Charger Capacity: Comply with NFPA 72. Provide minimum of 72 hours standby and

15 minutes of alarm backup power (60 minutes alarm if combination fire alarm/mass notification panel).

N. Surge Protection:

1. Provide surge protectors recommended by FACP manufacturer. Provide on all system wiring external to the building housing the FACP. This shall include power, telephone, and radio transmitter wiring.

O. Instructions: Computer printout or typewritten instruction card mounted behind a plastic or glass cover in a stainless-steel or aluminum frame. Include interpretation and describe appropriate response for displays and signals. Briefly describe the functional operation of the system under normal, alarm, and trouble conditions.

2.3 MANUAL FIRE ALARM BOXES

A. Description: UL 38 listed; finished in red with molded, raised-letter operating instructions in contrasting color. Station shall show visible indication of operation. Mounted on recessed outlet box; if indicated as surface mounted, provide manufacturer's surface back box.

1. Double-action mechanism requiring two actions to initiate an alarm, pull-lever type. With integral addressable module, arranged to communicate manual-station status (normal, alarm, or trouble) to the FACP.

2. Station Reset: CAT-15 key-operated switch. Device shall be keyed same as fire alarm control panel and other fire alarm equipment cabinets.

3. Indoor Protective Shield: Factory-fabricated clear polycarbonate plastic enclosure, hinged at the top to permit lifting for access to initiate fire alarm. STI or equal.

4. Use of break glass rods not acceptable.

2.4 SYSTEM SMOKE DETECTORS

A. General Description:

1. UL 268 listed, operating at 24-V dc, nominal. 2. Integral Addressable Module: Arranged to communicate detector status (normal, alarm, or

trouble) to the FACP. 3. Multipurpose type, containing the following:

a. Integral Addressable Module: Arranged to communicate detector status (normal, alarm, or trouble) to the FACP.

2. Plug-in Arrangement: Detector and associated electronic components shall be mounted in a plug-in module that connects to a fixed base. Provide terminals in the fixed base for connection of building wiring.

3. Self-Restoring: Detectors do not require resetting or readjustment after actuation to restore them to normal operation.

4. Integral Visual-Indicating Light: LED type. Indicating detector has operated and power-on status. 5. Remote Control: Unless otherwise indicated, detectors shall be analog-addressable type,

individually monitored at the FACP for calibration, sensitivity, and alarm condition, and individually adjustable for sensitivity from the FACP.

A. Photoelectric Smoke Detectors:

1. Sensor: LED or infrared light source with matching silicon-cell receiver. 2. Detector Sensitivity: Between 2.5 and 3.5 percent/foot smoke obscuration when tested according

to UL 268A.

B. Duct Smoke Detectors:

Page 310: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-9

1. Photoelectric Smoke Detectors: a. Sensor: LED or infrared light source with matching silicon-cell receiver. b. Detector Sensitivity: Between 2.5 and 3.5 percent/foot smoke obscuration when tested

according to UL 268A.

2. UL 268A listed, operating at 24-V dc, nominal. 3. Integral Addressable Module: Arranged to communicate detector status (normal, alarm, or

trouble) to the FACP. 4. Plug-in Arrangement: Detector and associated electronic components shall be mounted in a

plug-in module that connects to a fixed base. The fixed base shall be designed for mounting directly to the air duct. Provide terminals in the fixed base for connection to building wiring. a. Weatherproof Duct Housing Enclosure: UL listed for use with the supplied detector. The

enclosure shall comply with NEMA 250 requirements for Type 4X.

5. Self-Restoring: Detectors shall not require resetting or readjustment after actuation to restore them to normal operation.

6. Integral Visual-Indicating Light: LED type. Indicating detector has operated and power-on status. 7. Remote Control: Unless otherwise indicated, detectors shall be analog-addressable type,

individually monitored at the FACP for calibration, sensitivity, and alarm condition, and individually adjustable for sensitivity from the FACP.

8. Each sensor shall have multiple levels of detection sensitivity. 9. Sampling Tubes: Design and dimensions as recommended by manufacturer for the specific duct

size, air velocity, and installation conditions where applied. 10. Relay for Equipment Shutdown: Rated to interrupt fan control or power circuit. 11. Combination remote status LED and magnetic test switch mounted flush in ceiling directly below

device. In exposed ceiling areas, remote mount status LED adjacent to nearest exterior exit next to manual pull station. Label devices to match HVAC schedule.

2.5 THERMAL SENSORS

A. Thermal sensors shall be combination rate-of-rise/fixed temperature sensing. The alarm condition shall be determined by comparing sensor valve with the stored values.

B. Automatic self-test routines shall be performed on each sensor which will functionally check sensor sensitivity electronics and ensure the accuracy of the value being transmitted. Any sensor that fails this test shall indicate a trouble condition with the sensor location at the control panel.

C. An operator at the control panel, having the proper access level, shall have the capability to manually access the following information for each heat sensor:

1. Primary status. 2. Device type. 3. Present average value. 4. Sensor range 135 or 190 degrees as indicated. D. An operator at the control panel, having the proper access level, shall have the capability to

manually control the following information for each heat sensor: 1. Alarm detection sensitivity values. 2. Enable or disable the point/device. 3. Control sensor’s relay driver output. E. In high heat areas such as kitchens and mechanical rooms install 190 degree F. conventional

detectors connected to addressable modules (AID) outside of the high heat area.

2.6 NOTIFICATION APPLIANCES

A. Description: Equipped for mounting as indicated and with screw terminals for system connections. Color shall be white.

Page 311: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-10

1. Evacuation Speakers: Common speakers for both fire alarm and mass notification. See Section 13853, Mass Notification System.

2. Visible Alarm Devices. Unless otherwise noted, provide separate Xenon strobes for fire alarm and mass notification in a single mounting assembly. See Section 13853, Mass Notification System.

B. Bells: Electric-vibrating, 24-V dc, under-dome type; with provision for housing the operating mechanism behind the bell. Bells shall produce a sound-pressure level of 94 dBA, measured 10 feet from the bell. 10-inch size, unless otherwise indicated. Bells shall be weatherproof. Color: Red. Label bells “SPRINKLER WATER FLOW”.

2.7 REMOTE INDICATORS

A. Remote status and alarm indicator and magnetic test stations when detector is above accessible ceilings, with LED indicating lights. Light is connected to flash when the associated device is in an alarm or trouble mode. Lamp is flush mounted in a single-gang wall plate. A red, laminated, phenolic-resin identification plate at the indicating light identifies, in engraved white letters, device initiating the signal and room where the duct smoke detector, smoke detector, or valve is located. For water-flow switches, the identification plate also designates protected spaces downstream from the water-flow switch.

2.8 REMOTE ANNUNCIATOR

A. Description: Duplicate annunciator functions of the FACP for alarm, supervisory, and trouble indications. Also duplicate manual switching functions of the FACP, including acknowledging, silencing, resetting, and testing

1. Mounting: Flush cabinet, NEMA 250, Class 1.

B. Display Type and Functional Performance: Alphanumeric display same as the FACP. Controls with associated LEDs permit acknowledging, silencing, resetting, and testing functions for alarm, supervisory, and trouble signals identical to those in the FACP.

2.9 ADDRESSABLE INTERFACE DEVICE

A. Monitor module listed for use in providing a system address for listed alarm-initiating devices for wired applications with normally open contacts.

B. Control module shall have double throw form C contacts with minimum rating of 125VAC, 1 ampere inductive. Module shall receive control signal from signaling line circuit (SLC) and shall require no other external power for operation.

1. Control module shall be capable of providing a direct signal to the elevator controller to initiate elevator recall.

2.10 GUARDS FOR PHYSICAL PROTECTION

A. Description: Welded wire mesh or polycarbonate of size and shape for the manual station, smoke detector, strobe, or other device requiring protection. Any device located in Receiving/Staging area shall be protected as such.

B. Manual pull stations in areas accessible to the public shall have polycarbonate tamper proof cover equivalent to Edward Systems Stopper II without sounder.

2.11 WIRE AND CABLE

A. Wire and cable for fire alarm systems shall be UL listed and labeled as complying with NFPA 70, Article 760.

Page 312: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-11

B. Signaling Line Circuits: Non-plenum rated twisted, shielded pair, No. 14 AWG.

C. Non-Power-Limited Circuits: Non-plenum rated solid-copper conductors with 600-V rated, 75 deg C, color-coded insulation. Cable selection shall be based on voltage drop calculations.

1. Low-Voltage Circuits: No. 16 AWG, minimum. 2. Line-Voltage Circuits: No. 12 AWG, minimum.

2.12 FIRE ALARM MONITORING

A. The contractor shall connect the system to base-wide Fire Reporting System.

B. Provide a Monaco BTXM Radio-frequency transmitter and antenna to match the base-wide fire reporting system. Provide input/output interface in FACP to allow specific alarm and trouble signals to be transmitted. Provide a wall mounted antenna, mast, lightning arrestor, and all required accessories. Trim antenna to base operating frequency. Coordinate frequency selection with base fire department prior to trimming. This is a separate transmitter from the Mass Notification Transmitter/Receiver.

C. This equipment shall be a listed component of the fire alarm panel and shall be installed inside the fire alarm control panel per manufacturers criteria.

D. This equipment shall be capable of transmitting to the monitoring equipment the device address that is in alarm, supervisory, and trouble conditions.

E. Water-flow signals shall be specifically received by the monitoring service as water flow alarms.

2.13 REMOTE POWER SUPPLIES

A. Provide remote power supply for alarm indicating devices and peripheral functions. Power supply shall have NEMA 1 enclosure and shall provide four 24VDC, 2A Class II circuits. Power supplies shall have sealed batteries and a two rate charger. Battery capacity shall be 15 minutes of alarm and 72 hours of supervision plus minimum 25% spare capacity (60 minutes of alarm if unit serves Mass Notification devices).

PART 3. EXECUTION

3.1 EQUIPMENT INSTALLATION

A. Connecting to Existing Equipment: Verify that new fire alarm system is operational before making changes or connections to existing fire alarm system.

B. Smoke or Heat Detector Spacing:

1. Smooth ceiling spacing shall not exceed 30 feet. 2. Spacing of heat detectors for irregular areas, for irregular ceiling construction, and for

high ceiling areas, shall be determined according to Appendix A in NFPA 72. 3. Spacing of heat detectors shall be determined based on guidelines and

recommendations in NFPA 72.

C. HVAC: Locate detectors not closer than 3 feet from air-supply diffuser or return-air opening.

D. Duct Smoke Detectors: Comply with NFPA 72 and NFPA 90A. Install sampling tubes so they extend the full width of the duct. Provide 36” square access hatch with operable door and latch per architectural specifications for all devices located above inaccessible ceilings.

E. Remote Status and Alarm Indicators: Install near each smoke detector and each sprinkler water-flow switch and valve-tamper switch that is not readily visible from normal viewing position. Label device to match HVAC schedule.

Page 313: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-12

F. Visible Alarm-Indicating Devices: Install adjacent to each alarm bell or alarm horn and at least 6 inches below the ceiling, but not higher than 8 feet unless otherwise noted.

G. Device Location-Indicating Lights: Locate in public space near the device they monitor.

H. FACP: Surface mount with tops of cabinets not more than 72 inches above the finished floor.

I. Annunciator: Install with top of panel not more than 72 inches above the finished floor.

J. Antenna for Radio Alarm Transmitter: Mount per manufacturer’s recommendations to building structure where indicated. Use mounting arrangement and substrate connection that will resist 100-mph wind load with a 1.3 gust factor without damage.

K. No portion of a fire alarm system shall be installed prior to having plans on site that have been approved and stamped by the Contracting Officer and the local AHJ. This includes wiring. Approved stamped plans shall be on site at all times while the system is in the installation stage.

1. Smoke detectors shall not be installed until the construction cleanup of all trades is complete per NFPA 72. Any smoke detector that has been installed prior to the construction cleanup of all trades and without prior written approval of the engineer and local AHJ shall be marked in a permanent manner that will identify it from re-use and shall be replaced prior to commissioning of the system and/or turning over to the owner. Such detectors shall be replaced at the sole expense of the installing contractor. Subject to approval of the engineer and local AHJ this may exclude services, which do not create air-born particles such as telephone/network services, and modular furniture installation.

2. Orange shipping covers, rubber gloves, tape, or other devices shall not be used to bypass these basic requirements.

3.2 BACK BOXES

A. Speakers shall be installed in a 4-square deep box with extension ring to limit potential damage to wiring.

B. Manual pull stations shall be located on walls such that tamper resistant covers can be installed as required, or in the future. Therefore, a 3-inch clearance from other switches, window openings, door frames, etc. shall be provided on each side of a manual pull station and 4 inches clear area above and below the manual pull station.

3.3 WIRING INSTALLATION

A. Install wiring according to the following:

1. NECA 1.

B. Wiring Method: Install wiring in raceway according to Division 26: “Raceways and Boxes.”

1. Fire alarm/mass notification circuits and equipment control wiring associated with the fire alarm system shall be installed in a dedicated raceway system. This system shall not be used for any other wire or cable.

2. Devices shall be included on the circuits as indicated on the approved plans and calculations. Changes must be evaluated by the designer. Changes in wire routing may require new calculations.

3. Raceway system shall be minimum 3/4" EMT Type. 4. Paint all fire alarm conduit and boxes red. See section 26 05 33.

C. Unless noted otherwise on the plans, power booster panels shall not be fed from a separate notification power booster panel (daisy chained).

Page 314: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-13

D. Each circuit entering or exiting the building shall be protected with surge protection. This includes 24vdc, 120vac, and telephone circuits serving the fire alarm system.

E. Wiring within Enclosures: Separate power-limited and non-power-limited conductors as recommended by manufacturer. Install conductors parallel with or at right angles to sides and back of the enclosure. Bundle, lace, and train conductors to terminal points with no excess. Connect conductors that are terminated, spliced, or interrupted in any enclosure associated with the fire alarm system to terminal blocks. Mark each terminal according to the system's wiring diagrams. Make all connections with approved crimp-on terminal spade lugs, pressure-type terminal blocks, or plug connectors.

F. Cable Taps: Use numbered terminal strips in junction, pull, and outlet boxes, cabinets, or equipment enclosures where circuit connections are made.

G. Color-Coding: Color-code fire alarm conductors differently from the normal building power wiring. Use one color-code for alarm circuit wiring and a different color-code for supervisory circuits. Color-code audible alarm-indicating circuits differently from alarm-initiating circuits. Use different colors for visible alarm-indicating devices. Paint fire alarm system junction boxes and covers red.

H. Wiring to Remote Alarm Transmitting Device: 1-inch conduit between the FACP and the transmitter. Install number of conductors and electrical supervision for connecting wiring as needed to suit monitoring function.

3.4 IDENTIFICATION

A. Identify system components, wiring, cabling, and terminals according to Division 16 Section "Electrical Identification”.

B. Each conductor shall be identified as shown on the drawings at each end and at terminal points with wire markers. Attach permanent wire markers within 2 inches of the wire termination. Marker legends shall be visible.

C. Install instructions frame in a location visible from the FACP.

D. Paint power supply circuit breaker(s) red and label “FIRE ALARM”.

E. All initiating devices shall have permanent making indicated address in FACP.

3.5 GROUNDING

A. Ground the FACP and associated circuits; comply with IEEE 1100.

3.6 FIELD QUALITY CONTROL

A. Contractor Pre-Testing and Record of Completion Testing:

1. This section covers contractor pre-testing and documentation by the installing contractor that shall be conducted before any commissioning inspection or AHJ testing is scheduled.

2. Wiring runs shall be tested for continuity, short circuits and grounds before any system devices are installed or energized.

3. Provide the service of a competent, factory-trained engineer or technician authorized by the manufacturer of the fire alarm equipment to technically supervise and participate during all of the adjustments and tests for the system. All testing shall be in accordance with NFPA 72.

4. 100% of alarm devices shall be tested for correct operation and resetting. Tester shall provide typed spread sheet format listing address, device description, date tested, pass, fail and date corrected columns as a minimum. Tester’s shall sign and date report. Report

Page 315: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-14

to be given to fire department prior to scheduling acceptance testing. Also include copy in O & M manual.

5. Duct smoke detectors shall not be installed or in-place when the HVAC systems are first turned on. All HVAC systems shall be run sufficiently to remove loose dust and debris. Failure to protect detectors may result in detector replacement per this specification.

6. Audibility testing shall not be conducted until all doors, windows, walls, ceilings, and carpeting are in place.

7. All Alarm Initiating Devices shall be observed and logged for correct zone and sensitivity. These devices and their bases shall be tagged with adhesive tags located in an area not visible when installed, showing the initials of the installing technician and date.

8. Computer/labeler generated labels with the address number only may be installed on the exterior of the device as long as the background is clear and installed in a quality manner. This will assist in the inspection, testing, maintenance, and trouble-shooting of the system.

9. All Smoke detectors shall be commissioned using canned smoke or a method that will functionally test the smoke chamber. The use of Magnets for commission testing of smoke detectors is Strictly Prohibited.

10. A systematic record shall be maintained of all readings using schedules or charts of tests and measurements. Areas shall be provided on the logging form for readings, dates and witnesses.

11. Air velocity readings shall be taken and recorded for each HVAC related smoke detector. 12. The installing contractor shall make instruments, tools and labor required to conduct the

system tests available. 13. The following equipment shall be a minimum for conducting the tests:

a. Ladders, scaffolds, or lifts as required to access all installed equipment. b. Multimeter for reading voltage, current and resistance. c. Two way radios, flashlights, screwdrivers, measuring tapes. d. A manufacturer recommended device for measuring airflow through air duct

smoke detector sampling assemblies. e. Calibrated decibel meter.

B. At minimum the following tests shall be conducted and documented.

1. Turn each sprinkler system flow valve two full turns and verify proper supervisory alarm at the FACP.

2. Verify activation of all flow switches under approved flowing conditions. 3. Open initiating device circuits and verify that the trouble signal actuates. 4. Open and short signaling line circuits and verify that the trouble signal actuates. 5. Open and short Notification Appliance Circuits and verify that trouble signal actuates. 6. Ground all circuits and verify response of trouble signals. 7. Check presence and audibility of tone throughout building spaces. This includes

measuring dBA levels. 8. Check installation, supervision, and operation of all intelligent smoke detectors using the

Walk Test feature. 9. Each of the alarm conditions that the system is required to detect should be introduced

on the system. Verify the proper receipt and the proper processing of the signal at the FACP and the correct activation of the control points.

10. Each notification circuit shall be tested under standby/battery power. Any circuit that measures less than 16 volts dc or the nameplate voltage, whichever is higher, shall be considered as failing the design. Note: Some systems incorporating synchronizing modules can impair results. If the module cannot be bypassed for voltage readings, the manufacturer should be contacted for guidance.

11. When the system is equipped with optional features, the manufacturer's manual should be consulted to determine the proper testing procedures. This is intended to address such items as verifying controls performed by individually addressed or grouped devices, sensitivity monitoring, verification functionality and similar.

3.7 ACCEPTANCE TESTING

Page 316: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-15

A. This section details criteria for commissioning inspections by AHJ’s and the owner. Testing shall be scheduled with all parties minimum 10 working days in advance.

1. This stage of testing shall not be scheduled or conducted until all pre-testing has been

completed and is in compliance with applicable requirements. 2. A signed Record of Completion shall be provided to the inspector prior to starting this

testing. 3. The contractor is responsible for testing all components in accordance with the

manufacturers required and suggested procedures and in accordance with NFPA 72. If this specification incorporates a detailed Acceptance Test Procedure (ATP) prepared by the engineer than it shall also be followed.

4. A program matrix shall be provided by the installing contractor referencing each alarm input to every output function affected as a result of an alarm condition on that input.

5. The commissioning inspector shall use the system record drawings and other documents specified under this specification during the testing procedure to verify operation as programmed. In conducting the commissioning test, the inspector shall request demonstration of any or all input and output functions.

6. All Smoke detectors shall be commissioned using canned smoke or a method that will functionally test the smoke chamber. The use of magnets for commission testing of smoke detectors is strictly prohibited

7. New detectors that show to be dirty through system sensitivity testing shall be replaced. 8. The items tested shall include but not be limited to the following:

a. System wiring shall be tested to show the following results and the systems subsequence operation: 1) Open, Shorted or Grounded Circuits. 2) Primary and Battery power disconnected. 3) End-of-line voltage readings on notification circuits.

b. System notification circuits and appliances operate as programmed. Audibility

and visual levels meet required standards. c. A minimum of 15 dBA above ambient shall be obtained in every occupiable

space (throughout) per NFPA 72. This includes storage rooms, electrical rooms, telephone rooms, and any other occupiable space.

d. System shall demonstrate the correct messages at the FACP and any remote annunciator.

e. System off-site reporting shall be verified for alarm, supervisory, trouble, correct address, facility name, contact phone number, and contact name.

f. System shall be tested for stand-by battery backup as outlined in this specification.

3.8 FINAL DOCUMENTATION

A. System documentation shall be supplied to the owner and shall include but not be limited to the following:

1. System record (as-built) drawings and wiring details including one set of reproducible

drawings, and a CD ROM with copies of the record drawings in AUTOCAD .dwg format, or .dxf format for use in a CAD drafting program.

2. System Operating, Installation and Maintenance Manuals. 3. System matrix showing input signals to output commands. 4. Provide a copy of the FACP system programming on a CD-ROM.

B. A copy of all above materials and documentation shall be provided in O & M package. C. The installation contractor shall provide the owner with account information, phone numbers,

passwords, and terms/conditions of the monitoring company. 3.9 FINAL SYSTEM TRAINING

Page 317: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FIRE ALARM 28 31 11-16

A. The installation contractor shall familiarize the owner and/or owner representative with location of all fire alarm panels, modules, devices, wire routing, and plan cabinet contents.

B. The installation contractor shall furnish training as follows: 1. A simplified training manual on system operation unique to the system shall be prepared

and presented to the owner. This manual shall cover key items and day-to-day operation. Such manual shall be presented in a professional and legible format such as that provided through use of a Microsoft PowerPoint, or Microsoft Word.

2. The owner shall be provided with at least 3 hard-copies and an electronic PDF format that can be edited through commonly available software.

3. The training program shall be presented such that the owner can readily train new staff over the life of the system.

4. Training in the receipt, handling and acknowledgment of alarms. This shall include emphasis that alarms shall not be silenced until after a complete and thorough investigation has been conducted. If there is a hazard, then only the fire department is authorized to silence an alarm.

5. Sequence of operation for all interconnected systems. 6. Training in the system operation including manual control of output functions from the

system control panel. 7. The total training requirement shall be a minimum of 8 hours, but shall be sufficient to

cover all items specified. The contractor shall provide two such training sessions.

3.10 ADJUSTING AND FOLLOW-UP

A. Occupancy Adjustments: When requested within 12 months of date of beneficial occupancy, provide on-site assistance in adjusting system to suit actual occupied conditions. Provide up to two visits to project outside normal occupancy hours for this purpose.

B. Annual Test and Inspection: Eleven months after date of Substantial Completion, test the fire alarm system complying with the testing and visual inspection requirements in NFPA 72. Perform tests and inspections listed for monthly, quarterly, semiannual, and annual periods. Use forms developed for initial tests and inspections. The owner should be encouraged to participate in these services as reinforcement of system operability.

END OF SECTION 28 31 11

Page 318: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – EARTHWORK Section 31 10 00 - SITE CLEARING

SITE CLEARING 31 10 00-1

1. GENERAL

1.1 SUMMARY

A. Work of this Section Includes:

1. Clearing and grubbing 2. Removal of surface debris. 3. Removal of asphalt paving, concrete paving, curbs, and curb and gutter. 4. Removal of existing utilities, as indicated on the drawings. 5. Removal of existing fence. 6. Provisions for protection, removal, replacement and disposal.

B. Related Sections

1. Section 01 00 00 - Requirements of Fort Hood 2. Section 01 33 00 – Shop Drawings, Product Data & Submittals 3. Section 01 35 56 – Storm Water Pollution Prevention Measures 4. Section 31 20 00 - Earthwork

1.2 REGULATORY REQUIREMENTS/REFERENCES

A. Contractor shall comply with the requirements of specification Sectio n 01 00 00 – Requirements of Fort Hood Military Reservation.

B. Streets, roads, trees, adjacent property, and other works to remain shall be protected throughout the work by the General Contractor.

C. Maintain all bench marks, monuments, and oth er reference points. If disturbed o r destroyed, replace as directed by th e Contracting Officer. Contractor shall contact the Contracting Officer if additional bench mark information is required.

1.3 SUBMITTALS

A. In accordance with Section 01 33 00 – Shop Drawings, Product Data & Submittals.

2. PRODUCT S

2.1 NOT USED

3. E XECUTION

3.1 PREP ARATION

A. Verify that existing plant life designated to remain is tagged or identified.

B. Prior to commence ment of work, the contract or shall ide ntify the proper area for placing removed materials.

C. Underground Utilities: Location of the existing utilitie s indicated is approximate. The Contractor shall physically verify t he location, identifica tion and elevation of the existing utilities indicated prior to starting construction. The Contractor shall scan the construction site with electromagnetic and sonic equipment and mark the surface o f

Page 319: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – EARTHWORK Section 31 10 00 - SITE CLEARING

SITE CLEARING 31 10 00-2

the ground where existing underground utilities are discovered.

3.2 PROT ECTION

A. Where pedestrian and driver safety is endangered, use traffic barricades wit h flashing lights.

B. Trees and vegetation to be left standing shall be protect ed from damage during construction operations. Contractor shall submit details of protection system. Tree protection shall extend to one foot beyond the tree’s drip line.

C. Protect benchmarks, survey control points, pavements to remain, existing structures, and all existing facilities which remain from damage or displacement.

D. Provide contractor design shoring, brac ing an d protection systems as required to prevent damage or displacement to new work and existing facilities.

E. Protection and Removal of Utility Lines

1. Existing utility lines that are shown on the plans or the locations of which are made known to the Co ntractor prior to exca vation and that are to be re tained, as well as utility lines constructe d during excavation operations, shall be protected from damage during all site work operations, an d if damaged shall be repaired by the Contractor at no expense to AAFES. In the event th at the Contractor damages existing utility lines that are not shown on the plans, or the locations of which have not been known to t he Contractor, report of such damage sh all be made immediately to the Co ntracting Officer. When utility lines that are to be removed are encountered within the are a of operations, the Contractor shall notify th e Contracting Officer in ample time for the nece ssary measures to be taken to prevent interruption of the service.

2. The contractor shall be required to hand excavate adjacent to active utilitie s. Any damages to existing utilities shall be repaired by the Contractor at no cost to as identified in specification Section 01 00 00 – Requirements of Fort Hood.

3.3 REMOVAL / DEMOLITION

A. Remove asphalt paving, concrete paving, curbs, and curb and gutter in their entirety as indicated on the drawings. Neatly saw cut edges at right angle to surface.

B. Remove existing utilities, utility pip ing, utility pol es and a ll structures in their entirety as indicated on the drawings.

C. Remove exi sting fen ce, includ ing p ickets, line posts, and concrete fo undations in their entirety as indicated on the drawings.

3.4 CLEARI NG

A. Clearing shall consist o f the felling, trimming, a nd cutting o f trees into sections and the satisfactory disposal of the tree s and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing shall also includ e the removal and disposal of str uctures that obtrude, encroach upon, or otherwise obstruct the work. Trees, stumps, roots, brush, and other vegetation in areas to b e cleared shall be cut off flush with or below t he original gro und surface , except su ch trees an d vegetation as may be indicated or directed to be left stan ding. Any a pplication of any herbicide or pesticide must be

Page 320: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – EARTHWORK Section 31 10 00 - SITE CLEARING

SITE CLEARING 31 10 00-3

pre-approved by the Environmental Division of Base Civil Engineering (BCE) prior to the application.

3.5 GRUBBING

A. Grubbing shall consist of the remo val and disposal of stu mps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas, which are all areas to be improved. Materi al to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, shall be removed to a depth of no t less than 18 inches below the ori ginal surface level of th e ground in areas indica ted to be grubbed and in areas indicated as co nstruction a reas under this contract. Depressions made by grubbing shall be filled with suitable material and compacted to make the surface conform with the original adjacent surface of the ground.

3.6 DRAINAGE / DEWATERING

A. See specification Section 01 55 00 – Temporary Facilities, Barriers and Controls for requirements.

3.7 HAZARDOUS MATERIALS

A. If in the perf ormance of the work the Contractor encounters any abnormal materials such as, bu t not limited to drums, tanks, sta ined earth, unexploded munitions, or unusual od ors during site clear ing operatio ns, the work shall be temporarily discontinued, equipment left in place, the area cordo ned off an d the prop er authorities notified, including Base, the Exchang e Contracting Officer, AE and PM. The area is considere d to contain hazardous or toxic material. Work may be resumed only after a d etermination has bee n made by the proper au thorities an d unsafe materials removed and the area declared safe.

3.8 REPLACEMENT OF DAMAGED AREAS

A. Contractor shall repair or replace a t no additio nal cost to t he AAFES any damag e resulting from, or incidental to, construction.

1. Replacement or repair of seeded areas, sod, bituminous pavement and concrete pavement, structures, shr ubbery, trees, drives, walks, and/or fences damaged by construction work, or work incidental thereto, shall be performed by the Contractor as soon as is practical.

2. Replacement shall in clude existi ng trees and shrubs not scheduled fo r removal, th at do not show definit e signs of life and/or satisfactory growth during the growing period following construction.

B. Where removals leave holes and damage surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adj acent finish ed surfaces.

3.9 DISPOSAL

A. Removing From Construction Site:

1. All concrete, asphalt pavement, exca vated materials, below grade utilities and structures, and demolition debris not requir ed for con struction shall be removed in accordance with the provisions of specifications Section 01 00 00 –

Page 321: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – EARTHWORK Section 31 10 00 - SITE CLEARING

SITE CLEARING 31 10 00-4

Requirements of Fort Hood. 2. The General Contractor shall be re sponsible fo r contacting the Contracting

Officer, the Contracting Officer, and the Fort Hood BCE prior to the st art of excavation and disposal of materials.

3. Burning shall not be permitted.

3.10 QUALITY CONTROL

A. The Contractor shall establish and maintain quality control for operations under this section to ensure compliance with contract requirements and maintain records of his quality control for all materials, equipment, and construction operations, including but not limited to the following:

1. Clear areas flush or below original ground surface. 2. Disposal of cleared and grubbed materials.

B. A copy of these record s and Contr actor tests, as well as t he records of corrective action taken , shall b e f urnished to Fort Hood BCE as directed by the Contractin g Officer.

END 31 10 00

Page 322: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – EARTHWORK Section 31 20 00 EARTH MOVING

EARTH MOVING 31 20 00-1

1. PART 1 - GENERAL

1.1 SUMMARY

A. Work of this Section includes the following:

1. Soil Materials 2. Excavating for building foundations, slabs-on-grade, paving, curbs and gutters,

landscaping and site utilities. 3. Removal of overburden 4. Fill under slabs-on-grade and paving. 5. Consolidation and compaction. 6. Fill for over-excavation. 7. Backfilling and compaction of building and site structures. 8. Excavating, and compacting trenches for utilities from 5 feet outside building to

tie to existing utilities.

B. Option Proposal 1:

1. Subject to Base Bid requirements Contractor provide all earthwork related to substitution of medium duty concrete paving for asphalt paving.

C. Related Sections:

1. Section 01 00 00 – Requirements of Fort Hood. 2. Section 01 10 15 – Option Proposals. 3. Section 01 35 56 – Storm Water Pollution Prevention Measures. 4. Section 31 10 00 – Site Clearing. 5. Sectoin 21 21 00 – Landscape Grading. 6. Section 31 23 23 – Utility Backfill Materials. 7. Section 31 23 33 – Excavation Backfill and Compaction for Utilities. 8. Section 32 12 16 – Hot Mix Asphalt Concrete Pavement. 9. Section 32 13 13 – Concrete Paving.

1.2 DEFINITIONS

A. Backfill – Soil or crushed stone used to fill the space between the excavation and the exterior of a structure or around the foundation walls to provide a means for water to drain away from the foundation.

B. Fill – Soil, crushed stone or overburden material used to raise an existing grade or a man-made deposit.

C. Utility – Any buried pipe, duct, conduit or cable.

1.3 REFERENCES

A. American Association of State Highway and Transportation Officials (AASHTO)

1. AASHTO T 180 - Moisture-Density Relations of Soils Using a 10-lb Rammer and an 18-in. Drop.

B. ASTM International

1. ASTM D 1556 - Test Method for Density of Soil in Place by the Sand-Cone Method.

2. ASTM D 1557 - Laboratory Compaction Characteristics of Soil Using Modified Effort 56,000 ft-lbf/ft.

Page 323: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

EARTH MOVING 31 20 00-2

3. ASTM D 2167 - Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method.

4. ASTM D2487 - Classification of Soils for Engineering Purposes. 5. ASTM D 2922 - Test Methods for Density of Soil and Soil-Aggregate in Place

by Nuclear Methods (Shallow Depth). 6. ASTM D 3017 - Test Methods for Moisture Content of Soil and Soil-Aggregate

Mixtures.

C. State of Texas, Department of Transportation (TxDOT)

1.4 REFERENCE DOCUMENTS

A. LEED 2009 for Retail: New Construction and Major Renovations Reference Guide (Copyright © 2009 by the U.S. Green Building Council, Inc.) with errata.

B. LEED Documentation:

1. LEED Online: http://www.leedonline.com 2. Project ID: 1000022462.

1.5 SUBMITTALS

A. All submittals shall be in accordance with Section 01 33 00 – Shop Drawings, Product Data & Submittals.

A. Samples:

1. Submit 10 pound samples of existing soil and each type of fill to field office. 2. All sample containers shall be identified with the name of the material source.

B. LEED Submittals:

1. Product Data for Credit MR 4: For products having recycled content, refer to LEED Online for documentation requirements.

2. Product Certificates for Credit MR 5: For products and materials that comply with requirements for regional materials, refer to LEED Online for documentation requirements.

3. LEED Letter Templates:

a. Refer to LEED Online for Letter Templates and documentation required for each applicable Prerequisite and Credit.

b. Upload all submittals for LEED Credit documentation to LEED Online under the LEED Project ID.

1.6 SOURCE QUALITY CONTROL

A. Specification Section 01 45 16 - Quality Control and specification Section 01 45 29 - Testing Laboratory Services: Testing and analysis of soil material.

B. Testing and Analysis of Subsoil Material: Perform in accordance with ASTM D1557 and ASTM D2487.

C. Testing and Analysis of Topsoil Material: Composition testing as specified herein.

D. If tests indicate materials do not meet specified requirements, change material and retest.

E. Provide materials of each type from same source throughout the Work.

Page 324: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

EARTH MOVING 31 20 00-3

2. PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. Source: Materials classified below as Backfill and Fill Material, and Select Material shall be obtained from source outside of Fort Hood. For additional requirements, refer to specification Section 01 00 00 – Requirements of Fort Hood.

B. Soil Materials: Free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, and deleterious, or objectionable materials. Unless specified otherwise, the maximum particle shall be one-half the lift thickness or 3", whichever is smaller, in any dimension at the intended location.

C. General Fill: Approved, soil materials free of organic or other deleterious materials; have a maximum liquid limit of 40, a plasticity index between five (5) and 25, and a maximum particle size of two (2) inches. An occasional particle size of up to four (4) inches will be allowed. Lean clays, sandy clays, clayey sands, clayey gravels, and/or crushed limestone are acceptable materials. The Existing Fill soils and natural sandy lean clay soils excavated during construction may be suitable for re-use as General Fill if tested and processed so as to verify they meet the specified requirements for General Fill.

D. Select Fill: Approved, soil materials free of organic or other deleterious materials; have a maximum liquid limit of 35, a plasticity index between five (5) and 15, and a maximum particle size of two (2) inches. Select Fill soils shall consist of crushed limestone, meeting similar gradation requirements as set forth in TxDOT Item 247, Type A, Grade 3 or better.

E. Engineered Fill: Approved, soil materials consisting of on-site soils or off-site soils with similar plasticity index (PI) of the on-site materials. Soils placed under pavement shall be free of organics, deleterious material and particles larger than four (4) inches.

F. Reclaimed Asphalt Concrete Pavement: Furnish aggregate that meets the following gradation:

Sieve Size Total Percent Passing 1.5 inch 100 1 inch 75 to 100 ¾ inch 60 to 100 3/8 inch 35 to 75 No. 4 30 to 60 No. 30 7 to 30 No. 200 3 to 15

G. Aggregate Base Course: Furnish aggregate base course meeting the performance standards specified in TXDOT Item 247, Type A, Grade 1 (crushed limestone). Material shall meet TXDOT specified triaxial and wet ball mill requirements.

H. Existing Soil Material: See specification Section 02 31 00 - Subsurface Investigation & Geotechnical Report for additional information.

2.2 TOPSOIL MATERIALS

A. Existing Soil: Modify existing soil to conform to the requirements specified in paragraph entitled "Composition."

Page 325: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

EARTH MOVING 31 20 00-4

B. On-Site Topsoil: Reuse surface soil stripped and stockpiled on site if requirements specified for topsoil in paragraph entitled "Composition" are met.

C. Off-Site Topsoil: Conform to requirements specified in paragraph entitled "Composition." Additional topsoil shall be furnished by the contractor.

D. Composition: Provide topsoil that is fertile, friable, naturally loamy, surface soil; reasonably free of subsoil, clay lumps, brush, weeds, and other litter and free of roots, stumps, stones larger than 2 inches in any dimension, and other extraneous or toxic matter harmful to plant growth. On-site soil may be used, if suitable. If on-site is not suitable, obtain topsoil from local sources or from areas having similar soil characteristics to that found at site of work. Obtain topsoil from naturally well-drained sites where topsoil is at least 4 inches deep; do not obtain from bogs or marshes.

2.3 UNSUITABLE MATERIALS

A. In-Situ soil or other material which can be identified as having insufficient strength characteristics or stability to carry intended loads without excessive consolidation or loss of stability. Also backfill material which contains refuse, frozen material, large rocks, debris, soluble particles, and other material which could damage the pipe or cause the backfill not to compact.

B. Vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete slabs.

3. PART 3 - EXECUTION

3.1 PREPARATION

A. Identify required lines, levels, contours, and datum locations.

B. Protect plant life, lawns, and other features remaining as a portion of final landscaping.

C. Protect bench marks, survey control points, existing structures, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.

3.2 PROTECTION

A. Prevent displacement or loose soil from falling into excavation; maintain soil stability.

B. Newly graded areas shall be protected from traffic, erosion, and any settlement or washing away that may occur from any cause, prior to acceptance. Damaged areas shall be repaired and grades re-established to the required elevations and slopes at no additional cost to AAFES until such time that newly planted vegetation has stabilized the slopes.

C. Protect bottom of excavations and soil adjacent to and beneath foundation from freezing. Care shall be taken to prevent excessive drying or wetting of exposed soils.

3.3 SITE PREPARATION

A. Site shall be stripped of existing vegetation, roots, and any loose, soft wet, organic or otherwise unsuitable materials from areas developed during the proposed construction.

B. Pavement sections shall be removed to a depth of at least one (1) foot below proposed final grade elevation.

Page 326: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

EARTH MOVING 31 20 00-5

C. Structures and improvements shall be demolished and removed to a depth of at least three (3) feet below the final grade elevation and/or bottom of foundation elevation.

D. Building Area: Remove existing fill soils to a depth to allow placement of 12-inches of Select Fill. Excavation operations shall be performed within the proposed building area and extending at least five (5) beyond the building perimeter where hardscapes are proposed.

E. Paved Areas: Remove existing fill soils to a depth to allow placement of 12-inches of Engineered Fill.

3.4 SUB-GRADE PREPARATION

A. Proof Rolling

1. Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping and excavation, proof roll the existing subgrade of the pavement with at least a 15-ton pneumatic roller or equivalent.

2. Proof rolling shall be performed under the observation of a geotechnical engineer and the Contracting Officer. Notify the Contracting Officer a minimum of three (3) days prior to proof rolling. Upon approval of the sub-grade by the geotechnical engineer, the Contractor may commence placement of base course.

3. If the geotechnical engineer does not approve the sub-grade, the contractor shall immediately notify the Contracting Officer of the unsatisfactory condition for further direction.

B. Compaction

1. After proof-rolling operations are completed, exposed subgrade soils shall be scarified to a depth of eight (8) inches, moisture conditioned if necessary, and compacted to at least 90 percent of the maximum dry density as determined by the Modified Proctor (ASTM D1557).

3.5 EXCAVATING

A. Underpin adjacent structures which may be damaged by excavating work.

B. Excavate existing soils to accommodate building foundations, slabs-on-grade, paving and site structures, and construction operations, and detention basins.

C. Excavate sufficiently outside the finished lines of walls to allow for placement and removal of forms where required.

D. Slope banks with machine to angle of repose or less until shored.

E. Shore and brace where sloping is not possible because of space restrictions or stability of existing soil.

F. Do not interfere with 45 degree bearing splay of foundations.

G. Grade top perimeter of excavating to prevent surface water from draining into excavation.

H. Any existing drainage or utility lines which may be uncovered and/or broken or destroyed shall be repaired and protected at the contractor’s expense to the satisfaction of the Contracting Officer.

Page 327: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

EARTH MOVING 31 20 00-6

3.6 STOCKPILING

A. Stockpile excavated material in area designated on site.

1. Stockpile in sufficient quantities to meet Project schedule and requirements. 2. Separate differing materials with dividers or stockpile apart to prevent mixing. 3. Prevent intermixing of soil types or contamination.

B. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.

C. Remove stockpile, leave area in a clean and neat condition. Grade site surface to prevent free standing surface water.

3.7 DRAINAGE/DEWATERING

A. Dispose of surface water which may accumulate in open excavations, unfinished fills, or other low areas. Surface dewatering shall include rerouting of any storm water runoff or natural drainage if necessary.

B. Groundwater flowing toward or into excavations shall be controlled to prevent sloughing or excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction.

C. Rework by the contractor due to insufficient drainage / dewatering techniques during construction shall be performed at no additional expense to AAFES.

D. Perform Dewatering in accordance with Texas EPA rules and regulations.

3.8 FILL & COMPACTION

A. Compact subgrade to the density requirements specified herein.

B. Under and Immediately Adjacent to Building Foundations

1. Fill Type: General Fill from bottom of compacted subgrade to 12-inches below design subgrade elevations. Select Fill shall be placed to construct the upper 12-inches of the building pad. Trench backfill materials placed within the proposed building pad area shall consist of Select Fill.

2. Compaction: General and Select Fill shall be placed in eight (8) inch lifts, compacted to 95 percent of the maximum dry density as determined by the ASTM D-1557 method of compaction. The moisture content of the General and Select Fill soils shall be maintained between one (1) percentage point below to three (3) percentage points above the optimum moisture content value.

C. Utility Trenches

1. Pipe Embedment Zone: Comply with Section 31 23 23 Utility Backfill Materials and Section 31 23 23 Excavation Backfill and Compaction for Utilities

2. Trench Zone: a. Paved Areas:

1.) Fill Type: Select Fill 2.) Compaction: Select Fill shall be placed in eight (8) inch lifts,

compacted to 95 percent of the maximum dry density as determined by the ASTM D-1557 method of compaction. The moisture content of the Select Fill soils shall be maintained between one (1) percentage point below to three (3) percentage points above the optimum moisture content value.

Page 328: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

EARTH MOVING 31 20 00-7

b. Non-Paved Areas: 1.) Fill Type: General Fill 2.) Compaction: General Fill shall be placed in eight (8) inch lifts,

compacted to 90 percent of the maximum dry density as determined by the ASTM D-1557 method of compaction. The moisture content of the General Fill soils shall be maintained between one (1) percentage point below to three (3) percentage points above the optimum moisture content value.

D. Fill Under Grass and Landscaped Areas:

1. Fill Type: General or Engineered Fill, to bottom of topsoil, each 8 inch lift, compacted to 90 percent of the maximum dry density as determined by the ASTM D-1557 method of compaction.

E. Under Sidewalks, and Concrete Paving:

1. Fill Type: Engineered Fill to 6-inches below concrete, Aggregate Base Course to bottom of concrete.

2. Compaction: Engineered Fill shall be placed in eight (8) inch lifts, compacted to 92 percent of the maximum dry density as determined by the ASTM D-1557 method of compaction. The moisture content of the General and Select Fill soils shall be maintained between one (1) percentage point below to three (3) percentage points above the optimum moisture content value. Aggregate Base Course shall be placed in six (6) inch lifts, compacted to 95% of the maximum dry density as determined by ASTM D-1557 method of compaction.

F. Under Hot Mixed Asphalt Concrete Paving:

1. Fill Type: Engineered Fill to 12-inches below hot mix asphalt concrete, Aggregate Base Course to bottom of hot mix asphalt concrete.

2. Compaction: Engineered Fill shall be placed in eight (8) inch lifts, compacted to 92 percent of the maximum dry density as determined by the ASTM D-1557 method of compaction. The moisture content of the General and Select Fill soils shall be maintained between one (1) percentage point below to three (3) percentage points above the optimum moisture content value. Aggregate Base Course shall be placed in six (6) inch lifts, compacted to 95% of the maximum dry density as determined by ASTM D-1557 method of compaction.

3.9 FINISHED EXCAVATION AND FILLS

A. All areas covered by the project, including excavated and filled sections and adjacent transition areas, shall be uniformly smooth graded. The finished surface shall be reasonably smooth, compacted, and free from irregular surface changes. The degree of finish shall be that ordinary obtainable from blade-grader operations, except as otherwise specified. Surface shall be finished not more than 0.10 foot above or below the established grade.

3.10 DISPOSAL

A. All excess excavated material shall be removed from the site and disposed of at a location outside Fort Hood at the Contractor's expense.

B. Trucks hauling excavated material shall not be loaded beyond their rated load capacity.

Page 329: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

EARTH MOVING 31 20 00-8

3.11 FIELD QUALITY CONTROL

A. The testing services shall be supervised by a Professional Engineer, registered in the State of Texas.

B. Soil Compaction Testing:

1. The Contractor shall employ and pay for the services of a qualified geotechnical engineering consultant for advice on all earthwork techniques involved in the work. Contractor shall inform the Contracting Officer of conditions requiring a variation to the Contract Documents and consult with the Contracting Officer regarding disposition of earthwork variations.

2. The Contractor will employ an independent testing agency to perform tests on structural fill for compaction. Tests shall be provided by a laboratory approved and paid for by the Contractor. The Contractor shall provide a 50-pound sample of each material, from each source, to the testing agency five days prior to start of earthwork. Do not place any fill material until laboratory tests confirm material suitable as structural fill.

3. Laboratory Test on soil materials for compaction: ASTM D 1557. 4. Laboratory test on structural fill for compaction: ASTM D 1557. 5. Contractor shall notify the testing agency and geotechnical engineering

consultant sufficiently in advance of operations to allow for their assignment of personnel and scheduling of tests.

6. Testing Agency and geotechnical engineer shall prepare written reports of services performed. Testing Agency shall provide three (3) copies of testing reports to the Contracting Officer no later than 10 calendar days from the date testing occurs or test results are obtained.

7. Tests: a. Perform tests in areas where compacted fill densities are specified. b. Perform tests on sub-grade areas prior to backfilling, and at each layer of

compacted fill for every 5000 square feet, or less, of filled area, for areas other than back fill at foundation walls.

c. Perform tests at undisturbed bearing area and at each layer of compacted fill in bearing area not to exceed 50 feet o.c. at each individual footing.

d. Perform tests at each layer of compacted backfill at foundation walls; perform tests at locations not to exceed 50 feet o.c.

e. Perform tests remote from each other and in areas representative of the entire subgrade.

f. Perform tests at each layer of compacted fill in utility trenches not to exceed 50 feet o.c.

8. The testing laboratory shall promptly notify Contracting Officer and Contractor of irregularities or deficiencies of work which are observed during performance of services. If in the opinion of the Contracting Officer additional tests are required beyond those specified and their results indicate compaction less than the percentage density specified, the contractor shall bear the expense of such additional tests ordered.

C. Provide for visual inspection of bearing surfaces.

3.12 TOLERANCES

A. Perform all earthworks to a finished tolerance within plus or minus five hundredths of a foot (0.05').

END OF 31 20 00.

Page 330: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – Earthwork SECTION 31 21 00 LANDSCAPE GRADING

Landscape Grading 31 21 00 - 1

PART 1 - GENERAL 1.01 SECTION INCLUDES

A. Final grade topsoil for finish landscaping. 1.02 RELATED SECTIONS

A. Section 01 45 29 - Testing Laboratory Services

B. Section 31 20 00 - Earth Moving

C. Section 31 23 23 – Utility Backfill Materials

D. Section 32 92 00 Turf & Grasses PART 2 - PRODUCTS 2.01 MATERIAL

A. Topsoil: Provide Topsoil as specified in Specification Section 31 20 00 Earth Moving.

PART 3 - EXECUTION 3.01 EX AMINATION

A. Verify that building and trench backfilling have been inspected.

B. Verify that substrate base has been contoured and compacted. 3.02 SUBST RATE PREPARATION

A. Eliminate uneven areas and low spots.

B. Remove debris, roots, branches, stones, in excess of ½ inch in size.

C. Scarify surface to depth of 6 inches (150 mm) where topsoil is scheduled. Scarify in areas where equipment used for hauling and spreading topsoil has compacted subsoil.

3.03 PLACING TOPSOIL

A. Place topsoil in areas where seeding and planting is required to thickness as scheduled.

B. Place topsoil during dry weather.

Page 331: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – Earthwork SECTION 31 21 00 LANDSCAPE GRADING

Landscape Grading 31 21 00 - 2

C. Fine grade topsoil to eliminate rough or low areas. Maintain profiles and contour of subgrade.

D. Remove roots, weeds, rocks, and foreign material while spreading.

E. Manually spread topsoil close to existing plant life and building to prevent

damage.

F. Lightly compact placed topsoil.

G. Surplus imported subsoil and topsoil shall be removed from Government Property.

H. Leave stockpile area and site clean and raked, ready to receive landscaping.

3.04 TOLERANCES

A. Top of Topsoil: Plus or minus ½ inch.

3.05 PROT ECTION

A. Protect landscaping and other features remaining as final work.

B. Protect existing structures, fences, sidewalks, utilities, paving, and curbs. 3.06 SCHE DULES

A. Compacted topsoil thickness at the following areas:

1. Lawn: 4 inches. 2. Landscape Beds: 12 inches.

END OF SECTION

Page 332: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 1

PART 1: GENERAL 1.01 SECTION INCLUDES

A. Material Classifications B. Utility Backfill Materials:

1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank run sand 7. Select backfill 8. Random backfill

C. Material Handling and Quality Control Requirements.

1.02 DEFINITIONS A. Unsuitable Material:

1. Materials classified a s ML, CL-ML, MH, PT, OH, and OL according to

ASTM D2487. 2. Materials that cannot be compacted to require d density due to gradation,

plasticity, or moisture content. 3. Materials containing la rge clods, aggregates, or stones greater than 4

inches in a ny dimension; debris, vegetation, or waste; or any other deleterious materials.

4. Materials contaminated with h ydrocarbons or othe r chemical

contaminants. B. Suitable Material:

1. Materials meeting specification requirements. 2. Unsuitable materials meeting specification requirements for suitable soils

after treatment with lime or cement. C. Foundation Backfill Mat erials: Natur al soil or manufactured aggregate meeting

Class I requirements and geotextile filter fabrics as required, to con trol drainage and material separation. Foundation backfill material is placed and compacted as

Page 333: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 2

backfill where needed to provide stable suppor t for structu re foundation base. Foundation backfill materials may include concrete fill and seal slabs.

D. Foundation Base: Crushed stone aggregate with filter fabric (if required by the

project). Substitutions may be app roved by AW Project Manager on a case by case basis.

E. Backfill Material: Classi fied soil material meeting specified quality req uirements

for designated application as embedment or trench zone backfill. F. Embedment Material: Material as sp ecified herein and as shown on construction

details; unless otherwise approved in advance by AW. Be dding materials sha ll be placed under controlled co nditions wit hin embedment zone extending vertically upward from t op of foundation to an elevation 12 inches abo ve top of pipe, and including pipe bedding, haunching and initial backfill.

G. Trench Zone Backfill: Classified soil material meeting specified qualit y

requirements and place d under con trolled conditions in tren ch zone fro m top of embedment zone to base course in paved areas or to surface grading material in unpaved areas.

H. Foundation: Either suitable soil of trench bottom or material placed as backfill of

over excavation for removal and replacement of unsuitable or otherwise unstable soils.

I. Source: Source selected by Contractor for supply of e mbedment or tren ch zone

backfill material. Selected source may be project excavation, off-site borrow pits, commercial borrow pits, or sand and aggregate production or man ufacturing plants.

J. Refer to Section 31 2 3 23 Excavation Backfill and Co mpaction for Utilities

Section for other definitions regarding utility installation by trench construction. 1.03 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – Shop Drawings, Product Data &

Submittals. B. Submit description of source, materi al classification and product description,

production method, and application of backfill materials.

C. Submit test results for sam ples of off-site backfill m aterials. Com ply with Paragraph 2.03, Material Testing.

D. Before stockpiling materials, sub mit copy o f approval from landowner for

stockpiling backfill material on private property. E. Provide delivery ticket which includes source location for each d elivery of

material that is obtained from off site sources or is being paid as specific bid item.

Page 334: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 3

F. LEED Documentation:

1. LEED Online : http://www.leedonline.com 2. Project 10 xxxxxxxxxx

1.04 TESTS

A. Perform tests of sources for backfill material in accorda nce with P aragraph

2.03B. B. Verification tests of backfill material s may be p erformed b y AW in accordance

with Paragraph 3.03. PART 2: PRODUCTS 2.01 MATE RIAL CLASSIFICATIONS

A. Classify materials for b ackfill for p urpose of quality control in accorda nce with

Unified Soil Classification Symbols as defined in ASTM D2487. Material use and application is defined in utility instal lation specif ications and Drawings either by class, as de scribed in Paragraph 2.01 B, or by product descriptions, as given in Paragraph 2.02.

B. Class Designations Based on Laboratory Testing:

1. Class I: We ll-graded gr avels and sands, gravel-sand mixtures, cru shed

well-graded rock, little or no fines (GW, SW): a. Plasticity index: non-plastic. b. Gradation: D60/D10 - greater than 4 percent; amount passing No. 200

sieve - less than or equal to 5 percent. 2. Class II: Poorly graded gravels and sands, silty gravels and sands, little to

moderate fines (GM, GP, SP, SM): a. Plasticity index: non-plastic to 4. b. Gradations:

(1) Gradation (GP, SP): amount passing No. 200 sieve - less than 5

percent. (2) Gradation (GM, SM): amount passing No. 200 sieve - between 12

percent and 50 percent.

Page 335: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 4

(3) Borderline gradations with dual classificat ions (e.g., SP-SM): amount passing No. 200 sieve - between 5 percent and 12 percent.

3. Class III: Clayey gravel s and sands, poorly graded mixtures of gravel ,

sand, silt, and clay (GC, SC, and dual classifications, e.g., SP-SC): a. Plasticity index: greater than 7. b. Gradation: amount passing No. 20 0 sieve - be tween 12 p ercent and

50 percent. 4. Class IVA: Lean clays (CL).

a. Plasticity Indexes:

(1) Plasticity index: greater than 7, and above A line. (2) Borderline plasticity with dual cla ssifications (CL-ML): PI bet ween

4 and 7. b. Liquid limit: less than 50. c. Gradation: amount passing No. 200 sieve - greater than 50 percent. d. Inorganic.

5. Class IVB: Fat clays (CH)

a. Plasticity index: above A line. b. Liquid limit: 50 or greater. c. Gradation: amount passing No. 200 sieve - greater than 50 percent. d. Inorganic.

6. Use soils with dual class designation accordin g to AST M D2487, an d which are not defined above, according to more restrictive class.

2.02 PRODUCT DESCRIPTIONS

A. Soils classified as silt ( ML), silty clay (C L-ML with PI of 4 to 7), elastic silt (MH),

organic cla y and organic silt (OL , OH), and organic matter (PT) are not acceptable as backfill materials. These soils may be use d for site gr ading and restoration in unimproved areas a s approved by AW Project Manager. Soils in Class IV B, fat clay (CH) ma y be used as b ackfill materials where allowed, provided applicable Specification requirements specifically within Section 31 23 23 Excavation Backfill and Compaction for Utilities are satisfied.

Page 336: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 5

B. Provide backfill material that is free of stones greater than 6 inches, free of roots,

waste, deb ris, trash, organic ma terial, un stable material, non-so il matter, hydrocarbon or other contamination, conforming to following limits for deleterious materials: 1. Clay lumps: Less than 0.5 percent for Class I, and less tha n 2.0 perce nt

for Class II, when tested in accordance with ASTM C142. 2. Lightweight pieces: Less than 5 per cent when tested in accordance with

ASTM C123. 3. Organic imp urities: No color darker than standard color when tested in

accordance with ASTM C40. C. Manufactured materials, such as crushed con crete, may be substit uted for

natural soil or rock p roducts wh ere indicate d in produ ct specifica tion, and approved b y AW Project Manager, provided that physical property criteria are determined to be satisfactory by testing.

D. Bank Run Sand: Durable bank run sand classified as SP, SW, or SM b y Unified

Soil Classification System (ASTM D2487) meeting following requirements: 1. Less than 15 percent passing n umber 200 sieve wh en tested in

accordance with AST M D1140. Amount of cl ay lumps or balls may not exceed 2 percent.

2. Material passing number 40 sieve shall meet the following requirements

when teste d in accor dance with ASTM D4 318: Plasticity index: not exceeding 7.

E. Concrete Sand: Natural sand, manufactured sa nd, or combination of natural and

manufactured sand conforming to requirements of ASTM C3 3 and graded within following limits when tested in accordance with ASTM C136:

Sieve Percent Passing

3/8" 100 No. 4 95 to 100 No. 8 80 to 100

No. 16 50 to 85 No. 30 25 to 60 No. 50 10 to 30 No. 100 2 to 10

Page 337: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 6

F. Gem Sand: Sand conforming to requireme nts of ASTM C33 f or course aggregates specified fo r number 8 size and g raded within the following limits when tested in accordance with ASTM C136:

Sieve Percent Passing

3/8" 95 to 100 No. 4 60 to 80 No. 8 15 to 40

G. Pea Gra vel: Durable particles comp osed of small, smooth, rounded stones or

pebbles an d graded wi thin the following limits when tested in accord ance with ASTM C136:

Sieve Percent Passing

1/2" 100 3/8" 85 to 100

No. 4 10 to 30 No. 8 0 to10

No. 16 0 to 5 H. Crushed Aggregates: Crushed aggregates consist of durable particles obtained

from an approved source and meeting the following requirements: 1. Materials of one product delivered for same construction activity from

single source, unless otherwise approved by AW Project Manager. 2. Non-plastic fines. 3. Los Angeles abrasion te st wear not exceeding 45 percent when tested in

accordance with ASTM C131. 4. Crushed aggregate shall have minimu m of 90 perce nt of particles

retained on No. 4 sieve with 2 or more crushed faces. 5. Crushed stone: Produced from o versize plant processed stone or gravel,

sized by crushing to predominantly angular particles fr om naturally occurring single source. Uncrushed gravel is not acceptable materials for embedment where crushed ston e is shown on applicable utilit y embedment drawing details.

6. Crushed Concrete: Crushed concrete is an acceptable substitute f or

crushed st one as util ity backfill. Gradation and quality control test requirements are same as crush ed stone. Provide crushed concr ete produced fr om normal weight co ncrete of u niform quality; containing particles of aggregate and cement material, free from other substance s

Page 338: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 7

such as asphalt, reinforcing steel fragments, soil, waste gypsum (calciu m sulfate), or debris.

7. Gradations, as follows:

Percent Passing by Weight for Pipe Embedment by Ranges of Nominal Pipes Sizes

Sieve Pipe >15" Pipe 15" - 8" Pipe < 8"

1" 95 - 100 100 - 3/4" 6 0- 90 90 - 100 100 1/2" 2 5- 60 - 90 - 100 3/8" - 20 - 55 40 - 70

No.4 0- 5 0-10 0-15 No. 8 - 0- 5 0- 5

I. Select Backfill: Class III clayey gravel or sand or Class IV lean clay with plasticity

index between 7 and 20 or clayey soils tr eated with lime to meet plasticity criteria.

J. Random Backfill: Any suitable so il or mixture of soils within Classes I, II, III and

IV; or fat clay (CH) where allowed, pro vided applicable Spe cification requirements specif ically within Excavation Backfill and Co mpaction Section are satisfied.

2.03 MATERIAL TESTING

A. Source Qualification. Perform testing to confirm test results provided by suppliers

for sele ction of material source s and product s not from the project site. Te st samples of processed materials from current production rep resenting material to be delivered. Use tests t o verify that materials meet Specification requirements. Repeat qualification test procedures each time source characteristics change or there is pla nned chang e in source location or supplier. I nclude the following qualification tests, as applicable: 1. Gradation: Report complete sieve analyses regardless of specified control

sieves from largest particle through No. 200 sieve. 2. Plasticity of material passing No. 40 sieve 3. Los Angeles abrasion wear of material retained on No. 4 sieve 4. Clay lumps 5. Lightweight pieces

Page 339: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 8

6. Organic impurities B. Production Testing: At AW’s discre tion, Contractor shall pr ovide reports to AW

Project Manager from an independe nt testing laboratory that backfill materials to be placed in Work meet applicable specification requirements.

C. Assist AW Project Manager in obta ining material samples f or verification testing

at source or at production plant. PART 3 : EXECUTION 3.01 SOURCES

A. Use of existing material in trench e xcavations is acceptable, provided applicable

Specification requirements listed within Excavation Backfill and Co mpaction Section are satisfied.

B. Identify off-site source s for backfill materials at least 14 days ahead of in tended

use so that AW Project Manager may obtain samples for verification testing. C. Materials may be subjected to insp ection or ad ditional verif ication test ing after

delivery. Materials which do not meet requirements of Specifications will be rejected. Do not use m aterial which, after app roval, has b ecome unsu itable for use due to segregation, mixing with other materials, or by contamination. Once material is approved by AW Project Manager, expense for sampling and testing required to change to different material will be at the expense of the Contractor.

D. Bank run sand, select backfill, a nd random backfill, if available in project

excavation, may be obt ained by selective excavation and acceptance testing. Obtain additional quantit ies of these materials and other materials req uired to complete work from off-site sources.

E. AW does n ot represent or guarant ee that any soil found in excavation work will

be suitable and acceptable as backfill material. 3.02 MATERIAL HANDLING

A. When backf ill material is obtained from either commercial or non-co mmercial

borrow pit, open pit to expose vertical faces of various strata for identification and selection of approved material to be used. Excavate selected material by vertica l cuts extending through exposed strata to achieve uniformity in product.

B. Establish temporary stockpile locations for practical material handling and control

in advance of final p lacement. Obt ain approval from landowner for storage of backfill material on adjacent private property.

Page 340: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 23 – Utility Backfill Materials

Utility Backfill Materials 31 23 23 - 9

C. When stockpiling backf ill material near project site, use ap propriate co vers to eliminate blowing of materials in to adjacent areas and prevent runoff containing sediments from entering drainage system.

D. Place stockpiles in layers to avoi d segregation of processed materials. Load

material by making successive vertical cuts through entire depth of stockpile. 3.03 FIELD QUALITY CONTROL

A. Quality Control

1. The AW Project Manager may sample and test backfill at: a. Sources including borrow pits, production plants and Contractor's

designated off-site stockpiles. b. On-site stockpiles c. Materials placed in Work

2. The AW Project Manager may re-sa mple material at any stage of work or

location if changes in characteristics are apparent. B. Production Verification Testing: If requested, an independent testing laboratory

will provide verification testing on backfil l materials, as dire cted by AW Project Manager. Samples may be taken at source or at production plant, as applicable.

END OF SECTION 31 23 23

Page 341: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 1

PART 1: GENERAL 1.01 SECTION INCLUDES

A. Trench excavation, backfill, and compaction shall include, but not necessarily be

limited to, the excavati on, backfill, and compaction of trenches for water mains, and sanitar y sewers, shown on th e Drawings, and in a ccordance wit h the AW Standard Specifications and Details.

1.02 DEFINITIONS

A. Pipe Foundation: Suita ble and sta ble native soils that ar e exposed at trench

subgrade after excavation to depth of bottom of bedding as shown on Drawings, or foundation backfill material placed and compacted in over-excavations.

B. Embedment Material/Pipe Bedding: Portion of trench backfill that extend s

vertically from top of foundation up to level line at bottom of pipe, and horizontally from one trench sidewall to opposite sidewall.

C. Haunching: Material placed on eith er side of pipe from t op of bedding up to

springline of pipe and horizontally from one trench sidewall to opposite sidewall.

D. Initial Backf ill: Portion of trench backfill that ext ends vertically from springline of pipe (top o f haunching ) up to lev el line 12-inches abov e top of pipe, and horizontally from one trench sidewall to opposite sidewall.

E. Pipe Embe dment Zone: Portion of trench b ackfill that consists of bedding,

haunching and initial backfill. F. Trench Zone: Portion of trench backfill that extends vertically from top of pipe

embedment up to pa vement subgrade or up t o final grade when not beneath pavement.

G. Unsuitable Material: Unsuitable soil materials are the following:

1. Materials that are classified as ML, CL-ML, MH, PT, OH, and OL

according to ASTM D2487. 2. Materials that cannot be compacted to require d density due to gradation,

plasticity, or moisture content. 3. Materials that contain large clods, aggregates, stones gr eater than 4-

inches in any dimen sion, debris, vegetation, waste or any o ther deleterious materials.

4. Materials that are contaminated with hydrocarbons or other chemical

contaminants.

Page 342: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 2

H. Suitable Material: Suit able soil materials are those meeting specificat ion requirements. Materials mixed wit h lime, fly ash, or cement that can be compacted to required density and meeting re quirements for suitable materials may be considered suitable materials, unless otherwise indicated.

I. Backfill: Sui table material meeting specified quality requirements placed and

compacted under controlled conditions. J. Ground Wa ter Control Systems: In stallations external to trench, such as well

points, edu ctors, or deep wells. Ground water control includes dewatering to lower ground water, intercepting seepage which would ot herwise emerge from side or bottom of trenc h excavatio n, and depressurizat ion to prevent failure or heaving of excavation bottom.

K. Surface Water Control: Diversion and drainage of surface water runoff and rain

water away from trench excavatio n. Rain water and surface water accidentally entering trench shall be controlled and removed as part of excavation drainage.

L. Excavation Drainage: Removal of surface and seepage water in trench by sump

pumping and using dr ainage layer, as defin ed in ASTM D2321, placed o n foundation beneath pipe bedding or thickened bedding layer of Class I material.

M. Trench Conditions are defined with regard to stability of trench bottom and trench

walls of pipe embedment zone. Maintain t rench conditions that p rovide for effective placement and compaction of embedment material directly on or against undisturbed soils or foundation backfill, except where structural trench support is necessary.

1. Dry Stable Trench: Stable and sub stantially dry trench conditions exist in pipe embedment zone as result of typically dr y soils or achieved by ground water control (dewatering or depressurization) for trenche s extending below ground water level.

2. Stable Tren ch with Se epage: Sta ble trench in which g round water

seepage is controlled by excavation drainage. a. Stable Trench with Seepage in Clayey Soils: Excavation drainage

is provided in lieu of or to supplement ground water control systems to control seepage and provide stable trench subgrade in predominately clayey soils prior to bedding placement.

b. Stable Wet Trench in Sandy Soils: Excavation drain age is

provided in embedmen t zone in combination with ground water control in predominately sandy or silty soils.

3. Unstable Trench: Unstable trench conditions e xist in pipe embedmen t

zone if gr ound water inflow or high wat er content causes soil

Page 343: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 3

disturbances, such as sloughing, sliding, bo iling, heaving or loss of density.

N. Sub-trench: Sub-trench is special case of b enched excavation. Sub-trench

excavation below trench shields or shoring installations m ay be used to allow placement and compaction of f oundation or embedme nt materials direct ly against undisturbed soils. Depth of sub-trench depends upon trench stability and safety as determined by the Contractor.

O. Trench Dam: Placement of low permeab ility material in pipe embedment zone or

foundation to prohibit ground water flow along trench. P. Over-excavation and Backfill: Excavation of subgrade soils with unsatisfactory

bearing cap acity or composed of otherwise unsuitable materials below top of foundation as shown on Drawings, and backfilled with foundation backfil l material.

Q. Foundation Backfill Materials: Natural soil or manufactured aggregate of

controlled gradation, and geotextile filter fabrics as required, to control d rainage and material separation. Foundation backfill material is placed and compacted as backfill to pr ovide stable support for bedding. F oundation backfill materials ma y include concrete seal slabs.

R. Trench Safety Systems: Includes both protective systems and shoring systems. S. Trench Shield (Trench Box): Portable worker safety structure moved along trench

as work proceeds, used as protective system a nd designed to withstand forces imposed on it by cave in, thereby protecting persons wit hin trench. Trench shields may be stacked if so desig ned or placed in series depending on depth and length of excavation to be protected.

T. Shoring System: Structure that supports sid es of an e xcavation to maintain

stable soil conditions an d prevent c ave-ins, or t o prevent movement of ground affecting adjacent installations or improvements.

U. Special Shoring: Shoring system m eeting s pecial shoring as specified in

Paragraph 1.06, Special Shoring Design Requirements, for locations identified on Drawings.

1.03 SCHE DULING

A. Schedule work so that pipe embedment can b e completed on same day that

acceptable f oundation h as been achieved for each sectio n of pipe installation, manhole, or other structures.

B. The Contractor shall not excavate more trench in any day than can be completed

(facility installed and trench backfilled) in the same day, unless by written permission of AW. AW shall be empowered at any time to require the

Page 344: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 4

backfilling of open trenches over completed pipe lines if, in their judgment, such action is necessary.

1.04 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – Shop Drawings Product Data &

Submittals. B. Submit planned typical method of e xcavation, backfill placement and compaction

including:

1. Trench widths 2. Procedures for foundation and pipe zone bedding placement, and trench

backfill compaction. 3. Procedures for assuring compaction against un disturbed soil when pr e-

manufactured trench safety systems are proposed.

C. Submit backfill material sources an d product quality information in accordance with requirements of Section 31 23 23 – Utility Backfill Materials.

D. Submit trench excavati on safety pr ogram. Identify by name who will be OSHA

competent person for excavations. If special shoring system is to be used , include designs for special shoring meeting re quirements defined in Paragraph 1.06, Special Shoring Design Requirements contained herein.

E. Submit record of lo cation of utilitie s as in stalled, reference d to survey control

points. Incl ude locatio ns of utiliti es encount ered or rerouted. Give stations, horizontal dimensions, elevations, inverts, and gradients.

1.05 TESTS

A. Geotechnical testing a nd analysis of backfill materials for soil classification and

compaction testing during construction shall be provided by the Contractor, at the Contractor’s expense, a nd performed by an ind ependent, State-certified, testing company approved by AW. The results of all failing tests shall be communicated to AW immediately. Written results of all tests performed, shall be pre sented to AW in a timely manner. When test results ind icate that th e density is less than the percent specified, tractor shall excavate and re-compact the areas t hat have failed at no expense to AW.

B. Perform backfill material source qualification testing in accordan ce with

requirements of Section 31 23 23 – Utility Backfill Materials. C. The Contractor will arrange for all in-place moisture/density testing on the project.

Page 345: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 5

D. Frequency :

Compaction testing shall be performed on rando m lifts a minimum of every 300 LF unpaved areas and 100 LF in paved areas unless otherwise approved by the AW Project Manager. AW reserves the right to require re-tests if t he initial compaction test fails.

1. If ground water is present, at the discretion of the AW Project Manager,

compaction testing shall be increased to every 100 LF in unpaved areas. 2. A minimum of one (1) compaction t est per lift shall be performed for all

backfill operations with less linear footage than specified in 1.05 D.

3. The testing agency shall determine at the time of testing th e location o f each compaction test within the specified testing length.

4. As an alternative to the compaction testing frequency specified, the

Contract shall have the option to demonstrate aceptable compaction at the start of the project.

a. At the start of the trenching operation, the Contractor shall

demonstrate to the AW representative through the results reported by the accepted testing agency that the compaction density specified can be attained by the compaction equipment and methods the Contractor intends to use.

b. Once the method and equipment has been approved, no

substitutions will be permitted without AW’s approval.

c. Additional demonstration of the suitability of the compaction equipment and methods will be required whenever there is a significant change in material characteristics or change in compaction equipment or method.

d. Should testing determine that the required density is not being

met, or the material is outside the specified moisture range, the Contractor shall, without additional compensation, reexcavate, rework, and/or recompact the particular layer or section until the required density and/or moisture is attained.

E. Compaction

1. The Contractor shall, in unimproved areas outside the p ublic right s-of-way, compact each trench backfill layer in such a manner as to obtain a dense backf ill free of voids and not susceptib le to undue settlement or depression. Trench ba ckfill extend ing to n ot less than 1- foot in depth above the t op of pipe shall be co mpacted to at least 90% of ma ximum density at a moisture content within 5% of the optimum i n accordan ce with ASTM D1556.

Page 346: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 6

2. Trench backfill within a ll rights-of-way of improved or paved areas shall

be compacted to at least 95% of maximum density at a moisture conten t within 5%, or local req uirements which ever is more stringent, of the optimum moisture in accordance with AST M D1556. The final 1-foot of trench backfill to pavement subgrad e shall be compacted to at least 95 % of maxi mum density a t a moisture content within 5% of the optimum in accordance with ASTM D1556.

1.06 SPECIAL SHORING DESIGN REQUIREMENTS

A. Have special shoring designed or selected by Contractor's Professional Engineer

registered in the State the project is being completed to provide support for sides of excavati ons, including soils a nd hydrostatic ground water pre ssures as applicable, and to prevent ground movements affecting ad jacent installations or improvements such as structures, pavements and utilities. Special sh oring may be a premanufactured system selected by Contractor's Prof essional Engineer to meet project site requirements based on manufacturer's standard design.

B. The requir ement for special sho ring shall be determined by AW for all

excavations within 10-feet of an AW owned asset. PART 2: PRODUCT S 2.01 EQUIPMENT

A. Perform excavation with hydraulic excavator or other eq uipment suitable for

achieving requirements of this Section. B. Heavy compaction equipment shall not be used until adequate cover is attained.

in order to prevent damage to pipes, conduits, or ducts. C. Use trench shields or other protective syste ms or shoring systems, i ncluding

special shoring systems as referenced in Paragraph 1.06, which are designed and operated in accordance with all Local, State, and Fede ral (including OSHA) standards and regulations.

2.02 MATE RIAL CLASSIFICATIONS

A. Embedment and Trench Zone Backfill Materials: Conform to classi fications and

product descriptions of Section – Utility Backfill Materials. B. Concrete Encasement: Concrete used for en casement o r caps shall have a

minimum compressive strength of 3,000 psi.

C. Concrete Backfill: Also known as flowable fill. Flowable fill must be “excavatable” as defined by the National Ready Mi xed Association as having a co mpressive strength not exceeding 150 psi.

Page 347: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 7

D. Concrete for Trench Dams: Concrete backfill or 3 sack premixed (bag) concrete.

PART 3: EXECUTION 3.01 STANDARD PRACTICE

A. Install flexib le pipe, including "semi-rigid" pipe, to conform to standard practice

described in ASTM D2321, and as described in this Section. Where an apparent conflict occurs between standard pr actice and r equirements of this Sect ion, this Section governs.

B. Install rigid pipe to conform to stan dard practice described in ASTM C12, and as

described in this Sectio n. Where an apparent conflict o ccurs between standar d practice and requirements of this Section, this Section governs.

3.02 PREP ARATION

A. Maintain barricades an d warning lights for stre ets and inte rsections a ffected by

Work, and that are considered hazardous to traffic movements as specified in the approved traffic control plan for the project.

B. It is the Con tractor’s responsibility to obtained all required pe rmits for excavation

to include a Traffic Control Plan approved by the local governing authority. C. Perform wo rk to conform to applicable safety standards and regulations, as

outlined in current OHSA , State and local regulations D. Immediately notify agen cy or comp any owning any e xisting utility line which is

damaged, broken, or disturbed. Obtain approval from AW Project Manager and agency for any repairs or relocations, either temporary or permanent.

E. Remove existing pavements and structures, including sidewalks and drivewa ys,

to conform to local (local, State DOT, DPW, etc.) requirements F. Install and operate necessary dewatering and surface-wa ter control measures.

Provide stable trench to allow installation in accordance with Specifications. G. Maintain permanent b enchmarks, monu ments, and other reference points.

Unless otherwise directed in writing, at the expense of the Contractor a Licensed Surveyor shall replace t hose which are damag ed or destroyed in accordance with the requirements of the AW and local or State requirements.

3.03 CRITICAL LOCATION INVESTIGATION

Page 348: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 8

A. Horizontal and vertical location of various underground lines shown on Drawings, including but not limited to water lines, gas line s, storm sewers, sanitary sewers, telecommunication line s, electric lin es or power ducts, pipelines, concr ete and debris, are based on best infor mation available but a re only approximat e locations.

B. The Contractor is resp onsible for coordinating all utility lo cates within the Limits

of Disturba nce per t he standard p rocedures f or the proje ct lo cation ( One call system, DPW, Utility Company Coordination, etc.)

C. The Contractor is resp onsible for verifying the location of existing utilities in

manner that complies with all loca l, State and Federal regulations. Use extreme caution and care when uncovering these lines.

D. Notify AW Project Manager in writing immediately upon identification o f obstruction.

E. Notify involved utility co mpanies of date and time that investigation e xcavation

will occur and request that their respective utility lines be marked in field. Compl y with utility or pipeline company requirements that their repre sentative be present during excavation. Provide AW Proj ect Manager written 48 hours notice prior to field excavation or related work.

3.04 PROT ECTION

A. Protect tree s, shrubs, lawns, existing structure s, and othe r permanent objects

outside of grading limits and within grading limits as designated on Drawings. B. Protect and support above-grade and below-grade utilities which are to remain. C. Restore damaged permanent facilities to a condition equa l to or better than pre-

construction conditions unless re placement or abandonment of fa cilities is indicated on Drawings.

D. Take measures to minimize erosio n of trenche s. Do not a llow water to pond in

trenches. Where slides, washouts, settlements, or areas with loss of density o r pavement failures or potholes occur, repair, recompact, and pave those areas at no additional cost to AW.

E. Protection of Property and Structures: The Contractor shall be responsible for all

damage and assume all expense fo r direct or indirect injury caused by h is work, to above ground facilities or below ground facilities shown on the Drawings. The Contractor shall, at h is own expense, sustain in place and p rotect from direct or indirect injury all existing facilities in the vicinity of the excavation, whether above or below th e ground, or that ma y appear in the trench. The Contractor shall be responsible for the implementation of protective measures associated with the presence or proximity of pipes, pole s, tracks, walls, buildin gs, property markers, and other structures an d property of every kin d and descr iption in or over his

Page 349: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 9

trenches or in the vicin ity of his wor k whether above or below the surf ace of the ground.

. 3.05 EX CAVATION

A. Except as otherwise specified or shown on Drawings, install underground utilities

in open cut trenches with vertical sides. B. Perform excavation work so tha t p ipe, condu it, and duct s can be installed to

depths and alignments shown on Drawings. Avoid disturbin g surrounding ground and existing facilities and improvements.

C. Trenches shall be wide enough to allow for compaction equipment. D. Use sufficient trench width or benches above embedment z one for installation of

well point headers or manifolds and pumps where depth of trench makes it uneconomical or impractical to pump from surface elevatio n. Provide sufficient space betw een shorin g cross br aces to pe rmit equip ment operations and handling of forms, pipe, embedment and backfill, and other materials.

E. Upon discovery of unknown utilities, badly deteriorated utilities not designated for

removal, or concealed conditions notify AW Project Manager immediately F. Trench Support:

1. The Contractor shall support the sides and ends of all excavations

wherever necessary with braces, sheeting, shoring or stringers, trench boxes, or other acceptable excavation support systems. All timbering shall be installed by persons skilled in such work and shall be so arranged that it may be withdrawn as backfilling proceeds, without injury to the utility or structure constructed or to any roadbed or adjacent structure or property.

2. All work shall be performed in accordance with the latest OSHA

requirements. 3. All timbering in excavations, trench boxes, or excavation support systems

shall be wit hdrawn as the backfi lling is being done, except where and to such extent as the AW Project Manager shall order in writ ing that said timbering or excavation support system be left i n place or where the AW Project Manager permits the trench support t o be left in place at t he Contractor's expense a nd upon his request. Th e Contractor shall cut o ff any sheeting left in place 2 feet below finishe d grade and shall remove the material cut off without compensation therefore.

4. The suppor t of the tr ench shall be the sole respon sibility of the

Contractor.

Page 350: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 10

5. Removal or Moving of trench shoring shall be performed so that pipe, and backfill materials, after placement and compaction, are not damaged nor disturbed, nor degree of compaction reduced. Re-compact after shoring is moved if soil is disturbed.

6. The Contractor shall coordinate and provide safe access at all times to all

inspecting and testing activit ies for AW and AW-authorized representatives.

3.06 HANDLI NG EXCAVATED MATERIALS

A. Use only excavated materials, which are suitab le as def ined in this Se ction and

conforming to Section – Utility Backfil l Materi als. Place material sui table for backfilling in stockpiles per the most current OSHA standards.

B. When required, provide additional backfill material conforming to requirements of

Section – Utility Backfill Materials. C. Stockpile lo cations shall be pre-approved b y t he AW Proj ect Manager and the

local governing authority.

D. All excavated material n ot used a s backfill the same day as excavated shall be removed fro m the site and/or stockpiled in an area pre-a pproved b y the AW Project Manager or DPW.

3.07 TRENCH FOUNDATION

A. The Contractor shall, before any pipe or a ppurtenance is insta lled, fill al l

unauthorized depressions or irregularities in the bottom of the trench or tunnel with firmly compacted embankment or other approved material.

B. It shall be th e Contractor's responsibility to adequately control water that may be

present in t he excavation. He shall provide for the disposal of water removed from exca vations in su ch a manner not to cause damage to public or private property or to any portion of the Work completed or in progress or ca use any impediment to the use of any ar ea by the public. Nor shall the Contractor discharge any flushing or ground water or any material of any nature into existing sanitary sewer system during con struction of the faciliti es. All water shall be discharged through an approved sediment control device.

C. Notify AW Project Manager i mmediately when un satisfactory material is

encountered on trench bottom. With AW approval, up to 12 -inches of additional undercut may be permi tted to achieve suitable trench bottom. If the additional undercut does not result in a satisfactory trench bottom, the Contractor shall obtain a be dding desig n prepared by a Geote chnical Engineer license d in the State in which the project is being constructed.

Page 351: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 11

D. Perform over excavation, if directed by AW Project Manager, in accord ance with Paragraph 3.07.C above. Re moval of material ma ybe req uired. Eve n though Contractor has not determined material to be unsuitable.

E. Trench dams shall be installed as determined by the AW Project Manag er when

ground water is encountered. 3.08 PIPE EMBEDMENT, PLACEMENT, AND COMPACTION

A. The following material shall be used for the pipe embed ment zone (bedding,

haunching, and initial backfill) based on project location.

Location Water Main &

Sanitary Force Main Gravity Sewer

DIP PVC HDPE

Alabama (Fort Rucker) Native Material Native Material Native Material Native Material

Illinois (Scott AFB) Class II, Type A Class II, Type A Class II, Type A Class II, Type A

Kansas (Fort Leavenworth) KDOT AB-3 KDOT AB-3 KDOT AB-3 KDOT AB-3

Louisiana (Ft Polk) Select Material equal to ASTM

824

Select Material equal to ASTM

824

Select Material equal to ASTM

824

Select Material equal to ASTM 824

Maryland (Ft Meade) #57

stone/washed gravel

#57 stone/washed

gravel

#57 stone/washed

gravel

#57 stone/washed gravel

Oklahoma (Fort Sill) #57 clean Rock #57 clean Rock

or 3/8 fines (Dolese Select)

#57 clean Rock, 3/8 fines

(Dolese Select), sand

#57, 3/8 fines (Dolese Select)

Texas (Fort Hood) #57

stone/washed gravel

#57 stone/washed

gravel Sand #57 stone/washed

gravel Grade 6

Virginia (Fort AP Hill & Fort Belvoir) VDOT 21a or 21b VDOT 21a or

21b VDOT 57 or 68

B. Remove loose, slough ing, caving, or otherwise unsuitable soil from bottoms and

sidewalls of trenches immediately prior to placement of embedment materials. C. Place embedment including bedding, haunching, and init ial backfill a s shown on

Drawings.

Page 352: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 12

D. For pipe installation , manually s pread emb edment materials arou nd pipe to

provide uniform bearing and side support when compacted. Protect flexible pipe from damage during pla cing of pipe zone bedding material. Perform pl acement and compaction direct ly against undisturbed soils in trench sidewalls, or against sheeting which is to remain in place.

E. Do not place trench shields or shoring within height of em bedment zone unless

means to maintain density of co mpacted embedment material are used. I f moveable s upports are used in embedment z one, lift supp orts incrementally to allow placement and compaction of material against undisturbed soil.

F. Place geote xtile to prevent particle migration from in-situ soil into ope n-graded

(Class I) embedment materials or drainage layers. G. Do not damage coatings or wrappings of pipes during backfilling and compacting

operations. When emb edding coat ed or wrap ped pipes, do not use crushed stone or other sharp, angular aggregates.

H. Place haunching material around pipe and compact per the pipe manufacture’s

recommendation to pro vide uniform bearing and side su pport. The haunching shall be installed in a manner that prevents the pipe from moving.

I. Place electrical conduit, if used, directly on foundation without bedding. J. The method of compaction of the embedment zone material shall comply with the

pipe manufacture’s recommendation. Water tamping is not allowed.

3.09 TRENCH ZONE BACKFILL PLACEMENT AND COMPACTION A. Place backfill for pipe or conduits a nd restore surface as soon as practicable .

Leave only minimum length of trench open as necessary for construction.

B. For water and sewer lines under existing pavement, use an aggregate base backfill up t o the pavement base or sub grade. Aggregate base sha ll meet the specifications of and be installe d per the Departme nt of Transportation regulations for the State in which the project is located.

C. Unless otherwise shown on Drawings, for trench excavations not under

pavement, random backfill of suitable material may be used in trench zone. 1. Clay Soils may be used as trench zone backfill outside paved areas. 2. Place in maximum 8-inch thick lift. 3. Compact per Paragraph 1.05 of this specification section. 4. Moisture content as necessary to achieve density.

Page 353: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 31 – Earthwork Section 31 23 33 – Excavation Backfill and

Compaction For Utilities

Excavation Backfill and Compaction For Utilities 31 23 33 - 13

D. For electric conduits, remove form work used f or construction of condu its before

placing trench zone backfill. 3.10 MANHOLES, JUNCTION BOXES AND OTHER PIPELINE STRUCTURES

A. Manholes, junction boxes and other pipeline structures shall have bedding

consisting of a minimu m of 1’ compacted ¾” to 1” clean stone. The compacted ¾” to 1” stone shall be installed horizontally out from the ba se to the limits of the excavation (minimum 1’), and extend up to a m inimum of 1’ above the pipe or base, which ever is gre ater (does not include the upper connection o f a dro p inlet). The stone shall be installed to a uniform depth around the entire perimeter of the structure. The remainder of the backfill shall be insta lled per sect ion 3.09 Trench Zone Backfill Placement and Co mpaction to include paved and unpaved area requirements.

3.11 DISPOSAL OF EXCESS MATERIAL

A. Dispose of excess mat erials in accordance with requirements of the contract

documents, State and local requirements.

END OF SECTION 31 23 33

Page 354: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 31 – EARTHWORK Section 31 31 16 – TERMITE CONTROL

TERMITE CONTROL 31 31 16-1

1 GENERAL

1.1 WORK INCLUDES

A. Base Bid:

1. Contractor Provide:

a. Soil treatment of Building elements for termite control. b. Certification of EPA compliance. c. Testing services certificate of application rates. d. Warranty.

1.2 RELATED WORK

A. Specified elsewhere:

1. Division 1 – General Requirements. 2. Division 2 – Site Work. 3. Section 03 30 00 – Cast-In-Place Concrete.

1.3 QUALITY ASSURANCE

A. In addition to requirements of these specifications:

1. Comply with manufacturer's instructions and recommendations for work. 2. Follow manufacturer’s recommendations for preparation of substrate and

application.

B. Engage a professional pest control operator, licensed in accordance with regulations of governing authorities for application of soil treatment solution.

C. Use only termiticides that bear a Federal registration number of the U.S. Environmental Protection Agency.

1. formulate and apply termiticides and termiticide devices according to the EPA registered label.

D. Obtain termite control products from single manufacturer.

1.4 SUBMITTALS

A. Product Data: Submit manufacturer's technical data and application instructions.

B. Certification:

1. Provide written certification that products used comply with U.S. Environmental Protection Agency (EPA) Regulations for Termiticides.

2. Provide written certification of applicator/installer qualifications.

C. Testing Service: Provide and pay for services of an independent testing laboratory to certify termiticide application rates and submit observation data as follows:

1. Date and time of application. 2. Moisture content of soil before application. 3. Termiticide manufacturer and brand name. 4. Quantity of undiluted termiticide used. 5. Dilutions, methods, volumes used and rates of application.

Page 355: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TERMITE CONTROL 31 31 16-2

6. Areas of application. 7. Water source for application.

1.5 JOB CONDITIONS

A. Restrictions: Do not apply soil treatment solution until excavating, filling and grading operations are completed, except as otherwise required in construction operations.

B. To insure penetration, do not apply soil treatment to frozen or excessively wet soils or during inclement weather.

C. Fully comply with handling and application instructions of the soil toxicant manufacturer.

1.6 SPECIFIC PRODUCT WARRANTY

A. Furnish written warranty certifying that applied soil termiticide treatment will prevent infestation of subterranean termites.

1. If subterranean termite activity is discovered during warranty period, Contractor will re-treat soil.

2. Repair or replace damage caused by termite infestation.

B. Warranty shall be for a period of 5 years from date of Substantial Completion, signed by Applicator and Contractor.

2 PRODUCTS

2.1 SOIL TREATMENT SOLUTION

A. Use an emulsible concentrate termiticide for dilution with water, specially formulated to prevent infestation by termites that is EPA registered and complying with requirements of authorities having jurisdiction.

1. Fuel oil will not be permitted as a dilutent. 2. Provide a solution consisting of one of following chemical elements and

concentrations:

a. TalstarOne: 0.6 percent in water emulsion, FMC Corporation, Philadelphia, PA 19103.

b. Premise 75: 0.5 percent in water emulsion, Bayer Corporation, Kansas City, MO 64120.

c. Termidor SC: 0.6 percent in water emulsion, BASF Corporation, Research Triangle Park, NC 27709.

B. Other solutions may be used as recommended by Applicator if also acceptable to the Contracting Officer or designated representative and approved for intended application by jurisdictional authorities.

C. Use only soil treatment solutions that are not injurious to planting.

3 EXECUTION

3.1 APPLICATION

A. Surface Preparation: Remove foreign matter that could decrease effectiveness of treatment on areas to be treated.

Page 356: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

TERMITE CONTROL 31 31 16-3

1. Loosen, rake and level soil to be treated, except previously compacted areas under slabs and foundations.

2. Toxicants may be applied before placement of compacted fill under slabs, if recommended by toxicant manufacturer.

B. Under new slab-on-grade structures, treat soil before concrete slabs are placed, using the following rates of application:

1. Apply 2 gallons of chemical solution per 10 lineal feet to soil in critical areas under existing and new slab-on-grade construction, including:

a. Entire perimeter inside of foundation walls. b. Along both sides of interior partition walls. c. Around plumbing pipes and electric conduit penetrating slab. d. Around interior wall footings.

2. Under new slab areas:

a. Apply 1-1/2 gallons of chemical solution per 10 square feet to areas where fill is washed gravel or other coarse absorbent material.

b. Apply 1 gallon of chemical solution per 10 square feet as an overall treatment under slab areas where fill is soil or unwashed gravel.

3. Apply 2 gallons of chemical solution per 10 lineal feet of trench for each foot of depth from grade to footing along outside edge of building.

a. Dig a trench 6" to 8" wide along outside of foundation to a depth of not less than 12".

b. Punch holes in backfill to top of footing at not more than 12" o.c. and apply chemical solution.

c. Mix chemical solution with the soil as it is being replaced in trench.

C. At hollow masonry foundations or grade beams, treat voids at rate of 2 gallons per 10 lineal feet, poured directly into the hollow spaces.

D. At expansion joints, control joints, and areas where slabs will be penetrated, apply at rate of 2 gallons per 10 lineal feet of penetration.

E. Post signs in areas of application to warn workers that soil termiticide treatment has been applied and remove signs when areas are covered by other construction.

F. Reapply soil treatment solution to areas disturbed by subsequent excavation, grading, or other construction activities following application.

END 31 31 16.

Page 357: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 01 00 – PAVEMENT REPAIR AND

RESTORATION

Pavement Repair and Restoration 32 01 00 - 1

1. PART 1 GENERAL

1.1 SECTION INCLUDES

A. Repairing and resurfacing streets, highways, driveways, a nd other pavement s that have been removed, cut, broken, or otherwise damaged during construction.

1.2 SUBMITTALS

A. Contractor shall submit material certifications, along with su pporting data, from the paving materials suppliers stating that the materials conform to Sta te and/or local DPW paving specifications.

PART 2 PRODUCTS

2.01 MATERIAL S

A. Subgrade:

1. Provide backfill material as required by Specification Sectio n 31 23 33 – Excavation and Backfill for Utilities.

2. Provide material for stabilization as required.

B. Base: Provi de base material as required by State and/or local DPW paving

specifications.

C. Pavement: Provide paving materials as required by State and/or lo cal DPW standards.

PART 3 EXECUTION

3.01 PREPARATION

A. Notify AW prior to commencement of excavation in pavement for which a Dig Permit has been obtained. Follow directions contained in the permit.

B. Where directed by AW, Contractor shall saw cut pavement 18-inches wider than width of trench needed to install utiliti es u nless other wise indica ted on Drawings.

C. Protect edges of existing paveme nt to remai n from da mage during removals, utility p lacement, backfill, and paving operations . For concrete pavement, protect undisturbed subgrade that is to remain to support replacement slab.

D. Dowel in e xisting concrete pave ment where no reinforcement is fou nd or is broken due to construction a ctivities. U nless o therwise d irected by AW Project Manager, provide No. 6 bars 24-inches long, drilled and embedded 8-inches in to center of e xisting sla b with epoxy grout. Space dowels to match new pavement reinforcement spacing.

E. Provide transitional paving and earthwork as required to tie proposed pavement to existing pavement when unable to dowel new pavement into existing pavement.

Page 358: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 01 00 – PAVEMENT REPAIR AND

RESTORATION

Pavement Repair and Restoration 32 01 00 - 2

3.02 INSTALLAT ION

A. Temporary paving, or other appro priate material, must b e maintaine d until replaced by permanent paving.

B. All paving removed or damaged by construction operations shall be re placed in kind and/or repaired as specified herein.

C. All pavement work shall meet the requirements of the Stat e and/or local DPW for replacement of pa ving over all excavat ed and disturbed areas of the improved surface.

D. Parking Areas, Service Drives, and Driveways: Replace with material equal to or better th an existing or as ind icated on D rawings. Conform to applicable requirements of sections referenced in Paragraph 2.01, Materials.

E. Street Pavements and Curbs, Sidewalks, Curbs an d Gutters: Replace subgrade, base, and surface course with like materials or as indicated on Drawings. Curbs and curbs and gutters sh all match existing. Conform to requirements of sections reference d in Paragr aph 2.01, Materials. All joint s between existing curb o r sidewalk and replace ment work shall b e sa w cut a t right angles and neatly trimmed. Provide ½-i nch thich premolded expansion joint material between old and new joints.

F. At joints bet ween existing pavements and repav ing work, th e edges o f existing pavements shall be cut back parallel with the trench at right angles, neatly trimmed, an d approved by AW. An applicat ion of asph alt cement shall be provided at all locations where new pavement joins existing pavement.

G. For concrete pavement, install size and length of reinforcing steel and pavement thickness in dicated on Drawings. Place types and spacing of joints to match existing or as indicated on Drawings.

H. Where existing pavement consist s of concr ete pavement with asphaltic surfacing, resurface with minimum 2-inch depth asphaltic pavement.

I. Repair State highway and county crossin gs in accordan ce with ap plicable permit or county requirements as appropriate and within 1 week after utility work is installed.

3.03 WASTE MATERIAL DISPOSAL

A. Dispose of waste mate rials off site , in accordance with requirements of the Contract Documents, State and local regulations.

3.04 PROT ECTION

A. Maintain pavement in good condition until completion of Work.

B. Replace pavement damaged by Contractor's operations at no cost to AW.

3.05 TESTING

A. Obtain a minimum of one 6” diameter core sa mple for each 500 line ar feet of permanent paving for test of depth of bituminous material courses.

B. Take core samples at locations as directed by AW after final compaction rolling.

Page 359: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 01 00 – PAVEMENT REPAIR AND

RESTORATION

Pavement Repair and Restoration 32 01 00 - 3

C. Paving areas shown to be deficient by more than ¼” from th e specified depth in any one sample, or uni formly more than 1/8” in three or more samples, shall be removed and replaced to the correct depth at the Contractor’s expense.

D. Refill and compact te st hole s wi th material acceptab le to, and u nder the direction of, AW.

END OF SECTION 32 01 00

Page 360: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 12 16 – HOT MIX ASPHALT CONCRETE PAVEMENT

HOT MIX ASPHALT CONCRETE PAVEMENT 32 12 16 - 1

1. GENERAL

1.1 SUMMARY

A. The work under this section shall consist of providing all work, materials, labor, equipment, and supervision necessary to provide and construct the paving and surfacing as provided for in these specifications and on the drawings. Included are the following topics:

B. Option Proposal 1:

1. Subject to Base Bid requirements Contractor provide modifications to asphalt work indicated and related to substitution of medium duty concrete paving for asphalt paving.

C. Applicable provisions of Division 1 govern work under this Section. Related Work Specified Elsewhere:

1. Section 01 10 15 – Option Proposals. 2. Section 31 10 00 – Site Clearing. 3. Section 31 20 00 – Earth Moving. 4. Section 31 21 00 – Landscape Grading.

1.2 REFERENCES

A. State of Texas, Department of Transportation (TX DOT)

B. LEED 2009 for Retail: New Construction and Major Renovations Reference Guide (Copyright © by the U.S. Green Building Council, Inc.) with errata

C. LEED Documentation:

1. LEED Online: http://www.leedonline.com 2. Project ID: 11000022462

1.3 SUBMITTALS

A. All submittals shall be made in accordance with Section 01 33 00 Shop Drawings, Product Data, & Submittals.

B. Mix Design

C. LEED Submittals:

1. Product Data for Credit MR 4: For products having recycled content, refer to LEED Online for documentation requirements.

2. Product Certificates for Credit MR 5: For products and materials that comply with requirements for regional materials, refer to LEED Online for documentation requirements.

3. LEED Letter Templates:

a. Refer to LEED Online for Letter Templates and documentation required for each applicable Prerequisite and Credit.

b. Upload all submittals for LEED Credit documentation to LEED Online under the LEED Project ID.

Page 361: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 12 16 – HOT MIX ASPHALT CONCRETE PAVEMENT

HOT MIX ASPHALT CONCRETE PAVEMENT 32 12 16 - 2

1.4 QUALITY ASSURANCE

A. Except as modified herein or as indicated, work and materials shall be performed in accordance with the TX DOT.

2. PRODUCTS

2.1 RECYCLED PRODUCTS AND MATERIALS

A. Reclaimed asphalt pavement (RAP) may be used in asphalt pavement applications and shall be limited to a maximum of 20% RAP for surface and wearing courses and 30% for courses below the surface or wearting course.

B. RAP shall be salvaged, pulverized, broken or crushed asphalt pavement. The RAP to used int eh mix shall be crushed or broken to the extent that 100% will pass the two inch sieve. The RAP shall not be contaminated by dirt or other objectionable materials. Unless shown otherwise, RAP shall have a decantation of 5% or less and plasticity index of eight (8) or less when tested in accordance with TxDOT Tex-406-A, Part I, and Tex-106-E respectively. When RAP is used, the asphalt content and gradation for mixture design shall be determined.

2.2 HOT MIX ASPHALT PAVEMENT

A. The asphaltic concrete surface course shall conform to TxDOT Standard Specifications, Item 340, Type D. Asphaltic material for the paving mixture shall be asphaltic cement, viscosity grade AC-20, or performance grade PG64-22. Utilize the same material type throughout the paving operation unless noted elsewhere on the drawings.

2.3 PRIME COAT

A. The prime coat shall be cut-back asphalt, grade MC-30, conforming to the requirements of TxDOT, Standard Specifications, Item 300, Asphalts, Oils, Emulsions.

2.4 TACK COAT

A. The tack coat shall be cut-back asphalt, grade RC-250, or emulsified asphalt, grade SS-1, conforming to the requirements of TxDOT, Standard Specification, Item 300, Asphalts, Oils, Emulsions.

3. EXECUTION

3.1 EXAMINATION

A. Before commencing the placement of base course, the previously constructed subgrade, as specified in Section 31 20 00 Earth Moving, shall be inspected for surface tolerances and shall be cleaned of all foreign substances.

Page 362: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 12 16 – HOT MIX ASPHALT CONCRETE PAVEMENT

HOT MIX ASPHALT CONCRETE PAVEMENT 32 12 16 - 3

3.2 HOT MIX ASPHALT (HMA) PAVEMENT

A. Complete all work under this section to TxDOT Standard Specifications, Item 340. Provide HMA layer thicknesses as shown on the drawings. The asphaltic concrete shall be compacted to a minimum of 92 percent of the maximum theoretical specific gravity (Rice) of the mixture determined according to Text Method Tex-227-F. Pavement specimens, which shall be either cores or sections of asphaltic pavement, will be tested according to Test Method Tex-207-F. The nuclear-density gauge or other methods which correlate satisfactorily with results obtained from project roadway specimens may be used when approved by the Engineer. Unless otherwise shown on the plans, the Contractor shall be responsible for obtaining the required roadway specimens at their expense and in a manner and at locations selected by the Engineer.

B. Prime coat shall be applied to the surface of the crushed limestone base coarse. Tack coat should be applied to all surfaces that contact new asphalt pavement. See additional requirements for prime coats in the appropriate Unified Facilities Code (FC) Standard Specification for Asphaltic Concrete Materials.

3.3 REHEATING JOINTS

A. Prior to placing HMA pavement adjacent to a section of HMA pavement that was placed during a previous phase; reheat the abutting edge of the previously placed and compacted layer just prior to placing the new HMA pavement layer.

B. Provide a self-contained heating unit that heats by convection only. Do not use forced air to enhance the flame. Provide a fireproof barrier between the flame and the heater’s fuel source. The heater must produce a uniform distribution of heat within the heat box. Provide automatic controls to regulate the heater output and shutoff the heater when the paver stops or the heater control system loses power. Mount the heater on the paver inside the paver’s automatic leveling device.

C. Evenly reheat at least an 8 inch wide strip of the previously compacted layer in the adjacent lane. Reheat the joint to within 60 degrees F of the mix temperature at the paver auger. Joint temperature is to be measured immediately behind the heater.

D. The Contracting Officer may modify the required joint reheat temperatures to adjust for weather, wind, and other field conditions. Coordinate the heater output and paver speed to achieve the required joint reheat temperature without visible smoke emission.

3.4 PAVEMENT REPAIRS

A. Sawcut all pavement surfaces to neat and straight lines at the limits of removal by a two-step method. Limit the initial pavement removal to the immediate area of the proposed work. Full depth sawcutting is not required for this phase of removal. After the work is completed, make a full depth sawcut to neat and straight lines outside the widest point of pavement disruption. Sawcut the lines of the repair parallel to existing joints, or parallel to or perpendicular to pavement edges so as to form a neat patch. Carefully remove all remaining pavement within the sawcut area to the lines of the sawcut. Do not disturb the existing base materials between the area disturbed by the work and the sawcut line by the sawcutting, pavement removal, or pavement replacement processes.

Page 363: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 12 16 – HOT MIX ASPHALT CONCRETE PAVEMENT

HOT MIX ASPHALT CONCRETE PAVEMENT 32 12 16 - 4

B. Remove all walks, curbs, and other jointed paving by sawcutting at the nearest joint beyond the limits of removal.

C. Adjust all inlets, manholes, catch basins, valve boxes, and other such castings to match new finished grade as incidental work.

END 32 12 16.

Page 364: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 1

1. GENERAL

1.1 SUMMARY

A. Work of this section includes the following:

1. Concrete Pavement 2. Curbs 3. Sidewalks 4. Jointing Materials

B. Related Sections

1. Section 01 10 15 – Option Proposals. 2. Section 03 30 00 – Cast in Place Concrete. 3. Section 31 20 00 – Earth Moving.

C. Option Proposal 1:

1. Contractor, subject to base bid requirements, shall provide cast in place concrete paving as an alternate to hot mix asphalt concrete pavement including site clearing, earthwork, paving, joint sealing, pavement marking, and other related provisions.

1.2 REFERENCES

A. American Concrete Institute (ACI)

1. ACI 301 Specifications for Structural Concrete. 2. ACI 318 Building Code Requirements for Reinforced Concrete.

B. ASTM International

1. ASTM A 185 - Welded Steel Wire Fabric for Concrete Reinforcement 2. ASTM A 615 - Deformed and Plain Billet Steel Bars for Concrete

Reinforcement, Grade 60 3. ASTM C 33 - Concrete Aggregate 4. ASTM C 94 - Ready-Mixed Concrete 5. ASTM C 143 - Slump of Hydraulic Cement Concrete 6. ASTM C 150 - Portland Cement 7. ASTM C 171 - Sheet Materials for Curing Concrete 8. ASTM C 172 -Sampling Freshly Mixed Concrete 9. ASTM C 173 - Air Content of Freshly Mixed Concrete by the Volumetric

Method 10. ASTM C 309 - Liquid Membrane-Forming Compounds for Curing Concrete 11. ASTM D 422 - Particle-Size Analysis of Soils 12. ASTM D 1752 - Preformed Sponge Rubber and Cork Expansion Joint Fillers

for Concrete Paving and Structural Construction

C. Federal Specifications (FS)

1. FS SS-S-1401 - (Rev. C) Sealants, Joint, Non-Jet-Fuel-Resistant, Hot-Applied, for Portland Cement and Asphalt Concrete pavements.

D. State of Texas, Department of Transportation (TX DOT).

Page 365: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 2

E. LEED 2009 for Retail: New Construction and Major Renovations Reference Guide (Copyright © 2009 by the U.S Green Building Council, Inc.) with errata.

F. LEED Documentation:

1. LEED Online: http://www.leedonline.com 2. Project ID: 11000022462

1.3 PERFORMANCE REQUIREMENTS

A. Paving: Designed for parking, light duty commercial vehicles, and movement of trucks up to 60,000 lbs.

1.4 SUBMITTALS

A. All submittals shall be made in accordance with Section 01 33 00 Shop Drawings, Product Data, & Submittals.

B. LEED Submittals:

1. Product Data for Credit MR 4: For products having recycled content, refer to LEED Online for documentation requirements.

2. Product Certificates for Credit MR 5: For products and materials that comply with requirements for regional materials, refer to LEED Online for documentation requirements.

3. LEED Letter Templates:

a. Refer to LEED Online for Letter Templates and documentation required for each applicable Prerequisite and Credit.

b. Upload all submittals for LEED Credit documentation to LEED Online under the LEED Project ID.

1.5 QUALITY ASSURANCE

A. Except as modified herein or as indicated, work and materials shall be performed in accordance with the TX DOT.

1.6 JOB CONDITIONS

A. Weather Limitations

1. Do not place concrete when base surface temperature is less than 40°F, or surface is wet or frozen.

2. Except by specific written authorization of the Contracting Officer, concrete shall not be placed when the temperature is below 40° F and falling but may be placed when the temperature is above 35° F and rising. The temperature shall be taken in the shade and away from artificial heat.

3. When the temperature of the air is above 85° F, an approved retarding agent will be required in concrete. The maximum temperature of all regular concrete placed shall not exceed 95° F, unless otherwise specified.

Page 366: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 3

4. When the temperature is being placed in cold weather, the Contractor shall have available sufficient supply of an approved covering material to immediately protect concrete if the air temperature falls to 30° F or below, before concrete has been placed for 4 hours. Protection shall remain in place during the period the temperature continues below 32° F or for a period of not more than 5 days. Neither salt nor other chemicals shall be added to prevent freezing. The Contractor shall be responsible for the quality and strength of concrete under cold weather conditions. Concrete shall not be placed before sunrise and shall not be placed later than will permit finishing during sufficient natural light.

2. PRODUCTS

2.1 AGGREGATE BASE COURSE:

A. See Section 31 20 00 – Earth Moving, for aggregate base course material requirements.

2.2 FORMWORK

A. Form Materials: Conform to section 03 30 00 - Cast-In-Place Concrete.

B. Forms shall be of steel, except that wood forms may be used on curves having a radius of 150 feet or less, and for fillets.

C. Forms shall be equal in depth to the edge thickness of the slab as shown on the drawings.

D. Forms shall be in one piece for the full depth required except where the drawings require several different slab thicknesses; forms may be built-up with metal or wood to provide an increase in depth of not more than 26 percent.

1. Steel forms shall be furnished in sections not less than 10 feet in length, except that on curves having a radius of 150 feet or less, the length of the sections shall be 5 feet unless the sections are flexible or curved to the proper radius. Each 10-foot length of form shall be provided with at least three form braces and pin sockets so spaced that the form will be rigidly braced throughout its length. Lock joints between form sections shall be free from play or movement. Forms shall be free of warps, bends, or kinks. The top surface of a form shall not vary more than 1/8 inch in 10 feet from a true line. The face of the form shall not vary more than 1/4 inch in 10 feet from a true plane. Forms with battered top surfaces or distorted faces or bases shall be removed from the project.

2. Wood forms for curves and fillets shall be made of well-seasoned, surfaced plank or plywood, straight, and free from warp or bend. Wood forms shall be adequate in strength and rigidly braced.

2.3 DELIVERY, STORAGE AND HANDLING

A. Check all materials upon delivery to assure that the proper type, grade, color, and certification have been received.

Page 367: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 4

B. Protect all materials from damage due to jobsite conditions and in accordance with manufacturer's recommendations. Damaged materials shall not be incorporated into the work.

2.4 REINFORCEMENT

A. Recycled Content of Steel Products:

1. Materials/products shall contain the maximum amount of recycled content allowed that retains material integrity and product safety in order to meet the finished installation requirements. a. If achievable given these requirements, provide products with an average

recycled content so postconsumer recycled content plus one-half of pre-consumer recycled content is not less than 25 percent.

B. Reinforcing Steel: ASTM A615; 60 ksi yield grade; deformed billet steel bars; unfinished finish.

C. Welded Steel Wire Fabric: Plain type, ASTM A185; in flat sheets; unfinished.

D. Dowels: ASTM A615; 60 ksi yield grade, plain steel, unfinished finish.

2.5 CONCRETE MATERIALS

A. Cementitious Materials: Use the following cementitious materials of the same type, brand, and source throughout the Project

1. Portland Cement: ASTM C150, Type I, gray. a. Temperature of cement shall not be over 140 degrees F when delivered

to the batching plant. 2. Fly ash: ASTM C 618 Class C, denoted by TxDOT designations Type and B

conforming to the requirements of TxDOT Department Material Specifications DMS-4610, “Fly Ash”. a. Content may replace to 30 to 35 percent of a mix design’s Portland

cement content by absolute volume.

B. Aggregates:

1. Coarse Aggregate a. Coarse aggregate shall consist of durable particles of gravel, crushed

blast furnace slag, and/or crushed stone of reasonable uniform quality throughout, free from injurious amounts of salt, alkali, vegetable matter or other objectionable material, either free or as an adherent coating on the aggregate. It shall not contain more than 0.25 percent by weight of clay lumps nor more than 1.0 percent by weight of shale nor more than 5.0 percent by weight of laminated and/or friable particles when tested in accordance with TxDOT Test Method Tex-413-A.

b. Coarse aggregate shall have a wear of not more than 45 percent when tested in accordance with Tex Test Method Tex-410-A and when tested by standard laboratory methods shall meet the following grading requirements:

Page 368: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 5

Retained on 1-3/4 inch (43.75 mm) sieve 0% Retained on 1-1/2 inch (37.5 mm) sieve 0 – 5% Retained on 3/4 inch (19.0 mm) sieve 30 – 65% Retained on 3/8 inch (9.5 mm) sieve 70 – 90% Retained on No. 4 inch (4.75 mm) sieve 95 – 100%

c. Loss by Decantation TxDOT Test Method Tex-406-A , 1.0% Maximum d. Curb and gutter coarse aggregate shall meet the following grading

requirements Retained on 1-1/2 inch (37.5 mm) sieve 0% Retained on 3/8 inch (9.5 mm) sieve 5 – 30% Retained on No. 4 inch (4.75 mm) sieve 75 – 100%

2. Fine Aggregate

a. Fine aggregate shall be free from injurious amounts of salt, alkali, vegetable matter or other objectionable material. When subjected to the color test for organic impurities, TxDOT Test Method Tex 408-A, the fine aggregate shall not show a color darker than standard.

b. The fine aggregate shall have an acid insoluble residue of at least 60% by weight when tested in accordance with Tex 612-J. The fine aggregate shall meet the following grading requirements:

Retained on 3/8 inch (9.5 mm) sieve 0% Retained on No. 4 (4.75 mm) sieve 0 – 5% Retained on No. 8 (2.36 mm) sieve 0 – 205% Retained on No 16 (1.185 mm) sieve 15 – 30% Retained on No. 30 inch (0.600 mm) sieve 35 – 75% Retained on No. 50 inch (0.300 mm) sieve 70 – 90% Retained on No. 100 inch (0.150 mm) sieve 90 – 100% Retained on No. 200 inch (0.075 mm) sieve 97 – 100%

c. Fine aggregate shall be subjected to the Sand Equivalent Test, TxDOT Test Method 203-F. The sand equivalent shall not be less than 80.

C. Air Entraining Admixture:

1. The admixture shall be free of chlorides with formulation being adjusted to provide the recommended percentage of free air.

D. Admixtures

1. Admixtures conforming to TxDOT DMS-4640, “Chemical Admixtures for Concrete” may be used when approved by Contracting Officer to minimize segregation, improve workability, reduce the amount of mixing water and to provide normal hot weather provisions. The use of admixtures shall not alter the approved mix design, except for water content.

E. Water

1. Water for use in concrete and for curing shall be free from oils, acids, organic matter or other deleterious substances. Water sources from municipal supplies approved by the State Health Department will not require testing. Contractor shall sample and test water from other sources and submit test results to the Contracting Officer for approval 10 days prior to proposed use.

Page 369: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 6

F. Curing Materials:

1. The use of covering material that contains or becomes contaminated with sugar in any form, tannic acid or any other substance detrimental to Portland Cement concrete will not be permitted. a. Polyethylene Sheeting shall be white, opaque, free of visible defects,

uniform in appearance, and shall be not less than 0.004 inch thick. Polyethylene sheeting shall conform to the water retention requirements of ASTM C171.

b. Waterproof paper shall conform to ASTM C171. The top side of the waterproof paper shall be white.

2.6 JOINT FILLER

A. For expansion joints.

1. Shall conform to TX DOT “Construction and Materials Specification”, Latest edition, for the type specified on the plans or in the Contract.

B. Sealant, Joint, Non Fuel Resistant, Hot Applied

2.7 CONCRETE MIX DESIGNS:

A. General:

1. For additional requirements see paragraph herein entitled “Inspection and Testing”.

2. Laboratory test reports shall be identified with project location and submitted to the Contracting Officer for approval.

3. The contractor shall be responsible to coordinate testing procedures with the laboratory and be responsible for incorporating into the paving concrete of the minimum strengths specified.

B. Concrete Mix Design:

1. The concrete mix shall be designed to produce a concrete with the following requirements: Item Test Value Entrained Air Tex-416-A 3-6% Water-Cement Ratio gal/sack, max 6.25 Sacks cement, min 94 lbs. each 6/cy Coarse Agg. Factor 0.65-0.85 Compressive Strength, 7 days, psi Tex-418-A 4000 Compressive Strength, 28 day, psi Tex-418-A 4500 Max Cement Mix Temp °F 95 Retarder: Regular Concrete Increase in time over 360S, max minutes 60

2. When ice is used to lower the concrete temperature during hot weather, the addition of ice shall not exceed 50 percent of the total mix weight.

2.8 SHEAR CONNECTORS

Page 370: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 7

A. Shear connectors shall be 1/2-inch (12 mm) diameter thermoset isopthalic polyester resin-pultruded fiberglass reinforcement rods or equivalent to provide connection between vertically and horizontally adjacent units. Strength of shear connectors between vertical adjacent units shall be applicable over a design temperature of 10 degrees F to + 100 degrees F (-10 to 40 degrees C).

B. Shear connectors shall be capable of holding the geogrid in the proper design position during grid pre-tensioning and backfilling.

3. EXECUTION

3.1 EXAMINATION

A. Before commencing the placement of base course, the previously constructed subgrade, as specified in Section 31 20 00 Earth Moving, shall be inspected for surface tolerances and shall be cleaned of all foreign substances.

3.2 INSTALLATION OF BASE COURSE

A. See Section 31 20 00 for base course installation requirements.

B. No work shall proceed on pavement course until the base has been satisfactorily installed and inspected.

3.3 FORM SETTING

A. The forms shall be set in firm soil cut true to grade so that each form section when placed will be firmly in contact with the underlying layer for its entire length and base width.

B. The form sections shall be staked into position and tightly locked together.

C. The length of pins and quantity provided in each section shall be sufficient to hold the form at the correct line and grade.

D. When tested by a 10 foot straightedge the top of the form shall conform to the requirements specified for the finished surface of the concrete, and the longitudinal axis of the upstanding leg shall not vary more than 1/4 inch from the straightedge.

E. Conformity to the alignment and grade elevations shown on the drawings shall be checked, and necessary corrections shall be made immediately prior to placing the concrete.

F. The forms shall be cleaned and coated with non-staining form oil before being set in place.

3.4 PLACING CONCRETE

A. Place concrete in accordance with TX DOT.

B. Ensure reinforcement, inserts, embedded parts, and formed joints are not disturbed during concrete placement.

Page 371: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 8

C. Items to be embedded in the concrete shall be positioned accurately before placing concrete and held securely in position.

D. No concrete shall be placed until preparatory work (forms, reinforcement, subgrade, etc) has been approved by the project inspector. Each time the contractor intends to place concrete he shall notify the inspector and obtain approval. The contractor shall notify the inspector at least 24 hours before the intended time for placement.

E. Prior to placement of concrete the forms and subgrade shall be free of debris, ice, snow, extraneous oil, or other harmful substances or coatings. Any oil on the reinforcing steel or other surfaces required to be bonded to the concrete shall be removed. Rock surfaces shall be cleaned by wire brush scrubbing, as necessary, and shall be wetted immediately prior to placement of concrete. Placement of concrete on mud, dried earth, uncompacted fill or frozen subgrade will not be permitted.

F. Concrete placed in hot, dry, or windy conditions, shall have the subgrade lightly dampened with water in advance of concrete placement.

G. Place concrete continuously over the full width of the panel and between predetermined construction joints. Do not break or interrupt successive pours such that cold joints occur.

H. Concrete shall be distributed so that when consolidated and finished, the grade, surface elevation, and dimensions at all points are as required.

I. All edges that will be exposed to view when the structure is completed shall be given a 3/4 inch chamfer unless the edge is indicated to be rounded by a finishing tool. Chamfers shall be made by placing suitable forming strips inside the forms.

J. Concrete shall be deposited in the forms as closely as possible to its final position. Concrete shall not be dropped from higher than 2 feet above the surface where it is being deposited. Chutes, pipes or "elephant trunks" will be used where required to distribute the concrete and to avoid dropping the concrete. Concrete shall be thoroughly distributed and worked into corners and around reinforcement as required to prevent formation of voids in the concrete.

K. Concrete shall be thoroughly consolidated by vibrating, rodding, or tamping. Mechanical vibrators shall be used wherever possible. Vibration shall not be applied directly to the reinforcing steel or to the forms.

L. Bars or heavy tools shall not be used against the concrete in removing the forms. Any concrete damaged in form removal shall be repaired promptly by the contractor at no cost to AAFES.

M. After removal of forms, formed surfaces shall be patched as follows: Remove loose material, cut back unsound concrete, and voids fill holes with a stiff Portland cement mortar mix. Make patching mortar using some white cement with the regular cement and sand. Mix patching mortar to match surrounding concrete.

Page 372: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 9

N. Unless noted otherwise, the concrete may be placed by using forms or by use of a slip form paver. Any concrete not placed as herein prescribed within 30 minutes after mixing shall be rejected and disposed of except as provide otherwise herein. If in the opinion of the Contracting Officer, the temperature, wind, and/or humidity conditions are such that the quality of concrete will not be adversely affected, the specified placing time may be extended by a maximum of 45 minutes. Concrete with high range water reducing admixture shall not be placed after the slump has dropped by 3 inches or more.

3.5 JOINTS

A. Joints shall conform to the details indicated and shall be perpendicular to the finished grade of the pavement.

B. Transverse expansion and contraction joints shall be straight and continuous from edge of the pavement.

C. Expansion Joints shall be formed of preformed filler material. The filler shall be securely held in position by means of approved metal supports which shall remain in the pavement. A removable metal channel cap bar shall be used to hold the parts of the joint in proper position and protect the filler from damage during concreting operations. The cap bar shall be removable without damage to the pavement to provide a space for sealing of the joint. Adjacent sections of filler shall be fitted tightly together and the filler shall extend across the full width of the paving lane in order to prevent entrance of concrete into the expansion space. Expansion joints shall be formed about structures and features that project through, into, and against the pavement, using joint filler of the type, thickness, and width indicated, and installed in such a manner as to form a complete, uniform separation between the structure and pavement.

D. Construction Joints: Provide if an emergency stop occurs. Remove the concrete back to indicated location of expansion joint and install dowelled construction joint as shown.

E. Sealing Joints: Joints shall be sealed immediately following curing of the concrete or as soon thereafter as weather conditions permit, as directed. Crimping or sawing of filler-type joints shall be accomplished immediately before sealing of the joints.

F. Grooving and Sealing Cracks: Random cracks, except those specifically excluded by the Contracting Officer, that occur in the pavement during construction shall be grooved and sealed. The top of the crack shall be grooved to a depth of 3/4 inch and to a width not less than 3/8 inch or more than 5/8 inch by means of an approved mechanical grooving machine. The grooving tool shall be capable of following closely the path of the crack and of widening the top of the crack to the required section without damaging the concrete. Loose material shall be removed and the groove shall be completely sealed with an approved type of joint sealing material.

Page 373: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 10

3.6 FINISHING

A. Formed Surfaces: Fins and loose material shall be removed. Unsound concrete and voids shall be cut back to solid concrete, reamed, brushed-coated with cement grout, and filled solid with a stiff portland-cement-sand mortar mix. Patchwork shall finish flush with adjoining concrete surfaces and, where exposed, shall match adjoining surfaces in texture and color. Patchwork shall be cured for 72 hours. White Portland cement shall be used as needed to attain color match.

B. A finish coat of mortar shall be applied on the exposed surfaces of the monolithic curbs. The mortar shall be composed of 1 part of Portland Cement and 2 parts of fine aggregate. A mortar coat will not be required for extruded curbs.

C. Unformed Surfaces: Surfaces shall be finished to a true plane with no deviation exceeding 5/16 inch when tested with a 10-foot straightedge. Surfaces shall be pitched to drains. Surfaces shall be screeded and floated to the required level with no coarse aggregate visible before finishing as specified below.

1. Monolithic Finish: Monolithic finish shall be given to slabs unless otherwise specified. After the surface moisture has disappeared, floated-surfaces shall be steel-troweled to a smooth, even, dense finish free from blemish including trowel marks.

2. Nonslip Finish: Nonslip finish shall be given to stair treads, landings, exterior building entrances, vestibules, and sidewalks so indicated by brooming with a fiber-bristle brush in a direction transverse to that of main traffic.

3.7 PATCHING

A. Patch to match material, color and texture of surrounding area.

B. Replace defective work if patching is not acceptable to Contracting Officer.

3.8 CURING AND PROTECTION

A. Curing:

1. Immediately after the finishing operations, the exposed concrete surface shall be cured.

2. Immediately after finishing the concrete, the exposed surfaces shall be coated with a membrane-forming curing compound. The compound shall be applied in 2 coats by hand-operated pressure sprayers at a coverage of approximately 200 square feet per gallon for each coat. The second coat shall be applied in a direction approximately at right angles to the direction of application of the first coat. The compound shall form a uniform continuous, coherent film that will not check, crack, or peel and shall be free from pinholes or other imperfections. Concrete surfaces that are subjected to heavy rainfall within 3 hours after the curing compound has been applied shall be repaved by the method and at the coverage specified above at no additional cost to the Government. Concrete surfaces to which membrane-curing compounds have been applied shall be adequately protected for seven days from pedestrian and vehicular traffic and from any other action which might disrupt the continuity of the membrane.

Page 374: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 13 – CONCRETE PAVING

CONCRETE PAVING 32 13 13 - 11

B. Backfilling: After curing, debris shall be removed, and the area adjoining the sidewalk shall be backfilled, graded, and compacted to conform to the surrounding area in accordance with the lines and grades indicated.

C. Protection: The completed sidewalk shall be protected from damage until accepted. The Contractor shall repair damaged concrete and clean concrete discolored during construction. Sidewalk that is damaged shall be removed and reconstructed for the entire length between regularly scheduled joints. Refinishing the damaged portion will not be acceptable. Removed damaged portions shall be disposed of as directed by the Contracting Officer.

3.9 CONCRETE INSPECTION AND TESTING

A. Contractor will employ and pay for concrete testing services as follow:

1. Perform concrete inspection and tests as listed in “Methods and sampling and Testing”, ASTM C94 latest edition, ACI 301, Chapter 16.

2. Slump, air content, density, temperature, and strength of the fresh concrete shall be tested at least once for every 5000 ft2 of pavement and at least once per day

END 32 13 13

Page 375: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 73 – CONCRETE PAVING JOINT SEALANTS

Concrete Paving Joint Sealants 32 13 73 - 1

PART 1 GENERAL

1.1 SUMMARY

A. The Section includes the following:

1. Expansion and contraction joints within Portland cement concrete pavement. 2. Joints between Portland cement concrete and asphalt pavement.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions.

B. Related Sections including the following:

1. Section 31 13 13 Concrete Paving for constructing joints in concrete paving.

1.3 SUBMITTALS

A. Submit in accordance with the provisions of Section 01 33 00.

1. Product Data: For each joint-sealant product indicated. 2. Product Certificates: Sig ned by man ufacturers o f joint sealants certifying that

the products furnished comply with requirements and are suitable for the use indicated.

1.4 QUALITY ASSURANCE

A. Installer Qu alifications: An experienced installer who has specia lized in in stalling joint sealants similar in material, design, and extent to those indicated for this Project and whose work has resulted in jo int-sealant installations with a record of successful in-service performance.

B. Source Limitations: Obtain each type of joint sealant thro ugh one so urce from a single manufacturer.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to Project site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing instructions for multi-component materials.

B. Store and handle materials to co mply with manufacturer’s written instruction s to prevent their deterioration or dama ge due to moisture, high or low temperatures, contaminants, or other causes.

1.6 PROJECT CONDITIONS

A. Environmental Limitations: Do not proceed with installation of joint sealants under the following conditions:

1. When ambient and substrate te mperature conditions are outside limits permitted by joint sealant manufacturer.

2. When joint substrates are wet.

B. Joint-Width Conditions: Do not proceed with installation of joint sealants where join t widths are less than t hat allowed by joint sealant manufacturer for applicatio n

Page 376: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 73 – CONCRETE PAVING JOINT SEALANTS

Concrete Paving Joint Sealants 32 13 73 - 2

indicated.

C. Joint Substr ate Conditions: Do not proceed with installat ion of joint sealants until contaminants capable of interferin g with their adhesion are remove d from joint substrates.

PART 2 PRODUCTS 2.1 MATERIAL S, GENERAL

A. Compatibility: Provide joint sea lants, backing materials, and other rel ated materials that are compatible with one another and with joint substr ates under conditions o f service and applicat ion, as demonstrated by joint sealant manufacturer based on testing and field experience.

2.2 JOINT SEALANTS

A. Joint Sealer shall be TxDOT Class 2. Joint se alant shall b e placed in accordance with manufacturer’s re commended procedures. The joint sealant sh all have the following properties:

Color Gray

Flow, MIL-2-8802D, Sec 4.8.4, max 0.2

Working time, minutes 10

Tack Free time at 77° F +/- 2 F, MIL-2-8802D

Sec 4.8.7, minutes 60

Cure time at 77° F, days 7-14

Full Adhesion, days 14-21

As Cured – after 7 days at 77° F and 40% Relative Humidity

Elongation, minimum percent 1200

Durometer Hardness, Shore A, ASTM D 2240, min. 15

Joint movement capability, percent +100/-50

Tensile Strength, max. elongation,percent 100

Peal Strength, psi 25

2.3 JOINT-SEALANT BACKER MATERIALS

A. General: Provide joint-sealant backer materials that are no nstaining; are compatible with joint substrates, se alants, primers, and other joint filler s; and are approved for applications indicated by joint sealant manufacturer based on field exp erience and laboratory testing.

2.4 PRIMERS

Page 377: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 73 – CONCRETE PAVING JOINT SEALANTS

Concrete Paving Joint Sealants 32 13 73 - 3

A. Primers: Product reco mmended b y joint sealant manufacturer where required f or adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.

PART 3 EXECUTION

3.1 EX AMINATION

A. Examine joints ind icated to rece ive joint sealants, wit h installer present, fo r compliance with requirements for joint configuration, in stallation to lerances, a nd other conditions affecting joint-sealant performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREP ARATION

A. Surface Cleaning of Joints: Clea n out joints immediatel y before in stalling jo int sealants to comply with joint sealant manufacturer’s written instructions.

B. Joint Priming: Prime joint substrate s where indicated or where recommended i n writing by joint sealan t manufacturer, based on pre-construction joint-sealant-substrate te sts or pr ior experience. Apply pr imer to co mply with joint sealant manufacturer’s written instructions. Confi ne primers to are as of joint-sealant bond; do not allow spillage or migration onto adjoin surfaces.

3.3 INSTALLATION OF JOINT SEALANTS

A. General: Comply with joint sealan t manufacturer’s written installat ion instruction s applicable to product s and ap plications indicated, unless more stringen t requirements apply.

B. Sealant Inst allation Sta ndard: Comply with recommendatio ns of ASTM C 1193 for use of joint sealants as applicab le to mate rials, applications, and conditions indicated.

C. Install backer materials of type indicated to support sealants during application and at position require to produce cross-sect ional shapes and depths of installe d sealants relative to joint widths that allow optimum sealant movement capability.

1. Do not leave gaps between ends of backer materials. 2. Do not stretch, twist, puncture, or tear backer materials. 3. Remove ab sorbent backer materials that have become wet before sealant

application and replace them with dry materials.

D. Install sealants by proven techniqu es to comply with the following an d at the sa me time backings are installed:

1. Place sealants so they directly contact and fully wet joint substrates. 2. Completely fill recesses provided for each joint configuration. 3. Produce uniform, cross-sectional sh apes and depths relative to joint widths

that allow optimum sealant movement capability.

E. Tooling of Non-sag Sealants: Im mediately after sealant application and befor e skinning or curing begins, tool sealants according to requirements specified below to

Page 378: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 73 – CONCRETE PAVING JOINT SEALANTS

Concrete Paving Joint Sealants 32 13 73 - 4

form smooth, uniform beads of con figuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.

1. Remove excess sealants from surfaces adjacent to joint. 2. Use tooling agents that are approve d in writing by joint sealant manufa cturer

and that do not discolor sealants or adjacent surfaces.

F. For placement in vertical joints either of the following procedures may be used.

1. An amount of mixed material may be set asid e until partial curing ha s taken place and carefully trowelled into the joint with a suitable tool.

2. The portion of the joint in roadway shall be po ured and cured. The vertical curb faces shall then b e taped or formed and the materi al poured into the vertical joint from the top.

G. Provide joint configur ation to co mply with joint sealant manufacturer’s written instructions, unless otherwise indicated.

H. Provide recessed joint configuration for silicon e sealant s of recess d epth and a t locations indicated.

3.4 CLEANI NG

A. Clean off excess sea lants or se alant smea rs adja cent to jo ints as the W ork progresses by methods and with cl eaning materials approved by manufacturers of joint sealants and of products in which joints occur.

3.5 PROT ECTION

A. Protect joint sealants d uring and a fter curing period from contact co ntaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occur s, cut out and remo ve damaged or deteriorated joint sealants immed iately so in stallations with repaired areas are indistinguishable from the original work.

END OF SECTION 32 13 73

Page 379: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 13 73 – CONCRETE PAVING JOINT SEALANTS

Concrete Paving Joint Sealants 32 13 73 - 5

Page 380: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITEWORK Section 32 14 00 – CONCRETE UNIT PAVERS

CONCRETE UNIT PAVERS 32 14 00 -1

1. GENERAL

1.1 WORK INCLUDES

A. Base Bid:

1. Contractor provide:

a. All architectural concrete unit pavers. b. All truncated dome tactile warning pavers. c. Mortar bed, reinforcing and control/expansion joints. d. All bond coat mortar, additives, grout, expansion joints and miscellaneous

materials for a complete installation. e. Coordination between tile installer and site concrete subcontractor for surface

preparation of concrete slab to receive mortar bed. f. Clean up.

1.2 RELATED WORK

A. Specified elsewhere:

1. Division 1 – General Requirements. 2. Section 03 30 00 – Cast-in-Place Concrete. 3. Section 04 43 00 – Stone Masonry. 4. Section 05 50 00 – Metal Fabrications. 5. Section 12 93 00 – Site Furnishings. 6. Division 26 – Electrical. 7. Section 32 13 13 – Concrete Paving. 8. Section 32 13 73 – Concrete Paving Joint Sealants. 9. Section 32 93 00 – Plants.

1.3 REFERENCES

A. American Society for Testing and Materials (ASTM):

1. ASTM C 33: Specification for Concrete Aggregates. 2. ASTM C 150: Specification for Portland Cement. 3. ASTM C 1260: Method of Sampling and Testing Brick and Structural Clay Tile. 4. ASTM C 140: Specification for concrete

B. American National Standards Institute (ANSI):

1. Bond coat shall conform to ANSI A118.4 - 1992. 2. Tile installation shall conform to ANSI A118.5 – 1992. 3. Grout installation shall conform to ANSI A118.10 – 1992.

C. T.C.A. Tile Council of America:

1. Installation Method Cement Mortar Bonded F101.

D. Americans with Disabilities Act:

1. 2010 ADA Standards for Accessible Design, 15 September 2010.

E. LEED 2009 for Retail: New Construction and Major Renovations Reference Guide (Copyright © 2009 by the U.S. Green Building Council, Inc.) with errata.

Page 381: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONCRETE UNIT PAVERS 32 14 00 -2

F. LEED Documentation:

1. LEED Online: http://www.leedonline.com 2. Project ID: 1000056143.

1.4 QUALITY ASSURANCE

A. Manufacturer's Qualifications:

1. All products covered under this Section shall be produced by a single manufacturer unless otherwise specified.

2. Manufacturer shall submit evidence of having not less than ten (10) years successful production of this product.

3. The paver manufacturer shall demonstrate, either by proven field performance or a laboratory freeze-thaw test that the paving units have adequate durability if they are to be subjected to a freeze-thaw environment.

a. Satisfactory field performance is indicated when units similar in composition and made with the same manufacturing process as those to be supplied to the purchaser, do not exhibit objectionable deterioration after at least 3 years.

b. The units used as the basis for proven field performance shall have been exposed to the same general type of environment, temperature range and traffic volume, as is contemplated for the units supplied to the purchaser.

B. Installer Qualifications:

1. Installer shall submit evidence of skill and not less than five (5) years specialized experience with this product.

2. Installer shall submit evidence of skill and experience in setting tile using full thickness mortar bed as specified herein: a. Past experience shall demonstrate knowledge of requirements set forth by

the Tile Council of America. b. Demonstrate past compliance with referenced ANSI Standards.

1.5 SUBMITTALS

A. General: Submit in accord with 01 33 00:

B. Product Data: Product data on each item of new equipment furnished:

1. Manufacturer’s descriptive literature, installation instructions and paver color selection chart.

2. Technical information sheets indicating physical size, properties, admixtures and installation instructions.

C. Test Reports: Three (3) copies showing compliance with specified ASTM requirements.

D. Shop Drawings:

1. Layout drawings of each paved area showing the pattern of pavers:

a. Indicate pavers requiring cutting. b. Indicate setting bed methods in each area. c. Illustrate drainage patterns and water flow.

2. Include details of setting beds:

a. Include all materials and their thickness. b. Show details at curbs, vertical surface abutments and transitions to other

paving materials.

Page 382: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONCRETE UNIT PAVERS 32 14 00 -3

3. Details of custom installations at concrete curb cuts, stone patio sunshade pylons and other transitions requiring special cutting and fitting of units, including methods of installation.

E. Samples: Provide three (3) 6" x 6" sample pavers of each manufactured type, texture and color required for this Project.

F. LEED Submittals:

1. Product Data for Credit MR 4: For products having recycled content, refer to LEED Online for documentation requirements.

2. Product Certificates for Credit MR 5: For products and materials required to comply with requirements for regional materials, refer to LEED Online for documentation requirements.

3. LEED Letter Templates:

a. Refer to LEED Online for Letter Templates and documentation required for each applicable Prerequisite and Credit.

b. Upload all submittals for LEED Credit documentation to LEED Online under the LEED Project ID.

1.6 DELIVERY, STORAGE, AND HANDLING

A. General: Deliver and store in accord with Section 01 66 00.

B. Packaged Materials:

1. Deliver and store packaged materials in original containers with seals unbroken and labels intact until time of use.

2. Comply with requirement of ANSI A137.1 for labeling sealed packages.

C. Store pavers and cementitious materials on elevated platforms, under cover, and in a dry location.

D. Store aggregates where grading and other required characteristics can be maintained and contamination avoided.

E. Store liquid latexes and emulsion adhesives in unopened containers and protected from freezing.

F. Temporary Protective Coatings:

1. Handle pavers that have temporary protective coating on exposed surfaces to prevent coated surfaces from contacting backs or edges of other units.

2. If coating does contact bonding surfaces of pavers, remove coating from bonding surfaces before setting.

1.7 PROJECT CONDITIONS

A. Coordinate sequencing and scheduling of work with other supporting, adjacent, contiguous or otherwise related material trades.

B. Confirm that paver pattern and expansion joint layout are accurately coordinated with expansion and control joints in concrete substrates.

C. Maintain environmental conditions and protect work during and after installation to comply with referenced standards and manufacturer's printed recommendations.

Page 383: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONCRETE UNIT PAVERS 32 14 00 -4

D. Maintain temperatures at 50 deg F (10 deg C) or more in paved areas during installation and for 7 days after completion, unless higher temperatures are required by referenced installation standard or manufacturer's instructions.

1.8 WARRANTY

A. Surface sealer products specified shall bear manufacturer's standard warranty to retain water repellent qualities for the specified period.

B. Warranty shall be issued by manufacturer and be submitted with O & M Manuals in compliance with Section 01 77 00, Project Closeout.

1. Warranty period shall be five (5) years from date of Substantial Completion.

2. PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS AND PRODUCTS

A. Subject to compliance with the following provide paver system products as manufactured by one of the following:

MANUFACTURER PAVER PRODUCT TACTILE PRODUCT

Stepstone, Inc. CalArc Paver Truncated Dome Paver 17025 South Main Street Gardena, CA 90248 (310) 327-7474

Wausau Tile, Inc. UltraFace Paver Detectable Warning Paver 9001 Business Highway Wausau, WI 54402 (714) 359-3121

B. System Name:

1. Patio: Thick Mortar Method – Pedestrian Installation 2. Crosswalk: Thick Mortar Method – Vehicular Installation

2.2 PAVER MATERIALS

A. Regional Materials: Provide concrete pavers that have been manufactured within 500 miles of Project site from aggregates and cement that have been extracted, harvested, or recovered, as well as manufactured, within 500 miles of Project site.

B. Referenced Standards:

1. Cementitious Materials: Materials shall conform to the following applicable ASTM Specifications:

a. Portland Cement: ASTM C 150 for Portland Cement

2. Aggregates: Aggregates shall conform to these ASTM specifications, except that grading requirements shall not necessarily apply:

a. Normal Weight: ASTM C 33 for Concrete Aggregates

3. Other Materials: Admixtures and other materials used in mix design for precast concrete paving units specified herein shall be certified by manufacturer to conform to ASTM Standards and/or shown by testing not to be detrimental to the durability of the concrete including, but not limited to:

a. Integral water repellants. b. Coloring pigments.

Page 384: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONCRETE UNIT PAVERS 32 14 00 -5

c. Finely ground silica. d. Other components used in mix design.

C. Performance Requirements: Based on nominal 24" x 24" x 2” thick paving unit and standard mix designs:

1. Compressive Strength: At the time of delivery to the work site, the average compressive strength shall not be less than 8,000 psi with no individual unit less than 7,000 psi per ASTM C 140.

2. Absorption: The average shall not be greater than 6% per ASTM C140. 3. Flexural Strength: Not less than 800 psi per ASTM 293. 4. Concentrated Load Capacity: Paver units shall have a tested center load capacity

of 1,850 lbs. WT CL96.

D. Sizing: Permissible variations in dimensions shall not differ by more than 1/16” from width, height, length or thickness.

1. Units shall manufactured with square edges and corners. 2. Units shall conform to a true plane and not differ by more than 1/16” in either

concave and/or convex warpage. 3. Unit sizes shall be as indicated and conform to the following minimum dimensions:

a. Paver Product Size: All units shall be furnished in the following nominal sizes:

1.) Nominal width: 18" (17 7/8" actual). 2.) Nominal length: 36" (35 7/8" actual). 3.) Nominal thickness: 2 1/2" minimum to 2 3/4" maximum (actual).

b. Tactile Product Size: All units shall be furnished in the following nominal sizes:

1.) Nominal width: 12" (11 7/8" actual). 2.) Nominal length: 12" (11 7/8" actual). 3.) Nominal thickness: 2 1/2" minimum to 2 3/4" maximum (actual).

E. Surface Finish and Texture:

1. Paver Product: Sandblast/shot blast sand finish with square edges and corners. 2. Tactile Product: Truncated dome profile raised surfaces complying with specified

ADA requirements for tactile warning surfaces.

F. Grout Joints: Units shall be fabricated in modular sizes to layout in a nominal 18" x 36" pattern with 1/4" wide grout joints between units.

2.3 SETTING MATERIALS

A. Portland Cement Mortar Mix: ASTM C 150 Custom Bldg Products thick Bed Mortar Mix with water repellant latex additive equal to:

1. Mapei “Keralastic” water emulsion latex additive, serving as replacement for part or all of gaging water, or type specifically recommended by manufacturer for use with field-mixed Portland cement and aggregate mortar bed

B. Reinforcement: 2” x 2” - 16/16 welded galvanized wire mesh used in thick mortar bed.

C. Water: Clean and free of deleterious acids, alkalies or organic materials.

D. Grout: Custom Bldg Products Grout with water repellant latex additive in color as selected by Contracting Officer or designated representative.

E. Bond Slurry: Custom Bldg Products bond coat or approved equal.

Page 385: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONCRETE UNIT PAVERS 32 14 00 -6

F. Expansion and Contraction Joints: Provide joint fillers, bond breakers and sealants as specified in Section 32 13 73, Concrete Paving Joint Sealers in colors as selected by Contracting Officer or designated representative.

2.4 MIXING MORTARS AND GROUT

A. Mix mortars and grouts to comply with referenced standards and mortar and grout manufacturers' written instructions.

B. Add materials, water, and additives in accurate proportions.

C. Obtain and use type of mixing equipment, mixer speeds, mixing containers, mixing time, and other procedures to produce mortars and grouts of uniform quality with optimum performance characteristics for installations indicated.

1. Grout shall b installed using grout bag method.

D. Discard mortar that has reached its initial set.

2.5 SURFACE SEALER AND WATER REPELLANT

A. Acceptable Manufacturer: All surface sealer products manufactured by Glaze 'N Seal, 18207 McDurmott, Suite C, Irvine, CA 92614, (949) 250-9104 or equal products as recommended by paver manufacturer for type and setting method specified.

B. Acceptable Product: Invisible waterbase sealer formulated to impart water repellence and dirt reduction to concrete, tile and masonry surfaces with no change in surface appearance equal to Glaze 'N Seal "Natural Look" Penetrating Sealer.

C. Surface sealer shall be water based and designed to seal porous surfaces of concrete pavers and grout joints with a breathable, invisible film.

1. Base Material: Sodium Methyl Siliconate. 2. Color: Light Straw (drying to invisible film).

3. EXECUTION

3.1 INSPECTION

A. Examine all surfaces to receive components of the work specified herein.

1. Verify with field dimensions area of subsequent construction. 2. Notify the Contracting Officer or designated representative in writing of conditions

detrimental to the proper and timely completion of the work.

a. Do not proceed with the work until unsatisfactory conditions have been corrected.

b. Installation of precast concrete pavers and associated construction constitutes acceptance of the adjacent and underlying construction.

3.2 INSTALLATION OF PAVERS

A. Installation of Mortar bed shall be implemented as per current TCA F101 following written instructions of mortar and grout manufacturer for use in mortar method.

B. Install precast concrete pavers in running bond pattern indicated and in compliance with manufacturer's written instructions for method specified herein.

Page 386: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

CONCRETE UNIT PAVERS 32 14 00 -7

C. Field cut precast pavers in accordance with manufacturer's recommendations for methods, equipment and precautions.

D. Grout pavers in strict compliances with grout manufacturer’s written directions and instructions.

1. Implement grouting procedures using grout bag making certain that all joints are fully filled taking precautions to prevent grout spillage onto finished surfaces of paving.

2. Compact all grout joints as recommended by manufacturer for maximum long term performance and water resistance.

E. All control and expansion joints to be installed as per current TCA EJ 171.

1. Location of control and expansion joints shall be coordinated with control and expansion joints for concrete substrate slab per Section 32 13 13, Concrete Paving.

2. All joint materials shall be installed in strict compliance with paver manufacture's written directions and instructions.

F. Apply surface sealer at application rates and using methods in strict compliance with paver and sealer manufacturer's written instructions to attain specified warranty.

3.3 CLEANING AND PROTECTION

A. Remove and replace pavers that are found to be loose, chipped, broken, stained or otherwise damaged, or if units do not match adjoining units as intended to the satisfaction of the Contracting Officer or designated representative.

1. Provide new units to match adjoining units and install in same manner as original units, with same joint treatment to eliminate evidence of replacement.

2. Reapply surface sealer where units must be replaced.

B. Cleaning: Remove mortar stains and all other types of soiling from exposed paver surfaces, wash and scrub clean.

C. Provide final protection and maintain conditions in a manner acceptable to the Contracting Officer or designated representative to ensure paver work against damage or deterioration at time of substantial completion.

END 32 14 00

Page 387: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 17 23 – PAVEMENT MARKINGS

Pavement Markings 32 17 23 - 1

PART 1 GENERAL 1.1 SECTION INCLUDES

A. Traffic line paint and thermoplastic material for traffic striping and marking.

B. Application of traffic striping and control markings.

1.2 RELATED SECTIONS

A. Concrete paving is specified in Section 32 13 13 – Concrete Paving

B. All other painting is specified under Division 9.

1.3 REFERENCES

A. State of Texas Depart ment of Tra nsportation Standard Specificat ions, most recent edition.

1.4 SUBMITTALS

A. Refer to Section 01 33 23 Shop Drawings, Product Data and Submittals.

B. Shop Drawi ngs: Submit drawings and diagra ms indicatin g stripe wid th of divider stripes and parking stalls; configurat ion and dimensions of d irectional arrows, style, and size of letters for indicated designations; configura tion and dimensions of international handicapp ed symbol; and any other traffic control markings on pavement.

PART 2 PRODUCTS 2.1 MATERIAL S

A. Paint and Thermoplastic Mater ial: Provide paint and thermoplastic material conforming to the re quirements of TX DOT Standard Specificat ions, color s as indicated on the Drawings.

PART 3 EXECUTION 3.1 APPLICATI ON

A. Apply no paint or thermoplastic material until pavement has cured for at least 3 days or for the number of days as recommended by the manufacturer, whichever is longer. Ensure that pavement has cured suff iciently to carr y application equipment without damage.

B. Provide traffic striping and control markings on pavement, parking stalls, and curbs in accordance with the layout configurations, and dimen sions indicated on the Drawings and approved shop drawings.

C. Application equipment and procedur es shall conform to the applicable requirements of the TX DOT Standard Specifications. Keep paint thorou ghly mixed throughout application.

D. Traffic control markings and parking stalls shall be applied with the use of substantial cutout patte rns and templates, or with striping equipment that applies straig ht, uniform width, sharp lines. Coverage shall be th orough and complete in accordance

Page 388: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 17 23 – PAVEMENT MARKINGS

Pavement Markings 32 17 23 - 2

with the paint and thermoplastic manufacturer’s instructions.

1. Provide three coats for painted strip ing and pavement markings. Application rate per coat shall match that specified in the TX DOT Standard Specifications.

2. Apply thermoplastic mat erial at a minimum thickness of 0. 125 inch or at th e manufacturer’s recommended minimum thickness, whichever is greater.

E. Traffic contr ol markings and parking stalls sha ll be sharp and accurate, straight where required without fuzziness at edges of lines.

F. Accessible parking stalls shall include the International Symbol for Accessibility.

G. At completion, the Con tractor shall check the work thoroughly and sh all touch up traffic contr ol markings and parking stalls th at are not distinct or thorough in coverage, or are not uniform in color.

3.2 TOLERANCES AND APPEARANCE

A. In addition to the tolerances and appearance requirements specified in the TX DOT Standard Specificat ions, edges shall be uniform with local variations not exceeding 1/8 inch per foot and surfaces shall be smooth and uniform.

B. Letter sizes and patterns shall be as indicated on the Drawings with variations of not more than plus or minus 15 percent in dimension.

END OF SECTION 32 17 23

Page 389: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITEWORK Section 32 31 00 – FENCES & GATES

FENCES & GATES 32 31 00 -1

1. GENERAL

1.1 WORK INCLUDES

A. Base Bid:

1. Contractor provide:

a. Aluminum posts. b. Aluminum gates, hinges and cane bolts. c. Fittings and accessories to complete fence enclosures.

1.2 RELATED WORK

A. Specified elsewhere:

1. Division 1 – General Requirements. 2. Section 03 30 00 – Cast-in-Place Concrete. 3. Section 04 20 00 – Unit Masonry. 4. Section 05 50 00 – Metal Fabrications. 5. Section 32 13 13 – Concrete Paving. 6. Section 32 13 73 – Concrete Paving Joint Sealants.

1.3 REFERENCES

A. American Society for Testing and Materials (ASTM):

1. ASTM B209 - Aluminum and Aluminum-Alloy Sheet and Plate. 2. ASTM B221 - Aluminum and Aluminum Alloy Extruded Bars, Rods, Wire, Profiles,

and Tubes. 3. ASTM D822 - Filtered Open-Flame Carbon-Arc Exposures of Paint and Related

Coatings. 4. ASTM D2794 - Resistance of Organic Coatings to the Effects of Rapid

Deformation (Impact). 5. ASTM D3363 - Test Method for Film Hardness by Pencil Test.

B. LEED 2009 for Retail: New Construction and Major Renovations Reference Guide (Copyright © 2009 by the U.S. Green Building Council, Inc.) with errata.

C. LEED Documentation:

1. LEED Online: http://www.leedonline.com 2. Project ID: 1000056143.

1.4 QUALITY ASSURANCE

A. Manufacturer's Qualifications: All products covered under this Section shall be produced by a single manufacturer unless otherwise specified.

B. Installer Qualifications: An experienced installer who has completed fences and gates similar in material, design, and extent to those indicated for this Project and whose work has resulted in construction with a record of successful in-service performance.

C. Source Limitations for Fences and Gates: Obtain each color, grade, finish, type, and variety of component for fences and gates from one source with resources to provide fences and gates of consistent quality in appearance and physical properties.

Page 390: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FENCES & GATES 32 31 00 -2

1.5 SUBMITTALS

A. General: Submit in accord with 01 33 00:

B. Product Data: Material descriptions, construction details, dimensions of individual components and profiles, and finishes for the following:

1. Fence and gate posts, rails and fittings. 2. Gates, hardware and attachments.

C. Shop Drawings:

1. Show locations of gate, posts, rails, hardware, and accessories. 2. Indicate materials, dimensions, sizes, weights, and finishes of components. 3. Include plans, elevations, sections, gate swing and other required installation and

operational clearances, and details of post anchorage, attachment and bracing.

D. Samples: Provide 12 inch long samples of each component.

E. LEED Submittals:

1. Product Data for Credit MR 4: For products having recycled content, refer to LEED Online for documentation requirements.

2. Product Certificates for Credit MR 5: For products and materials required to comply with requirements for regional materials, refer to LEED Online for documentation requirements.

3. LEED Letter Templates:

a. Refer to LEED Online for Letter Templates and documentation required for each applicable Prerequisite and Credit.

b. Upload all submittals for LEED Credit documentation to LEED Online under the LEED Project ID.

1.6 DELIVERY, STORAGE, AND HANDLING

A. General: Deliver and store in accord with Section 01 66 00.

B. Packaged Materials:

1. Deliver and store packaged materials in original containers with seals unbroken and labels intact until time of use.

2. Comply with requirement of ANSI A137.1 for labeling sealed packages.

1.7 PROJECT CONDITIONS

A. Coordinate sequencing and scheduling of work with other supporting, adjacent, contiguous or otherwise related material trades.

1.8 WARRANTY

A. Manufacturer's standard warranty.

2. PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Subject to compliance with the following provide products as manufactured by Ametco Manufacturing Corporation, 4326 Hamann Parkway, Willoughby, Ohio 44096.

Page 391: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FENCES & GATES 32 31 00 -3

2.2 MATERIALS

A. Extruded aluminum: ASTM B221, Alloy 6063, Temper T-6.

B. Sheet aluminum: ASTM B209, Alloy 6063, Temper T-6.

C. Grout: Non-shrink type, pre-mixed compound consisting of non-metallic aggregate, cement, and water-reducing and plasticizing additives.

2.3 FENCE SYSTEM

A. Type: Ornamental fencing system consisting of vertical, fixed louver, modular fence panels fabricated with extruded aluminum framing bars and supported by extruded aluminum fence posts.

1. Style: Saturn Aluminum Fixed Louver Fencing as manufactured by Ametco Manufacturing Corporation.

B. Fence Panel:

1. Fixed louver blades: Extruded tubular aluminum louver blades spaced at 4 inches to provide 100 percent direct visual screening.

a. Size: 1/2 by 4 inches. b. Material thickness: 0.09 inch.

2. Framing bars: Extruded aluminum flat bars welded to ends of louvers. 3. Panel height: As indicated on drawings. 4. Panel width: As indicated on drawings.

C. Posts:

1. Type: 5-inch square extruded tubular aluminum sections with solid aluminum caps. 2. Length: As indicated on drawings.

2.4 GATES

A. Type: Hinged swinging single and double gate as indicated on drawings.

1. Construction: Welded frame fabricated from 2-inch square extruded aluminum tubing with aluminum fixed louver panels to match fencing material.

a. Size: As indicated on drawings. b. Hardware:

1.) Hinges: Heavy duty, brass bearing.

a) Provide 2 hinges for each leaf up to 6 feet high and 1 additional hinge for each additional 24 inches in height or fraction thereof.

2.) Latch: 3/4 inch diameter slide bolt to accommodate padlock. 3.) For double gates provide padlockable, 5/8 inch diameter center cane

bolt assembly and strike.

2.5 FACTORY FINISH

A. Large gate panels shall be coated with 2-part polyurethane coating.

B. Polyurethane coating: 1.0 mil dry film thickness of coating of test panel cured 30 minutes at 180 degrees F and aged 14 days shall resist the following test conditions without failure:

Page 392: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FENCES & GATES 32 31 00 -4

1. 5 percent salt spray for 500 hours. 2. 100 percent relative humidity for 1000 hours. 3. Water immersion for 100 hours. 4. 20 double rubs with cloth saturated with either lacquer thinner, acetone, MEK,

gasoline, or xylene. 5. Exposure to lubricating oils, hydraulic fluids, and cutting oils. 6. 16 cycles of 24 hours at 100 percent humidity, 24 hours at 10 degrees F, and 24

hours at 77 degrees F. 7. Hardness: H to 2H. 8. Flexibility: 1/8 inch conical mandrel.

C. Color: Silver.

3. EXECUTION

3.1 INSPECTION

A. Examine areas and conditions for compliance with requirements for earthwork, pavement work, and other conditions affecting performance.

B. Prior to fabrication, field verify required dimensions.

C. Do not begin installation before final grading is completed, unless otherwise permitted by Contracting Officer or designated representative.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Install fencing in accordance with manufacturer's installation instructions and approved shop drawings.

B. Install fence posts plumb and level.

C. Do not install bent, bowed, or otherwise damaged panels.

1. Remove damaged components from site and replace.

D. Secure fence panels with standard stainless steel bolts to fence posts after posts have been set in footings.

E. Gates:

1. Install gates and adjust hardware for smooth operation. 2. Provide concrete center foundation depth and drop rod retainers at center of

double swinging gate openings.

F. Touch-up damaged finish with paint supplied by manufacturer and matching original coating.

3.3 ADJUSTING

A. Gate: Adjust gate to operate smoothly, easily, and quietly, free from binding, warp, excessive deflection, distortion, nonalignment, misplacement, disruption, or malfunction, throughout entire operational range.

Page 393: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

FENCES & GATES 32 31 00 -5

B. Confirm that latches and locks engage accurately and securely without forcing or binding.

C. Lubricate hardware and other moving parts.

END 32 31 00

Page 394: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK

SECTION 32 92 00 – TURF & GRASSES

Turf & Grasses 32 92 00 - 1

PART 1 - GENERAL 1.01 SECTION INCLUDES

A. Seeding, optional Hydroseeding, mulching, and fertilizing.

B. Maintenance. 1.02 RELATED SECTIONS

A. Section 02205 - Soil Materials: Topsoil material.

B. Section 02223 - Backfilling: Rough grading of site.

C. Section 02225 - Trenching: Rough grading over underground utility installations.

D. Section 02923 - Landscape Grading: Preparation of subsoil and placement of topsoil in preparation for the work of this section.

1.03 REFERENCES

A. FS O-F-241 - Fertilizers, Mixed, Commercial. 1.04 DEFINITIONS

A. Weeds: Include Dandelion, Jimsonweed, Quackgrass, Horsetail, Morning Glory, Rush Grass, Mustard, Lambsquarter, Chickweed, Cress, Crabgrass, Canadian Thistle, Nutgrass, Poison Oak, Blackberry, Tansy Ragwort, Johnson Grass, Poison Ivy, Nut Sedge, Nimble Will, Bindweed, Bent Grass, Wild Garlic, Perennial Sorrel, and Brome Grass.

1.05 SUBMITTALS

A. Submit under provisions of Specification Section01 77 00 - Project Closeout. B. Maintenance Data: Submit maintenance instructions, recommended cutting methods

and maximum grass height, types, application frequency, and recommended coverage of fertilizer.

C. Product Data: Submit seed vendors' certified statement for grass seed mixture required,

stating botanical and common names, percentage by weight, and percentages of purity, germination, and weed seed for each grass seed species.

D. Certificate of Compliance: See Regulatory requirements.

1.06 QUALITY ASSURANCE

A. Provide seed mixture in containers showing percentage of seed mix, year of production, net weight, date of packaging, and location of packaging.

Page 395: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK

SECTION 32 92 00 – TURF & GRASSES

Turf & Grasses 32 92 00 - 2

1.07 REGULATORY REQUIREMENTS

A. Comply with regulatory agencies for fertilizer and herbicide composition.

B. Provide certificate of compliance from Project Manager indicating approval of seed mixture.

1.08 DELIVERY, STORAGE, AND PROTECTION

A. Transport, handle, store, and protect products in accordance with Specification Section 01 65 00 – Material and Equipment, and Section 01 66 00 – Storage and Protection.

B. Deliver grass seed mixture in sealed containers. Seed that is wet or moldy or that has

been otherwise damaged in transit or storage will not be acceptable.

C. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer.

1.09 MAINTENANCE SERVICE

A. Provide lawn maintenance including, but not limited to watering, cutting, weeding, fertilizing, re-seeding areas that are not taking hold for all seeded areas for sixty (60) days after the Date of Substantial Completion.

PART 2 - PRODUCTS 2.01 SEED MIXTURE

A. Seed Mixture: Provide fresh, clean, new-crop seed complying with tolerance for purity and germination established by U.S. Department of Agriculture Rules and Regulations under the Federal Seed Act.

B. Turf Lawn Seed mix required as follows: 34% Blue Grama – Bouteloua gracilis 66% Buffalograss – Bochloe dactyloides C. Biofilter Grass mix required as follows: 50% Hulled Common Bermuda grass – Cynadon dactylon 50% Coated Common Bermuda grass – Cyndaon dactylon

2.02 SOIL MATERIALS

A. Topsoil: As specified in Specification SECTION 02205 - SOIL MATERIALS. 2.03 ACCESSORIES

A. Mulching Material: Wood cellulose fiber, free of growth or germination inhibiting ingredients.

B. Fertilizer: FS O-F-241, recommended for grass, with fifty percent of the elements derived

from organic sources; of proportion necessary to eliminate any deficiencies of topsoil ,as indicated in analysis to the following proportions: Nitrogen 12 percent, phosphoric acid 12

Page 396: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK

SECTION 32 92 00 – TURF & GRASSES

Turf & Grasses 32 92 00 - 3

percent, soluble potash 12 percent.

C. Water: Clean, fresh, potable, and free of substances or matter which could inhibit vigorous growth of grass.

1. Water will be provided to the Landscape Contractor at the building hose bibbs.

2. The Landscape Contractor shall furnish all equipment and hose as required to

properly water the seeded areas.

D. Herbicide: Teflan or approved equal.

E. Protection Stakes: Softwood lumber, chisel pointed.

F. Protection String: Inorganic fiber. PART 3 - EXECUTION 3.01 EXAMINATION

A. Verify that prepared topsoil base is ready to receive the work of this Specification Section.

3.02 PREPARATION OF SUBSOIL

A. Prepare subsoil as per Specification Section 31 21 00 Landscape Grading.

3.03 PLACING TOPSOIL

A. Place topsoil as per Specification Section 31 21 00 Landscape Grading

3.04 FERTILIZING

A. Apply fertilizer at a rate of 30 pounds per 1,000 square feet.

B. Apply after smooth raking of topsoil and prior to roller compaction.

C. Do not apply fertilizer at same time or with same machine as will be used to apply seed.

D. Mix thoroughly into upper 2 inches of topsoil.

E. Lightly water to aid the dissipation of fertilizer. 3.05 SEEDING

A. Apply Turf Lawn seed at a rate of 6 lbs per 1000 sq ft and apply Bermuda grass at a rate of 2 lbs. per 1000 sq ft evenly in two intersecting directions. Rake in lightly.

B. Do not seed areas in excess of that which can be mulched on same day.

C. Planting Season: As established by the Project Manager.

D. Do not sow immediately following rain, when ground is too dry, or during windy periods.

Page 397: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK

SECTION 32 92 00 – TURF & GRASSES

Turf & Grasses 32 92 00 - 4

E. Roll seeded area with roller not exceeding 112 lbs.

F. Immediately following seeding and compacting, apply mulch to a thickness of 1/8 inches .

Maintain mulch clear of shrubs and trees.

G. Apply water with a fine spray immediately after each area has been mulched. Saturate the depth of the topsoil.

3.06 OPTIONAL HYDROSEEDING

A. Apply seeded slurry with a hydraulic seeder at a rate of 6 lbs per 1000 sq ft evenly in two intersecting directions.

B. Do not hydroseed areas in excess of that which can be mulched on the same day.

C. Immediately following seeding, apply mulch to a thickness of 1/8 inches. Maintain mulch

clear of shrubs and trees.

D. Apply water with a fine spray immediately after each area has been mulched. Saturate to the depth of the topsoil.

3.07 SEED PROTECTION

A. Identify seeded areas with stakes and string around area periphery. Set string height to 36 inches. Space stakes at 60 inches.

3.08 MAINTENANCE

A. Mow grass at regular intervals to maintain at a maximum height of 2-1/2 inches. Do not cut more than 1/3 of grass blade at any one mowing.

B. Neatly trim edges and hand clip where necessary.

C. Immediately remove clippings from Government Property after mowing and trimming.

D. Water to prevent grass and soil from drying out.

E. Roll surface to remove minor depressions or irregularities.

F. Control growth of weeds. Apply herbicides in accordance with manufacturer's

instructions. Remedy damage resulting from improper use of herbicides.

G. Immediately reseed areas which show bare spots.

H. Protect seeded areas with warning signs during maintenance period. 3.9 SCHEDULE

A. All project disturbed areas not scheduled to receive impervious materials, or plant bed areas, as shown on drawings, shall receive grass seed in accordance with this Specification Section. Verify extend of work with Project Manager.

Page 398: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK

SECTION 32 92 00 – TURF & GRASSES

Turf & Grasses 32 92 00 - 5

END OF SECTION

Page 399: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 1

PART 1 - GENERAL 1.01 SECTION INCLUDES

A. Preparation of subsoil and topsoil.

B. Topsoil bedding.

C. New trees, plants, and ground cover.

D. Mulch and fertilizer.

E. Maintenance. F. Tree Pruning.

1.02 RELATED SECTIONS

A. Section 31 20 00 – Earth Moving.

B. Section 31 21 00 – Landscape Grading.

C. Section 31 23 33 – Excavation Backfill and Compaction for Utilities.

D. Section 32 92 00 – Turf & Grasses.

1.03 REFERENCES

A. ANSI Z60.1 - American Standard for Nursery Stock.

B. NAA (National Arborist Association) - Pruning Standards for Shade Trees.

C. LEED 2009 for Retail: New Construction and Major Renovations Reference Guide (Copyright © 2009 by the U.S Green Building Council, Inc.) with errata.

D. LEED Documentation:

1. LEED Online: http://www.leedonline.com 2. Project ID: 11000022462

1.04 DEFINITIONS

A. Weeds: Include Dandelion, Jimsonweed, Quackgrass, Horsetail, Morning Glory, Rush Grass, Mustard, Lambsquarter, Chickweed, Cress, Crabgrass, Canadian Thistle, Nutgrass, Poison Oak, Blackberry, Tansy Ragwort, Johnson Grass, Poison Ivy, Nut Sedge, Nimble Will, Bindweed, Bent Grass, Wild Garlic, Perennial Sorrel, and Brome Grass.

Page 400: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 2

B. Plants: Living trees, plants, and ground cover specified in this Section. 1.05 SUBMITTALS

A. Section 01 30 00 – Shop Drawing, Product Data & Submittals.

B. Certificate of Inspection of Plant Material by State or Federal Authorities.

C. Maintenance Data: Include pruning and trimming method; types, application frequency, and recommended coverage of fertilizer for all installed plants.

D. Submit list of plant material sources.

E. Submit one 2 lb bagged sample of crushed grave mulchl for approval by the

Project Manager.

F. LEED Submittals: 1. Product Certificates for Credit MR 5: For products and materials that

comply with requirements for regional materials, refer to LEED Online for documentation requirements.

2. LEED Letter Templates: a. Refer to LEED Online for Letter Templates and documentation for

each applicable Prerequisite and Credit. b. Upload all submittals for LEED Credit documentation to LEED

Online under the LEED Project ID. 1.06 QUALITY ASSURANCE

A. Nursery Qualifications: Company specializing in growing and cultivating the plants with minimum five years experience.

B. Installer Qualifications: Company specializing in installing and planting the plants

with minimum three years experience and approved by nursery.

C. Tree Pruner Qualifications: Company specializing in pruning trees with proof of Arborist Certification.

D. Tree Pruning: NAA - Pruning Standards for Shade Trees.

E. Maintenance Services: Performed by qualified installer.

F. Plant Materials: Nursery grown trees and shrubs grown in a recognized nursery

in accordance with good horticultural practice with healthy root systems developed by transplanting or root pruning. Provide only healthy, vigorous stock, free of disease, insects, eggs, larvae, and defects such as knots, sun scald, injuries, abrasions, and disfigurement.

Page 401: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 3

1.07 SUBSTITUTIONS

A. Do not make substitutions of tree and shrub materials. If required landscape material is not obtainable, submit proof of non-availability to Project Manager and a proposal for use of equivalent material.

1.08 INSPECTION

A. The Project Manager may inspect trees and shrubs either at the place of growth or at site before planting for compliance with requirements for genus, species, variety, size and quality. Project Manager retains the right to inspect trees and shrubs further for size and condition of balls and root systems, insects, injuries, and latent defects and to reject unsatisfactory or defective material at any time during progress of work. Remove rejected trees or shrubs immediately from project site and replace with new material.

1.09 REGULATORY REQUIREMENTS

A. Comply with regulatory agencies for fertilizer and herbicide composition.

B. Provide certificate of compliance from authority having jurisdiction indicating approval of plants, fertilizer and herbicide mixture.

C. Plant Materials: Certified by federal or state department of agriculture Described

by ASTM Z60.1; free of disease or hazardous insects. 1.10 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, protect and handle products to site under provisions of Section 01 66 00.

B. Deliver fertilizer in waterproof bags showing weight, chemical analysis, name of

manufacturer, and certification of conformance to State regulations.

C. Protect and maintain plant materials until planted.

D. Deliver plant life materials immediately prior to placement. Do not deliver more plant material than can be planted in one day. Keep plants moist.

E. Label at least one tree and one shrub of each variety with a securely attached

waterproof tag bearing legible designation of botanical and common name. Where formal arrangements or consecutive order of trees or shrubs are shown, select stock for uniform height and spread.

F. Prune, thin out, and shape trees and shrubs in accordance with standard

horticultural practice. Prune trees to retain required height and spread. Unless otherwise directed by the Project Manager, do not cut tree leaders, and remove only injured or dead branches from trees. Required shrub sizes indicated are

Page 402: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 4

size after pruning. Prune shrubs to retain natural character. Any shrubs sheared into smooth regular shapes will be rejected.

1.11 ENVIRONMENTAL REQUIREMENTS

A. Do not install plant materials when ambient temperatures may drop below 35 degrees F (2 degrees C) or rise above 90 degrees F (32 degrees C); where soil is frozen or muddy.

B. Do not install plant life when wind velocity exceeds 30 mph (48 k/hr).

1.12 WARRANTY

A. Provide one-year warranty.

B. Warranty: Include coverage for one continuous growing season after all plant materials are installed; replace dead or unhealthy plants, or plants dead beyond normal pruning limits.

C. Replacements: Plants of same size and species as specified, planted in the next

growing season, with a new warranty commencing on date of replacement. 1.13 MAINTENANCE SERVICE

A. Maintain plant life for sixty (60) days after Date of Substantial Completion.

B. Maintain plant life immediately after placement until plants are well established and exhibit a vigorous growing condition. Continue maintenance until termination of warranty period.

C. Maintenance to include:

1. Cultivation and weeding plant beds and tree mulch rings. 2. Applying herbicides for weed control in accordance with manufacturer's

instructions. Remedy damage resulting from use of herbicides. 3. Remedy damage from use of insecticides. 4. Water sufficient to saturate root system. 5. Pruning, including removal of dead or broken branches. 6. Disease control. 7. Replacement of hardwood or gravel mulch.

D. Inspect plant life at a minimum of once per week. Perform maintenance

promptly.

Page 403: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 5

PART 2 - PRODUCTS 2.01 TREES, PLANTS, AND GROUND COVER

A. Trees, Plants, and Ground Cover: Species and size identifiable in plant schedule, grown in climatic conditions similar to those in locality of the Work.

2.02 SIZE

A. Provide trees and shrubs of the sizes indicated in plant list and in accordance with dimensional relationship requirements of ANSI Z60.1 for kind and shape of trees and shrubs required. Trees and shrubs of larger size than specified may be used if approved by the Project Manager. Size of roots or balls shall be increased proportionately.

B. Plugs shall be in a minimum 2” square open-bottomed pots.

Plugs shall be thoroughly rooted through the container. No species shall be substituted without approval of the architect.

2.03 MEASUREMENTS

A. Measure trees and shrubs with branches and trunks or canes in their normal position. Do not prune to obtain required sizes. Take caliper measurements 6 inches above ground for trees up to 4 inches caliper size, and 12 inches above ground for larger sizes. Measure main body of tree or shrub for height and spread dimensions: do not measure from branch or root tip to tip.

2.04 SOIL MATERIALS

A. Provide topsoil that is fertile, friable, naturally loamy, surface soil; reasonably free of subsoil, clay lumps, brush, weeds, and other litter and free of roots, stumps, stones larger than 2 inches in any dimension, and other extraneous or toxic matter harmful to plant growth. On-site soil may be used, if it is determined acceptable by the Project Manager.

B. If on-site is not suitable, obtain topsoil from local sources or from areas having

similar soil characteristics to that found at site of work. Obtain topsoil from naturally well-drained sites where topsoil is at least 4 inches deep; do not obtain from bogs or marshes.

2.05 SOIL AMENDMENT MATERIALS

A. Fertilizer: Containing fifty percent of the elements derived from organic sources; of proportion necessary to eliminate any deficiencies of topsoil to the following proportions: Nitrogen 11 percent, phosphoric acid 8 percent, soluble potash 4 percent.

Page 404: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 6

B. Peat Moss: Shredded, loose, sphagnum moss; free of lumps, roots, inorganic

material or acidic materials; minimum of 85 percent organic material measured by oven dry weight, pH range of 4 to 5; moisture content of 30 percent.

C. Bone Meal: Raw, finely ground, commercial grade, minimum of 3 percent

nitrogen and 20 percent phosphorous.

D. Lime: Ground limestone, dolomite type, minimum 95 percent carbonates.

E. Water: Clean, fresh, and free of substances or matter which could inhibit vigorous growth of plants.

1. Water will be provided by the contractor at the nearest available source in

the vicinity of the project. Contractor shall furnish hoses and other equipment.

2.06 MULCH MATERIALS

A. Mulching Material: Mulch shall be fine grade of shredded hardwood bark, 'Paygro' or an approved equal. Mulch shall be free of foreign matter and wood particles over 6" in length or 2" in width.

B. Decorative Gravel Mulch: Grave s hall be a crushed SOLADO limestone/quarry

stone to match color and texture of building stone.

2.07 ACCESSORIES

A. Anti-desiccant: Emulsion type, film-forming agent designed to permit transpiration, but retard excessive loss, of moisture from plants. Deliver in manufacturer’s fully identified containers and mix in accordance with manufacturer’s instructions.

2.08 PLANT SOIL MIX

A. A uniform mixture of 1 part topsoil and 1 part Ft. Hood Compost: Obtain Organic Compost from the Ft. Food Compost Center, contact the Solid Waste Contract Service Division, POC: (254) 287-5118 and the Environmental Services Division, PC: (254) 287-9184.

PART 3 - EXECUTION 3.01 EXAMINATION

A. Verify that prepared subsoil is ready to receive work; coordinate with lawn work; install plant materials after lawn grading, but prior to seed or sod work. If planting

Page 405: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 7

of trees and shrubs occurs after lawn work, protect lawn areas and promptly repair damage to lawns resulting from planting operations.

B. Saturate soil with water to test drainage.

3.02 PREPARATION OF SUBSOIL

A. Prepare subsoil as per Specification Section 31 20 00.

B. Dig pits and beds 6 inches larger than plant root system.

3.03 PLACING TOPSOIL

A. Place topsoil as per Specification Section 31 20 00.

3.04 FERTILIZING

A. Apply fertilizer in accordance with manufacturer's instructions.

B. Apply after initial raking of topsoil.

C. Mix thoroughly into upper 2 inches of topsoil.

D. Lightly water to aid the dissipation of fertilizer. 3.05 PLANTING

A. Place plants for best appearance for review and final orientation by Project Manager.

B. Space plants in beds as shown on drawings. Set minimum 3' from structures,

pavement edges, buildings, face of curb or as noted on drawings. C. Set plants in pits or beds, partly filled with prepared plant mix, at a minimum

depth of 6 inches under each plant. Remove all twine, bags and roping from base of trunks. Remove top 1/3 of the wire from root balls having wire baskets. Remove all rot-proof burlap.

D. Saturate soil with water when the pit or bed is half full of topsoil and again when

full. 3.06 TREE PRUNING

A. Prune trees to NAA Class 1 - Fine Pruning. B. Remove and replace excessively pruned or malformed stock resulting from

improper pruning.

Page 406: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 32 – SITE WORK SECTION 32 93 00 – PLANTS

Plants 32 93 00 - 8

3.07 FIELD QUALITY CONTROL

A. Section 01 42 10 - Quality Control: Field inspection and testing.

B. Plants will be rejected if a ball of earth surrounding roots has been disturbed or damaged prior to or during planting.

3.08 MAINTENANCE

A. Neatly trim plants where necessary removing dead or broken branches. Do not sheer plants into smooth, regular shapes. Immediately remove clippings after trimming.

B. Water to prevent soil from drying out.

1. Water will be provided to the Landscape Contractor at the building hose bibbs.

2. The Landscape Contractor shall furnish equipment and hose as needed.

C. Control growth of weeds. Apply herbicides in accordance with manufacturer's instructions.

D. Apply pesticides in accordance with manufacturer’s instructions.

3.09 SCHEDULE - PLANT LIST

A. See schedule on Landscape Plans. 3.10 SITE RESTORATION

A. Daily: At the end of each day, the grounds shall be cleaned of all landscape contractor- related refuse and debris.

B. Upon completion: All paved surfaces affected by planting operations shall be swept and hosed off. All plant beds shall be free of weeds.

END OF SECTION 32 93 00

Page 407: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilties Section 33 01 10 – Pressure and Leakage Tests

Pressure and Leakage Tests 33 01 10 - 1

PART 1: GENERAL 1.01 SCOPE OF WORK

A. Test all piping, valves, and appurtenances installed under this Contract. Testing shall be performed concurrent with installation. Do not install more than 1,000 feet of pipe without being tested, unless approved by AW.

1.02 SUBMITTALS

A. Prepare and submit schedules and procedures to AW for testing of all parts of the water main installed in accordance with this Contract. Submit the schedule at least seven days prior to any testing.

PART 2: PRODUCTS 2.01 EQUIPMENT

A. Furnish the pump, pipe connections, and all necessary apparatus for the pressure and leakage tests including gauges and metering devices. AW reserves the option to furnish the gauges and metering devices for the tests. Excavate, backfill, and furnish all necessary assistance for conducting the tests.

PART 3 EXECUTION 3.01 GENERAL

A. Leakage Tests must be in accordance with ASTM C969 and C1244. Leakage test are required for all gravity lines. Perform hydrostatic pressure tests in accordance with AWWA C600, Section 5.2 - Hydrostatic Testing after the pipe or section of pipe has been laid, thrust blocking cured (min. 5 days), and the trench is completely or partially backfilled. Where practical, testing shall be performed fully isolated from the active distribution system.

B. Contractor may, at his option, completely backfill the trench or partially backfill

the trench over the center portion of each pipe section to be tested. However, AW may direct the Contractor to completely backfill the trench if local traffic or safety conditions require.

C. For system operating pressures of 200 psi or less, perform the hydrostatic test at

a pressure of no less than 100 psi above the normal operating pressure without exceeding the rating of the pipe and appurtenances. For system operating pressures in excess of 200 psi, perform the hydrostatic test at a pressure that is 1.5 times the normal operating pressure, but no more than the design rating of the pipe and appurtenances.

Page 408: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilties Section 33 01 10 – Pressure and Leakage Tests

Pressure and Leakage Tests 33 01 10 - 2

D. Valves shall not be operated in either direction at a differential pressure exceeding the rated valve working pressure. A test pressure greater than the rated valve working pressure can result in trapped test pressure between the gates of a double-disc gate valve. For tests exceeding the rated valve working pressure, the test setup should include a provision, independent of the valve, to reduce the line pressure to the rated valve working pressure on completion of the test. The valve can then be opened enough to equalize the trapped pressure with the line pressure, or the valve can be fully opened if desired.

E. The test pressure shall not exceed the rated working pressure or differential

pressure of the valves when the pressure boundary of the test section includes closed, resilient-seated gate valves or butterfly valves.

F. Contractor shall attach a tapping sleeve and valve assembly to the main, and

pressure test the assembly prior to making the tap. The required test pressure shall be determined in the same manner as for pipe. The test is acceptable if there is no pressure drop in 15 minutes at test pressure.

3.02 FILLING AND TESTING

A. Slowly fill each segregated section of pipeline with water ensuring that all air is expelled. Extreme care must be taken to ensure that all air is expelled during the filling of pipe. The line shall stand full of water for at least twenty-four hours prior to testing to allow all air to escape. If necessary, tap the main at points of highest elevation to expel air as the pipe is filled. Remove the corporation stops and plug the taps after successfully filling the pipeline and expelling all air as approved by AW.

B. Apply the specified test pressure, measured at the point of lowest elevation,

using a suitable pump connected to the pipe in a manner satisfactory to the AW Project Manager. If the elevation of the high point of the pipeline being tested is such that the pressure during testing will be below 85% of the required test pressure, AW will require a separate test to be performed on this section of pipeline. In lieu of a separate test, the test pressure measured at the lowest elevation may be increased, within the pressure rating of the pipeline material, such that the resulting pressure at the highest point exceeds 85% of the required test pressure. The test will be conducted for at least two (2) hours at the required test pressure ± 5 psi.

C. Conduct a leakage test concurrently with the pressure test. Leakage is defined

as the volume of water that must be supplied into the newly laid pipeline to maintain pressure within ± 5 psi of the test pressure after it is filled and purged of air. Measure the volume of water using a calibrated container or meter.

D. No pipeline installation will be accepted by AW if the leakage is greater than that

shown in the following table:

Allowable Leakage per 1000 ft. of Pipeline*---gph __________________________________________________________________

Page 409: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilties Section 33 01 10 – Pressure and Leakage Tests

Pressure and Leakage Tests 33 01 10 - 3

___________________________________________________________________ *If the pipeline under test contains sections of various diameters, the allowable leakage will be the sum of the computed leakage for each size.

The table has been generated from the formula: 000,148

* PDSL

Where: L is the allowable leakage in gallons per hour,

S is the length of pipe in feet, D is the nominal pipe diameter in inches, and P is the average test pressure in psig.

E. Should any test disclose damaged or defective materials or leakage greater than that permitted, the Contractor shall, at the Contractor’s expense, locate and repair and/or replace the damaged or defective materials. Materials used for repair must be approved by AW and meet the relevant specifications. Repeat the tests until the leakage is within the permitted allowance and is satisfactory to AW.

END OF SECTION 33 01 10

Page 410: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 1

PART 1 GENERAL

1.01 SCOPE OF WORK

A. Flush and disinfect all pipelines installed under this Contract as indicated in the Drawings. This would include furnishing the necessary labor, tools, transportation, and other equipment for the operation of valves, hydrants, and blowoffs during chlorination. Install, and if directed by the AW Project Manager, remove all chlorination taps required for disinfection. Disinfection will be performed under the supervision of AW.

1.02 WORK BY AW

A. AW reserves the option to provide/furnish the chlorine and chlorination

equipment. AW will furnish water for testing, flushing and disinfecting pipelines. AW will also reserve the right to perform bacteriological testing and may collect the sample.

1.03 PROTECTION

A. Chlorine disinfection and dechlorination shall be under the direct supervision of someone familiar with the physiological, chemical, and physical properties of the form of chlorine used. They shall be trained and equipped to handle any emergency that may arise. All personnel involved shall observe appropriate safety practices to protect working personnel and the public.

B. The forwards of AWWA Standards B300 and B301 contain information and

additional reference material regarding the safe handling of hypochlorites and liquid chlorine. The Contractor shall familiarize himself with this information prior to performing any disinfection work.

1.04 SUBMITTAL

A. Conform to the requirements of Section 01 33 00 – Shop Drawings, Product

Data, & Submittals

1.05 RELATED WORK

A. Observe the precautions described in Section 33 11 00 – Piping – General

Provisions to avoid contamination during installation of the pipeline.

1.06 REFERENCES

A. Refer to current AWWA Standard C651 for Disinfecting Water Mains.

PART 2 PRODUCTS

2.01 MATERIALS AND EQUIPMENT

Page 411: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 2

A. Furnish liquid chlorine and/or calcium hypochlorite and injection equipment as

needed to disinfect all pipelines and appurtenances.

B. Liquid chlorine contains 100% available chlorine and is packaged in steel containers, usually of 100 lb, 150 lb, or 1 ton net chlorine weight. Liquid chlorine shall be furnished in accordance with AWWA B301.

C. Calcium hypochlorite is available in granular form or in approximately 5-g tablets,

and contains approximately 65% available chlorine by weight. The material should be stored in a cool, dry, and dark environment to minimize its deterioration. Do not use calcium hypochlorite intend for swimming pool disinfection, as this material (containing trichloroisocyanuric acid) has been sequestered and is extremely difficult to eliminate from the pipe after the desired contact time had been achieved.

D. Calcium hypochlorite must conform to AWWA B300.

PART 3 EXECUTION

3.01 PREPARATION

A. All pipelines shall be pressure and leak tested, flushed, and cleaned of debris and dirt prior to application of the disinfectant. Flushing shall continue until the volume in the newly installed main has turned over at least one time unless AW determines that conditions do not permit the required volume to be safely discharged to waste.

3.02 APPLICATION OF DISINFECTANT

A. Methods to be used for disinfection are those detailed in ANSI/AWWA C651

Disinfecting Water Mains.

3.03 WATER MAINS

Three methods of chlorination are described below. The third method, using tablets of hypochlorite, is only permitted by expressed approval of AW and under no circumstance allowed for projects of 2000 feet or more. Otherwise, information in the forward of AWWA Standard C651 will be helpful in determining the best method to be used.

A. Continuous Feed Method

1. Set-up

a. The continuous feed method consists of completely filling the main to

remove all air pockets, flushing the completed main to remove particulates, and then refilling the main with chlorinated potable water. The potable water shall be chlorinated, so that after a 24-hour holding

Page 412: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 3

period in the main, there will be a free chlorine residual of not less than 10 mg/L in collected samples.

b. Chlorine can be applied in advance of preliminary flushing by swabbing

joints with bleach or placing calcium hypochlorite granules in the pipe in areas where contamination is suspected. In any such case, the Contractor shall make sure and take appropriate action to make sure that the flushed water is dechlorinated.

c. Preliminary flushing - Prior to being chlorinated, fill the main to eliminate

air pockets and flush to remove particulates. The flushing velocity in the main shall be not less than 2.5 ft/sec unless the AW Project Manager determines that conditions do not permit the required flow to be discharged to waste. Table 1 below shows the rates of flow required to produce a velocity of 2.5 ft/sec in pipes of various sizes.

NOTE: Flushing is no substitute for preventive measures during construction.

Certain contaminants such as caked deposits resist flushing at any feasible velocity.

TABLE 1 Required Flow and Openings to Flush Pipelines

(40 psi Residual Pressure in Water Main)*

Pipe Diameter (inches)

Flow Required to Produce 2.5 ft/sec

velocity in main (gpm)

Size of Tap, (inches) Number of 2½-inch Hydrant

Outlets to Use

1 1-1/2 2 Number of taps on

Pipe † 4 100 1 - - 1 6 200 - 1 - 1 8 400 - 2 1 1

10 600 - 3 2 1 12 900 - - 2 2 16 1600 - - 4 2

*With a 40 psi pressure in the main with the hydrant flowing to atmosphere, a 2½-inch hydrant outlet will discharge approximately 1,000 gpm and a 4½-inch hydrant outlet will discharge approximately 2,500 gpm. † Number of taps on pipe based on discharging through 5 feet of galvanized iron pipe with one 90° elbow.

Page 413: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 4

d. In mains of 24-inches or larger diameter, an acceptable alternative to flushing is to broom-sweep the main, carefully removing all sweepings prior to chlorinating the main.

2. Chlorinating the Main

a. Flow water from the existing distri bution system or other approved source

of supply at a constant, measured rate into the newly laid water main. In the absence of a meter, approximate the rate by placing a Pitot gauge in the discharge or measuring the time to fill a container of known volume.

b. At a point not more than 10 feet downstream from the beginning of the new

main, dose the water entering the new main with chlorine fed at a constant rate such that the water will have not less than 25 mg/L free chlorine. Measure the chlorine concentration at regular intervals to ensure that this concentration is provided. Measure chlorine in accordance with the procedures described in the current edition of the AWWA Manual M12 or of Standard Methods for the Examination of Water and Wastewater.

c. Table 2 below gives the amount of chlorine required for each 100 feet of

pipe of various diameters. Solutions of 1 percent chlorine may be prepared with calcium hypochlorite. The solution requires 1 pound of calcium hypochlorite in 8 gallons of water.

TABLE 2

Chlorine Required to produce 25 mg/L Concentration in 100 feet of Pipe by Diameter

Pipe Diameter

(inches) 100% Chlorine

(lb) 1% Chlorine Solution

(gallons) 4 0.013 0.16 6 0.030 0.36 8 0.054 0.65

10 0.085 1.02 12 0.120 1.44 16 0.217 2.60

d. During the application of chlorine, position valves so that the strong chlorine solution in the main being treated will not flow into water mains in active service. Do not stop the chlorine application until the entire main is filled with heavily chlorinated water. Keep the chlorinated water in the main for at least 24 hours. During this time, operate all valves and hydrants in the section treated in order to disinfect the appurtenances. At the end of this 24-hour period, the treated water in all portions of the main shall have a residual of not less than 10 mg/L free chlorine.

e. Hypochlorite solution may be applied to the water main with a gasoline or

electrically powered chemical feed pump designed for feeding chlorine

Page 414: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 5

solutions. Feed lines shall be of such material and strength as to safely withstand the corrosion caused by the concentrated chlorine solutions and the maximum pressures that may be created by the pumps. Check all connections for tightness before the solution is applied to the main.

f. If gaseous chlorine in solution is permitted by the AW Project Manager and

proposed by the Contractor, the preferred equipment for the gas application employs a feed vacuum-operated chlorinator to mix the chlorine gas, in combination with a booster pump for injecting the chlorine gas solution water into the main to be disinfected. Direct feed chlorinators cannot be used. (A direct feed chlorinator is one which operates solely from the pressure in the chlorine cylinder.)

B. Slug Method

1. Set-up

a. The slug method consists of placing calcium hypochlorite granules in the main during construction; completely filling the main to eliminate all air pockets, flushing the main to remove particulates, and slowly flowing a slug of water containing 100 mg/L of free chlorine through the main so that all parts of the main and its appurtenances will be exposed to the highly chlorinated water for a period of not less than 3 hours.

2. Chlorinating the main.

a. At the option of AW, place calcium hypochlorite granules in the main during

construction. The purpose of this procedure is to provide a strong chlorine concentration in the first flow of flushing water especially to fill annular spaces in pipe joints. Flush the main to eliminate air and remove particulates to include management of dechlorination and discharged water.

b. At a point not more than 10 feet downstream from the beginning of the new

main, dose the water entering the new main with chlorine fed at a constant rate such that the water will have not less than 100 mg/L free chlorine. Measure the chlorine concentration at regular intervals to ensure that this concentration is provided. Measure chlorine in accordance with the procedures described in the current edition of the AWWA Manual M12 or of Standard Methods for the Examination of Water and Wastewater. The chlorine shall be applied continuously and for a sufficient period to develop a solid column or "slug" of chlorinated water that will, as it moves through the main, expose all interior surfaces to a concentration of approximately 100 mg/L for at least 3 hours.

c. The free chlorine residual shall be measured in the slug as it moves

through the main. If at any time it drops below 50 mg/L, stop the flow, relocate the chlorination equipment to the head of the slug, and as flow is resumed, apply chlorine to restore the free chlorine in the slug to not less than 100 mg/L.

Page 415: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 6

d. As the chlorinated water flows past fittings and valves, operate related

valves and hydrants so as to disinfect appurtenances and pipe branches.

C. Tablet Method

1. Set-up

a. The tablet method consists of adhering calcium hypochlorite tablets in the water main as it is being installed and then filling the main with potable water when installation is completed. This method may be used only if the pipes and appurtenances are kept clean and dry during construction and with permission by AW for short main installations.

2. Chlorinating the Main

a. Placing of Calcium Hypochlorite Tablets -. During construction, 5-g calcium

hypochlorite tablets shall be placed in each section of pipe. Also, one such tablet shall be placed in each hydrant, hydrant branch, and other appurtenance. The number of 5-g tablets required for each pipe section shall be 0.0012 d²L rounded to the next higher integer, where d is the inside pipe diameter, in inches, and L is the length of the pipe section, in feet. Table 3 below shows the number of tablets required for commonly used sizes of pipe. The tablets shall be attached by a food-grade NSF approved adhesive. There shall be no adhesive on the tablet except on the broadside attached to the surface of the pipe and no adhesive applied or spilled on the pipe surface. Excess adhesive must be removed immediately using mechanical means or an NSF-approved adhesive solvent. Attach all the tablets inside and at the top of the main, with approximately equal numbers of tablets at each end of a given pipe length. If the tablets are attached before the pipe section is placed in the trench, their position shall be marked on the section so it can be readily determined that the pipe is installed with the tablets at the top.

Page 416: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 7

TABLE 3

Number of 5-g Calcium Hypochlorite Tablets required for dose of 25 mg/L

b. Filling and Contact - When installation has been completed, the main shall be filled with water at a rate such that water within the main will flow at a velocity no greater than 1 ft/sec. Precautions shall be taken to ensure that air pockets are eliminated. This water shall remain in the pipe for at least 24 hours. If the water temperature is less than 41°F (5°C), the water shall remain in the pipe for at least 48 hours.

3.04 DISPOSAL OF HEAVILY CHLORINATED WATER

A. Do not keep heavily chlorinated water in contact with pipe for more than 48 hours

after the applicable retention period. In order to prevent damage to the pipe lining or corrosion damage to the pipe itself, flush the heavily chlorinated water from the main fittings, valves, and branches until chlorine measurements show that the concentration in the water leaving the main is no higher than that generally prevailing in the distribution syst em or is acceptable for domestic use. Take all steps necessary to dechlorinate water where required per Paragraph 3.04B and 3.04C below. Contact the local sewer department to arrange for disposal of the heavily chlorinated water to the sanitary sewer if applicable or permissible.

B. Neutralize the chlorine residual of the water being disposed of by treating with

one of the chemicals listed in Table 4 below. Select an alternative disposal site if a sanitary sewer system is unavailable for disposal of the chlorinated water.

C. The proposed alternative disposal site shall be inspected and approved by AW.

Apply a reducing agent to the chlorinated water to be wasted to completely neutralize the chlorine residual remaining in the water. (See Table 4 for neutralizing chemicals. Do not overdose neutralizing chemicals as this may result in adverse environmental impacts. Only dose the amount required to neutralize the amount of chlorine present). Contact Federal, State and local regulatory

Length of Pipe Section, ft

Pipe Diameter

13 or less 18 20 30 40

inches

Number of 5-g Calcium Hypochlorite Tablets

6

1 1 1 2 2

8

1 2 2 3 4

12

3 4 4 6 7

16

4 6 7 10 13

Page 417: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 8

agencies, where necessary, to determine special provisions for the disposal of heavily chlorinated water.

TABLE 4

Pounds of chemicals required to neutralize various residual chlorine concentrations in 100,000 gallons of water

Residual Chlorine

Concentration mg/L

Sulfur Dioxide (SO2)

lb

Sodium Bisulfite

(NaHSO3) lb

Sodium Sulfite

(Na2SO3) lb

Sodium Thiosulfate (Na2S2O3 · 5H2O)

lb

Ascorbic Acid

(C6O8H6) lb

1 0.8 1.2 1.4 1.2 2.1 2 1.7 2.5 2.9 2.4 4.2

10 8.3 12.5 14.6 12.0 20.9 50 41.7 62.6 73.0 60.0 104.0

D. Test for chlorine residual throughout the disposal process to be sure that the

chlorine is neutralized.

E. Submit a plan of disposal of flushed water to AW for approval

3.05 BACTERIOLOGICAL TESTING

A. After final flushing and before the water main is placed in service, the first of two consecutive sets of acceptable samples can be collected from the new main. The second set of samples must be taken at least 24 hours after the first set of samples. The main should not be flushed between collection of the first and second set of samples except to clear the sample site to collect the second sample. At least one set of samples shall be collected from every 1,200 feet, of the new water main, plus one set from the end of the line and at least one set from each branch when possible or as required by regulatory requirements.

B. Samples shall be collected by a person knowledgeable in collecting samples for

bacteriological sampling or arrange for AW to collect the sample. Coordinate with AW and submit samples to AW for testing of bacteriological (chemical and physical) quality. Testing will be in accordance with Standard Methods of the Examination of Water and Wastewater. Samples shall show the absence of coliform organisms; and the presence of a chlorine residual. Samples shall also be tested for turbidity, pH, and standard heterotrophic plate count (HPC). HPC levels must be consistent with levels normally found in the distribution system to which the new main is connected.

C. Bacteriological tests must show complete absence of coliforms and acceptable

HPCs. If tests show the presence of coliform or unacceptable HPCs, perform additional flushing and disinfection of the pipeline until acceptable tests are obtained, all at no cost to AW. The Contractor will not be charged for the additional testing performed by AW.

3.06 RETESTING AND TESTING SOURCE WATER

Page 418: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 9

A. At the time of initial flushing the main to remove material and test for air pockets,

Contractor may request AW to continue flushing until the desired chlorine residual is met at the discharge point. Notification must be provided in advance and the Contractor shall be prepared to test for chlorine at intervals of no more than five minutes as the water clears. This will provide the Contractor with some assurance that the source water is chlorinated.

B. If the subsequent tests for bacteriological contamination conducted by the

Contractor fail, the Contractor may request AW to continue flush from the source water into the new pipe system until a chlorine residual is found at the discharge point. Notification must be provided in advance and the Contractor shall be prepared to test for chlorine at intervals of no more than five minutes as the water clears. The operation of all existing sy stem valves shall be by AW at the Contractor’s expense and the discharge point must be opened prior to opening existing valves to avoid contamination. This will provide the Contractor with some assurance that the source water is chlorinated for subsequent tests.

3.07 DISINFECTION PROCEDUCE FOR CUT INTO OR REPAIR MAIN

A. The following procedures apply primarily when existing mains are wholly or

partially dewatered. Leaks or breaks that are repaired with clamping devices while the mains remain full of pressurized water may present little danger of contamination and therefore may not require disinfection.

1. Trench Treatment – When an existing main is opened either by accident or

by design, the excavation will likely be wet and may be badly contaminated from nearby sewers. Liberal quantities of hypochlorite applied to open trench areas will lessen the danger from this pollution. Tablets could have the advantage in this situation, as they dissolve slowly and continue to release hypochlorite as water is pumped from the excavation.

2. Swabbing With Hypochlorite Solution – The interior of the pipe and fittings

(particularly couplings and sleeve) used in making the repair shall be swabbed or sprayed with 1% hypochlorite solution before they are installed.

3. Flushing – Thorough flushing is the most practical means of removing

contamination introduced during repairs. If valve and hydrant location permit, flushing toward the work location from both directions is recommended. Flushing shall be started as soon as the repairs are completed and shall be continued until discolored water is eliminated.

4. Slug Chlorination – Where practical, in addition to flushing, the section of the

main in which the break is located shall be isolated, all service connections shut off, and the section flushed and chlorinated as described in Paragraph 3.03B above (Slug Method). The dose may be increased to as much as 300 mg/L and the contact time reduced to as little as 15 minutes. After chlorination, flushing shall be resumed and continued until discolored water is eliminated and the chlorine concentration in the water exiting the main is no

Page 419: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 15 – Disinfecting Pipelines

Disinfecting Pipelines 33 01 15 - 10

higher than the prevailing water in the distribution system or that which is acceptable for domestic use.

5. Bacteriological Samples – Bacteriological samples following procedures in

Paragraph 3.05 above shall be taken after repairs are completed to provide a record for determining the procedure’s effectiveness. If the direction of flow is unknown, then samples shall be taken on each side of the main break. If positive bacteriological samples are recorded, then the situation shall be evaluated by AW to determine corrective action. Daily sampling shall be continued until two consecutive negative samples are recorded.

END OF SECTION 33 01 15

Page 420: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 1

1. PART 1: GENERAL

1.1 PERF ORMANCE REQUIREMENTS

A. Gravity flow sanitary sewers are required to have straight alignment and uniform grade between manholes.

B. Flexible pip e, includ ing "semi-rigid" pipe, is re quired to sh ow no more than 5 percent deflection. Test pipe no sooner than 30 days a fter backfilling and compacting of line segment but prior to final acceptance using standard mandrel to verify that installed pipe is within specified deflection tolerances.

C. All new sanitary sewers shall be M andrel Tested. If the Mandrel Test is failed, the pipe sha ll also be televised in accordance with the requir ements outlined in this Specification.

D. Maximum allowable leakage for Infiltration or Exfiltration

1. The total exfiltration, as determined by h ydrostatic head test, shall no t exceed 50 gallons per inch diamet er per mile of pipe per 24 hours at minimum test head of 2 feet above crown of pipe at upstream manhole or 2 feet above groundwater elevation, whichever is greater.

2. When pipes are installed more than 2 feet below groundwa ter level, use infiltration test in lieu of exfiltration test. Total inf iltration shall not exceed 50 gallons per inch diameter per mile of pipe pe r 24 hours. Groundwater elevation must be at least 2 feet above crown of pipe at upstrea m manhole.

3. Refer to Ta ble 1 at th e end of th is se ction, f or water te st allowable leakage in sewers. Perform leakage testing to verify that leakage criteria are met.

E. Perform air testing in accordance with requirements of this Specification and the any State or local environmental agency requirements.

1. Refer to Table 2 at the end of this section, for time allowed for pressure loss from 3.5 psig to 2.5 psig;

2. Refer to Table 3 at the end of this section, for minimum testing times for low pressure air test; and

3. Refer to Table 4 at the end of this section, for vacuum test time table.

1.2 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – Shop Drawings, Product Data & Submittals.

B. Test Plan: Test plan shall be submitted to th e AW Proje ct Manager for review two weeks prior to testing. Test pla n shall include testing procedures, methods, equipment, and tentative schedule. Contra ctor shall obtain advance written approval for deviations from Drawings and Specifications.

C. Test Reports: Submit test reports for each te st on each segment of sanitary sewer.

D. Video television records shall be provided on DVD medium.

1.3 GRAVITY SANITARY SEWER QUALITY ASSURANCE

Page 421: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 2

A. Repair, correct, and ret est manholes or sections of pipe which fail to meet specified requirements when tested.

B. Provide testing reports and video of television inspection a s directed b y AW Project Manager.

C. Upon completion of video televising reviews by the AW Project Manager, Contractor will be notified regarding final acceptance of sewer segment.

1.4 SEQUENCING AND SCHEDULING

A. Contractor shall perform testing as work progresses. Sche dule testing so that no more than 1000 linear feet of installed sewer remains untested at one time.

B. Coordinate testing schedules with t he AW Project Manager. Perform testin g under observation of the AW Project Manager.

1.5 TELEVISI ON INSPECTION A. Quality Assurance: Submit one example video DVD of previous sewer

inspection work that shows operational and structural defects in sewers, complete with audio commentary and inspection log(s).

1. Video and inspection lo gs will be reviewed to determine if quality o f CCTV image is accept able, and if defects were properly i dentified and documented.

2. Modify equ ipment and/or inspec tion procedu res to ach ieve report material of acceptable quality.

3. Do not commence work prior to ap proval of report by the AW Project Manager.

B. Inspection Logs: Unless otherwise indica ted, submit inspection logs that include the following as a minimum:

1. Project title 2. Name of American Water 3. Time of day 4. System map number 5. Manhole to manhole pipe section 6. Pipe segment length 7. Pipe material 8. Line size 9. Compass direction of viewing 10. Direction of camera’s travel 11. Pipe depth 12. Operator name 13. Tape counter reading at beginning and end of each manhole to manhole

pipe segment.

C. Video DVD’ s: Submit completed video DVD’s after sanitary sewer main installation, cleaning and/or rehabilitation.

D. Maintain copy of all inspection documentation (DVD’s, databases, and logs) for duration of Work and warranty period.

Page 422: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 3

2. PART 2: PRODUCTS

2.01 DEFLECTI ON MANDREL

A. Mandrel Sizing. Rigid mandrel shall have OD equal to 95 percent of inside ID of pipe. ID of pipe, for purpose of determining OD of mandrel, shall be average OD minus two minimum wall thicknesses for OD c ontrolled pipe and average ID for ID controlled pipe, dimensions sha ll be per appropriate st andard. Statistica l or other "tolerance packages" shall not be considered in mandrel sizing.

B. Mandrel Design. Rigid mandrel shall be constructed of metal or rig id plastic material that can withstand 200 psi without being deformed. Mandrel shall have nine or more "runners" or "legs" as long as total number of legs is odd n umber. Barrel section of mandrel shall have length of at least 75 percent of ID of pipe. Rigid mandrel shall not have adjustable or co llapsible legs which would allow reduction in mandrel diameter during testing. Provide and use proving ring for modifying each size mandrel.

C. Proving Rin g. Furnish " proving ring" with each mandrel. Fabricate ring of 1/2-inch-thick, 3 -inch-wide bar steel to diameter 0.02 inches larger than approved mandrel diameter.

D. Mandrel Dimensions (5 percent allowance). Average ID and minimum mandre l diameter are specified in Table 5, Pipe vs. Mandrel Diameter, at end of th is Section. Mandrels for higher strength, thicker wall pipe or other pipe not listed in table may be used when approved by AW Project Manager.

2.02 EX FILTRATION TEST

A. Test Equipment:

1. Pipe plugs.

2. Pipe risers where manh ole cone is less than 2 feet above h ighest point in pipe or service lead.

2.03 INFILTRATI ON TEST

A. Test Equipment:

1. Calibrated 90 degree V-notch weir.

2. Pipe plugs.

2.04 LOW PRESSURE AIR TEST

A. Minimum Requirement for Equipment:

1. Control panel

2. Low-pressure air supply connected to control panel.

3. Pneumatic plugs: Acce ptable size for diameter of pipe to be tested ; capable of withstanding internal test pressure without leaking or requiring external bracing.

4. Air hoses from control panel to:

1. Air supply. 2. Pneumatic plugs. 3. Sealed line for pressuring.

Page 423: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 4

4. Sealed line for monitoring internal pressure.

B. Testing Pneumatic Plugs: Place pneumatic plug in each end of length of pipe on ground. Pressurize plug s to 25 psig; then pressurize sea led pipe to 5 psig. Plugs are acceptable w hen they re main in place against te st pressure without external aids.

2.05 GROUND WATER DETERMINATION

A. Equipment: Pipe probe or small diameter casing for grou nd water elevation determination.

2.06 SMOKE TESTING

A. Equipment:

1. Pneumatic plugs.

2. Smoke generator.

3. Blowers producing 2500 scfm minimum.

2.07 TELEVISION INSPECTION MATERIALS AND EQUIPMENT A. DVD: Standard size medium usable in laptop and television DVD players.

1. Audio portion of compo site DVD sha ll be sufficiently free from electrical interference and backgr ound noise to provide complete int elligibility of oral report.

2. Identify each tape with tape labels showing Project Name, Contractor’s name, and each manhole-to-manhole pipe segment of sewer lin e represented on tape.

B. Television Inspection Camera(s): Equipped with rotating head, capable of 90-degree rotation from horizontal and 360-degree rotation about its centerline.

1. Minimum Camera Res olution: 40 0 vertical lines and 46 0 horizontal lines.

2. Camera Lens: Not less than 140 degree viewing angle, with automatic or remote focus and iris controls.

3. Focal Dista nce: Adjustable throug h range of 6 inches (1 52 mm) t o infinity.

4. Camera(s) shall be int rinsically safe and operative in 100 percent humidity conditions.

5. Lighting Intensity: Remote-controlled and adjusted to minimize reflective glare.

6. Lighting an d Camera Quality: Provide clear, in-focus p icture of ent ire inside periphery of sewer.

C. Footage Counter: Measures distance traveled by camera i n sewer, accurate to plus or minus 2 feet in 1,000 feet .

Page 424: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 5

D. Video Titlin g: Video equipment shall include genlocking capabilities to extent that computer generated data (such as footag e, date, and size as det ermined by SDR), can be overlaid onto video, and be indicated on television monitor and permanently recorded on inspection DVD.

3. PART 3: EXECUTION

3.01 PREP ARATION

A. Provide labor, equipment, tools, te st plug s, risers, air compressor, air hose, pressure meters, pipe probe, calibrated weirs, or any other device necessary for proper testing and inspection.

B. Determine selection of t est methods and pressu res for gravity sanitary s ewers based on ground water elevation. Determine ground wa ter elevation using equipment and procedures conforming to Control of Ground Water and Surface Water.

3.02 MANDREL TESTING FOR GRAVITY SANITARY SEWERS

A. Perform deflection testing on flexible and semi-rigid pipe to confirm pipe has no more than 5 percent def lection. Mandrel testing shall conform to ASTM D3034. Perform tes ting no soo ner than 30 days after backfilling o f line segment, but prior to final acceptance testing of line segment.

B. Pull approved mandrel by hand through sewer sections. Replace any section of sewer not passing mandrel. Mandrel testing is not required for stubs.

C. Retest repaired or replaced sewer sections.

3.03 LEAKAGE TESTING FOR GRAVITY SANITARY SEWERS

A. Test Options:

1. Test gravity sanitary se wer pipes f or leakage by either exfiltration or infiltration methods, as appropriate, or with low pressure air testing.

2. Test new o r rehabilitat ed sanitary sewer manholes with water or l ow pressure air. Manholes tested with low pressure air shall underg o physical inspection prior to testing.

3. Perform leakage testing after backfilling of line segment, an d prior to tie-in of service connections.

4. If no installed piezometer is within 500 feet of sewer segment, provide temporary piezometer for this purpose.

B. Compensating for Ground Water Pressure:

1. Where ground water exists, install pipe nipple at same time sewer line is placed. Use 1/2-inch capped pipe nipple approximately 10-inches long . Make installation through manhole wall on top of sewer line where line enters manhole.

2. Immediately before performing line acceptance test, remove cap, clear pipe nipple with air pre ssure, and connect clear plastic tu be to nipp le. Support tube vertically and allow water to rise in tube. After water stops rising, measure height in feet of water over invert of pipe. Divide this height by 2.3 ft/psi to determine ground water pressure to be used in line testing.

Page 425: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 6

C. Exfiltration test:

1. Determine ground water elevation.

2. Plug sewer in downstream manhole.

3. Plug incoming pipes in upstream manhole.

4. Install riser pipe in outg oing pipe of upstream manhole when highest point in service lead (house service) is less than 2 feet belo w bottom of manhole cone.

5. Fill sewer pipe and manhole or pipe riser, when used, with water to point 2-1/2 feet above highest point in sewer pipe, house lead, or ground water table, whichever is highest.

6. Allow water to stabilize for one to two hours. Take water level reading to determine d rop of wate r surface, in inches, over one-hour period, and calculate water loss (1 inch of wate r in 4 feet diameter man hole equals 8.22 gallon s) or measure quantity of water required to keep water at same level. Loss sh all not exceed that calculated fr om allowable leakage according to Table 1 at the end of this Section.

D. Infiltration t est: Ground water elevation must be not less than 2 fe et above highest point of sewer pipe or service lead (house service).

1. Determine ground water elevation.

2. Plug incoming pipes in upstream manhole.

3. Insert calib rated 90 d egree V-notch weir in pipe on downstream manhole.

4. Allow water to rise and flow over weir until it stabilizes.

5. Take five re adings of a ccumulated volume ove r period of 2 hours and use average for infiltratio n. Average must not exceed that ca lculated for 2 hours from allowable leakage according to Table 1 at th e end of thi s Section.

E. Low Air Pressure Test: When using this test co nform to ASTM C 828, ASTM C 924, or ASTM F1417, as applicable, with holding time not less than that listed in Table 2 below.

1. Air testing for sections of pipe shall be limited to lines less than 36-inch average inside diameter.

2. Lines 36-inch average inside diameter and larger shall be tested at each joint. Minimum time allowable for pr essure to drop from 3.5 pounds per square inch gauge to 2. 5 pounds p er square in ch during jo int test sha ll be 10 seconds, regardless of pipe size.

3. For pipe sections less than 36-inch average inside diameter:

a. Determine ground water level. b. Plug both e nds of pipe . For concre te pipe, floo d pipe and allow 2

hours to saturate concrete. Then drain and plug concrete pipe.

Page 426: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 7

c. After manho le-to-manhole section of sanitary se wer main h as been sliplined and prior to an y service lines being connected to new liner, plug liner at each manhole with pneumatic plugs.

d. Pressurize pipe to 4.0 psig. Increase pressure 1.0 psi for each 2.3 feet of ground water o ver highest point in system. Allow p ressure to stabilize for 2 to 4 minutes. Adjust pressure to start at 3.5 p sig (plus adjustment for ground water table). See Table 2 at the end of this Section.

e. To determine air loss, measure time interval for pressure to drop to 2.5 psig. Time must exceed that listed in Table 2 at the en d of this Section for pipe diameter and lengt h. For sliplin ing, use d iameter of carrier pipe.

F. Retest: Repair and retest any section of pipe which fails to meet requirements.

3.04 TEST CRITERIA TABLES

A. Exfiltration and Infiltration Water Tests: Refer to Table 1 at the end of this Section, for water test allowable leakage.

B. Low Pressure Air Test:

1. Time in Table 2 at the end of this Section, allowed for pressure loss from 3.5 psig to 2.5 psig, are based on equation from Te xas Commission on Environmental Quality (TCEQ) Design Criteria 317.2(a)(4)(B). If the State where the project is being completed has more stringent times, the local state’s requirements will apply.

T = 0.0850(D)(K)/(Q)

where: T = Time for pressure to drop 1.0 p ounds per square inch gauge in seconds

K = 0.000419 DL, but not less than 1.0 D = Average inside diameter in inches L = Length of line of same pipe size in feet Q = Rate of loss, 0.0015 ft³ /min./sq.ft. internal surface

2. Since K value of less t han 1.0 sh all not be u sed, there are minimu m testing times for each pipe diameter as given in Table 3 at the end of this Section for minimum testing times for low pressure air test.

Notes: 1. When two sizes of pipe are involved, compute time by ratio of length s

involved.

2. Lines with 27-inch average inside diameter and larger may be air tested at each joint.

3. Lines with a verage inside diameter greater than 36 inches must be air tested for leakage at each joint.

4. If joint test is used, perf orm visual inspection of joint immediately after testing.

5. For joint test, pipe is to be pressurized to 3.5 psi greater than pressure exerted by groundwater above pipe . Once pres sure has stabilized, tim e

Page 427: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 8

allowable fo r pressure t o drop from 3.5 pound s psi g auge to 2.5 psi gauge shall be a minimum of 10 seconds.

3.05 LEAKAGE TESTING FOR MANHOLES

A. After completion of manhole construction, wall sealing, or rehabilitation, but prior to backfillin g, test man holes for water tightness using hydrostatic or vacuu m testing procedures.

B. Plug influent and effluent lines, including service lines, with suitably-sized pneumatic or mechanical plugs. Ensure plugs ar e properly rated for pressures required for test; follow manufacturer's safety and installation recommendations. Place plugs minimum o f 6 inches outside of manhole wa lls. Brace in verts to prevent lines from being dislodged when lines entering manhole have not been backfilled.

C. Vacuum testing:

1. Install vacuum tester head assembly at top access point of manhole and adjust for p roper seal on straight top section of manhole structure. Following manufacturer's instru ctions and safety precautions, inf late sealing e lement to recommended maximum i nflation pre ssure; do n ot over-inflate.

2. Evacuate manhole with vacuum pump to 10 inches mercury (Hg), disconnect pump, and monitor vacuum for time period specified in Table 33 01 30.13-4, Vacuum Test Time Table.

3. If drop in vacuum e xceeds 1 in ch Hg ove r specified time period tabulated in Table 33 01 30.1 3-4, locate leaks, co mplete rep airs necessary to seal man hole and re peat test pr ocedure unt il sat isfactory results are obtained.

D. Perform hydrostatic exfiltration testing as follows:

1. Seal wastewater lines coming into manhole with internal pipe plug. Then fill manhole with water and maintain it full for at least one hour.

2. The maximum leakage for hydrostatic testing sh all be 0.025 gallons per foot diameter per foot of manhole depth per hour.

3. If water loss exceeds amount tab ulated above, locate le aks, comple te repairs necessary to seal manhole and repe at test procedure until satisfactory results are obtained.

3.06 SMOKE TEST PROCEDURE FOR POINT REPAIRS

A. Application: Perform smoke test to:

1. Locate points of line failure for point repair.

2. Determine when point repairs are properly made.

3. Determine when service connect ions have been reconnected t o rehabilitated sewer.

4. Check integrity of conn ections to newly replaced service taps to liners and to existing private service connections.

Page 428: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 9

B. Limitations: Do not bac kfill service taps until completion of this test. Test only those taps in single manhole sect ion at one time. Keep number of open excavations to minimum.

C. Preparation: Prior to smoke testing, give writt en notices t o area residents no fewer than 2 days, nor more than 7 days, prior to proposed testing. Also give notice to local police a nd fire dep artments 24 hours prio r to actual smoke testing.

D. Isolate Sect ion: Isolate manhole section to be tested from adjacent manhole sections to keep smoke localized . Temporarily seal annular space at manhole for sliplined sections.

E. Smoke Introduction:

1. Operate equipment according to manufacturer's recommendation and as approved by AW Project Manager.

2. Conduct test by forcing smoke from smoke gen erators through sanitary sewer main and service connectio ns. Operate smoke generators for minimum of 5 minutes.

3. Introduce smoke into upstrea m and d ownstream manhole as appropriate. Monitor tap/connectio n for smoke leaks. No te sources of leaks.

F. Repair and Retest: Repair and replace taps or connection s noted as leaking and then retest. Taps and connections may be left exposed in only one manhole section at time. When repair or replacement, testing or retesting, and b ackfilling of excavation is not completed within one wo rk day, pro perly barricade and cover each excavation as approved by AW Project Manager.

G. Service Co nnections: On houses where smok e does not issue from plumbing vent stacks to confirm reconnection of sewer service to n ewly installed liner pipe, perform dye test t o confirm reconnection. Introduce dye into service line through plumbing fixture inside structure or sewer cleanout immediately outside structure a nd flush with water. Observe flo w at servi ce reconne ction or downstream manhole. Detection of dye confirms reconnection.

3.07 TELEVISION INSPECTION PROCEDURES

A. SEWER FLOW REQUIREMENTS 1. Do not exceed depth o f flow shown in Table below for respective pip e

sizes as measured in manhole when performing TV inspection.

2. When depth of flow at upstream manhole of sewer line section being worked is above maximum allowable for TV ins pection, reduce flow to level shown in Table below, by pl ugging or blocking of flow, or b y pumping and bypassing of flow as specified.

Page 429: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 10

TABLE 1

Maximum Depth of Flow for TV Inspection

Nominal Pipe Diameter Maximum Depth of Flow

6” - 10” 20 percent of pipe diameter

12” - 24” 25 percent of pipe diameter

B. SEQUENCE OF WORK Perform Work in the following sequence:

1. Clean sewer lines and manholes in accordan ce with req uirements of Specifications”.

2. Perform TV inspection to comply with requirements of this specification.

C. INSPE CTION REQUIREMENTS 1. Access: AW shall have access to observe monitor and other operations at all times.

2. DVD Commentary: Record the following information on a udio track of DVD inspection tape: narrative of location, dir ection of view, manhol e numbers, pipe diameter and material, date, t ime of insp ection, and location of laterals and other key features

a. DVD shall visually disp lay this infor mation at beginning an d end of each manhole-to-manhole pipe segment.

b. DVD betwe en manholes shall visu ally display length in f eet from starting point of given segment.

3. Sewer Identification: DV D and inspection docu mentation shall inclu de sewer line and manhole identifiers shown on Drawings. After installation of liner, use upstream manhole as identifier in conjunction with distance meter.

4. Image Perspective: C amera imag e shall be down cente r axis of p ipe when camera is in motion.

a. Provide 360 -degree sweep of pipe interior at points of int erest, to more fully document existing condition of sewer.

b. Points of int erest may i nclude, but are not limited to the following: defects, en crustations, mineral deposits, debr is, sediment, and any location determined not to be clean or part of proper liner installation, and defects in liner that include, but are not limited to bumps, folds, tears, and dimples.

c. Cabling system employed to transport camera and transmit its signa l shall not obstruct camera’s view.

Page 430: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 11

5. Sewer Reach Length: Physically measure an d record length of each sewer reach from centerline of its terminal manholes.

6. Inspection Rate: Ca mera shall be pulled through sewer in either direction, b ut both insp ections are to be in sa me directio n. Maximu m rate of travel shall be 30 feet (9 m) per minute when recording.

D. FIELD QUALITY CONTROL 1. AW will review DVD’s and logs to ensure l ines are clean and free o f

visible defects.

2. If sewer line , in sole opinion of AW, is not ad equately clean, and free of visual defects it sha ll be re-cleaned and CCTV-inspected by Contractor at no additional cost.

TABLE 1 WATER TEST ALLOWABLE LEAKAGE

DIAMETER OF RISER OR STACK IN INCHES

VOLUME PER INCH OF DEPTH ALLOWANCE LEAKAGE*

INCH GALL ONS PIPE SIZE IN

INCHES GALLONS/MINUTE

PER 100FT. 1 0.7854 .0034 6 0.0039 2 3.1416 .0136 8 0.0053

2.5 4.9087 .0212 13 0.0066 3 7.0686 .0306 12 0.0079 4 12.566 4 .0306 15 0.0099 5 19.635 0 .0544 18 0.0118 6 28.274 3 .1224 21 0.0138 8 50.265 5 .2176 24 0.0158 27 0.0177 30 0.0197 36 0.0237 42 0.0276

For other diameters, multiply square of diameters by value of 1” diameter

Equivalent to 50 gallons per inch of inside diameter per mile per 24 hours

* Allowable leakage rate shall be reduced to 10 gallons per inch of inside diameter per mile per 24 hours, when sewer is identified as located within 25-year flood plain

Page 431: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 12

TABLE 2 ACCEPTANCE TESTING FOR SANITARY SEWERS

Pipe Diam. Min.(in) Time

(min /sec) 100 ft 150 ft 200 ft 250 ft 300 ft 350 ft 400 ft 450 ft 500 ft 550 ft 600 ft

6 5:40 398 0.854 5:40 5:40 5:40 5:40 5:40 5:40 5:42 6:25 7:07 7:50 8:33

8 7:33 298 1.519 7:33 7:33 7:33 7:33 7:36 8:52 10:08 11:24 12:40 13:56 15:12

10 9:27 239 2.374 9:27 9:27 9:27 9:54 11:52 13:51 15:50 17:48 19:47 21:46 23:45

12 11:20 199 3.419 11:20 11:20 11:20 14:15 17:06 19:57 22:48 25:39:00 28:30:00 31:20:00 34:11:00

15 14:10 159 5.342 14:10 14:10 17:48 22:16 26:43:00 31:10:00 35:37:00 40:04:00 44:31:00 48:58:00 53:25:00

18 17:00 133 7.692 17:00 19:14 25:39:00 32:03:00 38:28:00 44:52:00 51:17:00 57:42:00 64:06:00 70:31:00 76:56:00

21 19:50 114 10.47 19:50 26:11:00 34:54:00 43:38:00 52:21:00 61:05:00 69:48:00 78:32:00 87:15:00 95:59:00 104:42:00

24 22:40 99 13.67 22:48 34:11:00 45:35:00 56:59:00 68:23:00 79:47:00 91:10:00 102:34:00 113:58:00 125:22:00 136:46:00

27 25:30:00 88 17.3 28:51:00 43:16:00 57:42:00 72:07:00 86:33:00 100:58:00 115.24 129.49 144.14 158.4 173.05

30 28:20:00 80 21.36 35:37:00 53:25:00 71:14:00 89:02:00 106:51:00 124:39:00 142:28:00 160:16:00 178:05:00 195:53:00 213:41:00

33 31:10:00 72 25.85 43:06:00 64:38:00 86:11:00 107:44:00 129:17:00 150:50:00 172:23:00 193:55:00 215:28:00 237:01:00 258:34:00

TIME ALLOWED FOR PRESSURE LOSS FROM 3.5 PSIG TO 2.5 PSIG

Length for min. time (ft)

Time for Longer Length (sec)

Specification Time for Length (L) shown (min:sec)

TABLE 3 MINIMUM TESTING TIMES FOR SANITARY SEWERS - LOW PRESSURE AIR TEST

PIPE DIAMETER (inches)

MINIMUM TIME

(seconds)

LENGTH FOR MINIMUM TIME

(feet)

TIME FOR LONGER LENGTH

(seconds) 0.855 (L) 6 340 398 1.520 (L) 8 454 298 2.374 (L) 10 567 239 3.419 (L) 12 680 199 5.342 (L) 15 850 159 7.693 (L) 18 1020 133 10.471 (L) 21 1190 114 13.676(L) 24 1360 100 17.309 (L) 27 1530 88 21.369 (L) 30 1700 80 25.856 (L) 33 1870 72

Page 432: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 13

TABLE 4 MINIMUM TESTING TIMES FOR SANITARY MANHOLES - LOW PRESSURE AIR TEST

DEPTH IN FEET TIME IN SECONDS BY PIPE DIAMETER 48” 60” 72”

4 10 13 16 8 20 26 32 12 30 39 48 16 40 52 64 20 50 65 80 24 60 78 96 * 5.0 6.5 8.0

*Add T times for each additional 2-foot depth. (The values listed above have been extrapolated from ASTM C924-85)

TABLE 5 PIPE VS. MANDREL DIAMETER

Material and Wall

Construction

Normal size

(inches)

Average I.D.

(inches)

MinimumMandrel Diameter (inches)

PVC-Solid (sdr 26)6

6 5.764 5.476

8 7.715 7.329 10 9.646 9.162 PVC-Solid (SDR 35)12

12 11.737 11.15

15 14.374 13.655 18 17.629 16.748 21 20.783 19.744 24 23.381 22.12 27 26.351 25.033 PVC-Truss 8 7.75 7.363 10 9.75 9.263 12 11.79 11.201 15 14.77 14.032 PVC-Profile (ASTM F794)

12 11.74 11.153

15 14.37 13.652 18 17.65 16.768 21 20.75 19.713 24 23.5 22.325 27 26.5 25.175 30 29.5 28.025

Page 433: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 01 30 – Acceptance Testing for

Sanitary Sewers

Acceptance Testing for Sanitary Sewers 33 01 30 - 14

36 35.5 33.725 42 41.5 39.425 48 47.5 45.125 HDPE-Profile 18 18 17.1 21 21 19.95 24 24 22.8 27 27 25.65 30 30 28.5 36 36 34.2 42 42 39.9 48 48 45.6 54 54 51.3 60 60 57 Fiberglass 12 12.85 11.822 (Class SN 46) 18 18.66 17.727 20 20.68 19.646 24 24.72 23.484 30 30.68 29.146 36 36.74 34.903 42 42.7 40.565 48 48.76 46.322 54 54.82 52.079 60 60.38 57.361

END OF SECTION 33 01 30

Page 434: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 05 27 – Tracer Wire

Tracer Wire 33 05 27 - 1

PART 1: GENERAL 1.01 SCOPE

A. Install electrically continuous tracer wire with access points as described herein to be used for locating pipe with an electronic pipe locator after installation. Tracer wire shall be installed on all water mains and services, all wastewater lines and sewer mains and services and all wastewater force mains.

1.02 SUBMITTALS

A. Submit shop drawings and manufacturer's lit erature to the Engineer for approval in accordance with Specification Section 01 33 00 – Shop Drawings, Product Data & Submittals.

PART 2: PRODUCTS 2.01 TRACER WIRE MATERIAL

A. Tracer wire to be twelve gauge minimum solid copper with thermoplastic insulation recommended for direct burial. Wire connec tors to be 3M DBR, or approved equal, and shall be watertight to provide electrical continuity.

B. Tracer wire color shall be blue for all water construction and green for all wastewater

construction. 2.02 TRACER WIRE ACCESS BOXES

For locations where valve boxes are not present, the tracer wire access point shall be composed of one SnakePit Tracer Wire Access Box, or approved equal, installed at each proposed access point.

2.03 TESTING REQUIREMENTS

A. Contractor shall perform a continuity test on all tracer wire in the presence of AW or AW’s

representative. If the tracer wire is found to be not continuous after testing, Contractor shall repair or replace the failed segment of the wire at their own expense.

PART 3: EXECUTION 3.01 INSTALLATION - GENERAL REQUIREMENTS

A. Tracer wire shall be installed on all water and sewer mains and services. The wire shall be installed in such a manner as to be able to properly tracer all mains without loss or deterioration of signal or without the transmitted signal migrating off the tracer wire.

B. Tracer wire shall be installed in the same trench and inside bored holes and casing with

pipe during pipe installation. It shall be laid in the trench below the pipe and pipe bedding being installed to ensure that the wire is not damaged during future repair operations. The tracer wire shall be securely bonded together at all wire joints with an approved

Page 435: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 05 27 – Tracer Wire

Tracer Wire 33 05 27 - 2

watertight connector to provide electrical continuity, and it shall be accessible at all tracer wire access points.

C. Tracer wire access points shall in general be no more than five-hundred feet and at every

proposed concrete valve box collar (or m anhole where required). Concentrations of multiple proposed valves near pipe intersections, i.e. tees or crosses, may require more than one access point assembly in each concre te valve box collar. Tracer wire access points shall be within public right-of-way or public utility easements.

D. At e ach v alve l ocation, (including fire hydrant isolation valves), a loop of wire is to be

brought up the outside of the valve box and looped inside the box through a hole drilled 2-inch below the bottom of the lid.

E. At the point of connection between cast or ductile iron mains, with any non-iron main, the

tracer wire shall be properly connected to the iron pipe with a cad weld or approved equivalent. Tracer wire welds shall be completely sealed with the use of an approved mastic type sealer specifically manufactured for underground use. Mastic shall be applied in a thick coat a minimum of 2 inches thick and shall be protected from contamination by the backfill material with the use of a plastic membrane.

F. Except for approved spliced-in connections, tracer wire shall be continuous and without

splices from each tracer wire access poi nt. Where any approved spliced-in connections occur, 3M DBR water tight connectors, or approved equal, shall be used to provide electrical continuity.

G. At all main end caps, a minimum of 6 f eet of tracer wire shall be extended beyond the

end of the pipe, coiled and secured for future connections. The end of the tracer wire shall be spliced to the wire of a six pound zinc anode and is to be buried at the same elevation as the water main.

H. For directional drilling, auguring or boring installations, four #12 tracer wires shall be

installed with the pipe and connected to the tracer wire at both ends, or cad welded to the existing iron pipe at both ends.

I. Spliced connections between the main line tracer wire and branch connection tracer wire

shall only be allowed at water main tees, cr osses or at iron or copper water services where a portion of the branch connection water main or water service is replaced with non-iron or non-copper material. The branch connection tracer wire shall be a single tracer wire properly spliced to the main line tracer wire. Where the existing branch connection is neither iron nor copper, then t he new branch connection tracer wire shall be properly spliced to the existing tracer wire on the branch connection.

J. At all repair locations where there is existi ng tracer wire, the tracer wire shall be properly

reconnected and spliced as outlined above.

END OF SECTION 33 05 27

Page 436: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 1

PART 1: GENERAL 1.01 DRAWINGS

Dimensions shown on Drawings are approximate only. Verify all piping geometry in the field and to ensure proper alignment and fit of all piping consistent with the intent of the Drawings. Submit field layout drawings as required for approval.

PART 2: PRODUCTS 2.01 CONTRACTOR’S RESPONSIBILITY FOR MATERIAL

A. Examine all material carefully for defects. Do not install material which is known, or thought to be, defective.

B. AW reserves the right to inspect all material and to reject all defective material

shipped to the job site or stored on the site. Failure of AW to detect damaged material shall not relieve the Contractor from his total responsibility for the completed work if it leaks or breaks after installation.

C. Lay all defective material aside for final inspection by AW. AW will determine if

corrective repairs may be made, or if the material is rejected. AW shall determine the extent of the repairs.

D. Classify defective pipe prior to AW’s inspection as follows:

1. Damage to interior and/or exterior paint seal coatings.

2. Damage to interior cement-mortar or epoxy lining.

3. Insufficient interior cement-mortar lining or epoxy thickness.

4. Excessive pitting of pipe.

5. Poor quality exterior paint seal coat.

6. Pipe out of round.

7. Pipe barrel area damaged to a point where pipe class thickness is reduced (all pipe).

8. Denting or gouges in plain end of pipe (all pipe).

9. Excessive slag on pipe affecting gasket seal (DIP).

10. Any visible cracks, holes.

11. Embedded foreign materials.

Page 437: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 2

12. Non-uniform color, density and other physical properties along the length of the pipe.

E. The Contractor shall be responsible for all material, equipment, fixtures, and

devices furnished. These materials, equipment, fixtures and devices shall comply with the requirements and standards of all Federal, State, and local laws, ordinances, codes, rules, and regulations governing safety and health.

F. The Contractor shall take full responsibility for the storage and handling of all

material furnished until the material is incorporated in the completed project and accepted by AW. Contractor shall be solely responsible for the safe storage of all material furnished to or by him until incorporated in the completed project and accepted by AW.

G. Load and unload pipe, fittings, valves, hydrants and accessories by lifting with

hoists or skidding to avoid shock or damage. Do not drop these materials. Pipe handled on skidways shall not be skidded or rolled against other pipe. Handle this material in accordance with AWWA C600, C605 or C906 whichever is applicable.

H. Drain and store fittings and valves prior to installation in such a manner as to

protect them from damage due to freezing of trapped water. 2.02 PETROLATUM TAPE COATING

A. The tape coating shall be a cold applied, saturant tape made from either

petrolatum or petroleum wax with a noncellulosic synthetic fiber fabric. The fabric shall be encapsulated and coated on both sides with the petrolatum or petroleum wax. The thickness of the tape shall be no less than 40 mil. The petrolatum or petroleum wax shall be at least 50% of the product by weight.

B. The tape coating shall be supplied in sheets, pads or rolls. Pads and sheets

shall be sized to fit the area that is to be covered, allowing for an overlap per AWWA Standards.

2.03 RUBBERIZED-BITUMEN BASED SPRAY-ON UNDERCOATING

Subject to approval by AW, an alternative corrosion protection for exposed buried metal is an aerosol applied rubberized coating. The material shall be rapid dry and specifically designed for corrosion protection. 3M Rubberized Underseal Undercoating 08883 or any equivalent rubberized-bitumen based spray-on undercoating may be used. Follow manufacturer’s recommendations for storage and application.

PART 3: EXECUTION 3.01 INSTALLATION - GENERAL REQUIREMENTS

Page 438: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 3

A. Lay and maintain all pipe to the required lines and depths. Install fittings, valves and hydrants in strict accordance with the Specifications at the required locations with joints centered, spigots home, and all valve and hydrant stems plumb. Do not deviate from the required alignment, depth or grade without the written consent of AW.

B. Buried steel lugs, rods, brackets, and flanged joint nuts and bolts are not

permitted unless specifically shown on t he Drawings or approved in writing by AW. Cover any and all buried steel lugs, rods, brackets, and flanged joint nuts and bolts with approved coating in accordance with AWWA Standard C217 prior to backfilling. Encase the same in polyethylene encased if the Specifications require polyethylene encasement of the pipe, valves or fittings..

C. Lay all pipe to the depth specified. Measure the depth from the final surface

grade to the top of the pipe barrel. The minimum pipe cover shall be as shown on the Drawings or as specified in the Specifications.

D. Do not lay pipe in a wet trench, on subgrade containing frost, or when trench

conditions are unsuitable for such work. If all efforts fail to obtain a stable dry trench bottom and AW determines that the trench bottom is unsuitable for such work, AW will order the kind of stabilization to be constructed, in writing. In all cases, water levels must be at least 6” below the bottom of the pipe.

E. Thoroughly clean the pipes and fittings before they are installed. Keep these

materials clean until the acceptance of the completed Work. Lay pipe with the bell ends facing in the direction of laying, unless otherwise shown on the Drawings, or directed by AW. Exercise care to ensure that each length abuts the next in such a manner that no shoulder or unevenness of any kind occurs in the pipe line.

F. Do not wedge or block the pipe during laying unless by written order of AW. G. Before joints are made, bed each section of pipe the full length of the barrel, at

the required grade, and at the invert matching the previously laid pipe. Dig bell holes sufficiently large to permit proper joint making. Do not bring succeeding pipe into position until the preceding length is embedded and secure in place.

H. Take up and relay pipe that is out of alignment or grade, or pipe having disturbed

joints after laying. Take up such in-place pipe sections found to be defective and replace them with new pipe. Take up, relaying, and replacement will be at the Contractor's expense.

I. Place enough backfill over the center sections of the pipe to prevent floating.

Take all other necessary precautions to prevent the floating of the pipeline by the accumulation of water in the trench, or the collapse of the pipeline from any cause. Should floating or collapse occur, restoration will be at the Contractor's expense.

Page 439: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 4

J. Contractor shall install tracer wire along all pipelines. Tracer wire may be installed in trench below both the pipe and pipe bedding to prevent the tracer wire from being disturbed during repairs.

K. Bedding materials and concrete work for the pipe bedding and thrust restraint

shall be as specified. L. Prevent foreign material from entering the pipe while it is being placed. Do not

place debris, tools, clothing, or other materials in the pipe during laying operations. Close all openings in the pipeline with watertight plugs when pipe laying is stopped at the close of the day's work, or for other reasons such as rest breaks or meal periods.

M. Only cut pipe with equipment specifically designed for cutting pipe such as an

abrasive wheel, a rotary wheel cutter, a guillotine pipe saw, or a milling wheel saw. Do not use chisels or hand saws. Grind cut ends and rough edges smooth. Bevel the cut end slightly for push-on connections as per manufacturer recommendations.

N. In distributing material at the site of the Work, unload each piece opposite or near

the place where it is to be laid in the trench. If the pipe is to be strung out, do so in a straight line or in a line conforming to the curvature of the street. Block each length of pipe adequately to prevent movement. Block stockpiled pipe adequately to prevent movement. Do not place pipe, material, or any other object on private property, obstructing walkwa ys or driveways, or in any manner that interferes with the normal flow of traffic.

O. Exercise special care to avoid damage to the bells, spigots or flanged ends of

pipe during handling, temporary storage, and construction. Replace damaged pipe that cannot be repaired to AW’s satisfaction, at the Contractor's expense.

P. Remove all existing pipe, fittings, valves, pipe supports, blocking, and all other

items necessary to provide space for making connections to existing pipe and installing all piping required under this Contract.

Q. Maintain the minimum required distance between water and sewer lines and

other utility lines in strict accordance with all Federal, State, and local requirements and all right-of-way limitations.

R. Provide and install polyethylene encasement for ductile iron pipe, fittings and

valves as required. See Specification Section 33 11 17 - Polyethylene Wrap.

S. The maximum allowable deflection at the joints for push-on joint pipe shall be the lesser of manufacturer’s recommendations or as described in the DIPRA Guideline, Ductile Iron Pipe Joints and Their Uses, as follows:

Page 440: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 5

Size of Deflection Maximum Deflection Pipe Angle (18-ft. Length) (20-ft. Length)

3”-12" 5 degrees 19" 21"

14"-42" 3 degrees 11" 12" 48"-64" 3 degrees N/A 12"

T. The maximum allowable deflection at the joints for PVC pressure pipe shall be as follows:

Size of Deflection Maximum Deflection

Pipe Angle (20-ft. Length) 4”-12" 2 degrees 8"

14" + 1.5 degrees 6"

U. Use short lengths of pipe (minimum length 3 feet, no more than three short sections), when approved by the AW Project Manager, to make curves that cannot be made with full length sections of pipe without exceeding the allowable deflection. Making these curves will be at no additional cost to AW.

V. Furnish air relief valve assemblies in accordance with Drawings provided or as

specified in Specification Special Conditions section. AW Project Manager will provide standard detail for additional air release valve assemblies. Any deviation from the standard detail, proposed by Contractor must be approved in advance.

W. Exercise particular care so that no high points are established where air can

accumulate. Install an air release valve and manhole, as extra Work to the Contract, when the AW Project Manager determines that unforeseen field conditions necessitate a change in the pipe profile that requires the installation of an air release valve and manhole. If the Contractor requests a change in the pipe profile solely for ease of construction, and the requested change requires the installation of an air release valve and manhole as determined by the AW Project Manager, the cost of furnishing and installing the air release valve and manhole will be at the expense of the Contractor.

X. All water mains 20” and greater in diameter shall be constructed using DIP only.

Other construction materials, such as PVC and HDPE, are limited to water mains 16” and under in diameter. Alternate materials for larger water mains may be approved by AW on a case-by-case basis.

Y. Marking tape to be provided along all mains and service lines installed. Marking

tape to be installed 12” below grade. Foil backing is not required on marking tape. Tape shall be colored blue for water mains and green for sewer. Marking tape along pressurized force mains shall be labeled “Pressurized Wastewater”.

3.02 CONSTRUCTION METHODS TO AVOID CONTAMINATION

Page 441: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 6

A. Heavy particulates generally contain bacteria and prevent even very high chlorine concentrations from contacting and killing such organisms. It is essential that the procedures of this Section be observed to assure that a water main and its appurtenances are thoroughly clean for the final disinfection by chlorination.

B. Take precautions to protect the interior of pipes, fittings, and valves against

contamination. String pipe delivered for construction so as to keep foreign material out of the pipe. Close all openings in the pipeline with watertight plugs when pipe laying is stopped at the close of the day's work or for other reasons, such as rest breaks or meal periods. Use rodent-proof plugs approved by AW, where it is determined that watertight plugs are not practical and where thorough cleaning will be performed.

C. Delay in placement of delivered pipe invites contamination. The more closely the

rate of delivery is correlated to the rate of pipe laying, the lower the likelihood of contamination. Complete the joints of all pipe in the trench before stopping work. If water accumulates in the trench, keep the plugs in place until the trench is dry.

D. When encountering conditions on pre-existing pipe that requires packing, employ

yarning or packing material made of molded or tubular rubber rings, or rope of treated paper or other approved materials. Do not use materials such as jute, asbestos, or hemp. Handle packing material in a manner that avoids contamination.

E. Do not use contaminated material or any material capable of supporting prolific

growth of microorganisms for sealing joints. Handle sealing material or gaskets in a manner that avoids contamination. The lubricant used in the installation of sealing gaskets shall be suitable for use in potable water. Deliver the lubricant to the job in closed containers and keep it clean.

F. If dirt enters the pipe, and in the opinion of AW the dirt will not be removed by the

flushing operation, clean the interior of the pipe by mechanical means, then swab with a 1% hypochlorite disinfecting solution. Clean using a pig, swab, or "go-devil" only when AW has specified such and has determined that such operation will not force mud or debris into pipe joint spaces.

G. If the main is flooded during construction, the flooded section must be isolated

from the remainder of the installation as soon as practical. Submit a plan to AW on correcting the condition and do not proceed until authorized by AW. Replace or fully clean and disinfect the affected pipe at no additional cost to AW.

3.03 VALVE INSTALLATION

A. Prior to installation, inspect valves for direction of opening, freedom of operation, tightness of pressure containing bolting, cleanliness of valve ports and especially of seating surfaces, handling damage, and cracks. Correct defective valves or hold for inspection by the AW Project Manager.

Page 442: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 7

B. Set and join to the pipe in the manner specified in Paragraph 3.01. Provide

valves with adequate support, such as crushed stone and concrete pads, so that the pipe will not be required to support the weight of the valve. Set truly vertical. If polyethylene is applied to the pipe, the entire valve shall be encased in polyethylene encasement prior to backfill. The polyethylene encasement shall be installed up to the operating nut leaving the operating nut, exposed and free to be operated.

C. Provide a valve box for each valve. Set the top of the valve box neatly to existing

grade, unless directed otherwise by AW. Do not install in a way that allows the transfer of shock or stress to the valve. Center and plumb the box over the wrench nut of the valve. Do not use valves to bring misaligned pipe into alignment during installation. Support pipe in such manner as to prevent stress on the valve.

D. Provide extension stem for each valve, topped with a standard 2-inch AWWA

nut. Pin the extension stem to the operating nut on the valves. Extension stem shall extend to with 12-inches of finished grade.

E. Provide valve marking posts, when authorized by AW, at locations designated by

AW and in accordance with detail drawings. 3.04 THRUST RESTRAINT

A. Provide all plugs, caps, tees, and bends (both horizontal and vertical) with concrete thrust blocking and/or restrained joint pipe as represented on the Drawings, or specified in the Specification Special Conditions.

B. Place concrete thrust blocking between undisturbed solid ground and the fitting to be anchored. Install the concrete thrust blocking in accordance with Section Cast-In-Place Concrete and Standard Details provided. Locate the thrust blocking to contain the resultant thrust force while keeping the pipe and fitting joints accessible for repair, unless otherwise shown or directed.

C. Use restrained joints for all fittings and for a distance on either side of the fitting or valve. Determine minimum length of restrained joints using DIPRA- “Thrust Restrained Design for Ductile Iron Pipe”.

D. Provide temporary thrust restraint at temporary caps and plugs. Submit details of

temporary restraint to AW for approval. E. At connections with existing water mains where there is a limit on the time the

water main may be removed from service, use metal harnesses of anchor clamps, tie rods and straps; mechanical joints utilizing set-screw retainer glands; or restrained push-on joints as permitted by AW. No restraining system can be installed without the approval of AW. Submit details of the proposed installation to AW for approval. For pipe up to 12-inches in size, use a minimum of two 3/4-inch tie rods. If approved for use, install retainer glands in accordance with the

Page 443: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 00 – Piping – General Provisions

Piping – General Provisions 33 11 00 - 8

manufacturer’s instructions. Material for metal harnessing and tie-rods shall be ASTM A36 or A307, as a minimum requirement.

F. Protection of Metal Harnessing: Protect ties rods, clamps and other metal

components against corrosion and by encasement of the entire assembly with 8-mil thick (12 mil thick in corrosive soils) loose polyethylene film in accordance with AWWA C105. Apply tape on all exposed tie rods prior to installing polyethylene.

END OF SECTION 33 11 00

Page 444: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 11 – Polyvinyl Chloride (PVC) Pipe

Polyvinyl Chloride (PVC) Pipe 33 11 11 - 1

PART 1: GENERAL 1.01 SECTION INCLUDES

PVC pressure pipe and fabricated f ittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent outside diameters.

1.02 SUBMITTALS

Submit ma nufacturer’s product data, installa tion instruct ions and certification f or all materials to be furnished in accordance with Specificatio n Section 01 33 00 – Shop Drawings, Product Data & Submittals. Submit classification and grad ation test results for embedment and pipe backfill material.

PART 2: PRODUCTS Research has documented that certain pipe materials (such as polyvinyl chloride, po lyethylene, and polybutylene) and certain elastomers (such as tho se used in g asket mater ial) may be subject to permeation by lower-molecular weight orga nic solvents or petrole um products. Products supplied under this Sectio n assume t hat petroleum products or organic solvents will not be encountered. If during the course of pipeline installation the Contractor identifies, or suspects the presence of petroleum products or any unkn own chemical subst ance, notify AW immediately. Stop installing piping in the area of suspected contamination until direction is provided by AW Project Manager.. PVC Sched ule 40 or 80 is not pe rmitted for conveying wastewater or potable water within distribution or collect ion systems. However, it may be us ed in other application s, such a s conveying chemicals or for drainage. 2.01 PIPE MATERIALS – WATER DISTRIBUTION

All PVC pip e shall be PVC 1120 pressure pipe made from class 12454 material as defined by ASTM D1784 with outside diameter dimensions of steel or cast iron pipe. The PVC compounds shall b e treated or certified su itable for pot able water products by the National Sanitation Foundation Testing Laboratory (NSF Standard No. 61). PVC pipe to be used for potable water shall be blue in color. PVC Pipe 4-inch through 12-inch: AWWA Sta ndard C900, DR14 an d where pe rmitted DR18. DR25 pipe will no t be allowed. PVC pipe has recently been upgraded by pressure class, h owever American Water does not allow p ipe in its system to be fully subject to the revised pressure s in AWWA C900. DR14 shall not be subjected to pressures exceeding 250 psi. DR18 shall not be subjected to pressures exceeding 200 psi.

2.02 GRAVITY SEWER PIPE

Page 445: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 11 – Polyvinyl Chloride (PVC) Pipe

Polyvinyl Chloride (PVC) Pipe 33 11 11 - 2

A. PVC gravity sanitary se wer pipe sh all be green in co lor and in accord ance with provisions in foll owing table e xcept where specifi ed diffe rently on t he Drawings:

B.

Type of service Acceptable Materials

Gravity Mains with depth of cover < 10 feet PVC SDR 35

Gravity Mains with depth of cover 10-15 feet PVC SDR 26

Gravity Mains with depth of cover > 15 feet Ductile Iron Pipe

C. When solid wall PVC pi pe 18-inches to 27-inches in diameter is required in SDR 26, provide pipe co nforming to AS TM F6 79, ex cept pr ovide wall th ickness a s required for SDR 26 and pipe strength of 115 psi.

D. For sewers up to 12-inch diameter crossing over water lines, or crossing under water lines with less than 2-fe et separation, provide minimu m 150 psi pressure rated pipe conforming to ASTM D2241 with suitable PVC adapter couplings.

E. Joints: Spigot and integral wall section bel l wi th solid cross section elastomeric or rubber ring gasket conforming to requirements of ASTM D3212 and ASTM F477, or ASTM D3139 and AST M F477. Gasket s shall b e fact ory-assembled a nd securely bonded in place to p revent d isplacement. M anufacturer s hall t est sample f rom each batch conforming to requirements ASTM D2444

F. Fittings: Provide PVC gravity s ewer sanit ary bends, t ee, or wye fit tings for ne w sanitary sewer construction. PVC pipe fittings shall be full-bodied, either injection molded or factory fabricated. Saddle-type tee or wye fittings are not acceptable.

G. Conditioning. Conditioning of samples prior to and during tests is subject to approval by AW Project Manager. When referee tests are required, condition specimens in accordance with Procedure A in ASTM D618 at 73.4° F +/- 3.6° F and 5 0 percent relative h umidity p lus or mi nus 5 percent re lative h umidity for not less than 40 hours prior to test. Conduct tests under same conditions of temperature and humidity unless otherwise specified.

H. Pipe Stiffness. Determine pipe stiff ness at 5 percent defle ction in accordance with Test Method D 2412. Minimum pipe stiffness shall be 46 psi. For diameters 4-inches through 18-inches, test three specimens, each a min imum of 6-inches ( 150 mm) in length. For diameters 21-in ch through 36-inch, test thr ee specimens, each a minimum of 12-inch (300 mm) in length.

Page 446: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 11 – Polyvinyl Chloride (PVC) Pipe

Polyvinyl Chloride (PVC) Pipe 33 11 11 - 3

I. Flattening. Flatten thre e specimens of pipe, prepared in accorda nce with Paragraph 2.04F, in suitable press until internal diameter has been reduced to 60 percent of original inside diameter of pipe. Rate of loading shall be uniform. Test specimens, when examined under normal light and with unaided eye, shall show no evidence of splitting, cracking, breaking, or separation of pipe walls or bracing profiles. Perform the flattening test in conjunction with pipe stiffness test.

J. Joint Tightness. Test for joint tightness in accordance with ASTM D3212, except that joint shall remain watertight at minimum deflection of 5 percent. Manufacturer will be required to provide independent third p arty certification for joint testing each diameter of storm sewer pipe.

K. Purpose of Tests. Flattening and pipe stiffness tests are in tended to be routine quality control tests. Jo int tightness test is in tended to qualify pipe to specifie d level of performance.

2.03 SANITARY SEWER FORCE MAIN PIPE

A. PVC sanitary sewer force main pipe shall be g reen in colo r. Provide a pproved PVC pressure pipe co nforming to requirements for wat er service pipe, and conforming t o mi nimum working p ressure ra ting specif ied in Sect ion 33 34 00 - Sanitary Sewer Force Mains.

B. Acceptable pipe jo ints are int egral bell-and -spigot, containing a bonded-in elastomeric sealing ring meeting r equirements of ASTM F477. I n de signated areas requiring restrained joint pipe and fittings, use a pproved joint restraint device conforming to UNI-B-13, for PVC pipe 12-inch diameter and less.

C. Fittings: Provide ductile iron fittings as per Section - Ductile Iron Pipe and Fittings, except furnish fittings with one of following approved internal linings:

1. Nominal 40 Mils (35 Mils minimum) virgin polyethylene complying with ASTM D 1248, heat fused to interior surface of fitting

2. Nominal 40 Mils (35 Mils minimum) polyurethane

3. Nominal 40 Mils (35 Mils minimum) ceramic epoxy

4. Nominal 40 Mils (35 Mils minimum) fusion bonded epoxy

D. Exterior Protection: Provide polyethylene wrapping of ductile-iron fittings as required by Section 33 11 00.17 - Polyethylene Wrap.

E. Hydrostatic Tests: Hydrostatically test pressure rated pipe in accordance with Specifications.

2.04 RECEIVING, HANDLING AND STORAGE

Page 447: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 11 – Polyvinyl Chloride (PVC) Pipe

Polyvinyl Chloride (PVC) Pipe 33 11 11 - 4

A. Inspect pipe and appurtenances for defects prio r to installation in the trench. Set aside and clearly mark defect ive, damaged or unsound material and hold material for inspection by AW.

B. Load and unload all materials in accordance with the manufacturer’s

recommendations and in such a manner as to prevent damage. Do n ot drop pipe and accessories or handle them in a rough manner.

C. Provide safe storage for all materials. Cover stored pipe that will be exposed

to sunlight for periods longer than 6 months. Cover with canvas or other opaque material with provision for adequate air circulation. PVC pipe shall not be stored close to heat sources, such as heat ers, boilers, steam line s, or engine exhaust.

PART 3: EXECUTION

3.01 INSTALLAT ION

Follow the provisions of Section 33 11 00 - Piping - Gene ral Provisions, and Sanitary Sewer Force Mains in addition to the following requirements:

A. Remove all dirt and foreign matter from pipe before lowering it into the tr ench. Do

not place debris, hand tools, clothing or other materials in the pipe. Keep pipe clean during and after laying.

B. Lay pipe with the bell end pointing in the direction of work progress. Do not roll,

drop or dump pipe or appurtenances into the trench. C. Assemble push-on jo ints in accordance with the pipe manufacturer’s

recommendations. Assemble me chanical jo ints in accor dance with the fitting manufacturer’s recommendations.

D. Cut pipe with pipe saws, circular sa ws, handsaws, or similar equipment. Provide

a smooth end at a right angle to the longitudinal axis of the pipe. Deburr, bevel, and re-mark insertion line on spigot ends. Match factory bevel length an d angle for field bevels. When connecting t o certain sh allow depth bells, su ch as those on some ca st iron fittin gs and valves, cut off the factory b evel and prepare a deburred, square cut end with a slight outer bevel.

E. Clean the sealing surfa ce of the spigot end, the pipe bell, the coupler or fitting,

and the ela stomeric ga skets immediately befo re assembly. Do not remove factory installed gaske ts for clean ing. Keep the joint fre e of dirt, sand, grit, grease or any foreign material. Apply approved lubricant when a ssembling gasketed joints in accor dance with the pipe manufacturer’s requirements. The use of improper lubrica nts can damage gaskets. Excessive lubricant use can make disinfection more difficult and cause taste and odor problems when the line is placed in service.

Page 448: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 11 – Polyvinyl Chloride (PVC) Pipe

Polyvinyl Chloride (PVC) Pipe 33 11 11 - 5

F. Good pipe alignment is essential for proper joint assembly. Align the spigot to the bell and insert the spigot into the bell until it contacts the gasket uniformly. Do not swing or “st ab” the joint ; that is, do not suspen d the pipe and swing it into the bell. The sp igot end of the pipe is marked by the manufacturer to ind icate the proper depth of insertion. Avoid metal to plastic contact with the pushing the pipe home (use wood or other material to cushion moving the pipe.

G. Assemble pipe using the following types of joints:

1. Gasketed bell joint – Integral with the pipe or fitting

2. Gasketed coupling – A double gasketed coupling

3. Mechanical joint – Any of the several joint designs that have gaskets a nd bolts manufactured in accordance with AWWA standards.

H. Tracer Wire

1. Place tracer wire in accordance with Section 33 05 27 - Tracer Wire. 2. The wire shall be contiguous except at test stations, valve boxes, and

where splicing is required. All splices shall be encased with a 3M-Gel Pack Model No. 054007-09053, or approved equal.

I. All pressure and leakag e testing sh all be done in accordan ce with Specificat ion

Section 33 01 10 – Pressure and Leakage Tests

J. PVC pipe fittings shall e mploy ductile iron pipe f ittings per Specificat ions 15105. See detail drawings for transitions between different pipe materials.

K. Gaskets - Gaskets sh all be as pr ovided or re commended by the manufacturer

and satisfy AWWA standard C111 in all respe cts. Where ductile iron pipe and PVC pipe are directly connected, the appropriate gasket material for this purpose shall be employed. As noted in the products section of this specif ication, some gasket materials are prone to permeation of certain hydrocarbons which may exist in the soil (see Pa rt 2). Unde r these conditions and at the discr etion of AW’s Project Manager, Contractor shall require contractor to provide FKM (Viton, Flourel) gasket material in areas of concern.

3.02 SERVICE CONNECTIONS

A. Install service connections in accordance with AWWA Standard C605 and the

manufacturer’s recommendations using the following methods:

1. Tapping is only permitted through the use of service clamps or saddles.

2. Using injection molded couplings with threaded outlets.

3. Tapping with large service connections through appropriately sized tapping sleeves and valves.

Page 449: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 11 – Polyvinyl Chloride (PVC) Pipe

Polyvinyl Chloride (PVC) Pipe 33 11 11 - 6

4. Direct tapping of 1-inch and smaller service connections is not permitted. Use service saddles only for AWWA Standard C900 pipe, for nominal pipe sizes 6-inch through 12-inch. Corporation stops shall be threaded and conform to AWWA Standard C800.

5. The distance between the PVC pipe joint and a service tap (2-inchs and smaller) shall be a minimum of 3 feet. The distance between the PVC pipe joint and a service tap (4-inchs and larger) shall be a minimum of 4 feet. Where necessary, excavate along the pipe to confirm the acceptable distance before starting the tap.

END OF SECTION 33 11 11

Page 450: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 17 – Polyethlene Wrap

Polyethylene Wrap 33 11 17 - 1

PART 1: GENERAL

1.1 SECTION INCLUDES

A. The minimum requirements for polyethylene wrap to be used fo r external corrosion protection of buried ductile iron pipe, fittings, an d appurtenances an d for cast iron and ductile iron fittings on PVC pipe, and for barrier valves.

1.2 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – S hop Drawings, Product Data & Submittals.

B. Submit product data for proposed film and tape for approval.

PART 2 : PRODUCTS

2.01 MATERIAL S

A. Polyethylene Film: Tub ular or she et fo rm without tears, breaks, ho lidays, or defects; conforming with requirements of AWWA C105, 2.5 to 3 percent carbon black content, either low or high density:

1. Low-density polyethylene film shall be m anufactured from v irgin polyethylene material co nforming to the following requirements of AST M D4976.

a. Raw material.

1) Group: 2 (linear)

2) Class: C (black).

3) Density: 0.910 to 0.935 g/cm3

4) Dielectric strength: Volume resistivity, 1015 ohm-cm, minimum

b. Physical properties.

1) Tensile strength: 3600 psi, minimum.

2) Elongation: 800 percent, minimum.

3) Dielectric strength: 800 V/mil thickness, minimum.

c. Thickness: Low-density polyethylene film shall have normal thickness of 0.008 inch. Mi nus tolerance on thickness is 10 percent of nominal thickness.

2. High-density, cross laminated polyethylene film shall be manufactured from virgin polyethyl ene material confor ming to the f ollowing requirements of ASTM D4976.

a. Raw material.

1) Group: 2 (linear)

2) Density: 0.940 to 0.960 g/cm3

3) Class: C (black)

Page 451: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 17 – Polyethlene Wrap

Polyethylene Wrap 33 11 17 - 2

4) Dielectric strength: Volume resistivity, 1015 ohm-cm, minimum.

b. Physical properties.

1) Tensile strength: 6300 psi, minimum.

2) Elongation: 100 percent, minimum.

3) Dielectric strength: 800 V/mil thickness, minimum.

c. Thickness: Film shall h ave nomina l thickness of 0.004 in ch. Minus tolerance of thickness is 10 percent of nominal thickness.

B. Polyethylene Tape: Provide minimum 2-inch-wide (3-inch typical), plastic-backed, adhesive tape.

PART 3 : EXECUTION 3.01 PREP ARATION

A. Remove lumps of clay, mud, and cinders from pipe surface prior to installation of polyethylene encasement. Prevent soil or emb edment material from b ecoming trapped between pipe and polyethylene.

B. Fit polyethylene film to contour of pipe to affect snug, but not tight fit; encase with minimum space between polyethylene and p ipe. Allow sufficient slack in contouring to prevent stretching pol yethylene where it brid ges irregular surfac es, such as bell-spigot interfaces, bolted joints, or fittings, and to prevent d amage to polyethylene due to b ackfilling op erations. Secure overlaps and ends with adhesive tape to hold polyethylene encasement in place until b ackfilling operations are complete.

C. For installations below water table or in areas subject to tidal actions, seal both ends of polyethylene tube with adhesive tape at joint overlap.

3.02 INSTALLAT ION

A. Tubular Type (Method A):

1. Cut polyeth ylene tube to length approximatel y 2 feet longer than pipe section. Slip tube around pipe, centering tube to prov ide 1-foot overlap on each adjacent pipe section, and bun ching it accordion-fashion lengthwise until it clears pipe ends.

2. Lower pipe into trench and make u p pipe joint with preceding section of pipe. Make shallow bell hole at joints to facilitate installation of polyethylene tube.

3. After asse mbling pipe joint, make overlap of polyethylene tube. Pull bunched polyethylene f rom p receding l ength o f pipe, s lip i t over e nd o f adjoining length of pipe, and secure in p lace. Then slip end of polyethylene from adjoining pipe section over end of first wrap until it overlaps joint at end of preceding length of pipe. Se cure overlap in place. Take up slack width at top of pipe to make snug, but not tight, fit along barrel of pipe, securing fold at quarter points.

Page 452: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 17 – Polyethlene Wrap

Polyethylene Wrap 33 11 17 - 3

4. Repair cuts, tears, punctures, or other damage t o polyethylene. Proceed with installation of next section of pipe in same manner.

B. Tubular Type (Method B):

1. Cut polyeth ylene tube t o length approximately 1 foot shorter than pipe section. Slip tube around pipe, centering it to pr ovide 6 inches of bare pipe at each end. Take up slack w idth at top of pipe to make snug, but not tight, fit along barrel of pipe, securing fold at quarter points; secure ends.

2. Before making up joint, slip 3 f oot length of polyethylene tube over end of preceding pipe sec tion, bunc hing i n acco rdion-fashion l engthwise. Aft er completing joint, pull 3 foot length o f po lyethylene ove r join t, ove rlapping polyethylene previously placed on each adjacent section of pi pe by at leas t I foot; make each end snug and secure.

3. Repair cuts, tears, punctures, or oth er damage to polyethylene. Procee d with installation of next section of pipe in same manner.

C. Sheet Type:

1. Cut polyeth ylene sheet to length approximatel y 2 feet lon ger than pipe section. Center length to provide 1 -foot overlap on e ach a djacent pipe section, bunching sheet until it c lears pipe ends. Wrap polyethylene around pipe so that sheet circumferentially overlaps top quadrant of pipe. Secure cut edge of polyethylene sheet at intervals of approximately 3 feet.

2. Lower wrap ped pipe into trench and makeup pipe joint with precedin g section of pipe. M ake shallow bell hole at joints to facilitate installation of polyethylene. After completing joint, make overlap and secure ends.

3. Repair cuts, tears, punctures, or oth er damage to polyethylene. Procee d with installation of next section of pipe in same manner.

D. Pipe-shaped Appurtenances: Cover bends, reducers, off sets, and o ther pipe-shaped appurtenances with polyethylene in same manner as pipe.

E. Odd-shaped Appur tenances: Wh en it is no t practica l t o wrap valves, te es, crosses, and other odd-shaped pieces in tube, wrap with flat sheet or split length of polyethylene tube by passing sheet around appurtenance and encasing it. Make seams by b ringing edges together, folding ove r twice, and taping down. Ta pe polyethylene securely in place at valve stem and other penetrations.

F. Openings in Encasement : Crea te open ings for br anches, se rvice t aps, blow-offs, air valves, and similar appurtenances by making X-shaped cut in polyethylene and temporarily folding back f ilm. After app urtenance is inst alled, t ape sla ck securely to app urtenance an d r epair cut, a s well as ot her damaged a rea in polyethylene, with ta pe. Service tap s may also be made d irectly through polyethylene, with resulting damaged areas being repaired as specified.

G. Junctions between Wrapped and Unwrapped Pipe: Where polyethylene-wrapped pipe joins adjacent p ipe th at i s n ot wrapped, extend p olyethylene wrap t o co ver adjacent pipe for distance of at least 3 feet. Secure end with circumferential turns

Page 453: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

Division 33 – Utilities Section 33 11 17 – Polyethlene Wrap

Polyethylene Wrap 33 11 17 - 4

of tape. Wrap service lines o f dissimilar metals with polyethylene or suitable dielectric tape for minimum clear distance of 3 fe et away from cast or d uctile iron pipe.

3.03 REPAI RS

A. Repair cuts, tears, punctures, or damage to polyethylene with adhesive tape or with short length o f po lyethylene sheet or cut open tube, wrapped a round pipe to cover damaged area, and secured in place.

END OF SECTION 33 11 17

Page 454: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 16 – GATE VALVES

Gate Valves 33 12 16 - 1

PART 1: GENERAL 1.01 SCOPE

Furnish, install, and test all gate valves shown on the Drawings. 1.02 SUBMITTALS

Submit shop drawings and manufacturer's literature to the AW Project Manager for approval in accordance with Section 01 33 00 – Shop Drawings, Product Data & Submittals.

1.03 APPLICATION

All valves 3 inches through 16 inches shall be resilient-seated type gate valves. PART 2: PRODUCTS 2.01 SMALL GATE VALVES

A. All gate valves, 3 inches through 16 inches NPS, shall be iron body, resilient-seated, nut-operated, non-rising stem gate valves suitable for buried service. The valve interior and exterior shall be epoxy coated at the factory by the valve manufacturer in accordance with AWWA Standard C550 (6-8 mil average, 4 mil minimum). The valves shall be designed for a minimum differential pressure of 250 psi and a minimum internal test pressure of 500 psi unless otherwise noted on the Drawings. Valves shall be designed to operate in the vertical position. All valves shall open left (CCW).

B. Valves shall comply fully with AWWA Standard C509. Valve ends shall be

restrained mechanical joint or as shown on the plans or approved in writing in accordance with AWWA Standard C111. Stems shall be made of a low zinc alloy in accordance with AWWA C509. Stem seals shall be double O-ring stem seals. Square operating nuts conforming to AWWA Standard C509 shall be used. Valves shall open left in accordance with AW standard. All valve materials shall meet the requirements of NSF 61.

C. For exposed piping, valves shall be flanged joint.

D. Test valves (Operation Test and Hydrostatic Tests) at the manufacturer’s plant in

accordance with AWWA Standard C509. Provide AW with certified copies of all tests prior to shipment. AW reserves the right to observe all tests.

Page 455: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 16 – GATE VALVES

Gate Valves 33 12 16 - 2

2.02 LARGE GATE VALVES

A. Gate valves larger than 16-inches NPS shall be iron body, double disc (metal to metal seat), parallel seats, bronze mounted, rubber O-ring packing seals, epoxy coated interior and exterior meeting the requirements of AWWA Standard C550, and conforming to AWWA Standard C500. Stems shall be made of a low zinc alloy in accordance with AWWA C500. All valves shall have openings through the body of the same circular area as that of the pipe to which they are attached. All valves furnished shall open left (CCW) in accordance with the AW standard. All valve materials shall meet the requirements of NSF 61.

B. Test valves (Operation Test and Hydrostatic Tests) at the manufacturer’s plant in

accordance with AWWA Standard C500. Provide AW with certified copies of all tests prior to shipment. AW reserves the right to observe all tests.

C. Valves shall have mechanical joint ends unless otherwise designated on the

Drawings or approved by AW.

D. The valves shall be designed for a minimum differential pressure of 150 psi and a minimum internal test pressure of 300 psi, unless otherwise noted on the Drawings. Make all valves tight under their working pressures after they have been placed and before the main is placed in operation. Any defective parts shall be replaced at the Contractor's expense.

2.03 VALVE EXTENSIONS

A. Valve extensions will be required on any gate valve where the distance from the

finished grade to the top of the operating nut exceeds 4 foot. Extension shall be of a locking type to prevent it from coming off the valve. Top of extension will be no deeper than 1 foot from finished grade.

PART 3: EXECUTION 3.01 INSTALLATION

A. Install the valves in strict accordance with the requirements contained in Section 33 11 00 and detail Drawings. All valves shall be restrained.

3.02 PROTECTION

A. After field installation of the valve all external bolts except the operating nut shall receive a layer of tape coating or approved rubberized-bitumen based spray-on undercoating applied before backfill. All buried valves shall be encased in polyethylene encasement prior to backfill. The polyethylene encasement shall be installed up to the operating nut leaving the operating nut exposed and free to be operated. Valve box shall be installed per Specification Section 33 11 00.

END OF SECTION 33 12 16

Page 456: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 17 – TAPPING SLEEVES AND VALVES

Tapping Sleeves and Valves 33 12 17 - 1

PART 1: GENERAL 1.01 SCOPE

Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings.

1.02 RELATED WORK Specification Section 33 11 00 - Piping - General Provisions 1.03 SUBMITTALS

Submit shop drawings and manufacturer's literature to the Engineer for approval in accordance with Specification Section 01 33 00 – Shop Drawings, Product Data & Submittals.

PART 2: PRODUCTS 2.01 GENERAL

All tapping sleeves, saddles and valves shall be designed for a working pressure of at least 250 psig for 12-inch and smaller. The valves shall be designed for a minimum differential pressure of 250 psi and a minimum internal test pressure of 500 psi unless otherwise noted on the plans.

2.02 DUCTILE IRON TAPPING SLEEVES

A. Verify the type of existing pipe and the outside diameter of the pipe on which the tapping sleeve is to be installed. B. Tapping sleeves shall be ductile iron dual compression type unless otherwise specified on the Drawings. The Drawings may require the use of corrosion resistant tapping sleeves in addition to polywrap in areas with corrosive soils. The sleeves shall be made in two halves which can be assembled and bolted around the main. Sleeves shall meet the requirements of NSF 61. Outlet flanges shall conform to the flange requirements of AWWA C110. All valves furnished shall open left in accordance with the AW’s standard. C. For size on size taps up to 12” x 12”, Contractor shall use ductile iron tapping sleeves. For applications greater than 12” x 12” a tapping sleeve and valve is not permitted. The tee and valve(s) shall be cut in to the existing main on applications larger than 12” x 12”.

2.03 TAPPING VALVES

Page 457: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 17 – TAPPING SLEEVES AND VALVES

Tapping Sleeves and Valves 33 12 17 - 2

A. The horizontal tapping valve shall conform to the applicable requirements of AWWA Standard C509. All tapping valves, 3 inches through 12 inches NPS, shall be ductile iron body, resilient-seated, nut-operated, non-rising stem gate valves suitable for buried service. The valve interior and exterior shall be epoxy coated at the factory by the valve manufacturer in accordance with AWWA Standard C550 (6-8 mil average, 4 mil minimum). The tapping valves shall have flanged inlets with mechanical joint outlets, enclosed bevel gears, bypass valve, rollers, tracks and scrapers. All valves furnished shall open left in accordance with the AW’s standard.

2.04 STAINLESS STEEL TAPPING SLEEVES

A. The stainless steel band flange shall be manufactured in compliance with AWWA C207, Class D ANSI B.16.1 drilling, recessed for tapping valve MSS-SP60. Mechanical Joint tapping sleeve outlet shall meet or exceed all material specifications as listed below and be suitable for use with standard mechanical joint by mechanical joint resilient wedge gate valves per ANSI/AWWA C509-94 and be NSF 61 approved.

B. Stainless steel tapping sleeves are not permitted for size on size tapping applications. Ductile iron tapping sleeves must be used.

C. Tapping sleeves to be attached to 4” through 12” nominal pipe diameter shall

meet the following minimum requirements.

1. The entire fitting shall be stainless steel type 304 (18-8). The body, lug, and gasket armor plate shall be in compliance with ASTM A240. The Flange shall be cast stainless steel in compliance with ASTM A743. The MJ outlet shall be one-piece casting made of stainless steel. The test plug shall be ¾” NPT in compliance with ANSI B2.1 and shall be lubricated or coated to prevent galling. All metal surfaces shall be passivated after fabrication in compliance with ASTM A-380.

2. The gasket shall provide a 360-sealing surface of such size and shape to

provide and adequate compressive force against the pipe after assembly, to affect a positive seal under the combinations of joint and gasket tolerances. The materials used shall be vulcanized natural or vulcanized synthetic rubber with antioxidant and antiozonant ingredients to resist set after installation. No reclaimed rubber shall be used. A heavy-gauge-type 304-stainless armor plate shall be vulcanized into the gasket to span the lug area.

3. The lugs shall be heliarc welded (GMAW) to the shell. The lug shall have

a pass-through-bolt design to avoid alignment problems and allow tightening from either side of the main. Bolts shall NOT BE integrally welded to the sleeve. Finger Lug designs are not approved; it is the intent of these specifications to allow a tapping sleeve that has a lug design similar to the approved models.

Page 458: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 17 – TAPPING SLEEVES AND VALVES

Tapping Sleeves and Valves 33 12 17 - 3

4. Bolts and nuts shall be type 304 (18-8) stainless steel and Teflon coated or as specified in the bolt section below at the discretion of the Engineer. Bent or damaged units will be rejected.

5. Quality control procedures shall be employed to insure that the shell, Lug,

(4” and Larger Nominal Pipe Diameter) armor plate, gasket and related hardware are manufactured to be free of any visible defects. Each unit, after proper installation, shall have a working-pressure rating up to 250 psi.

6. The sleeve construction shall provide a positive means of preventing

gasket cold flow and/or extrusion.

7. Each sleeve shall be stenciled, coded or marked in a satisfactory manner to identify the size range. The markings shall be permanent type, water resistant, that will not smear or become illegible.

D. Tapping sleeves attached to 16” and larger nominal pipe diameter shall meet the

following minimum requirements:

1. The body shall be in compliance with ASTM A285, Grade C or ASTM A36. The test plug shall be ¾” NPT conforming to ANSI B2.1.

2. The gasket shall provide a watertight sealing surface of such size and

shape to provide an adequate compressive force against the pipe. After assembly, the gasket will insure a positive seal under all combinations of joint and gasket tolerances. Gaskets shall be formed from vulcanized natural or vulcanized synthetic rubber with antioxidant ingredients to resist set after installation. No reclaimed rubber shall be used.

3. Bolts and nuts shall be high strength, corrosion resistant, low alloy, pre

AWWA C111, ANSI A21.11 and as specified in the subsection on bolts in this specification.

4. Quality control procedures shall be employed to insure that the shell,

gaskets, and related hardware area are manufactured to be free of visible defects. Each unit, after proper installation, shall have a working-pressure rating up to 200 psi.

5. Unless otherwise noted, unit shall be protected by electrostatically applied

baked epoxy or polyurethane.

6. Units for concrete, steel cylinder pipe shall be furnished with load bearing setscrews on the gland flange to transfer loads on the outlet away from the steel cylinder and onto the sleeve. Epoxy –coated tapping sleeves do not require grout seal cavity (AWWA M-9 Manual).

Page 459: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 17 – TAPPING SLEEVES AND VALVES

Tapping Sleeves and Valves 33 12 17 - 4

7. Each sleeve shall be stenciled, coded or marked in a satisfactory manner to identify the size range. The marking shall be permanent type, water resistant, that will not smear or become illegible.

2.05 FABRICATED STEEL TAPPING SLEEVE

The fabricated steel tapping sleeve shall be manufactured in compliance with AWWA C207. Sleeves shall be fabricated of minimum three-eights (3/8) inch carbon steel meeting ASTM A285 Grade C. Outlet flange shall meet AWWA C-207, Class "D" ANSI 150 lb. drilling and be properly recessed for the tapping valve. Bolts and nuts shall be high strength low alloy steel to AWWA C111 (ANSI A21.11). Gasket shall be vulcanized natural or synthetic rubber. Sleeve shall have manufacturer applied fusion bonded epoxy coating, minimum 12 mil thickness, Class D ANSI B.16.1 drilling, recessed for tapping valve MSS-SP60. Mechanical Joint tapping sleeve outlet shall meet or exceed all material specifications as listed below and be suitable for use with standard mechanical joint by mechanical joint resilient wedge gate valves per ANSI/AWWA C509-94 and be NSF 61 approved.

2.06 TAPPING SADDLES

Unless otherwise specified by the Drawings, tapping saddles conform to the requirements of AWWA Standard C800 for the High Pressure class tapping saddles. Tapping saddles shall consist of ductile iron outlet castings, attached to the pipeline with high strength stainless steel straps. Castings shall be sealed to pipeline with O-ring seals. Saddles shall have ANSI A21.10 flanged outlets counterbored for use with tapping valves and tapping equipment.

2.07 BOLTS

All bolts shall have American Standard heavy unfinished hexagonal head and nut dimensions all as specified in ANSI B18.2. Bolts shall be X ylan or FluoroKote #1 suitable for direct bury in corrosive soils.

PART 3: EXECUTION 3.01 INSTALLATION

Install the tapping sleeves, saddles, and valves in strict accordance with the requirements of Specification Section 33 11 00. Install the tapping sleeves, tapping saddles, and tapping valves in accordance with the manufacturer’s instructions. The tapping procedure is to be in accordance with the tapping machine manufacturer's instructions.

Page 460: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 17 – TAPPING SLEEVES AND VALVES

Tapping Sleeves and Valves 33 12 17 - 5

3.02 PROTECTION After field installation of the valve all external bolts except the operating nut shall receive a layer of tape coating or approved rubberized-bitumen based spray-on undercoating applied before backfill. If polyethylene is applied to the pipe, the entire sleeve and valve assembly shall be encased in polyethylene encasement prior to backfill. The polyethylene encasement shall be installed up to the operating nut leaving the operating nut of the tapping valve exposed and free to be operated.

3.03 PRELIMINARY TESTING

A. Perform a hydrostatic test of the tapping sleeve and valve assembly in accordance with Specification Section 33 01 10 after installation of the tapping sleeve and valve, but prior to making the tap. The test shall be made with the valve open using a tapped mechanical joint cap. No leakage is acceptable. The test pressure shall be maintained for a minimum of 15 minutes.

B. Perform hydrostatic test of tapping saddles in accordance with AWWA Standard

C800.

END OF SECTION 33 12 17

Page 461: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 19– FIRE HYDRANTS

Fire Hydrants 33 12 19 - 1

PART 1: GENERAL 1.01 SCOPE

A. Fire hydrants.

B. Adjustment of fire hydrants and gate valves.

1.02 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – Shop Drawings, Product Data & Submittals.

B. Submit name of hydran t manufacturer, type of bonnet paint, and engineering control drawing number for hydrant proposed for use.

PART 2: PRODUCTS 2.01 HYDRANTS

A. Provide hyd rants in con formance wi th AWWA Standard C502, Dry Barrel Fire Hydrants (Latest Editio n). Hydrant s ar e appr oved by AW by issua nce of a Certificate o f Responsib ility. Hydran ts shall op en left (count erclockwise). The following hydrant has been approved. Alternate hydrants will not be considered.

APPROVED HYDRANT TYPE The AW approved hydrant at all locations is Mueller Model Sup er

Centurion 250.

B. The AW Project Manager ma y, at any ti me p rior to or d uring installation of

hydrants, randomly select furnishe d hydrant for disasse mbly and laboratory inspection, at AW’s expense, to verify compliance with Specificatio ns. When hydrant is found to be non-compliant, replace, at Contractor's e xpense, hydrants, with hydrants that comply with Specifications.

C. Provide lower hydrant b arrel fabricated from Du ctile Iron Pipe as single piece, connected t o upper h ydrant barrel by means o f joint coupling that will pro vide three hundred sixty (360) degree rotation of upper barrel.

2.02 HYDRANT TEE

A. Fire hydrant installations shall require the use of a hydrant tee on the main line. Hydrant valves shall be bolted to the hyd rant tee for all installations. Mechanical joint hydra nt tee shall be ductile iron cla ss 350 and shall be produced in accordance with ANSI/AWWA A21.53/C153 and ANSI/AWW A A21.11/C111 for joints and ANSI/AWWA A21.4/C-104 for cement lining in size s 3” through 24”. Hydrant tee mechanical joint nuts and bolts shall be ductile iron, high strength, low alloy steel per ANSI/AWWA A21.11/C-111.

2.03 LEADS

A. Branches ( Leads): Conform to requirements of Section 33 11 11 - Polyvinyl Chloride Pipe.

2.04 HYDRANT PAINTING

Page 462: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 19– FIRE HYDRANTS

Fire Hydrants 33 12 19 - 2

A. New hydra nts and ref urbished hydrants shall be shop coated as specified herein.

B. Exterior Above Traffic Flange (Including Bolts & Nuts).

1. Surface preparation to be in accor dance with SSPC-SP 10 (NACE 2) near white blast cleaned surface.

2. Coat with three coat alky d/silicone alky d system with total d ry film thickness (DFT) of 6 - 9 mils as follows:

a. Prime Coat - Oil modified alkyd primer, to be in general conformance with SSPC Paint Specification No. 25. Total dry film thickness (DFT) 2 - 3 mils.

b. Intermediate Coat - He avy Duty In dustrial Alkyd Ena mel to be in general conformance with SSPC Paint Specification No. 104, and Federal Standard A-A-2962A. Total dry film thickness (DFT) of 2 -3 mils.

c. Finish Coat - Silicone Alkyd Re sin Enamel to be in general conformance with SSPC Paint Specification No. 21. T otal dry f ilm thickness (DFT) to be 2 - 3 mils. Exception - hydrant bonnet shall not be finished shop coat ed, only intermediate coated. Inst all color coded finish coating of bonnet in field.

d. Bonnet Paint - Field apply finish coat of Silicone Alkyd Resin Enamel to be in general conformance with SSPC Paint Specification No. 21. Dry film thickness of 2 - 3 mils. Bon net colors are to be as specified in Paragraph 3.01 to designate t he available fire flow at 20 psi residual.

3. Colors - Primer: Manufacturers sta ndard color. Finish coat of hydra nt body and connection caps, to be painted to match the color o f existing in service hydrants on the base. Approval of the color paint to be used on the hydrants shall be ap proved by the American Water Project Manager prior to the final application of paint to the newly installed hydrant.

C. Field Maintenance Painting (Exterior Above Traffic Flange)

1. Surface Preparation to be in accor dance with SSPC - SP2, Hand Tool Cleaning, or SSPC - SP3, Power Tool Cleaning, depending on condition of existing paint and e xtent of corrosion. It is not necessary to remo ve tightly adhered mill scal e, rust, and paint. Mill scale, rust and paint are considered tightly adherent when they cannot be removed with dull putty knife. In some severe cases where it is necessary to re move majority of existing paint, surface should be cleaned in accordance with SSPC -SP11, Power Tool Cleaning to Bare Metal.

2. When surface is cleaned to bare metal (SSPC - SP11), coat hydrant with three coat Alkyd/Silicone Alkyd system in accordance wit h Paragraph 2.03.B.2 as for new hyd rants. When surface is cleaned to SSPC - SP2 or SSPC - SP3, coat hydrant with Silicone Alkyd Resin Enamel i n

Page 463: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 19– FIRE HYDRANTS

Fire Hydrants 33 12 19 - 3

general conformance with SSPC Paint Specification No. 21. Total dry film thickness of 3 - 6 mils surface is cleaned to bare met al (SSPC - SP11), coat hydrant with three co at Alkyd/Silicone Alkyd system in accordance with Paragraph 2.04.B.2 as for new hydrants.

D. Exterior Below Traffic Flange

1. Surface preparation in accordance with SSPC-SP10 (NACE 2) Ne ar White Blast Cleaned Surface.

2. Primer and intermediate coat: coal tar epoxy i n general conformance with SSPC Paint Specification No. 16. Apply two (2) coats with dry film thickness (DFT) of 8 - 10 mils each for total DFT of 16 -20 mils.

3. Finish coat: Water based vinyl acrylic mastic. Apply one coat with dry film thickness of 6 - 8 mils. Color of f inish coat to be same as finish coat for exterior above traffic flange.

E. Interior Surfaces Above and Below Water Line Valve

1. Material used for internal coating of hydrant interior ferrous surfaces below water line valve must meet the require ments of lo cal or State standards.

2. Coating sh all be liquid or powder epoxy syst em in acco rdance with AWWA Standard C-550. Coating may be applied in two o r three co ats, according t o manufacturer's reco mmendations, for tota l dry film thickness of 12 -18 mils.

PART 3: EXECUTION 3.01 INSTALLAT ION

A. Set fire hydrant plumb and brace at lo cations and grades as shown o n Drawings. When barrel o f hydrant passes t hrough concret e slab, plac e 1-inch -thick piece of standard sidewalk expansion joint material around section of barrel passing through concrete.

B. Place 12-in ch by 12-in ch yellow indicators (p lastic, sheet metal, plywood, or other material approved by AW Proj ect Manager) on pumpe r nozzles of new or relocated fir e hydrants installed on new water lines not in service. Remo ve indicators after new water line is tested and approved by Project Manager.

C. Thrust blocks are required on all hydrant t ees. If hydrant lateral is no t restrained, contractor shall provide a thrust block behind hydrant shoe. Do not cover drain ports, bolts, or fittings when placing concrete thrust block.

D. Obtain AW Project Manager's appro val in writing prior to installation of hydrants which require changes in bury depth due t o obstructio ns not sho wn on Drawings. Unit price adj ustments will not be all owed for changes in water line flow line or fire hydrant barrel length caused by obstructions.

Page 464: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 12 19– FIRE HYDRANTS

Fire Hydrants 33 12 19 - 4

E. Plug branch lines to valves and fire hydrants shown on Drawings to be removed. Deliver fire hydrants designated for salvage to AW at their base depot location.

F. Coating Requirements:

1. Apply coatings in strict accordance with manufacturer's recommendations. No r equirements of this spe cification shall cancel or supersede written directions and r ecommendations of speci fic manufacturer so as to jeopardize integrity of applied system.

G. Furnish aff idavit of compliance that coatin gs furnishe d complies with requirements of this Specificat ion and referenced standards, as applicable. Per NFPA stand ards, provide a color code for the hydrant bon net to indicate the hydrant’s available flow at 20 psi according to the following table:

Supply Water Line Flow Characteristics Bonnet Color

Less than 500 GPM Red

500-999 GPM Orange

1000-1499 GPM Green

1500 GPM & Above Light Blue

H. Remove and dispo se o f unsuitab le materials and debris in accordan ce with local or State requirements.

END OF SECTION 33 12 19

Page 465: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 11 – GRAVITY SANITARY SEWERS

Gravity Sanitary Sewers 33 31 11 - 1

PART 1: GENERAL 1.1 SCOPE

A. Gravity sanitary sewers and appurtenances.

1.2 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – Shop Drawings, Product Data & Submittals.

B. Submit proposed methods, equipme nt, materials and sequ ence of operations for sewer construction. Plan operations to minimize disruption of utilities to occupied facilities or adjacent property.

C. Test Reports: Submit test reports and inspection videos as specified in Part 3 of this Section. Videos become property of AW.

1.3 QUALITY ASSURANCE

A. Qualifications. Install sa nitary sewer that is wat ertight both in pipe-to-pipe joints and in pipe- to-manhole connections. Perform te sting in accordance with Section 33 01 30.12 - Acceptance Testing for Sanitary Sewers.

B. Regulatory Requirements.

1. Install sewer lines to meet minimu m State mandated separation distance from potabl e water lines. Separation distance is defined as distance between outside of water pipe and outside of sewer pipe. Install new sanitary sewers no closer to water lines than 10 feet in all horizont al directions. Where water and sanitary sewer lines cross, a minimum vertical sep aration in accordance with State and/or local standards is required when the wat er line p asses above the sanitary sewer main. Where separation distance cannot be achieved, sanitary sewers shall be constructed of ductile iron sanitary sewer piping or encased in reinforced concrete (as detailed on the Drawin gs) for a minimum distance of 10 feet either side of the crossing.

2. Notify AW Project Manager immedia tely when water lines are uncovered during sanit ary sewer installation where minimum separation distan ce cannot be maintained.

3. Lay gravity sewer lines in straight alignment and grade.

1.4 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Inspect pipe and fittings upon arrival of materials at job site.

B. Handle and store pipe materials and fittings to protect them from damage due to impact, shock, shear or free fall. Do not drag pipe and fittin gs along ground. Do not roll pipe unrestrained from delivery trucks.

C. Use mechanical means to move or handle pipe. Employ acceptable clamps, rope or slings around outsid e barrel of pipe and fittings. Do not use hooks, bars, or other devices in contact with interior surface of pipe to lift or move lined pipe.

Page 466: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 11 – GRAVITY SANITARY SEWERS

Gravity Sanitary Sewers 33 31 11 - 2

PART 2: PRODUCTS 2.01 PIPE

A. Provide piping materials for gra vity sanitary sewers of sizes and types indicated on Drawings or as specified.

B. Unlined reinforced concrete pipe is not acceptable.

2.02 PIPE MATERIAL SCHEDULE

A. Unless oth erwise sho wn on Drawings, use pipe materials that conform t o requirements specified in one or more of following Sections:

1. Section 33 11 11 - Polyvinyl Chloride Pipe.

B. Where sho wn on Drawings, provide pipe meeting minimum class, d imension ratio, or other criteria indicated.

C. Pipe materials other than those listed above shall not be used for gravity sanitary sewers.

2.03 APPURTENANCE S

A. Laterals. Conform to requirements of Section 33 31 15 - Sanitary Sewer Service Laterals.

B. Service Co nnections. Conform to requirements of Section 33 31 15 - Sanitary Sewer Service Laterals.

C. Roof, street or other type of surf ace water dr ains shall n ot be co nnected or reconnected into sanitary sewer lines.

2.04 BEDDING AND BACKFILL MATERIAL

A. Bedding and Backfill: Conform to requirements of Section 3 1 23 33 - E xcavation and Backfill for Utilities and Section 31 23 23 - Utility Backfill Materials.

PART 3: EXECUTION 3.01 PREP ARATION

A. Prepare traffic co ntrol plans and set up st reet detour s and barricades in preparation for excavation when construct ion will affect traffic. C onform to requirements of MUTCD, and/or local standards where applicable.

B. Provide barricades, f lashing warnin g lights, a nd warning signs for excavations . Conform to requirements MUTCD and/or local standard s where applicable . Maintain barricades and warning lights where wo rk is in progress or where traffic is affected.

C. Perform work in accordance with OSHA standards. Employ trench safety system for excavations over 5 feet deep.

D. Immediately notify age ncy or co mpany ownin g utility line which is damaged, broken or disturbed. Obtain approval from AW Project Manager and agency or utility company for repairs or relocations, either temporary or permanent.

Page 467: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 11 – GRAVITY SANITARY SEWERS

Gravity Sanitary Sewers 33 31 11 - 3

E. Remove old pavement s and structures includ ing sidewalks and driveways in accordance with installation and DPW requirements.

F. Install and operate dewatering and surface water control measures in accordance with Contract Document requirements.

G. Do not allow sand, debris or runoff to enter sewer system.

3.02 DIVERSION PUMPING

A. All diversion and bypass pumping shall be perfor med in accordance with Section 33 01 30.51 – Pumping and Bypassing.

3.03 EX CAVATION

A. Earthwork. Conform to requireme nts of Section 31 23 33 - Exca vation and Backfill for Utilities. Use bedding as indicated on Drawings.

B. Line and Grade. Est ablish required uniform line and grade in trench from benchmarks identified by AW Project Manager. Maintain this control for minimum of 100 feet behind and ahead of pipe-laying operation. Use laser beam equipment to establish and maintain proper line and gra de of work. Use of appropriately sized grade boards which are substantia lly supported is also acceptable. Protect boards and location stakes from damage or dislocation.

C. Trench Excavation. Excavate pipe trenches to depths shown on Drawings and as specified in Section 31 23 33 - Excavation and Backfill for Utilities.

3.04 PIPE INSTALLATION BY OPEN CUT

A. Install pipe in accordan ce with pipe manufacturer's recommendation s and as specified in following paragraphs.

B. Install pipe only after e xcavation is completed, bottom of trench fine graded, bedding material is in stalled, and trench has been appro ved by AW Project Manager.

C. Install pipe to line and grade indicated. Place pipe so that it has co ntinuous bearing of barrel on bedding material and is laid in trench so interior surfaces of pipe follow grades and alignment indicated. Provide bell holes where necessary.

D. Install pipe with spigot ends toward downstream end of flow such that water flows into bell and out the spigot.

E. Form concentric joint with each section of adjoining pipe so as to prevent offsets.

F. Keep interior of pipe cle an as installation progresses. Remove foreign material and debris from pipe

G. Provide lubricant, place and drive home newl y laid sectio ns with come-a-long winches so as to eliminate damage to sectio ns. Install p ipe to "home" mark where provi ded. Use of back hoes or similar powered equipment will not be allowed unless protective measure s are provided and approved in advance by Project Manager.

H. Keep excavations free of water during construction and until final inspection.

Page 468: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 11 – GRAVITY SANITARY SEWERS

Gravity Sanitary Sewers 33 31 11 - 4

I. When work is not in progress, cover exposed ends of pipes with approved plug to prevent foreign material from entering pipe.

J. Where gravity sanitary sewer is to be insta lled under existing water line with separation distance of less than 2 fe et, construct new sewer pipe so that 20 feet of ductile ir on pipe is centered on water line crossing or e ncase the sewer line with reinforced concrete encasement as detailed on the plans. If gra vity sanitary sewer is to be installed above existing water lin e, construct new sewer pipe so that 20 feet of ductile iron pipe is centered on water line cro ssing or en case the sewer line with reinforced concrete encasement. .

K. Where gravity sanitary sewer is to be installed under existing water lin e, insta ll new sewer using duct ile iron or en cased in re inforced concrete encasement as shown on Drawings. Maintain minimum 2-feet separation distance.

L. Where the length of the stub is not indicated, in stall the stu b to the righ t-of-way line and seal the free end with an approved plug.

3.05 PIPE INSTALLATION OTHER THAN OPEN CUT

A. For installa tion of pip e by directional drillin g, conform to requirements of specification sections on directional drilling as appropriate.

3.06 INSTALLAT ION OF APPURTENANCES

A. Service Connections. I nstall service connect ions to conform to requirements of Section 33 31 15- Sanitary Sewer Laterals.

B. Construct manholes to conform to requirements of Section 03 48 10 - Precast Concrete Manholes.

3.07 INSPECTION AND TESTING

A. Visual Inspection: Check pipe align ment in accordance with Section 3 3 01 30 - Acceptance Testing for Sanitary Sewers.

B. Mandrel Testing. Use Mandrel Test to test fle xible pipe for deflectio n. Refer to Section 33 01 30 - Acceptance Testing for Sanitary Sewers.

C. Pipe Leaka ge Test. After backfillin g line segment and prior to tie-in of service connections, visually inspect gravity sanitary se wers where feasible, an d test for leakage in a ccordance with Section 33 01 30 - Acceptance Testing for Sanitary Sewers.

3.08 BACKFILL AND SITE CLEANUP

A. Backfill and compact soil in accorda nce with Se ction 31 23 33 - Excava tion and Backfill for Utilities.

B. Backfill tre nch in spe cified lifts onl y after pipe installa tion is approved by AW Project Manager.

C. Repair and replace r emoved or damaged pavement, curbs, gu tters, an d sidewalks as specified by local base regulations.

END OF SECTION 33 31 11

Page 469: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 1

1. GENERAL

1.1 SECTION INCLUDES

A. Precast concrete manholes for sanitary sewers and water lines or as indicated on the Drawings.

B. Precast concrete sanitary sewer manholes with fiberglass liner or sewer gas resistance epoxy coating where corrosion resistant manholes are specifically required to prevent early deterioration of the manhole.

C. Pile-supported concrete foundation used for unstable subgrade treatment for manhole base.

1.2 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – Shop Drawings, Product Data & Submittals.

B. Submit manufacturer's data and details of following items for approval:

1. Shop drawings of manhole sections, base units and construction details, including reinforcement, jointing methods, materials and dimensions.

2. Summary of criteria used in manhole design including, as minimum, material properties, loadings, load combinations, and dimensions assumed. Include certification from manufacturer that precast manhole design is in full accordance with ASTM C 478 and design criteria as established in Paragraph 2.01E of this Specification.

3. Frames, grates, rings, and covers

4. Materials to be used in fabricating drop connections

5. Materials to be used for pipe connections at manhole walls

6. Materials to be used for stubs and stub plugs, if required.

7. Materials and procedures for corrosion-resistant liner and coatings, if required.

8. Plugs to be used for sanitary sewer hydrostatic testing

9. Manufacturer's data for pre-mix (bag) concrete, if used for channel inverts and benches.

2. PRODUCT S

2.01 PRECAST CONCRETE MANHOLES

A. Provide manhole sections, base sections, and related components conforming to ASTM C 478. Provide base riser section with integral floors, unless shown otherwise. Provide adjustment rings which are standard components of manufacturer of manhole sections. Mark date of manufacture and name or trademark of manufacturer on inside of barrel.

B. Construct barrels for precast manholes from standard reinforced concrete manhole sections of diameter indicated on AW Standard Drawings. Use various lengths of manhole sections in combination to provide correct height with fewest joints.

Page 470: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 2

C. Provide tops to support AASHTO HS-20 vehicle loading, and receive cast iron frame covers, as indicated on AW Standard Drawings.

D. For manholes larger than 48-inch diameter, provide precast base sections with flat slab top precast sections used to transition to 48-inch diameter manhole access riser sections. Transition can be concentric or eccentric unless otherwise requested by AW Project Manager. Locate transition to provide minimum of 7-foot head clearance from base to underside of transition unless otherwise approved by AW Project Manager.

E. Design Loading Criteria: Manhole walls, transition slabs, cone tops, and manhole base slab shall be designed by manufacturer, to requirements of ASTM C 478 for depth as shown on AW Standard Drawings and to resist the following loads.

1. AASHTO HS-20 vehicle loading applied to manhole cover and transmitted down to transition and base slabs

2. Unit soil weight of 120 lbs/ft3 located above portions of manhole, including base slab projections

3. Lateral soil pressure based on saturated soil conditions producing an at-rest equivalent fluid pressure of 100 lbs/ft3

4. Internal liquid pressure based on unit weight of 63 lbs/ft3

5. Dead load of manhole sections fully supported by transition and base slabs

F. Provide joints between sections with o-ring gaskets conforming to ASTM C443.

G. When base is cast monolithic with portion of vertical section, extend reinforcing in vertical section into base.

H. Precast Concrete Base: Suitable cutouts or holes to receive pipe and connections. Lowest edge of holes or cutouts: For water line manhole, no less than 6-inches above inside surface of floor of base.

2.02 CONCRET E

A. Conform to requirements of Section – 03 30 00 Cast-In-Place Concrete.

B. Channel Inverts: Use concrete for inverts not integrally formed with manhole base, with minimum compressive strength of 4000 psi.

C. Concrete Foundation: Provide concrete with minimum compressive strength of 4000 psi for concrete foundation slab under manhole base section as indicated on AW Standard Drawing.

2.03 REINF ORCING BARS

A. Conform to the requirements of Section – 03 30 00 Cast-In-Place Concrete.

2.04 FRAMES AND COVERS

A. Use castings for frames, grates, rings and covers conforming to ASTM A48, Class 35B.

B. Use clean castings capable of withstanding application of AASHTO M306- 40,000 pound proof loading without detrimental permanent deformation.

Page 471: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 3

C. Fabricate castings to conform to shapes and dimensions as shown on AW Standard Drawing, and cast with the wording or logo “SEWER”for sanitary sewer and “WATER” for water system frames and covers. Standard dimensions for manhole frames and covers shall be either 24 or 30-inches in diameter.

D. Castings shall be smoooth and clean, and free from blowholes and other surface imperfections. Use clean and symmetrical cast holes in covers, free of plugs.

E. Provide watertight manhole frames and covers when the top of the frame and cover is below the 100-year flood elevation or when subjected to ponding. Watertight manhole frames and covers shall be provided with minimum of four bolts and gasket designed to seal cover to frame. Supply approved watertight manhole covers and frames.

2.05 DROP CONNECTIONS AND STUBS

A. All manhole drop connections shall be outside drop. Outside drops shall be provided when the invert elevation into the manhole is 24-inches higher than the manhole invert.

1. Pipe material used for outside drops shall be same pipe material as sewer main, or;

2. Ductile iron pipe as indicated on AW Standard Detail.

2.06 PIPE CONNECTIONS TO MANHOLE

A. Sanitary Sewers.

1. Provide resilient connectors conforming to requirements of ASTM C923. Use the following materials for metallic mechanical devices as defined in ASTM C923:

a. External clamps: Type 304 stainless steel 1) Internal, expandable clamps on standard manholes: Type 304

stainless steel, 11 gauge minimum. 2) Internal, expandable clamps on corrosion-resistant manholes:

b. Type 316 stainless steel, 11 gauge minimum c. Type 304 stainless steel, 11 gauge minimum, coated with minimum

16 mil fusion bonded epoxy conforming to AWWA C213

2. Where rigid joints between pipe and cast-in-place manhole base are specified, provide polyethylene-isoprene water-stop meeting physical property requirements of ASTM C923.

B. Water Lines

1. Where smooth exterior pipes, i.e., steel, ductile iron, or PVC pipes are connected to manhole base or barrel, seal space between pipe and manhole wall with assembly consisting of rubber gasket or links mechanically compressed to form a watertight barrier.

2. When connecting concrete or cement mortar coated steel pipes, or as option for connecting smooth exterior pipes to manhole base or barrel, space between pipe and manhole wall may be sealed with an assembly

Page 472: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 4

consisting of a stainless steel power sleeve, stainless steel take-up clamp and a rubber gasket. Take-up clamp: Minimum of 9/16-inch wide.

2.07 SEALANT MATERIALS

A. Provide sealing materials between precast concrete adjustment ring and manhole cover frame in accordance with ASTM C443.

2.08 CORROSION RESISTANT MANHOLE MATERIALS

A. Where corrosion-resistant manholes are required, such as a manhole receiving a force main or manholes located within a 1,000 feet down-stream of a force discharge, provide a fiberglass liner or sewer gas resistant epoxy coating for precast cylindrical manhole section, base sections, and cone sections. Liners relying on mechanically fastened batten strips as primary means of anchorage are unacceptable. All manholes with a corrosion resistant interior coating shall be provided with an exterior bituminous coating in locations where ground water table can reach above the base of the manhole.

2.09 BACKFILL MATERIALS

A. Conform to requirements of Section -31 23 33 Excavation and Backfill for Utilities.

2.10 NON- SHRINK GROUT

A. Provide prepackaged, inorganic, flowable, non-gas-liberating, non-metallic, cement-based grout requiring only addition of water.

B. Meet requirements of ASTM C1107 and have a minimum 28-day compressive strength of 7000 psi.

2.11 VENT PIPES

A. Provide an external vent pipe for manholes for every third manhole when three or more consecutive water tight frame and covers are installed.

B. Vent opening to be located a minimum of 1 foot above 100 year flood plain.

C. Buried Vent Pipes: Provide appropriate size PVC or DIP as indicated on the Drawings.

D. Vent Outlet Assembly: Provide vent outlet assembly as shown on AW standard details.

2.12 PROHIBITED MATERIALS

A. Do not use brick masonry for construction of sanitary sewer manholes, including adjustment of manholes to grade. Use only specified materials listed herein.

2.13 MANHOL E LADDER FOR WATERLINE MANHOLES

A. Manhole Ladder: Fiberglass with 300-lb rating at appropriate length; conform to requirements of OSHA.

1. Use components, including rungs, made of fiberglass, fabricated with nylon or aluminum rivets and/or epoxy. Apply non-skid coating to ladder rungs. Mount ladder using manufacturer's recommended hardware.

2. Fiberglass: Premium type polyester resin, reinforced with fiberglass; constructed to provide complete wetting of glass by resin; resistant to

Page 473: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 5

rot, fungi, bacterial growth and adverse effects of acids, alkalis and residential and industrial waste; yellow in color.

B. Provide approved petroleum-based tape encapsulating bolts in access manhole.

3. E XECUTION

3.01 EX AMINATION

A. Verify that lines and grades are correct.

B. Obtain an adequate foundation for all manhole structures by removing and replacing unsuitable material with well-graded granular material, by tightening with coarse rock, or by such other means as provided for foundation preparation of the connected sewers, or as directed by the AW Project Manager.

C. Dewater sufficiently to maintain the ground water level at or below the bottom of the manhole foundation prior to an during the placement of the foundation.

D. Do not build manholes in ditches, swales, or drainage paths unless approved by AW Project Manager.

3.02 PLACEMENT

A. Install precast manholes to conform to locations and dimensions as shown on Drawings.

B. Place sanitary manholes at points of change in alignment, grade, size, pipe intersections, and end of sewer unless otherwise directed by AW Project Manager.

3.03 MANHOLE BASE SECTIONS AND FOUNDATIONS

A. Place precast base on 6-inch thick (minimum) foundation of crushed stone, or concrete foundation slab.

B. Unstable Subgrade Treatment: Notify AW Project Manager immediately when unsatisfactory material is encountered in the manhole subgrade. With AW approval, up to 12-inches of additional undercut may be permitted to achieve suitable foundation. If the additional undercut does not result in a satisfactory foundation, the Contractor shall obtain a bedding design prepared by a Geotechnical Engineer licensed in the State in which the project is being constructed.

3.04 PRECAST MANHOLE SECTIONS

A. Install sections, joints, and gaskets in accordance with manufacturer's printed recommendations.

B. Install precast adjustment rings above tops of cones or flat-top sections as required to adjust finished elevation and to support manhole frame.

C. Seal any lifting holes with non-shrink grout.

D. Where fiberglass liners are required, seal joints between sections in accordance with manufacturer's recommendations.

E. Precast concrete grade rings shall be permitted to achieve the required grade. Grade rings shall not be permitted to more than 12-inches.

Page 474: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 6

F. External joint wrap all riser joints to ensure seal. No grout is permitted on the interior of manhole riser joints prior to testing.

G. Concrete base must be dry prior to setting any sections above it.

3.05 PIPE CONNECTIONS AT MANHOLES

A. Install approved resilient connectors at each pipe entering and exiting manholes in accordance with manufacturer's instructions.

1. Where smooth exterior pipes, i.e. steel, ductile iron or PVC pipes are connected to manhole base or barrel, space between pipe and manhole wall shall be sealed with an assembly consisting of rubber gaskets or links mechanically compressed to form watertight barrier.

2. When connecting concrete or cement mortar coated steel pipes, or as an option for connecting smooth exterior pipes to manhole base or barrel, space between pipe and manhole wall may be sealed with an assembly consisting of stainless steel power sleeve, stainless steel take-up clamp and rubber gasket. Take-up clamp: Minimum of 9/16-inch wide.

B. Ensure no concrete, fill, or other rigid material is allowed to enter space between pipe and edge of wall opening at and around resilient connector on either interior or exterior of manhole. If necessary, fill space with compressible material to ensure full flexibility provided by resilient connector.

C. Where new manhole is constructed on existing sewer, rigid joint pipe may be used. Install waterstop gasket around existing pipe at center of cast-in-place wall. Join ends of split waterstop material at pipe springline using an adhesive recommended and supplied by waterstop manufacturer.

D. Test connection for watertight seal before backfilling, or at direction of AW.

3.06 INVERTS FOR SANITARY SEWERS

A. Construct invert channels to provide smooth flow transition waterway with no disruption of flow at pipe-manhole connections. Conform to following criteria:

1. Slope of invert bench: 1-inch per foot minimum; 1-1/2-inches per foot maximum

2. Depth of bench to invert:

a. Pipes smaller than 15-inches: one-half of largest pipe diameter b. Pipes 15 to 24-inches: three-fourths of largest pipe diameter c. Pipes larger than 24-inches: equal to largest pipe diameter

3. Invert slope through manhole: 0.17 foot (2-inches) drop across manhole with smooth transition of invert through manhole, unless otherwise indicated on Drawing.

Form invert channels with concrete if not integral with manhole base section. For direction changes of mains, construct channels tangent to mains with maximum possible radius of curvature. Provide curves for side inlets and smooth invert fillets for flow transition between pipe inverts.

3.07 DROP CONNECTIONS FOR SANITARY SEWERS

A. Install drop connection when sewer line enters manhole higher than 24-inches above invert of manhole

Page 475: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 7

B. Backfill drop assembly shall be 3000 psi concrete to form solid encasement for all drop connections. Extend concrete encasement minimum of 4-inches outside bells, all per AW Standard Detail.

3.08 STUBS FOR FUTURE CONNECTIONS

A. In manholes, where future connections are indicated on Drawings, install resilient connectors and pipe stubs with approved watertight plugs.

3.09 MANHOLE FRAME AND ADJUSTMENT RINGS

A. Combine precast concrete or HDPE adjustment rings so elevation of installed casting cover matches pavement surface. Seal between concrete adjustment ring and precast top section with non-shrink grout; do not use mortar between adjustment rings. Apply latex-based bonding agent to precast concrete surfaces joined with non-shrink grout. Set cast iron frame on adjustment ring in bed of approved sealant material. Install sealant bed consisting of two beads of sealant, each bead having minimum dimensions of 1/2-inch and 1/2-inch wide.

B. Wrap manhole frame and adjustment rings with external sealing material, minimum 3-inches beyond joint between ring and frame and adjustment rings and precast section.

C. For manholes in unpaved areas, set top of frame flush with existing grade upto a maximum of 12-inches above existing grade, unless otherwise noted. In unpaved areas, encase manhole frame in mortar or non-shrink grout placed flush with face of manhole ring and top edge of frame. Provide rounded corner around perimeter.

3.10 BACKFILL

A. Place and compact backfill materials in area of excavation surrounding manholes in accordance with requirements of Section 31 23 33 - Excavation and Backfill for Utilities.

B. Where rigid joints are used for connecting existing sewers to manhole, backfill existing sewer up to springline of pipe with flowable fill.

C. In unpaved areas, provide positive drainage away from all manhole frames to natural grade. Provide restoration of disturbed areas.

3.11 DO GHOUSE MANHOLE

A. Existing sewer pipe to remain until satisfactory completion of manhole testing.

B. Crown of existing pipe shall be flush with concrete shelf that is formed within the manhole.

C. Doghouse manholes shall be constructed as per AW Standard Details.

3.12 FIELD QUALITY CONTROL

A. Conduct testing of manholes in accordance with requirements of Section 33 01 30- Acceptance Testing for Sanitary Sewers.

3.13 PROT ECTION

A. Protect manholes from damage until Work has been accepted. Repair damage to manholes at no additional cost to AW.

Page 476: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 12 – PRECAST CONCRETE MANHOLES

Precast Concrete Manholes 33 31 12 - 8

END OF SECTION 33 31 12

Page 477: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 15 – SANITARY SEWER LATERALS

Sanitary Sewer Laterals 33 31 15 - 1

PART 1: GENERAL 1.1 SECTION INCLUDES

A. Installation of service laterals in sani tary sewers serving areas where sanitary sewer service did not previously exist.

B. Reconnection of existin g service connections along parallel, replace ment, or rehabilitated sanitary sewers.

1.2 PERF ORMANCE REQUIREMENTS

A. Accurately locate in field all proposed service laterals alon g new sanitary sewer main.

B. Accurately locate in fie ld existing service con nections an d proposed service laterals along alignment of new parallel or replacement sewer main.

1.3 SUBMITTALS

A. Conform to requirements of Section 01 33 00 – Shop Drawings, Product Data & Submittals.

B. Submit product data for each pipe product, fitting, coupling and adapter.

C. Show reconnected services on reco rd drawings. Give exact distance from each service connection to nearest downstream manhole.

PART 2: PRODUCTS 2.01 PVC SERVICE CONNECTION

A. Use SDR 35 PVC sewer pipe conforming to ASTM D1784 and ASTM D3034. For depths greater than 10’, use SDR 26.

B. PVC pipe shall be gasket jointed with gasket conforming to ASTM D3212.

C. Provide service connection pipe in sizes shown on Drawings. For reconnection of existing services, select service connection p ipe diameter to match existing service diameter. Reconnections t o rehabilita ted sanitary sewer mains shal l be limited to following maximum service connection diameter:

Sewer Diameter Maximum Service Connection Diameter

8” or less 4”

10” or less 6”

D. Subject to a bove limits, provide 6- inch service connection w hen more than one service discharges into single pipe.

E. Connect se rvice laterals to new, parallel, or replacement sewer mains with prefabricated, full-bodie d tee or wye fittings conforming to specifica tions for sewer main pipe materia l as specified in other Sections for sewers less t han 10 inches in diameter.

F. Where sewers are inst alled using pipe augering or tunneling, or wher e sewer is 10 inches o r greater in diameter, use an inserta tee to conn ect service t o sewer main.

Page 478: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 15 – SANITARY SEWER LATERALS

Sanitary Sewer Laterals 33 31 15 - 2

2.02 PIPE SADDLES

A. Use pipe saddles only on existing sanitary sewer mains. Comply with Paragraph 2.01E for new, parallel, and replacement sanitary sewer mains.

B. Supply one-piece pref abricated saddle, eith er polyethylene or PVC, with neoprene g asket to accomplish complete seal. Use sa ddle fabrica ted to fit outside diameter of connecting pipe. Protruding lip of saddle must be at least 5/8-inch long with grooves or ridges to retain stainless steel band clamps.

C. Use 1/2-inch stainless steel band clamps for securing saddles to liner pipe.

2.03 COUPLINGS AND ADAPTERS

A. For connections between new PVC pipe stubou ts and exist ing service, 4-, 6-, or 8-inch diameter, use flexible adapter coupling consisting of neoprene gasket and stainless steel shear rings with 1/2-inch stainless steel band clamps:

B. For connect ions between new PVC pipe stubout and new service, use rubber-gasket adapter coupling:

2.04 PLUGS AND CAPS

C. Seal upstream end of unconnected sewer service stubs with rubber gasket plugs or caps of same pipe type and size.

2.05 CLEANOUT S

A. Use SDR 35 PVC sewer pipe conforming to ASTM D1784 and ASTM D3034.

B. PVC pipe shall be gasket jointed with gasket conforming to ASTM D3212.

C. Cleanouts to be provided every 100 LF, and at all changes of direction along the sanitary sewer lateral.

D. Concrete collars to be provided on all new cleanout installations.

E. Install double cleanout on all new individual service connections in accordance with AW standard details.

PART 3: EXECUTION 3.01 PERF ORMANCE REQUIREMENTS

A. Provide minimum of 72 hours notice to customers whose sanitary sewer service will potentially be interrupted.

B. Accurately f ield lo cate service con nections, whether in service or n ot, along rehabilitated sanitary se wer main. For parallel a nd replacement sewers, service connections may be located as pipe laying p rogresses fr om downstream to upstream.

C. Properly disconnect e xisting con nections fr om sewer and reconnect to rehabilitated liner, as described in this Section.

D. Reconnect service con nections, including tho se that go to unoccu pied or abandoned buildings or to vacant lots, unless dir ected otherwise by AW Project Manager.

Page 479: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 15 – SANITARY SEWER LATERALS

Sanitary Sewer Laterals 33 31 15 - 3

E. Complete reconnection of service lines within 2 4 hours afte r cured-in-place liner installation and within 72 hours a fter disconn ection for sliplinin g, pa rallel, or replacement sanitary sewer mains.

F. Reconnect services on cured-in-place liner at 12 feet depth or less by excavation method. AW Project Manager re serves right to require service con nections by excavation when remote cut service connection damages lines.

G. Reconnection by e xcavation method shall include fittings and required pipe length to reconnect service line.

H. Connect ser vices 8 inch es in diame ter and larg er to sewer by constru ction of manhole. Refer to appropriate Specification on manholes for construction.

3.02 PROT ECTION

A. Provide barricades, warning lights, and signs for excavations created fo r service connections.

B. Do not allow sand, debris, or runoff to enter sewer system.

3.03 PREP ARATION

A. Determine existing sewer locations and number of existing service con nections from closed circuit tele vision (CCTV) inspectio n DVDs or from field survey. Accurately field locate existing servic e connections, whether in service or not. Use existing service locations to connect or reconnect service lines or liner.

B. For rehabilitated sanita ry sewer mains, allow liner to n ormalize to ambient temperature and recove r from impo sed stretch. For cured-in-place liner s, verif y that liner is completely cured.

C. For new pa rallel and re placement sanitary sewer mains, complete testing and acceptance of downstream sewers as applicable.

3.04 EXCAVATION AND BACKFILL

A. Excavate in accordan ce with Sect ion 31 23 33 - Excavation and B ackfill for Utilities.

B. Perform work in accordance with OSHA standards.

C. Install and operate necessary ground water and surface wat er control measures in accordance with requirements of the Contract Documents.

D. Determine locations where limited access, buildings or structure preclud e use of mechanical excavation equipment. Obtain approval from AW Project Manager for hand excavation.

3.05 RECONNECTION BY EXCAVATION METHOD

A. Remove portion of existing sanitary sewer main or carrier pipe to expose liner pipe. Provide sufficient working space for installing prefabricated pipe saddle.

B. Carefully cut liner pipe making hole to accept stubout protruding from underside of saddle.

Page 480: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 15 – SANITARY SEWER LATERALS

Sanitary Sewer Laterals 33 31 15 - 4

C. Strap on saddle using stainless steel band on each side of saddle. Tighten bands to produce watertight seal of saddle gasket to liner pipe.

D. Remove and replace cracked, off set, or lea king service line for up t o 5 feet, measured horizontally, from center of new liner.

E. Make up co nnection between liner and service line using PVC sewer pipe and approved fittings and couplings.

F. Encase ent ire service connection in cement stabilized sand as shown on Drawings.

G. Test service connections before backfilling.

3.06 RECONNECTION BY REMOTE METHOD

A. Make service reconne ctions u sing remote-operated cutting tools on cured-in-place liners at depth greater than 12 feet.

B. Employ method and equipment that restore se rvice connection capacity to not less than 90 percent of original capacity.

C. Immediately open miss ed connecti ons and repair holes drilled in error using method approved by AW Project Manager.

3.07 RECONNECTION ON PARALLEL OR REPLACEMENT SEGMENTS

A. Install service connections on sewer main.

B. Remove and replace cracked, off set or lea king service line for up t o 5 feet, measured horizontally, from centerline of sanitary sewer main.

C. Make up connection be tween main and existing service line using PVC sewe r pipe and approved couplings, as shown on Drawings.

D. Test service connections before backfilling.

E. Embed service connection and service line as specified for sanitary sewer main as shown on Drawings. Place and compact trench zone backfill in compliance with Section 31 23 33 - Excavation and Backfill for Utilities.

3.08 INSTALLATION OF NEW SERVICE LATERALS

A. Install service connect ions on sanitary sewer main for each service connection. Provide length of lateral indicated o n Drawings. Install plug or cap on upstream end of service lateral as needed.

B. Test service connections before backfilling.

C. Embed service connection and service line a s specified for sanitary sewer main, and as sh own on Drawings. Pla ce and co mpact trench zone b ackfill in compliance with Section 31 23 33 - Excavation and Backf ill for Utilities. Install minimum 2-foot length of magnetic locating tape along axis of service stub and 9 inches to 12 inches above crown of pipe, at end of stub.

D. Install dual direction cleanouts at the point of demarcation or as otherwise shown on Drawings.

3.09 TESTING

Page 481: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 31 15 – SANITARY SEWER LATERALS

Sanitary Sewer Laterals 33 31 15 - 5

A. Test service reconnect ions and se rvice laterals. Follow a pplicable pr ocedures given in Section 33 01 30.13 - Acceptance Testing for Sanitary Sewers to perform smoke testing to confirm reconnection.

B. Perform po st insta llation CCTV inspection as specifie d in the Contract Documents. Cleaning and television inspection to show locations of service connection.

3.10 CLEANUP

A. Backfill excavation as specified in Section 31 23 33 - Excavation and B ackfill for Utilities.

B. Replace pavement or sidewalks r emoved or damaged by excavati on. In unpaved areas, bring surface to grade and slope surro unding excavation. Restore all disturbed paved and la wn areas in accordance with lo cal base and DPW regulations.

END OF SECTION 33 31 15

Page 482: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 41 00 – STORM SEWERAGE SYSTEM

Storm Sewage System 33 41 00 - 1

1. GENERAL

1.1 SUMMARY

A. Work of this Section includes the following:

1. Site storm sewerage drainage piping, fittings and accessories, and bedding. 2. Connection of drainage system to existing system. 3. Catch basins, paved area drainage, and site surface drainage.

B. Related Sections

1. Section 01 00 00 – Requirements of F.H. 2. Section 03 30 00 - Cast-in-Place Concrete 3. Section 31 20 00 – Earth Moving 4. Section 31 23 23 – Utility Backfill Materials 5. Section 31 23 33 – Excavation Backfill and Compaction for Utilities 6. Section 33 11 00 – Piping-General Provisions 7. Section 33 31 11 – Gravity Sanitary Sewers

1.2 REGULATORY REQUIREMENTS/REFERENCES

A. American Association of State Highway and Transportation Officials(AASHTO)

1. AASHTO M198 - (1990;R 1993) Joints for Circular Concrete Sewer and Culvert Pipe Using Flexible Watertight Gaskets.

B. American Concrete Pipe Association

1. ACPA 01-102 - (1988) Concrete Pipe Handbook 2. ACPA 01-103 - (1990) Concrete Pipe Installation Manual

C. ASTM International

1. ASTM A 497 - (1990; Rev B) Steel Welded Wire Fabric, Deformed, for Concrete Reinforcement

2. ASTM A 615/A 615/M - (1993) Deformed and Plain Billet-Steel Bars for Concrete Reinforcement

3. ASTM C 76 - (1990) Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe 4. ASTM C 139 - (1973; Rev. 1989) Concrete Masonry Units for Construction of

Catch Basins and Manholes 5. ASTM C 270 - (1994) Mortar for Unit Masonry 6. ASTM C 443 - (1985; Rev. A, R 1990) joints for Circular Concrete Sewer and

Culvert Pipe, Using Rubber Gaskets 7. ASTM C 476 - (1991) Grout for Masonry 8. ASTM D 3034 - Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC)

Sewer Pipe and Fittings. 9. ASTM D 3139 - Joints for Plastic Pressure Pipes Using Flexible Elastomeric

Seals. 10. ASTM D 3212 - (1992) Joints for Drain and Sewer Plastic Pipes Using Flexible

Page 483: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 41 00 – STORM SEWERAGE SYSTEM

Storm Sewage System 33 41 00 - 2

Elastomeric Seals. 11. ASTM D 4101 - (1992; Rev. B) Propylene Plastic Injection and Extrusion Materials 12. ASTM F 477 - (1993) Elastomeric Seals (Gaskets) for Joining Plastic Pipe 13. ASTM F 794 - (1993; Rev. A) Polyvinyl Chloride (PVC) Corrugated Sewer Pipe

with a Smooth Interior and Fittings

D. Federal Specification

E. FS RR-F-621 - (Rev. E) Frames, Covers, Gratings, Steps, Sump and Catch Basin, Manhole

F. State of Texas, Department of Transportation (TX DOT).

1.3 SUBMITTALS

A. Section 01 33 00 – Shop Drawings, Product Data & Submittals.

B. Test Reports: Certified copies of test reports demonstrating conformance to the applicable pipe specifications shall be submitted to the Contracting Officer for review before the pipe is installed.

C. Manufacturer's Installation Instructions: Indicate special procedures required to install Products specified.

D. Manufacture's product data on all pipe.

E. As-Built Survey indicating Catch Basin and Pipe locations and Inverts.

F. Certification: Certify that materials comply with specification requirements.

G. Accurately record actual locations of pipe runs, connections, catch basins, curb inlets, cleanouts, and invert elevations.

H. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.

1.4 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Deliver material with manufacture's tags and labels intact.

B. Handle and store so as to avoid damage.

1.5 COORDINATION

A. Coordinate the Work with termination of storm sewer connection outside building, trenching, and connection to building drainage piping.

B. Accurately record actual locations of pipe runs, connections, catch basins, curb inlets,

Page 484: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 41 00 – STORM SEWERAGE SYSTEM

Storm Sewage System 33 41 00 - 3

cleanouts, and invert elevations.

C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.

2. PRODUCTS

2.1 PIPELINE MATERIALS

A. Concrete Pipe and Fittings: Storm drainage pipe 12" and larger shall be reinforced concrete pipe conforming to ASTM C 76, Class III

1. Concrete Pipe Joints shall conform to ASTM C443, and gaskets shall be suitable for use with sewage.

B. PVC Pipe and Fittings: Storm drainage pipe 6" to 12" shall be ASTM D3034, SDR 35.

1. Joints shall conform to ASTM D3212, and gaskets shall conform to ASTM F477.

C. Corrugated Plastic Pipe (Smooth Interior) and Fittings: Use for pipes 4 inches in diameter or smaller. Corrugated Polyvinyl chloride (PVC) pipe shall conform to ASTM F 794. PVC fittings shall conform to ASTM D 1784.

1. Joints shall conform to ASTM D3212, and gaskets shall conform to ASTM F477.

D. Mortar: ASTM C 270, Type M.

E. Water: Water for masonry mortar shall be fresh, clean and potable.

F. Grout: ASTM C 476.

2.2 ACCESSORIES

A. Pipe Joints: Mechanical clamp ring type, expanding and contracting sleeve, neoprene ribbed gasket for positive seal.

B. Fittings: Same material as pipe molded or formed to suit pipe size and end design, in required tee, bends, elbows, cleanouts, reducers, traps and other configurations required.

C. For requirements refer to specification Section 01 00 00 Requirements of F.H.

D. Grout: as required in specification Section 03 30 00 – Cast-In-Place Concrete. Materials: ASTM D 3212 for PVC pipe joints with ASTM F 477

2.3 DRAINAGE STRUCTURES

A. Precast Concrete Structures: ASTM C 478, except as specified herein. Provide an air content of 6 percent, plus or minus 3 percent and a minimal wall thickness of 5 inches. ASTM A 615/A 615M reinforcing bars. ASTM A 497 welded wire fabric. ASTM C 443 or

Page 485: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 41 00 – STORM SEWERAGE SYSTEM

Storm Sewage System 33 41 00 - 4

AASHTO M 198, Type B gaskets for joint connections. Provide a 4-inch layer of clean gravel bedding with a maximum size of 2 inches.

B. Concrete Headwalls: Provide cast in place concrete and steal reinforcement in accordance with specification Section 03 30 00 – Cast-In-Place Concrete.

C. Masonry Materials: Shall conform to the following specifications and other requirements specified hereunder.

2.4 METAL ITEMS

A. Frames, Covers and Gratings: Traffic rated.

1. Curb Inlet, East Jordan Ironworks V-1432 or equivalent. 2. Surface Inlet, Neenah Foundry R-2558 or equivalent. 3. Biofilter Outlet, Neenah Foundry R-4859-C or equivalent. 4. Storm Manhole, Neenah Foundry R-1557 or equivalent. 5. All drainage castings shall be marked “DUMP NO WASTE. DRAINS TO

WATERWAYS”.

B. Drainage Structure Steps: Zinc-coated steel conforming to ANSI A14.3. Plastic or rubber coating pressure-molded to the steel. Plastic coating shall conform to ASTM D 4101, copolymer polypropylene. Rubber shall conform to ASTM C 443, except shore A durometer hardness shall be 70, plus or minus 5. Steps are not required in manholes, curb inlets or catch basins less than 4 feet in depth.

2.5 MANHOLES

A. Provide as specified in 03 31 12 Precast Concrete Manholes.

3. EXECUTION

3.1 EX AMINATION

A. Verify that trench cut is ready to receive work and excavations, dimensions, and elevations are as indicated on drawings.

3.2 PREPARATION

A. Hand trim excavations to required elevati ons. Correct over excavation with coarse aggregate.

B. Remove large stones or other hard matter which could damage piping or impede consistent backfilling or compaction.

C. Prior to the construction of any storm sewer, the Contractor's surveyor shall place adequate line and grade stakes and shall also set stakes and furnish grades so that all structure tops can be set to finish grade, in accordance with the approved plans.

Page 486: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 41 00 – STORM SEWERAGE SYSTEM

Storm Sewage System 33 41 00 - 5

3.3 INSTALLATION OF PIPELINES AND APPURTENANT CONSTRUCTION

A. Location: The work covered by this section shall terminate at a point approximately 5 feet from the building.

B. Earthwork: Perform earthwork operations in accordance with specification Section 31 20 00 – Earth Moving, Section 31 23 23 – Utility Backfill Materials, and Section 31 23 33 – Excavation Backfill and Compaction for Utilities

C. Pipe Laying and Jointing: Replace, by one of the proper dimensions, any pipe or fitting that does not allow sufficient space for proper caulking or installation of joint material. At the end of each work day, close open ends of pipe temporarily with wood blocks or bulkheads.

D. Connections to Existing Lines: Notify the Installation Contracting Officer in writing at least 10 days prior to the date that connections are to be made. Obtain approval of the Contracting Officer before interrupting service. Conduct work so that there is a minimal interruption of service on existing lines.

E. Special Requirements of Installation of Concrete Piping: Install pipe and fittings in accordance with the general requirements and procedures for the installation of piping and with the provisions for rubber gasket jointing and jointing procedures of ACPA 01-103 or of ACPA 01-102, Chapter 9. Make joints with the gaskets previously specified for joints with this piping. Clean and dry surfaces receiving lubricants, cements or adhesives. Affix gaskets to pipe not more than 24 hours prior to the installation of the pipe. Protect gaskets from the sun, blowing dust and other deleterious agents at all times. Before installation of the pipe, inspect gaskets and remove and replace loose or improperly affixed gaskets. Align each pipe se ction with the previously installed pipe section, and pull the joint together. If while pulling the joint, the gasket becomes loose and can be seen through the exterior joint recess when the pipe is pulled up to within one inch of closure, remove the pipe and remake the joint.

F. Special Requirements of Installation of Corrugated Plastic Piping: Install pipe and fittings in accordance with the general requirements and procedures for the installation of piping and with the recommendations of the PVC pipe manufacturer. Utility Line Marking: For requirements see specification Section 01 00 00 – Requirements of F.H.

3.4 PIPELINE TESTING

A. Check each straight run of pipeline for gross deficiencies by holding a light in a manhole; it shall show a practically full circle of light through the pipeline when viewed from the adjoining end of line.

B. PVC Pipe Deflection Test:

1. General: a. Test installed pipeline for deflection by pulling a mandrel through sewer

Page 487: Cover V-2 of 2 Hood Construct...Substitution Procedures 01 25 00-3 Schedule of Values 01 29 73-2 Progress Payments 01 29 76-3 Project Management & Coordination 01 31 13-3 AAFES Progress

DIVISION 33 – UTILITIES SECTION 33 41 00 – STORM SEWERAGE SYSTEM

Storm Sewage System 33 41 00 - 6

without aid of mechanical pulling device. b. Perform test at least 30 days after trench backfill and compaction have been

completed. c. No pipe shall exceed a deflection of 5 percent.

2. Mandrel: a. Full circle, solid or rigid odd number of legs (minimum 9 legs) steel cylinder

with pulling rings at each end. b. Diameter: Sized to allow only as much initial deflection for ultimate deflection

of 5 percent. c. Obtain Contracting Officer approval for use of mandrel smaller than 96-2/3

percent of inside diameter of pipe. 3. Correcting Deficiencies or Obstructions:

a. Excavate to spring line of pipeline and replace and re-compact pipe zone material.

b. Internal pipe re-rounding or vibration will not be allowed. c. If pipe does not pass mandrel test after replacement of pipe zone material and

trench backfill, re-excavate and replace pipeline.

END OF SECTION 33 41 00