cover meappsd.daera-ni.gov.uk/ipri/docs/p0052-04a lafarge ireland... · 2019. 4. 2. · monitoring...

56
ISO/IEC 17025 Accredited Legal Entity, UKAS Accredited Testing Laboratory No. 4279 Exova (UK) Ltd trading as Exova Catalyst & Exova Catalyst Ireland Unit C5, Emery Court, The Embankment Business Park, Stockport, SK4 3GL Stack Reference Lafarge Ireland Ltd Cookstown Works 29 Sandholes Road Cookstown BT80 9AR Primary Site Contact: Jim Buchanan Installation Name & Address PPC Permit: P0052/04A/V6 EN 14181 AST Report Commissioned by A8 - Kiln Exhaust Main Stack (Standby Analyser) Lafarge Ireland Ltd Exova Catalyst, 70 Montrose Avenue, Hillington Park, Glasgow, G52 4LA Your Exova Catalyst Contact: John Healey (07826 916 681) E: [email protected] Job Reference Number CEK-2909 Report Approved by Report Written by COVER ME Signature of Report Approver Version 1 Report Version John Healey 29th May 2018 Report Date TE1 TE2 TE3 TE4 MM 03 476 MCERTS Level 2 15th - 16th May 2018 Dates of the Monitoring Campaign Regional Manager Deputy Regional Manager TE1 TE2 TE3 TE4 MM 04 492 MCERTS Level 2 Iain Wilkie CAT-14181 (Version X) CEK-2909 Lafarge Ireland Ltd (Cookstown) - A8 Kiln Exhaust Main Stack - AST (Standby Analyser)

Upload: others

Post on 09-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • ISO/IEC 17025 Accredited Legal Entity, UKAS Accredited Testing Laboratory No. 4279Exova (UK) Ltd trading as Exova Catalyst & Exova Catalyst Ireland

    Unit C5, Emery Court, The Embankment Business Park, Stockport, SK4 3GL

    Stack Reference

    Lafarge Ireland LtdCookstown Works29 Sandholes Road

    CookstownBT80 9AR

    Primary Site Contact: Jim Buchanan

    Installation Name & Address

    PPC Permit: P0052/04A/V6

    EN 14181 AST Report Commissioned by

    A8 - Kiln Exhaust Main Stack (Standby Analyser)

    Lafarge Ireland Ltd

    Exova Catalyst, 70 Montrose Avenue, Hillington Park, Glasgow, G52 4LAYour Exova Catalyst Contact: John Healey (07826 916 681)

    E: [email protected]

    Job Reference NumberCEK-2909

    Report Approved by

    Report Written by

    COVER ME

    Signature of Report Approver

    Version 1Report Version

    John Healey

    29th May 2018Report Date

    TE1 TE2 TE3 TE4MM 03 476

    MCERTS Level 2

    15th - 16th May 2018Dates of the Monitoring Campaign

    Regional Manager

    Deputy Regional Manager

    TE1 TE2 TE3 TE4MM 04 492

    MCERTS Level 2

    Iain Wilkie

    CAT-14181 (Version X)CEK-2909 Lafarge Ireland Ltd (Cookstown) - A8 Kiln Exhaust Main Stack - AST (Standby Analyser)

  • SECTION 1A: TITLE PAGE

    CONTENTS 2

    SECTIONS 1B & 1C: EXECUTIVE SUMMARY

    Overall Aim of the Monitoring Campaign & Special Requirements 3

    AST Calibration Check Summary 3

    Summary of Standard Reference Method & EN 14181 Deviations 4

    Conclusions, Discussions and Actions arising from the Sampling 5

    SECTION 2: INFORMATION ABOUT THE REGULATED INSTALLATION

    Regulatory Information 5

    Operational Information and Site Monitoring Provisions 6

    Monitoring Provisions at the Installation - Periodic Monitoring 7

    Continuous Emissions Monitors (CEM) at the Installation 9

    SECTION 3: INFORMATION ABOUT THE MONITORING CAMPAIGN

    Test Laboratory Staff 10

    Standard Reference Methods (SRMs) 10

    SECTION 4B: Data and Calculations - AST

    SECTION 5: Results of the Functional Tests

    CONTENTS

    SECTION 5: Results of the Functional Tests

    This test report has been written to fully comply with the requirements in EN 14181:2014 and the Environment Agency's Technical Guidance Note TGN M20, Version 3 (incorporating MID 14181 as Annex A) which was published in June 2015.

    Opinions and interpretations expressed herein are outside the scope of Exova Catalyst's UKAS accreditation.

    This test report shall not be reproduced, except in full, without the written approval of Exova Catalyst.

    CAT-14181 (Version X)2 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Overall Aim of the Monitoring Campaign

    Special Requirements

    AST CALIBRATION CHECK SUMMARY

    Parameter Calibration Function as Derived from the

    Previous QAL2

    Result of Calibration

    Test

    SECTION 1B

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    15th - 16th May 2018

    Exova Catalyst were commissioned by Lafarge Ireland Ltd to carry out stack emissions testing on the A8 - Kiln Exhaust Main Stack (Standby Analyser) Stack at Cookstown Works.

    There were no special requirements.

    The aim of the monitoring campaign was to perform an AST Calibration Check Exercise on the Continuous Emissions Monitor (CEM), which is installed on the Plant, following the requirements of EN 14181.

    Executive Summary (Page 1 of 2)

    Calibration Function derived

    from QAL2?

    Range after AST Extension

    @ REF Conditions

    Calibration Function that the AST was

    performed against (See Conclusion)

    Result of Variability

    Test

    Calibration Range from

    Previous QAL2 @ REF

    Conditions

    All calibration functions relate to mg/m³, unless otherwise stated.

    y = 0.9876x + 20.5419

    Ammonia Yes y = 1.1299x -1.804

    Carbon Monoxide y = 1.064x -3.5405Hydrogen Chloride y = 0.991x -0.4158

    Total Particulate Matter y = 0.5384x + 2.3444Total VOCs y = 0.8427x -0.7458

    Pass Passy = 0.9708x -0.0951

    0 to 21.80 to 16.6Water Vapour (% v/v) Yes y = 0.9708x -0.0951 Pass Pass

    Oxygen (% v/v) Yes y = 1.0181x + 0.3301 y = 1.0181x + 0.3301

    Pass

    PassPass

    PassPassPass

    PassOxides of Nitrogen (as NO₂) Yes y = 0.9622x + 5.9809 Pass PassSulphur Dioxide Yes

    YesYes

    YesYes

    0 to 60.20 to 12.1

    0 to 677.50 to 976.80 to 19.10 to 30.1

    Existing Range Still Valid

    Existing Range Still Valid

    Existing Range Still Valid

    Existing Range Still Valid

    Existing Range Still Valid

    Existing Range Still Valid

    Existing Range Still Valid

    Existing Range Still Valid

    Existing Range Still Validy = 0.5384x + 2.3444y = 0.8427x -0.7458y = 0.9622x + 5.9809

    y = 0.9876x + 20.5419y = 1.064x -3.5405

    Pass Passy = 0.991x -0.4158y = 1.1299x -1.804

    Pass

    PassPass0 to 544.5

    The calibration functions, once applied, only remain valid as long as the QAL3 data remains within control limits, and that there are no manual adjustments made to the CEMs other than those allowed to bring the settings back within the QAL3 control limit.

    CAT-14181 (Version X)3 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Total Particulate Matter, Total VOCs, Oxides of Nitrogen, Sulphur Dioxide, Carbon Monoxide, Hydrogen Chloride, Ammonia, Water Vapour & Oxygen

    15th - 16th May 2018A8 - Kiln Exhaust Main Stack (Standby Analyser)

    CONCLUSIONS, DISCUSSIONS & ACTIONS FROM THE SAMPLING EXERCISE

    SECTION 1C

    Executive Summary (Page 2 of 2)

    Lafarge Ireland Ltd, Cookstown Works

    The CEM data was corrected using the calibration function derived during the most recent QAL2 campaign. The corrected values passed both the variability and calibration tests as required by EN 14181 and therefore the calibration function is deemed to be valid within the given tolerances. The calibration range derived in the previous QAL2 is still valid.

    SUMMARY OF STANDARD REFERENCE METHOD & EN 14181 DEVIATIONS

    Parameter Run Deviation

    All Parameters All There are no deviations associated with the sampling employed

    CAT-14181 (Version X)4 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Regulated Determinands and Emission Limit Values (ELVs)

    ¹ TGN M20, Version 3

    Date CEMs Data Obtained by Exova Catalyst 25th May 2018

    Section 2: Information about the Regulated Installation

    2020 ¹

    Name of the Installation

    Value

    600

    --

    30

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    15th - 16th May 2018

    Short-Term ELV (mg/m³)

    Daily or 48hr Average ELV (mg/m³)

    Date of the Last QAL2 / AST Campaign 1st - 6th November 2017 (Gaseous AST / TPM QAL2)

    Cookstown Works

    Oxides of Nitrogen (as NO₂) -

    --

    3035

    600

    40Hydrogen ChlorideCarbon Monoxide

    10- 50

    30

    Ammonia

    -

    Determinand

    Cement & LimePermit Number P0052/04A/V6

    Address of the Installation See Title PageSector of the Installation

    REGULATORY INFORMATION

    Parameter

    800 20

    Uncertainty Requirement (%)

    Sulphur Dioxide

    Total VOCsTotal Particulate Matter

    40

    ¹ TGN M20, Version 3

    CAT-14181 (Version X)5 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Process Type and Variations in Emissions

    Type of Fuel

    Continuous

    Yes

    No

    OPERATIONAL INFORMATION AND SITE MONITORING PROVISIONS

    No

    Were there any variations in emissions during the EN 14181 test (e.g. Load changes)Will these variations affect the representative nature of the collected data?

    A8 - Kiln Exhaust Main Stack (Standby Analyser)15th - 16th May 2018

    Are multiple calibration functions required if the emissions vary

    Value

    Pulverised Coal & Recyled Liquid Fuel Oil

    No

    Are there any factors that may affect the collected data(e.g. auto-calibrations, plant start up and shut down)

    Fuel type used during the EN 14181 test(include proportions for co-incineration)

    Was the CEM reading zero for any determinands, if so, was this investigated to ensure it was working?

    Section 2: Information about the Regulated Installation

    Continuous or batch process

    No

    What product was being processed during the tests? Cement

    Reviewing historical Plant data, were low emissions expected for any determinands?

    No

    Parameter

    Lafarge Ireland Ltd, Cookstown Works

    Parameter Value

    Abatement

    due to different fuel types being used?

    ESP

    Parameter Value

    Running Status On

    Type of Abatement System

    CAT-14181 (Version X)6 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Duct Characteristics Location of Sampling Platform

    Platform Details

    Number of Ports - 4.0

    cm 9.0Orientation of Duct - Vertical

    Safe access available

    YesPlatform has vertical base boards (approx. 0.25m high) Yes

    Yes

    No

    Sufficient working area to manipulate probe and operate the measuring instruments

    4" BSP

    EA Technical Guidance Note M1 / EN 15259 Platform Requirements

    YesYes

    Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)

    Platform has chains / self closing gates at top of ladders

    Value

    Units Value General Platform Information Value

    Type - Circular Permanent / Temporary Platform PermanentDepth m 4.82 Inside / Outside OutsideWidth m -Area m² 18.25Port Depth

    -

    Section 2: Information about the Regulated Installation

    MONITORING PROVISIONS AT THE INSTALLATION - PERIODIC MONITORING

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Sample Port Size

    Access to sample ports unhindered by obstructions

    15th - 16th May 2018

    Parameter

    (Page 1 of 2)

    Sampling Location / Platform Improvement Recommendations

    EN 15259 Homogeneity Test Requirements

    Sampling Plane Validation Criteria (EN 15259)

    -

    6.0

    m/s 5.22 -Highest Gas Velocity

    < 15° Yes

    - > 5 Pa Yes

    --

    Yes-

    - - - -

    Safe access available

    Required Compliant

    Lowest Differential Pressure Pa 13.5

    Maximum Angle of Swirl ° -

    No

    The sampling location meets all the requirements specified in EA Guidance Note M1 and EN 15259, and therefore there are no improvement recommendations.

    According to EN 15259, a Homogeneity Test is required on this stack, however, as far as we are aware, it has not yet been undertaken. Unless agreed otherwise with the respective regulator, we would recommend that the Homogeneity Test be undertaken prior to the next set of emissions testing on this stack, and would be happy to carry out the work. Please contact Exova Catalyst for further details.

    Criteria in M1 Units

    --

    Ratio of Above : 1 1.20

    4.85 - -

    Yes

    - -

    Yes

    4.34 -

    -No Local Negative Flow -

    - - -

    Lowest Gas Velocity m/s

    - -

    Traverse 1 - - - -

    < 3 : 1

    Mean Velocity m/s - - - --

    Easy access available Yes

    - -

    CAT-14181 (Version X)7 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Pro-forma for Site Provisions for Monitoring

    Plant Photos

    Yes

    Compliance with MID 15259

    Section 2: Information about the Regulated Installation

    Requirement Notes

    Photo 1 Photo 2

    A safe and clean working environment with sufficient space and weather protection.

    Yes

    Easy and safe access to the CEM. Yes

    Adequate supplies of reference materials, tools and spare parts.

    15th - 16th May 2018

    Yes

    Compliant

    MONITORING PROVISIONS AT THE INSTALLATION - PERIODIC MONITORING

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Facilities to introduce the reference materials for gaseous-monitoring systems, both at the inlet of the sampling line (where present), and at the inlet of the CEM.

    Yes

    (Page 2 of 2)

    See the Sampling Plane Validation Criteria table on the previous page.

    Sample Points

    where = isokinetic point sampled at

    = isokinetic point not sampled at

    = combustion gases sample point

    = non-isokinetic sample point

    Line A

    Line B

    B1

    B4

    B3

    B2

    B6

    B9

    B8

    B7

    A8A7 A9 A10

    A1 A2 A3 A4

    B10

    B5

    A5

    A6

    CAT-14181 (Version X)8 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Type

    ABB CEMAS FTIR-NT

    MC 030016

    Yes DURAG D-R-230

    3.350294.7

    3.350294.7

    3.350294.7

    ExtractiveExtractiveExtractive

    YesExtractiveExtractiveExtractive

    MC 030016MC 030016Oxygen (Wet)

    3.350294.7

    Ammonia 0 - 15

    Cross-Duct

    MC 030016MC 030016

    15th - 16th May 2018

    Yes

    ExtractiveExtractive

    ABB CEMAS FTIR-NT

    FTIR

    0 - 40%Water Vapour 3.350294.7

    Total Particulate Matter DURAG D-R-230

    Instrument Name

    A0 2000 Multi FIDABB CEMAS FTIR-NT

    0 - 25%

    Lafarge Ireland Ltd, Cookstown Works

    Extractive 3.350294.7

    Nitrogen MonoxideNitrogen DioxideSulphur Dioxide

    FID

    Measurement Principle

    Total VOCs 3.350294.73.350294.7

    Optical Light Scattering

    Carbon MonoxideHydrogen Chloride

    QAL1 Compliant

    MC 030015

    MC 030016MC 030016

    Certified Range (mg/m³)

    0 - 7.5 MC 140253

    FTIRFTIR

    Zirconia

    MC 030016

    Pressure Yes DURAG D-R-230

    ABB CEMAS FTIR-NTABB CEMAS FTIR-NT

    Peripheral Determinand Recorded Instrument Name

    Temperature

    ABB CEMAS FTIR-NT

    Main Determinand

    0 - 200

    Instrument Serial Number

    01239225

    A8 - Kiln Exhaust Main Stack (Standby Analyser)

    0 - 15

    MCERTS Number

    FTIRFTIR

    FTIRFTIR

    Section 2: Information about the Regulated Installation

    CONTINUOUS EMISSION MONITORs (CEMs) AT THE INSTALLATION

    -0 - 750 - 750 - 15

    YesYesYesYes

    ABB CEMAS FTIR-NTABB CEMAS FTIR-NT

    3.350294.7YesYes

    YesYes

    CAT-14181 (Version X)9 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • NOTE 1: Exova Catalyst hold UKAS and MCERTS Accreditation for all Standard Reference Method Tests performed.

    NOTE 2: The MU specified in this column is reported as the MU at the Daily ELV (not the MU percentage of concentration measured.)

    where: MST stands for Manual Sampling Train

    Anthony LovellTechnician

    Position Technical EndorsementsMCERTS AccreditationName

    Stephen Dick MCERTS Level 2 TE1 TE2 TE3 TE4MCERTS Level 1 MM 16 1397, Expiry: 30/09/2021 None

    Gasmet DX4000Total VOCs

    0 - 75

    Gasmet DX4000Water Vapour 0 -30%

    Team Leader

    MCERTS Number & Expiry Date

    MM 10 1061, Expiry :30/04/2020

    Operational (mg/m³)

    N/A - SRM0 - 161

    0 - 936.9

    Instrumental Ranges

    Sulphur Dioxide

    EN 12619

    0 - 75.9 MC 030014 TGN M22 8.1

    EN 14789TGN M22FTIR

    Paramagnetic CellHoriba PG-350E

    0 - 15

    MU ²(%)

    MC 030014Gasmet DX4000

    MST

    FTIRFTIR

    STANDARD REFERENCE METHODS (SRMs)

    Total Particulate Matter

    FTIRCarbon Monoxide 0 - 75

    EN 13284-1

    Ammonia Gasmet DX4000 FTIR N/A

    0 - 15

    Determinand

    8.02.22.41.5

    Sick Maihak 3006

    Exova Catalyst hold UKAS and MCERTS Accreditation for performing QAL2 and ASTs, to EN 14181.

    MCERTS Number

    FTIR

    0 - 200 MC 030014MC 040036MC 030014

    Reference Method

    0 - 1159.2TGN M22

    Measurement Principle

    GravimetricFID

    TGN M222.28.9

    Oxides of Nitrogen (as NO₂)

    0 - 20%0 - 25%

    Instrument Name

    Certified (mg/m³)

    Section 3 - Information about the Monitoring Campaign

    TEST LABORATORY STAFF

    MC 130223MC 030014

    Oxygen (Dry) 0 - 25%

    0 - 75

    Hydrogen Chloride

    TGN M22TGN M22

    Gasmet DX4000Gasmet DX4000 MC 030014

    MC 0300140 - 624.60 - 16.3

    5.43.4

    Servomex 4900

    Oven Box (1)

    Mass View (2)

    CAT 13.24Umbilical (2)

    Control Box DGM (1)

    CAT 4.206Stack Thermocouple (1)

    -Digital Temperature Meter CAT 3.34 / 3.54

    Heated Probe (2) CAT 5.162 CAT 20.131

    5m Heated Line (1)

    CAT 12.963 CAT 4.934

    Stopwatch

    Oven Box (2)

    CAT 25.4

    Heated Probe (3) CAT 5.11 Ankersmid APP100

    Box Thermocouples (2)Umbilical (1) CAT 3.57

    Servomex 5200MP -Barometer

    -CAT 14.53

    Equipment Type Equipment I.D. Equipment Type Equipment I.D. Equipment I.D.Equipment Type

    -

    -CAT 10.4

    Stack Thermocouple (3) CAT 4.995 / 4.0048

    Heated Probe (1) CAT 5.4Bernath 3006 FID

    CAT 12.721m Heated Line (2)

    L-Pitot -

    Mass Flow Controller (1)Mass Flow Controller (2) CAT 6.12

    CAT 6.111m Heated Line (3) -

    CAT 21S.28

    Gasmet DX4000 CAT 19.12Stack Thermocouple (2)

    Extractive Sampling Instrumental Analysers

    Eco Physics CLD 822Mh

    CAT 7.38 Horiba PG-350E CAT 39.7 Digital Manometer (1) CAT 3.34Control Box DGM (2)

    LIST OF EQUIPMENT

    - Horiba PG-250 SRM CAT 9.13 Digital Manometer (2) CAT 3.54

    CAT 17.420m Heated Line (1) CAT 20.133

    Box Thermocouples (1) CAT 3.57

    -ABB AO2020-URAS26

    Miscellaneous Items

    S-Pitot (1)

    CAT 8.4

    -

    JCT JCC P1 CoolerCAT 4.597

    -

    1m Heated Line (1) CAT 20.130Gasmet Sampling System

    S-Pitot (2) 15m Heated Line (1) -CAT 21P.95 / 105

    20m Heated Line (2) -Dual Channel Heater Controller1Kg Check Weight

    Last Impinger ArmCallipersTubes Kit Thermocouple

    CAT 17.4CAT 4.22 / 4.24 / 4.9993

    CAT 23.22CAT 4.217

    Easylogger EN-EL-12 Bit -Hioki 5043 (V) CAT 11.94

    CAT 3.161Single Channel Heater Controller

    500g Check WeightMass View (1) -

    -Laboratory Balance CAT 1.18 / 1.18aTape Measure CAT 16.3

    CAT-14181 (Version X)10 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Calibration Data

    Outliers Data

    Reason for Data Pair Removal

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    INPUT

    INPUT INPUT 0.00 0.00

    5 15/05/2018 14:20 - 15:06 10.56 8.469.34

    Time

    8

    SRM (STP, DRY,

    10% O₂) mg/m³

    (Page 1 of 3)

    7.5612.11

    x - xav(A)

    y - yav(B)

    13.80

    12:00 - 12:45

    Section 4B - Data and Calculations - AST

    TOTAL PARTICULATE MATTER: AST CALCULATIONS

    INPUT INPUT 0.00 0.00 INPUT

    INPUT

    1

    -0.75

    MAX SRM - MIN SRM

    x, CEM (STP, ACTUAL) mg/m³

    -0.39

    0.00 INPUT

    6

    43

    INPUT INPUT 0.00 0.00

    0.00

    0.005INPUTINPUT INPUT 0.00

    2.53 2.75(DAILY) DELV (mg/m³)

    30

    INPUT2 INPUT INPUT

    INPUT 0.00 0.00

    8.08

    9.01 14.15

    10.65

    -0.12 0.03 8.067 16/05/2018 09:00 - 09:46

    10:48 - 11:34

    y, SRM (STP, ACTUAL) mg/m³

    (A) x (B) (x - xav)² CAL CEM (STP,

    ACTUAL) mg/m³

    1 15/05/2018 09:35 - 10:20 11.21 9.50 15.27 0.77 0.64 0.49 0.5915/05/2018

    0.93 0.56

    5.2530

    95% CI MU (%)

    Pair Date Time

    0.59

    SUM

    0.16 0.09 0.34 8.2811.0317.36 -0.03 2.08 -0.07 0.00 7.95

    8.382

    15.46

    6 15/05/2018 15:25 - 16:11 10.62 8.19 13.19

    3 15/05/2018 10.41 10.93

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Pair Date

    4 15/05/2018 13:15 - 14:02

    16/05/2018 10:00 - 10:45

    0.12

    7.80 12.71

    0.21 0.49 0.10 0.04

    -1.259.69 7.61-0.66

    9.36

    -0.05 0.01 8.030.18

    -1.08 -1.06 1.14 1.17 7.38

    INPUT

    x, CEM (ACTUAL)

    mg/m³

    y, SRM (ACTUAL)

    mg/m³

    Filter ID Number

    (47-XXXX)

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    INPUT

    INPUT

    8 INPUT INPUT 0.00 0.00

    6

    10

    INPUT0.00 INPUT7

    INPUT 0.00 0.000.00

    INPUT INPUT 0.00 0.00 INPUTINPUT 0.00

    Existing Calibration Function

    0.00 INPUT9 INPUT

    y = 0.5384x + 2.3444Source of Existing Calibration Function

    INPUT INPUT

    CEK-2705 Exova Catalyst QAL2

    Existing Calibration Range (@ REF Conditions)0 to 30.1 mg/m³

    CAT-14181 (Version X)11 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • PLOT 1: BAR CHART FOR REFERENCE SRM vs REFERENCE CEM (STANDARDISED)

    Variability Test Data where CAL = Calibrated using AST calibration functions

    A8 - Kiln Exhaust Main Stack (Standby Analyser)

    Date

    TOTAL PARTICULATE MATTER: AST CALCULATIONS (Page 2 of 3)

    Lafarge Ireland Ltd, Cookstown Works

    SRMPressure

    COPY CORRECT PLOT 1 BAR CHART

    SRMWater

    CEMOxygen

    CEMOxygen

    SRMOxygen

    Section 4B - Data and Calculations - AST

    Time CEMTemp

    SRMTemp

    CEMPressure

    PairCAL CAL

    CEMWater

    CEMWater

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    1 2 3 4 5 6 7 8

    mg/

    m³ (

    REF)

    Pair

    CEM SRM

    101.7 101.7

    0.0

    101.7 101.7

    00/01/1900

    0 00/01/1900 00:00 0.0 0.0 0.0

    101.7

    0

    0.0

    0

    91.9

    0.0 0.0 0.0

    0 00/01/1900

    00:000

    0.00 0.000

    PressurekPa

    67 16/05/2018 90.1

    96.0 101.7 101.7

    1 15/05/2018

    94.3

    Water Vapour% v/v

    Oxygen (DRY)% v/v

    Oxygen (DRY)% v/v

    Oxygen (DRY)% v/v

    15.97 15.41 14.19

    0 00/01/1900

    10:00 - 10:45

    9.989.75 10.26 10.02

    95.3

    0.00

    101.7 101.796.1

    00/01/1900

    0

    9.68 10.19 10.2616.11 15.55 14.59 9.70 10.21

    00/01/1900

    09:35 - 10:20 93.8

    00:00 0.0

    90.4 93.7

    13.80 0.766 15/05/2018 15:25 - 16:11

    101.7

    94.3 95.3

    8 16/05/2018

    0

    0.00

    0.00

    0

    00/01/1900

    5

    2

    101.7

    15/05/2018 10:48 - 11:34 94.3

    Temp°C

    0.00 0.00 0.00 0.00

    2

    -0.228

    Filter ID Number

    (47-XXXX)

    47-4896847-51049

    00:00MAX

    0.00 0.000.0000.00 0.00

    0 0.000:00 0.0

    15/05/2018 10:48 - 11:34

    12:00 - 12:45

    Date Time CAL CEM (ACTUAL)

    mg/m³

    CAL CEM (STP, DRY,

    10% O₂) mg/m³

    000:00 0.00 0.00

    15/05/2018

    00:0016/05/2018

    8.38 13.49 15.27 1.78

    13:15 - 14:02 8.08 13.0515/05/2018 14:20 - 15:06

    12.11

    0.00

    15.46 2.42

    10:00 - 10:45 7.38 12.19

    0.0 0.0

    Sd 1.52

    0.000 000/01/1900 00:00

    09:35 - 10:20

    0.00

    16/05/2018

    00/01/1900

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00 0

    13.49

    4

    0 00/01/19000 00/01/1900 00:00

    0.000.00 0.00 0.00 0.00

    8.03 13.04

    17.36 4.44

    8.06

    SRM (STP, DRY,

    10% O₂) mg/m³

    ys, SRM - CAL CEM

    0

    Pair

    0

    712.71 0.52

    0.0 0.0

    96.6 101.7 101.715/05/2018

    15/05/2018 15:25 - 16:11 94.3 96.4 101.7

    Temp°C

    PressurekPa

    13:15 - 14:0215/05/2018 101.7 101.7

    4

    0.0

    13.04 13.19 0.15

    00:00 0.0

    0.753 15/05/2018 12:00 - 12:45 7.95 12.91

    47-5044309:00 - 09:46 12.33

    15/05/2018

    0.0 0.0 0.000:00

    0.0 0.010.40

    0.00 0.00 0.00 0.00 0.00 0.00

    0.000.00

    94.3

    00/01/1900

    09:00 - 09:46

    00:00 0.0 0.0

    16.08 15.51 15.18

    47-5121547-5096347-5044447-5121647-50449

    1

    0.00 0.00 0.00 0.00 0.00 0.00

    3

    7.56

    5

    8.28 13.40 14.15

    0.0 0.0

    15/05/2018 14:20 - 15:06

    0.00.00.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    Water Vapour% v/v

    Water Vapour% v/v

    16.09 15.52 16.98 9.68 10.19 10.2216.06 15.49 15.28 9.75 10.26 10.2615.89 15.33 16.14 9.72 10.23 10.0215.50 14.95 15.93 9.98 10.49 10.0615.51 14.96 14.80 10.10 10.61

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

    00/01/1900 00:00

    CAT-14181 (Version X)12 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Test of Variability Test of Calibration (Acceptance of Calibration Function)

    where N (number of samples) = 8

    The variability is accepted if Sd ≤1.5 x Q₀ x Kv The calibration is accepted if D < t0.95 (N-1) x Sd / SQRT (N) + Q₀

    PLOT 2: X-Y Plot - REF CAL CEM vs REF SRM Values

    Standard Deviation (Sd)

    4.59

    Section 4B - Data and Calculations - AST

    TOTAL PARTICULATE MATTER: AST CALCULATIONS

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Existing Range Still Valid

    1.321.5 x Q₀ x Kv 6.56

    Kv for 8 Pairs of Data

    t0.95 (N-1)

    a) Calibrated Range (10% extension) (mg/m³)

    1.52 Mean Difference (D)t0.95 (N-1) x Sd / SQRT (N) + Q₀

    Outcome of Variability Test Pass

    Q₀ = ELV x (MU / 100) / 1.96

    (Page 3 of 3)

    Outcome of Calibration Test

    0 to 14.8b) Calibrated Range (50% of Daily ELV) (mg/m³) 0 to 15

    New range up to a maximum of 50% of the Daily ELV 0 to 14.8

    1.895

    5.61Pass

    0.9521

    Parameter Value Parameter Value

    New Calibration Range (REF)

    25.0

    30.0

    35.0 DATE/S: 15/05/2018 to 16/05/2018

    COPY APPROPRIATE PLOT 2: X-Y PLOT OF REF CAL CEM vs REF SRM VALUES (choose the graph with or without the AST extension)

    -5.0

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0

    SRM

    mg/

    m³ (

    REF)

    CAL CEM mg/m³ (REF)

    TPMCalibration Range

    CAT-14181 (Version X)13 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Calibration Data

    15/05/2018 -1.66 -2.01

    0.00

    -0.83 0.43 0.27 7.8519 15/05/2018 -1.10 -1.38 1.52 1.22

    (Page 1 of 3)

    8.90

    11.58 13.78 0.95 9.08

    0.04

    6 15/05/2018 05:32 - 06:02 11.85

    8.26

    7.81

    4 15/05/2018 03:32 - 04:02 11.84 12.105

    13.26 -0.11 0.22 -0.02 0.01 8.19

    15/05/2018 08:32 - 09:02

    0.00 0.00 0.00 0.00 0.00

    15/05/2018

    0.37

    11.267.42

    8.64

    2 15/05/2018

    9.24

    Section 4B - Data and Calculations - AST

    8.123 15/05/2018 02:32 - 03:02 10.60 10.95

    6.37

    9.90 11.86 -0.52

    9.23

    18:32 - 19:02

    21:32 - 22:02

    0.00 0.00

    8.9615/05/2018 10:32 - 11:02 11.66

    VOLATILE ORGANIC COMPOUNDS: AST CALCULATIONS

    SRM (STP, DRY,

    10% O₂) mg/m³

    15 15/05/2018

    CAL CEM (STP, WET)

    mg/m³

    915/05/2018 09:32 - 10:02 11.52 12.15 15.14

    1.16 0.89 0.58 8.92

    10.88 13.13

    8.48

    1.72 2.56 2.22

    10.48 12.85

    11.48 11.89 14.14 0.76

    10.49 12.60

    0.78 0.33 0.18

    8.12

    (A) x (B)

    14

    5.17

    7.35

    11.96 14.13

    18 15/05/2018 17:32 - 18:02

    9.548

    0.36 0.08

    -0.03 -0.25

    1.45 1.29

    0.00

    A8 - Kiln Exhaust Main Stack (Standby Analyser)

    16 15/05/2018 15:32 - 16:02 10.95 11.08

    13:32 - 14:02

    13.29

    130.01 0.00

    1.43 1.15

    0 00/01/1900 00:00

    -1.85 2.62 2.01

    -0.19

    0.00 0.00

    17 15/05/2018

    0.00 0.00

    22:32 - 23:020.00

    -1.4219:32 - 20:02 9.69 9.32

    0.24

    10.66 -0.23 0.01

    14.83 1.12

    12.92 -0.19 0.10 -0.02 0.04

    10

    10.94 10.70

    -0.03

    8.88 10.77

    0.00

    15/05/201815/05/2018 20:32 - 21:02 9.30

    0.15

    0.65

    0.74

    11.33 10.85 13.35 0.61 0.13 0.08

    x - xav(A)

    y - yav(B)

    0 00/01/1900 00:00 0.00

    11

    Pair Date

    0.00 0.000.00 0.00

    0 00/01/1900 00:00 0.00

    16:32 - 17:02

    0.81

    20 15/05/2018

    23

    9.61 9.35

    10.53

    15/05/2018 0.911.49

    7.0922 8.44

    0.5406:32 - 07:02 12.20

    10.719.05

    1

    1.2711.14

    21

    8.33-0.05

    7 15/05/2018

    Time (30-minute Average)

    01:32 - 02:02 10.52 10.83

    0.00

    1.54

    12.00

    Lafarge Ireland Ltd, Cookstown Works

    0.43

    x, CEM (STP, WET)

    mg/m³

    y, SRM (STP, WET)

    mg/m³

    14.27 1.13 1.28

    11.23 -1.02

    0.00 0.00 0.000.00 0.00

    00:00 0.00

    9.61 -2.27 -2.92 6.64

    15/05/2018 04:32 - 05:02

    -1.40 1.44 1.05

    (x - xav)²

    07:32 - 08:02 11.45

    1.37

    0.00 0.00

    8.72

    0 00/01/1900

    12 15/05/2018 11:32 - 12:02

    0.00 0.00

    15/05/2018 12:32 - 13:02 10.77

    15/05/2018 00:32 - 01:02

    0.000.00

    13.29 0.23 -0.03 -0.01 0.05

    1.23

    14:32 - 15:02

    0.85

    10.20

    10.69

    8.24

    3.33 2.75 6.88

    8.800.06

    11.50 13.74

    0.89

    10.85 12.89 0.06 0.13 0.01

    12.44 14.76

    0.81

    8.48

    Outliers Data

    Reason for Data Pair Removal

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    CEK-2320 Exova Catalyst QAL2 Report (Standby Analyser)

    0.00 0.00 0.00 0.00 0.00

    Existing Calibration Range (@ REF Conditions)

    0.00

    8

    Existing Calibration Functiony = 0.8427x -0.7458

    Source of Existing Calibration Function

    0.00 0.00

    0 to 19.1 mg/m³

    SELECT or TYPE IN

    00/01/1900 00:00

    0 00/01/1900 00:00

    0.00 0.00 0.00

    INPUT 0.00 0.00

    0.00 0.003 INPUT INPUT

    0.00 0.00

    0

    Time (30-minute Average)

    x, CEM (WET) mg/m³

    00:00 0.00

    0.00

    INPUT INPUT 0.00 0.009 INPUT INPUT 0.00

    0.00

    5 INPUT INPUT 0.00 0.006 INPUT INPUT 0.00 0.007 INPUT

    3595% CI MU (%) 30

    0.000 00/01/1900

    y, SRM (WET) mg/m³

    0.00 0.00

    1 INPUT2 INPUT INPUT

    0.00 0.00

    Pair Date

    4 INPUT INPUT 0.00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    0.0010 INPUT INPUT 0.00 0.00

    0.00MAX SRM - MIN SRM 5.53 SUM 25.72 20.65(DAILY) DELV (mg/m³)

    0.00

    INPUT 0.00

    0.00 0.00

    CAT-14181 (Version X)14 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • PLOT 1a: GRAPH FOR STP SRM vs STP CEM (NON-STANDARDISED) (1 minute readings)

    PLOT 1: GRAPH FOR REFERENCE SRM vs REFERENCE CEM (STANDARDISED) (30 minute rolling averages)

    (Page 2 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    COPY PLOT 1: 30/60-MINUTE ROLLING AVERAGE TREND GRAPH INTO HERE

    COPY PLOT 1a: 1 MINUTE TREND GRAPH INTO HERE

    Section 4B - Data and Calculations - AST

    VOLATILE ORGANIC COMPOUNDS: AST CALCULATIONS

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    35.0

    00:0

    0

    01:0

    0

    02:0

    0

    03:0

    0

    04:0

    0

    05:0

    0

    06:0

    0

    07:0

    0

    08:0

    0

    09:0

    0

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    mg/

    m³ (

    STP)

    Time

    VOCs (CEM - 1 min)VOCs (SRM - 1 min)

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    35.0

    00:0

    0

    01:0

    0

    02:0

    0

    03:0

    0

    04:0

    0

    05:0

    0

    06:0

    0

    07:0

    0

    08:0

    0

    09:0

    0

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    mg/

    Time

    VOCs (CEM - 30 min)VOCs (SRM - 30 min)

    Variability Test Datawhere CAL = Calibrated using AST calibration functions

    MAX0.00 0.00 0.000 00/01/1900

    8.48

    0.61

    9.06 11.23 2.18

    00:00 0.00 0.00 0.00 0.00

    0 00/01/1900 00:00 0.00

    00:00 0.00

    14 13:32 - 14:02 8.26

    10.74 15.14 4.41

    15/05/2018 04:32 - 05:02

    08:32 - 09:02 8.92

    15/05/2018 9.54

    02:32 - 03:02 8.19

    1 15/05/2018 00:32 - 01:02 8.12

    19 15/05/2018 18:32 - 19:02 7.35

    1.9422 15/05/2018 21:32 - 22:02 6.37 8.00 9.61 1.61

    9.86

    SRM (STP, DRY,

    10% O₂) mg/m³

    ys, SRM - CAL CEM

    14:32 - 15:02

    13.78

    15.86 15.30 15.54 9.78

    19:32 - 20:02 7.42

    16.09 15.53 15.77 9.76 10.27 10.1216.05 15.49 15.75

    15/05/2018 01:32 - 02:02 8.12 9.90

    11.52 14.76

    10.29

    Date Time (30-minute Average)

    CAL CEM (STP, WET)

    mg/m³

    4 15/05/2018 03:32 - 04:02 9.235

    15/05/2018

    06:32 - 07:02

    7.85

    15/05/2018 8.48

    2.8110.20 13.29 3.09

    17:32 - 18:02

    2

    11:32 - 12:02 8.24

    9.48

    3.02

    10.1616.25 15.68

    16 15/05/2018

    9.97

    18 15/05/2018

    13.26 3.15

    Sd

    CAL CALCEM

    Water Vapour% v/v

    CEMWater Vapour% v/v

    10.11

    10.84

    Pair SRMWater Vapour% v/v

    CEMOxygen (DRY)% v/v

    CEMOxygen (DRY)% v/v

    SRMOxygen (DRY)% v/v

    16.21

    11.52

    17

    21 15/05/2018 20:32 - 21:02 7.09 8.83 10.77

    15:32 - 16:02

    10.00 12.60

    15/05/2018 16:32 - 17:02 13.35

    15.64 15.93 10.37

    8.646 15/05/2018 05:32 - 06:02 9.24

    9.97 12.85 2.87

    9 15/05/2018

    0 00/01/1900

    7

    2.31

    3.07

    20 15/05/2018

    13.74 3.25

    12 15/05/201811 15/05/2018 10:32 - 11:02 9.08 10.89

    8.80 10.54

    12:32 - 13:02 8.33

    15

    2.6013 15/05/2018

    3.258 15/05/2018 07:32 - 08:02 8.90 10.72 14.13 3.41

    23 15/05/2018

    10.27 13.29

    10.45 10.2116.36 15.79 16.02 9.77

    12.89

    10.28 10.31

    15.83 9.63 10.13 10.02

    16.02 15.46 15.72 9.69 10.19 9.9516.06 15.50 15.75 9.77 10.28 10.0215.96 15.39 15.64

    9.62 10.12

    9.65

    CAL CEM (STP, DRY,

    10% O₂) mg/m³

    11.25 14.83 3.58

    15.98 15.42 15.67 9.72 10.23 10.00

    9.96 13.13 3.1712.92 3.03

    2.93

    10.5011.20 14.27

    15.91 9.78

    2.89

    15.93 15.36 15.63 9.64 10.15

    10.0416.16 15.59 15.83 9.94

    10.4016.01 15.44 15.61 9.73 10.23 10.13

    22:32 - 23:02 6.88

    14.14 3.3110 15/05/2018 09:32 - 10:02 8.96

    15.90 15.34

    00/01/1900 00:00 0.00 0.00 0.00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.0000/01/1900 00:00

    3 15/05/2018

    0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00

    15.60 9.82 10.32 8.95 11.26

    10.0116.09 15.53 15.75 9.71 10.21 10.3416.06 15.50 15.74 9.75 10.25 10.49

    10.18 10.70 10.46

    0 0.00 0.00 0.00 0.000

    8.63 10.7115.77 15.22 15.37 10.14 10.65 10.420.00 0.00 0.00

    2.08

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00

    15.93 15.37 15.65 9.79 10.30 10.0810.29 10.05

    10.15 10.5416.17 15.60

    15.88 15.32 15.62 9.69 10.19

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    11.8610.17

    15.89 15.33 15.57 9.85 10.36 10.1915.84 15.28 15.53 10.06 10.57 10.2715.58 15.03 15.20

    10.13

    0.00 0.00 0.00

    2.38

    Time

    CAT-14181 (Version X)15 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Test of Variability Test of Calibration (Acceptance of Calibration Function)

    where N (number of samples) = 23

    The variability is accepted if Sd ≤1.5 x Q₀ x Kv The calibration is accepted if D < t0.95 (N-1) x Sd / SQRT (N) + Q₀

    PLOT 2: X-Y Plot - REF CAL CEM vs REF SRM Values

    0.611.5 x Q₀ x Kv 7.89

    1.711

    Existing Range Still Valid

    Outcome of Calibration Test

    Standard Deviation (Sd)

    PassOutcome of Variability Test

    Mean Difference (D)t0.95 (N-1) x Sd / SQRT (N) + Q₀

    Pass

    2.885.57

    0.9824

    Parameter

    Q₀ = ELV x (MU / 100) / 1.96 t0.95 (N-1)

    Parameter ValueValue

    5.36Kv for 23 Pairs of Data

    Section 4B - Data and Calculations - AST

    VOLATILE ORGANIC COMPOUNDS: AST CALCULATIONS(Page 3 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    a) Calibrated Range (10% extension) (mg/m³) 0 to 12.7b) Calibrated Range (50% of Daily ELV) (mg/m³) 0 to 17.5

    New range up to a maximum of 50% of the Daily ELV 0 to 12.7

    New Calibration Range (REF)

    25.0

    30.0

    35.0

    40.0 DATE/S: 15/05/2018 to 15/05/2018

    COPY APPROPRIATE PLOT 2: X-Y PLOT OF REF CAL CEM vs REF SRM VALUES (choose the graph with or without the AST extension)

    -10.0

    -5.0

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    -5.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0

    SRM

    mg/

    m³ (

    REF)

    CAL CEM mg/m³ (REF)

    VOCsCalibration Range

    CAT-14181 (Version X)16 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Calibration Data

    653.21 0.20 8.35 1.65 0.04 537.57

    597.87 583.53100.25

    685.46 37.39 32.10 573.3645.59

    A8 - Kiln Exhaust Main Stack (Standby Analyser)

    Pair (A) x (B) (x - xav)² CAL CEM (STP, WET)

    mg/m³

    00:32 - 01:02

    6 15/05/2018 3621.36

    10 15/05/2018

    549.6754 15/05/2018

    56.9515/05/2018 04:32 - 05:02 641.01 622.86 744.09 88.74 80.55 7147.68

    3 15/05/2018 02:32 - 03:02

    1 15/05/2018

    706.9001:32 - 02:02

    525.39 506.31

    163.08

    1091.18

    622.76

    632.69

    511.51

    7.85

    SRM (STP, DRY,

    10% O₂) mg/m³

    723.08

    -34.45 -31.6715/05/2018

    2078.53 581.251879.34

    701.17 608.74 513.64

    7537.55

    556.04

    x - xav(A)

    y - yav(B)

    1200.48 1398.34

    4042.94 598.567

    550.16 674.04 12.77

    2 15/05/2018

    Date Time (30-minute Average)

    15/05/2018 10:32 - 11:02 527.60

    694.29 10.63 16.66

    13 15/05/2018 12:32 - 13:0212

    453.84

    11:32 - 12:02 517.83 510.63 613.13

    589.67 574.41

    615.86 599.26 712.4605:32 - 06:02

    09:32 - 10:02 472.88 473.56 590.06 -79.40 -68.75 5458.41 6303.709 15/05/2018 08:32 - 09:02 521.87 501.74 596.74 -30.40 -40.56

    15 15/05/2018 14:32 - 15:02 562.91 558.96

    567.33

    628.01

    634.55 -14.69 -8.15 119.73 215.78 523.25

    15/05/2018 15:32 - 16:02 509.78 527.72 -42.49 -14.58

    23

    20:32 - 21:02 465.46 466.01

    0.00

    03:32 - 04:02 565.057874.01

    0.00 0.00

    63.58

    177.09 113.04 547.6116

    537.59 534.15

    00/01/1900

    611.17

    17 15/05/2018 16:32 - 17:02 555.16 540.65 664.88 2.88 -1.65 -4.76 8.30 540.15

    0.00 0.00

    512.83 628.39 -26.44 -29.48 779.50 699.18 511.94

    1233.24 924.38 508.13460.99

    11

    15/05/2018 07:32 - 08:02 571.67 550.73 650.53

    -86.82 -76.30 6624.17

    0.000

    540.68 -105.68 -102.04 10783.54 11167.79 435.700 00/01/1900 00:00 0.00 0.00

    0.00 0.000

    912.36 968.96

    22:32 - 23:02 446.60 440.26

    00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00

    22 15/05/2018 21:32 - 22:02 646.46

    18 15/05/2018 17:32 - 18:02 668.27 654.46 784.56 116.00 112.15 13009.66 13455.66 648.9919 15/05/2018 18:32 - 19:02 583.40 571.61 687.98 31.13 29.31

    0.00 0.0000:00 0.00 0.00 0.00

    15/05/20188426.69 8871.60

    20 15/05/2018 19:32 - 20:02 501.71 496.87 598.71 -50.56 -45.44 2297.41 2556.79 488.7321 15/05/2018

    0.00 0.00 0.000.00

    -35.99

    631.77 777.88 94.19 89.47

    513.89 611.40 -24.67 -28.42

    Section 4B - Data and Calculations - AST

    OXIDES OF NITROGEN (as NO₂): AST CALCULATIONS(Page 1 of 3)

    Lafarge Ireland Ltd, Cookstown Works

    8

    x, CEM (STP, WET)

    mg/m³

    y, SRM (STP, WET)

    mg/m³

    19.39 8.42 163.35 376.15

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00

    565.67

    -26.89 967.88

    41.22

    619.67 1805.52 496.49

    15/05/2018 06:32 - 07:02 552.47 550.66

    1186.79 504.23

    14 15/05/2018 13:32 - 14:02 525.83

    Outliers Data

    SELECT or TYPE IN

    Existing Calibration Function

    0.006

    0.00 0.00

    INPUT 0.00

    Existing Calibration Range (@ REF Conditions)0 to 976.8 mg/m³

    Reason for Data Pair Removal

    SELECT or TYPE INSELECT or TYPE IN

    INPUT

    00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00

    00/01/1900

    0

    0.004 INPUT INPUT

    20

    0.00 0.00 0.00 0.00 0.00 0.00

    5 INPUT INPUT 0.00

    x, CEM (WET) mg/m³

    SELECT or TYPE IN

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0

    Source of Existing Calibration Function

    INPUT 0.00 0.008 INPUT

    0.00 0.0000:00 0.00 0.00 0.00

    0.00 0.00 0.00MAX SRM - MIN SRM(DAILY) DELV (mg/m³) 80095% CI MU (%)

    0.00

    INPUT INPUT 0.00 0.00INPUT INPUT 0.00 0.00

    2 INPUT INPUT 0.00 0.003 INPUT INPUT 0.00

    243.88 SUM 67311.05 73079.91

    0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00

    0.007 INPUT

    9

    Pair Date Time (30-minute Average)

    0.00

    y, SRM (WET) mg/m³

    1 INPUT INPUT

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN10

    INPUT 0.00

    CEK-2320 Exova Catalyst QAL2 Report (Standby Analyser)y = 0.9622x + 5.9809

    0.00

    CAT-14181 (Version X)17 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • PLOT 1: GRAPH FOR REFERENCE SRM vs REFERENCE CEM (STANDARDISED) (30 minute rolling averages)

    Variability Test Datawhere CAL = Calibrated using AST calibration functions

    Section 4B - Data and Calculations - AST

    OXIDES OF NITROGEN (as NO₂): AST CALCULATIONS(Page 2 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    ys, SRM -

    COPY PLOT 1: 30/60-MINUTE ROLLING AVERAGE TREND GRAPH INTO HERE

    CAL CEM SRM CAL CAL

    CEM CEM SRM CEM CEM SRMPair Date Time CAL CEM

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    00:0

    0

    01:0

    0

    02:0

    0

    03:0

    0

    04:0

    0

    05:0

    0

    06:0

    0

    07:0

    0

    08:0

    0

    09:0

    0

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    mg/

    Time

    NOx (CEM - 30 min)NOx (SRM - 30 min)

    0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00

    690.49

    0.00 0.00 0.00

    15.22 15.37 10.14 10.420.00 0.00 0.00 0.00 0.00 0.000.00 0.000.00

    -2.51

    023

    0.00

    10.28

    549.67 669.82 674.04 4.22

    617.08 596.74

    15/05/2018 04:32 - 05:02 622.76

    00/01/1900 00:00

    725.98 712.46 -13.527 15/05/2018 06:32 - 07:02

    0.00

    0.00 0.00 0.00

    14

    03:32 - 04:02

    15/05/2018

    669.32 650.53

    15.03 15.20 10.18 10.70 10.4615.84

    698.45

    05:32 - 06:02756.23 744.09 -12.13

    2 15/05/2018 01:32 - 02:02 573.36

    15.39 15.64 9.65 10.15 10.5416.17 15.60 15.83

    15.59 15.83

    10.0215.96

    717.87 706.90

    8 15/05/2018 07:32 - 08:02

    ys, SRM - CAL CEM

    -20.34

    0 00/01/1900 00:00 0.00 0.00 0.00 0.000

    20

    16

    0.000

    10.65

    15.53 10.06

    9.78 10.29 10.0515.98

    9

    5

    35.85

    1 15/05/2018 00:32 - 01:02 511.51 627.28 611.17

    15/05/2018

    19 15/05/2018 18:32 - 19:02 567.33

    15/05/2018 10:32 - 11:02 513.64 615.86 611.40 -4.46

    6 15/05/2018

    9.63 10.13 10.02

    13 15/05/2018 12:32 - 13:02 523.25

    -10.97

    -18.79

    15.86 15.30 15.54

    685.46 -12.993 9.94 10.45 10.21

    556.04

    16.36 15.79 16.02 9.77 10.28 10.3115.93

    10.12626.22 634.55

    415.37 15.65 9.79 10.30 10.08

    15.42

    784.00 784.56 0.56

    649.10 653.21 4.10

    511.9415.49 15.75

    00/01/1900 00:00

    15/05/2018 13:32 - 14:02

    9.95

    16.09 15.53 15.77

    15.46

    546.40 540.68 -5.7222:32 - 23:02 435.700.00

    0.00

    0.00 0.00 0.000 00/01/1900 00:00

    08:32 - 09:02 508.13552.47 590.06 37.60

    11

    15.67 9.72 10.23 10.0016.02

    537.57

    15/05/2018

    12 15/05/2018 11:32 - 12:02 504.23

    15/05/2018 02:32 - 03:02 581.25

    10 15/05/2018

    CAL CEM (STP, DRY,

    10% O₂) mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    612.03 613.13 1.10

    16.21 15.64 15.93 9.86 10.37 10.1616.25 15.68 15.91 9.78 10.29 10.0416.16

    15.72 9.69 10.1916.06 15.50 15.75 9.77

    09:32 - 10:02 460.99

    598.56

    540.15 647.00 664.88 17.8818 15/05/2018 17:32 - 18:02 648.99

    CEMWater Vapour% v/v

    CEMWater Vapour% v/v

    SRMWater Vapour% v/v

    CEMOxygen (DRY)% v/v

    CEMOxygen (DRY)% v/v

    SRMOxygen (DRY)% v/v

    10.15 10.4016.01 15.44 15.61 9.73 10.23 10.13

    -16.11

    Pair Date Time (30-minute Average)

    CAL CEM (STP, WET)

    mg/m³

    16.05 9.62 10.12

    15 15/05/2018 14:32 - 15:02 547.61 663.22 694.29 31.07

    9.76 10.2710.01

    16.098.32

    16.52

    15.90 15.34 15.60 9.82 10.32 10.17

    15.28

    617.91 628.39

    15:32 - 16:02 496.49 596.84

    19:32 - 20:02 488.73 596.55 598.71 2.1521 15/05/2018 20:32 - 21:02 453.84 565.17 565.67 0.5022 15/05/2018 21:32 - 22:02 628.01 789.14 777.88 -11.26

    17 15/05/2018 16:32 - 17:02

    15/05/2018

    687.9815.89 15.33 15.57 9.85 10.36 10.19

    0.00 0.00

    10.57 10.2715.58

    00/01/1900 00:00 0.00

    0.00 0.00 0.00 0.00

    0.0015.77

    15.53 15.75 9.71 10.21 10.3416.06 15.50 15.74 9.75 10.25 10.4915.88 15.32 15.62 9.69 10.19 10.1315.93 15.36 15.63 9.64

    15/05/2018

    0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.000 00/01/1900 00:00

    0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00

    0.00 0.000.00 0.00

    0.00 0.00 0.00 0.00 0.00MAX 789.14 Sd

    632.69

    10.48

    CAT-14181 (Version X)18 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Test of Variability Test of Calibration (Acceptance of Calibration Function)

    where N (number of samples) = 23

    The variability is accepted if Sd ≤1.5 x Q₀ x Kv The calibration is accepted if D < t0.95 (N-1) x Sd / SQRT (N) + Q₀

    PLOT 2: X-Y Plot - REF CAL CEM vs REF SRM Values

    Kv for 23 Pairs of Data1.711

    0.9824

    Parameter Value Parameter Value

    Section 4B - Data and Calculations - AST

    OXIDES OF NITROGEN (as NO₂): AST CALCULATIONS(Page 3 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Standard Deviation (Sd) 16.52 Mean Difference (D) 1.091.5 x Q₀ x Kv 120.29 t0.95 (N-1) x Sd / SQRT (N) + Q₀ 87.53Outcome of Variability Test Pass Outcome of Calibration Test Pass

    Existing Range Still Valid

    Q₀ = ELV x (MU / 100) / 1.96 81.63

    a) Calibrated Range (10% extension) (mg/m³) 0 to 868b) Calibrated Range (50% of Daily ELV) (mg/m³) 0 to 400

    New range up to a maximum of 50% of the Daily ELV 0 to 400

    New Calibration Range (REF)

    t0.95 (N-1)

    1000

    1200 DATE/S: 15/05/2018 to 15/05/2018

    COPY APPROPRIATE PLOT 2: X-Y PLOT OF REF CAL CEM vs REF SRM VALUES (choose the graph with or without the AST extension)

    -200

    0

    200

    400

    600

    800

    0 200 400 600 800 1000 1200

    SRM

    mg/

    m³ (

    REF)

    CAL CEM mg/m³ (REF)

    NOxCalibration Range

    CAT-14181 (Version X)19 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Calibration Data

    0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00

    17 15/05/2018 16:32 - 17:02 350.70 354.13 435.50 58.42 62.06 3625.54 3413.40 366.8918 15/05/2018 17:32 - 18:02 290.07 289.06 346.53 -2.20 -3.01 6.62 4.84 307.0219 15/05/2018 18:32 - 19:02 229.08 220.91 265.88 -63.19 -71.16 4496.59 3992.76 246.79

    189.71 181.96 220.88 -102.57 -110.11 11293.35 10519.84 207.90

    23 15/05/2018 22:32 - 23:02 187.25 177.87 218.44 -105.02 -114.20 11993.55 11029.64 205.470 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00

    14 15/05/2018 13:32 - 14:02 289.21 289.63 354.90 -3.07 -2.44 7.47 9.41 306.1615 15/05/2018 14:32 - 15:02 308.49 310.26 385.37 16.22 18.19 295.02 263.16 325.2116 15/05/2018 15:32 - 16:02 327.20 330.17 395.84 34.93 38.10 1330.72 1219.85 343.68

    11 15/05/2018 10:32 - 11:02 326.37 324.61 386.20 34.10 32.54 1109.42 1162.66 342.8612 15/05/2018 11:32 - 12:02 300.91 303.51 364.44 8.64 11.44 98.84 74.66 317.7213 15/05/2018 12:32 - 13:02 305.43 308.42 366.39 13.16 16.35 215.14 173.11 322.18

    8 15/05/2018 07:32 - 08:02 333.53 335.15 395.89 41.26 43.08 1777.75 1702.60 349.949 15/05/2018 08:32 - 09:02 328.72 329.83 392.28 36.45 37.76 1376.16 1328.43 345.19

    10 15/05/2018 09:32 - 10:02 335.86 337.01 419.92 43.59 44.94 1958.77 1899.84 352.24

    326.85 400.44 35.07 34.77 1219.46 1229.71 343.825 15/05/2018 04:32 - 05:02 323.81 331.49 396.01 31.53 39.42 1242.93 994.37 340.336 15/05/2018 05:32 - 06:02 311.17 317.29 377.23 18.89 25.22 476.57 356.96 327.857 15/05/2018 06:32 - 07:02 332.46 334.33 396.59 40.18 42.26 1698.04 1614.75 348.88

    (A) x (B) (x - xav)² CAL CEM (STP, WET)

    mg/m³

    1 15/05/2018 00:32 - 01:02 307.81 306.99 370.57 15.54 14.92 231.91 241.55 324.54

    y, SRM (STP, WET)

    mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    x - xav(A)

    y - yav(B)

    550.89 409.12 329.173 15/05/2018 02:32 - 03:02 323.97 325.47 394.29 31.70 33.40 1058.77 1004.61 340.494 15/05/2018 03:32 - 04:02 327.34

    Section 4B - Data and Calculations - AST

    SULPHUR DIOXIDE: AST CALCULATIONS(Page 1 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Pair Date Time (30-minute Average)

    x, CEM (STP, WET)

    mg/m³

    20 15/05/2018 19:32 - 20:02 205.71 197.46 237.93 -86.56 -94.61 8190.06 7493.36 223.7021 15/05/2018 20:32 - 21:0222 15/05/2018 21:32 - 22:02 174.97 165.91 204.29 -117.30 -126.16 14798.07 13759.25 193.34

    2 15/05/2018 01:32 - 02:02 312.50 319.31 381.04 20.23 27.24

    Outliers Data

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    Reason for Data Pair Removal

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.003 INPUT

    SUM 69051.65 63897.87(DAILY) DELV (mg/m³) 60095% CI MU (%) 20

    2 INPUT INPUT

    4 INPUT INPUT 0.00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pair Date Time (30-minute Average)

    x, CEM (WET) mg/m³

    y, SRM (WET) mg/m³

    1 INPUT INPUT 0.00

    INPUT 0.00 0.00

    INPUT INPUT 0.00 0.009

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    MAX SRM - MIN SRM 231.21

    0.00

    0 00/01/1900 00:00

    Existing Calibration Range (@ REF Conditions)0 to 677.5 mg/m³

    5 INPUT INPUT 0.00 0.006 INPUT INPUT 0.00 0.007 INPUT INPUT 0.00 0.008

    INPUT INPUT 0.00 0.0010 INPUT INPUT 0.00 0.00

    Existing Calibration Function Source of Existing Calibration Functiony = 0.9876x + 20.5419 CEK-2320 Exova Catalyst QAL2 Report (Standby Analyser)

    SELECT or TYPE IN

    CAT-14181 (Version X)20 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • PLOT 1: GRAPH FOR REFERENCE SRM vs REFERENCE CEM (STANDARDISED) (30 minute rolling averages)

    Variability Test Datawhere CAL = Calibrated using AST calibration functions

    COPY PLOT 1: 30/60-MINUTE ROLLING AVERAGE TREND GRAPH INTO HERE

    Pair Date Time CAL CEM CAL CEM SRM CAL

    ys, SRM - CAL

    CEM CEM SRM CEM CEM SRM

    Section 4B - Data and Calculations - AST

    SULPHUR DIOXIDE: AST CALCULATIONS(Page 2 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    00:0

    0

    01:0

    0

    02:0

    0

    03:0

    0

    04:0

    0

    05:0

    0

    06:0

    0

    07:0

    0

    08:0

    0

    09:0

    0

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    mg/

    Time

    SO₂ (CEM - 30 min)SO₂ (SRM - 30 min)

    0.00 0.00

    207.90 258.89 220.88 -38.0222 15/05/2018 21:32 - 22:02 193.34

    257.67 218.44 -39.240 00/01/1900 00:00 0.00

    20 15/05/2018 19:32 - 20:02 223.70 273.05 237.93 -35.1221 15/05/2018 20:32 - 21:02

    00/01/1900 00:00 0.00

    15.89 15.33

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00

    10.70 10.4615.77 15.22 15.37 10.14 10.65 10.42

    0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00

    0 00/01/1900 00:00 0.00

    17 15/05/2018 16:32 - 17:02 366.89 439.47 435.50 -3.9718 15/05/2018 17:32 - 18:02 307.02

    15.58 15.03 15.20 10.18

    00/01/1900 00:00 0.00 0.00 0.00 0.00

    23 15/05/2018 22:32 - 23:02 205.47

    0 00/01/1900

    370.88 346.53 -24.3619 15/05/2018 18:32 - 19:02 246.79 300.36 265.88 -34.48

    15.93 15.36 15.63 9.64 10.15 10.4016.01 15.44 15.61 9.73 10.23 10.1315.90 15.34 15.60 9.82 10.32 10.17

    0 00/01/1900

    12 15/05/2018 11:32 - 12:02 317.72 385.65 364.44 -21.2113 15/05/2018 12:32 - 13:02 322.18 385.59 366.39 -19.20

    16.09 15.53 15.77 9.76 10.27 10.1216.05 15.49 15.75 9.62 10.12 10.01

    -17.30

    16.09 15.53 15.75 9.71 10.21 10.3416.06 15.50 15.74 9.75 10.25 10.4915.88 15.32 15.62 9.69 10.19 10.13

    09:32 - 10:02 352.24 422.14 419.92 -2.2111 15/05/2018 10:32 - 11:02 342.86 411.10 386.20 -24.89

    16.02 9.77 10.28 10.3115.93 15.37 15.65 9.79 10.30 10.0815.86 15.30 15.54 9.78 10.29 10.05

    2 15/05/2018 01:32 - 02:02 329.17 400.98 381.04 -19.94

    Pair Date Time (30-minute Average)

    CAL CEM (STP, WET)

    mg/m³

    CAL CEM (STP, DRY,

    10% O₂) mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    ys, SRM - CAL CEM

    398.00 370.57 -27.42

    15.98 15.42 15.67 9.72 10.23 10.00

    413.27 396.01 -17.266 15/05/2018 05:32 - 06:02 327.85 397.64 377.23 -20.41

    CEMWater Vapour% v/v

    CEMWater Vapour% v/v

    SRMWater Vapour% v/v

    CEMOxygen (DRY)% v/v

    CEMOxygen (DRY)% v/v

    SRMOxygen (DRY)% v/v

    16.21 15.64 15.93 9.86 10.37 10.1616.25 15.68 15.91 9.78 10.29 10.0416.16 15.59 15.83 9.94 10.45 10.2116.36 15.79

    1 15/05/2018 00:32 - 01:02 324.54

    3 15/05/2018 02:32 - 03:02 340.49 420.53 394.29 -26.244 15/05/2018 03:32 - 04:02 343.82 418.98 400.44 -18.535 15/05/2018 04:32 - 05:02 340.33

    242.95 204.29 -38.67

    8 15/05/2018 07:32 - 08:02 349.94

    15/05/2018

    14 15/05/2018 13:32 - 14:02 306.16 369.54 354.90 -14.6315 15/05/2018 14:32 - 15:02 325.21 393.87 385.37 -8.5016 15/05/2018 15:32 - 16:02 343.68 413.14 395.84

    421.23 395.89 -25.349 15/05/2018 08:32 - 09:02 345.19 419.20 392.28 -26.93

    10

    7 15/05/2018 06:32 - 07:02 348.88 421.26 396.59 -24.67

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00

    0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    00:00 0.00 0.00 0.00 0.000

    0.000.00 0.00 0.00

    000:00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00MAX 439.47 Sd 10.15

    16.02 15.46 15.72 9.69 10.19 9.9516.06 15.50 15.75 9.77 10.28 10.0215.96 15.39 15.64 9.65 10.15 10.5416.17 15.60 15.83 9.63 10.13 10.02

    15.57 9.85 10.36 10.1915.84 15.28 15.53 10.06 10.57 10.27

    CAT-14181 (Version X)21 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Test of Variability Test of Calibration (Acceptance of Calibration Function)

    where N (number of samples) = 23

    The variability is accepted if Sd ≤1.5 x Q₀ x Kv The calibration is accepted if D < t0.95 (N-1) x Sd / SQRT (N) + Q₀

    PLOT 2: X-Y Plot - REF CAL CEM vs REF SRM Values

    Section 4B - Data and Calculations - AST

    SULPHUR DIOXIDE: AST CALCULATIONS(Page 3 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Outcome of Variability Test Pass Outcome of Calibration Test Pass

    Existing Range Still Valid

    Value Parameter ValueStandard Deviation (Sd) 10.15 Mean Difference (D) 22.981.5 x Q₀ x Kv 90.22 t0.95 (N-1) x Sd / SQRT (N) + Q₀ 64.85

    Q₀ = ELV x (MU / 100) / 1.96 61.22 t0.95 (N-1) 1.711Kv for 23 Pairs of Data 0.9824

    Parameter

    a) Calibrated Range (10% extension) (mg/m³) 0 to 483.4b) Calibrated Range (50% of Daily ELV) (mg/m³) 0 to 300

    New range up to a maximum of 50% of the Daily ELV 0 to 300

    New Calibration Range (REF)

    700

    800 DATE/S: 15/05/2018 to 15/05/2018

    COPY APPROPRIATE PLOT 2: X-Y PLOT OF REF CAL CEM vs REF SRM VALUES (choose the graph with or without the AST extension)

    -100

    0

    100

    200

    300

    400

    500

    600

    0 100 200 300 400 500 600 700 800

    SRM

    mg/

    m³ (

    REF)

    CAL CEM mg/m³ (REF)

    SO₂Calibration Range

    CAT-14181 (Version X)22 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Calibration Data

    21 15/05/2018 20:32 - 21:02 284.76 280.59 340.60 -54.90 -46.25 2539.32 3014.43 299.4422 15/05/2018 21:32 - 22:02 280.92 274.96 338.55 -58.74 -51.88 3047.87

    359.0215 15/05/2018 14:32 - 15:02 347.08 333.22 413.90 7.42 6.38 47.35 55.09

    0.00 0.00 0.00

    0 00/01/1900 00:00

    305.4300:00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    23 15/05/2018 22:32 - 23:02 2144.90 2428.273450.89 295.35

    0.00 0.00

    15/05/2018 13:32 - 14:02 340.76 328.32 402.31 1.10 1.47 1.61 1.20365.75

    16 15/05/2018 15:32 - 16:02 354.32 339.65 407.21 14.66 12.81 187.75 214.94 373.46

    286.04 344.67 -46.23 -40.80 1886.56 2137.67 308.66

    18 15/05/2018 17:32 - 18:02 316.58 305.34 366.04 -23.08 -21.50 496.25 532.73 333.3019 15/05/2018 18:32 - 19:02 301.14 292.09 351.55 -38.52 -34.7520 15/05/2018 19:32 - 20:02 293.42

    316.88

    17 15/05/2018 16:32 - 17:02 353.77 372.88

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.000

    0.00 0.00

    15/05/2018 10:32 - 11:02 352.98 338.40 402.61 13.32 11.55 153.85 177.33 372.0312 15/05/2018 11:32 - 12:02 339.61 326.19 391.67 -0.05 -0.65 0.03 0.00 357.8013 15/05/2018 12:32 - 13:02 346.01 331.98 394.38 6.35 5.14 32.64 40.33 364.61

    0.00 0.000.00 0.00 0.00 0.00

    0 00/01/1900

    0 00/01/1900 00:00

    14.71 18.44 362.4311

    Pair Date Time (30-minute Average)

    x, CEM (STP, WET)

    mg/m³

    y, SRM (STP, WET)

    mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    x - xav(A)

    y - yav(B)

    (A) x (B) (x - xav)² CAL CEM (STP, WET)

    mg/m³

    360.75 346.75 420.06 21.09 19.91 419.77 444.68 380.29

    1 15/05/2018 00:32 - 01:02 366.94 348.94 421.21 27.28 22.10 602.96 744.41 386.892 15/05/2018 01:32 - 02:02 363.00 346.00 412.89 23.34 19.15 447.03 544.76 382.69

    Section 4B - Data and Calculations - AST

    CARBON MONOXIDE: AST CALCULATIONS

    15/05/2018 06:32 - 07:02 355.50 339.76 403.03 15.84 12.91 204.50

    367.64 349.81 417.90 27.98 22.97 642.59 782.86 387.63

    250.80 374.718 15/05/2018 07:32 - 08:02 356.32 341.08 402.89 16.66 14.24 237.16 277.51 375.589 15/05/2018 08:32 - 09:02 351.75 338.15 402.18 12.09 11.31 136.70 146.11 370.72

    10

    14

    15/05/2018 09:32 - 10:02 343.95 330.27 411.53 4.29 3.43

    338.92 416.79 14.11 12.07 170.41 199.23

    00/01/1900 0.00 0.00

    1338.48 1483.56

    4 15/05/2018 03:32 - 04:02 383.01 372.30 456.13 43.35 45.46 1970.67 1879.49 403.995 15/05/2018 04:32 - 05:026 15/05/2018 05:32 - 06:02 361.59 345.32 410.55 21.93 405.15 480.83 381.19

    3 15/05/2018 02:32 - 03:02

    (Page 1 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    718.48

    00:00 0.00 0.00

    290.38 283.32 347.94 -49.28 -43.53

    Outliers Data

    0.00 0.00 0.00 0.00

    Pair Date Time (30-minute Average)

    x, CEM (WET) mg/m³

    y, SRM (WET) mg/m³

    1 INPUT INPUT 0.00 0.00

    0.00 0.00

    INPUT INPUT 0.00 0.00

    19305.57

    Reason for Data Pair Removal

    SELECT or TYPE INSELECT or TYPE IN

    (DAILY) DELV (mg/m³)

    0.00 0.000.00 0.00

    10 INPUT INPUT 0.00 0.00

    60095% CI MU (%) 20

    2 INPUT INPUT 0.00 0.00

    Existing Calibration Function Source of Existing Calibration Functiony = 1.064x -3.5405 CEK-2320 Exova Catalyst QAL2 Report (Standby Analyser)

    7 INPUT INPUT6 INPUT INPUT 0.00 0.00

    0.00

    0 00/01/1900 0.00 0.00 0.000 00/01/1900 00:000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.008 INPUT INPUT 0.00 0.00

    SELECT or TYPE ININPUT INPUT 0.00 0.009

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    3

    00:00

    MAX SRM - MIN SRM 117.59 SUM 17128.26

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.000 00/01/1900 00:00

    Existing Calibration Range (@ REF Conditions)

    0.00 0.00 0.00

    0 to 544.5 mg/m³

    4 INPUT INPUT 0.00 0.005 INPUT INPUT 0.00

    CAT-14181 (Version X)23 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • PLOT 1a: GRAPH FOR STP SRM vs STP CEM (NON-STANDARDISED) (1 minute readings)

    PLOT 1: GRAPH FOR REFERENCE SRM vs REFERENCE CEM (STANDARDISED) (30 minute rolling averages)

    COPY PLOT 1a: 1 MINUTE TREND GRAPH INTO HERE

    COPY PLOT 1: 30/60-MINUTE ROLLING AVERAGE TREND GRAPH INTO HERE

    Section 4B - Data and Calculations - AST

    CARBON MONOXIDE: AST CALCULATIONS(Page 2 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    0

    100

    200

    300

    400

    500

    600

    00:0

    0

    01:0

    0

    02:0

    0

    03:0

    0

    04:0

    0

    05:0

    0

    06:0

    0

    07:0

    0

    08:0

    0

    09:0

    0

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    mg/

    m³ (

    STP)

    Time

    CO (CEM - 30 min)CO (SRM - 30 min)

    0

    100

    200

    300

    400

    500

    00:0

    0

    01:0

    0

    02:0

    0

    03:0

    0

    04:0

    0

    05:0

    0

    06:0

    0

    07:0

    0

    08:0

    0

    09:0

    0

    10:0

    0

    11:0

    0

    12:0

    0

    13:0

    0

    14:0

    0

    15:0

    0

    16:0

    0

    17:0

    0

    18:0

    0

    19:0

    0

    20:0

    0

    21:0

    0

    22:0

    0

    23:0

    0

    mg/

    Time

    CO (CEM - 30 min)CO (SRM - 30 min)

    Variability Test Datawhere CAL = Calibrated using AST calibration functions

    0.00 0.00 0.00

    15.44 15.61 9.73 10.23 10.1315.90 15.34 15.60 9.82 10.32 10.1715.89 15.33 15.57 9.85 10.36 10.19 -32.10

    00:00

    Sd 9.210 00/01/1900 00:00 0.00 0.00 0.00 0.00

    20 15/05/2018 19:32 - 20:02 308.66 376.76

    -32.5823 15/05/2018 22:32 - 23:02 305.43 383.03

    17 15/05/2018 16:32 - 17:02

    21 15/05/2018 20:32 - 21:02 299.44 372.89 340.60 -32.29

    0 00/01/1900 00:00 0.000

    00:00

    16.06 15.50 15.74 9.75 10.25 10.4915.88 15.32 15.62 9.69 10.19 10.1315.93 15.36 15.63 9.64 10.15 10.4016.01 402.63 366.04 -36.59

    19 15/05/2018

    0.00 0.00

    0.000 00/01/1900 00:00 0.00 0.00 0.00

    15.77

    0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00

    22 15/05/2018 21:32 - 22:02 295.35 371.13 338.55

    15/05/2018 05:32 - 06:02

    18:32 - 19:02 316.88 385.66 351.55 -34.11

    362.43 434.35 411.53 -22.8211 15/05/2018 10:32 - 11:02 372.03 446.06 402.61 -43.4512 15/05/2018 11:32 - 12:02 357.80 434.30 391.67 -42.6313 15/05/2018 12:32 - 13:02 364.61

    -36.16

    15.91 9.78 10.29 10.04

    15/05/2018 15:32 - 16:02 373.46 448.93 407.21 -41.72

    436.37 394.38 -41.99

    10 15/05/2018 09:32 - 10:02

    9.77 10.28 10.3115.93 15.37

    -29.8518 15/05/2018 17:32 - 18:02 333.30

    14

    9.69

    -29.0716

    374.71 452.45 403.03 -49.42

    16.16 15.5915.79 16.02

    15.83 9.94 10.45 10.2116.36

    SRMWater Vapour% v/v

    CEMOxygen (DRY)% v/v

    CEMOxygen (DRY)% v/v

    SRMOxygen (DRY)% v/v

    2 15/05/2018380.29 469.68 420.06 -49.62

    4 15/05/2018 03:32 - 04:02

    01:32 - 02:02 382.69 466.18 412.89 -53.2910.16

    16.25 15.68

    Pair Date Time (30-minute Average)

    CAL CEM (STP, WET)

    mg/m³

    CAL CEM (STP, DRY,

    10% O₂) mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    ys, SRM - CAL CEM

    CAL CALCEM

    Water Vapour% v/v

    CEMWater Vapour% v/v

    15.65 9.79 10.30 10.08

    8

    15/05/2018

    15/05/2018 07:32 - 08:02 375.58 452.10 402.89 -49.209 15/05/2018 08:32 - 09:02 370.72 450.21 402.18 -48.03

    1 15/05/2018 00:32 - 01:02 386.89 474.46 421.21 -53.24

    13:32 - 14:02 359.02 433.34 402.31 -31.04

    10.19 9.9516.06 15.50 15.75 9.77 10.28 10.0215.96 15.39 15.64 9.65 10.15 10.5416.17 15.60 15.83 9.63 10.13 10.0216.09 15.53 15.77 9.76 10.27 10.12

    403.99 492.29 456.13470.70 417.90 -52.80

    6

    10.37

    3 15/05/2018 02:32 - 03:02

    347.94 -35.090 00/01/1900 00:00 0.00

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    0.00

    00/01/1900

    15.22 15.37 10.14 10.65 10.420.00

    0.00

    0 00/01/1900

    381.19 462.33 410.55 -51.787 15/05/2018 06:32 - 07:02

    0.00 0.00 0.00

    344.67

    442.97 413.90

    15.86 15.30 15.54 9.78 10.29 10.0515.98 15.42 15.67 9.72 10.23 10.0016.02 15.46 15.72

    5 15/05/2018 04:32 - 05:02 387.63

    16.21 15.64 15.93 9.86

    16.05 15.49 15.75 9.62 10.12 10.0116.09 15.53 15.75 9.71 10.21 10.34

    15.84 15.28 15.53 10.06 10.57 10.2715.58 15.03 15.20 10.18 10.70 10.46

    0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.000.00 0.00

    0.00 0.00 0.00

    0.00 0.00

    0.00

    15 15/05/2018 14:32 - 15:02 365.75

    372.88 446.64 416.79

    0.000.000.00 0.00 0.00 0.00 0.00 0.00

    MAX 492.29

    Time

    CAT-14181 (Version X)24 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Test of Variability Test of Calibration (Acceptance of Calibration Function)

    where N (number of samples) = 23

    The variability is accepted if Sd ≤1.5 x Q₀ x Kv The calibration is accepted if D < t0.95 (N-1) x Sd / SQRT (N) + Q₀

    PLOT 2: X-Y Plot - REF CAL CEM vs REF SRM Values

    0 to 300

    New Calibration Range (REF)

    Parameter Value Parameter Value

    a) Calibrated Range (10% extension) (mg/m³)

    Pass Outcome of Calibration Test

    0 to 541.5b) Calibrated Range (50% of Daily ELV) (mg/m³) 0 to 300

    New range up to a maximum of 50% of the Daily ELV

    CARBON MONOXIDE: AST CALCULATIONS(Page 3 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Q₀ = ELV x (MU / 100) / 1.96 61.22 1.711Kv for 23 Pairs of Data 0.9824

    Standard Deviation (Sd) 9.21 Mean Difference (D) 40.391.5 x Q₀ x Kv 90.22 t0.95 (N-1) x Sd / SQRT (N) + Q₀ 64.51Outcome of Variability Test Pass

    Existing Range Still Valid

    t0.95 (N-1)

    Section 4B - Data and Calculations - AST

    600

    700

    800 DATE/S: 15/05/2018 to 15/05/2018

    COPY APPROPRIATE PLOT 2: X-Y PLOT OF REF CAL CEM vs REF SRM VALUES (choose the graph with or without the AST extension)

    -100

    0

    100

    200

    300

    400

    500

    600

    -100 0 100 200 300 400 500 600 700

    SRM

    mg/

    m³ (

    REF)

    CAL CEM mg/m³ (REF)

    COCalibration Range

    CAT-14181 (Version X)25 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Calibration Data

    0.00

    (x - xav)² CAL CEM (STP, WET)

    mg/m³

    8.54

    00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.000.00

    0.00 0.00

    0

    00/01/1900 00:00 0.00 0.00

    0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    0.00

    0 00/01/1900

    0.00

    00/01/1900 00:00 0.00 0.00 0.00

    0 00/01/1900 00:00 0.00 0.00

    00:00 0.00 0.00 0.00 0.00

    0.000.00 0.00

    0 00/01/1900 00:00 0.00 0.00

    0.000.00

    0.00 0.00 0.000.00

    0 00/01/1900 00:00

    0.00

    0

    5 15/05/2018 04:32 - 05:02

    0.53 8.28

    0.70 6.72

    0.000 00/01/1900 00:00

    1 15/05/2018 00:32 - 01:02 8.07 6.13 7.40 0.02 -0.70 -0.02

    0.00 0.00 0.00

    0.00

    0.00

    0.00 0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00

    0.000

    0 00/01/1900

    0.99

    -0.29

    0.98

    0.00

    00/01/1900 00:00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.000.00

    2 15/05/2018

    0.00

    0 00/01/1900 00:00 0.00 0.00 0.00

    0.34 6.9802:32 - 03:02 8.77 7.37 8.93 0.73 0.54 0.39

    0.00 0.00 0.00

    0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    03:32 - 04:02 7.46 7.33

    8.19 -0.84 0.06 -0.05

    0.00 0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 00/01/1900 00:00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00

    0.00

    y - yav(B)

    (A) x (B)

    4 15/05/2018

    0.00 0.00 0.000

    15/05/2018 05:32 - 06:02 7.20 6.89

    8.98

    Section 4B - Data and Calculations - AST

    HYDROGEN CHLORIDE: AST CALCULATIONS(Page 1 of 3)

    Lafarge Ireland Ltd, Cookstown Works

    3 15/05/2018

    A8 - Kiln Exhaust Main Stack (Standby Analyser)

    Pair Date Time (30-minute Average)

    x, CEM (STP, WET)

    mg/m³

    y, SRM (STP, WET)

    mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    x - xav(A)

    -0.58 0.49

    01:32 - 02:02 9.04 5.96 7.117.58

    7.72 7.32 8.74 -0.32 0.48 -0.16 0.10 7.236

    0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.000 00/01/1900 00:00 0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00

    0.00 0.00 0.00 0.00

    -0.87 -0.87

    0.00

    0 00/01/1900 00:00

    Outliers Data

    0.0000:00 0.00 0.00 0.00

    Existing Calibration Range (@ REF Conditions)0 to 12.1 mg/m³

    0.00 0.00 0.00 0.00 0.00

    40

    Pair Date

    2

    0.00

    INPUT

    INPUT 0.00

    INPUT

    0.00 0.00 0.00 0.00

    INPUT

    0.00

    INPUT

    INPUT

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    Existing Calibration Function Source of Existing Calibration Functiony = 0.991x -0.4158 CEK-2320 Exova Catalyst QAL2 Report (Standby Analyser)

    0.00 0.00

    0.00 0.003 INPUT INPUT 0.00

    8 INPUT INPUT 0.00 0.009 0.00 0.00

    10 INPUT INPUT 0.00 0.00

    0.00 0.00 0.00

    7 INPUT INPUT 0.00 0.00

    5

    0.000 00/01/1900 00:00 0.00 0.00 0.00

    SELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE INSELECT or TYPE IN

    6 INPUT INPUT

    INPUT INPUT 0.00 0.00

    0.0000/01/1900

    Reason for Data Pair Removal

    SELECT or TYPE IN

    MAX SRM - MIN SRM 1.86 SUM -0.98 2.67(DAILY) DELV (mg/m³) 1095% CI MU (%)

    0 00/01/1900

    SELECT or TYPE IN

    00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00

    0 0.00 0.000

    00/01/190000:00

    0.004 INPUT INPUT 0.00 0.00

    Time (30-minute Average)

    x, CEM (WET) mg/m³

    y, SRM (WET) mg/m³

    1

    CAT-14181 (Version X)26 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • PLOT 1: GRAPH FOR REFERENCE SRM vs REFERENCE CEM (STANDARDISED) (30 minute rolling averages)

    Variability Test Datawhere CAL = Calibrated using AST calibration functions

    HYDROGEN CHLORIDE: AST CALCULATIONS(Page 2 of 3)

    CAL CEM SRM ys, SRM - Pair Date Time

    COPY PLOT 1: 30/60-MINUTE ROLLING AVERAGE TREND GRAPH INTO HERE

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    CAL CALCAL CEM

    Section 4B - Data and Calculations - AST

    CEM CEM SRM CEM CEM SRM

    0.0

    2.0

    4.0

    6.0

    8.0

    10.0

    12.0

    14.0

    16.0

    18.0

    20.0

    00:0

    0

    00:3

    0

    01:0

    0

    01:3

    0

    02:0

    0

    02:3

    0

    03:0

    0

    03:3

    0

    04:0

    0

    04:3

    0

    05:0

    0

    05:3

    0

    mg/

    Time

    HCl (CEM - 30 min)HCl (SRM - 30 min)

    0.00 0.00 0.00

    0.00

    00:00 0.000.00 0.000.00 0.00

    15/05/2018 00:32 - 01:02 7.58

    16.36 15.7910.22 8.93

    0.00

    00:00

    00:00 0.00

    00/01/19000.00

    0 00/01/1900

    0.00

    00/01/1900

    00/01/1900 00:00 0.00

    0.00 0.00 0.000 00/01/1900

    00/01/1900 00:00 0.00 0.00 0.00

    0.00

    0.000.00

    0.00 0.000 00/01/1900 00:00 0.00

    0

    00:00 0.00

    0.00 0.0000/01/1900 00:00 0.00

    0

    0 00/01/1900

    0.00

    0.00

    0.00 0.00

    0.00

    00.00

    0.00

    0.00 0.00 0.00 0.00

    -1.294 15/05/2018 03:32 - 04:02 6.98 8.50 8.98

    15.86

    0.00

    00:00

    00:00

    00/01/1900

    CAL CEM (STP, DRY,

    10% O₂) mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    ys, SRM - CAL CEM

    Pair Date Time (30-minute Average)

    0.00

    0.00 0.00 0.00 0.00 0.00 0.000.00

    10.40 7.11 -3.293

    00.00 0.00 0.00

    0

    15/05/2018 02:32 - 03:02 8.28

    15.93 15.37 15.65 9.79 10.30 10.08

    10.1615.64

    0.00 0.00 0.00

    1 15.93 9.86 10.37

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00

    0.00 0.00

    15.30 15.54 9.78

    CAL CEM (STP, WET)

    mg/m³

    9.29

    MAX 10.40 Sd 1.43

    00:00 0.00

    16.25 15.68 15.91 9.78

    0.00 0.00 0.00 0.00 0.00 0.00

    6 15/05/2018 05:32 - 06:02 6.72 8.15

    7.40 -1.892 15/05/2018 01:32 - 02:02 8.54

    0 00/01/1900 00:00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    0.00

    10.0416.16 15.59 15.83 9.94 10.45 10.21

    16.02 9.77 10.28 10.31

    0.00 0.00 0.00

    8.19 0.04

    0.47

    0

    00/01/1900 00:00 0.00

    0.000 00/01/1900

    0

    5

    00/01/1900 00:00 0.00 0.00 0.00 0.00

    15/05/2018 04:32 - 05:02 7.23 8.78 8.74 -0.05

    0 00/01/1900 0.0000:00 0.00 0.00 0.00

    0

    0 00/01/1900 0.00

    00:00 0.00 0.00

    0.000 00/01/1900 00:00 0.00 0.00 0.00

    0.00 0.00

    10.29

    0.00 0.0000/01/1900 00:00

    0 00/01/1900 00:00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.00

    0 00/01/1900 00:00 0.00 0.00 0.00 0.000 00/01/1900 00:00 0.00 0.00 0.00 0.000 00:0000/01/1900 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00

    0.00

    10.29 10.05

    0.00 0.000

    0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    0.00

    0.00 0.00

    CEMWater Vapour% v/v

    CEMWater Vapour% v/v

    SRMWater Vapour% v/v

    CEMOxygen (DRY)% v/v

    CEMOxygen (DRY)% v/v

    SRMOxygen (DRY)% v/v

    16.21

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    0.00

    0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00

    CAT-14181 (Version X)27 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Test of Variability Test of Calibration (Acceptance of Calibration Function)

    where N (number of samples) = 6

    The variability is accepted if Sd ≤1.5 x Q₀ x Kv The calibration is accepted if D < t0.95 (N-1) x Sd / SQRT (N) + Q₀

    PLOT 2: X-Y Plot - REF CAL CEM vs REF SRM Values

    Value Parameter ValueStandard Deviation (Sd) 1.43 Mean Difference (D)

    t0.95 (N-1) x Sd / SQRT (N) + Q₀2.86

    2.015Kv for 6 Pairs of Data 0.9329

    Parameter

    Q₀ = ELV x (MU / 100) / 1.96 2.04 t0.95 (N-1)

    Outcome of Calibration Test Pass

    Existing Range Still Valid

    1.001.5 x Q₀ x Kv 3.22Outcome of Variability Test Pass

    Section 4B - Data and Calculations - AST

    HYDROGEN CHLORIDE: AST CALCULATIONS(Page 3 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    a) Calibrated Range (10% extension) (mg/m³) 0 to 11.4b) Calibrated Range (50% of Daily ELV) (mg/m³) 0 to 5

    New range up to a maximum of 50% of the Daily ELV 0 to 5

    New Calibration Range (REF)

    12.0

    14.0

    16.0 DATE/S: 15/05/2018 to 15/05/2018

    COPY APPROPRIATE PLOT 2: X-Y PLOT OF REF CAL CEM vs REF SRM VALUES (choose the graph with or without the AST extension)

    -4.0

    -2.0

    0.0

    2.0

    4.0

    6.0

    8.0

    10.0

    12.0

    -2.0 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0

    SRM

    mg/

    m³ (

    REF)

    CAL CEM mg/m³ (REF)

    HClCalibration Range

    CAT-14181 (Version X)28 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • Calibration Data

    32.71

    0.00

    -3.17

    15:32 - 16:02 29.03 28.11 33.70 -1.61 -1.98 3.19 2.59 30.99

    0.08

    15/05/2018 07:32 - 08:02 32.89

    00/01/1900 00:00

    34.14

    0.00 0.00 0.00 0.00 0.00

    29.50 30.31 36.04 -1.14 0.22 -0.25 1.30 31.52

    00/01/1900 00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 00/01/1900

    15/05/2018 03:32 - 04:02 30.55 31.16 38.18 -0.09 1.07 0.01

    15/05/2018 05:32 - 06:02

    33.1213 15/05/2018 12:32 - 13:02 31.82 30.72 36.50

    69.06 8.72 36.15

    09:32 - 10:02 32.2533.97 32.86 39.10 3.34 2.77 9.24 11.13 36.58

    12 15/05/2018

    31.90

    0.00 0.00 0.00 0.00

    0.00

    -0.57 -1.05 0.32

    36.47 -1.06 -0.40 0.4215/05/2018 22:32 - 23:02 29.57 29.69

    0.0000/01/1900 00:00 0.00

    00:00

    1415

    15/05/2018 18:32 - 19:02

    1.13 31.610

    15/05/2018

    0.000.00 0.00

    39.62 2.29

    0 0.00

    25.90

    1.81 4.09 5.08

    2.76 3.66

    22 15/05/2018 21:32 - 22:02 25.47

    1.80 4.13 5.23 35.40

    01:32 - 02:02 25.84

    (Page 1 of 3)

    Lafarge Ireland Ltd, Cookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Pair Date

    15/05/2018 00:32 - 01:02 28.68 28.24 34.0916.24 14.58

    y, SRM (STP, WET)

    mg/m³

    SRM (STP, DRY,

    10% O₂) mg/m³

    15/05/2018

    30.07 29.05 34.96 0.60

    -4.19 21.65 26.64 26.9823

    17

    7 15/05/2018 06:32 - 07:02 33.59

    0

    18 15/05/2018 17:32 - 18:02 30.19 29.37

    31.89 -5.16

    0.00 0.000.00

    34.4221 15/05/2018 20:32 - 21:02 31.51 31.10 37.75 0.87 1.00 0.88 0.76 33.80

    33.16

    0.74

    38.04 1.43 1.48 2.11 2.03

    10 15/05/2018

    15/05/2018 13:32 - 14:02 32.55

    1.61 0.61 0.98 2.60

    15/05/2018

    2.25

    5

    11 15/05/2018 10:32 - 11:02

    31.91

    11:32 - 12:02 30.91

    14:32 - 15:02 32.92

    30.43 36.54 0.28

    32.3119

    31.53

    8 37.69 35.369 15/05/2018 08:32 - 09:02 33.83

    16

    Section 4B - Data and Calculations - AST

    AMMONIA: AST CALCULATIONS

    29.23

    6.62

    26.823.81 30.61

    4 -0.0933.70 -3.52 -1.88 12.39 28.8315/05/2018

    3.61

    3 15/05/2018 02:32 - 03:02 27.4728.50

    x - xav(A)

    y - yav(B)

    (A) x (B) (x - xav)² CAL CEM (STP, WET)

    mg/m³

    130.83 -3.82 -4.252 15/05/2018

    Time (30-minute Average)

    x, CEM (STP, WET)

    mg/m³

    6.75 10.02

    20 15/05/2018 19:32 - 20:02 32.06 31.57

    16:32 - 17:02 31.86 30.92 38.02 1.22 0.82 1.00 1.49

    34.97

    34.19

    39.34 2.95 3.07

    0.00 0.00

    36.42

    27.96 33.87

    28.21

    -1.95 -1.85

    0.00

    0.34

    0.32 0.20

    4.46 10.2231.49 37.45 3.20 1.40

    35.21 -0.45 -0.73

    30.70 38.26

    1.91 1.44

    -2.13

    1.18 0.63

    34.63

    1.3938.64

    0.09

    32.17

    04:32 - 05:02 27.12

    0.00

    Daily

    Outliers Data

    INPUT INPUT 0.00

    SELECT or TYPE INSELECT or TYPE IN

    INPUT 0.00 0.00

    00:00 0.00

    98.60

    00/01/1900 00:00

    0.003 INPUT

    0.00 0.00

    00/01/19000.00 0.00 0.00 0.00

    INPUT

    00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 00/01/1900

    0.00

    8 INPUTINPUT

    1

    SELECT or TYPE INSELECT or TYPE IN

    Reason for Data Pair Removal

    SELECT or TYPE INSELECT or TYPE IN

    0.00

    9 INPUT 0.00 0.0010 INPUT INPUT 0.00 0.00

    0.00INPUT 0.00

    0

    SELECT or TYPE IN

    0

    00/01/1900

    0.00 0.000.00

    0.00 0.00 0.00 0.00

    0

    00:00 0.00

    7 INPUT6 INPUT INPUT 0.00 0.00

    4 INPUT INPUT5 INPUT INPUT 0.00 0.00

    INPUT 0.00 0.00

    125.39ELV (mg/m³) 5095% CI MU (%) 40

    Existing Calibration Function Source of Existing Calibration Functiony = 1.1299x -1.804 CEK-2320 Exova Catalyst QAL2 Report (Standby Analyser)

    Existing Calibration Range (@ REF Conditions)0 to 60.2 mg/m³

    0.00 0.00 0.00 0.00 0.00

    x, CEM (WET) mg/m³

    y, SRM (WET) mg/m³

    0.00 0.00

    Pair Date Time (30-minute Average)

    SELECT or TYPE IN

    SELECT or TYPE INSELECT or TYPE IN

    MAX SRM - MIN SRM 8.78 SUM

    0.00 0.000.00 0.00

    2INPUT

    CAT-14181 (Version X)29 of 37

    Lafarge Ireland LtdCookstown WorksA8 - Kiln Exhaust Main Stack (Standby Analyser)

    Job Number: CEK-2909, Version 1Sample Date/s: 15th - 16th May 2018

    PPC Permit: P0052/04A/V6

  • PLOT 1: GRAPH FOR REFERENCE SRM vs REFERENCE CEM (STANDARDISED) (30 minute rolling averages)

    Variability Test Datawhere CAL = Calibrated using AST calibration functionsCAL

    COPY PLOT 1: 30/60-MINUTE ROLLING AVERAGE TREND GRAPH INTO HERE

    (Page 2 of 3)

    Time CAL CEM CAL

    CEM CEM

    AMMONIA: AST CALCULATIONS

    Pair Date

    Section 4B - Data and Calculat