cover + daftar isi seminar waktu edar shovel pc4000

13
PENGAMATAN KONDISI FRONT DAN WAKTU EDAR ALAT MUAT PC 4000 SHOVEL SEMINAR INDUSTRI Oleh : OKTAVIANUS ARBI NIM : 712214269

Upload: furqanmahmudabusyra

Post on 08-Dec-2015

224 views

Category:

Documents


0 download

DESCRIPTION

Waktu Edar Shovel PC4000

TRANSCRIPT

Page 1: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

PENGAMATAN KONDISI FRONT DAN WAKTU EDAR ALAT MUAT PC 4000 SHOVEL

SEMINAR INDUSTRI

Oleh :OKTAVIANUS ARBI

NIM : 712214269

JURUSAN TEKNIK PERTAMBANGANSEKOLAH TINGGI TEKNOLOGI NASIONAL

YOGYAKARTA2015

Page 2: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

PENGAMATAN KONDISI FRONT DAN WAKTU EDAR ALAT MUAT PC 4000 SHOVEL

Dibuat Sebagai Salah Satu Syarat Untuk Memenuhi Mata Kuliah Seminar IndustriPada Jurusan Teknik Pertambangan Sekolah Tinggi Teknologi Nasional

Yogyakarta

Disusun Oleh :OKTAVIANUS ARBI

NIM : 712214269

MengetahuiKetua Jurusan T.Pertambangan

( Ir. Ag. Isjudarto, MT )NIK : 19730068

Yogyakarta, September 2015

MenyetujuiDosen Pembimbing

( R. Andy Erwin Wijaya , ST.MT ) NIK : 1973 0227

ii

Page 3: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

SARI

Penambangan adalah suatu kegiatan yang ditunjukan untuk mengambil bahan galian, mineral dan batubara dari dalam kulit bumi yang kemudian membawanya ke atas permukaan bumi untuk dapat dimanfaatkan. Dalam dunia pertambangan dikenal metode tambang terbuka, metode tambang terbuka ini adalah sebuah aktivitas penambangan yang melakukan pembuatan lubang bukaan pada permukaan bumi untuk memindahkan lapisan batuan dan tanah penutup dan mengambil bahan galian, mineral dan batubara dengan alat-alat mekanis, aktivitas ini dinamakan produksi.

Kegiatan produksi ini berlangsung di area front loading yang telah disediakan oleh engineer, front loading adalah sebuah tempat dimana disana dilakukan berbagai aktivitas produksi oleh alat-alat mekanis, seperti melakukan pemuatan dan manuver semakin lebar area front loading maka semakin kecil waktu edar alat muat dan angkut, semakin luas area front loading maka semakin mudah juga penentuan pola muat dan alat yang digunakan.

Waktu edar atau waktu siklus adalah waktu untuk produktiviti suatu alat yang sedang bekerja, waktu edar akan berpengaruh ke target produksi dan produktiviti apabila keadaan front loading tidak ideal untuk alat muat dan alat angkut, maka dari itu untuk mencapai waktu optimal untuk loading dan angkut kondisi area front loading harus diperhatikan sebelum meletakan alat-alat mekanis

Front loading yang ideal dan waktu kerja yang ideal untuk alat muat Komatsu PC 4000 shovel dapat dilihat dari hasil pengamatan lapangan dan parameter kerja unit dari perusahaan, untuk front loading ideal PC 4000 shovel dari hasil pengamatan lebar front maksimal ± 52.8 meter, tinggi jenjang 12.6 meter, sedangkan front loading dari parameter lebar front maksimal 45 meter dan tinggi jenjang maksimal 11.5 meter dan untuk waktu siklus alat muat PC 4000 shovel dari parameter waktu minimal 24 detik dan waktu maksimal 30 detik dan dari data aktual minimal 24 detik dan waktu maksimal 74 detik .

iii

Page 4: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

KATA PENGANTAR

Puji dan syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa,

karena atas rahmat dan karunia-Nya sehingga penulis dapat menyelesaikan

Seminar Industri ini dengan baik. Penyusunan seminar industri dengan judul

“Pengamatan Kondisi Front dan Waktu Edar Alat Muat Komatsu PC 4000

Shovel” sebagai salah satu syarat untuk memenuhi kurikulum semester VII pada

Jurusan Teknik Pertambangan Sekolah Tinggi Teknologi Nasional Yogyakarta

Pada kesempatan ini, penulis ingin mengucapkan banyak terima kasih

kepada :

1. Bapak Ir. H. Ircham, MT, Selaku Ketua Sekolah Tinggi Teknologi

Nasional Yogyakarta.

2. Bapak Ir. Ag. Isjudarto, MT, selaku Ketua Jurusan Teknik

Pertambangan Sekolah Tinggi Teknologi Nasional Yogyakarta.

3. R. Andy Erwin Wijaya, ST.MT selaku Dosen Pembimbing

4. Orang tua saya Bapak Gandi Landuk dan Ibu Ita Riani yang turut serta

mendoakan dan mendukung dalam menyelesaikan seminar ini.

5. Muhamad, Amd. M. Rizky Aditya, Amd. Hadriansyah, Amd. dan

semua teman-teman seperjuangan yang telah banyak membantu dan

memberikan masukan sehingga laporan ini dapat terselesaikan.

6. Meta Yulistira, SE yang selalu memberi semangat sehingga laporan ini

dapat terselesaikan.

Penulis menyadari bahwa penulisan ini masih jauh dari kesempurnaan.

Untuk itu kritik dan saran yang sifatnya membangun sangat penulis harapkan

guna perbaikan pada penulisan berikutnya.

Yogyakarta, September 2015

Penulis

iv

Page 5: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

DAFTAR ISI

Halaman

HALAMAN JUDUL....................................................................................... i

HALAMAN PENGESAHAN........................................................................ ii

SARI ................................................................................................................ iii

KATA PENGANTAR ................................................................................... iv

DAFTAR ISI................................................................................................... v

DAFTAR GAMBAR...................................................................................... vii

DAFTAR TABEL........................................................................................... viii

BAB I PENDAHULUAN............................................................................... 1

1.1 Latar Belakang............................................................................... 1

1.2 Perumusan Masalah........................................................................ 2

1.3 Batasan Masalah............................................................................. 2

1.4 Tujuan Penulisan............................................................................ 2

1.5 Metode Penelitian........................................................................... 2

1.6 Manfaat Penulisan.......................................................................... 3

BAB II TINJAUAN UMUM.......................................................................... 4

2.1 Sejarah dan Perkembangan Excavator........................................... 4

2.2 Penggunaan Excavator................................................................... 5

2.3 Excavator Pertama Di Dunia.......................................................... 5

2.4 Teknologi Modern.......................................................................... 6

2.5 Excavator Terbesar Di Dunia......................................................... 7

BAB III LANDASAN TEORI....................................................................... 8

3.1 Penambangan.................................................................................. 8

3.2 Analisis Tempat Kerja.................................................................... 8

3.2.1 Kondisi Front Kerja.............................................................. 8

3.2.2 Pola Muat.............................................................................. 9

3.2.2.1 Prosedur Kerja Double Side Loading....................... 9

v

Page 6: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

3.3 Waktu Edar ....................................................................................11

3.4 Faktor-faktor Yang Mempengaruhi Waktu Edar Alat Muat ..........12

3.4.1 Parameter Kondisi Front .......................................................12

3.4.2 Kondisi Material ...................................................................13

3.4.3 Keterampilan Operator ..........................................................14

BAB IV PEMBAHASAN...............................................................................15

4.1 Keadaan Lokasi Penambangan ......................................................15

4.2 Hasi Pengamatan Lapangan ...........................................................17

4.2.1 Spesifikasi Alat Muat ...........................................................18

..............................................................................................................

4.3 Kondisi Front PC 4000 Shovel 03A...............................................19

4.3.1 Lebar Front dan Tinggi Jenjang Kerja..................................23

4.3.2 Kondisi Lantai Front PC 4000 Shovel 03A ..........................26

4.3.3 Metode Loading Pada Front PC 4000 Shovel 03A...............29

4.4.3 Waktu Edar Alat Muat...........................................................31

BAB V KESIMPULAN DAN SARAN..........................................................42

5.1 Kesimpulan.....................................................................................42

..............................................................................................................

5.2 Saran...............................................................................................42

..............................................................................................................

DAFTAR PUSTAKA......................................................................................43

vi

Page 7: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

DAFTAR GAMBAR

Gambar Halaman

4.1 Peta Keadaan Lokasi Penambangan PT. Sapta Indra Sejati....................... 15

4.2 Keadaan Lokasi Pit West di PT. Sapta Indra Sejati.................................... 16

4.3 Keadaan Lokasi Pit South 2 di PT. Sapta Indra Sejati................................ 16

4.4 Alat Muat Pada Saat Pengamatan di PT. Sapta Indra Sejati....................... 17

4.5 Lebar Front Maksimal PC 4000 Shovel 03A............................................. 23

4.6 Lebar Front Minimal PC 4000 Shovel 03A................................................ 24

4.7 Tinggi Jenjang Maksimal di Pit West Front PC 4000 Shovel 03A............. 25

4.8 Tinggi Jenjang Minimal Front PC 4000 Shovel 03A.................................. 26

4.9 Kondisi Lantai Front PC 4000 Shovel 03A................................................ 27

4.10 Kondisi Lantai Front PC 4000 Shovel 03A di Pit West............................ 28

4.11 Kondisi Lantai Front PC 4000 Shovel 03A di Pit West............................ 28

4.12 Pola Muat Pada Front PC 4000 Shovel 03A di Pit West............................ 31

4.13 Aktivitas Digingg di Pit South 2................................................................. 32

4.14 Aktivitas Digingg di West........................................................................... 32

4.15 Aktivitas Swing Load di Pit South 2.......................................................... 34

4.16 Aktivitas Swing Load di Pit West.............................................................. 34

4.17 Aktivitas Dumping di Pit South 2............................................................... 36

4.18 Aktivitas Dumping di Pit West................................................................... 36

4.19 Aktivitas Swing Empty di Pit South 2......................................................... 38

4.20 Aktivitas Swing Empty di Pit West............................................................. 38

vii

Page 8: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

DAFTAR TABEL

Tabel Halaman

3.1 Standar Waktu Edar Alat Muat................................................................... 12

3.2 Standar Dimensi Kerja Alat Muat .............................................................. 13

3.3 Tabel Faktor Konversi................................................................................ 13

4.1 Spesifikasi Alat Excavator Komatsu PC 4000 Shovel................................ 18

4.2 Hasil Pengamatan ....................................................................................... 20

4.3 Standar Dimensi Kerja Alat Muat............................................................... 25

4.4 Waktu Diging.............................................................................................. 33

4.5 Waktu Swing Load...................................................................................... 35

4.6 Waktu Dumping.......................................................................................... 37

4.7 Waktu Swing Empty.................................................................................... 39

4.8 Waktu Siklus Pengamatan 1....................................................................... 40

4.9 Waktu Siklus Pengamatan 5....................................................................... 40

4.10 Waktu Siklus Pengamatan 6....................................................................... 41

viii

Page 9: Cover + Daftar isi Seminar Waktu Edar Shovel PC4000

ix